Point Happy TR 31348 BCPR2022-0016PLAN SNAPSHOT REPORT BCPR2022-0016
FOR CITY OF LA QUINTA
Building Construction Plan Review 08/08/2022App Date:Plan No.:Plan Type:BCPR2022-0016
City of La QuintaBuilding Construction Plan Review 06/29/2024Exp Date:District:Work Class:
0.00Expired NOT COMPLETEDCompleted:Square Feet:Status:
Description:
Valuation:
POINT HAPPY / MASTER SOLAR PLANS FOR THE 2019 CODE CYCLE
POINT HAPPY / SOLAR PHOTOVOLTAIC MASTER PLANS FOR PLAN TYPES 1, 2 & 2X FOR THE
2019 CODE CYCLE. INDIVIDUAL PERMITS TO BE ISSUED FOR EACH ADDRESS. 2019 CALIFORNIA
BUILDING CODES.
ALL PLAN TYPES: 6.3kW SOLAR ARRAY - (18) 350W LSUNPOWER SPR-X21-350-BLK-E-AC
MODULES W/ INTEGRATED MICROINVERTERS + 100A PV LOAD CENTER [360SF]. SOLAR ARRAY
TO BE ORIENTED BETWEEN 105°-300° AZIMUTH.Edit
REVISION #1 - NEW ROOF LAYOUTS + NEW SYSTEM ATTRIBUTES OF ALL PLAN TYPES: 6.48kW
SOLAR ARRAY - (16) 405W HANWHA Q CELLS Q.PEAK DUO BLK ML-G10+ PANELS + W/ (16)
ENPHASE IQ7HS-66-M-US MICROINVERTERS [346SF]
REVISION #2 - ADDITION OF OPTIONAL ESS
$0.00 Assigned To:Approval
Expire Date:06/29/2024
Parcel:Main643240044 Address:Point Happy
Main Zone:
Applicant
Jared Nast
195 Park Dr Apt C Boston, MA
02215
Contractor
Amy Clemans
1414 HARBOUR WAY S SUITE
1901 RICHMOND, CA 94804
Applicant
Amy Clemans
1414 HARBOUR WAY S SUITE
1901 RICHMOND, CA 94804
Plan Custom Fields
Tract / Subdivision
Name
POINT HAPPY Tract Number 31348 Model/Series Name MASTER SOLAR PLANS
Number of Plan Types SFDX3 Code Edition 2019 Is this a revision?No
General Plan ROW City Limits Within La Quinta City
Limits
Acreage 2.3
Subdivision Name TR 31348 AMEND Lot Number I Legal Description Lot I MB 390/1 TR 31348
AMEND
Centerlines 88528, 87924, 88204,
88526, 87927, 88529,
87925, 87928, 87929,
87926
Lot Size 13511
Attachment File Name Added On Added By Attachment Group Notes
BCPR2022-0016 - REVISION 1 - SOLAR
PLAN (APPROVED).pdf
09/21/2023 22:54 Ortega, AJ Available Online
BCPR2022-0016 - SOLAR MASTER
PLANS (APPROVED).pdf
09/21/2023 22:54 Ortega, AJ Available Online
BCPR2022-0016 - TAKEOFF
SHEETS.pdf
09/21/2023 22:54 Ortega, AJ Internal Only TAKE OFF SHEETS
Point Happy master Resubmittal
Letter.pdf
09/21/2023 22:54 Ortega, AJ Available Online
DO NOT USE -- INCORRECT.pdf 12/19/2023 10:20 Fuson, Jake Internal Only Construction Plan Set
REVISION #2 - NARRATIVE OF
CHANGES.pdf
12/19/2023 10:20 Fuson, Jake Available Online Revision Narrative
DO NOT USE -- INCORRECT.pdf 12/19/2023 10:35 Fuson, Jake Internal Only
REVISION #2 - MASTER PLAN
(APPROVED).pdf
12/20/2023 13:43 Fuson, Jake Available Online
Page 1 of 578-495 Calle TampicoJune 24, 2025
PLAN SNAPSHOT REPORT (BCPR2022-0016)
Created ByNote Date and Time Created
1.Deisy MendezMUST SUBMIT A REVISED NARRATIVE LETTER TO INDICATE
THE SYSTEM SIZE CHANGES
01/18/2024 14:53
Invoice No.Amount PaidFeeFee Amount
INV-00003192 $218.75 Hourly Charge - City Building Staff $218.75
$5.47 Credit Card Convenience Fee $5.47
$224.22 $224.22 Total for Invoice INV-00003192
Grand Total for Plan $224.22 $224.22
Submittal Name Status Received Date Due Date Complete Date Resubmit Completed
Requires Re-submitBuilding Revision Review v.1 09/22/2023 09/29/2023 11/20/2023 Yes Yes
Completed
Date
Due
Date
Assigned
DateStatusAssigned UserDepartmentItem Review Name
Building (1 Day)Building Fuson, Jake Revisions Required 09/22/2023 09/29/2023 11/17/2023
Comments: REVISION #1 - ADD OPTIONAL ESS
Correction Type Category Corrective ActionComments Resolved Create
Date
Resolved
Date
Building Review -
Correction
Building Review -
Correction
-CONDUCTORS AND
SUBPANEL ARE SHOWN AS
'EXISTING BY OTHERS'
HOWEVER NO SUBPANEL IS
SHOWN IN THE SINGLE LINE
DIAGRAM OF THE DWELLING
PLANS, PLEASE REVISE.
-ALUMINUM CONDUCTORS
SHALL NOT BE SMALLER
THAN 1/0 AWG PER LQMC
8.03.030, PLEASE REVISE
-ATTACHED GARAGES IN
WHICH ESS ARE INSTALLED
SHALL BE PROTECTED BY A
HEAT DETECTOR, LISTED AND
INTERCONNECTED TO THE
SMOKE ALARMS. (CRC
R328.7)
-IT APPEARS THAT THE
OUTPUT CURRENT FROM THE
HUB+ AND THE GRID WILL
EXCEED THE MAXIMUM
AMPACITY OF THE BUSBAR
AT THE MAIN SERVICE PANEL.
PLEASE DEMONSTRATE
COMPLIANCE WITH CEC
705.12(B)(2)(3)
Building Department review
correction
No 11/17/2023
Submittal Name Status Received Date Due Date Complete Date Resubmit Completed
ApprovedBuilding Revision Review v.2 11/29/2023 12/06/2023 12/19/2023 No Yes
Page 2 of 578-495 Calle TampicoJune 24, 2025
PLAN SNAPSHOT REPORT (BCPR2022-0016)
Completed
Date
Due
Date
Assigned
DateStatusAssigned UserDepartmentItem Review Name
Building (1 Day)Building Fuson, Jake Approved 11/29/2023 12/06/2023 12/19/2023
Comments: REVISION #2 - ADDITION OF OPTIONAL ESS
Correction Type Category Corrective ActionComments Resolved Create
Date
Resolved
Date
Building Review -
Correction
Building Review -
Correction
-CONDUCTORS AND
SUBPANEL ARE SHOWN AS
'EXISTING BY OTHERS'
HOWEVER NO SUBPANEL IS
SHOWN IN THE SINGLE LINE
DIAGRAM OF THE DWELLING
PLANS, PLEASE REVISE.
-ALUMINUM CONDUCTORS
SHALL NOT BE SMALLER
THAN 1/0 AWG PER LQMC
8.03.030, PLEASE REVISE
-ATTACHED GARAGES IN
WHICH ESS ARE INSTALLED
SHALL BE PROTECTED BY A
HEAT DETECTOR, LISTED AND
INTERCONNECTED TO THE
SMOKE ALARMS. (CRC
R328.7)
-IT APPEARS THAT THE
OUTPUT CURRENT FROM THE
HUB+ AND THE GRID WILL
EXCEED THE MAXIMUM
AMPACITY OF THE BUSBAR
AT THE MAIN SERVICE PANEL.
PLEASE DEMONSTRATE
COMPLIANCE WITH CEC
705.12(B)(2)(3)
Building Department review
correction
Yes 11/29/2023 12/19/2023
Submittal Name Status Received Date Due Date Complete Date Resubmit Completed
Requires Re-submitBuilding Revision Review v.1 12/20/2023 12/29/2023 01/10/2024 Yes Yes
Page 3 of 578-495 Calle TampicoJune 24, 2025
PLAN SNAPSHOT REPORT (BCPR2022-0016)
Completed
Date
Due
Date
Assigned
DateStatusAssigned UserDepartmentItem Review Name
Building (1WK)Building Fuson, Jake Revisions Required 12/20/2023 12/29/2023 01/09/2024
Comments: REVISION #2
Correction Type Category Corrective ActionComments Resolved Create
Date
Resolved
Date
Building Review -
Correction
Building Review -
Correction
1) Revise note on cover sheet
to read: “All construction shall
comply with the 2019
California Residential,
Mechanical, Electrical,
Plumbing, Green Building and
Energy Codes and the La
Quinta Municipal Code.”
Remove notes referencing
other codes.
2) The equipment was
changed from the original
submittal, please provide the
installation manuals for the IQ
System Controller and the IQ
Battery 5P.
3) Aluminum conductors are
permitted only if size 1/0 or
larger, and only to feed main
or sub-panels. All other
current carrying conductors
shall be copper. Please revise
conduit/conductor tag “C”.
(LQMC §8.03.040)
4) Conductors and subpanel
are shown as 'existing by
others' however no subpanels
are shown in the single line
diagram of the dwelling plans,
revised plans must be
approved through the dwelling
plans prior to approval of
these revised solar plans.
Building Department review
correction
No 01/09/2024
Submittal Name Status Received Date Due Date Complete Date Resubmit Completed
Requires Re-submitBuilding Revision Review v.2 01/22/2024 01/29/2024 01/26/2024 Yes Yes
Completed
Date
Due
Date
Assigned
DateStatusAssigned UserDepartmentItem Review Name
Building (1WK)Building Fuson, Jake Revisions Required 01/22/2024 01/29/2024 01/26/2024
Comments: REV3 - PC2. See 'Corrections' tab.
Correction Type Category Corrective ActionComments Resolved Create
Date
Resolved
Date
Building Review -
Correction
Building Review -
Correction
The original Revision #3
narrative did not denote the
reduction in DC system size.
After review, the proposed DC
system sizes of plans 2 & 2X
do not meet the minimum
required by the energy report
(6.2kW & 6.14kW). Other
previous corrections have
been resolved.
Building Department review
correction
No 01/22/2024
Submittal Name Status Received Date Due Date Complete Date Resubmit Completed
Requires Re-submitBuilding Revision Review v.3 02/12/2024 02/20/2024 02/15/2024 Yes Yes
Page 4 of 578-495 Calle TampicoJune 24, 2025
PLAN SNAPSHOT REPORT (BCPR2022-0016)
Completed
Date
Due
Date
Assigned
DateStatusAssigned UserDepartmentItem Review Name
Building (1WK)Building Fuson, Jake Revisions Required 02/12/2024 02/20/2024 02/15/2024
Comments: See "Corrections" tab.
Correction Type Category Corrective ActionComments Resolved Create
Date
Resolved
Date
Building Review -
Correction
Building Review -
Correction
Same correction applies, if
Title 24 Energy Report has
been revised it must be
submitted for review and
approval under the tract
dwelling construction plans in
order to be utilized to grant
solar PV approvals.
Building Department review
correction
No 02/12/2024
Workflow Step / Action Name Action Type Start Date End Date
Plan Check v.1 12/19/2023 10:20
Building Revision Review v.1 Receive Submittal 09/22/2023 0:00 11/20/2023 7:33
Building Revision Review v.2 Receive Submittal 11/29/2023 0:00 12/19/2023 10:20
Building Revision Review v.1 Receive Submittal 12/20/2023 0:00 01/10/2024 8:17
Building Revision Review v.2 Receive Submittal 01/22/2024 0:00 01/26/2024 11:47
Building Revision Review v.3 Receive Submittal 02/12/2024 0:00 02/15/2024 10:50
Building Revision Review v.4 Receive Submittal 02/15/2024 0:00
Linked Records v.1
Linked Permits v.1 Create Sub Permit
Page 5 of 578-495 Calle TampicoJune 24, 2025
BCPR2022-0016 – POINT HAPPY MASTER SOLAR PLAN
TAKE-OFFS
PLAN 1, 2 & 2X
Permit Notes:
PLAN 1, 2 OR 2X: 6.3kW SOLAR ARRAY - (18) 350W LSUNPOWER SPR-X21-350-BLK-E-AC MODULES W/
INTEGRATED MICROINVERTERS + 100A PV LOAD CENTER [360SF]. SOLAR ARRAY TO BE ORIENTED
BETWEEN 105°-300° AZIMUTH. 2019 CALIFORNIA BUILDING CODES.
Description:
POINT HAPPY / 6.3kW PV SYSTEM - (18) AC MODULES +100A SUB
Fee Breakdown:
- Building Standards Administration (BSAS)
- Electrical 2019
o PV System less than 10kW PC
o PV System less than 10kW
- Permit issuance
- Records Management Fee
- Technology Enhancement Fee
3/3/2023
BUILDING AND SAFETY DEPARTMENT
City of La Quinta
RE: RESUBMITAL LETTER
Plan Check Number/Permit Number:
Project Name:
Project Address:
Project Description:Rooftop Photovoltaic System Master Plan Permit Package for Point Happy
Sheet No.
PVA-0 to PVA-1 PVE-
1 to PVE-3
Should you have any additional questions, feel free to contact me.
Sincerely,
_____________________________
Gellie Greagnda / Design Engineer
Gellie.Greganda@sunpowercorp.com
1 TRANSITIONED TO 405W HANWHA Q-CELL AND UPDATED ELECTRICAL SHEETS
Change No. Description of Change
Point Happy
La Quinta, California 92253
9/12/2023
BUILDING AND SAFETY DEPARTMENT
City of La Quinta
RE: RESUBMITTAL LETTER
Plan Check Number/Permit Number:
Project Name:Point Happy
Project Address:
Sheet No.
PVA-0, PVA-4 to PVA-6,
PVE-1.2, PVE-1.4, PVE-2,
PVE-3, PVE-5
Should you have any additional questions, feel free to contact me.
Sincerely,
_____________________________
John Albert Reyes / Design Engineer
JohnAlbert.Reyes@sunpowercorp.com
2 ADDED ESS OPTION
Change No. Description of Change
La Quinta, California 92253
Rooftop Photovoltaic System Master Plan Permit Package for Point HappyProject Description: