BRES2022-0500 HERS ReportRegistration Number: 424-A020061538A-000-001-M01001A-0000 Registration Date/Time: 2024-04-09 17:56:22 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 17:57:30
SPACE CONDITIONING SYSTEMS, DUCTS, AND FANS CF2R-MCH-01-E
(Page 1 of 10)
CERTIFICATE OF INSTALLATION
Project Name: 58-892 Marbella Lot 60 Enforcement Agency: La Quinta, City of
Dwelling Address: 58-892 Marbella Lot 60 Permit Number: PENDING
City and Zip Code La Quinta, 92253 Permit Application Date: 2024-04-01
A. General Information
01 Dwelling Unit Name 58-892 Marbella Lot 60 02 Climate Zone 15
03 Dwelling Unit Total Conditioned
Floor Area (ft2)3000 04 Number of Space Conditioning
Systems in this Dwelling Unit.3
05 Certificate of Compliance Type Prescriptive alterations (CF1R-ALT )06 Method Used to Calculate HVAC
Loads (See Section 150.0(h))Not applicable - equipment changeout, like-for-like
07 Calculated Dwelling Unit
Sensible Cooling Load (Btu/h)n/a 08 Calculated Dwelling Unit Heating
Load (Btu/h)n/a
09 Dwelling Unit Number of
Bedrooms 3
MCH-01b - Space Conditioning Systems Ducts and Fans - Prescriptive Alterations
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
SPACE CONDITIONING SYSTEMS, DUCTS, AND FANS CF2R-MCH-01-E
(Page 2 of 10)
Registration Number: 424-A020061538A-000-001-M01001A-0000 Registration Date/Time: 2024-04-09 17:56:22 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 17:57:30
B. Space Conditioning (SC) System Information
01 02 03 04 05 06 07 08 09 10
SC System ID/
Name from
parent CC
SC System
Description of
Area Served
CFA served by this
SC System (ft2)
Is the SC system a
ducted system?
Does work
include installing
a refrigerant
containing
component?
Does work
include installing
new SC system
components?
Does work
include installing
more than 25 feet
of ducts?
Does work
include installing
an "entirely new
duct system"?
Does work
include installing
an "entirely new
SC system"?
Alteration Type
System 1 Living area 1000 Yes Yes Yes Yes Yes No
Entirely new or
complete
replacement duct
system with or
without
equipment
changeout
System 2 Master 1000 Yes Yes Yes Yes Yes No
Entirely new or
complete
replacement duct
system with or
without
equipment
changeout
System 3 Casita 1000 Yes Yes Yes Yes Yes No
Entirely new or
complete
replacement duct
system with or
without
equipment
changeout
Notes:
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
SPACE CONDITIONING SYSTEMS, DUCTS, AND FANS CF2R-MCH-01-E
(Page 3 of 10)
Registration Number: 424-A020061538A-000-001-M01001A-0000 Registration Date/Time: 2024-04-09 17:56:22 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 17:57:30
C. Space Conditioning (SC) System Alterations Compliance Information
01 02 03 04 05 06 07 08 09 10 11 12 13 14 15
SC System
ID/ Name
from
parent CC
SC System
Description
of Area
Served
Heating
System
Type
Altered
Heating
Componen
t
Heating
Efficiency
Type
Heating
Minimum
Efficiency
Value
Cooling
System
Type
Altered
Cooling
Componen
t
Cooling
Efficiency
Type
Cooling
Minimum
Efficiency
Value
SEER/SEER
2
Cooling
Minimum
Efficiency
Value
EER/EER2/
CEER
Required
Thermostat
Type
Number of
Indoor
Units for
this System
Number of
Ducted
Indoor
Units for
this System
Central Fan
Integrated
(CFI)
Ventilation
System
Status
System 1 Living area Electric
All new
heating
component
s
HSPF 0.8 Central
split HP
All new
cooling
component
s
EER/SEER 14 11.7 Setback n/a 1 Not a CFI
system
System 2 Master Electric
All new
heating
component
s
HSPF 0.8 Central
split HP
All new
cooling
component
s
EER/SEER 14 11.7 Setback n/a 1 Not a CFI
system
System 3 Casita Electric
All new
heating
component
s
HSPF 0.8 Central
split HP
All new
cooling
component
s
EER/SEER 14 11.7 Setback n/a 1 Not a CFI
system
Notes:
D. Installed Heating Equipment Information for Gas Furnace Indoor Unit, or Heat Pump Indoor Unit, or Packaged Unit (Gas Furnace or Heat Pump)
01 02 03 04 05 06 07 08 09 10
SC System ID/
Name from
parent CC
SC System
Description of
Area Served
Heating Efficiency
Type
Heating Efficiency
Value
Indoor Unit or
Packaged Unit
Manufacturer
Indoor Unit or
Packaged Unit
Model Number
Indoor Unit or
Packaged Unit
Serial Number
SC System Rated
Heating Capacity,
Output (Btu/h)
Multi-Split Systems only
Indoor Unit Name
or Description of
Area Served
Indoor Unit Duct
Status
System 1 Living area HSPF 0.8 AMANA ASPT49D14AD 2205127282 8 n/a n/a
System 2 Master HSPF 0.8 AMANA ASPT37C14AC 2208298121 8 n/a n/a
System 3 Casita HSPF 0.8 AMANA ASPT29B14AB ASPT29B14AB 8 n/a n/a
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
SPACE CONDITIONING SYSTEMS, DUCTS, AND FANS CF2R-MCH-01-E
(Page 4 of 10)
Registration Number: 424-A020061538A-000-001-M01001A-0000 Registration Date/Time: 2024-04-09 17:56:22 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 17:57:30
E. Installed Cooling Equipment Information for Outdoor Condenser or Packaged Unit (Air Conditioner or Heat Pump)
01 02 03 04 05 06 07 08 09 10
SC System ID/
Name from
parent CC
SC System
Description of
Area Served
Cooling Efficiency
Type
Cooling Efficiency
Value SEER/SEER2
Cooling Efficiency
Value EER/EER2/CEER
Condenser or Package
Unit Manufacturer
Condenser or Package
Unit Model Number
Condenser or
Package Unit
Serial Number
System Cooling
Capacity at
Design
Conditions
(Btu/h)
Condenser
Nominal
Capacity (tons)
System 1 Living area EER/SEER 14 11.7 GOODMAN GSZH504810AA 2310151351 48000 4
System 2 Master EER/SEER 14 11.7 GOODMAN GSZH503610AB GSZH503610AB 36000 3
System 3 Casita EER/SEER 14 11.7 GOODMAN GSZH502410AB 2403009323 24000 2
Notes:
F. Altered Space Conditioning System Duct Information ( < 75% of duct system is altered; or duct system is not altered)
This section does not apply to this project.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
SPACE CONDITIONING SYSTEMS, DUCTS, AND FANS CF2R-MCH-01-E
(Page 5 of 10)
Registration Number: 424-A020061538A-000-001-M01001A-0000 Registration Date/Time: 2024-04-09 17:56:22 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 17:57:30
G. Installed New or Complete Replacement Duct System Information
01 02 03 04 05 06 07 08 09 10 11 12 13 14 15
SC System
ID/ Name
from
parent CC
SC System
Description
of Area
Served
Indoor Unit
Name or
Description
of Area
Served
Total Duct
Length
Required
New Duct
R-Value
(Unconditi
oned
Space)
Supply
Duct
Location
New
Supply
Duct
R-Value
Return
Duct
Location
New
Return
Duct
R-Value
Exception
from
Minimum
R-Value
Method of
compliance
with
Airflow and
Fan Efficacy
Req's in
150.0(m)13
Number of
Air Filter
Devices on
Indoor
Units
Can
Approved
Airflow
Protocols
be used to
test this
System?
Can
Approved
Fan Efficacy
Protocol be
used to
test this
System?
Indoor Unit
Nominal
Cooling
capacity
(tons)
System 1 Living area Living room Ducted >
10ft length R-8
Conditione
d
space-
entirely
R-8
Conditione
d
space-
entirely
R-8 No
Exception
HERS
verified fan
efficacy
(W/cfm)
and airflow
rate
(cfm/ton)
2 Yes Yes n/a
System 2 Master 1 Ducted >
10ft length R-8
Conditione
d
space-
entirely
R-8
Conditione
d
space-
entirely
R-8 No
Exception
HERS
verified fan
efficacy
(W/cfm)
and airflow
rate
(cfm/ton)
1 Yes Yes n/a
System 3 Casita Casita Ducted >
10ft length R-8
Conditione
d
space-
entirely
R-8
Conditione
d
space-
entirely
R-8 No
Exception
HERS
verified fan
efficacy
(W/cfm)
and airflow
rate
(cfm/ton)
1 Yes Yes n/a
Notes
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
SPACE CONDITIONING SYSTEMS, DUCTS, AND FANS CF2R-MCH-01-E
(Page 6 of 10)
Registration Number: 424-A020061538A-000-001-M01001A-0000 Registration Date/Time: 2024-04-09 17:56:22 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 17:57:30
H. Installed Air Filter Device Information
Mandatory requirements for air filter devices are specified Section 150.0(m)12. The installer shall place a sticker in or near each filter grille that displays the design airflow rate
for that filter grille/rack and the maximum allowed clean filter pressure drop at the design airflow rate. This will inform the occupant of the airflow vs pressure drop
performance required for replacement air filters.
01 02 03 04 05 06 07 08 09 10 11 12 13
SC System
Identification
or Name
from parent
CC
SC System
Location or
Area Served
Indoor Unit
Name or
Description
of Area
Served
Air Filter
Name or
Description
of Location
Air Filter Rack
Type
Design
Airflow Rate
for Air Filter
Device (cfm)
Air Filter
Nominal
Depth (inch)
Air Filter
Nominal
Length (inch)
Air Filter
Nominal
Width (inch)
Air Filter
Calculated
Nominal Face
Area (inch2)
Air Filter
Required
Minimum
Face Area
(inch2)
Face Area
Compliance
Design
Allowable
Pressure
Drop for Air
Filter Device
(inch W.C.)
System 1 Living area Living room Filter 1 Filter Grille 15 1 20 20 400 14.4 Complies 0.1
System 1 Living area Living room Filter 2 Filter Grille 15 1 20 20 400 14.4 Complies 0.1
System 2 Master 1 Filter 3 Filter Grille 15 1 20 20 400 14.4 Complies 0.1
System 3 Casita Casita Filter 4 Filter Grille 15 1 20 20 400 14.4 Complies 0.1
Notes:
I. Air Filter Device Requirements
01 Mandatory Air Filter Device Requirements can be found in Section 150.0(m)12A-E. Some mandatory requirements may apply in addition to those listed below.
02 All recirculated air and all outdoor air (including make up air) supplied to the occupiable space is filtered before passing through the system's thermal conditioning components.
03
The space conditioning system shall be designed to accommodate the clean-filter pressure drop imposed by the system air filter device(s). The design airflow rate and maximum
allowable clean-filter pressure drop at the design airflow rate applicable to each air filter shall be determined by the system designer. The system installer shall affix a sticker/label to
each system air filter grille/rack locations that discloses the filter's design airflow rate and the filter's maximum allowable clean-filter pressure drop at the design airflow rate. The
sticker/labels shall be permanently affixed to the air filter grille/rack, readily legible, and visible to a person replacing the air filter.
04 All system air filter devices shall be located and installed in such a manner as to allow access and regular service by the system owner.
05
The system shall be provided with air filter media having a designated efficiency equal to or greater than MERV 6 when tested in accordance with ASHRAE Standard 52.2, or a particle
size efficiency rating equal to or greater than 50% in the 0.30 to1.0 m range and equal to or greater than 85 percent in the 1.0 - 3.0 m range when tested in accordance with AHRI
Standard 680.
06 The system shall be provided with air filters that have been labeled by the manufacturer to disclose efficiency and pressure drop ratings that conform to the efficiency and pressure drop
requirements for the air filter grilles/racks..
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
SPACE CONDITIONING SYSTEMS, DUCTS, AND FANS CF2R-MCH-01-E
(Page 7 of 10)
Registration Number: 424-A020061538A-000-001-M01001A-0000 Registration Date/Time: 2024-04-09 17:56:22 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 17:57:30
I. Air Filter Device Requirements
07 Filter racks or grilles shall use gaskets, sealing, or other means to close gaps around inserted filters and prevent air from bypassing the filter.
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met.
J. HERS Verification Requirements for Duct Systems
01 02 03 04 05 06 07 08 09
SC System
Identification or
Name
SC System
Description of Area
Served
Indoor Unit Name
or Description of
Area Served
Exemption From
Duct Leakage
Requirements
MCH-20
.
.
.
Duct Leakage Test
MCH-21
.
Duct Location
Verification
MCH-22
.
.
AHU Fan Efficacy
(W/cfm)
MCH-23
.
AHU Airflow Rate
(cfm/ton)
MCH-28
.
Return Duct Design
- Table 160.3-A or B
System 1 Living area Living room None Yes No Yes Yes No
System 2 Master 1 None Yes No Yes Yes No
System 3 Casita Casita None Yes No Yes Yes No
Notes:
K. HERS Verification Requirements For Space Conditioning Equipment
01 02 03
SC System ID/ Name from parent CC SC System Description of Area Served
MCH-25
.
.
Refrigerant Charge
System 1 Living area Yes
System 2 Master Yes
System 3 Casita Yes
Notes:
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
SPACE CONDITIONING SYSTEMS, DUCTS, AND FANS CF2R-MCH-01-E
(Page 8 of 10)
Registration Number: 424-A020061538A-000-001-M01001A-0000 Registration Date/Time: 2024-04-09 17:56:22 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 17:57:30
L. Space Conditioning Systems, Ducts and Fans Mandatory Requirements and Additional Measures
Additional mandatory requirements from Section 150.0 that are not listed here may be applicable to some systems. These requirements may be applicable to only newly
installed equipment or portions of the system that are altered. Existing equipment may be exempt from these requirements.
Heating Equipment
01 Equipment Efficiency: All heating equipment must meet the minimum efficiency requirements of Section 110.1 and Section 110.2(a) and the Appliance Efficiency Regulations.
02 Controls: All unitary heating systems, including heat pumps, must be controlled by a setback thermostat. These thermostats must be capable of allowing the occupant to program the
temperature set points for at least four different periods in 24 hours. See Sections 150.0(i), 110.2(b).
03 Sizing: Heating load calculations must be done on portions of the building served by new heating systems to prevent inadvertent undersizing or oversizing. See sections 150.0(h)1 and
2).
04 Furnace Temperature Rise: Central forced-air heating furnace installations must be configured to operate at or below the furnace manufacturer's maximum inlet-to-outlet temperature
rise specification. See Section 150.0(h)4.
05 Standby Losses and Pilot Lights: Fan-type central furnaces may not have a continuously burning pilot light. Section 110.5 and Section 110.2(d).
Cooling Equipment
06 Equipment Efficiency: All cooling equipment must meet the minimum efficiency requirements of Section 110.1 and Section 110.2(a) and the Appliance Efficiency Regulations.
07 Refrigerant Line Insulation: All refrigerant line insulation in split system air conditioners and heat pumps must meet the R-value and protection requirements of Section 150.0(j)2 and 3,
and Section 150.0(m)9.
08 Condensing Unit Location: Condensing units shall not be placed within five (5) feet of a dryer vent outlet. See Section 150.0(h)3A.
09 Liquid Line Filter Drier: A liquid line filter drier shall be installed according to the manufacturer's specifications 150.0(h)3B
10 Sizing: Cooling load calculations must be done on portions of the building served by new cooling systems to prevent inadvertent undersizing or oversizing. See Section 150.0(h)1 and 2.
Air Distribution System Ducts, Plenums and Fans
11 Insulation: The minimum duct insulation value is R-6 or ducts can be uninsulated if the duct system is located entirely in conditioned space. Note that higher values may be required by
the prescriptive or performance requirements. See Section 150.0(m)1B for exceptions.
12 Connections and Closures: All installed air-distribution system ducts and plenums must be, sealed and insulated to meet the requirements of CMC Sections 601.0, 602.0, 603.0, 604.0,
605.0 and ANSI/SMACNA-006-2006.
Heat Pump Thermostat
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
SPACE CONDITIONING SYSTEMS, DUCTS, AND FANS CF2R-MCH-01-E
(Page 9 of 10)
Registration Number: 424-A020061538A-000-001-M01001A-0000 Registration Date/Time: 2024-04-09 17:56:22 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 17:57:30
L. Space Conditioning Systems, Ducts and Fans Mandatory Requirements and Additional Measures
Additional mandatory requirements from Section 150.0 that are not listed here may be applicable to some systems. These requirements may be applicable to only newly
installed equipment or portions of the system that are altered. Existing equipment may be exempt from these requirements.
13 A thermostat shall be installed that meets the requirements of Section 110.2(b) and Section 110.2(c).
14 The thermostat shall be installed in accordance with the manufacturers published installation specifications
15 First stage of heating shall be assigned to heat pump heating.
16 Second stage back up heating shall be set to come on only when the indoor set temperature cannot be met.
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
SPACE CONDITIONING SYSTEMS, DUCTS, AND FANS CF2R-MCH-01-E
(Page 10 of 10)
Registration Number: 424-A020061538A-000-001-M01001A-0000 Registration Date/Time: 2024-04-09 17:56:22 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 17:57:30
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Angel Arechiga
Documentation Author Signature:
Company:
iPermit
Signature Date:
2024-04-09
Address:
31225 La Baya Drive
CEA/ HERS Certification Identification (if applicable):
RCN13516
City/State/Zip:
Westlake Village CA 91362
Phone:
818-735-7876
RESPONSIBLE PERSON'S DECLARATION STATEMENT
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Installation is true and correct.
2.II am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the
system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of
Installation, and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this
statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all
applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the
enforcement agency.
4.I understand that a registered copy of this Certificate of Installation shall be posted or made available with the building permit(s) issued for the building, and made
available to the enforcement agency for all applicable inspections, and I will take the necessary steps to ensure this requirement is accomplished.
5.I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at
occupancy, and I will take the necessary steps to ensure this requirement is accomplished.
Responsible Builder/Installer Name:
Tom Powers (authorized Angel Arechiga)
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or Builder/Owner)
DEH Mechanical Company Inc
Position With Company (Title):
Contractor/Installer
Address:
PO Box 12374
CSLB License:
752819
City/State/Zip:
Palm Desert CA 92255
Phone:
(760) 346-5354
Date Signed:
2024-04-09
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-A020061538A-000-001-M20002A-0000
Registration Date/Time: 2024-04-09 17:56:35 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 17:57:43
DUCT LEAKAGE DIAGNOSTIC TEST CF2R-MCH-20-H
(Page 1 of 4)
CERTIFICATE OF INSTALLATION
Project Name: 58-892 Marbella Lot 60 Enforcement Agency: La Quinta, City of
Dwelling Address: 58-892 Marbella Lot 60 Permit Number: PENDING
City and Zip Code La Quinta, 92253 Permit Application Date: 2024-04-01
A. System Information
01 Space Conditioning System Identification or Name System 1
02 Space Conditioning System Location or Area Served Living area
03 Indoor Unit Name or Description of Area Served Living room
04 Building Type from from parent CC Single family
05 Verified Low Leakage Ducts in Conditioned Space (VLLDCS) Credit
from parent CC?
No, credit is not taken
06 Verified Low Leakage Air Handling Unit Credit from parent CC?No, credit is not taken
07 Duct System Compliance Category New
08 Portions of Duct Located in Garage?No
09 Is the system type Small Duct High Velocity (SDHV) ?No
MCH-20a - Completely New Duct System
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
DUCT LEAKAGE DIAGNOSTIC TEST CF2R-MCH-20-H
(Page 2 of 4)
Registration Number:
424-A020061538A-000-001-M20002A-0000
Registration Date/Time: 2024-04-09 17:56:35 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 17:57:43
B. Duct Leakage Diagnostic Test
01 Air Handling Unit Airflow (AHU Airflow) Determination Method Cooling system method
02 Condenser Nominal Cooling Capacity (ton)4
03 Indoor Unit Nominal Cooling Capacity 4
04 Heating Capacity (kBtu/h)n/a
05 Conditioned Floor Area Served by this HVAC System (ft2)1000
06 Measured AHU Airflow (cfm)n/a
07 Duct Leakage Test Conditions Test final
08 Duct Leakage Test Method Total leakage
09 Leakage Factor 0.05
10 Calculated Target Allowable Duct Leakage (cfm)80
11 Actual Duct Leakage Rate from Leakage Test Measurement (cfm)80
12 Compliance Statement System passes leakage test
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
DUCT LEAKAGE DIAGNOSTIC TEST CF2R-MCH-20-H
(Page 3 of 4)
Registration Number:
424-A020061538A-000-001-M20002A-0000
Registration Date/Time: 2024-04-09 17:56:35 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 17:57:43
C. Additional Requirements for Compliance
01 System was tested in its normal operation condition. No temporary taping allowed.
02
Outside air (OA) duct connections to the central forced air duct system shall not be sealed/taped off during duct leakage testing. OA
ducts used for Central Fan Integrated (CFI) Indoor Air Quality ventilation systems, or Central Fan Ventilation Cooling Systems, that utilize
dampers that open only when OA is required and automatically close when OA is not required, may configure the OA damper to the
closed position during duct leakage testing.
03 All supply and return register boots were sealed to the drywall.
04 Building cavities were not used as plenums or platform returns in lieu of ducts.
05 If cloth backed tape was used it was covered with Mastic and draw bands.
06 All connection points between the air handler and the supply and return plenums are completely sealed.
Visual Inspection at Final Construction Stage (applicable if system was tested at rough-in).
After installing the interior finishing wall and verifying that the above rough-in tests was completed, the following procedure must be performed
07 For all supply and return registers, verify that the spaces between the register boot and the interior finishing wall are properly sealed.
08 If the house rough-in duct leakage test was conducted without an air handler installed, inspect the connection points between the air
handler and the supply and return plenums to verify that the connection points are properly sealed.
09 Inspect all joints to ensure that no cloth backed rubber adhesive duct tape is used.
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
DUCT LEAKAGE DIAGNOSTIC TEST CF2R-MCH-20-H
(Page 4 of 4)
Registration Number:
424-A020061538A-000-001-M20002A-0000
Registration Date/Time: 2024-04-09 17:56:35 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 17:57:43
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Angel Arechiga
Documentation Author Signature:
Company:
iPermit
Signature Date:
2024-04-09
Address:
31225 La Baya Drive
CEA/ HERS Certification Identification (if applicable):
RCN13516
City/State/Zip:
Westlake Village CA 91362
Phone:
818-735-7876
RESPONSIBLE PERSON'S DECLARATION STATEMENT
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this certificate of installation is true and correct.
2.I am either: a) a responsible person eligible under division 3 of the business and professions code in the applicable
classification to accept responsibility for the system design, construction, or installation of features, materials,
components, or manufactured devices for the scope of work identified on this certificate of installation, and attest to the
declarations in this statement, or b) i am an authorized representative of the responsible person and attest to the
declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on
this certificate of installation conforms to all applicable codes and regulations and the installation conforms to the
requirements given on the certificate of compliance, plans, and specifications approved by the enforcement agency.
4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the
installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner.
5.I understand that a registered copy of this certificate of installation shall be posted or made available with the building
permit(s) issued for the building and made available to the enforcement agency for all applicable inspections, and I will
take the necessary steps to ensure this requirement is accomplished.
6.I understand that a registered copy of this certificate of installation is required to be included with the documentation
the builder provides to the building owner at occupancy, and I will take the necessary steps to ensure this requirement is
accomplished.
Responsible Builder/Installer Name:
Tom Powers (authorized Angel Arechiga)
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or
Builder/Owner)
DEH Mechanical Company Inc
Position With Company (Title):
Contractor/Installer
Address:
PO Box 12374
CSLB License:
752819
City/State/Zip:
Palm Desert CA 92255
Phone:
(760) 346-5354
Date Signed:
2024-04-09
Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-A020061538A-000-001-M23003A-0000
Registration Date/Time: 2024-04-09 17:56:46 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 17:57:54
SPACE CONDITIONING SYSTEM AIRFLOW
RATE
CF2R-MCH-23-H
(Page 1 of 3)
CERTIFICATE OF INSTALLATION
Project Name: 58-892 Marbella Lot 60 Enforcement Agency: La Quinta, City of
Dwelling Address: 58-892 Marbella Lot 60 Permit Number: PENDING
City and Zip Code La Quinta, 92253 Permit Application Date: 2024-04-01
A. Ducted Cooling System Information
01 Space Conditioning System Identification or Name System 1
02 Space Conditioning System Description of Area Served Living area
03 Indoor Unit Name Living room
04 System Installation Type New
05 Nominal Cooling Capacity (tons)4
06 Condenser Speed Type n/a
07 Cooling System Zonal Control Type n/a
08 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system
09 System Bypass Duct Status n/a
10 Date of System Airflow Rate Measurement 2024-04-09
11 Airflow Rate Protocol Utilized RA3.3 procedures for airflow rate measurement
12 Central Fan Ventilation Cooling System Status Not a CFVCS
B. Hole for the placement of a Static Pressure Probe (HSPP), and Permanently Installed Static Pressure Probe (PSPP) in the Supply Plenum.
Procedures for installing HSPP or PSPP are specified in RA3.3.1.1.
01 Method Used to Demonstrate Compliance with the HSPP/PSPP
Requirement
HSPP installed and labeled consistent with Figure RA3.3-1
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
SPACE CONDITIONING SYSTEM AIRFLOW
RATE
CF2R-MCH-23-H
(Page 2 of 3)
Registration Number:
424-A020061538A-000-001-M23003A-0000
Registration Date/Time: 2024-04-09 17:56:46 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 17:57:54
C. Airflow Rate Measurement Apparatus and Procedure Information
Instrument Specifications are given in RA3.3.1.1, and system airflow rate measurement apparatus information is given in RA3.3.2.
01 Airflow Rate Measurement Type used for this airflow rate
verification.
Traditional Flow Capture Hood according to procedure in
RA3.3.3.1.4
02 Manufacturer of Airflow Measurement Apparatus Testo
03 Model number of Airflow Measurement Apparatus Testo420
04
Certification Status of the Airflow Measurement Apparatus
Accuracy
Certified by Manufacturer and listed on CEC Website at
http://www.energy.ca.gov/title24/equipment_cert/ama_fas/index.
html
MCH-23a Forced Air System Airflow Rate Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed Compressor
D. Forced Air System Airflow Rate Measurement
The procedures for System Airflow Rate Verification are specified in Reference Residential Appendix RA3.3.
01 Required Minimum System Airflow Rate (cfm/ton)350
02 Required Minimum System Airflow Target (cfm)1400
03 Actual System Airflow Rate Measurement (cfm)1438
04 Compliance Statement:System airflow rate complies
E. Additional Requirements
01 Air filters that meet the applicable requirements of Standards Section 150.0(m)12 or 150.0(m)13 were properly installed in the system
during system air flow rate measurement identified on this Certificate of Installation.
02
The airflow rate measurement apparatus used to perform the airflow rate measurement identified on this Certificate of Installation was
calibrated in accordance with the apparatus manufacturer's specifications and conforms to the instrumentation specifications given in
RA3.3.1.
03
A visual inspection shall confirm that bypass ducts that deliver conditioned supply air directly to the space conditioning system return
duct airflow are not used on newly constructed zonally controlled systems unless the Performance Certificate of Compliance indicates an
allowance for use of a bypass duct. When a bypass duct is accounted for on the Performance Certificate of Compliance, the airflow rate
shall conform to the specifications listed on the Certificate of Compliance.
04 All registers were fully open during the diagnostic test.
05 System fan was set at maximum speed during the diagnostic test.
06 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test.
07 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value.
08 Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan efficacy
(Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air handler fan speed.
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
SPACE CONDITIONING SYSTEM AIRFLOW
RATE
CF2R-MCH-23-H
(Page 3 of 3)
Registration Number:
424-A020061538A-000-001-M23003A-0000
Registration Date/Time: 2024-04-09 17:56:46 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 17:57:54
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Angel Arechiga
Documentation Author Signature:
Company:
iPermit
Signature Date:
2024-04-09
Address:
31225 La Baya Drive
CEA/ HERS Certification Identification (if applicable):
RCN13516
City/State/Zip:
Westlake Village CA 91362
Phone:
818-735-7876
RESPONSIBLE PERSON'S DECLARATION STATEMENT
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this certificate of installation is true and correct.
2.I am either: a) a responsible person eligible under division 3 of the business and professions code in the applicable
classification to accept responsibility for the system design, construction, or installation of features, materials,
components, or manufactured devices for the scope of work identified on this certificate of installation, and attest to the
declarations in this statement, or b) i am an authorized representative of the responsible person and attest to the
declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on
this certificate of installation conforms to all applicable codes and regulations and the installation conforms to the
requirements given on the certificate of compliance, plans, and specifications approved by the enforcement agency.
4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the
installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner.
5.I understand that a registered copy of this certificate of installation shall be posted or made available with the building
permit(s) issued for the building and made available to the enforcement agency for all applicable inspections, and I will
take the necessary steps to ensure this requirement is accomplished.
6.I understand that a registered copy of this certificate of installation is required to be included with the documentation
the builder provides to the building owner at occupancy, and I will take the necessary steps to ensure this requirement is
accomplished.
Responsible Builder/Installer Name:
Tom Powers (authorized Angel Arechiga)
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or
Builder/Owner)
DEH Mechanical Company Inc
Position With Company (Title):
Contractor/Installer
Address:
PO Box 12374
CSLB License:
752819
City/State/Zip:
Palm Desert CA 92255
Phone:
(760) 346-5354
Date Signed:
2024-04-09
Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-A020061538A-000-001-M22004A-0000
Registration Date/Time: 2024-04-09 17:57:08 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 17:58:15
SPACE CONDITIONING SYSTEM FAN
EFFICACY
CF2R-MCH-22-H
(Page 1 of 3)
CERTIFICATE OF INSTALLATION
Project Name: 58-892 Marbella Lot 60 Enforcement Agency: La Quinta, City of
Dwelling Address: 58-892 Marbella Lot 60 Permit Number: PENDING
City and Zip Code La Quinta, 92253 Permit Application Date: 2024-04-01
A. Ducted Cooling System Information
01 System Identification or Name System 1
02 System Location or Area Served Living area
03 Indoor Unit Name or Description of Area Served Living room
04 System Installation Type New
05 Nominal Cooling Capacity (tons) of Condenser 4
06 Condenser Speed Type n/a
07 Cooling System Zonal Control Type n/a
08 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system
09 System Bypass Duct Status n/a
10 Date of System Airflow Rate Measurement 2024-04-09
11 Airflow Rate Protocol utilized RA3.3 procedures for airflow rate measurement
12 Central Fan Ventilation Cooling System Status Not a CFVCS
B. Fan Watt Measurement Apparatus and Procedure Information
Instrument Specifications are given in RA3.3.1, and system fan watt measurement apparatus information is given in RA3.3.2.2.
01 Fan Watt Verification Device Used.Portable Watt Meter
MCH-22a Forced Air System Fan Efficacy Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed Compressor
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
SPACE CONDITIONING SYSTEM FAN
EFFICACY
CF2R-MCH-22-H
(Page 2 of 3)
Registration Number:
424-A020061538A-000-001-M22004A-0000
Registration Date/Time: 2024-04-09 17:57:08 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 17:58:15
C. Forced Air System Fan Efficacy Measurement
The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3
01 Actual Tested Watts 15
02 Actual Tested Airflow from MCH-23 (cfm)1438
03 Required Fan Efficacy (Watts/cfm)0.58
04 Actual Fan Efficacy (Watts/cfm)0.01
05 Compliance Statement:System fan efficacy complies
D. Additional Requirements
01 All registers were fully open during the diagnostic test.
02 System fan was set at maximum speed during the diagnostic test.
03 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test.
04 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value.
05 Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan efficacy
(Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air handler fan speed.
06 Zoned cooling air distribution systems with single speed compressors shall meet both the airflow (cfm/ton) and fan efficacy (Watt/cfm)
criteria in every zonal control mode.
07 Portable watt meters used for measurements of air handler watt draws shall be true power measurement systems (i.e. sensor plus data
acquisition system) having an accuracy of +- 2% of reading or +- 10 Watts whichever is greater
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
SPACE CONDITIONING SYSTEM FAN
EFFICACY
CF2R-MCH-22-H
(Page 3 of 3)
Registration Number:
424-A020061538A-000-001-M22004A-0000
Registration Date/Time: 2024-04-09 17:57:08 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 17:58:15
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Angel Arechiga
Documentation Author Signature:
Company:
iPermit
Signature Date:
2024-04-09
Address:
31225 La Baya Drive
CEA/ HERS Certification Identification (if applicable):
RCN13516
City/State/Zip:
Westlake Village CA 91362
Phone:
818-735-7876
RESPONSIBLE PERSON'S DECLARATION STATEMENT
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this certificate of installation is true and correct.
2.I am either: a) a responsible person eligible under division 3 of the business and professions code in the applicable
classification to accept responsibility for the system design, construction, or installation of features, materials,
components, or manufactured devices for the scope of work identified on this certificate of installation, and attest to the
declarations in this statement, or b) i am an authorized representative of the responsible person and attest to the
declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on
this certificate of installation conforms to all applicable codes and regulations and the installation conforms to the
requirements given on the certificate of compliance, plans, and specifications approved by the enforcement agency.
4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the
installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner.
5.I understand that a registered copy of this certificate of installation shall be posted or made available with the building
permit(s) issued for the building and made available to the enforcement agency for all applicable inspections, and I will
take the necessary steps to ensure this requirement is accomplished.
6.I understand that a registered copy of this certificate of installation is required to be included with the documentation
the builder provides to the building owner at occupancy, and I will take the necessary steps to ensure this requirement is
accomplished.
Responsible Builder/Installer Name:
Tom Powers (authorized Angel Arechiga)
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or
Builder/Owner)
DEH Mechanical Company Inc
Position With Company (Title):
Contractor/Installer
Address:
PO Box 12374
CSLB License:
752819
City/State/Zip:
Palm Desert CA 92255
Phone:
(760) 346-5354
Date Signed:
2024-04-09
Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-A020061538A-000-001-M25011A-0000
Registration Date/Time: 2024-04-09 18:00:51 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 18:01:58
REFRIGERANT CHARGE VERIFICATION CF2R-MCH-25-H
(Page 1 of 5)
CERTIFICATE OF INSTALLATION
Project Name: 58-892 Marbella Lot 60 Enforcement Agency: La Quinta, City of
Dwelling Address: 58-892 Marbella Lot 60 Permit Number: PENDING
City and Zip Code La Quinta, 92253 Permit Application Date: 2024-04-01
A. System Information
Each system requiring refrigerant charge verification will be documented on a separate certificate.
01 Space Conditioning System Identification or Name System 1
02 Space Conditioning System Location or Area Served Living area
03 Condenser (or package unit) Make or Brand GOODMAN
04 Condenser (or package unit) Model Number GSZH504810AA
05 Nominal Cooling Capacity (tons) of Condenser 4
06 Condenser (or package unit) Serial Number 2310151351
07 Refrigerant Type R-410A
08 Other Refrigerant Type (if applicable)n/a
09 Liquid Line Filter Drier Installed According to Manufacturers
Specifications (if applicable)
Yes
10 System Installation Type New
11 Fault Indicator Display (FID) Status (Note: Even systems with a FID
must have refrigerant charge verified by installer).
This system does not have a FID device installed
12
Is the system of a type that the minimum airflow can be verified for
all indoor units using an approved measurement procedure (RA3.3
or RA3.3.3)?
Yes
13
Is the system of a type that approved refrigerant charge verification
procedures can be used to verify compliance with the refrigerant
charge verification requirements when temperatures are >= 55 °F
(RA3.2.2, or RA1)?
Yes, one of the Refrigerant charge verification procedures from
RA3.2.2 or RA1 is applicable to this system and can be used to
verify compliance
14 Date of Refrigerant Charge Verification for this system 2024-04-09
15 Refrigerant charge verification method used.Subcooling (outdoor temperature must be equal to or greater than
55 degF)
16 Person who performed the Refrigerant Charge Verification
reported on this Certificate of Installation
HERS rater
17 HERS Verification Compliance Requirement Status System does not qualify for group sampling
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
REFRIGERANT CHARGE VERIFICATION CF2R-MCH-25-H
(Page 2 of 5)
Registration Number:
424-A020061538A-000-001-M25011A-0000
Registration Date/Time: 2024-04-09 18:00:51 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 18:01:58
MCH-25b - Refrigerant Charge Verification - Subcooling Method
B. Metering Device Verification
Subcooling Method can only be used on systems that have a variable metering device.
01 Refrigerant metering device Thermostatic Expansion Valve (TXV)
02 Subcooling Method applicability status Subcooling Method is applicable to this system.
C. Instrument Calibration
Procedures for instrument calibration are given in Reference Residential Appendix RA3.2.2 and RA3.2.2.2
01 Date of Digital Refrigerant Gauge Calibration 2024-03-25
02 Date of Digital Thermocouple Calibration 2024-04-03
03 Digital Refrigerant Gauge Calibration Status Calibration is current
04 Digital Thermocouple Calibration Status Calibration is current
D. Measurement Access Hole (MAH) Verification
Procedures for installing MAH are specified in Reference Residential Appendix RA3.2.2.3
01 Method Used to Demonstrate Compliance with the Measurement
Access Hole (MAH) Requirement
MAH installed and labeled consistent with Figure 3.2-1
E. Minimum System Airflow Rate Verification
Procedures for verifying minimum system airflow are specified in Reference Residential Appendix RA3.3.3.
01 02 03
Indoor Unit Name or Description of Area
Served Minimum Required System Airflow Rate (cfm)System Airflow Rate Verification Status
Living room 1400 System complies with minimum airflow rate
requirements
04 SC System complies with Minimum System Airflow Rate Verification
Notes:
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
REFRIGERANT CHARGE VERIFICATION CF2R-MCH-25-H
(Page 3 of 5)
Registration Number:
424-A020061538A-000-001-M25011A-0000
Registration Date/Time: 2024-04-09 18:00:51 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 18:01:58
F. Data Collection and Calculations
Procedures for determining Refrigerant Charge using the Standard Charge Verification Procedure are given in Reference Residential Appendix
RA3.2.2.
01 Lowest Return Air Dry Bulb Temperature that Occurred During the
Refrigerant Charge Verification Procedure ( °F)
75
02 Measured Condenser Air Entering Dry-Bulb Temperature
(Tcondenser, db)
85
03 Outdoor Temperature Qualification Status Outdoor temperature is within range for using Subcooling
refrigerant charge verification method
04 Measured Liquid Line Temperature (Tliquid) ( °F)85.6
05 Measured Liquid Line Pressure (Pliquid) (psig)310.4
06 Condenser Saturation Temperature (Tcondenser, sat) from Digital
Gauge or P-T Table using Line F05 ( °F)
95.8
07 Measured Subcooling (Line F06 - Lilne F04 ( °F)10.2
08 Target Subcooling from Manufacturer ( °F)8
09 Compliance Statement:System complies with Subcooling Method - Must also pass
metering device verification, next section
G. Metering Device Verification
Procedures for the verification of proper metering device operation are specified in RA3.2.2.6.2
01 Measured Suction Line Temperature (Tsuction) ( °F)60.8
02 Measured Suction Line Pressure (Psuction) (psig)117.9
03 Evaporator Saturation Temperature (Tevaporator, sat) from Digital
Gauge or P-T Table using Line G02 ( °F)
39.8
04 Measured Superheat (Line G01- Line G03) ( °F)21
05 Measured Superheat (Line G04) is between 4 °F and 25 °F
(inclusive)
Passes CEC requirement
06 Measured Superheat (Line G04) is within Manufacturer's
Specifications ( if known)
Yes, documentation to be provided upon request
07 Compliance Statement Metering device verification passes
MCH-25d - Refrigeration Charge Verification - Fault Indicator Display (FID)
H. Fault Indicator Display
This section does not apply to this project.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
REFRIGERANT CHARGE VERIFICATION CF2R-MCH-25-H
(Page 4 of 5)
Registration Number:
424-A020061538A-000-001-M25011A-0000
Registration Date/Time: 2024-04-09 18:00:51 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 18:01:58
I. Fault Indicator Display Additional Requirements
This section does not apply to this project.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
REFRIGERANT CHARGE VERIFICATION CF2R-MCH-25-H
(Page 5 of 5)
Registration Number:
424-A020061538A-000-001-M25011A-0000
Registration Date/Time: 2024-04-09 18:00:51 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 18:01:58
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Angel Arechiga
Documentation Author Signature:
Company:
iPermit
Signature Date:
2024-04-09
Address:
31225 La Baya Drive
CEA/ HERS Certification Identification (if applicable):
RCN13516
City/State/Zip:
Westlake Village CA 91362
Phone:
818-735-7876
RESPONSIBLE PERSON'S DECLARATION STATEMENT
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this certificate of installation is true and correct.
2.I am either: a) a responsible person eligible under division 3 of the business and professions code in the applicable
classification to accept responsibility for the system design, construction, or installation of features, materials,
components, or manufactured devices for the scope of work identified on this certificate of installation, and attest to the
declarations in this statement, or b) i am an authorized representative of the responsible person and attest to the
declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on
this certificate of installation conforms to all applicable codes and regulations and the installation conforms to the
requirements given on the certificate of compliance, plans, and specifications approved by the enforcement agency.
4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the
installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner.
5.I understand that a registered copy of this certificate of installation shall be posted or made available with the building
permit(s) issued for the building and made available to the enforcement agency for all applicable inspections, and I will
take the necessary steps to ensure this requirement is accomplished.
6.I understand that a registered copy of this certificate of installation is required to be included with the documentation
the builder provides to the building owner at occupancy, and I will take the necessary steps to ensure this requirement is
accomplished.
Responsible Builder/Installer Name:
Tom Powers (authorized Angel Arechiga)
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or
Builder/Owner)
DEH Mechanical Company Inc
Position With Company (Title):
Contractor/Installer
Address:
PO Box 12374
CSLB License:
752819
City/State/Zip:
Palm Desert CA 92255
Phone:
(760) 346-5354
Date Signed:
2024-04-09
Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-A020061538A-000-001-M20005A-0000
Registration Date/Time: 2024-04-09 17:57:20 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 17:58:28
DUCT LEAKAGE DIAGNOSTIC TEST CF2R-MCH-20-H
(Page 1 of 4)
CERTIFICATE OF INSTALLATION
Project Name: 58-892 Marbella Lot 60 Enforcement Agency: La Quinta, City of
Dwelling Address: 58-892 Marbella Lot 60 Permit Number: PENDING
City and Zip Code La Quinta, 92253 Permit Application Date: 2024-04-01
A. System Information
01 Space Conditioning System Identification or Name System 2
02 Space Conditioning System Location or Area Served Master
03 Indoor Unit Name or Description of Area Served 1
04 Building Type from from parent CC Single family
05 Verified Low Leakage Ducts in Conditioned Space (VLLDCS) Credit
from parent CC?
No, credit is not taken
06 Verified Low Leakage Air Handling Unit Credit from parent CC?No, credit is not taken
07 Duct System Compliance Category New
08 Portions of Duct Located in Garage?No
09 Is the system type Small Duct High Velocity (SDHV) ?No
MCH-20a - Completely New Duct System
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
DUCT LEAKAGE DIAGNOSTIC TEST CF2R-MCH-20-H
(Page 2 of 4)
Registration Number:
424-A020061538A-000-001-M20005A-0000
Registration Date/Time: 2024-04-09 17:57:20 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 17:58:28
B. Duct Leakage Diagnostic Test
01 Air Handling Unit Airflow (AHU Airflow) Determination Method Cooling system method
02 Condenser Nominal Cooling Capacity (ton)3
03 Indoor Unit Nominal Cooling Capacity 3
04 Heating Capacity (kBtu/h)n/a
05 Conditioned Floor Area Served by this HVAC System (ft2)1000
06 Measured AHU Airflow (cfm)n/a
07 Duct Leakage Test Conditions Test final
08 Duct Leakage Test Method Total leakage
09 Leakage Factor 0.05
10 Calculated Target Allowable Duct Leakage (cfm)60
11 Actual Duct Leakage Rate from Leakage Test Measurement (cfm)55
12 Compliance Statement System passes leakage test
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
DUCT LEAKAGE DIAGNOSTIC TEST CF2R-MCH-20-H
(Page 3 of 4)
Registration Number:
424-A020061538A-000-001-M20005A-0000
Registration Date/Time: 2024-04-09 17:57:20 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 17:58:28
C. Additional Requirements for Compliance
01 System was tested in its normal operation condition. No temporary taping allowed.
02
Outside air (OA) duct connections to the central forced air duct system shall not be sealed/taped off during duct leakage testing. OA
ducts used for Central Fan Integrated (CFI) Indoor Air Quality ventilation systems, or Central Fan Ventilation Cooling Systems, that utilize
dampers that open only when OA is required and automatically close when OA is not required, may configure the OA damper to the
closed position during duct leakage testing.
03 All supply and return register boots were sealed to the drywall.
04 Building cavities were not used as plenums or platform returns in lieu of ducts.
05 If cloth backed tape was used it was covered with Mastic and draw bands.
06 All connection points between the air handler and the supply and return plenums are completely sealed.
Visual Inspection at Final Construction Stage (applicable if system was tested at rough-in).
After installing the interior finishing wall and verifying that the above rough-in tests was completed, the following procedure must be performed
07 For all supply and return registers, verify that the spaces between the register boot and the interior finishing wall are properly sealed.
08 If the house rough-in duct leakage test was conducted without an air handler installed, inspect the connection points between the air
handler and the supply and return plenums to verify that the connection points are properly sealed.
09 Inspect all joints to ensure that no cloth backed rubber adhesive duct tape is used.
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
DUCT LEAKAGE DIAGNOSTIC TEST CF2R-MCH-20-H
(Page 4 of 4)
Registration Number:
424-A020061538A-000-001-M20005A-0000
Registration Date/Time: 2024-04-09 17:57:20 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 17:58:28
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Angel Arechiga
Documentation Author Signature:
Company:
iPermit
Signature Date:
2024-04-09
Address:
31225 La Baya Drive
CEA/ HERS Certification Identification (if applicable):
RCN13516
City/State/Zip:
Westlake Village CA 91362
Phone:
818-735-7876
RESPONSIBLE PERSON'S DECLARATION STATEMENT
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this certificate of installation is true and correct.
2.I am either: a) a responsible person eligible under division 3 of the business and professions code in the applicable
classification to accept responsibility for the system design, construction, or installation of features, materials,
components, or manufactured devices for the scope of work identified on this certificate of installation, and attest to the
declarations in this statement, or b) i am an authorized representative of the responsible person and attest to the
declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on
this certificate of installation conforms to all applicable codes and regulations and the installation conforms to the
requirements given on the certificate of compliance, plans, and specifications approved by the enforcement agency.
4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the
installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner.
5.I understand that a registered copy of this certificate of installation shall be posted or made available with the building
permit(s) issued for the building and made available to the enforcement agency for all applicable inspections, and I will
take the necessary steps to ensure this requirement is accomplished.
6.I understand that a registered copy of this certificate of installation is required to be included with the documentation
the builder provides to the building owner at occupancy, and I will take the necessary steps to ensure this requirement is
accomplished.
Responsible Builder/Installer Name:
Tom Powers (authorized Angel Arechiga)
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or
Builder/Owner)
DEH Mechanical Company Inc
Position With Company (Title):
Contractor/Installer
Address:
PO Box 12374
CSLB License:
752819
City/State/Zip:
Palm Desert CA 92255
Phone:
(760) 346-5354
Date Signed:
2024-04-09
Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-A020061538A-000-001-M23006A-0000
Registration Date/Time: 2024-04-09 17:57:33 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 17:58:40
SPACE CONDITIONING SYSTEM AIRFLOW
RATE
CF2R-MCH-23-H
(Page 1 of 3)
CERTIFICATE OF INSTALLATION
Project Name: 58-892 Marbella Lot 60 Enforcement Agency: La Quinta, City of
Dwelling Address: 58-892 Marbella Lot 60 Permit Number: PENDING
City and Zip Code La Quinta, 92253 Permit Application Date: 2024-04-01
A. Ducted Cooling System Information
01 Space Conditioning System Identification or Name System 2
02 Space Conditioning System Description of Area Served Master
03 Indoor Unit Name 1
04 System Installation Type New
05 Nominal Cooling Capacity (tons)3
06 Condenser Speed Type n/a
07 Cooling System Zonal Control Type n/a
08 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system
09 System Bypass Duct Status n/a
10 Date of System Airflow Rate Measurement 2024-04-09
11 Airflow Rate Protocol Utilized RA3.3 procedures for airflow rate measurement
12 Central Fan Ventilation Cooling System Status Not a CFVCS
B. Hole for the placement of a Static Pressure Probe (HSPP), and Permanently Installed Static Pressure Probe (PSPP) in the Supply Plenum.
Procedures for installing HSPP or PSPP are specified in RA3.3.1.1.
01 Method Used to Demonstrate Compliance with the HSPP/PSPP
Requirement
HSPP installed and labeled consistent with Figure RA3.3-1
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
SPACE CONDITIONING SYSTEM AIRFLOW
RATE
CF2R-MCH-23-H
(Page 2 of 3)
Registration Number:
424-A020061538A-000-001-M23006A-0000
Registration Date/Time: 2024-04-09 17:57:33 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 17:58:40
C. Airflow Rate Measurement Apparatus and Procedure Information
Instrument Specifications are given in RA3.3.1.1, and system airflow rate measurement apparatus information is given in RA3.3.2.
01 Airflow Rate Measurement Type used for this airflow rate
verification.
Traditional Flow Capture Hood according to procedure in
RA3.3.3.1.4
02 Manufacturer of Airflow Measurement Apparatus Testo
03 Model number of Airflow Measurement Apparatus Testo420
04
Certification Status of the Airflow Measurement Apparatus
Accuracy
Certified by Manufacturer and listed on CEC Website at
http://www.energy.ca.gov/title24/equipment_cert/ama_fas/index.
html
MCH-23a Forced Air System Airflow Rate Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed Compressor
D. Forced Air System Airflow Rate Measurement
The procedures for System Airflow Rate Verification are specified in Reference Residential Appendix RA3.3.
01 Required Minimum System Airflow Rate (cfm/ton)350
02 Required Minimum System Airflow Target (cfm)1050
03 Actual System Airflow Rate Measurement (cfm)1068
04 Compliance Statement:System airflow rate complies
E. Additional Requirements
01 Air filters that meet the applicable requirements of Standards Section 150.0(m)12 or 150.0(m)13 were properly installed in the system
during system air flow rate measurement identified on this Certificate of Installation.
02
The airflow rate measurement apparatus used to perform the airflow rate measurement identified on this Certificate of Installation was
calibrated in accordance with the apparatus manufacturer's specifications and conforms to the instrumentation specifications given in
RA3.3.1.
03
A visual inspection shall confirm that bypass ducts that deliver conditioned supply air directly to the space conditioning system return
duct airflow are not used on newly constructed zonally controlled systems unless the Performance Certificate of Compliance indicates an
allowance for use of a bypass duct. When a bypass duct is accounted for on the Performance Certificate of Compliance, the airflow rate
shall conform to the specifications listed on the Certificate of Compliance.
04 All registers were fully open during the diagnostic test.
05 System fan was set at maximum speed during the diagnostic test.
06 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test.
07 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value.
08 Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan efficacy
(Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air handler fan speed.
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
SPACE CONDITIONING SYSTEM AIRFLOW
RATE
CF2R-MCH-23-H
(Page 3 of 3)
Registration Number:
424-A020061538A-000-001-M23006A-0000
Registration Date/Time: 2024-04-09 17:57:33 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 17:58:40
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Angel Arechiga
Documentation Author Signature:
Company:
iPermit
Signature Date:
2024-04-09
Address:
31225 La Baya Drive
CEA/ HERS Certification Identification (if applicable):
RCN13516
City/State/Zip:
Westlake Village CA 91362
Phone:
818-735-7876
RESPONSIBLE PERSON'S DECLARATION STATEMENT
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this certificate of installation is true and correct.
2.I am either: a) a responsible person eligible under division 3 of the business and professions code in the applicable
classification to accept responsibility for the system design, construction, or installation of features, materials,
components, or manufactured devices for the scope of work identified on this certificate of installation, and attest to the
declarations in this statement, or b) i am an authorized representative of the responsible person and attest to the
declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on
this certificate of installation conforms to all applicable codes and regulations and the installation conforms to the
requirements given on the certificate of compliance, plans, and specifications approved by the enforcement agency.
4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the
installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner.
5.I understand that a registered copy of this certificate of installation shall be posted or made available with the building
permit(s) issued for the building and made available to the enforcement agency for all applicable inspections, and I will
take the necessary steps to ensure this requirement is accomplished.
6.I understand that a registered copy of this certificate of installation is required to be included with the documentation
the builder provides to the building owner at occupancy, and I will take the necessary steps to ensure this requirement is
accomplished.
Responsible Builder/Installer Name:
Tom Powers (authorized Angel Arechiga)
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or
Builder/Owner)
DEH Mechanical Company Inc
Position With Company (Title):
Contractor/Installer
Address:
PO Box 12374
CSLB License:
752819
City/State/Zip:
Palm Desert CA 92255
Phone:
(760) 346-5354
Date Signed:
2024-04-09
Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-A020061538A-000-001-M22007A-0000
Registration Date/Time: 2024-04-09 17:58:04 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 17:59:11
SPACE CONDITIONING SYSTEM FAN
EFFICACY
CF2R-MCH-22-H
(Page 1 of 3)
CERTIFICATE OF INSTALLATION
Project Name: 58-892 Marbella Lot 60 Enforcement Agency: La Quinta, City of
Dwelling Address: 58-892 Marbella Lot 60 Permit Number: PENDING
City and Zip Code La Quinta, 92253 Permit Application Date: 2024-04-01
A. Ducted Cooling System Information
01 System Identification or Name System 2
02 System Location or Area Served Master
03 Indoor Unit Name or Description of Area Served 1
04 System Installation Type New
05 Nominal Cooling Capacity (tons) of Condenser 3
06 Condenser Speed Type n/a
07 Cooling System Zonal Control Type n/a
08 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system
09 System Bypass Duct Status n/a
10 Date of System Airflow Rate Measurement 2024-04-09
11 Airflow Rate Protocol utilized RA3.3 procedures for airflow rate measurement
12 Central Fan Ventilation Cooling System Status Not a CFVCS
B. Fan Watt Measurement Apparatus and Procedure Information
Instrument Specifications are given in RA3.3.1, and system fan watt measurement apparatus information is given in RA3.3.2.2.
01 Fan Watt Verification Device Used.Portable Watt Meter
MCH-22a Forced Air System Fan Efficacy Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed Compressor
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
SPACE CONDITIONING SYSTEM FAN
EFFICACY
CF2R-MCH-22-H
(Page 2 of 3)
Registration Number:
424-A020061538A-000-001-M22007A-0000
Registration Date/Time: 2024-04-09 17:58:04 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 17:59:11
C. Forced Air System Fan Efficacy Measurement
The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3
01 Actual Tested Watts 15
02 Actual Tested Airflow from MCH-23 (cfm)1068
03 Required Fan Efficacy (Watts/cfm)0.58
04 Actual Fan Efficacy (Watts/cfm)0.01
05 Compliance Statement:System fan efficacy complies
D. Additional Requirements
01 All registers were fully open during the diagnostic test.
02 System fan was set at maximum speed during the diagnostic test.
03 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test.
04 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value.
05 Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan efficacy
(Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air handler fan speed.
06 Zoned cooling air distribution systems with single speed compressors shall meet both the airflow (cfm/ton) and fan efficacy (Watt/cfm)
criteria in every zonal control mode.
07 Portable watt meters used for measurements of air handler watt draws shall be true power measurement systems (i.e. sensor plus data
acquisition system) having an accuracy of +- 2% of reading or +- 10 Watts whichever is greater
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
SPACE CONDITIONING SYSTEM FAN
EFFICACY
CF2R-MCH-22-H
(Page 3 of 3)
Registration Number:
424-A020061538A-000-001-M22007A-0000
Registration Date/Time: 2024-04-09 17:58:04 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 17:59:11
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Angel Arechiga
Documentation Author Signature:
Company:
iPermit
Signature Date:
2024-04-09
Address:
31225 La Baya Drive
CEA/ HERS Certification Identification (if applicable):
RCN13516
City/State/Zip:
Westlake Village CA 91362
Phone:
818-735-7876
RESPONSIBLE PERSON'S DECLARATION STATEMENT
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this certificate of installation is true and correct.
2.I am either: a) a responsible person eligible under division 3 of the business and professions code in the applicable
classification to accept responsibility for the system design, construction, or installation of features, materials,
components, or manufactured devices for the scope of work identified on this certificate of installation, and attest to the
declarations in this statement, or b) i am an authorized representative of the responsible person and attest to the
declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on
this certificate of installation conforms to all applicable codes and regulations and the installation conforms to the
requirements given on the certificate of compliance, plans, and specifications approved by the enforcement agency.
4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the
installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner.
5.I understand that a registered copy of this certificate of installation shall be posted or made available with the building
permit(s) issued for the building and made available to the enforcement agency for all applicable inspections, and I will
take the necessary steps to ensure this requirement is accomplished.
6.I understand that a registered copy of this certificate of installation is required to be included with the documentation
the builder provides to the building owner at occupancy, and I will take the necessary steps to ensure this requirement is
accomplished.
Responsible Builder/Installer Name:
Tom Powers (authorized Angel Arechiga)
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or
Builder/Owner)
DEH Mechanical Company Inc
Position With Company (Title):
Contractor/Installer
Address:
PO Box 12374
CSLB License:
752819
City/State/Zip:
Palm Desert CA 92255
Phone:
(760) 346-5354
Date Signed:
2024-04-09
Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-A020061538A-000-001-M25012A-0000
Registration Date/Time: 2024-04-09 18:02:19 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 18:03:26
REFRIGERANT CHARGE VERIFICATION CF2R-MCH-25-H
(Page 1 of 5)
CERTIFICATE OF INSTALLATION
Project Name: 58-892 Marbella Lot 60 Enforcement Agency: La Quinta, City of
Dwelling Address: 58-892 Marbella Lot 60 Permit Number: PENDING
City and Zip Code La Quinta, 92253 Permit Application Date: 2024-04-01
A. System Information
Each system requiring refrigerant charge verification will be documented on a separate certificate.
01 Space Conditioning System Identification or Name System 2
02 Space Conditioning System Location or Area Served Master
03 Condenser (or package unit) Make or Brand GOODMAN
04 Condenser (or package unit) Model Number GSZH503610AB
05 Nominal Cooling Capacity (tons) of Condenser 3
06 Condenser (or package unit) Serial Number GSZH503610AB
07 Refrigerant Type R-410A
08 Other Refrigerant Type (if applicable)n/a
09 Liquid Line Filter Drier Installed According to Manufacturers
Specifications (if applicable)
Yes
10 System Installation Type New
11 Fault Indicator Display (FID) Status (Note: Even systems with a FID
must have refrigerant charge verified by installer).
This system does not have a FID device installed
12
Is the system of a type that the minimum airflow can be verified for
all indoor units using an approved measurement procedure (RA3.3
or RA3.3.3)?
Yes
13
Is the system of a type that approved refrigerant charge verification
procedures can be used to verify compliance with the refrigerant
charge verification requirements when temperatures are >= 55 °F
(RA3.2.2, or RA1)?
Yes, one of the Refrigerant charge verification procedures from
RA3.2.2 or RA1 is applicable to this system and can be used to
verify compliance
14 Date of Refrigerant Charge Verification for this system 2024-04-09
15 Refrigerant charge verification method used.Subcooling (outdoor temperature must be equal to or greater than
55 degF)
16 Person who performed the Refrigerant Charge Verification
reported on this Certificate of Installation
HERS rater
17 HERS Verification Compliance Requirement Status System does not qualify for group sampling
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
REFRIGERANT CHARGE VERIFICATION CF2R-MCH-25-H
(Page 2 of 5)
Registration Number:
424-A020061538A-000-001-M25012A-0000
Registration Date/Time: 2024-04-09 18:02:19 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 18:03:26
MCH-25b - Refrigerant Charge Verification - Subcooling Method
B. Metering Device Verification
Subcooling Method can only be used on systems that have a variable metering device.
01 Refrigerant metering device Thermostatic Expansion Valve (TXV)
02 Subcooling Method applicability status Subcooling Method is applicable to this system.
C. Instrument Calibration
Procedures for instrument calibration are given in Reference Residential Appendix RA3.2.2 and RA3.2.2.2
01 Date of Digital Refrigerant Gauge Calibration 2024-03-25
02 Date of Digital Thermocouple Calibration 2024-04-03
03 Digital Refrigerant Gauge Calibration Status Calibration is current
04 Digital Thermocouple Calibration Status Calibration is current
D. Measurement Access Hole (MAH) Verification
Procedures for installing MAH are specified in Reference Residential Appendix RA3.2.2.3
01 Method Used to Demonstrate Compliance with the Measurement
Access Hole (MAH) Requirement
MAH installed and labeled consistent with Figure 3.2-1
E. Minimum System Airflow Rate Verification
Procedures for verifying minimum system airflow are specified in Reference Residential Appendix RA3.3.3.
01 02 03
Indoor Unit Name or Description of Area
Served Minimum Required System Airflow Rate (cfm)System Airflow Rate Verification Status
1 1400 System complies with minimum airflow rate
requirements
04 SC System complies with Minimum System Airflow Rate Verification
Notes:
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
REFRIGERANT CHARGE VERIFICATION CF2R-MCH-25-H
(Page 3 of 5)
Registration Number:
424-A020061538A-000-001-M25012A-0000
Registration Date/Time: 2024-04-09 18:02:19 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 18:03:26
F. Data Collection and Calculations
Procedures for determining Refrigerant Charge using the Standard Charge Verification Procedure are given in Reference Residential Appendix
RA3.2.2.
01 Lowest Return Air Dry Bulb Temperature that Occurred During the
Refrigerant Charge Verification Procedure ( °F)
80
02 Measured Condenser Air Entering Dry-Bulb Temperature
(Tcondenser, db)
85
03 Outdoor Temperature Qualification Status Outdoor temperature is within range for using Subcooling
refrigerant charge verification method
04 Measured Liquid Line Temperature (Tliquid) ( °F)88.9
05 Measured Liquid Line Pressure (Pliquid) (psig)305.9
06 Condenser Saturation Temperature (Tcondenser, sat) from Digital
Gauge or P-T Table using Line F05 ( °F)
94.5
07 Measured Subcooling (Line F06 - Lilne F04 ( °F)5.6
08 Target Subcooling from Manufacturer ( °F)8
09 Compliance Statement:System complies with Subcooling Method - Must also pass
metering device verification, next section
G. Metering Device Verification
Procedures for the verification of proper metering device operation are specified in RA3.2.2.6.2
01 Measured Suction Line Temperature (Tsuction) ( °F)59.4
02 Measured Suction Line Pressure (Psuction) (psig)106.9
03 Evaporator Saturation Temperature (Tevaporator, sat) from Digital
Gauge or P-T Table using Line G02 ( °F)
42.8
04 Measured Superheat (Line G01- Line G03) ( °F)16.6
05 Measured Superheat (Line G04) is between 4 °F and 25 °F
(inclusive)
Passes CEC requirement
06 Measured Superheat (Line G04) is within Manufacturer's
Specifications ( if known)
Yes, documentation to be provided upon request
07 Compliance Statement Metering device verification passes
MCH-25d - Refrigeration Charge Verification - Fault Indicator Display (FID)
H. Fault Indicator Display
This section does not apply to this project.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
REFRIGERANT CHARGE VERIFICATION CF2R-MCH-25-H
(Page 4 of 5)
Registration Number:
424-A020061538A-000-001-M25012A-0000
Registration Date/Time: 2024-04-09 18:02:19 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 18:03:26
I. Fault Indicator Display Additional Requirements
This section does not apply to this project.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
REFRIGERANT CHARGE VERIFICATION CF2R-MCH-25-H
(Page 5 of 5)
Registration Number:
424-A020061538A-000-001-M25012A-0000
Registration Date/Time: 2024-04-09 18:02:19 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 18:03:26
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Angel Arechiga
Documentation Author Signature:
Company:
iPermit
Signature Date:
2024-04-09
Address:
31225 La Baya Drive
CEA/ HERS Certification Identification (if applicable):
RCN13516
City/State/Zip:
Westlake Village CA 91362
Phone:
818-735-7876
RESPONSIBLE PERSON'S DECLARATION STATEMENT
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this certificate of installation is true and correct.
2.I am either: a) a responsible person eligible under division 3 of the business and professions code in the applicable
classification to accept responsibility for the system design, construction, or installation of features, materials,
components, or manufactured devices for the scope of work identified on this certificate of installation, and attest to the
declarations in this statement, or b) i am an authorized representative of the responsible person and attest to the
declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on
this certificate of installation conforms to all applicable codes and regulations and the installation conforms to the
requirements given on the certificate of compliance, plans, and specifications approved by the enforcement agency.
4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the
installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner.
5.I understand that a registered copy of this certificate of installation shall be posted or made available with the building
permit(s) issued for the building and made available to the enforcement agency for all applicable inspections, and I will
take the necessary steps to ensure this requirement is accomplished.
6.I understand that a registered copy of this certificate of installation is required to be included with the documentation
the builder provides to the building owner at occupancy, and I will take the necessary steps to ensure this requirement is
accomplished.
Responsible Builder/Installer Name:
Tom Powers (authorized Angel Arechiga)
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or
Builder/Owner)
DEH Mechanical Company Inc
Position With Company (Title):
Contractor/Installer
Address:
PO Box 12374
CSLB License:
752819
City/State/Zip:
Palm Desert CA 92255
Phone:
(760) 346-5354
Date Signed:
2024-04-09
Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-A020061538A-000-001-M20008A-0000
Registration Date/Time: 2024-04-09 17:58:31 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 17:59:41
DUCT LEAKAGE DIAGNOSTIC TEST CF2R-MCH-20-H
(Page 1 of 4)
CERTIFICATE OF INSTALLATION
Project Name: 58-892 Marbella Lot 60 Enforcement Agency: La Quinta, City of
Dwelling Address: 58-892 Marbella Lot 60 Permit Number: PENDING
City and Zip Code La Quinta, 92253 Permit Application Date: 2024-04-01
A. System Information
01 Space Conditioning System Identification or Name System 3
02 Space Conditioning System Location or Area Served Casita
03 Indoor Unit Name or Description of Area Served Casita
04 Building Type from from parent CC Single family
05 Verified Low Leakage Ducts in Conditioned Space (VLLDCS) Credit
from parent CC?
No, credit is not taken
06 Verified Low Leakage Air Handling Unit Credit from parent CC?No, credit is not taken
07 Duct System Compliance Category New
08 Portions of Duct Located in Garage?No
09 Is the system type Small Duct High Velocity (SDHV) ?No
MCH-20a - Completely New Duct System
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
DUCT LEAKAGE DIAGNOSTIC TEST CF2R-MCH-20-H
(Page 2 of 4)
Registration Number:
424-A020061538A-000-001-M20008A-0000
Registration Date/Time: 2024-04-09 17:58:31 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 17:59:41
B. Duct Leakage Diagnostic Test
01 Air Handling Unit Airflow (AHU Airflow) Determination Method Cooling system method
02 Condenser Nominal Cooling Capacity (ton)2
03 Indoor Unit Nominal Cooling Capacity 2
04 Heating Capacity (kBtu/h)n/a
05 Conditioned Floor Area Served by this HVAC System (ft2)1000
06 Measured AHU Airflow (cfm)n/a
07 Duct Leakage Test Conditions Test final
08 Duct Leakage Test Method Total leakage
09 Leakage Factor 0.05
10 Calculated Target Allowable Duct Leakage (cfm)40
11 Actual Duct Leakage Rate from Leakage Test Measurement (cfm)40
12 Compliance Statement System passes leakage test
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
DUCT LEAKAGE DIAGNOSTIC TEST CF2R-MCH-20-H
(Page 3 of 4)
Registration Number:
424-A020061538A-000-001-M20008A-0000
Registration Date/Time: 2024-04-09 17:58:31 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 17:59:41
C. Additional Requirements for Compliance
01 System was tested in its normal operation condition. No temporary taping allowed.
02
Outside air (OA) duct connections to the central forced air duct system shall not be sealed/taped off during duct leakage testing. OA
ducts used for Central Fan Integrated (CFI) Indoor Air Quality ventilation systems, or Central Fan Ventilation Cooling Systems, that utilize
dampers that open only when OA is required and automatically close when OA is not required, may configure the OA damper to the
closed position during duct leakage testing.
03 All supply and return register boots were sealed to the drywall.
04 Building cavities were not used as plenums or platform returns in lieu of ducts.
05 If cloth backed tape was used it was covered with Mastic and draw bands.
06 All connection points between the air handler and the supply and return plenums are completely sealed.
Visual Inspection at Final Construction Stage (applicable if system was tested at rough-in).
After installing the interior finishing wall and verifying that the above rough-in tests was completed, the following procedure must be performed
07 For all supply and return registers, verify that the spaces between the register boot and the interior finishing wall are properly sealed.
08 If the house rough-in duct leakage test was conducted without an air handler installed, inspect the connection points between the air
handler and the supply and return plenums to verify that the connection points are properly sealed.
09 Inspect all joints to ensure that no cloth backed rubber adhesive duct tape is used.
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
DUCT LEAKAGE DIAGNOSTIC TEST CF2R-MCH-20-H
(Page 4 of 4)
Registration Number:
424-A020061538A-000-001-M20008A-0000
Registration Date/Time: 2024-04-09 17:58:31 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 17:59:41
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Angel Arechiga
Documentation Author Signature:
Company:
iPermit
Signature Date:
2024-04-09
Address:
31225 La Baya Drive
CEA/ HERS Certification Identification (if applicable):
RCN13516
City/State/Zip:
Westlake Village CA 91362
Phone:
818-735-7876
RESPONSIBLE PERSON'S DECLARATION STATEMENT
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this certificate of installation is true and correct.
2.I am either: a) a responsible person eligible under division 3 of the business and professions code in the applicable
classification to accept responsibility for the system design, construction, or installation of features, materials,
components, or manufactured devices for the scope of work identified on this certificate of installation, and attest to the
declarations in this statement, or b) i am an authorized representative of the responsible person and attest to the
declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on
this certificate of installation conforms to all applicable codes and regulations and the installation conforms to the
requirements given on the certificate of compliance, plans, and specifications approved by the enforcement agency.
4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the
installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner.
5.I understand that a registered copy of this certificate of installation shall be posted or made available with the building
permit(s) issued for the building and made available to the enforcement agency for all applicable inspections, and I will
take the necessary steps to ensure this requirement is accomplished.
6.I understand that a registered copy of this certificate of installation is required to be included with the documentation
the builder provides to the building owner at occupancy, and I will take the necessary steps to ensure this requirement is
accomplished.
Responsible Builder/Installer Name:
Tom Powers (authorized Angel Arechiga)
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or
Builder/Owner)
DEH Mechanical Company Inc
Position With Company (Title):
Contractor/Installer
Address:
PO Box 12374
CSLB License:
752819
City/State/Zip:
Palm Desert CA 92255
Phone:
(760) 346-5354
Date Signed:
2024-04-09
Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-A020061538A-000-001-M23009A-0000
Registration Date/Time: 2024-04-09 17:58:47 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 18:01:12
SPACE CONDITIONING SYSTEM AIRFLOW
RATE
CF2R-MCH-23-H
(Page 1 of 3)
CERTIFICATE OF INSTALLATION
Project Name: 58-892 Marbella Lot 60 Enforcement Agency: La Quinta, City of
Dwelling Address: 58-892 Marbella Lot 60 Permit Number: PENDING
City and Zip Code La Quinta, 92253 Permit Application Date: 2024-04-01
A. Ducted Cooling System Information
01 Space Conditioning System Identification or Name System 3
02 Space Conditioning System Description of Area Served Casita
03 Indoor Unit Name Casita
04 System Installation Type New
05 Nominal Cooling Capacity (tons)2
06 Condenser Speed Type n/a
07 Cooling System Zonal Control Type n/a
08 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system
09 System Bypass Duct Status n/a
10 Date of System Airflow Rate Measurement 2024-04-09
11 Airflow Rate Protocol Utilized RA3.3 procedures for airflow rate measurement
12 Central Fan Ventilation Cooling System Status Not a CFVCS
B. Hole for the placement of a Static Pressure Probe (HSPP), and Permanently Installed Static Pressure Probe (PSPP) in the Supply Plenum.
Procedures for installing HSPP or PSPP are specified in RA3.3.1.1.
01 Method Used to Demonstrate Compliance with the HSPP/PSPP
Requirement
HSPP installed and labeled consistent with Figure RA3.3-1
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
SPACE CONDITIONING SYSTEM AIRFLOW
RATE
CF2R-MCH-23-H
(Page 2 of 3)
Registration Number:
424-A020061538A-000-001-M23009A-0000
Registration Date/Time: 2024-04-09 17:58:47 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 18:01:12
C. Airflow Rate Measurement Apparatus and Procedure Information
Instrument Specifications are given in RA3.3.1.1, and system airflow rate measurement apparatus information is given in RA3.3.2.
01 Airflow Rate Measurement Type used for this airflow rate
verification.
Traditional Flow Capture Hood according to procedure in
RA3.3.3.1.4
02 Manufacturer of Airflow Measurement Apparatus Testo
03 Model number of Airflow Measurement Apparatus Testo420
04
Certification Status of the Airflow Measurement Apparatus
Accuracy
Certified by Manufacturer and listed on CEC Website at
http://www.energy.ca.gov/title24/equipment_cert/ama_fas/index.
html
MCH-23a Forced Air System Airflow Rate Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed Compressor
D. Forced Air System Airflow Rate Measurement
The procedures for System Airflow Rate Verification are specified in Reference Residential Appendix RA3.3.
01 Required Minimum System Airflow Rate (cfm/ton)350
02 Required Minimum System Airflow Target (cfm)700
03 Actual System Airflow Rate Measurement (cfm)720
04 Compliance Statement:System airflow rate complies
E. Additional Requirements
01 Air filters that meet the applicable requirements of Standards Section 150.0(m)12 or 150.0(m)13 were properly installed in the system
during system air flow rate measurement identified on this Certificate of Installation.
02
The airflow rate measurement apparatus used to perform the airflow rate measurement identified on this Certificate of Installation was
calibrated in accordance with the apparatus manufacturer's specifications and conforms to the instrumentation specifications given in
RA3.3.1.
03
A visual inspection shall confirm that bypass ducts that deliver conditioned supply air directly to the space conditioning system return
duct airflow are not used on newly constructed zonally controlled systems unless the Performance Certificate of Compliance indicates an
allowance for use of a bypass duct. When a bypass duct is accounted for on the Performance Certificate of Compliance, the airflow rate
shall conform to the specifications listed on the Certificate of Compliance.
04 All registers were fully open during the diagnostic test.
05 System fan was set at maximum speed during the diagnostic test.
06 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test.
07 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value.
08 Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan efficacy
(Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air handler fan speed.
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
SPACE CONDITIONING SYSTEM AIRFLOW
RATE
CF2R-MCH-23-H
(Page 3 of 3)
Registration Number:
424-A020061538A-000-001-M23009A-0000
Registration Date/Time: 2024-04-09 17:58:47 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 18:01:12
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Angel Arechiga
Documentation Author Signature:
Company:
iPermit
Signature Date:
2024-04-09
Address:
31225 La Baya Drive
CEA/ HERS Certification Identification (if applicable):
RCN13516
City/State/Zip:
Westlake Village CA 91362
Phone:
818-735-7876
RESPONSIBLE PERSON'S DECLARATION STATEMENT
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this certificate of installation is true and correct.
2.I am either: a) a responsible person eligible under division 3 of the business and professions code in the applicable
classification to accept responsibility for the system design, construction, or installation of features, materials,
components, or manufactured devices for the scope of work identified on this certificate of installation, and attest to the
declarations in this statement, or b) i am an authorized representative of the responsible person and attest to the
declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on
this certificate of installation conforms to all applicable codes and regulations and the installation conforms to the
requirements given on the certificate of compliance, plans, and specifications approved by the enforcement agency.
4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the
installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner.
5.I understand that a registered copy of this certificate of installation shall be posted or made available with the building
permit(s) issued for the building and made available to the enforcement agency for all applicable inspections, and I will
take the necessary steps to ensure this requirement is accomplished.
6.I understand that a registered copy of this certificate of installation is required to be included with the documentation
the builder provides to the building owner at occupancy, and I will take the necessary steps to ensure this requirement is
accomplished.
Responsible Builder/Installer Name:
Tom Powers (authorized Angel Arechiga)
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or
Builder/Owner)
DEH Mechanical Company Inc
Position With Company (Title):
Contractor/Installer
Address:
PO Box 12374
CSLB License:
752819
City/State/Zip:
Palm Desert CA 92255
Phone:
(760) 346-5354
Date Signed:
2024-04-09
Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-A020061538A-000-001-M22010A-0000
Registration Date/Time: 2024-04-09 17:59:03 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 18:00:11
SPACE CONDITIONING SYSTEM FAN
EFFICACY
CF2R-MCH-22-H
(Page 1 of 3)
CERTIFICATE OF INSTALLATION
Project Name: 58-892 Marbella Lot 60 Enforcement Agency: La Quinta, City of
Dwelling Address: 58-892 Marbella Lot 60 Permit Number: PENDING
City and Zip Code La Quinta, 92253 Permit Application Date: 2024-04-01
A. Ducted Cooling System Information
01 System Identification or Name System 3
02 System Location or Area Served Casita
03 Indoor Unit Name or Description of Area Served Casita
04 System Installation Type New
05 Nominal Cooling Capacity (tons) of Condenser 2
06 Condenser Speed Type n/a
07 Cooling System Zonal Control Type n/a
08 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system
09 System Bypass Duct Status n/a
10 Date of System Airflow Rate Measurement 2024-04-09
11 Airflow Rate Protocol utilized RA3.3 procedures for airflow rate measurement
12 Central Fan Ventilation Cooling System Status Not a CFVCS
B. Fan Watt Measurement Apparatus and Procedure Information
Instrument Specifications are given in RA3.3.1, and system fan watt measurement apparatus information is given in RA3.3.2.2.
01 Fan Watt Verification Device Used.Portable Watt Meter
MCH-22a Forced Air System Fan Efficacy Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed Compressor
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
SPACE CONDITIONING SYSTEM FAN
EFFICACY
CF2R-MCH-22-H
(Page 2 of 3)
Registration Number:
424-A020061538A-000-001-M22010A-0000
Registration Date/Time: 2024-04-09 17:59:03 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 18:00:11
C. Forced Air System Fan Efficacy Measurement
The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3
01 Actual Tested Watts 15
02 Actual Tested Airflow from MCH-23 (cfm)720
03 Required Fan Efficacy (Watts/cfm)0.58
04 Actual Fan Efficacy (Watts/cfm)0.02
05 Compliance Statement:System fan efficacy complies
D. Additional Requirements
01 All registers were fully open during the diagnostic test.
02 System fan was set at maximum speed during the diagnostic test.
03 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test.
04 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value.
05 Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan efficacy
(Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air handler fan speed.
06 Zoned cooling air distribution systems with single speed compressors shall meet both the airflow (cfm/ton) and fan efficacy (Watt/cfm)
criteria in every zonal control mode.
07 Portable watt meters used for measurements of air handler watt draws shall be true power measurement systems (i.e. sensor plus data
acquisition system) having an accuracy of +- 2% of reading or +- 10 Watts whichever is greater
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
SPACE CONDITIONING SYSTEM FAN
EFFICACY
CF2R-MCH-22-H
(Page 3 of 3)
Registration Number:
424-A020061538A-000-001-M22010A-0000
Registration Date/Time: 2024-04-09 17:59:03 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 18:00:11
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Angel Arechiga
Documentation Author Signature:
Company:
iPermit
Signature Date:
2024-04-09
Address:
31225 La Baya Drive
CEA/ HERS Certification Identification (if applicable):
RCN13516
City/State/Zip:
Westlake Village CA 91362
Phone:
818-735-7876
RESPONSIBLE PERSON'S DECLARATION STATEMENT
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this certificate of installation is true and correct.
2.I am either: a) a responsible person eligible under division 3 of the business and professions code in the applicable
classification to accept responsibility for the system design, construction, or installation of features, materials,
components, or manufactured devices for the scope of work identified on this certificate of installation, and attest to the
declarations in this statement, or b) i am an authorized representative of the responsible person and attest to the
declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on
this certificate of installation conforms to all applicable codes and regulations and the installation conforms to the
requirements given on the certificate of compliance, plans, and specifications approved by the enforcement agency.
4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the
installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner.
5.I understand that a registered copy of this certificate of installation shall be posted or made available with the building
permit(s) issued for the building and made available to the enforcement agency for all applicable inspections, and I will
take the necessary steps to ensure this requirement is accomplished.
6.I understand that a registered copy of this certificate of installation is required to be included with the documentation
the builder provides to the building owner at occupancy, and I will take the necessary steps to ensure this requirement is
accomplished.
Responsible Builder/Installer Name:
Tom Powers (authorized Angel Arechiga)
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or
Builder/Owner)
DEH Mechanical Company Inc
Position With Company (Title):
Contractor/Installer
Address:
PO Box 12374
CSLB License:
752819
City/State/Zip:
Palm Desert CA 92255
Phone:
(760) 346-5354
Date Signed:
2024-04-09
Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-A020061538A-000-001-M25013A-0000
Registration Date/Time: 2024-04-09 18:03:23 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 18:04:30
REFRIGERANT CHARGE VERIFICATION CF2R-MCH-25-H
(Page 1 of 5)
CERTIFICATE OF INSTALLATION
Project Name: 58-892 Marbella Lot 60 Enforcement Agency: La Quinta, City of
Dwelling Address: 58-892 Marbella Lot 60 Permit Number: PENDING
City and Zip Code La Quinta, 92253 Permit Application Date: 2024-04-01
A. System Information
Each system requiring refrigerant charge verification will be documented on a separate certificate.
01 Space Conditioning System Identification or Name System 3
02 Space Conditioning System Location or Area Served Casita
03 Condenser (or package unit) Make or Brand GOODMAN
04 Condenser (or package unit) Model Number GSZH502410AB
05 Nominal Cooling Capacity (tons) of Condenser 2
06 Condenser (or package unit) Serial Number 2403009323
07 Refrigerant Type R-410A
08 Other Refrigerant Type (if applicable)n/a
09 Liquid Line Filter Drier Installed According to Manufacturers
Specifications (if applicable)
Yes
10 System Installation Type New
11 Fault Indicator Display (FID) Status (Note: Even systems with a FID
must have refrigerant charge verified by installer).
This system does not have a FID device installed
12
Is the system of a type that the minimum airflow can be verified for
all indoor units using an approved measurement procedure (RA3.3
or RA3.3.3)?
Yes
13
Is the system of a type that approved refrigerant charge verification
procedures can be used to verify compliance with the refrigerant
charge verification requirements when temperatures are >= 55 °F
(RA3.2.2, or RA1)?
Yes, one of the Refrigerant charge verification procedures from
RA3.2.2 or RA1 is applicable to this system and can be used to
verify compliance
14 Date of Refrigerant Charge Verification for this system 2024-04-09
15 Refrigerant charge verification method used.Subcooling (outdoor temperature must be equal to or greater than
55 degF)
16 Person who performed the Refrigerant Charge Verification
reported on this Certificate of Installation
HERS rater
17 HERS Verification Compliance Requirement Status System does not qualify for group sampling
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
REFRIGERANT CHARGE VERIFICATION CF2R-MCH-25-H
(Page 2 of 5)
Registration Number:
424-A020061538A-000-001-M25013A-0000
Registration Date/Time: 2024-04-09 18:03:23 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 18:04:30
MCH-25b - Refrigerant Charge Verification - Subcooling Method
B. Metering Device Verification
Subcooling Method can only be used on systems that have a variable metering device.
01 Refrigerant metering device Thermostatic Expansion Valve (TXV)
02 Subcooling Method applicability status Subcooling Method is applicable to this system.
C. Instrument Calibration
Procedures for instrument calibration are given in Reference Residential Appendix RA3.2.2 and RA3.2.2.2
01 Date of Digital Refrigerant Gauge Calibration 2024-03-25
02 Date of Digital Thermocouple Calibration 2024-04-03
03 Digital Refrigerant Gauge Calibration Status Calibration is current
04 Digital Thermocouple Calibration Status Calibration is current
D. Measurement Access Hole (MAH) Verification
Procedures for installing MAH are specified in Reference Residential Appendix RA3.2.2.3
01 Method Used to Demonstrate Compliance with the Measurement
Access Hole (MAH) Requirement
MAH installed and labeled consistent with Figure 3.2-1
E. Minimum System Airflow Rate Verification
Procedures for verifying minimum system airflow are specified in Reference Residential Appendix RA3.3.3.
01 02 03
Indoor Unit Name or Description of Area
Served Minimum Required System Airflow Rate (cfm)System Airflow Rate Verification Status
Casita 1400 System complies with minimum airflow rate
requirements
04 SC System complies with Minimum System Airflow Rate Verification
Notes:
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
REFRIGERANT CHARGE VERIFICATION CF2R-MCH-25-H
(Page 3 of 5)
Registration Number:
424-A020061538A-000-001-M25013A-0000
Registration Date/Time: 2024-04-09 18:03:23 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 18:04:30
F. Data Collection and Calculations
Procedures for determining Refrigerant Charge using the Standard Charge Verification Procedure are given in Reference Residential Appendix
RA3.2.2.
01 Lowest Return Air Dry Bulb Temperature that Occurred During the
Refrigerant Charge Verification Procedure ( °F)
85
02 Measured Condenser Air Entering Dry-Bulb Temperature
(Tcondenser, db)
88
03 Outdoor Temperature Qualification Status Outdoor temperature is within range for using Subcooling
refrigerant charge verification method
04 Measured Liquid Line Temperature (Tliquid) ( °F)89.5
05 Measured Liquid Line Pressure (Pliquid) (psig)306.9
06 Condenser Saturation Temperature (Tcondenser, sat) from Digital
Gauge or P-T Table using Line F05 ( °F)
95.4
07 Measured Subcooling (Line F06 - Lilne F04 ( °F)5.9
08 Target Subcooling from Manufacturer ( °F)8
09 Compliance Statement:System complies with Subcooling Method - Must also pass
metering device verification, next section
G. Metering Device Verification
Procedures for the verification of proper metering device operation are specified in RA3.2.2.6.2
01 Measured Suction Line Temperature (Tsuction) ( °F)62.4
02 Measured Suction Line Pressure (Psuction) (psig)219.0
03 Evaporator Saturation Temperature (Tevaporator, sat) from Digital
Gauge or P-T Table using Line G02 ( °F)
40.1
04 Measured Superheat (Line G01- Line G03) ( °F)22.3
05 Measured Superheat (Line G04) is between 4 °F and 25 °F
(inclusive)
Passes CEC requirement
06 Measured Superheat (Line G04) is within Manufacturer's
Specifications ( if known)
Yes, documentation to be provided upon request
07 Compliance Statement Metering device verification passes
MCH-25d - Refrigeration Charge Verification - Fault Indicator Display (FID)
H. Fault Indicator Display
This section does not apply to this project.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
REFRIGERANT CHARGE VERIFICATION CF2R-MCH-25-H
(Page 4 of 5)
Registration Number:
424-A020061538A-000-001-M25013A-0000
Registration Date/Time: 2024-04-09 18:03:23 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 18:04:30
I. Fault Indicator Display Additional Requirements
This section does not apply to this project.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
REFRIGERANT CHARGE VERIFICATION CF2R-MCH-25-H
(Page 5 of 5)
Registration Number:
424-A020061538A-000-001-M25013A-0000
Registration Date/Time: 2024-04-09 18:03:23 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 18:04:30
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Angel Arechiga
Documentation Author Signature:
Company:
iPermit
Signature Date:
2024-04-09
Address:
31225 La Baya Drive
CEA/ HERS Certification Identification (if applicable):
RCN13516
City/State/Zip:
Westlake Village CA 91362
Phone:
818-735-7876
RESPONSIBLE PERSON'S DECLARATION STATEMENT
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this certificate of installation is true and correct.
2.I am either: a) a responsible person eligible under division 3 of the business and professions code in the applicable
classification to accept responsibility for the system design, construction, or installation of features, materials,
components, or manufactured devices for the scope of work identified on this certificate of installation, and attest to the
declarations in this statement, or b) i am an authorized representative of the responsible person and attest to the
declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on
this certificate of installation conforms to all applicable codes and regulations and the installation conforms to the
requirements given on the certificate of compliance, plans, and specifications approved by the enforcement agency.
4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the
installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner.
5.I understand that a registered copy of this certificate of installation shall be posted or made available with the building
permit(s) issued for the building and made available to the enforcement agency for all applicable inspections, and I will
take the necessary steps to ensure this requirement is accomplished.
6.I understand that a registered copy of this certificate of installation is required to be included with the documentation
the builder provides to the building owner at occupancy, and I will take the necessary steps to ensure this requirement is
accomplished.
Responsible Builder/Installer Name:
Tom Powers (authorized Angel Arechiga)
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or
Builder/Owner)
DEH Mechanical Company Inc
Position With Company (Title):
Contractor/Installer
Address:
PO Box 12374
CSLB License:
752819
City/State/Zip:
Palm Desert CA 92255
Phone:
(760) 346-5354
Date Signed:
2024-04-09
Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-A020061538A-000-001-M20002A-M20A
Registration Date/Time: 2024-04-09 18:03:55 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 18:05:03
DUCT LEAKAGE DIAGNOSTIC TEST CF3R-MCH-20-H
(Page 1 of 4)
CERTIFICATE OF VERIFICATION
Project Name: 58-892 Marbella Lot 60 Enforcement Agency: La Quinta, City of
Dwelling Address: 58-892 Marbella Lot 60 Permit Number: PENDING
City and Zip Code La Quinta, 92253 Permit Application Date: 2024-04-01
A. System Information
01 Space Conditioning System Identification or Name System 1
02 Space Conditioning System Location or Area Served Living area
03 Indoor Unit Name or Description of Area Served Living room
04 Building Type from from parent CC Single family
05 Verified Low Leakage Ducts in Conditioned Space (VLLDCS) Credit
from parent CC?
No, credit is not taken
06 Verified Low Leakage Air Handling Unit Credit from parent CC?No, credit is not taken
07 Duct System Compliance Category New
08 Portions of Duct Located in Garage?No
09 Is the system type Small Duct High Velocity (SDHV) ?No
MCH-20a - Completely New Duct System
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
DUCT LEAKAGE DIAGNOSTIC TEST CF3R-MCH-20-H
(Page 2 of 4)
Registration Number:
424-A020061538A-000-001-M20002A-M20A
Registration Date/Time: 2024-04-09 18:03:55 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 18:05:03
B. Duct Leakage Diagnostic Test
01 Air Handling Unit Airflow (AHU Airflow) Determination Method Cooling system method
02 Condenser Nominal Cooling Capacity (ton)4
03 Indoor Unit Nominal Cooling Capacity 4
04 Heating Capacity (kBtu/h)n/a
05 Conditioned Floor Area Served by this HVAC System (ft2)1000
06 Measured AHU Airflow (cfm)n/a
07 Duct Leakage Test Conditions Test final
08 Duct Leakage Test Method Total leakage
09 Leakage Factor 0.05
10 Calculated Target Allowable Duct Leakage (cfm)80
11 Actual Duct Leakage Rate from Leakage Test Measurement (cfm)80
12 Compliance Statement System passes leakage test
13 Notes:
C. Additional Requirements for Compliance
01 System was tested in its normal operation condition. No temporary taping allowed.
02
Outside air (OA) duct connections to the central forced air duct system shall not be sealed/taped off during duct leakage testing. OA ducts
used for Central Fan Integrated (CFI) Indoor Air Quality ventilation systems, or Central Fan Ventilation Cooling Systems, that utilize
dampers that open only when OA is required and automatically close when OA is not required, may configure the OA damper to the
closed position during duct leakage testing.
03 All supply and return register boots were sealed to the drywall.
04 Building cavities were not used as plenums or platform returns in lieu of ducts.
05 If cloth backed tape was used it was covered with Mastic and draw bands.
06 All connection points between the air handler and the supply and return plenums are completely sealed.
Visual Inspection at Final Construction Stage (applicable if system was tested at rough-in).
After installing the interior finishing wall and verifying that the above rough-in tests was completed, the following procedure must be performed
07 For all supply and return registers, verify that the spaces between the register boot and the interior finishing wall are properly sealed.
08 If the house rough-in duct leakage test was conducted without an air handler installed, inspect the connection points between the air
handler and the supply and return plenums to verify that the connection points are properly sealed.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
DUCT LEAKAGE DIAGNOSTIC TEST CF3R-MCH-20-H
(Page 3 of 4)
Registration Number:
424-A020061538A-000-001-M20002A-M20A
Registration Date/Time: 2024-04-09 18:03:55 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 18:05:03
09 Inspect all joints to ensure that no cloth backed rubber adhesive duct tape is used.
10 Verification Status:Pass - all applicable requirements are met.
11 Correction Notes:
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met unless
otherwise noted in the Verification Status and the Corrections Notes in this table.
D. Determination of HERS Verification Compliance
All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order
for this Certificate of Verification as a whole to be determined to be in compliance.
01 Complies: All specified verification protocol requirements on this document are met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
DUCT LEAKAGE DIAGNOSTIC TEST CF3R-MCH-20-H
(Page 4 of 4)
Registration Number:
424-A020061538A-000-001-M20002A-M20A
Registration Date/Time: 2024-04-09 18:03:55 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 18:05:03
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT
1. I certify that this Certificate of Verification documentation is accurate and complete.
Documentation Author Name:
Angel Arechiga
Documentation Author Signature:
Company:
iPermit
Date Signed:
2024-04-09
Address:
31225 La Baya Drive
CEA/ HERS Certification Identification (if applicable):
RCN13516
City/State/Zip:
Westlake Village CA 91362
Phone:
818-735-7876
RESPONSIBLE PERSON'S DECLARATION STATEMENT
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Verification is true and correct.
2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible
rater).
3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS
verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3,
and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency.
4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s)
responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R)
approved by the enforcement agency.
5.I understand that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s)
issued for the building, and made available to the enforcement agency for all applicable inspections, and I will take the necessary
steps to ensure this requirement is accomplished.
6.I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder
provides to the building owner at occupancy, and I will take the necessary steps to ensure this requirement is accomplished.
BUILDER OR INSTALLER INFORMATION AS SHOWN ON THE CERTIFICATE OF INSTALLATION
Company Name (Installing Subcontractor, General Contractor, or Builder/Owner):
DEH Mechanical Company Inc
Responsible Builder or Installer Name:
Tom Powers (authorized Angel Arechiga)
CSLB License:
752819
HERS PROVIDER DATA REGISTRY INFORMATION
Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable)
N/A
HERS RATER INFORMATION
HERS Rater Company Name:
iPermit
Responsible Rater Name:
Angel Arechiga
Responsible Rater Signature:
Responsible Rater Certification Number w/ this HERS Provider:
RCN13516
Date Signed:
2024-04-09
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-A020061538A-000-001-M23003A-M23A
Registration Date/Time: 2024-04-09 18:03:57 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 18:05:05
SPACE CONDITIONING SYSTEM AIRFLOW
RATE
CF3R-MCH-23-H
(Page 1 of 4)
CERTIFICATE OF VERIFICATION
Project Name: 58-892 Marbella Lot 60 Enforcement Agency: La Quinta, City of
Dwelling Address: 58-892 Marbella Lot 60 Permit Number: PENDING
City and Zip Code La Quinta, 92253 Permit Application Date: 2024-04-01
A. Ducted Cooling System Information
01 Space Conditioning System Identification or Name System 1
02 Space Conditioning System Description of Area Served Living area
03 Indoor Unit Name Living room
04 System Installation Type New
05 Nominal Cooling Capacity (tons)4
06 Condenser Speed Type n/a
07 Cooling System Zonal Control Type n/a
08 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system
09 System Bypass Duct Status n/a
10 Date of System Airflow Rate Measurement 2024-04-09
11 Airflow Rate Protocol Utilized RA3.3 procedures for airflow rate measurement
12 Central Fan Ventilation Cooling System Status Not a CFVCS
B. Hole for the placement of a Static Pressure Probe (HSPP), and Permanently Installed Static Pressure Probe (PSPP) in the Supply Plenum.
Procedures for installing HSPP or PSPP are specified in RA3.3.1.1.
01 Method Used to Demonstrate Compliance with the HSPP/PSPP
Requirement
HSPP installed and labeled consistent with Figure RA3.3-1
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
SPACE CONDITIONING SYSTEM AIRFLOW
RATE
CF3R-MCH-23-H
(Page 2 of 4)
Registration Number:
424-A020061538A-000-001-M23003A-M23A
Registration Date/Time: 2024-04-09 18:03:57 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 18:05:05
C. Airflow Rate Measurement Apparatus and Procedure Information
Instrument Specifications are given in RA3.3.1.1, and system airflow rate measurement apparatus information is given in RA3.3.2.
01 Airflow Rate Measurement Type used for this airflow rate
verification.
Traditional Flow Capture Hood according to procedure in
RA3.3.3.1.4
02 Manufacturer of Airflow Measurement Apparatus Testo
03 Model number of Airflow Measurement Apparatus Testo420
04
Certification Status of the Airflow Measurement Apparatus
Accuracy
Certified by Manufacturer and listed on CEC Website at
http://www.energy.ca.gov/title24/equipment_cert/ama_fas/index.
html
MCH-23a Forced Air System Airflow Rate Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed Compressor
D. Forced Air System Airflow Rate Measurement
The procedures for System Airflow Rate Verification are specified in Reference Residential Appendix RA3.3.
01 Required Minimum System Airflow Rate (cfm/ton)350
02 Required Minimum System Airflow Target (cfm)1400
03 Actual System Airflow Rate Measurement (cfm)1438
04 Compliance Statement:System airflow rate complies
E. Additional Requirements
01 Air filters that meet the applicable requirements of Standards Section 150.0(m)12 or 150.0(m)13 were properly installed in the system
during system air flow rate measurement identified on this Certificate of Verification.
02
The airflow rate measurement apparatus used to perform the airflow rate measurement identified on this Certificate of Verification was
calibrated in accordance with the apparatus manufacturer's specifications and conforms to the instrumentation specifications given in
RA3.3.1.
03
A visual inspection shall confirm that bypass ducts that deliver conditioned supply air directly to the space conditioning system return
duct airflow are not used on newly constructed zonally controlled systems unless the Performance Certificate of Compliance indicates an
allowance for use of a bypass duct. When a bypass duct is accounted for on the Performance Certificate of Compliance, the airflow rate
shall conform to the specifications listed on the Certificate of Compliance.
04 All registers were fully open during the diagnostic test.
05 System fan was set at maximum speed during the diagnostic test.
06 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test.
07 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
SPACE CONDITIONING SYSTEM AIRFLOW
RATE
CF3R-MCH-23-H
(Page 3 of 4)
Registration Number:
424-A020061538A-000-001-M23003A-M23A
Registration Date/Time: 2024-04-09 18:03:57 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 18:05:05
E. Additional Requirements
08 Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan efficacy
(Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air handler fan speed.
09 Verification Status:Pass - all applicable requirements are met.
10 Correction Notes:
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met unless
otherwise noted in the Verification Status and the Corrections Notes in this table
F. Determination of HERS Verification Compliance
All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order
for this Certificate of Verification as a whole to be determined to be in compliance.
01 Complies: All specified verification protocol requirements on this document are met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
SPACE CONDITIONING SYSTEM AIRFLOW
RATE
CF3R-MCH-23-H
(Page 4 of 4)
Registration Number:
424-A020061538A-000-001-M23003A-M23A
Registration Date/Time: 2024-04-09 18:03:57 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 18:05:05
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT
1. I certify that this Certificate of Verification documentation is accurate and complete.
Documentation Author Name:
Angel Arechiga
Documentation Author Signature:
Company:
iPermit
Date Signed:
2024-04-09
Address:
31225 La Baya Drive
CEA/ HERS Certification Identification (if applicable):
RCN13516
City/State/Zip:
Westlake Village CA 91362
Phone:
818-735-7876
RESPONSIBLE PERSON'S DECLARATION STATEMENT
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Verification is true and correct.
2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible
rater).
3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS
verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3,
and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency.
4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s)
responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R)
approved by the enforcement agency.
5.I understand that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s)
issued for the building, and made available to the enforcement agency for all applicable inspections, and I will take the necessary
steps to ensure this requirement is accomplished.
6.I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder
provides to the building owner at occupancy, and I will take the necessary steps to ensure this requirement is accomplished.
BUILDER OR INSTALLER INFORMATION AS SHOWN ON THE CERTIFICATE OF INSTALLATION
Company Name (Installing Subcontractor, General Contractor, or Builder/Owner):
DEH Mechanical Company Inc
Responsible Builder or Installer Name:
Tom Powers (authorized Angel Arechiga)
CSLB License:
752819
HERS PROVIDER DATA REGISTRY INFORMATION
Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable)
N/A
HERS RATER INFORMATION
HERS Rater Company Name:
iPermit
Responsible Rater Name:
Angel Arechiga
Responsible Rater Signature:
Responsible Rater Certification Number w/ this HERS Provider:
RCN13516
Date Signed:
2024-04-09
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-A020061538A-000-001-M22004A-M22A
Registration Date/Time: 2024-04-09 18:04:05 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 18:05:12
SPACE CONDITIONING SYSTEM FAN
EFFICACY
CF3R-MCH-22-H
(Page 1 of 3)
CERTIFICATE OF VERIFICATION
Project Name: 58-892 Marbella Lot 60 Enforcement Agency: La Quinta, City of
Dwelling Address: 58-892 Marbella Lot 60 Permit Number: PENDING
City and Zip Code La Quinta, 92253 Permit Application Date: 2024-04-01
A. Ducted Cooling System Information
01 System Identification or Name System 1
02 System Location or Area Served Living area
03 Indoor Unit Name or Description of Area Served Living room
04 System Installation Type New
05 Nominal Cooling Capacity (tons) of Condenser 4
06 Condenser Speed Type n/a
07 Cooling System Zonal Control Type n/a
08 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system
09 System Bypass Duct Status n/a
10 Date of System Airflow Rate Measurement 2024-04-09
11 Airflow Rate Protocol utilized RA3.3 procedures for airflow rate measurement
12 Central Fan Ventilation Cooling System Status Not a CFVCS
B. Fan Watt Measurement Apparatus and Procedure Information
Instrument Specifications are given in RA3.3.1, and system fan watt measurement apparatus information is given in RA3.3.2.2.
01 Fan Watt Verification Device Used.Portable Watt Meter
MCH-22a Forced Air System Fan Efficacy Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed Compressor
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
SPACE CONDITIONING SYSTEM FAN
EFFICACY
CF3R-MCH-22-H
(Page 2 of 3)
Registration Number:
424-A020061538A-000-001-M22004A-M22A
Registration Date/Time: 2024-04-09 18:04:05 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 18:05:12
C. Forced Air System Fan Efficacy Measurement
The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3
01 Actual Tested Watts 15
02 Actual Tested Airflow from MCH-23 (cfm)1438
03 Required Fan Efficacy (Watts/cfm)0.58
04 Actual Fan Efficacy (watts/cfm)0.01
05 Compliance Statement:System fan efficacy complies
D. Additional Requirements
01 All registers were fully open during the diagnostic test.
02 System fan was set at maximum speed during the diagnostic test.
03 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test.
04 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value.
05 Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan efficacy
(Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air handler fan speed.
06 Zoned cooling air distribution systems with single speed compressors shall meet both the airflow (cfm/ton) and fan efficacy (Watt/cfm)
criteria in every zonal control mode.
07 Portable watt meters used for measurements of air handler watt draws shall be true power measurement systems (i.e. sensor plus data
acquisition system) having an accuracy of +- 2% of reading or +- 10 Watts whichever is greater
08 Verification Status Pass - all applicable requirements are met.
09 Correction Notes
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met unless
otherwise noted in the Verification Status and the Corrections Notes in this table.
E. Determination of HERS Verification Compliance
All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order
for this Certificate of Verification as a whole to be determined to be in compliance.
01 Complies: All specified verification protocol requirements on this document are met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
SPACE CONDITIONING SYSTEM FAN
EFFICACY
CF3R-MCH-22-H
(Page 3 of 3)
Registration Number:
424-A020061538A-000-001-M22004A-M22A
Registration Date/Time: 2024-04-09 18:04:05 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 18:05:12
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT
1. I certify that this Certificate of Verification documentation is accurate and complete.
Documentation Author Name:
Angel Arechiga
Documentation Author Signature:
Company:
iPermit
Date Signed:
2024-04-09
Address:
31225 La Baya Drive
CEA/ HERS Certification Identification (if applicable):
RCN13516
City/State/Zip:
Westlake Village CA 91362
Phone:
818-735-7876
RESPONSIBLE PERSON'S DECLARATION STATEMENT
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Verification is true and correct.
2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible
rater).
3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS
verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3,
and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency.
4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s)
responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R)
approved by the enforcement agency.
5.I understand that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s)
issued for the building, and made available to the enforcement agency for all applicable inspections, and I will take the necessary
steps to ensure this requirement is accomplished.
6.I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder
provides to the building owner at occupancy, and I will take the necessary steps to ensure this requirement is accomplished.
BUILDER OR INSTALLER INFORMATION AS SHOWN ON THE CERTIFICATE OF INSTALLATION
Company Name (Installing Subcontractor, General Contractor, or Builder/Owner):
DEH Mechanical Company Inc
Responsible Builder or Installer Name:
Tom Powers (authorized Angel Arechiga)
CSLB License:
752819
HERS PROVIDER DATA REGISTRY INFORMATION
Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable)
N/A
HERS RATER INFORMATION
HERS Rater Company Name:
iPermit
Responsible Rater Name:
Angel Arechiga
Responsible Rater Signature:
Responsible Rater Certification Number w/ this HERS Provider:
RCN13516
Date Signed:
2024-04-09
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-A020061538A-000-001-M25011A-M25A
Registration Date/Time: 2024-04-09 18:04:40 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 18:05:48
REFRIGERANT CHARGE VERIFICATION CF3R-MCH-25-H
(Page 1 of 4)
CERTIFICATE OF VERIFICATION
Project Name: 58-892 Marbella Lot 60 Enforcement Agency: La Quinta, City of
Dwelling Address: 58-892 Marbella Lot 60 Permit Number: PENDING
City and Zip Code La Quinta, 92253 Permit Application Date: 2024-04-01
A. System Information
HERS Rater to field-verify all system information, discrepancies to be noted by overwriting entry.
01 Space Conditioning System Identification or Name System 1
02 Space Conditioning System Location or Area Served Living area
03 Condenser (or package unit) make or brand GOODMAN
04 Condenser (or package unit) model number GSZH504810AA
05 Nominal Cooling Capacity (tons) of Condenser 4
06 Condenser (or package unit) serial number 2310151351
07 Refrigerant Type R-410A
08 Other Refrigerant Type (if applicable)n/a
09 Liquid Line Filter Drier Installed According to Manufacturers
Specifications (if applicable)
Yes
10 System Installation Type New
11 Fault Indicator Display (FID) Status (Note: Even systems with a FID
must have refrigerant charge verified by installer)
This system does not have a FID device installed
12
Is the system of a type that the minimum airflow can be verified for
all indoor units using an approved measurement procedure (RA3.3
or RA3.3.3)?
Yes
13
Is the system of a type that approved refrigerant charge verification
procedures can be used to verify compliance with the refrigerant
charge verification requirements when temperatures are >= 55 °F
(RA3.2.2, or RA1)?
Yes, one of the Refrigerant charge verification procedures from
RA3.2.2 or RA1 is applicable to this system and can be used to
verify compliance
14 Date of Refrigerant Charge Verification for this system 2024-04-09
15 Refrigerant charge verification method used.Subcooling (outdoor temperature must be equal to or greater than
55 degF)
16 Person who performed the Refrigerant Charge Verification
reported on this Certificate of Installation
HERS rater
17 HERS Verification Compliance Requirement Status System does not qualify for group sampling
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
REFRIGERANT CHARGE VERIFICATION CF3R-MCH-25-H
(Page 2 of 4)
Registration Number:
424-A020061538A-000-001-M25011A-M25A
Registration Date/Time: 2024-04-09 18:04:40 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 18:05:48
A. System Information
HERS Rater to field-verify all system information, discrepancies to be noted by overwriting entry.
18 Refrigerant charge verification method used by HERS Rater.Subcooling
MCH-25b - Refrigerant Charge Verification - Subcooling Method
B. Metering Device Verification
HERS Rater is required to visually field verify all information from CF2R. Subcooling Method can only be used on systems that have a variable
metering device.
01 Refrigerant metering device Thermostatic Expansion Valve (TXV)
02 Subcooling Method applicability status Subcooling Method is applicable to this system.
C. Instrument Calibration
HERS Raters are required to calibrate their diagnostic tools. Procedures for instrument calibration are given in Reference Residential Appendix
RA3.2.2 and RA3.2.2.2
01 Date of Digital Refrigerant Gauge Calibration 2024-03-25
02 Date of Digital Thermocouple Calibration 2024-04-03
03 Digital Refrigerant Gauge Calibration Status Calibration is current
04 Digital Thermocouple Calibration Status Calibration is current
D. Measurement Access Hole (MAH) Verification
HERS Raters are required to visually field verify MAH. Procedures for installing MAH are specified in Reference Residential Appendix RA3.2.2.3
01 Method Used to Demonstrate Compliance with the Measurement
Access Hole (MAH) Requirement
MAH installed and labeled consistent with Figure 3.2-1
E. Minimum System Airflow Rate Verification
Procedures for verifying minimum system airflow are specified in Reference Residential Appendix RA3.3.3.
01 02 03
Indoor Unit Name or Description of Area
Served Minimum Required System Airflow Rate (cfm)System Airflow Rate Verification Status
Living room 1050 System complies with minimum airflow rate
requirements
04 SC System complies with Minimum System Airflow Rate Verification
Notes:
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
REFRIGERANT CHARGE VERIFICATION CF3R-MCH-25-H
(Page 3 of 4)
Registration Number:
424-A020061538A-000-001-M25011A-M25A
Registration Date/Time: 2024-04-09 18:04:40 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 18:05:48
F. Data Collection and Calculations
HERS Rater must independently collect all data in this section. Procedures for determining Refrigerant Charge using the Standard Charge
Verification Procedure are given in Reference Residential Appendix RA3.2.2 and RA3.2.2.2
01 Lowest Return Air Dry Bulb Temperature that Occurred During the
Refrigerant Charge Verification Procedure ( °F)
75
02 Measured Condenser Air Entering Dry-Bulb Temperature
(Tcondenser, db)
85
03 Outdoor Temperature Qualification Status Outdoor temperature is within range for using Subcooling
refrigerant charge verification method
04 Measured Liquid Line Temperature (Tliquid) ( °F)85.6
05 Measured Liquid Line Pressure (Pliquid) (psig)310.4
06 Condenser Saturation Temperature (Tcondenser, sat) from Digital
Gauge or P-T Table using Line F05 ( °F)
95.8
07 Measured Subcooling (Line F06 - Lilne F04 ( °F)10.2
08 Target Subcooling from Manufacturer ( °F)8
09 Compliance Statement:System complies with Subcooling Method - Must also pass
metering device verification, next section
G. Metering Device Verification
HERS Rater must independently collect all data in this section. Procedures for the verification of proper metering device operation are specified
in RA3.2.2.6.2
01 Measured Suction Line Temperature (Tsuction) ( °F)60.8
02 Measured Suction Line Pressure (Psuction) (psig)117.9
03 Evaporator Saturation Temperature (Tevaporator, sat) from Digital
Gauge or P-T Table using Line G02 ( °F)
39.8
04 Measured Superheat (Line G01- Line G03) ( °F)21
05 Measured Superheat (Line G04) is between 3 °F and 26 °F
(inclusive)
Passes CEC requirement
06 Measured Superheat (Line G04) is within Manufacturer's
Specifications ( if known)
Yes, documentation to be provided upon request
07 Compliance Statement:Metering device verification passes
H. Determination of HERS Verification Compliance
All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order
for this Certificate of Verification as a whole to be determined to be in compliance.
01 Complies: All specified verification protocol requirements on this document are met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
REFRIGERANT CHARGE VERIFICATION CF3R-MCH-25-H
(Page 4 of 4)
Registration Number:
424-A020061538A-000-001-M25011A-M25A
Registration Date/Time: 2024-04-09 18:04:40 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 18:05:48
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT
1. I certify that this Certificate of Verification documentation is accurate and complete.
Documentation Author Name:
Angel Arechiga
Documentation Author Signature:
Company:
iPermit
Date Signed:
2024-04-09
Address:
31225 La Baya Drive
CEA/ HERS Certification Identification (if applicable):
RCN13516
City/State/Zip:
Westlake Village CA 91362
Phone:
818-735-7876
RESPONSIBLE PERSON'S DECLARATION STATEMENT
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Verification is true and correct.
2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible
rater).
3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS
verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3,
and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency.
4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s)
responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R)
approved by the enforcement agency.
5.I understand that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s)
issued for the building, and made available to the enforcement agency for all applicable inspections, and I will take the necessary
steps to ensure this requirement is accomplished.
6.I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder
provides to the building owner at occupancy, and I will take the necessary steps to ensure this requirement is accomplished.
BUILDER OR INSTALLER INFORMATION AS SHOWN ON THE CERTIFICATE OF INSTALLATION
Company Name (Installing Subcontractor, General Contractor, or Builder/Owner):
DEH Mechanical Company Inc
Responsible Builder or Installer Name:
Tom Powers (authorized Angel Arechiga)
CSLB License:
752819
HERS PROVIDER DATA REGISTRY INFORMATION
Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable)
N/A
HERS RATER INFORMATION
HERS Rater Company Name:
iPermit
Responsible Rater Name:
Angel Arechiga
Responsible Rater Signature:
Responsible Rater Certification Number w/ this HERS Provider:
RCN13516
Date Signed:
2024-04-09
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-A020061538A-000-001-M20005A-M20A
Registration Date/Time: 2024-04-09 18:03:42 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 18:04:50
DUCT LEAKAGE DIAGNOSTIC TEST CF3R-MCH-20-H
(Page 1 of 4)
CERTIFICATE OF VERIFICATION
Project Name: 58-892 Marbella Lot 60 Enforcement Agency: La Quinta, City of
Dwelling Address: 58-892 Marbella Lot 60 Permit Number: PENDING
City and Zip Code La Quinta, 92253 Permit Application Date: 2024-04-01
A. System Information
01 Space Conditioning System Identification or Name System 2
02 Space Conditioning System Location or Area Served Master
03 Indoor Unit Name or Description of Area Served 1
04 Building Type from from parent CC Single family
05 Verified Low Leakage Ducts in Conditioned Space (VLLDCS) Credit
from parent CC?
No, credit is not taken
06 Verified Low Leakage Air Handling Unit Credit from parent CC?No, credit is not taken
07 Duct System Compliance Category New
08 Portions of Duct Located in Garage?No
09 Is the system type Small Duct High Velocity (SDHV) ?No
MCH-20a - Completely New Duct System
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
DUCT LEAKAGE DIAGNOSTIC TEST CF3R-MCH-20-H
(Page 2 of 4)
Registration Number:
424-A020061538A-000-001-M20005A-M20A
Registration Date/Time: 2024-04-09 18:03:42 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 18:04:50
B. Duct Leakage Diagnostic Test
01 Air Handling Unit Airflow (AHU Airflow) Determination Method Cooling system method
02 Condenser Nominal Cooling Capacity (ton)3
03 Indoor Unit Nominal Cooling Capacity 3
04 Heating Capacity (kBtu/h)n/a
05 Conditioned Floor Area Served by this HVAC System (ft2)1000
06 Measured AHU Airflow (cfm)n/a
07 Duct Leakage Test Conditions Test final
08 Duct Leakage Test Method Total leakage
09 Leakage Factor 0.05
10 Calculated Target Allowable Duct Leakage (cfm)60
11 Actual Duct Leakage Rate from Leakage Test Measurement (cfm)55
12 Compliance Statement System passes leakage test
13 Notes:
C. Additional Requirements for Compliance
01 System was tested in its normal operation condition. No temporary taping allowed.
02
Outside air (OA) duct connections to the central forced air duct system shall not be sealed/taped off during duct leakage testing. OA ducts
used for Central Fan Integrated (CFI) Indoor Air Quality ventilation systems, or Central Fan Ventilation Cooling Systems, that utilize
dampers that open only when OA is required and automatically close when OA is not required, may configure the OA damper to the
closed position during duct leakage testing.
03 All supply and return register boots were sealed to the drywall.
04 Building cavities were not used as plenums or platform returns in lieu of ducts.
05 If cloth backed tape was used it was covered with Mastic and draw bands.
06 All connection points between the air handler and the supply and return plenums are completely sealed.
Visual Inspection at Final Construction Stage (applicable if system was tested at rough-in).
After installing the interior finishing wall and verifying that the above rough-in tests was completed, the following procedure must be performed
07 For all supply and return registers, verify that the spaces between the register boot and the interior finishing wall are properly sealed.
08 If the house rough-in duct leakage test was conducted without an air handler installed, inspect the connection points between the air
handler and the supply and return plenums to verify that the connection points are properly sealed.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
DUCT LEAKAGE DIAGNOSTIC TEST CF3R-MCH-20-H
(Page 3 of 4)
Registration Number:
424-A020061538A-000-001-M20005A-M20A
Registration Date/Time: 2024-04-09 18:03:42 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 18:04:50
09 Inspect all joints to ensure that no cloth backed rubber adhesive duct tape is used.
10 Verification Status:Pass - all applicable requirements are met.
11 Correction Notes:
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met unless
otherwise noted in the Verification Status and the Corrections Notes in this table.
D. Determination of HERS Verification Compliance
All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order
for this Certificate of Verification as a whole to be determined to be in compliance.
01 Complies: All specified verification protocol requirements on this document are met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
DUCT LEAKAGE DIAGNOSTIC TEST CF3R-MCH-20-H
(Page 4 of 4)
Registration Number:
424-A020061538A-000-001-M20005A-M20A
Registration Date/Time: 2024-04-09 18:03:42 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 18:04:50
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT
1. I certify that this Certificate of Verification documentation is accurate and complete.
Documentation Author Name:
Angel Arechiga
Documentation Author Signature:
Company:
iPermit
Date Signed:
2024-04-09
Address:
31225 La Baya Drive
CEA/ HERS Certification Identification (if applicable):
RCN13516
City/State/Zip:
Westlake Village CA 91362
Phone:
818-735-7876
RESPONSIBLE PERSON'S DECLARATION STATEMENT
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Verification is true and correct.
2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible
rater).
3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS
verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3,
and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency.
4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s)
responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R)
approved by the enforcement agency.
5.I understand that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s)
issued for the building, and made available to the enforcement agency for all applicable inspections, and I will take the necessary
steps to ensure this requirement is accomplished.
6.I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder
provides to the building owner at occupancy, and I will take the necessary steps to ensure this requirement is accomplished.
BUILDER OR INSTALLER INFORMATION AS SHOWN ON THE CERTIFICATE OF INSTALLATION
Company Name (Installing Subcontractor, General Contractor, or Builder/Owner):
DEH Mechanical Company Inc
Responsible Builder or Installer Name:
Tom Powers (authorized Angel Arechiga)
CSLB License:
752819
HERS PROVIDER DATA REGISTRY INFORMATION
Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable)
N/A
HERS RATER INFORMATION
HERS Rater Company Name:
iPermit
Responsible Rater Name:
Angel Arechiga
Responsible Rater Signature:
Responsible Rater Certification Number w/ this HERS Provider:
RCN13516
Date Signed:
2024-04-09
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-A020061538A-000-001-M23006A-M23A
Registration Date/Time: 2024-04-09 18:03:44 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 18:04:52
SPACE CONDITIONING SYSTEM AIRFLOW
RATE
CF3R-MCH-23-H
(Page 1 of 4)
CERTIFICATE OF VERIFICATION
Project Name: 58-892 Marbella Lot 60 Enforcement Agency: La Quinta, City of
Dwelling Address: 58-892 Marbella Lot 60 Permit Number: PENDING
City and Zip Code La Quinta, 92253 Permit Application Date: 2024-04-01
A. Ducted Cooling System Information
01 Space Conditioning System Identification or Name System 2
02 Space Conditioning System Description of Area Served Master
03 Indoor Unit Name 1
04 System Installation Type New
05 Nominal Cooling Capacity (tons)3
06 Condenser Speed Type n/a
07 Cooling System Zonal Control Type n/a
08 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system
09 System Bypass Duct Status n/a
10 Date of System Airflow Rate Measurement 2024-04-09
11 Airflow Rate Protocol Utilized RA3.3 procedures for airflow rate measurement
12 Central Fan Ventilation Cooling System Status Not a CFVCS
B. Hole for the placement of a Static Pressure Probe (HSPP), and Permanently Installed Static Pressure Probe (PSPP) in the Supply Plenum.
Procedures for installing HSPP or PSPP are specified in RA3.3.1.1.
01 Method Used to Demonstrate Compliance with the HSPP/PSPP
Requirement
HSPP installed and labeled consistent with Figure RA3.3-1
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
SPACE CONDITIONING SYSTEM AIRFLOW
RATE
CF3R-MCH-23-H
(Page 2 of 4)
Registration Number:
424-A020061538A-000-001-M23006A-M23A
Registration Date/Time: 2024-04-09 18:03:44 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 18:04:52
C. Airflow Rate Measurement Apparatus and Procedure Information
Instrument Specifications are given in RA3.3.1.1, and system airflow rate measurement apparatus information is given in RA3.3.2.
01 Airflow Rate Measurement Type used for this airflow rate
verification.
Traditional Flow Capture Hood according to procedure in
RA3.3.3.1.4
02 Manufacturer of Airflow Measurement Apparatus Testo
03 Model number of Airflow Measurement Apparatus Testo420
04
Certification Status of the Airflow Measurement Apparatus
Accuracy
Certified by Manufacturer and listed on CEC Website at
http://www.energy.ca.gov/title24/equipment_cert/ama_fas/index.
html
MCH-23a Forced Air System Airflow Rate Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed Compressor
D. Forced Air System Airflow Rate Measurement
The procedures for System Airflow Rate Verification are specified in Reference Residential Appendix RA3.3.
01 Required Minimum System Airflow Rate (cfm/ton)350
02 Required Minimum System Airflow Target (cfm)1050
03 Actual System Airflow Rate Measurement (cfm)1068
04 Compliance Statement:System airflow rate complies
E. Additional Requirements
01 Air filters that meet the applicable requirements of Standards Section 150.0(m)12 or 150.0(m)13 were properly installed in the system
during system air flow rate measurement identified on this Certificate of Verification.
02
The airflow rate measurement apparatus used to perform the airflow rate measurement identified on this Certificate of Verification was
calibrated in accordance with the apparatus manufacturer's specifications and conforms to the instrumentation specifications given in
RA3.3.1.
03
A visual inspection shall confirm that bypass ducts that deliver conditioned supply air directly to the space conditioning system return
duct airflow are not used on newly constructed zonally controlled systems unless the Performance Certificate of Compliance indicates an
allowance for use of a bypass duct. When a bypass duct is accounted for on the Performance Certificate of Compliance, the airflow rate
shall conform to the specifications listed on the Certificate of Compliance.
04 All registers were fully open during the diagnostic test.
05 System fan was set at maximum speed during the diagnostic test.
06 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test.
07 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
SPACE CONDITIONING SYSTEM AIRFLOW
RATE
CF3R-MCH-23-H
(Page 3 of 4)
Registration Number:
424-A020061538A-000-001-M23006A-M23A
Registration Date/Time: 2024-04-09 18:03:44 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 18:04:52
E. Additional Requirements
08 Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan efficacy
(Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air handler fan speed.
09 Verification Status:Pass - all applicable requirements are met.
10 Correction Notes:
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met unless
otherwise noted in the Verification Status and the Corrections Notes in this table
F. Determination of HERS Verification Compliance
All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order
for this Certificate of Verification as a whole to be determined to be in compliance.
01 Complies: All specified verification protocol requirements on this document are met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
SPACE CONDITIONING SYSTEM AIRFLOW
RATE
CF3R-MCH-23-H
(Page 4 of 4)
Registration Number:
424-A020061538A-000-001-M23006A-M23A
Registration Date/Time: 2024-04-09 18:03:44 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 18:04:52
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT
1. I certify that this Certificate of Verification documentation is accurate and complete.
Documentation Author Name:
Angel Arechiga
Documentation Author Signature:
Company:
iPermit
Date Signed:
2024-04-09
Address:
31225 La Baya Drive
CEA/ HERS Certification Identification (if applicable):
RCN13516
City/State/Zip:
Westlake Village CA 91362
Phone:
818-735-7876
RESPONSIBLE PERSON'S DECLARATION STATEMENT
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Verification is true and correct.
2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible
rater).
3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS
verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3,
and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency.
4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s)
responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R)
approved by the enforcement agency.
5.I understand that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s)
issued for the building, and made available to the enforcement agency for all applicable inspections, and I will take the necessary
steps to ensure this requirement is accomplished.
6.I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder
provides to the building owner at occupancy, and I will take the necessary steps to ensure this requirement is accomplished.
BUILDER OR INSTALLER INFORMATION AS SHOWN ON THE CERTIFICATE OF INSTALLATION
Company Name (Installing Subcontractor, General Contractor, or Builder/Owner):
DEH Mechanical Company Inc
Responsible Builder or Installer Name:
Tom Powers (authorized Angel Arechiga)
CSLB License:
752819
HERS PROVIDER DATA REGISTRY INFORMATION
Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable)
N/A
HERS RATER INFORMATION
HERS Rater Company Name:
iPermit
Responsible Rater Name:
Angel Arechiga
Responsible Rater Signature:
Responsible Rater Certification Number w/ this HERS Provider:
RCN13516
Date Signed:
2024-04-09
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-A020061538A-000-001-M22007A-M22A
Registration Date/Time: 2024-04-09 18:03:52 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 18:04:59
SPACE CONDITIONING SYSTEM FAN
EFFICACY
CF3R-MCH-22-H
(Page 1 of 3)
CERTIFICATE OF VERIFICATION
Project Name: 58-892 Marbella Lot 60 Enforcement Agency: La Quinta, City of
Dwelling Address: 58-892 Marbella Lot 60 Permit Number: PENDING
City and Zip Code La Quinta, 92253 Permit Application Date: 2024-04-01
A. Ducted Cooling System Information
01 System Identification or Name System 2
02 System Location or Area Served Master
03 Indoor Unit Name or Description of Area Served 1
04 System Installation Type New
05 Nominal Cooling Capacity (tons) of Condenser 3
06 Condenser Speed Type n/a
07 Cooling System Zonal Control Type n/a
08 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system
09 System Bypass Duct Status n/a
10 Date of System Airflow Rate Measurement 2024-04-09
11 Airflow Rate Protocol utilized RA3.3 procedures for airflow rate measurement
12 Central Fan Ventilation Cooling System Status Not a CFVCS
B. Fan Watt Measurement Apparatus and Procedure Information
Instrument Specifications are given in RA3.3.1, and system fan watt measurement apparatus information is given in RA3.3.2.2.
01 Fan Watt Verification Device Used.Portable Watt Meter
MCH-22a Forced Air System Fan Efficacy Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed Compressor
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
SPACE CONDITIONING SYSTEM FAN
EFFICACY
CF3R-MCH-22-H
(Page 2 of 3)
Registration Number:
424-A020061538A-000-001-M22007A-M22A
Registration Date/Time: 2024-04-09 18:03:52 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 18:04:59
C. Forced Air System Fan Efficacy Measurement
The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3
01 Actual Tested Watts 15
02 Actual Tested Airflow from MCH-23 (cfm)1068
03 Required Fan Efficacy (Watts/cfm)0.58
04 Actual Fan Efficacy (watts/cfm)0.01
05 Compliance Statement:System fan efficacy complies
D. Additional Requirements
01 All registers were fully open during the diagnostic test.
02 System fan was set at maximum speed during the diagnostic test.
03 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test.
04 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value.
05 Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan efficacy
(Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air handler fan speed.
06 Zoned cooling air distribution systems with single speed compressors shall meet both the airflow (cfm/ton) and fan efficacy (Watt/cfm)
criteria in every zonal control mode.
07 Portable watt meters used for measurements of air handler watt draws shall be true power measurement systems (i.e. sensor plus data
acquisition system) having an accuracy of +- 2% of reading or +- 10 Watts whichever is greater
08 Verification Status Pass - all applicable requirements are met.
09 Correction Notes
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met unless
otherwise noted in the Verification Status and the Corrections Notes in this table.
E. Determination of HERS Verification Compliance
All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order
for this Certificate of Verification as a whole to be determined to be in compliance.
01 Complies: All specified verification protocol requirements on this document are met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
SPACE CONDITIONING SYSTEM FAN
EFFICACY
CF3R-MCH-22-H
(Page 3 of 3)
Registration Number:
424-A020061538A-000-001-M22007A-M22A
Registration Date/Time: 2024-04-09 18:03:52 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 18:04:59
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT
1. I certify that this Certificate of Verification documentation is accurate and complete.
Documentation Author Name:
Angel Arechiga
Documentation Author Signature:
Company:
iPermit
Date Signed:
2024-04-09
Address:
31225 La Baya Drive
CEA/ HERS Certification Identification (if applicable):
RCN13516
City/State/Zip:
Westlake Village CA 91362
Phone:
818-735-7876
RESPONSIBLE PERSON'S DECLARATION STATEMENT
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Verification is true and correct.
2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible
rater).
3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS
verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3,
and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency.
4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s)
responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R)
approved by the enforcement agency.
5.I understand that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s)
issued for the building, and made available to the enforcement agency for all applicable inspections, and I will take the necessary
steps to ensure this requirement is accomplished.
6.I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder
provides to the building owner at occupancy, and I will take the necessary steps to ensure this requirement is accomplished.
BUILDER OR INSTALLER INFORMATION AS SHOWN ON THE CERTIFICATE OF INSTALLATION
Company Name (Installing Subcontractor, General Contractor, or Builder/Owner):
DEH Mechanical Company Inc
Responsible Builder or Installer Name:
Tom Powers (authorized Angel Arechiga)
CSLB License:
752819
HERS PROVIDER DATA REGISTRY INFORMATION
Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable)
N/A
HERS RATER INFORMATION
HERS Rater Company Name:
iPermit
Responsible Rater Name:
Angel Arechiga
Responsible Rater Signature:
Responsible Rater Certification Number w/ this HERS Provider:
RCN13516
Date Signed:
2024-04-09
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-A020061538A-000-001-M25012A-M25A
Registration Date/Time: 2024-04-09 18:04:43 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 18:05:50
REFRIGERANT CHARGE VERIFICATION CF3R-MCH-25-H
(Page 1 of 4)
CERTIFICATE OF VERIFICATION
Project Name: 58-892 Marbella Lot 60 Enforcement Agency: La Quinta, City of
Dwelling Address: 58-892 Marbella Lot 60 Permit Number: PENDING
City and Zip Code La Quinta, 92253 Permit Application Date: 2024-04-01
A. System Information
HERS Rater to field-verify all system information, discrepancies to be noted by overwriting entry.
01 Space Conditioning System Identification or Name System 2
02 Space Conditioning System Location or Area Served Master
03 Condenser (or package unit) make or brand GOODMAN
04 Condenser (or package unit) model number GSZH503610AB
05 Nominal Cooling Capacity (tons) of Condenser 3
06 Condenser (or package unit) serial number GSZH503610AB
07 Refrigerant Type R-410A
08 Other Refrigerant Type (if applicable)n/a
09 Liquid Line Filter Drier Installed According to Manufacturers
Specifications (if applicable)
Yes
10 System Installation Type New
11 Fault Indicator Display (FID) Status (Note: Even systems with a FID
must have refrigerant charge verified by installer)
This system does not have a FID device installed
12
Is the system of a type that the minimum airflow can be verified for
all indoor units using an approved measurement procedure (RA3.3
or RA3.3.3)?
Yes
13
Is the system of a type that approved refrigerant charge verification
procedures can be used to verify compliance with the refrigerant
charge verification requirements when temperatures are >= 55 °F
(RA3.2.2, or RA1)?
Yes, one of the Refrigerant charge verification procedures from
RA3.2.2 or RA1 is applicable to this system and can be used to
verify compliance
14 Date of Refrigerant Charge Verification for this system 2024-04-09
15 Refrigerant charge verification method used.Subcooling (outdoor temperature must be equal to or greater than
55 degF)
16 Person who performed the Refrigerant Charge Verification
reported on this Certificate of Installation
HERS rater
17 HERS Verification Compliance Requirement Status System does not qualify for group sampling
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
REFRIGERANT CHARGE VERIFICATION CF3R-MCH-25-H
(Page 2 of 4)
Registration Number:
424-A020061538A-000-001-M25012A-M25A
Registration Date/Time: 2024-04-09 18:04:43 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 18:05:50
A. System Information
HERS Rater to field-verify all system information, discrepancies to be noted by overwriting entry.
18 Refrigerant charge verification method used by HERS Rater.Subcooling
MCH-25b - Refrigerant Charge Verification - Subcooling Method
B. Metering Device Verification
HERS Rater is required to visually field verify all information from CF2R. Subcooling Method can only be used on systems that have a variable
metering device.
01 Refrigerant metering device Thermostatic Expansion Valve (TXV)
02 Subcooling Method applicability status Subcooling Method is applicable to this system.
C. Instrument Calibration
HERS Raters are required to calibrate their diagnostic tools. Procedures for instrument calibration are given in Reference Residential Appendix
RA3.2.2 and RA3.2.2.2
01 Date of Digital Refrigerant Gauge Calibration 2024-03-25
02 Date of Digital Thermocouple Calibration 2024-04-03
03 Digital Refrigerant Gauge Calibration Status Calibration is current
04 Digital Thermocouple Calibration Status Calibration is current
D. Measurement Access Hole (MAH) Verification
HERS Raters are required to visually field verify MAH. Procedures for installing MAH are specified in Reference Residential Appendix RA3.2.2.3
01 Method Used to Demonstrate Compliance with the Measurement
Access Hole (MAH) Requirement
MAH installed and labeled consistent with Figure 3.2-1
E. Minimum System Airflow Rate Verification
Procedures for verifying minimum system airflow are specified in Reference Residential Appendix RA3.3.3.
01 02 03
Indoor Unit Name or Description of Area
Served Minimum Required System Airflow Rate (cfm)System Airflow Rate Verification Status
1 1050 System complies with minimum airflow rate
requirements
04 SC System complies with Minimum System Airflow Rate Verification
Notes:
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
REFRIGERANT CHARGE VERIFICATION CF3R-MCH-25-H
(Page 3 of 4)
Registration Number:
424-A020061538A-000-001-M25012A-M25A
Registration Date/Time: 2024-04-09 18:04:43 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 18:05:50
F. Data Collection and Calculations
HERS Rater must independently collect all data in this section. Procedures for determining Refrigerant Charge using the Standard Charge
Verification Procedure are given in Reference Residential Appendix RA3.2.2 and RA3.2.2.2
01 Lowest Return Air Dry Bulb Temperature that Occurred During the
Refrigerant Charge Verification Procedure ( °F)
80
02 Measured Condenser Air Entering Dry-Bulb Temperature
(Tcondenser, db)
85
03 Outdoor Temperature Qualification Status Outdoor temperature is within range for using Subcooling
refrigerant charge verification method
04 Measured Liquid Line Temperature (Tliquid) ( °F)88.9
05 Measured Liquid Line Pressure (Pliquid) (psig)305.9
06 Condenser Saturation Temperature (Tcondenser, sat) from Digital
Gauge or P-T Table using Line F05 ( °F)
94.5
07 Measured Subcooling (Line F06 - Lilne F04 ( °F)5.6
08 Target Subcooling from Manufacturer ( °F)8
09 Compliance Statement:System complies with Subcooling Method - Must also pass
metering device verification, next section
G. Metering Device Verification
HERS Rater must independently collect all data in this section. Procedures for the verification of proper metering device operation are specified
in RA3.2.2.6.2
01 Measured Suction Line Temperature (Tsuction) ( °F)59.4
02 Measured Suction Line Pressure (Psuction) (psig)106.9
03 Evaporator Saturation Temperature (Tevaporator, sat) from Digital
Gauge or P-T Table using Line G02 ( °F)
42.8
04 Measured Superheat (Line G01- Line G03) ( °F)16.6
05 Measured Superheat (Line G04) is between 3 °F and 26 °F
(inclusive)
Passes CEC requirement
06 Measured Superheat (Line G04) is within Manufacturer's
Specifications ( if known)
Yes, documentation to be provided upon request
07 Compliance Statement:Metering device verification passes
H. Determination of HERS Verification Compliance
All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order
for this Certificate of Verification as a whole to be determined to be in compliance.
01 Complies: All specified verification protocol requirements on this document are met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
REFRIGERANT CHARGE VERIFICATION CF3R-MCH-25-H
(Page 4 of 4)
Registration Number:
424-A020061538A-000-001-M25012A-M25A
Registration Date/Time: 2024-04-09 18:04:43 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 18:05:50
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT
1. I certify that this Certificate of Verification documentation is accurate and complete.
Documentation Author Name:
Angel Arechiga
Documentation Author Signature:
Company:
iPermit
Date Signed:
2024-04-09
Address:
31225 La Baya Drive
CEA/ HERS Certification Identification (if applicable):
RCN13516
City/State/Zip:
Westlake Village CA 91362
Phone:
818-735-7876
RESPONSIBLE PERSON'S DECLARATION STATEMENT
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Verification is true and correct.
2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible
rater).
3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS
verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3,
and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency.
4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s)
responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R)
approved by the enforcement agency.
5.I understand that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s)
issued for the building, and made available to the enforcement agency for all applicable inspections, and I will take the necessary
steps to ensure this requirement is accomplished.
6.I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder
provides to the building owner at occupancy, and I will take the necessary steps to ensure this requirement is accomplished.
BUILDER OR INSTALLER INFORMATION AS SHOWN ON THE CERTIFICATE OF INSTALLATION
Company Name (Installing Subcontractor, General Contractor, or Builder/Owner):
DEH Mechanical Company Inc
Responsible Builder or Installer Name:
Tom Powers (authorized Angel Arechiga)
CSLB License:
752819
HERS PROVIDER DATA REGISTRY INFORMATION
Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable)
N/A
HERS RATER INFORMATION
HERS Rater Company Name:
iPermit
Responsible Rater Name:
Angel Arechiga
Responsible Rater Signature:
Responsible Rater Certification Number w/ this HERS Provider:
RCN13516
Date Signed:
2024-04-09
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-A020061538A-000-001-M20008A-M20A
Registration Date/Time: 2024-04-09 18:04:09 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 18:05:16
DUCT LEAKAGE DIAGNOSTIC TEST CF3R-MCH-20-H
(Page 1 of 4)
CERTIFICATE OF VERIFICATION
Project Name: 58-892 Marbella Lot 60 Enforcement Agency: La Quinta, City of
Dwelling Address: 58-892 Marbella Lot 60 Permit Number: PENDING
City and Zip Code La Quinta, 92253 Permit Application Date: 2024-04-01
A. System Information
01 Space Conditioning System Identification or Name System 3
02 Space Conditioning System Location or Area Served Casita
03 Indoor Unit Name or Description of Area Served Casita
04 Building Type from from parent CC Single family
05 Verified Low Leakage Ducts in Conditioned Space (VLLDCS) Credit
from parent CC?
No, credit is not taken
06 Verified Low Leakage Air Handling Unit Credit from parent CC?No, credit is not taken
07 Duct System Compliance Category New
08 Portions of Duct Located in Garage?No
09 Is the system type Small Duct High Velocity (SDHV) ?No
MCH-20a - Completely New Duct System
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
DUCT LEAKAGE DIAGNOSTIC TEST CF3R-MCH-20-H
(Page 2 of 4)
Registration Number:
424-A020061538A-000-001-M20008A-M20A
Registration Date/Time: 2024-04-09 18:04:09 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 18:05:16
B. Duct Leakage Diagnostic Test
01 Air Handling Unit Airflow (AHU Airflow) Determination Method Cooling system method
02 Condenser Nominal Cooling Capacity (ton)2
03 Indoor Unit Nominal Cooling Capacity 2
04 Heating Capacity (kBtu/h)n/a
05 Conditioned Floor Area Served by this HVAC System (ft2)1000
06 Measured AHU Airflow (cfm)n/a
07 Duct Leakage Test Conditions Test final
08 Duct Leakage Test Method Total leakage
09 Leakage Factor 0.05
10 Calculated Target Allowable Duct Leakage (cfm)40
11 Actual Duct Leakage Rate from Leakage Test Measurement (cfm)40
12 Compliance Statement System passes leakage test
13 Notes:
C. Additional Requirements for Compliance
01 System was tested in its normal operation condition. No temporary taping allowed.
02
Outside air (OA) duct connections to the central forced air duct system shall not be sealed/taped off during duct leakage testing. OA ducts
used for Central Fan Integrated (CFI) Indoor Air Quality ventilation systems, or Central Fan Ventilation Cooling Systems, that utilize
dampers that open only when OA is required and automatically close when OA is not required, may configure the OA damper to the
closed position during duct leakage testing.
03 All supply and return register boots were sealed to the drywall.
04 Building cavities were not used as plenums or platform returns in lieu of ducts.
05 If cloth backed tape was used it was covered with Mastic and draw bands.
06 All connection points between the air handler and the supply and return plenums are completely sealed.
Visual Inspection at Final Construction Stage (applicable if system was tested at rough-in).
After installing the interior finishing wall and verifying that the above rough-in tests was completed, the following procedure must be performed
07 For all supply and return registers, verify that the spaces between the register boot and the interior finishing wall are properly sealed.
08 If the house rough-in duct leakage test was conducted without an air handler installed, inspect the connection points between the air
handler and the supply and return plenums to verify that the connection points are properly sealed.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
DUCT LEAKAGE DIAGNOSTIC TEST CF3R-MCH-20-H
(Page 3 of 4)
Registration Number:
424-A020061538A-000-001-M20008A-M20A
Registration Date/Time: 2024-04-09 18:04:09 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 18:05:16
09 Inspect all joints to ensure that no cloth backed rubber adhesive duct tape is used.
10 Verification Status:Pass - all applicable requirements are met.
11 Correction Notes:
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met unless
otherwise noted in the Verification Status and the Corrections Notes in this table.
D. Determination of HERS Verification Compliance
All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order
for this Certificate of Verification as a whole to be determined to be in compliance.
01 Complies: All specified verification protocol requirements on this document are met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
DUCT LEAKAGE DIAGNOSTIC TEST CF3R-MCH-20-H
(Page 4 of 4)
Registration Number:
424-A020061538A-000-001-M20008A-M20A
Registration Date/Time: 2024-04-09 18:04:09 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 18:05:16
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT
1. I certify that this Certificate of Verification documentation is accurate and complete.
Documentation Author Name:
Angel Arechiga
Documentation Author Signature:
Company:
iPermit
Date Signed:
2024-04-09
Address:
31225 La Baya Drive
CEA/ HERS Certification Identification (if applicable):
RCN13516
City/State/Zip:
Westlake Village CA 91362
Phone:
818-735-7876
RESPONSIBLE PERSON'S DECLARATION STATEMENT
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Verification is true and correct.
2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible
rater).
3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS
verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3,
and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency.
4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s)
responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R)
approved by the enforcement agency.
5.I understand that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s)
issued for the building, and made available to the enforcement agency for all applicable inspections, and I will take the necessary
steps to ensure this requirement is accomplished.
6.I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder
provides to the building owner at occupancy, and I will take the necessary steps to ensure this requirement is accomplished.
BUILDER OR INSTALLER INFORMATION AS SHOWN ON THE CERTIFICATE OF INSTALLATION
Company Name (Installing Subcontractor, General Contractor, or Builder/Owner):
DEH Mechanical Company Inc
Responsible Builder or Installer Name:
Tom Powers (authorized Angel Arechiga)
CSLB License:
752819
HERS PROVIDER DATA REGISTRY INFORMATION
Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable)
N/A
HERS RATER INFORMATION
HERS Rater Company Name:
iPermit
Responsible Rater Name:
Angel Arechiga
Responsible Rater Signature:
Responsible Rater Certification Number w/ this HERS Provider:
RCN13516
Date Signed:
2024-04-09
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-A020061538A-000-001-M23009A-M23A
Registration Date/Time: 2024-04-09 18:04:27 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 18:05:47
SPACE CONDITIONING SYSTEM AIRFLOW
RATE
CF3R-MCH-23-H
(Page 1 of 4)
CERTIFICATE OF VERIFICATION
Project Name: 58-892 Marbella Lot 60 Enforcement Agency: La Quinta, City of
Dwelling Address: 58-892 Marbella Lot 60 Permit Number: PENDING
City and Zip Code La Quinta, 92253 Permit Application Date: 2024-04-01
A. Ducted Cooling System Information
01 Space Conditioning System Identification or Name System 3
02 Space Conditioning System Description of Area Served Casita
03 Indoor Unit Name Casita
04 System Installation Type New
05 Nominal Cooling Capacity (tons)2
06 Condenser Speed Type n/a
07 Cooling System Zonal Control Type n/a
08 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system
09 System Bypass Duct Status n/a
10 Date of System Airflow Rate Measurement 2024-04-09
11 Airflow Rate Protocol Utilized RA3.3 procedures for airflow rate measurement
12 Central Fan Ventilation Cooling System Status Not a CFVCS
B. Hole for the placement of a Static Pressure Probe (HSPP), and Permanently Installed Static Pressure Probe (PSPP) in the Supply Plenum.
Procedures for installing HSPP or PSPP are specified in RA3.3.1.1.
01 Method Used to Demonstrate Compliance with the HSPP/PSPP
Requirement
HSPP installed and labeled consistent with Figure RA3.3-1
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
SPACE CONDITIONING SYSTEM AIRFLOW
RATE
CF3R-MCH-23-H
(Page 2 of 4)
Registration Number:
424-A020061538A-000-001-M23009A-M23A
Registration Date/Time: 2024-04-09 18:04:27 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 18:05:47
C. Airflow Rate Measurement Apparatus and Procedure Information
Instrument Specifications are given in RA3.3.1.1, and system airflow rate measurement apparatus information is given in RA3.3.2.
01 Airflow Rate Measurement Type used for this airflow rate
verification.
Traditional Flow Capture Hood according to procedure in
RA3.3.3.1.4
02 Manufacturer of Airflow Measurement Apparatus Testo
03 Model number of Airflow Measurement Apparatus Testo420
04
Certification Status of the Airflow Measurement Apparatus
Accuracy
Certified by Manufacturer and listed on CEC Website at
http://www.energy.ca.gov/title24/equipment_cert/ama_fas/index.
html
MCH-23a Forced Air System Airflow Rate Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed Compressor
D. Forced Air System Airflow Rate Measurement
The procedures for System Airflow Rate Verification are specified in Reference Residential Appendix RA3.3.
01 Required Minimum System Airflow Rate (cfm/ton)350
02 Required Minimum System Airflow Target (cfm)700
03 Actual System Airflow Rate Measurement (cfm)720
04 Compliance Statement:System airflow rate complies
E. Additional Requirements
01 Air filters that meet the applicable requirements of Standards Section 150.0(m)12 or 150.0(m)13 were properly installed in the system
during system air flow rate measurement identified on this Certificate of Verification.
02
The airflow rate measurement apparatus used to perform the airflow rate measurement identified on this Certificate of Verification was
calibrated in accordance with the apparatus manufacturer's specifications and conforms to the instrumentation specifications given in
RA3.3.1.
03
A visual inspection shall confirm that bypass ducts that deliver conditioned supply air directly to the space conditioning system return
duct airflow are not used on newly constructed zonally controlled systems unless the Performance Certificate of Compliance indicates an
allowance for use of a bypass duct. When a bypass duct is accounted for on the Performance Certificate of Compliance, the airflow rate
shall conform to the specifications listed on the Certificate of Compliance.
04 All registers were fully open during the diagnostic test.
05 System fan was set at maximum speed during the diagnostic test.
06 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test.
07 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
SPACE CONDITIONING SYSTEM AIRFLOW
RATE
CF3R-MCH-23-H
(Page 3 of 4)
Registration Number:
424-A020061538A-000-001-M23009A-M23A
Registration Date/Time: 2024-04-09 18:04:27 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 18:05:47
E. Additional Requirements
08 Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan efficacy
(Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air handler fan speed.
09 Verification Status:Pass - all applicable requirements are met.
10 Correction Notes:
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met unless
otherwise noted in the Verification Status and the Corrections Notes in this table
F. Determination of HERS Verification Compliance
All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order
for this Certificate of Verification as a whole to be determined to be in compliance.
01 Complies: All specified verification protocol requirements on this document are met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
SPACE CONDITIONING SYSTEM AIRFLOW
RATE
CF3R-MCH-23-H
(Page 4 of 4)
Registration Number:
424-A020061538A-000-001-M23009A-M23A
Registration Date/Time: 2024-04-09 18:04:27 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 18:05:47
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT
1. I certify that this Certificate of Verification documentation is accurate and complete.
Documentation Author Name:
Angel Arechiga
Documentation Author Signature:
Company:
iPermit
Date Signed:
2024-04-09
Address:
31225 La Baya Drive
CEA/ HERS Certification Identification (if applicable):
RCN13516
City/State/Zip:
Westlake Village CA 91362
Phone:
818-735-7876
RESPONSIBLE PERSON'S DECLARATION STATEMENT
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Verification is true and correct.
2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible
rater).
3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS
verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3,
and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency.
4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s)
responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R)
approved by the enforcement agency.
5.I understand that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s)
issued for the building, and made available to the enforcement agency for all applicable inspections, and I will take the necessary
steps to ensure this requirement is accomplished.
6.I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder
provides to the building owner at occupancy, and I will take the necessary steps to ensure this requirement is accomplished.
BUILDER OR INSTALLER INFORMATION AS SHOWN ON THE CERTIFICATE OF INSTALLATION
Company Name (Installing Subcontractor, General Contractor, or Builder/Owner):
DEH Mechanical Company Inc
Responsible Builder or Installer Name:
Tom Powers (authorized Angel Arechiga)
CSLB License:
752819
HERS PROVIDER DATA REGISTRY INFORMATION
Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable)
N/A
HERS RATER INFORMATION
HERS Rater Company Name:
iPermit
Responsible Rater Name:
Angel Arechiga
Responsible Rater Signature:
Responsible Rater Certification Number w/ this HERS Provider:
RCN13516
Date Signed:
2024-04-09
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-A020061538A-000-001-M22010A-M22A
Registration Date/Time: 2024-04-09 18:04:37 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 18:05:47
SPACE CONDITIONING SYSTEM FAN
EFFICACY
CF3R-MCH-22-H
(Page 1 of 3)
CERTIFICATE OF VERIFICATION
Project Name: 58-892 Marbella Lot 60 Enforcement Agency: La Quinta, City of
Dwelling Address: 58-892 Marbella Lot 60 Permit Number: PENDING
City and Zip Code La Quinta, 92253 Permit Application Date: 2024-04-01
A. Ducted Cooling System Information
01 System Identification or Name System 3
02 System Location or Area Served Casita
03 Indoor Unit Name or Description of Area Served Casita
04 System Installation Type New
05 Nominal Cooling Capacity (tons) of Condenser 2
06 Condenser Speed Type n/a
07 Cooling System Zonal Control Type n/a
08 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system
09 System Bypass Duct Status n/a
10 Date of System Airflow Rate Measurement 2024-04-09
11 Airflow Rate Protocol utilized RA3.3 procedures for airflow rate measurement
12 Central Fan Ventilation Cooling System Status Not a CFVCS
B. Fan Watt Measurement Apparatus and Procedure Information
Instrument Specifications are given in RA3.3.1, and system fan watt measurement apparatus information is given in RA3.3.2.2.
01 Fan Watt Verification Device Used.Portable Watt Meter
MCH-22a Forced Air System Fan Efficacy Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed Compressor
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
SPACE CONDITIONING SYSTEM FAN
EFFICACY
CF3R-MCH-22-H
(Page 2 of 3)
Registration Number:
424-A020061538A-000-001-M22010A-M22A
Registration Date/Time: 2024-04-09 18:04:37 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 18:05:47
C. Forced Air System Fan Efficacy Measurement
The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3
01 Actual Tested Watts 15
02 Actual Tested Airflow from MCH-23 (cfm)720
03 Required Fan Efficacy (Watts/cfm)0.58
04 Actual Fan Efficacy (watts/cfm)0.02
05 Compliance Statement:System fan efficacy complies
D. Additional Requirements
01 All registers were fully open during the diagnostic test.
02 System fan was set at maximum speed during the diagnostic test.
03 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test.
04 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value.
05 Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan efficacy
(Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air handler fan speed.
06 Zoned cooling air distribution systems with single speed compressors shall meet both the airflow (cfm/ton) and fan efficacy (Watt/cfm)
criteria in every zonal control mode.
07 Portable watt meters used for measurements of air handler watt draws shall be true power measurement systems (i.e. sensor plus data
acquisition system) having an accuracy of +- 2% of reading or +- 10 Watts whichever is greater
08 Verification Status Pass - all applicable requirements are met.
09 Correction Notes
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met unless
otherwise noted in the Verification Status and the Corrections Notes in this table.
E. Determination of HERS Verification Compliance
All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order
for this Certificate of Verification as a whole to be determined to be in compliance.
01 Complies: All specified verification protocol requirements on this document are met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
SPACE CONDITIONING SYSTEM FAN
EFFICACY
CF3R-MCH-22-H
(Page 3 of 3)
Registration Number:
424-A020061538A-000-001-M22010A-M22A
Registration Date/Time: 2024-04-09 18:04:37 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 18:05:47
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT
1. I certify that this Certificate of Verification documentation is accurate and complete.
Documentation Author Name:
Angel Arechiga
Documentation Author Signature:
Company:
iPermit
Date Signed:
2024-04-09
Address:
31225 La Baya Drive
CEA/ HERS Certification Identification (if applicable):
RCN13516
City/State/Zip:
Westlake Village CA 91362
Phone:
818-735-7876
RESPONSIBLE PERSON'S DECLARATION STATEMENT
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Verification is true and correct.
2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible
rater).
3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS
verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3,
and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency.
4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s)
responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R)
approved by the enforcement agency.
5.I understand that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s)
issued for the building, and made available to the enforcement agency for all applicable inspections, and I will take the necessary
steps to ensure this requirement is accomplished.
6.I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder
provides to the building owner at occupancy, and I will take the necessary steps to ensure this requirement is accomplished.
BUILDER OR INSTALLER INFORMATION AS SHOWN ON THE CERTIFICATE OF INSTALLATION
Company Name (Installing Subcontractor, General Contractor, or Builder/Owner):
DEH Mechanical Company Inc
Responsible Builder or Installer Name:
Tom Powers (authorized Angel Arechiga)
CSLB License:
752819
HERS PROVIDER DATA REGISTRY INFORMATION
Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable)
N/A
HERS RATER INFORMATION
HERS Rater Company Name:
iPermit
Responsible Rater Name:
Angel Arechiga
Responsible Rater Signature:
Responsible Rater Certification Number w/ this HERS Provider:
RCN13516
Date Signed:
2024-04-09
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-A020061538A-000-001-M25013A-M25A
Registration Date/Time: 2024-04-09 18:04:47 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 18:05:55
REFRIGERANT CHARGE VERIFICATION CF3R-MCH-25-H
(Page 1 of 4)
CERTIFICATE OF VERIFICATION
Project Name: 58-892 Marbella Lot 60 Enforcement Agency: La Quinta, City of
Dwelling Address: 58-892 Marbella Lot 60 Permit Number: PENDING
City and Zip Code La Quinta, 92253 Permit Application Date: 2024-04-01
A. System Information
HERS Rater to field-verify all system information, discrepancies to be noted by overwriting entry.
01 Space Conditioning System Identification or Name System 3
02 Space Conditioning System Location or Area Served Casita
03 Condenser (or package unit) make or brand GOODMAN
04 Condenser (or package unit) model number GSZH502410AB
05 Nominal Cooling Capacity (tons) of Condenser 2
06 Condenser (or package unit) serial number 2403009323
07 Refrigerant Type R-410A
08 Other Refrigerant Type (if applicable)n/a
09 Liquid Line Filter Drier Installed According to Manufacturers
Specifications (if applicable)
Yes
10 System Installation Type New
11 Fault Indicator Display (FID) Status (Note: Even systems with a FID
must have refrigerant charge verified by installer)
This system does not have a FID device installed
12
Is the system of a type that the minimum airflow can be verified for
all indoor units using an approved measurement procedure (RA3.3
or RA3.3.3)?
Yes
13
Is the system of a type that approved refrigerant charge verification
procedures can be used to verify compliance with the refrigerant
charge verification requirements when temperatures are >= 55 °F
(RA3.2.2, or RA1)?
Yes, one of the Refrigerant charge verification procedures from
RA3.2.2 or RA1 is applicable to this system and can be used to
verify compliance
14 Date of Refrigerant Charge Verification for this system 2024-04-09
15 Refrigerant charge verification method used.Subcooling (outdoor temperature must be equal to or greater than
55 degF)
16 Person who performed the Refrigerant Charge Verification
reported on this Certificate of Installation
HERS rater
17 HERS Verification Compliance Requirement Status System does not qualify for group sampling
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
REFRIGERANT CHARGE VERIFICATION CF3R-MCH-25-H
(Page 2 of 4)
Registration Number:
424-A020061538A-000-001-M25013A-M25A
Registration Date/Time: 2024-04-09 18:04:47 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 18:05:55
A. System Information
HERS Rater to field-verify all system information, discrepancies to be noted by overwriting entry.
18 Refrigerant charge verification method used by HERS Rater.Subcooling
MCH-25b - Refrigerant Charge Verification - Subcooling Method
B. Metering Device Verification
HERS Rater is required to visually field verify all information from CF2R. Subcooling Method can only be used on systems that have a variable
metering device.
01 Refrigerant metering device Thermostatic Expansion Valve (TXV)
02 Subcooling Method applicability status Subcooling Method is applicable to this system.
C. Instrument Calibration
HERS Raters are required to calibrate their diagnostic tools. Procedures for instrument calibration are given in Reference Residential Appendix
RA3.2.2 and RA3.2.2.2
01 Date of Digital Refrigerant Gauge Calibration 2024-03-25
02 Date of Digital Thermocouple Calibration 2024-04-03
03 Digital Refrigerant Gauge Calibration Status Calibration is current
04 Digital Thermocouple Calibration Status Calibration is current
D. Measurement Access Hole (MAH) Verification
HERS Raters are required to visually field verify MAH. Procedures for installing MAH are specified in Reference Residential Appendix RA3.2.2.3
01 Method Used to Demonstrate Compliance with the Measurement
Access Hole (MAH) Requirement
MAH installed and labeled consistent with Figure 3.2-1
E. Minimum System Airflow Rate Verification
Procedures for verifying minimum system airflow are specified in Reference Residential Appendix RA3.3.3.
01 02 03
Indoor Unit Name or Description of Area
Served Minimum Required System Airflow Rate (cfm)System Airflow Rate Verification Status
Casita 1050 System complies with minimum airflow rate
requirements
04 SC System complies with Minimum System Airflow Rate Verification
Notes:
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
REFRIGERANT CHARGE VERIFICATION CF3R-MCH-25-H
(Page 3 of 4)
Registration Number:
424-A020061538A-000-001-M25013A-M25A
Registration Date/Time: 2024-04-09 18:04:47 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 18:05:55
F. Data Collection and Calculations
HERS Rater must independently collect all data in this section. Procedures for determining Refrigerant Charge using the Standard Charge
Verification Procedure are given in Reference Residential Appendix RA3.2.2 and RA3.2.2.2
01 Lowest Return Air Dry Bulb Temperature that Occurred During the
Refrigerant Charge Verification Procedure ( °F)
85
02 Measured Condenser Air Entering Dry-Bulb Temperature
(Tcondenser, db)
88
03 Outdoor Temperature Qualification Status Outdoor temperature is within range for using Subcooling
refrigerant charge verification method
04 Measured Liquid Line Temperature (Tliquid) ( °F)89.5
05 Measured Liquid Line Pressure (Pliquid) (psig)306.9
06 Condenser Saturation Temperature (Tcondenser, sat) from Digital
Gauge or P-T Table using Line F05 ( °F)
95.4
07 Measured Subcooling (Line F06 - Lilne F04 ( °F)5.9
08 Target Subcooling from Manufacturer ( °F)8
09 Compliance Statement:System complies with Subcooling Method - Must also pass
metering device verification, next section
G. Metering Device Verification
HERS Rater must independently collect all data in this section. Procedures for the verification of proper metering device operation are specified
in RA3.2.2.6.2
01 Measured Suction Line Temperature (Tsuction) ( °F)62.4
02 Measured Suction Line Pressure (Psuction) (psig)219.0
03 Evaporator Saturation Temperature (Tevaporator, sat) from Digital
Gauge or P-T Table using Line G02 ( °F)
40.1
04 Measured Superheat (Line G01- Line G03) ( °F)22.3
05 Measured Superheat (Line G04) is between 3 °F and 26 °F
(inclusive)
Passes CEC requirement
06 Measured Superheat (Line G04) is within Manufacturer's
Specifications ( if known)
Yes, documentation to be provided upon request
07 Compliance Statement:Metering device verification passes
H. Determination of HERS Verification Compliance
All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order
for this Certificate of Verification as a whole to be determined to be in compliance.
01 Complies: All specified verification protocol requirements on this document are met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
REFRIGERANT CHARGE VERIFICATION CF3R-MCH-25-H
(Page 4 of 4)
Registration Number:
424-A020061538A-000-001-M25013A-M25A
Registration Date/Time: 2024-04-09 18:04:47 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2022 Residential Compliance
Report Version: 2022.0.000
Schema Version: rev 20220101
Report Generated: 2024-04-09 18:05:55
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT
1. I certify that this Certificate of Verification documentation is accurate and complete.
Documentation Author Name:
Angel Arechiga
Documentation Author Signature:
Company:
iPermit
Date Signed:
2024-04-09
Address:
31225 La Baya Drive
CEA/ HERS Certification Identification (if applicable):
RCN13516
City/State/Zip:
Westlake Village CA 91362
Phone:
818-735-7876
RESPONSIBLE PERSON'S DECLARATION STATEMENT
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Verification is true and correct.
2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible
rater).
3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS
verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3,
and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency.
4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s)
responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R)
approved by the enforcement agency.
5.I understand that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s)
issued for the building, and made available to the enforcement agency for all applicable inspections, and I will take the necessary
steps to ensure this requirement is accomplished.
6.I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder
provides to the building owner at occupancy, and I will take the necessary steps to ensure this requirement is accomplished.
BUILDER OR INSTALLER INFORMATION AS SHOWN ON THE CERTIFICATE OF INSTALLATION
Company Name (Installing Subcontractor, General Contractor, or Builder/Owner):
DEH Mechanical Company Inc
Responsible Builder or Installer Name:
Tom Powers (authorized Angel Arechiga)
CSLB License:
752819
HERS PROVIDER DATA REGISTRY INFORMATION
Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable)
N/A
HERS RATER INFORMATION
HERS Rater Company Name:
iPermit
Responsible Rater Name:
Angel Arechiga
Responsible Rater Signature:
Responsible Rater Certification Number w/ this HERS Provider:
RCN13516
Date Signed:
2024-04-09
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Scan to Validate
CHEERS REGISTRY
PROJECT STATUS REPORT
CERTIFICATE OF COMPLIANCE (CF1R)
DATE DOCUMENT TITLE REGISTRATION NUMBER STATUS
04/09/2024 CF1R-ALT-02-E Residential HVAC Alterations 424-A020061538A-000-000-0000000-0000
F06 changed from ".80" to "0.8"
F06 changed from ".80" to "0.8"
F06 changed from ".80" to "0.8"
CERTIFICATE OF INSTALLATION (CF2R)
DATE DOCUMENT TITLE REGISTRATION NUMBER STATUS
04/09/2024 CF2R-MCH-01b-E HVAC, Ducts and Fans 424-A020061538A-000-001-M01001A-0000
B02 changed from "Location 1" to "Living area "
B09 changed from "true" to "false"
B02 changed from "Location 2" to "Master "
B09 changed from "true" to "false"
B02 changed from "Location 3" to "Casita "
B09 changed from "true" to "false"
C03 changed from "CentralGasFurnace" to "Electric"
C05 changed from "AFUE" to "HSPF"
C07 changed from "CentralSplitAC" to "CentralSplitHP"
C03 changed from "CentralGasFurnace" to "Electric"
C05 changed from "AFUE" to "HSPF"
C07 changed from "CentralSplitAC" to "CentralSplitHP"
C03 changed from "CentralGasFurnace" to "Electric"
C05 changed from "AFUE" to "HSPF"
C07 changed from "CentralSplitAC" to "CentralSplitHP"
1
04/09/2024 CF2R-MCH-20a-H Duct Leakage 424-A020061538A-000-001-M20005A-0000
04/09/2024 CF2R-MCH-22a-H Fan Efficacy 424-A020061538A-000-001-M22007A-0000
04/09/2024 CF2R-MCH-23a-H Airflow Rate 424-A020061538A-000-001-M23006A-0000
PROJECT SUMMARY
Project Name:58-892 Marbella Lot 60
Address:58-892 Marbella Lot 60
City, State, Zip:La Quinta, CA 92253
Building Department:La Quinta, City of
Permit Number:PENDING
Building Energy Code:2022 Standards
ENERGY CODE
COMPLIANCE COMPLETE
HERS VERIFIABLE
MEASURES
COMPLETE
NOTICE: This compliance summary report has been generated by a registration platform provided by CHEERS using
information that has been uploaded to that registration platform by third parties that are not affiliated or related to
CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the
information contained in this certificate. Page 1 of 3
- continued on next page -
Scan to Validate
CHEERS REGISTRY
PROJECT STATUS REPORT
CERTIFICATE OF INSTALLATION (CF2R)
DATE DOCUMENT TITLE REGISTRATION NUMBER STATUS
Casita
04/09/2024 CF2R-MCH-20a-H Duct Leakage 424-A020061538A-000-001-M20008A-0000
04/09/2024 CF2R-MCH-22a-H Fan Efficacy 424-A020061538A-000-001-M22010A-0000
04/09/2024 CF2R-MCH-23a-H Airflow Rate 424-A020061538A-000-001-M23009A-0000
Living room
04/09/2024 CF2R-MCH-20a-H Duct Leakage 424-A020061538A-000-001-M20002A-0000
04/09/2024 CF2R-MCH-22a-H Fan Efficacy 424-A020061538A-000-001-M22004A-0000
04/09/2024 CF2R-MCH-23a-H Airflow Rate 424-A020061538A-000-001-M23003A-0000
System 1
04/09/2024 CF2R-MCH-25b-H Refrigerant Charge 424-A020061538A-000-001-M25011A-0000
System 2
04/09/2024 CF2R-MCH-25b-H Refrigerant Charge 424-A020061538A-000-001-M25012A-0000
System 3
04/09/2024 CF2R-MCH-25b-H Refrigerant Charge 424-A020061538A-000-001-M25013A-0000
CERTIFICATE OF VERIFICATION (CF3R)
DATE DOCUMENT TITLE REGISTRATION NUMBER STATUS
1
04/09/2024 CF3R-MCH-20a-H Duct Leakage 424-A020061538A-000-001-M20005A-
M20A
04/09/2024 CF3R-MCH-22a-H Fan Efficacy 424-A020061538A-000-001-M22007A-
M22A
04/09/2024 CF3R-MCH-23a-H Airflow Rate 424-A020061538A-000-001-M23006A-
M23A
NOTICE: This compliance summary report has been generated by a registration platform provided by CHEERS using
information that has been uploaded to that registration platform by third parties that are not affiliated or related to
CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the
information contained in this certificate. Page 2 of 3
- continued on next page -
Scan to Validate
CHEERS REGISTRY
PROJECT STATUS REPORT
CERTIFICATE OF VERIFICATION (CF3R)
DATE DOCUMENT TITLE REGISTRATION NUMBER STATUS
Casita
04/09/2024 CF3R-MCH-20a-H Duct Leakage 424-A020061538A-000-001-M20008A-
M20A
04/09/2024 CF3R-MCH-22a-H Fan Efficacy 424-A020061538A-000-001-M22010A-
M22A
04/09/2024 CF3R-MCH-23a-H Airflow Rate 424-A020061538A-000-001-M23009A-
M23A
Living room
04/09/2024 CF3R-MCH-20a-H Duct Leakage 424-A020061538A-000-001-M20002A-
M20A
04/09/2024 CF3R-MCH-22a-H Fan Efficacy 424-A020061538A-000-001-M22004A-
M22A
04/09/2024 CF3R-MCH-23a-H Airflow Rate 424-A020061538A-000-001-M23003A-
M23A
System 1
04/09/2024 CF3R-MCH-25b-H Refrigerant Charge 424-A020061538A-000-001-M25011A-
M25A
System 2
04/09/2024 CF3R-MCH-25b-H Refrigerant Charge 424-A020061538A-000-001-M25012A-
M25A
System 3
04/09/2024 CF3R-MCH-25b-H Refrigerant Charge 424-A020061538A-000-001-M25013A-
M25A
NOTICE: This compliance summary report has been generated by a registration platform provided by CHEERS using
information that has been uploaded to that registration platform by third parties that are not affiliated or related to
CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the
information contained in this certificate. Page 3 of 3