Loading...
BRES2022-0500 HERS ReportRegistration Number: 424-A020061538A-000-001-M01001A-0000 Registration Date/Time: 2024-04-09   17:56:22 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   17:57:30 SPACE CONDITIONING SYSTEMS, DUCTS, AND FANS CF2R-MCH-01-E (Page 1 of 10) CERTIFICATE OF INSTALLATION Project Name: 58-892 Marbella Lot 60 Enforcement Agency: La Quinta, City of Dwelling Address: 58-892 Marbella Lot 60 Permit Number: PENDING City and Zip Code La Quinta, 92253 Permit Application Date: 2024-04-01 A. General Information 01 Dwelling Unit Name 58-892 Marbella Lot 60 02 Climate Zone 15 03 Dwelling Unit Total Conditioned Floor Area (ft2)3000 04 Number of Space Conditioning Systems in this Dwelling Unit.3 05 Certificate of Compliance Type Prescriptive alterations (CF1R-ALT )06 Method Used to Calculate HVAC Loads (See Section 150.0(h))Not applicable - equipment changeout, like-for-like 07 Calculated Dwelling Unit Sensible Cooling Load (Btu/h)n/a 08 Calculated Dwelling Unit Heating Load (Btu/h)n/a 09 Dwelling Unit Number of Bedrooms 3 MCH-01b - Space Conditioning Systems Ducts and Fans - Prescriptive Alterations NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. SPACE CONDITIONING SYSTEMS, DUCTS, AND FANS CF2R-MCH-01-E (Page 2 of 10) Registration Number: 424-A020061538A-000-001-M01001A-0000 Registration Date/Time: 2024-04-09   17:56:22 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   17:57:30 B. Space Conditioning (SC) System Information 01 02 03 04 05 06 07 08 09 10 SC System ID/ Name from parent CC SC System Description of Area Served CFA served by this SC System (ft2) Is the SC system a ducted system? Does work include installing a refrigerant containing component? Does work include installing new SC system components? Does work include installing more than 25 feet of ducts? Does work include installing an "entirely new duct system"? Does work include installing an "entirely new SC system"? Alteration Type System 1 Living area 1000 Yes Yes Yes Yes Yes No Entirely new or complete replacement duct system with or without equipment changeout System 2 Master 1000 Yes Yes Yes Yes Yes No Entirely new or complete replacement duct system with or without equipment changeout System 3 Casita 1000 Yes Yes Yes Yes Yes No Entirely new or complete replacement duct system with or without equipment changeout Notes: NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. SPACE CONDITIONING SYSTEMS, DUCTS, AND FANS CF2R-MCH-01-E (Page 3 of 10) Registration Number: 424-A020061538A-000-001-M01001A-0000 Registration Date/Time: 2024-04-09   17:56:22 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   17:57:30 C. Space Conditioning (SC) System Alterations Compliance Information 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 SC System ID/ Name from parent CC SC System Description of Area Served Heating System Type Altered Heating Componen t Heating Efficiency Type Heating Minimum Efficiency Value Cooling System Type Altered Cooling Componen t Cooling Efficiency Type Cooling Minimum Efficiency Value SEER/SEER 2 Cooling Minimum Efficiency Value EER/EER2/ CEER Required Thermostat Type Number of Indoor Units for this System Number of Ducted Indoor Units for this System Central Fan Integrated (CFI) Ventilation System Status System 1 Living area Electric All new heating component s HSPF 0.8 Central split HP All new cooling component s EER/SEER 14 11.7 Setback n/a 1 Not a CFI system System 2 Master Electric All new heating component s HSPF 0.8 Central split HP All new cooling component s EER/SEER 14 11.7 Setback n/a 1 Not a CFI system System 3 Casita Electric All new heating component s HSPF 0.8 Central split HP All new cooling component s EER/SEER 14 11.7 Setback n/a 1 Not a CFI system Notes: D. Installed Heating Equipment Information for Gas Furnace Indoor Unit, or Heat Pump Indoor Unit, or Packaged Unit (Gas Furnace or Heat Pump) 01 02 03 04 05 06 07 08 09 10 SC System ID/ Name from parent CC SC System Description of Area Served Heating Efficiency Type Heating Efficiency Value Indoor Unit or Packaged Unit Manufacturer Indoor Unit or Packaged Unit Model Number Indoor Unit or Packaged Unit Serial Number SC System Rated Heating Capacity, Output (Btu/h) Multi-Split Systems only Indoor Unit Name or Description of Area Served Indoor Unit Duct Status System 1 Living area HSPF 0.8 AMANA ASPT49D14AD 2205127282 8 n/a n/a System 2 Master HSPF 0.8 AMANA ASPT37C14AC 2208298121 8 n/a n/a System 3 Casita HSPF 0.8 AMANA ASPT29B14AB ASPT29B14AB 8 n/a n/a NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. SPACE CONDITIONING SYSTEMS, DUCTS, AND FANS CF2R-MCH-01-E (Page 4 of 10) Registration Number: 424-A020061538A-000-001-M01001A-0000 Registration Date/Time: 2024-04-09   17:56:22 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   17:57:30 E. Installed Cooling Equipment Information for Outdoor Condenser or Packaged Unit (Air Conditioner or Heat Pump) 01 02 03 04 05 06 07 08 09 10 SC System ID/ Name from parent CC SC System Description of Area Served Cooling Efficiency Type Cooling Efficiency Value SEER/SEER2 Cooling Efficiency Value EER/EER2/CEER Condenser or Package Unit Manufacturer Condenser or Package Unit Model Number Condenser or Package Unit Serial Number System Cooling Capacity at Design Conditions (Btu/h) Condenser Nominal Capacity (tons) System 1 Living area EER/SEER 14 11.7 GOODMAN GSZH504810AA 2310151351 48000 4 System 2 Master EER/SEER 14 11.7 GOODMAN GSZH503610AB GSZH503610AB 36000 3 System 3 Casita EER/SEER 14 11.7 GOODMAN GSZH502410AB 2403009323 24000 2 Notes: F. Altered Space Conditioning System Duct Information ( < 75% of duct system is altered; or duct system is not altered) This section does not apply to this project. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. SPACE CONDITIONING SYSTEMS, DUCTS, AND FANS CF2R-MCH-01-E (Page 5 of 10) Registration Number: 424-A020061538A-000-001-M01001A-0000 Registration Date/Time: 2024-04-09   17:56:22 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   17:57:30 G. Installed New or Complete Replacement Duct System Information 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 SC System ID/ Name from parent CC SC System Description of Area Served Indoor Unit Name or Description of Area Served Total Duct Length Required New Duct R-Value (Unconditi oned Space) Supply Duct Location New Supply Duct R-Value Return Duct Location New Return Duct R-Value Exception from Minimum R-Value Method of compliance with Airflow and Fan Efficacy Req's in 150.0(m)13 Number of Air Filter Devices on Indoor Units Can Approved Airflow Protocols be used to test this System? Can Approved Fan Efficacy Protocol be used to test this System? Indoor Unit Nominal Cooling capacity (tons) System 1 Living area Living room Ducted > 10ft length R-8 Conditione d space- entirely R-8 Conditione d space- entirely R-8 No Exception HERS verified fan efficacy (W/cfm) and airflow rate (cfm/ton) 2 Yes Yes n/a System 2 Master 1 Ducted > 10ft length R-8 Conditione d space- entirely R-8 Conditione d space- entirely R-8 No Exception HERS verified fan efficacy (W/cfm) and airflow rate (cfm/ton) 1 Yes Yes n/a System 3 Casita Casita Ducted > 10ft length R-8 Conditione d space- entirely R-8 Conditione d space- entirely R-8 No Exception HERS verified fan efficacy (W/cfm) and airflow rate (cfm/ton) 1 Yes Yes n/a Notes NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. SPACE CONDITIONING SYSTEMS, DUCTS, AND FANS CF2R-MCH-01-E (Page 6 of 10) Registration Number: 424-A020061538A-000-001-M01001A-0000 Registration Date/Time: 2024-04-09   17:56:22 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   17:57:30 H. Installed Air Filter Device Information Mandatory requirements for air filter devices are specified Section 150.0(m)12. The installer shall place a sticker in or near each filter grille that displays the design airflow rate for that filter grille/rack and the maximum allowed clean filter pressure drop at the design airflow rate. This will inform the occupant of the airflow vs pressure drop performance required for replacement air filters. 01 02 03 04 05 06 07 08 09 10 11 12 13 SC System Identification or Name from parent CC SC System Location or Area Served Indoor Unit Name or Description of Area Served Air Filter Name or Description of Location Air Filter Rack Type Design Airflow Rate for Air Filter Device (cfm) Air Filter Nominal Depth (inch) Air Filter Nominal Length (inch) Air Filter Nominal Width (inch) Air Filter Calculated Nominal Face Area (inch2) Air Filter Required Minimum Face Area (inch2) Face Area Compliance Design Allowable Pressure Drop for Air Filter Device (inch W.C.) System 1 Living area Living room Filter 1 Filter Grille 15 1 20 20 400 14.4 Complies 0.1 System 1 Living area Living room Filter 2 Filter Grille 15 1 20 20 400 14.4 Complies 0.1 System 2 Master 1 Filter 3 Filter Grille 15 1 20 20 400 14.4 Complies 0.1 System 3 Casita Casita Filter 4 Filter Grille 15 1 20 20 400 14.4 Complies 0.1 Notes: I. Air Filter Device Requirements 01 Mandatory Air Filter Device Requirements can be found in Section 150.0(m)12A-E. Some mandatory requirements may apply in addition to those listed below. 02 All recirculated air and all outdoor air (including make up air) supplied to the occupiable space is filtered before passing through the system's thermal conditioning components. 03 The space conditioning system shall be designed to accommodate the clean-filter pressure drop imposed by the system air filter device(s). The design airflow rate and maximum allowable clean-filter pressure drop at the design airflow rate applicable to each air filter shall be determined by the system designer. The system installer shall affix a sticker/label to each system air filter grille/rack locations that discloses the filter's design airflow rate and the filter's maximum allowable clean-filter pressure drop at the design airflow rate. The sticker/labels shall be permanently affixed to the air filter grille/rack, readily legible, and visible to a person replacing the air filter. 04 All system air filter devices shall be located and installed in such a manner as to allow access and regular service by the system owner. 05 The system shall be provided with air filter media having a designated efficiency equal to or greater than MERV 6 when tested in accordance with ASHRAE Standard 52.2, or a particle size efficiency rating equal to or greater than 50% in the 0.30 to1.0 m range and equal to or greater than 85 percent in the 1.0 - 3.0 m range when tested in accordance with AHRI Standard 680. 06 The system shall be provided with air filters that have been labeled by the manufacturer to disclose efficiency and pressure drop ratings that conform to the efficiency and pressure drop requirements for the air filter grilles/racks.. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. SPACE CONDITIONING SYSTEMS, DUCTS, AND FANS CF2R-MCH-01-E (Page 7 of 10) Registration Number: 424-A020061538A-000-001-M01001A-0000 Registration Date/Time: 2024-04-09   17:56:22 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   17:57:30 I. Air Filter Device Requirements 07 Filter racks or grilles shall use gaskets, sealing, or other means to close gaps around inserted filters and prevent air from bypassing the filter. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. J. HERS Verification Requirements for Duct Systems 01 02 03 04 05 06 07 08 09 SC System Identification or Name SC System Description of Area Served Indoor Unit Name or Description of Area Served Exemption From Duct Leakage Requirements MCH-20 . . . Duct Leakage Test MCH-21 . Duct Location Verification MCH-22 . . AHU Fan Efficacy (W/cfm) MCH-23 . AHU Airflow Rate (cfm/ton) MCH-28 . Return Duct Design - Table 160.3-A or B System 1 Living area Living room None Yes No Yes Yes No System 2 Master 1 None Yes No Yes Yes No System 3 Casita Casita None Yes No Yes Yes No Notes: K. HERS Verification Requirements For Space Conditioning Equipment 01 02 03 SC System ID/ Name from parent CC SC System Description of Area Served MCH-25 . . Refrigerant Charge System 1 Living area Yes System 2 Master Yes System 3 Casita Yes Notes: NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. SPACE CONDITIONING SYSTEMS, DUCTS, AND FANS CF2R-MCH-01-E (Page 8 of 10) Registration Number: 424-A020061538A-000-001-M01001A-0000 Registration Date/Time: 2024-04-09   17:56:22 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   17:57:30 L. Space Conditioning Systems, Ducts and Fans Mandatory Requirements and Additional Measures Additional mandatory requirements from Section 150.0 that are not listed here may be applicable to some systems. These requirements may be applicable to only newly installed equipment or portions of the system that are altered. Existing equipment may be exempt from these requirements. Heating Equipment 01 Equipment Efficiency: All heating equipment must meet the minimum efficiency requirements of Section 110.1 and Section 110.2(a) and the Appliance Efficiency Regulations. 02 Controls: All unitary heating systems, including heat pumps, must be controlled by a setback thermostat. These thermostats must be capable of allowing the occupant to program the temperature set points for at least four different periods in 24 hours. See Sections 150.0(i), 110.2(b). 03 Sizing: Heating load calculations must be done on portions of the building served by new heating systems to prevent inadvertent undersizing or oversizing. See sections 150.0(h)1 and 2). 04 Furnace Temperature Rise: Central forced-air heating furnace installations must be configured to operate at or below the furnace manufacturer's maximum inlet-to-outlet temperature rise specification. See Section 150.0(h)4. 05 Standby Losses and Pilot Lights: Fan-type central furnaces may not have a continuously burning pilot light. Section 110.5 and Section 110.2(d). Cooling Equipment 06 Equipment Efficiency: All cooling equipment must meet the minimum efficiency requirements of Section 110.1 and Section 110.2(a) and the Appliance Efficiency Regulations. 07 Refrigerant Line Insulation: All refrigerant line insulation in split system air conditioners and heat pumps must meet the R-value and protection requirements of Section 150.0(j)2 and 3, and Section 150.0(m)9. 08 Condensing Unit Location: Condensing units shall not be placed within five (5) feet of a dryer vent outlet. See Section 150.0(h)3A. 09 Liquid Line Filter Drier: A liquid line filter drier shall be installed according to the manufacturer's specifications 150.0(h)3B 10 Sizing: Cooling load calculations must be done on portions of the building served by new cooling systems to prevent inadvertent undersizing or oversizing. See Section 150.0(h)1 and 2. Air Distribution System Ducts, Plenums and Fans 11 Insulation: The minimum duct insulation value is R-6 or ducts can be uninsulated if the duct system is located entirely in conditioned space. Note that higher values may be required by the prescriptive or performance requirements. See Section 150.0(m)1B for exceptions. 12 Connections and Closures: All installed air-distribution system ducts and plenums must be, sealed and insulated to meet the requirements of CMC Sections 601.0, 602.0, 603.0, 604.0, 605.0 and ANSI/SMACNA-006-2006. Heat Pump Thermostat NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. SPACE CONDITIONING SYSTEMS, DUCTS, AND FANS CF2R-MCH-01-E (Page 9 of 10) Registration Number: 424-A020061538A-000-001-M01001A-0000 Registration Date/Time: 2024-04-09   17:56:22 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   17:57:30 L. Space Conditioning Systems, Ducts and Fans Mandatory Requirements and Additional Measures Additional mandatory requirements from Section 150.0 that are not listed here may be applicable to some systems. These requirements may be applicable to only newly installed equipment or portions of the system that are altered. Existing equipment may be exempt from these requirements. 13 A thermostat shall be installed that meets the requirements of Section 110.2(b) and Section 110.2(c). 14 The thermostat shall be installed in accordance with the manufacturers published installation specifications 15 First stage of heating shall be assigned to heat pump heating. 16 Second stage back up heating shall be set to come on only when the indoor set temperature cannot be met. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. SPACE CONDITIONING SYSTEMS, DUCTS, AND FANS CF2R-MCH-01-E (Page 10 of 10) Registration Number: 424-A020061538A-000-001-M01001A-0000 Registration Date/Time: 2024-04-09   17:56:22 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   17:57:30 DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Angel Arechiga Documentation Author Signature: Company: iPermit Signature Date: 2024-04-09 Address: 31225 La Baya Drive CEA/ HERS Certification Identification (if applicable): RCN13516 City/State/Zip: Westlake Village CA 91362 Phone: 818-735-7876 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.II am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation, and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a registered copy of this Certificate of Installation shall be posted or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections, and I will take the necessary steps to ensure this requirement is accomplished. 5.I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy, and I will take the necessary steps to ensure this requirement is accomplished. Responsible Builder/Installer Name: Tom Powers (authorized Angel Arechiga) Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) DEH Mechanical Company Inc Position With Company (Title): Contractor/Installer Address: PO Box 12374 CSLB License: 752819 City/State/Zip: Palm Desert CA 92255 Phone: (760) 346-5354 Date Signed: 2024-04-09 NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-A020061538A-000-001-M20002A-0000 Registration Date/Time: 2024-04-09   17:56:35 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   17:57:43 DUCT LEAKAGE DIAGNOSTIC TEST CF2R-MCH-20-H (Page 1 of 4) CERTIFICATE OF INSTALLATION Project Name: 58-892 Marbella Lot 60 Enforcement Agency: La Quinta, City of Dwelling Address: 58-892 Marbella Lot 60 Permit Number: PENDING City and Zip Code La Quinta, 92253 Permit Application Date: 2024-04-01 A. System Information 01 Space Conditioning System Identification or Name System 1 02 Space Conditioning System Location or Area Served Living area 03 Indoor Unit Name or Description of Area Served Living room 04 Building Type from from parent CC Single family 05 Verified Low Leakage Ducts in Conditioned Space (VLLDCS) Credit from parent CC? No, credit is not taken 06 Verified Low Leakage Air Handling Unit Credit from parent CC?No, credit is not taken 07 Duct System Compliance Category New 08 Portions of Duct Located in Garage?No 09 Is the system type Small Duct High Velocity (SDHV) ?No MCH-20a - Completely New Duct System NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. DUCT LEAKAGE DIAGNOSTIC TEST CF2R-MCH-20-H (Page 2 of 4) Registration Number: 424-A020061538A-000-001-M20002A-0000 Registration Date/Time: 2024-04-09   17:56:35 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   17:57:43 B. Duct Leakage Diagnostic Test 01 Air Handling Unit Airflow (AHU Airflow) Determination Method Cooling system method 02 Condenser Nominal Cooling Capacity (ton)4 03 Indoor Unit Nominal Cooling Capacity 4 04 Heating Capacity (kBtu/h)n/a 05 Conditioned Floor Area Served by this HVAC System (ft2)1000 06 Measured AHU Airflow (cfm)n/a 07 Duct Leakage Test Conditions Test final 08 Duct Leakage Test Method Total leakage 09 Leakage Factor 0.05 10 Calculated Target Allowable Duct Leakage (cfm)80 11 Actual Duct Leakage Rate from Leakage Test Measurement (cfm)80 12 Compliance Statement System passes leakage test NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. DUCT LEAKAGE DIAGNOSTIC TEST CF2R-MCH-20-H (Page 3 of 4) Registration Number: 424-A020061538A-000-001-M20002A-0000 Registration Date/Time: 2024-04-09   17:56:35 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   17:57:43 C. Additional Requirements for Compliance 01 System was tested in its normal operation condition. No temporary taping allowed. 02 Outside air (OA) duct connections to the central forced air duct system shall not be sealed/taped off during duct leakage testing. OA ducts used for Central Fan Integrated (CFI) Indoor Air Quality ventilation systems, or Central Fan Ventilation Cooling Systems, that utilize dampers that open only when OA is required and automatically close when OA is not required, may configure the OA damper to the closed position during duct leakage testing. 03 All supply and return register boots were sealed to the drywall. 04 Building cavities were not used as plenums or platform returns in lieu of ducts. 05 If cloth backed tape was used it was covered with Mastic and draw bands. 06 All connection points between the air handler and the supply and return plenums are completely sealed. Visual Inspection at Final Construction Stage (applicable if system was tested at rough-in). After installing the interior finishing wall and verifying that the above rough-in tests was completed, the following procedure must be performed 07 For all supply and return registers, verify that the spaces between the register boot and the interior finishing wall are properly sealed. 08 If the house rough-in duct leakage test was conducted without an air handler installed, inspect the connection points between the air handler and the supply and return plenums to verify that the connection points are properly sealed. 09 Inspect all joints to ensure that no cloth backed rubber adhesive duct tape is used. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. DUCT LEAKAGE DIAGNOSTIC TEST CF2R-MCH-20-H (Page 4 of 4) Registration Number: 424-A020061538A-000-001-M20002A-0000 Registration Date/Time: 2024-04-09   17:56:35 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   17:57:43 DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Angel Arechiga Documentation Author Signature: Company: iPermit Signature Date: 2024-04-09 Address: 31225 La Baya Drive CEA/ HERS Certification Identification (if applicable): RCN13516 City/State/Zip: Westlake Village CA 91362 Phone: 818-735-7876 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this certificate of installation is true and correct. 2.I am either: a) a responsible person eligible under division 3 of the business and professions code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this certificate of installation, and attest to the declarations in this statement, or b) i am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this certificate of installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the certificate of compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I understand that a registered copy of this certificate of installation shall be posted or made available with the building permit(s) issued for the building and made available to the enforcement agency for all applicable inspections, and I will take the necessary steps to ensure this requirement is accomplished. 6.I understand that a registered copy of this certificate of installation is required to be included with the documentation the builder provides to the building owner at occupancy, and I will take the necessary steps to ensure this requirement is accomplished. Responsible Builder/Installer Name: Tom Powers (authorized Angel Arechiga) Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) DEH Mechanical Company Inc Position With Company (Title): Contractor/Installer Address: PO Box 12374 CSLB License: 752819 City/State/Zip: Palm Desert CA 92255 Phone: (760) 346-5354 Date Signed: 2024-04-09 Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable): NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-A020061538A-000-001-M23003A-0000 Registration Date/Time: 2024-04-09   17:56:46 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   17:57:54 SPACE CONDITIONING SYSTEM AIRFLOW RATE CF2R-MCH-23-H (Page 1 of 3) CERTIFICATE OF INSTALLATION Project Name: 58-892 Marbella Lot 60 Enforcement Agency: La Quinta, City of Dwelling Address: 58-892 Marbella Lot 60 Permit Number: PENDING City and Zip Code La Quinta, 92253 Permit Application Date: 2024-04-01 A. Ducted Cooling System Information 01 Space Conditioning System Identification or Name System 1 02 Space Conditioning System Description of Area Served Living area 03 Indoor Unit Name Living room 04 System Installation Type New 05 Nominal Cooling Capacity (tons)4 06 Condenser Speed Type n/a 07 Cooling System Zonal Control Type n/a 08 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system 09 System Bypass Duct Status n/a 10 Date of System Airflow Rate Measurement 2024-04-09 11 Airflow Rate Protocol Utilized RA3.3 procedures for airflow rate measurement 12 Central Fan Ventilation Cooling System Status Not a CFVCS B. Hole for the placement of a Static Pressure Probe (HSPP), and Permanently Installed Static Pressure Probe (PSPP) in the Supply Plenum. Procedures for installing HSPP or PSPP are specified in RA3.3.1.1. 01 Method Used to Demonstrate Compliance with the HSPP/PSPP Requirement HSPP installed and labeled consistent with Figure RA3.3-1 NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. SPACE CONDITIONING SYSTEM AIRFLOW RATE CF2R-MCH-23-H (Page 2 of 3) Registration Number: 424-A020061538A-000-001-M23003A-0000 Registration Date/Time: 2024-04-09   17:56:46 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   17:57:54 C. Airflow Rate Measurement Apparatus and Procedure Information Instrument Specifications are given in RA3.3.1.1, and system airflow rate measurement apparatus information is given in RA3.3.2. 01 Airflow Rate Measurement Type used for this airflow rate verification. Traditional Flow Capture Hood according to procedure in RA3.3.3.1.4 02 Manufacturer of Airflow Measurement Apparatus Testo 03 Model number of Airflow Measurement Apparatus Testo420 04 Certification Status of the Airflow Measurement Apparatus Accuracy Certified by Manufacturer and listed on CEC Website at http://www.energy.ca.gov/title24/equipment_cert/ama_fas/index. html MCH-23a Forced Air System Airflow Rate Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed Compressor D. Forced Air System Airflow Rate Measurement The procedures for System Airflow Rate Verification are specified in Reference Residential Appendix RA3.3. 01 Required Minimum System Airflow Rate (cfm/ton)350 02 Required Minimum System Airflow Target (cfm)1400 03 Actual System Airflow Rate Measurement (cfm)1438 04 Compliance Statement:System airflow rate complies E. Additional Requirements 01 Air filters that meet the applicable requirements of Standards Section 150.0(m)12 or 150.0(m)13 were properly installed in the system during system air flow rate measurement identified on this Certificate of Installation. 02 The airflow rate measurement apparatus used to perform the airflow rate measurement identified on this Certificate of Installation was calibrated in accordance with the apparatus manufacturer's specifications and conforms to the instrumentation specifications given in RA3.3.1. 03 A visual inspection shall confirm that bypass ducts that deliver conditioned supply air directly to the space conditioning system return duct airflow are not used on newly constructed zonally controlled systems unless the Performance Certificate of Compliance indicates an allowance for use of a bypass duct. When a bypass duct is accounted for on the Performance Certificate of Compliance, the airflow rate shall conform to the specifications listed on the Certificate of Compliance. 04 All registers were fully open during the diagnostic test. 05 System fan was set at maximum speed during the diagnostic test. 06 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test. 07 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value. 08 Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air handler fan speed. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. SPACE CONDITIONING SYSTEM AIRFLOW RATE CF2R-MCH-23-H (Page 3 of 3) Registration Number: 424-A020061538A-000-001-M23003A-0000 Registration Date/Time: 2024-04-09   17:56:46 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   17:57:54 DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Angel Arechiga Documentation Author Signature: Company: iPermit Signature Date: 2024-04-09 Address: 31225 La Baya Drive CEA/ HERS Certification Identification (if applicable): RCN13516 City/State/Zip: Westlake Village CA 91362 Phone: 818-735-7876 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this certificate of installation is true and correct. 2.I am either: a) a responsible person eligible under division 3 of the business and professions code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this certificate of installation, and attest to the declarations in this statement, or b) i am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this certificate of installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the certificate of compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I understand that a registered copy of this certificate of installation shall be posted or made available with the building permit(s) issued for the building and made available to the enforcement agency for all applicable inspections, and I will take the necessary steps to ensure this requirement is accomplished. 6.I understand that a registered copy of this certificate of installation is required to be included with the documentation the builder provides to the building owner at occupancy, and I will take the necessary steps to ensure this requirement is accomplished. Responsible Builder/Installer Name: Tom Powers (authorized Angel Arechiga) Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) DEH Mechanical Company Inc Position With Company (Title): Contractor/Installer Address: PO Box 12374 CSLB License: 752819 City/State/Zip: Palm Desert CA 92255 Phone: (760) 346-5354 Date Signed: 2024-04-09 Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-A020061538A-000-001-M22004A-0000 Registration Date/Time: 2024-04-09   17:57:08 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   17:58:15 SPACE CONDITIONING SYSTEM FAN EFFICACY CF2R-MCH-22-H (Page 1 of 3) CERTIFICATE OF INSTALLATION Project Name: 58-892 Marbella Lot 60 Enforcement Agency: La Quinta, City of Dwelling Address: 58-892 Marbella Lot 60 Permit Number: PENDING City and Zip Code La Quinta, 92253 Permit Application Date: 2024-04-01 A. Ducted Cooling System Information 01 System Identification or Name System 1 02 System Location or Area Served Living area 03 Indoor Unit Name or Description of Area Served Living room 04 System Installation Type New 05 Nominal Cooling Capacity (tons) of Condenser 4 06 Condenser Speed Type n/a 07 Cooling System Zonal Control Type n/a 08 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system 09 System Bypass Duct Status n/a 10 Date of System Airflow Rate Measurement 2024-04-09 11 Airflow Rate Protocol utilized RA3.3 procedures for airflow rate measurement 12 Central Fan Ventilation Cooling System Status Not a CFVCS B. Fan Watt Measurement Apparatus and Procedure Information Instrument Specifications are given in RA3.3.1, and system fan watt measurement apparatus information is given in RA3.3.2.2. 01 Fan Watt Verification Device Used.Portable Watt Meter MCH-22a Forced Air System Fan Efficacy Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed Compressor NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. SPACE CONDITIONING SYSTEM FAN EFFICACY CF2R-MCH-22-H (Page 2 of 3) Registration Number: 424-A020061538A-000-001-M22004A-0000 Registration Date/Time: 2024-04-09   17:57:08 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   17:58:15 C. Forced Air System Fan Efficacy Measurement The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3 01 Actual Tested Watts 15 02 Actual Tested Airflow from MCH-23 (cfm)1438 03 Required Fan Efficacy (Watts/cfm)0.58 04 Actual Fan Efficacy (Watts/cfm)0.01 05 Compliance Statement:System fan efficacy complies D. Additional Requirements 01 All registers were fully open during the diagnostic test. 02 System fan was set at maximum speed during the diagnostic test. 03 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test. 04 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value. 05 Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air handler fan speed. 06 Zoned cooling air distribution systems with single speed compressors shall meet both the airflow (cfm/ton) and fan efficacy (Watt/cfm) criteria in every zonal control mode. 07 Portable watt meters used for measurements of air handler watt draws shall be true power measurement systems (i.e. sensor plus data acquisition system) having an accuracy of +- 2% of reading or +- 10 Watts whichever is greater The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. SPACE CONDITIONING SYSTEM FAN EFFICACY CF2R-MCH-22-H (Page 3 of 3) Registration Number: 424-A020061538A-000-001-M22004A-0000 Registration Date/Time: 2024-04-09   17:57:08 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   17:58:15 DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Angel Arechiga Documentation Author Signature: Company: iPermit Signature Date: 2024-04-09 Address: 31225 La Baya Drive CEA/ HERS Certification Identification (if applicable): RCN13516 City/State/Zip: Westlake Village CA 91362 Phone: 818-735-7876 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this certificate of installation is true and correct. 2.I am either: a) a responsible person eligible under division 3 of the business and professions code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this certificate of installation, and attest to the declarations in this statement, or b) i am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this certificate of installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the certificate of compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I understand that a registered copy of this certificate of installation shall be posted or made available with the building permit(s) issued for the building and made available to the enforcement agency for all applicable inspections, and I will take the necessary steps to ensure this requirement is accomplished. 6.I understand that a registered copy of this certificate of installation is required to be included with the documentation the builder provides to the building owner at occupancy, and I will take the necessary steps to ensure this requirement is accomplished. Responsible Builder/Installer Name: Tom Powers (authorized Angel Arechiga) Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) DEH Mechanical Company Inc Position With Company (Title): Contractor/Installer Address: PO Box 12374 CSLB License: 752819 City/State/Zip: Palm Desert CA 92255 Phone: (760) 346-5354 Date Signed: 2024-04-09 Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-A020061538A-000-001-M25011A-0000 Registration Date/Time: 2024-04-09   18:00:51 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   18:01:58 REFRIGERANT CHARGE VERIFICATION CF2R-MCH-25-H (Page 1 of 5) CERTIFICATE OF INSTALLATION Project Name: 58-892 Marbella Lot 60 Enforcement Agency: La Quinta, City of Dwelling Address: 58-892 Marbella Lot 60 Permit Number: PENDING City and Zip Code La Quinta, 92253 Permit Application Date: 2024-04-01 A. System Information Each system requiring refrigerant charge verification will be documented on a separate certificate. 01 Space Conditioning System Identification or Name System 1 02 Space Conditioning System Location or Area Served Living area 03 Condenser (or package unit) Make or Brand GOODMAN 04 Condenser (or package unit) Model Number GSZH504810AA 05 Nominal Cooling Capacity (tons) of Condenser 4 06 Condenser (or package unit) Serial Number 2310151351 07 Refrigerant Type R-410A 08 Other Refrigerant Type (if applicable)n/a 09 Liquid Line Filter Drier Installed According to Manufacturers Specifications (if applicable) Yes 10 System Installation Type New 11 Fault Indicator Display (FID) Status (Note: Even systems with a FID must have refrigerant charge verified by installer). This system does not have a FID device installed 12 Is the system of a type that the minimum airflow can be verified for all indoor units using an approved measurement procedure (RA3.3 or RA3.3.3)? Yes 13 Is the system of a type that approved refrigerant charge verification procedures can be used to verify compliance with the refrigerant charge verification requirements when temperatures are >= 55 °F (RA3.2.2, or RA1)? Yes, one of the Refrigerant charge verification procedures from RA3.2.2 or RA1 is applicable to this system and can be used to verify compliance 14 Date of Refrigerant Charge Verification for this system 2024-04-09 15 Refrigerant charge verification method used.Subcooling (outdoor temperature must be equal to or greater than 55 degF) 16 Person who performed the Refrigerant Charge Verification reported on this Certificate of Installation HERS rater 17 HERS Verification Compliance Requirement Status System does not qualify for group sampling NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. REFRIGERANT CHARGE VERIFICATION CF2R-MCH-25-H (Page 2 of 5) Registration Number: 424-A020061538A-000-001-M25011A-0000 Registration Date/Time: 2024-04-09   18:00:51 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   18:01:58 MCH-25b - Refrigerant Charge Verification - Subcooling Method B. Metering Device Verification Subcooling Method can only be used on systems that have a variable metering device. 01 Refrigerant metering device Thermostatic Expansion Valve (TXV) 02 Subcooling Method applicability status Subcooling Method is applicable to this system. C. Instrument Calibration Procedures for instrument calibration are given in Reference Residential Appendix RA3.2.2 and RA3.2.2.2 01 Date of Digital Refrigerant Gauge Calibration 2024-03-25 02 Date of Digital Thermocouple Calibration 2024-04-03 03 Digital Refrigerant Gauge Calibration Status Calibration is current 04 Digital Thermocouple Calibration Status Calibration is current D. Measurement Access Hole (MAH) Verification Procedures for installing MAH are specified in Reference Residential Appendix RA3.2.2.3 01 Method Used to Demonstrate Compliance with the Measurement Access Hole (MAH) Requirement MAH installed and labeled consistent with Figure 3.2-1 E. Minimum System Airflow Rate Verification Procedures for verifying minimum system airflow are specified in Reference Residential Appendix RA3.3.3. 01 02 03 Indoor Unit Name or Description of Area Served Minimum Required System Airflow Rate (cfm)System Airflow Rate Verification Status Living room 1400 System complies with minimum airflow rate requirements 04 SC System complies with Minimum System Airflow Rate Verification Notes: NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. REFRIGERANT CHARGE VERIFICATION CF2R-MCH-25-H (Page 3 of 5) Registration Number: 424-A020061538A-000-001-M25011A-0000 Registration Date/Time: 2024-04-09   18:00:51 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   18:01:58 F. Data Collection and Calculations Procedures for determining Refrigerant Charge using the Standard Charge Verification Procedure are given in Reference Residential Appendix RA3.2.2. 01 Lowest Return Air Dry Bulb Temperature that Occurred During the Refrigerant Charge Verification Procedure ( °F) 75 02 Measured Condenser Air Entering Dry-Bulb Temperature (Tcondenser, db) 85 03 Outdoor Temperature Qualification Status Outdoor temperature is within range for using Subcooling refrigerant charge verification method 04 Measured Liquid Line Temperature (Tliquid) ( °F)85.6 05 Measured Liquid Line Pressure (Pliquid) (psig)310.4 06 Condenser Saturation Temperature (Tcondenser, sat) from Digital Gauge or P-T Table using Line F05 ( °F) 95.8 07 Measured Subcooling (Line F06 - Lilne F04 ( °F)10.2 08 Target Subcooling from Manufacturer ( °F)8 09 Compliance Statement:System complies with Subcooling Method - Must also pass metering device verification, next section G. Metering Device Verification Procedures for the verification of proper metering device operation are specified in RA3.2.2.6.2 01 Measured Suction Line Temperature (Tsuction) ( °F)60.8 02 Measured Suction Line Pressure (Psuction) (psig)117.9 03 Evaporator Saturation Temperature (Tevaporator, sat) from Digital Gauge or P-T Table using Line G02 ( °F) 39.8 04 Measured Superheat (Line G01- Line G03) ( °F)21 05 Measured Superheat (Line G04) is between 4 °F and 25 °F (inclusive) Passes CEC requirement 06 Measured Superheat (Line G04) is within Manufacturer's Specifications ( if known) Yes, documentation to be provided upon request 07 Compliance Statement Metering device verification passes MCH-25d - Refrigeration Charge Verification - Fault Indicator Display (FID) H. Fault Indicator Display This section does not apply to this project. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. REFRIGERANT CHARGE VERIFICATION CF2R-MCH-25-H (Page 4 of 5) Registration Number: 424-A020061538A-000-001-M25011A-0000 Registration Date/Time: 2024-04-09   18:00:51 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   18:01:58 I. Fault Indicator Display Additional Requirements This section does not apply to this project. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. REFRIGERANT CHARGE VERIFICATION CF2R-MCH-25-H (Page 5 of 5) Registration Number: 424-A020061538A-000-001-M25011A-0000 Registration Date/Time: 2024-04-09   18:00:51 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   18:01:58 DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Angel Arechiga Documentation Author Signature: Company: iPermit Signature Date: 2024-04-09 Address: 31225 La Baya Drive CEA/ HERS Certification Identification (if applicable): RCN13516 City/State/Zip: Westlake Village CA 91362 Phone: 818-735-7876 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this certificate of installation is true and correct. 2.I am either: a) a responsible person eligible under division 3 of the business and professions code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this certificate of installation, and attest to the declarations in this statement, or b) i am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this certificate of installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the certificate of compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I understand that a registered copy of this certificate of installation shall be posted or made available with the building permit(s) issued for the building and made available to the enforcement agency for all applicable inspections, and I will take the necessary steps to ensure this requirement is accomplished. 6.I understand that a registered copy of this certificate of installation is required to be included with the documentation the builder provides to the building owner at occupancy, and I will take the necessary steps to ensure this requirement is accomplished. Responsible Builder/Installer Name: Tom Powers (authorized Angel Arechiga) Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) DEH Mechanical Company Inc Position With Company (Title): Contractor/Installer Address: PO Box 12374 CSLB License: 752819 City/State/Zip: Palm Desert CA 92255 Phone: (760) 346-5354 Date Signed: 2024-04-09 Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-A020061538A-000-001-M20005A-0000 Registration Date/Time: 2024-04-09   17:57:20 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   17:58:28 DUCT LEAKAGE DIAGNOSTIC TEST CF2R-MCH-20-H (Page 1 of 4) CERTIFICATE OF INSTALLATION Project Name: 58-892 Marbella Lot 60 Enforcement Agency: La Quinta, City of Dwelling Address: 58-892 Marbella Lot 60 Permit Number: PENDING City and Zip Code La Quinta, 92253 Permit Application Date: 2024-04-01 A. System Information 01 Space Conditioning System Identification or Name System 2 02 Space Conditioning System Location or Area Served Master 03 Indoor Unit Name or Description of Area Served 1 04 Building Type from from parent CC Single family 05 Verified Low Leakage Ducts in Conditioned Space (VLLDCS) Credit from parent CC? No, credit is not taken 06 Verified Low Leakage Air Handling Unit Credit from parent CC?No, credit is not taken 07 Duct System Compliance Category New 08 Portions of Duct Located in Garage?No 09 Is the system type Small Duct High Velocity (SDHV) ?No MCH-20a - Completely New Duct System NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. DUCT LEAKAGE DIAGNOSTIC TEST CF2R-MCH-20-H (Page 2 of 4) Registration Number: 424-A020061538A-000-001-M20005A-0000 Registration Date/Time: 2024-04-09   17:57:20 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   17:58:28 B. Duct Leakage Diagnostic Test 01 Air Handling Unit Airflow (AHU Airflow) Determination Method Cooling system method 02 Condenser Nominal Cooling Capacity (ton)3 03 Indoor Unit Nominal Cooling Capacity 3 04 Heating Capacity (kBtu/h)n/a 05 Conditioned Floor Area Served by this HVAC System (ft2)1000 06 Measured AHU Airflow (cfm)n/a 07 Duct Leakage Test Conditions Test final 08 Duct Leakage Test Method Total leakage 09 Leakage Factor 0.05 10 Calculated Target Allowable Duct Leakage (cfm)60 11 Actual Duct Leakage Rate from Leakage Test Measurement (cfm)55 12 Compliance Statement System passes leakage test NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. DUCT LEAKAGE DIAGNOSTIC TEST CF2R-MCH-20-H (Page 3 of 4) Registration Number: 424-A020061538A-000-001-M20005A-0000 Registration Date/Time: 2024-04-09   17:57:20 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   17:58:28 C. Additional Requirements for Compliance 01 System was tested in its normal operation condition. No temporary taping allowed. 02 Outside air (OA) duct connections to the central forced air duct system shall not be sealed/taped off during duct leakage testing. OA ducts used for Central Fan Integrated (CFI) Indoor Air Quality ventilation systems, or Central Fan Ventilation Cooling Systems, that utilize dampers that open only when OA is required and automatically close when OA is not required, may configure the OA damper to the closed position during duct leakage testing. 03 All supply and return register boots were sealed to the drywall. 04 Building cavities were not used as plenums or platform returns in lieu of ducts. 05 If cloth backed tape was used it was covered with Mastic and draw bands. 06 All connection points between the air handler and the supply and return plenums are completely sealed. Visual Inspection at Final Construction Stage (applicable if system was tested at rough-in). After installing the interior finishing wall and verifying that the above rough-in tests was completed, the following procedure must be performed 07 For all supply and return registers, verify that the spaces between the register boot and the interior finishing wall are properly sealed. 08 If the house rough-in duct leakage test was conducted without an air handler installed, inspect the connection points between the air handler and the supply and return plenums to verify that the connection points are properly sealed. 09 Inspect all joints to ensure that no cloth backed rubber adhesive duct tape is used. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. DUCT LEAKAGE DIAGNOSTIC TEST CF2R-MCH-20-H (Page 4 of 4) Registration Number: 424-A020061538A-000-001-M20005A-0000 Registration Date/Time: 2024-04-09   17:57:20 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   17:58:28 DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Angel Arechiga Documentation Author Signature: Company: iPermit Signature Date: 2024-04-09 Address: 31225 La Baya Drive CEA/ HERS Certification Identification (if applicable): RCN13516 City/State/Zip: Westlake Village CA 91362 Phone: 818-735-7876 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this certificate of installation is true and correct. 2.I am either: a) a responsible person eligible under division 3 of the business and professions code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this certificate of installation, and attest to the declarations in this statement, or b) i am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this certificate of installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the certificate of compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I understand that a registered copy of this certificate of installation shall be posted or made available with the building permit(s) issued for the building and made available to the enforcement agency for all applicable inspections, and I will take the necessary steps to ensure this requirement is accomplished. 6.I understand that a registered copy of this certificate of installation is required to be included with the documentation the builder provides to the building owner at occupancy, and I will take the necessary steps to ensure this requirement is accomplished. Responsible Builder/Installer Name: Tom Powers (authorized Angel Arechiga) Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) DEH Mechanical Company Inc Position With Company (Title): Contractor/Installer Address: PO Box 12374 CSLB License: 752819 City/State/Zip: Palm Desert CA 92255 Phone: (760) 346-5354 Date Signed: 2024-04-09 Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable): NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-A020061538A-000-001-M23006A-0000 Registration Date/Time: 2024-04-09   17:57:33 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   17:58:40 SPACE CONDITIONING SYSTEM AIRFLOW RATE CF2R-MCH-23-H (Page 1 of 3) CERTIFICATE OF INSTALLATION Project Name: 58-892 Marbella Lot 60 Enforcement Agency: La Quinta, City of Dwelling Address: 58-892 Marbella Lot 60 Permit Number: PENDING City and Zip Code La Quinta, 92253 Permit Application Date: 2024-04-01 A. Ducted Cooling System Information 01 Space Conditioning System Identification or Name System 2 02 Space Conditioning System Description of Area Served Master 03 Indoor Unit Name 1 04 System Installation Type New 05 Nominal Cooling Capacity (tons)3 06 Condenser Speed Type n/a 07 Cooling System Zonal Control Type n/a 08 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system 09 System Bypass Duct Status n/a 10 Date of System Airflow Rate Measurement 2024-04-09 11 Airflow Rate Protocol Utilized RA3.3 procedures for airflow rate measurement 12 Central Fan Ventilation Cooling System Status Not a CFVCS B. Hole for the placement of a Static Pressure Probe (HSPP), and Permanently Installed Static Pressure Probe (PSPP) in the Supply Plenum. Procedures for installing HSPP or PSPP are specified in RA3.3.1.1. 01 Method Used to Demonstrate Compliance with the HSPP/PSPP Requirement HSPP installed and labeled consistent with Figure RA3.3-1 NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. SPACE CONDITIONING SYSTEM AIRFLOW RATE CF2R-MCH-23-H (Page 2 of 3) Registration Number: 424-A020061538A-000-001-M23006A-0000 Registration Date/Time: 2024-04-09   17:57:33 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   17:58:40 C. Airflow Rate Measurement Apparatus and Procedure Information Instrument Specifications are given in RA3.3.1.1, and system airflow rate measurement apparatus information is given in RA3.3.2. 01 Airflow Rate Measurement Type used for this airflow rate verification. Traditional Flow Capture Hood according to procedure in RA3.3.3.1.4 02 Manufacturer of Airflow Measurement Apparatus Testo 03 Model number of Airflow Measurement Apparatus Testo420 04 Certification Status of the Airflow Measurement Apparatus Accuracy Certified by Manufacturer and listed on CEC Website at http://www.energy.ca.gov/title24/equipment_cert/ama_fas/index. html MCH-23a Forced Air System Airflow Rate Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed Compressor D. Forced Air System Airflow Rate Measurement The procedures for System Airflow Rate Verification are specified in Reference Residential Appendix RA3.3. 01 Required Minimum System Airflow Rate (cfm/ton)350 02 Required Minimum System Airflow Target (cfm)1050 03 Actual System Airflow Rate Measurement (cfm)1068 04 Compliance Statement:System airflow rate complies E. Additional Requirements 01 Air filters that meet the applicable requirements of Standards Section 150.0(m)12 or 150.0(m)13 were properly installed in the system during system air flow rate measurement identified on this Certificate of Installation. 02 The airflow rate measurement apparatus used to perform the airflow rate measurement identified on this Certificate of Installation was calibrated in accordance with the apparatus manufacturer's specifications and conforms to the instrumentation specifications given in RA3.3.1. 03 A visual inspection shall confirm that bypass ducts that deliver conditioned supply air directly to the space conditioning system return duct airflow are not used on newly constructed zonally controlled systems unless the Performance Certificate of Compliance indicates an allowance for use of a bypass duct. When a bypass duct is accounted for on the Performance Certificate of Compliance, the airflow rate shall conform to the specifications listed on the Certificate of Compliance. 04 All registers were fully open during the diagnostic test. 05 System fan was set at maximum speed during the diagnostic test. 06 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test. 07 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value. 08 Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air handler fan speed. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. SPACE CONDITIONING SYSTEM AIRFLOW RATE CF2R-MCH-23-H (Page 3 of 3) Registration Number: 424-A020061538A-000-001-M23006A-0000 Registration Date/Time: 2024-04-09   17:57:33 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   17:58:40 DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Angel Arechiga Documentation Author Signature: Company: iPermit Signature Date: 2024-04-09 Address: 31225 La Baya Drive CEA/ HERS Certification Identification (if applicable): RCN13516 City/State/Zip: Westlake Village CA 91362 Phone: 818-735-7876 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this certificate of installation is true and correct. 2.I am either: a) a responsible person eligible under division 3 of the business and professions code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this certificate of installation, and attest to the declarations in this statement, or b) i am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this certificate of installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the certificate of compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I understand that a registered copy of this certificate of installation shall be posted or made available with the building permit(s) issued for the building and made available to the enforcement agency for all applicable inspections, and I will take the necessary steps to ensure this requirement is accomplished. 6.I understand that a registered copy of this certificate of installation is required to be included with the documentation the builder provides to the building owner at occupancy, and I will take the necessary steps to ensure this requirement is accomplished. Responsible Builder/Installer Name: Tom Powers (authorized Angel Arechiga) Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) DEH Mechanical Company Inc Position With Company (Title): Contractor/Installer Address: PO Box 12374 CSLB License: 752819 City/State/Zip: Palm Desert CA 92255 Phone: (760) 346-5354 Date Signed: 2024-04-09 Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-A020061538A-000-001-M22007A-0000 Registration Date/Time: 2024-04-09   17:58:04 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   17:59:11 SPACE CONDITIONING SYSTEM FAN EFFICACY CF2R-MCH-22-H (Page 1 of 3) CERTIFICATE OF INSTALLATION Project Name: 58-892 Marbella Lot 60 Enforcement Agency: La Quinta, City of Dwelling Address: 58-892 Marbella Lot 60 Permit Number: PENDING City and Zip Code La Quinta, 92253 Permit Application Date: 2024-04-01 A. Ducted Cooling System Information 01 System Identification or Name System 2 02 System Location or Area Served Master 03 Indoor Unit Name or Description of Area Served 1 04 System Installation Type New 05 Nominal Cooling Capacity (tons) of Condenser 3 06 Condenser Speed Type n/a 07 Cooling System Zonal Control Type n/a 08 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system 09 System Bypass Duct Status n/a 10 Date of System Airflow Rate Measurement 2024-04-09 11 Airflow Rate Protocol utilized RA3.3 procedures for airflow rate measurement 12 Central Fan Ventilation Cooling System Status Not a CFVCS B. Fan Watt Measurement Apparatus and Procedure Information Instrument Specifications are given in RA3.3.1, and system fan watt measurement apparatus information is given in RA3.3.2.2. 01 Fan Watt Verification Device Used.Portable Watt Meter MCH-22a Forced Air System Fan Efficacy Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed Compressor NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. SPACE CONDITIONING SYSTEM FAN EFFICACY CF2R-MCH-22-H (Page 2 of 3) Registration Number: 424-A020061538A-000-001-M22007A-0000 Registration Date/Time: 2024-04-09   17:58:04 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   17:59:11 C. Forced Air System Fan Efficacy Measurement The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3 01 Actual Tested Watts 15 02 Actual Tested Airflow from MCH-23 (cfm)1068 03 Required Fan Efficacy (Watts/cfm)0.58 04 Actual Fan Efficacy (Watts/cfm)0.01 05 Compliance Statement:System fan efficacy complies D. Additional Requirements 01 All registers were fully open during the diagnostic test. 02 System fan was set at maximum speed during the diagnostic test. 03 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test. 04 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value. 05 Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air handler fan speed. 06 Zoned cooling air distribution systems with single speed compressors shall meet both the airflow (cfm/ton) and fan efficacy (Watt/cfm) criteria in every zonal control mode. 07 Portable watt meters used for measurements of air handler watt draws shall be true power measurement systems (i.e. sensor plus data acquisition system) having an accuracy of +- 2% of reading or +- 10 Watts whichever is greater The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. SPACE CONDITIONING SYSTEM FAN EFFICACY CF2R-MCH-22-H (Page 3 of 3) Registration Number: 424-A020061538A-000-001-M22007A-0000 Registration Date/Time: 2024-04-09   17:58:04 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   17:59:11 DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Angel Arechiga Documentation Author Signature: Company: iPermit Signature Date: 2024-04-09 Address: 31225 La Baya Drive CEA/ HERS Certification Identification (if applicable): RCN13516 City/State/Zip: Westlake Village CA 91362 Phone: 818-735-7876 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this certificate of installation is true and correct. 2.I am either: a) a responsible person eligible under division 3 of the business and professions code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this certificate of installation, and attest to the declarations in this statement, or b) i am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this certificate of installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the certificate of compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I understand that a registered copy of this certificate of installation shall be posted or made available with the building permit(s) issued for the building and made available to the enforcement agency for all applicable inspections, and I will take the necessary steps to ensure this requirement is accomplished. 6.I understand that a registered copy of this certificate of installation is required to be included with the documentation the builder provides to the building owner at occupancy, and I will take the necessary steps to ensure this requirement is accomplished. Responsible Builder/Installer Name: Tom Powers (authorized Angel Arechiga) Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) DEH Mechanical Company Inc Position With Company (Title): Contractor/Installer Address: PO Box 12374 CSLB License: 752819 City/State/Zip: Palm Desert CA 92255 Phone: (760) 346-5354 Date Signed: 2024-04-09 Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-A020061538A-000-001-M25012A-0000 Registration Date/Time: 2024-04-09   18:02:19 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   18:03:26 REFRIGERANT CHARGE VERIFICATION CF2R-MCH-25-H (Page 1 of 5) CERTIFICATE OF INSTALLATION Project Name: 58-892 Marbella Lot 60 Enforcement Agency: La Quinta, City of Dwelling Address: 58-892 Marbella Lot 60 Permit Number: PENDING City and Zip Code La Quinta, 92253 Permit Application Date: 2024-04-01 A. System Information Each system requiring refrigerant charge verification will be documented on a separate certificate. 01 Space Conditioning System Identification or Name System 2 02 Space Conditioning System Location or Area Served Master 03 Condenser (or package unit) Make or Brand GOODMAN 04 Condenser (or package unit) Model Number GSZH503610AB 05 Nominal Cooling Capacity (tons) of Condenser 3 06 Condenser (or package unit) Serial Number GSZH503610AB 07 Refrigerant Type R-410A 08 Other Refrigerant Type (if applicable)n/a 09 Liquid Line Filter Drier Installed According to Manufacturers Specifications (if applicable) Yes 10 System Installation Type New 11 Fault Indicator Display (FID) Status (Note: Even systems with a FID must have refrigerant charge verified by installer). This system does not have a FID device installed 12 Is the system of a type that the minimum airflow can be verified for all indoor units using an approved measurement procedure (RA3.3 or RA3.3.3)? Yes 13 Is the system of a type that approved refrigerant charge verification procedures can be used to verify compliance with the refrigerant charge verification requirements when temperatures are >= 55 °F (RA3.2.2, or RA1)? Yes, one of the Refrigerant charge verification procedures from RA3.2.2 or RA1 is applicable to this system and can be used to verify compliance 14 Date of Refrigerant Charge Verification for this system 2024-04-09 15 Refrigerant charge verification method used.Subcooling (outdoor temperature must be equal to or greater than 55 degF) 16 Person who performed the Refrigerant Charge Verification reported on this Certificate of Installation HERS rater 17 HERS Verification Compliance Requirement Status System does not qualify for group sampling NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. REFRIGERANT CHARGE VERIFICATION CF2R-MCH-25-H (Page 2 of 5) Registration Number: 424-A020061538A-000-001-M25012A-0000 Registration Date/Time: 2024-04-09   18:02:19 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   18:03:26 MCH-25b - Refrigerant Charge Verification - Subcooling Method B. Metering Device Verification Subcooling Method can only be used on systems that have a variable metering device. 01 Refrigerant metering device Thermostatic Expansion Valve (TXV) 02 Subcooling Method applicability status Subcooling Method is applicable to this system. C. Instrument Calibration Procedures for instrument calibration are given in Reference Residential Appendix RA3.2.2 and RA3.2.2.2 01 Date of Digital Refrigerant Gauge Calibration 2024-03-25 02 Date of Digital Thermocouple Calibration 2024-04-03 03 Digital Refrigerant Gauge Calibration Status Calibration is current 04 Digital Thermocouple Calibration Status Calibration is current D. Measurement Access Hole (MAH) Verification Procedures for installing MAH are specified in Reference Residential Appendix RA3.2.2.3 01 Method Used to Demonstrate Compliance with the Measurement Access Hole (MAH) Requirement MAH installed and labeled consistent with Figure 3.2-1 E. Minimum System Airflow Rate Verification Procedures for verifying minimum system airflow are specified in Reference Residential Appendix RA3.3.3. 01 02 03 Indoor Unit Name or Description of Area Served Minimum Required System Airflow Rate (cfm)System Airflow Rate Verification Status 1 1400 System complies with minimum airflow rate requirements 04 SC System complies with Minimum System Airflow Rate Verification Notes: NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. REFRIGERANT CHARGE VERIFICATION CF2R-MCH-25-H (Page 3 of 5) Registration Number: 424-A020061538A-000-001-M25012A-0000 Registration Date/Time: 2024-04-09   18:02:19 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   18:03:26 F. Data Collection and Calculations Procedures for determining Refrigerant Charge using the Standard Charge Verification Procedure are given in Reference Residential Appendix RA3.2.2. 01 Lowest Return Air Dry Bulb Temperature that Occurred During the Refrigerant Charge Verification Procedure ( °F) 80 02 Measured Condenser Air Entering Dry-Bulb Temperature (Tcondenser, db) 85 03 Outdoor Temperature Qualification Status Outdoor temperature is within range for using Subcooling refrigerant charge verification method 04 Measured Liquid Line Temperature (Tliquid) ( °F)88.9 05 Measured Liquid Line Pressure (Pliquid) (psig)305.9 06 Condenser Saturation Temperature (Tcondenser, sat) from Digital Gauge or P-T Table using Line F05 ( °F) 94.5 07 Measured Subcooling (Line F06 - Lilne F04 ( °F)5.6 08 Target Subcooling from Manufacturer ( °F)8 09 Compliance Statement:System complies with Subcooling Method - Must also pass metering device verification, next section G. Metering Device Verification Procedures for the verification of proper metering device operation are specified in RA3.2.2.6.2 01 Measured Suction Line Temperature (Tsuction) ( °F)59.4 02 Measured Suction Line Pressure (Psuction) (psig)106.9 03 Evaporator Saturation Temperature (Tevaporator, sat) from Digital Gauge or P-T Table using Line G02 ( °F) 42.8 04 Measured Superheat (Line G01- Line G03) ( °F)16.6 05 Measured Superheat (Line G04) is between 4 °F and 25 °F (inclusive) Passes CEC requirement 06 Measured Superheat (Line G04) is within Manufacturer's Specifications ( if known) Yes, documentation to be provided upon request 07 Compliance Statement Metering device verification passes MCH-25d - Refrigeration Charge Verification - Fault Indicator Display (FID) H. Fault Indicator Display This section does not apply to this project. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. REFRIGERANT CHARGE VERIFICATION CF2R-MCH-25-H (Page 4 of 5) Registration Number: 424-A020061538A-000-001-M25012A-0000 Registration Date/Time: 2024-04-09   18:02:19 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   18:03:26 I. Fault Indicator Display Additional Requirements This section does not apply to this project. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. REFRIGERANT CHARGE VERIFICATION CF2R-MCH-25-H (Page 5 of 5) Registration Number: 424-A020061538A-000-001-M25012A-0000 Registration Date/Time: 2024-04-09   18:02:19 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   18:03:26 DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Angel Arechiga Documentation Author Signature: Company: iPermit Signature Date: 2024-04-09 Address: 31225 La Baya Drive CEA/ HERS Certification Identification (if applicable): RCN13516 City/State/Zip: Westlake Village CA 91362 Phone: 818-735-7876 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this certificate of installation is true and correct. 2.I am either: a) a responsible person eligible under division 3 of the business and professions code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this certificate of installation, and attest to the declarations in this statement, or b) i am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this certificate of installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the certificate of compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I understand that a registered copy of this certificate of installation shall be posted or made available with the building permit(s) issued for the building and made available to the enforcement agency for all applicable inspections, and I will take the necessary steps to ensure this requirement is accomplished. 6.I understand that a registered copy of this certificate of installation is required to be included with the documentation the builder provides to the building owner at occupancy, and I will take the necessary steps to ensure this requirement is accomplished. Responsible Builder/Installer Name: Tom Powers (authorized Angel Arechiga) Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) DEH Mechanical Company Inc Position With Company (Title): Contractor/Installer Address: PO Box 12374 CSLB License: 752819 City/State/Zip: Palm Desert CA 92255 Phone: (760) 346-5354 Date Signed: 2024-04-09 Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-A020061538A-000-001-M20008A-0000 Registration Date/Time: 2024-04-09   17:58:31 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   17:59:41 DUCT LEAKAGE DIAGNOSTIC TEST CF2R-MCH-20-H (Page 1 of 4) CERTIFICATE OF INSTALLATION Project Name: 58-892 Marbella Lot 60 Enforcement Agency: La Quinta, City of Dwelling Address: 58-892 Marbella Lot 60 Permit Number: PENDING City and Zip Code La Quinta, 92253 Permit Application Date: 2024-04-01 A. System Information 01 Space Conditioning System Identification or Name System 3 02 Space Conditioning System Location or Area Served Casita 03 Indoor Unit Name or Description of Area Served Casita 04 Building Type from from parent CC Single family 05 Verified Low Leakage Ducts in Conditioned Space (VLLDCS) Credit from parent CC? No, credit is not taken 06 Verified Low Leakage Air Handling Unit Credit from parent CC?No, credit is not taken 07 Duct System Compliance Category New 08 Portions of Duct Located in Garage?No 09 Is the system type Small Duct High Velocity (SDHV) ?No MCH-20a - Completely New Duct System NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. DUCT LEAKAGE DIAGNOSTIC TEST CF2R-MCH-20-H (Page 2 of 4) Registration Number: 424-A020061538A-000-001-M20008A-0000 Registration Date/Time: 2024-04-09   17:58:31 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   17:59:41 B. Duct Leakage Diagnostic Test 01 Air Handling Unit Airflow (AHU Airflow) Determination Method Cooling system method 02 Condenser Nominal Cooling Capacity (ton)2 03 Indoor Unit Nominal Cooling Capacity 2 04 Heating Capacity (kBtu/h)n/a 05 Conditioned Floor Area Served by this HVAC System (ft2)1000 06 Measured AHU Airflow (cfm)n/a 07 Duct Leakage Test Conditions Test final 08 Duct Leakage Test Method Total leakage 09 Leakage Factor 0.05 10 Calculated Target Allowable Duct Leakage (cfm)40 11 Actual Duct Leakage Rate from Leakage Test Measurement (cfm)40 12 Compliance Statement System passes leakage test NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. DUCT LEAKAGE DIAGNOSTIC TEST CF2R-MCH-20-H (Page 3 of 4) Registration Number: 424-A020061538A-000-001-M20008A-0000 Registration Date/Time: 2024-04-09   17:58:31 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   17:59:41 C. Additional Requirements for Compliance 01 System was tested in its normal operation condition. No temporary taping allowed. 02 Outside air (OA) duct connections to the central forced air duct system shall not be sealed/taped off during duct leakage testing. OA ducts used for Central Fan Integrated (CFI) Indoor Air Quality ventilation systems, or Central Fan Ventilation Cooling Systems, that utilize dampers that open only when OA is required and automatically close when OA is not required, may configure the OA damper to the closed position during duct leakage testing. 03 All supply and return register boots were sealed to the drywall. 04 Building cavities were not used as plenums or platform returns in lieu of ducts. 05 If cloth backed tape was used it was covered with Mastic and draw bands. 06 All connection points between the air handler and the supply and return plenums are completely sealed. Visual Inspection at Final Construction Stage (applicable if system was tested at rough-in). After installing the interior finishing wall and verifying that the above rough-in tests was completed, the following procedure must be performed 07 For all supply and return registers, verify that the spaces between the register boot and the interior finishing wall are properly sealed. 08 If the house rough-in duct leakage test was conducted without an air handler installed, inspect the connection points between the air handler and the supply and return plenums to verify that the connection points are properly sealed. 09 Inspect all joints to ensure that no cloth backed rubber adhesive duct tape is used. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. DUCT LEAKAGE DIAGNOSTIC TEST CF2R-MCH-20-H (Page 4 of 4) Registration Number: 424-A020061538A-000-001-M20008A-0000 Registration Date/Time: 2024-04-09   17:58:31 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   17:59:41 DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Angel Arechiga Documentation Author Signature: Company: iPermit Signature Date: 2024-04-09 Address: 31225 La Baya Drive CEA/ HERS Certification Identification (if applicable): RCN13516 City/State/Zip: Westlake Village CA 91362 Phone: 818-735-7876 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this certificate of installation is true and correct. 2.I am either: a) a responsible person eligible under division 3 of the business and professions code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this certificate of installation, and attest to the declarations in this statement, or b) i am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this certificate of installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the certificate of compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I understand that a registered copy of this certificate of installation shall be posted or made available with the building permit(s) issued for the building and made available to the enforcement agency for all applicable inspections, and I will take the necessary steps to ensure this requirement is accomplished. 6.I understand that a registered copy of this certificate of installation is required to be included with the documentation the builder provides to the building owner at occupancy, and I will take the necessary steps to ensure this requirement is accomplished. Responsible Builder/Installer Name: Tom Powers (authorized Angel Arechiga) Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) DEH Mechanical Company Inc Position With Company (Title): Contractor/Installer Address: PO Box 12374 CSLB License: 752819 City/State/Zip: Palm Desert CA 92255 Phone: (760) 346-5354 Date Signed: 2024-04-09 Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable): NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-A020061538A-000-001-M23009A-0000 Registration Date/Time: 2024-04-09   17:58:47 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   18:01:12 SPACE CONDITIONING SYSTEM AIRFLOW RATE CF2R-MCH-23-H (Page 1 of 3) CERTIFICATE OF INSTALLATION Project Name: 58-892 Marbella Lot 60 Enforcement Agency: La Quinta, City of Dwelling Address: 58-892 Marbella Lot 60 Permit Number: PENDING City and Zip Code La Quinta, 92253 Permit Application Date: 2024-04-01 A. Ducted Cooling System Information 01 Space Conditioning System Identification or Name System 3 02 Space Conditioning System Description of Area Served Casita 03 Indoor Unit Name Casita 04 System Installation Type New 05 Nominal Cooling Capacity (tons)2 06 Condenser Speed Type n/a 07 Cooling System Zonal Control Type n/a 08 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system 09 System Bypass Duct Status n/a 10 Date of System Airflow Rate Measurement 2024-04-09 11 Airflow Rate Protocol Utilized RA3.3 procedures for airflow rate measurement 12 Central Fan Ventilation Cooling System Status Not a CFVCS B. Hole for the placement of a Static Pressure Probe (HSPP), and Permanently Installed Static Pressure Probe (PSPP) in the Supply Plenum. Procedures for installing HSPP or PSPP are specified in RA3.3.1.1. 01 Method Used to Demonstrate Compliance with the HSPP/PSPP Requirement HSPP installed and labeled consistent with Figure RA3.3-1 NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. SPACE CONDITIONING SYSTEM AIRFLOW RATE CF2R-MCH-23-H (Page 2 of 3) Registration Number: 424-A020061538A-000-001-M23009A-0000 Registration Date/Time: 2024-04-09   17:58:47 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   18:01:12 C. Airflow Rate Measurement Apparatus and Procedure Information Instrument Specifications are given in RA3.3.1.1, and system airflow rate measurement apparatus information is given in RA3.3.2. 01 Airflow Rate Measurement Type used for this airflow rate verification. Traditional Flow Capture Hood according to procedure in RA3.3.3.1.4 02 Manufacturer of Airflow Measurement Apparatus Testo 03 Model number of Airflow Measurement Apparatus Testo420 04 Certification Status of the Airflow Measurement Apparatus Accuracy Certified by Manufacturer and listed on CEC Website at http://www.energy.ca.gov/title24/equipment_cert/ama_fas/index. html MCH-23a Forced Air System Airflow Rate Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed Compressor D. Forced Air System Airflow Rate Measurement The procedures for System Airflow Rate Verification are specified in Reference Residential Appendix RA3.3. 01 Required Minimum System Airflow Rate (cfm/ton)350 02 Required Minimum System Airflow Target (cfm)700 03 Actual System Airflow Rate Measurement (cfm)720 04 Compliance Statement:System airflow rate complies E. Additional Requirements 01 Air filters that meet the applicable requirements of Standards Section 150.0(m)12 or 150.0(m)13 were properly installed in the system during system air flow rate measurement identified on this Certificate of Installation. 02 The airflow rate measurement apparatus used to perform the airflow rate measurement identified on this Certificate of Installation was calibrated in accordance with the apparatus manufacturer's specifications and conforms to the instrumentation specifications given in RA3.3.1. 03 A visual inspection shall confirm that bypass ducts that deliver conditioned supply air directly to the space conditioning system return duct airflow are not used on newly constructed zonally controlled systems unless the Performance Certificate of Compliance indicates an allowance for use of a bypass duct. When a bypass duct is accounted for on the Performance Certificate of Compliance, the airflow rate shall conform to the specifications listed on the Certificate of Compliance. 04 All registers were fully open during the diagnostic test. 05 System fan was set at maximum speed during the diagnostic test. 06 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test. 07 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value. 08 Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air handler fan speed. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. SPACE CONDITIONING SYSTEM AIRFLOW RATE CF2R-MCH-23-H (Page 3 of 3) Registration Number: 424-A020061538A-000-001-M23009A-0000 Registration Date/Time: 2024-04-09   17:58:47 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   18:01:12 DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Angel Arechiga Documentation Author Signature: Company: iPermit Signature Date: 2024-04-09 Address: 31225 La Baya Drive CEA/ HERS Certification Identification (if applicable): RCN13516 City/State/Zip: Westlake Village CA 91362 Phone: 818-735-7876 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this certificate of installation is true and correct. 2.I am either: a) a responsible person eligible under division 3 of the business and professions code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this certificate of installation, and attest to the declarations in this statement, or b) i am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this certificate of installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the certificate of compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I understand that a registered copy of this certificate of installation shall be posted or made available with the building permit(s) issued for the building and made available to the enforcement agency for all applicable inspections, and I will take the necessary steps to ensure this requirement is accomplished. 6.I understand that a registered copy of this certificate of installation is required to be included with the documentation the builder provides to the building owner at occupancy, and I will take the necessary steps to ensure this requirement is accomplished. Responsible Builder/Installer Name: Tom Powers (authorized Angel Arechiga) Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) DEH Mechanical Company Inc Position With Company (Title): Contractor/Installer Address: PO Box 12374 CSLB License: 752819 City/State/Zip: Palm Desert CA 92255 Phone: (760) 346-5354 Date Signed: 2024-04-09 Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-A020061538A-000-001-M22010A-0000 Registration Date/Time: 2024-04-09   17:59:03 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   18:00:11 SPACE CONDITIONING SYSTEM FAN EFFICACY CF2R-MCH-22-H (Page 1 of 3) CERTIFICATE OF INSTALLATION Project Name: 58-892 Marbella Lot 60 Enforcement Agency: La Quinta, City of Dwelling Address: 58-892 Marbella Lot 60 Permit Number: PENDING City and Zip Code La Quinta, 92253 Permit Application Date: 2024-04-01 A. Ducted Cooling System Information 01 System Identification or Name System 3 02 System Location or Area Served Casita 03 Indoor Unit Name or Description of Area Served Casita 04 System Installation Type New 05 Nominal Cooling Capacity (tons) of Condenser 2 06 Condenser Speed Type n/a 07 Cooling System Zonal Control Type n/a 08 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system 09 System Bypass Duct Status n/a 10 Date of System Airflow Rate Measurement 2024-04-09 11 Airflow Rate Protocol utilized RA3.3 procedures for airflow rate measurement 12 Central Fan Ventilation Cooling System Status Not a CFVCS B. Fan Watt Measurement Apparatus and Procedure Information Instrument Specifications are given in RA3.3.1, and system fan watt measurement apparatus information is given in RA3.3.2.2. 01 Fan Watt Verification Device Used.Portable Watt Meter MCH-22a Forced Air System Fan Efficacy Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed Compressor NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. SPACE CONDITIONING SYSTEM FAN EFFICACY CF2R-MCH-22-H (Page 2 of 3) Registration Number: 424-A020061538A-000-001-M22010A-0000 Registration Date/Time: 2024-04-09   17:59:03 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   18:00:11 C. Forced Air System Fan Efficacy Measurement The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3 01 Actual Tested Watts 15 02 Actual Tested Airflow from MCH-23 (cfm)720 03 Required Fan Efficacy (Watts/cfm)0.58 04 Actual Fan Efficacy (Watts/cfm)0.02 05 Compliance Statement:System fan efficacy complies D. Additional Requirements 01 All registers were fully open during the diagnostic test. 02 System fan was set at maximum speed during the diagnostic test. 03 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test. 04 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value. 05 Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air handler fan speed. 06 Zoned cooling air distribution systems with single speed compressors shall meet both the airflow (cfm/ton) and fan efficacy (Watt/cfm) criteria in every zonal control mode. 07 Portable watt meters used for measurements of air handler watt draws shall be true power measurement systems (i.e. sensor plus data acquisition system) having an accuracy of +- 2% of reading or +- 10 Watts whichever is greater The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. SPACE CONDITIONING SYSTEM FAN EFFICACY CF2R-MCH-22-H (Page 3 of 3) Registration Number: 424-A020061538A-000-001-M22010A-0000 Registration Date/Time: 2024-04-09   17:59:03 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   18:00:11 DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Angel Arechiga Documentation Author Signature: Company: iPermit Signature Date: 2024-04-09 Address: 31225 La Baya Drive CEA/ HERS Certification Identification (if applicable): RCN13516 City/State/Zip: Westlake Village CA 91362 Phone: 818-735-7876 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this certificate of installation is true and correct. 2.I am either: a) a responsible person eligible under division 3 of the business and professions code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this certificate of installation, and attest to the declarations in this statement, or b) i am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this certificate of installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the certificate of compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I understand that a registered copy of this certificate of installation shall be posted or made available with the building permit(s) issued for the building and made available to the enforcement agency for all applicable inspections, and I will take the necessary steps to ensure this requirement is accomplished. 6.I understand that a registered copy of this certificate of installation is required to be included with the documentation the builder provides to the building owner at occupancy, and I will take the necessary steps to ensure this requirement is accomplished. Responsible Builder/Installer Name: Tom Powers (authorized Angel Arechiga) Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) DEH Mechanical Company Inc Position With Company (Title): Contractor/Installer Address: PO Box 12374 CSLB License: 752819 City/State/Zip: Palm Desert CA 92255 Phone: (760) 346-5354 Date Signed: 2024-04-09 Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-A020061538A-000-001-M25013A-0000 Registration Date/Time: 2024-04-09   18:03:23 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   18:04:30 REFRIGERANT CHARGE VERIFICATION CF2R-MCH-25-H (Page 1 of 5) CERTIFICATE OF INSTALLATION Project Name: 58-892 Marbella Lot 60 Enforcement Agency: La Quinta, City of Dwelling Address: 58-892 Marbella Lot 60 Permit Number: PENDING City and Zip Code La Quinta, 92253 Permit Application Date: 2024-04-01 A. System Information Each system requiring refrigerant charge verification will be documented on a separate certificate. 01 Space Conditioning System Identification or Name System 3 02 Space Conditioning System Location or Area Served Casita 03 Condenser (or package unit) Make or Brand GOODMAN 04 Condenser (or package unit) Model Number GSZH502410AB 05 Nominal Cooling Capacity (tons) of Condenser 2 06 Condenser (or package unit) Serial Number 2403009323 07 Refrigerant Type R-410A 08 Other Refrigerant Type (if applicable)n/a 09 Liquid Line Filter Drier Installed According to Manufacturers Specifications (if applicable) Yes 10 System Installation Type New 11 Fault Indicator Display (FID) Status (Note: Even systems with a FID must have refrigerant charge verified by installer). This system does not have a FID device installed 12 Is the system of a type that the minimum airflow can be verified for all indoor units using an approved measurement procedure (RA3.3 or RA3.3.3)? Yes 13 Is the system of a type that approved refrigerant charge verification procedures can be used to verify compliance with the refrigerant charge verification requirements when temperatures are >= 55 °F (RA3.2.2, or RA1)? Yes, one of the Refrigerant charge verification procedures from RA3.2.2 or RA1 is applicable to this system and can be used to verify compliance 14 Date of Refrigerant Charge Verification for this system 2024-04-09 15 Refrigerant charge verification method used.Subcooling (outdoor temperature must be equal to or greater than 55 degF) 16 Person who performed the Refrigerant Charge Verification reported on this Certificate of Installation HERS rater 17 HERS Verification Compliance Requirement Status System does not qualify for group sampling NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. REFRIGERANT CHARGE VERIFICATION CF2R-MCH-25-H (Page 2 of 5) Registration Number: 424-A020061538A-000-001-M25013A-0000 Registration Date/Time: 2024-04-09   18:03:23 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   18:04:30 MCH-25b - Refrigerant Charge Verification - Subcooling Method B. Metering Device Verification Subcooling Method can only be used on systems that have a variable metering device. 01 Refrigerant metering device Thermostatic Expansion Valve (TXV) 02 Subcooling Method applicability status Subcooling Method is applicable to this system. C. Instrument Calibration Procedures for instrument calibration are given in Reference Residential Appendix RA3.2.2 and RA3.2.2.2 01 Date of Digital Refrigerant Gauge Calibration 2024-03-25 02 Date of Digital Thermocouple Calibration 2024-04-03 03 Digital Refrigerant Gauge Calibration Status Calibration is current 04 Digital Thermocouple Calibration Status Calibration is current D. Measurement Access Hole (MAH) Verification Procedures for installing MAH are specified in Reference Residential Appendix RA3.2.2.3 01 Method Used to Demonstrate Compliance with the Measurement Access Hole (MAH) Requirement MAH installed and labeled consistent with Figure 3.2-1 E. Minimum System Airflow Rate Verification Procedures for verifying minimum system airflow are specified in Reference Residential Appendix RA3.3.3. 01 02 03 Indoor Unit Name or Description of Area Served Minimum Required System Airflow Rate (cfm)System Airflow Rate Verification Status Casita 1400 System complies with minimum airflow rate requirements 04 SC System complies with Minimum System Airflow Rate Verification Notes: NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. REFRIGERANT CHARGE VERIFICATION CF2R-MCH-25-H (Page 3 of 5) Registration Number: 424-A020061538A-000-001-M25013A-0000 Registration Date/Time: 2024-04-09   18:03:23 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   18:04:30 F. Data Collection and Calculations Procedures for determining Refrigerant Charge using the Standard Charge Verification Procedure are given in Reference Residential Appendix RA3.2.2. 01 Lowest Return Air Dry Bulb Temperature that Occurred During the Refrigerant Charge Verification Procedure ( °F) 85 02 Measured Condenser Air Entering Dry-Bulb Temperature (Tcondenser, db) 88 03 Outdoor Temperature Qualification Status Outdoor temperature is within range for using Subcooling refrigerant charge verification method 04 Measured Liquid Line Temperature (Tliquid) ( °F)89.5 05 Measured Liquid Line Pressure (Pliquid) (psig)306.9 06 Condenser Saturation Temperature (Tcondenser, sat) from Digital Gauge or P-T Table using Line F05 ( °F) 95.4 07 Measured Subcooling (Line F06 - Lilne F04 ( °F)5.9 08 Target Subcooling from Manufacturer ( °F)8 09 Compliance Statement:System complies with Subcooling Method - Must also pass metering device verification, next section G. Metering Device Verification Procedures for the verification of proper metering device operation are specified in RA3.2.2.6.2 01 Measured Suction Line Temperature (Tsuction) ( °F)62.4 02 Measured Suction Line Pressure (Psuction) (psig)219.0 03 Evaporator Saturation Temperature (Tevaporator, sat) from Digital Gauge or P-T Table using Line G02 ( °F) 40.1 04 Measured Superheat (Line G01- Line G03) ( °F)22.3 05 Measured Superheat (Line G04) is between 4 °F and 25 °F (inclusive) Passes CEC requirement 06 Measured Superheat (Line G04) is within Manufacturer's Specifications ( if known) Yes, documentation to be provided upon request 07 Compliance Statement Metering device verification passes MCH-25d - Refrigeration Charge Verification - Fault Indicator Display (FID) H. Fault Indicator Display This section does not apply to this project. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. REFRIGERANT CHARGE VERIFICATION CF2R-MCH-25-H (Page 4 of 5) Registration Number: 424-A020061538A-000-001-M25013A-0000 Registration Date/Time: 2024-04-09   18:03:23 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   18:04:30 I. Fault Indicator Display Additional Requirements This section does not apply to this project. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. REFRIGERANT CHARGE VERIFICATION CF2R-MCH-25-H (Page 5 of 5) Registration Number: 424-A020061538A-000-001-M25013A-0000 Registration Date/Time: 2024-04-09   18:03:23 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   18:04:30 DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Angel Arechiga Documentation Author Signature: Company: iPermit Signature Date: 2024-04-09 Address: 31225 La Baya Drive CEA/ HERS Certification Identification (if applicable): RCN13516 City/State/Zip: Westlake Village CA 91362 Phone: 818-735-7876 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this certificate of installation is true and correct. 2.I am either: a) a responsible person eligible under division 3 of the business and professions code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this certificate of installation, and attest to the declarations in this statement, or b) i am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this certificate of installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the certificate of compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I understand that a registered copy of this certificate of installation shall be posted or made available with the building permit(s) issued for the building and made available to the enforcement agency for all applicable inspections, and I will take the necessary steps to ensure this requirement is accomplished. 6.I understand that a registered copy of this certificate of installation is required to be included with the documentation the builder provides to the building owner at occupancy, and I will take the necessary steps to ensure this requirement is accomplished. Responsible Builder/Installer Name: Tom Powers (authorized Angel Arechiga) Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) DEH Mechanical Company Inc Position With Company (Title): Contractor/Installer Address: PO Box 12374 CSLB License: 752819 City/State/Zip: Palm Desert CA 92255 Phone: (760) 346-5354 Date Signed: 2024-04-09 Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-A020061538A-000-001-M20002A-M20A Registration Date/Time: 2024-04-09   18:03:55 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   18:05:03 DUCT LEAKAGE DIAGNOSTIC TEST CF3R-MCH-20-H (Page 1 of 4) CERTIFICATE OF VERIFICATION Project Name: 58-892 Marbella Lot 60 Enforcement Agency: La Quinta, City of Dwelling Address: 58-892 Marbella Lot 60 Permit Number: PENDING City and Zip Code La Quinta, 92253 Permit Application Date: 2024-04-01 A. System Information 01 Space Conditioning System Identification or Name System 1 02 Space Conditioning System Location or Area Served Living area 03 Indoor Unit Name or Description of Area Served Living room 04 Building Type from from parent CC Single family 05 Verified Low Leakage Ducts in Conditioned Space (VLLDCS) Credit from parent CC? No, credit is not taken 06 Verified Low Leakage Air Handling Unit Credit from parent CC?No, credit is not taken 07 Duct System Compliance Category New 08 Portions of Duct Located in Garage?No 09 Is the system type Small Duct High Velocity (SDHV) ?No MCH-20a - Completely New Duct System NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. DUCT LEAKAGE DIAGNOSTIC TEST CF3R-MCH-20-H (Page 2 of 4) Registration Number: 424-A020061538A-000-001-M20002A-M20A Registration Date/Time: 2024-04-09   18:03:55 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   18:05:03 B. Duct Leakage Diagnostic Test 01 Air Handling Unit Airflow (AHU Airflow) Determination Method Cooling system method 02 Condenser Nominal Cooling Capacity (ton)4 03 Indoor Unit Nominal Cooling Capacity 4 04 Heating Capacity (kBtu/h)n/a 05 Conditioned Floor Area Served by this HVAC System (ft2)1000 06 Measured AHU Airflow (cfm)n/a 07 Duct Leakage Test Conditions Test final 08 Duct Leakage Test Method Total leakage 09 Leakage Factor 0.05 10 Calculated Target Allowable Duct Leakage (cfm)80 11 Actual Duct Leakage Rate from Leakage Test Measurement (cfm)80 12 Compliance Statement System passes leakage test 13 Notes: C. Additional Requirements for Compliance 01 System was tested in its normal operation condition. No temporary taping allowed. 02 Outside air (OA) duct connections to the central forced air duct system shall not be sealed/taped off during duct leakage testing. OA ducts used for Central Fan Integrated (CFI) Indoor Air Quality ventilation systems, or Central Fan Ventilation Cooling Systems, that utilize dampers that open only when OA is required and automatically close when OA is not required, may configure the OA damper to the closed position during duct leakage testing. 03 All supply and return register boots were sealed to the drywall. 04 Building cavities were not used as plenums or platform returns in lieu of ducts. 05 If cloth backed tape was used it was covered with Mastic and draw bands. 06 All connection points between the air handler and the supply and return plenums are completely sealed. Visual Inspection at Final Construction Stage (applicable if system was tested at rough-in). After installing the interior finishing wall and verifying that the above rough-in tests was completed, the following procedure must be performed 07 For all supply and return registers, verify that the spaces between the register boot and the interior finishing wall are properly sealed. 08 If the house rough-in duct leakage test was conducted without an air handler installed, inspect the connection points between the air handler and the supply and return plenums to verify that the connection points are properly sealed. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. DUCT LEAKAGE DIAGNOSTIC TEST CF3R-MCH-20-H (Page 3 of 4) Registration Number: 424-A020061538A-000-001-M20002A-M20A Registration Date/Time: 2024-04-09   18:03:55 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   18:05:03 09 Inspect all joints to ensure that no cloth backed rubber adhesive duct tape is used. 10 Verification Status:Pass - all applicable requirements are met. 11 Correction Notes: The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. D. Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. DUCT LEAKAGE DIAGNOSTIC TEST CF3R-MCH-20-H (Page 4 of 4) Registration Number: 424-A020061538A-000-001-M20002A-M20A Registration Date/Time: 2024-04-09   18:03:55 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   18:05:03 DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name: Angel Arechiga Documentation Author Signature: Company: iPermit Date Signed: 2024-04-09 Address: 31225 La Baya Drive CEA/ HERS Certification Identification (if applicable): RCN13516 City/State/Zip: Westlake Village CA 91362 Phone: 818-735-7876 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency. 5.I understand that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections, and I will take the necessary steps to ensure this requirement is accomplished. 6.I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy, and I will take the necessary steps to ensure this requirement is accomplished. BUILDER OR INSTALLER INFORMATION AS SHOWN ON THE CERTIFICATE OF INSTALLATION Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): DEH Mechanical Company Inc Responsible Builder or Installer Name: Tom Powers (authorized Angel Arechiga) CSLB License: 752819 HERS PROVIDER DATA REGISTRY INFORMATION Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) N/A HERS RATER INFORMATION HERS Rater Company Name: iPermit Responsible Rater Name: Angel Arechiga Responsible Rater Signature: Responsible Rater Certification Number w/ this HERS Provider: RCN13516 Date Signed: 2024-04-09 NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-A020061538A-000-001-M23003A-M23A Registration Date/Time: 2024-04-09   18:03:57 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   18:05:05 SPACE CONDITIONING SYSTEM AIRFLOW RATE CF3R-MCH-23-H (Page 1 of 4) CERTIFICATE OF VERIFICATION Project Name: 58-892 Marbella Lot 60 Enforcement Agency: La Quinta, City of Dwelling Address: 58-892 Marbella Lot 60 Permit Number: PENDING City and Zip Code La Quinta, 92253 Permit Application Date: 2024-04-01 A. Ducted Cooling System Information 01 Space Conditioning System Identification or Name System 1 02 Space Conditioning System Description of Area Served Living area 03 Indoor Unit Name Living room 04 System Installation Type New 05 Nominal Cooling Capacity (tons)4 06 Condenser Speed Type n/a 07 Cooling System Zonal Control Type n/a 08 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system 09 System Bypass Duct Status n/a 10 Date of System Airflow Rate Measurement 2024-04-09 11 Airflow Rate Protocol Utilized RA3.3 procedures for airflow rate measurement 12 Central Fan Ventilation Cooling System Status Not a CFVCS B. Hole for the placement of a Static Pressure Probe (HSPP), and Permanently Installed Static Pressure Probe (PSPP) in the Supply Plenum. Procedures for installing HSPP or PSPP are specified in RA3.3.1.1. 01 Method Used to Demonstrate Compliance with the HSPP/PSPP Requirement HSPP installed and labeled consistent with Figure RA3.3-1 NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. SPACE CONDITIONING SYSTEM AIRFLOW RATE CF3R-MCH-23-H (Page 2 of 4) Registration Number: 424-A020061538A-000-001-M23003A-M23A Registration Date/Time: 2024-04-09   18:03:57 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   18:05:05 C. Airflow Rate Measurement Apparatus and Procedure Information Instrument Specifications are given in RA3.3.1.1, and system airflow rate measurement apparatus information is given in RA3.3.2. 01 Airflow Rate Measurement Type used for this airflow rate verification. Traditional Flow Capture Hood according to procedure in RA3.3.3.1.4 02 Manufacturer of Airflow Measurement Apparatus Testo 03 Model number of Airflow Measurement Apparatus Testo420 04 Certification Status of the Airflow Measurement Apparatus Accuracy Certified by Manufacturer and listed on CEC Website at http://www.energy.ca.gov/title24/equipment_cert/ama_fas/index. html MCH-23a Forced Air System Airflow Rate Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed Compressor D. Forced Air System Airflow Rate Measurement The procedures for System Airflow Rate Verification are specified in Reference Residential Appendix RA3.3. 01 Required Minimum System Airflow Rate (cfm/ton)350 02 Required Minimum System Airflow Target (cfm)1400 03 Actual System Airflow Rate Measurement (cfm)1438 04 Compliance Statement:System airflow rate complies E. Additional Requirements 01 Air filters that meet the applicable requirements of Standards Section 150.0(m)12 or 150.0(m)13 were properly installed in the system during system air flow rate measurement identified on this Certificate of Verification. 02 The airflow rate measurement apparatus used to perform the airflow rate measurement identified on this Certificate of Verification was calibrated in accordance with the apparatus manufacturer's specifications and conforms to the instrumentation specifications given in RA3.3.1. 03 A visual inspection shall confirm that bypass ducts that deliver conditioned supply air directly to the space conditioning system return duct airflow are not used on newly constructed zonally controlled systems unless the Performance Certificate of Compliance indicates an allowance for use of a bypass duct. When a bypass duct is accounted for on the Performance Certificate of Compliance, the airflow rate shall conform to the specifications listed on the Certificate of Compliance. 04 All registers were fully open during the diagnostic test. 05 System fan was set at maximum speed during the diagnostic test. 06 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test. 07 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. SPACE CONDITIONING SYSTEM AIRFLOW RATE CF3R-MCH-23-H (Page 3 of 4) Registration Number: 424-A020061538A-000-001-M23003A-M23A Registration Date/Time: 2024-04-09   18:03:57 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   18:05:05 E. Additional Requirements 08 Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air handler fan speed. 09 Verification Status:Pass - all applicable requirements are met. 10 Correction Notes: The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table F. Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. SPACE CONDITIONING SYSTEM AIRFLOW RATE CF3R-MCH-23-H (Page 4 of 4) Registration Number: 424-A020061538A-000-001-M23003A-M23A Registration Date/Time: 2024-04-09   18:03:57 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   18:05:05 DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name: Angel Arechiga Documentation Author Signature: Company: iPermit Date Signed: 2024-04-09 Address: 31225 La Baya Drive CEA/ HERS Certification Identification (if applicable): RCN13516 City/State/Zip: Westlake Village CA 91362 Phone: 818-735-7876 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency. 5.I understand that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections, and I will take the necessary steps to ensure this requirement is accomplished. 6.I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy, and I will take the necessary steps to ensure this requirement is accomplished. BUILDER OR INSTALLER INFORMATION AS SHOWN ON THE CERTIFICATE OF INSTALLATION Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): DEH Mechanical Company Inc Responsible Builder or Installer Name: Tom Powers (authorized Angel Arechiga) CSLB License: 752819 HERS PROVIDER DATA REGISTRY INFORMATION Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) N/A HERS RATER INFORMATION HERS Rater Company Name: iPermit Responsible Rater Name: Angel Arechiga Responsible Rater Signature: Responsible Rater Certification Number w/ this HERS Provider: RCN13516 Date Signed: 2024-04-09 NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-A020061538A-000-001-M22004A-M22A Registration Date/Time: 2024-04-09   18:04:05 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   18:05:12 SPACE CONDITIONING SYSTEM FAN EFFICACY CF3R-MCH-22-H (Page 1 of 3) CERTIFICATE OF VERIFICATION Project Name: 58-892 Marbella Lot 60 Enforcement Agency: La Quinta, City of Dwelling Address: 58-892 Marbella Lot 60 Permit Number: PENDING City and Zip Code La Quinta, 92253 Permit Application Date: 2024-04-01 A. Ducted Cooling System Information 01 System Identification or Name System 1 02 System Location or Area Served Living area 03 Indoor Unit Name or Description of Area Served Living room 04 System Installation Type New 05 Nominal Cooling Capacity (tons) of Condenser 4 06 Condenser Speed Type n/a 07 Cooling System Zonal Control Type n/a 08 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system 09 System Bypass Duct Status n/a 10 Date of System Airflow Rate Measurement 2024-04-09 11 Airflow Rate Protocol utilized RA3.3 procedures for airflow rate measurement 12 Central Fan Ventilation Cooling System Status Not a CFVCS B. Fan Watt Measurement Apparatus and Procedure Information Instrument Specifications are given in RA3.3.1, and system fan watt measurement apparatus information is given in RA3.3.2.2. 01 Fan Watt Verification Device Used.Portable Watt Meter MCH-22a Forced Air System Fan Efficacy Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed Compressor NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. SPACE CONDITIONING SYSTEM FAN EFFICACY CF3R-MCH-22-H (Page 2 of 3) Registration Number: 424-A020061538A-000-001-M22004A-M22A Registration Date/Time: 2024-04-09   18:04:05 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   18:05:12 C. Forced Air System Fan Efficacy Measurement The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3 01 Actual Tested Watts 15 02 Actual Tested Airflow from MCH-23 (cfm)1438 03 Required Fan Efficacy (Watts/cfm)0.58 04 Actual Fan Efficacy (watts/cfm)0.01 05 Compliance Statement:System fan efficacy complies D. Additional Requirements 01 All registers were fully open during the diagnostic test. 02 System fan was set at maximum speed during the diagnostic test. 03 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test. 04 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value. 05 Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air handler fan speed. 06 Zoned cooling air distribution systems with single speed compressors shall meet both the airflow (cfm/ton) and fan efficacy (Watt/cfm) criteria in every zonal control mode. 07 Portable watt meters used for measurements of air handler watt draws shall be true power measurement systems (i.e. sensor plus data acquisition system) having an accuracy of +- 2% of reading or +- 10 Watts whichever is greater 08 Verification Status Pass - all applicable requirements are met. 09 Correction Notes The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. E. Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. SPACE CONDITIONING SYSTEM FAN EFFICACY CF3R-MCH-22-H (Page 3 of 3) Registration Number: 424-A020061538A-000-001-M22004A-M22A Registration Date/Time: 2024-04-09   18:04:05 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   18:05:12 DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name: Angel Arechiga Documentation Author Signature: Company: iPermit Date Signed: 2024-04-09 Address: 31225 La Baya Drive CEA/ HERS Certification Identification (if applicable): RCN13516 City/State/Zip: Westlake Village CA 91362 Phone: 818-735-7876 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency. 5.I understand that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections, and I will take the necessary steps to ensure this requirement is accomplished. 6.I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy, and I will take the necessary steps to ensure this requirement is accomplished. BUILDER OR INSTALLER INFORMATION AS SHOWN ON THE CERTIFICATE OF INSTALLATION Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): DEH Mechanical Company Inc Responsible Builder or Installer Name: Tom Powers (authorized Angel Arechiga) CSLB License: 752819 HERS PROVIDER DATA REGISTRY INFORMATION Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) N/A HERS RATER INFORMATION HERS Rater Company Name: iPermit Responsible Rater Name: Angel Arechiga Responsible Rater Signature: Responsible Rater Certification Number w/ this HERS Provider: RCN13516 Date Signed: 2024-04-09 NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-A020061538A-000-001-M25011A-M25A Registration Date/Time: 2024-04-09   18:04:40 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   18:05:48 REFRIGERANT CHARGE VERIFICATION CF3R-MCH-25-H (Page 1 of 4) CERTIFICATE OF VERIFICATION Project Name: 58-892 Marbella Lot 60 Enforcement Agency: La Quinta, City of Dwelling Address: 58-892 Marbella Lot 60 Permit Number: PENDING City and Zip Code La Quinta, 92253 Permit Application Date: 2024-04-01 A. System Information HERS Rater to field-verify all system information, discrepancies to be noted by overwriting entry. 01 Space Conditioning System Identification or Name System 1 02 Space Conditioning System Location or Area Served Living area 03 Condenser (or package unit) make or brand GOODMAN 04 Condenser (or package unit) model number GSZH504810AA 05 Nominal Cooling Capacity (tons) of Condenser 4 06 Condenser (or package unit) serial number 2310151351 07 Refrigerant Type R-410A 08 Other Refrigerant Type (if applicable)n/a 09 Liquid Line Filter Drier Installed According to Manufacturers Specifications (if applicable) Yes 10 System Installation Type New 11 Fault Indicator Display (FID) Status (Note: Even systems with a FID must have refrigerant charge verified by installer) This system does not have a FID device installed 12 Is the system of a type that the minimum airflow can be verified for all indoor units using an approved measurement procedure (RA3.3 or RA3.3.3)? Yes 13 Is the system of a type that approved refrigerant charge verification procedures can be used to verify compliance with the refrigerant charge verification requirements when temperatures are >= 55 °F (RA3.2.2, or RA1)? Yes, one of the Refrigerant charge verification procedures from RA3.2.2 or RA1 is applicable to this system and can be used to verify compliance 14 Date of Refrigerant Charge Verification for this system 2024-04-09 15 Refrigerant charge verification method used.Subcooling (outdoor temperature must be equal to or greater than 55 degF) 16 Person who performed the Refrigerant Charge Verification reported on this Certificate of Installation HERS rater 17 HERS Verification Compliance Requirement Status System does not qualify for group sampling NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. REFRIGERANT CHARGE VERIFICATION CF3R-MCH-25-H (Page 2 of 4) Registration Number: 424-A020061538A-000-001-M25011A-M25A Registration Date/Time: 2024-04-09   18:04:40 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   18:05:48 A. System Information HERS Rater to field-verify all system information, discrepancies to be noted by overwriting entry. 18 Refrigerant charge verification method used by HERS Rater.Subcooling MCH-25b - Refrigerant Charge Verification - Subcooling Method B. Metering Device Verification HERS Rater is required to visually field verify all information from CF2R. Subcooling Method can only be used on systems that have a variable metering device. 01 Refrigerant metering device Thermostatic Expansion Valve (TXV) 02 Subcooling Method applicability status Subcooling Method is applicable to this system. C. Instrument Calibration HERS Raters are required to calibrate their diagnostic tools. Procedures for instrument calibration are given in Reference Residential Appendix RA3.2.2 and RA3.2.2.2 01 Date of Digital Refrigerant Gauge Calibration 2024-03-25 02 Date of Digital Thermocouple Calibration 2024-04-03 03 Digital Refrigerant Gauge Calibration Status Calibration is current 04 Digital Thermocouple Calibration Status Calibration is current D. Measurement Access Hole (MAH) Verification HERS Raters are required to visually field verify MAH. Procedures for installing MAH are specified in Reference Residential Appendix RA3.2.2.3 01 Method Used to Demonstrate Compliance with the Measurement Access Hole (MAH) Requirement MAH installed and labeled consistent with Figure 3.2-1 E. Minimum System Airflow Rate Verification Procedures for verifying minimum system airflow are specified in Reference Residential Appendix RA3.3.3. 01 02 03 Indoor Unit Name or Description of Area Served Minimum Required System Airflow Rate (cfm)System Airflow Rate Verification Status Living room 1050 System complies with minimum airflow rate requirements 04 SC System complies with Minimum System Airflow Rate Verification Notes: NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. REFRIGERANT CHARGE VERIFICATION CF3R-MCH-25-H (Page 3 of 4) Registration Number: 424-A020061538A-000-001-M25011A-M25A Registration Date/Time: 2024-04-09   18:04:40 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   18:05:48 F. Data Collection and Calculations HERS Rater must independently collect all data in this section. Procedures for determining Refrigerant Charge using the Standard Charge Verification Procedure are given in Reference Residential Appendix RA3.2.2 and RA3.2.2.2 01 Lowest Return Air Dry Bulb Temperature that Occurred During the Refrigerant Charge Verification Procedure ( °F) 75 02 Measured Condenser Air Entering Dry-Bulb Temperature (Tcondenser, db) 85 03 Outdoor Temperature Qualification Status Outdoor temperature is within range for using Subcooling refrigerant charge verification method 04 Measured Liquid Line Temperature (Tliquid) ( °F)85.6 05 Measured Liquid Line Pressure (Pliquid) (psig)310.4 06 Condenser Saturation Temperature (Tcondenser, sat) from Digital Gauge or P-T Table using Line F05 ( °F) 95.8 07 Measured Subcooling (Line F06 - Lilne F04 ( °F)10.2 08 Target Subcooling from Manufacturer ( °F)8 09 Compliance Statement:System complies with Subcooling Method - Must also pass metering device verification, next section G. Metering Device Verification HERS Rater must independently collect all data in this section. Procedures for the verification of proper metering device operation are specified in RA3.2.2.6.2 01 Measured Suction Line Temperature (Tsuction) ( °F)60.8 02 Measured Suction Line Pressure (Psuction) (psig)117.9 03 Evaporator Saturation Temperature (Tevaporator, sat) from Digital Gauge or P-T Table using Line G02 ( °F) 39.8 04 Measured Superheat (Line G01- Line G03) ( °F)21 05 Measured Superheat (Line G04) is between 3 °F and 26 °F (inclusive) Passes CEC requirement 06 Measured Superheat (Line G04) is within Manufacturer's Specifications ( if known) Yes, documentation to be provided upon request 07 Compliance Statement:Metering device verification passes H. Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. REFRIGERANT CHARGE VERIFICATION CF3R-MCH-25-H (Page 4 of 4) Registration Number: 424-A020061538A-000-001-M25011A-M25A Registration Date/Time: 2024-04-09   18:04:40 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   18:05:48 DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name: Angel Arechiga Documentation Author Signature: Company: iPermit Date Signed: 2024-04-09 Address: 31225 La Baya Drive CEA/ HERS Certification Identification (if applicable): RCN13516 City/State/Zip: Westlake Village CA 91362 Phone: 818-735-7876 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency. 5.I understand that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections, and I will take the necessary steps to ensure this requirement is accomplished. 6.I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy, and I will take the necessary steps to ensure this requirement is accomplished. BUILDER OR INSTALLER INFORMATION AS SHOWN ON THE CERTIFICATE OF INSTALLATION Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): DEH Mechanical Company Inc Responsible Builder or Installer Name: Tom Powers (authorized Angel Arechiga) CSLB License: 752819 HERS PROVIDER DATA REGISTRY INFORMATION Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) N/A HERS RATER INFORMATION HERS Rater Company Name: iPermit Responsible Rater Name: Angel Arechiga Responsible Rater Signature: Responsible Rater Certification Number w/ this HERS Provider: RCN13516 Date Signed: 2024-04-09   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-A020061538A-000-001-M20005A-M20A Registration Date/Time: 2024-04-09   18:03:42 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   18:04:50 DUCT LEAKAGE DIAGNOSTIC TEST CF3R-MCH-20-H (Page 1 of 4) CERTIFICATE OF VERIFICATION Project Name: 58-892 Marbella Lot 60 Enforcement Agency: La Quinta, City of Dwelling Address: 58-892 Marbella Lot 60 Permit Number: PENDING City and Zip Code La Quinta, 92253 Permit Application Date: 2024-04-01 A. System Information 01 Space Conditioning System Identification or Name System 2 02 Space Conditioning System Location or Area Served Master 03 Indoor Unit Name or Description of Area Served 1 04 Building Type from from parent CC Single family 05 Verified Low Leakage Ducts in Conditioned Space (VLLDCS) Credit from parent CC? No, credit is not taken 06 Verified Low Leakage Air Handling Unit Credit from parent CC?No, credit is not taken 07 Duct System Compliance Category New 08 Portions of Duct Located in Garage?No 09 Is the system type Small Duct High Velocity (SDHV) ?No MCH-20a - Completely New Duct System NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. DUCT LEAKAGE DIAGNOSTIC TEST CF3R-MCH-20-H (Page 2 of 4) Registration Number: 424-A020061538A-000-001-M20005A-M20A Registration Date/Time: 2024-04-09   18:03:42 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   18:04:50 B. Duct Leakage Diagnostic Test 01 Air Handling Unit Airflow (AHU Airflow) Determination Method Cooling system method 02 Condenser Nominal Cooling Capacity (ton)3 03 Indoor Unit Nominal Cooling Capacity 3 04 Heating Capacity (kBtu/h)n/a 05 Conditioned Floor Area Served by this HVAC System (ft2)1000 06 Measured AHU Airflow (cfm)n/a 07 Duct Leakage Test Conditions Test final 08 Duct Leakage Test Method Total leakage 09 Leakage Factor 0.05 10 Calculated Target Allowable Duct Leakage (cfm)60 11 Actual Duct Leakage Rate from Leakage Test Measurement (cfm)55 12 Compliance Statement System passes leakage test 13 Notes: C. Additional Requirements for Compliance 01 System was tested in its normal operation condition. No temporary taping allowed. 02 Outside air (OA) duct connections to the central forced air duct system shall not be sealed/taped off during duct leakage testing. OA ducts used for Central Fan Integrated (CFI) Indoor Air Quality ventilation systems, or Central Fan Ventilation Cooling Systems, that utilize dampers that open only when OA is required and automatically close when OA is not required, may configure the OA damper to the closed position during duct leakage testing. 03 All supply and return register boots were sealed to the drywall. 04 Building cavities were not used as plenums or platform returns in lieu of ducts. 05 If cloth backed tape was used it was covered with Mastic and draw bands. 06 All connection points between the air handler and the supply and return plenums are completely sealed. Visual Inspection at Final Construction Stage (applicable if system was tested at rough-in). After installing the interior finishing wall and verifying that the above rough-in tests was completed, the following procedure must be performed 07 For all supply and return registers, verify that the spaces between the register boot and the interior finishing wall are properly sealed. 08 If the house rough-in duct leakage test was conducted without an air handler installed, inspect the connection points between the air handler and the supply and return plenums to verify that the connection points are properly sealed. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. DUCT LEAKAGE DIAGNOSTIC TEST CF3R-MCH-20-H (Page 3 of 4) Registration Number: 424-A020061538A-000-001-M20005A-M20A Registration Date/Time: 2024-04-09   18:03:42 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   18:04:50 09 Inspect all joints to ensure that no cloth backed rubber adhesive duct tape is used. 10 Verification Status:Pass - all applicable requirements are met. 11 Correction Notes: The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. D. Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. DUCT LEAKAGE DIAGNOSTIC TEST CF3R-MCH-20-H (Page 4 of 4) Registration Number: 424-A020061538A-000-001-M20005A-M20A Registration Date/Time: 2024-04-09   18:03:42 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   18:04:50 DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name: Angel Arechiga Documentation Author Signature: Company: iPermit Date Signed: 2024-04-09 Address: 31225 La Baya Drive CEA/ HERS Certification Identification (if applicable): RCN13516 City/State/Zip: Westlake Village CA 91362 Phone: 818-735-7876 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency. 5.I understand that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections, and I will take the necessary steps to ensure this requirement is accomplished. 6.I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy, and I will take the necessary steps to ensure this requirement is accomplished. BUILDER OR INSTALLER INFORMATION AS SHOWN ON THE CERTIFICATE OF INSTALLATION Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): DEH Mechanical Company Inc Responsible Builder or Installer Name: Tom Powers (authorized Angel Arechiga) CSLB License: 752819 HERS PROVIDER DATA REGISTRY INFORMATION Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) N/A HERS RATER INFORMATION HERS Rater Company Name: iPermit Responsible Rater Name: Angel Arechiga Responsible Rater Signature: Responsible Rater Certification Number w/ this HERS Provider: RCN13516 Date Signed: 2024-04-09 NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-A020061538A-000-001-M23006A-M23A Registration Date/Time: 2024-04-09   18:03:44 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   18:04:52 SPACE CONDITIONING SYSTEM AIRFLOW RATE CF3R-MCH-23-H (Page 1 of 4) CERTIFICATE OF VERIFICATION Project Name: 58-892 Marbella Lot 60 Enforcement Agency: La Quinta, City of Dwelling Address: 58-892 Marbella Lot 60 Permit Number: PENDING City and Zip Code La Quinta, 92253 Permit Application Date: 2024-04-01 A. Ducted Cooling System Information 01 Space Conditioning System Identification or Name System 2 02 Space Conditioning System Description of Area Served Master 03 Indoor Unit Name 1 04 System Installation Type New 05 Nominal Cooling Capacity (tons)3 06 Condenser Speed Type n/a 07 Cooling System Zonal Control Type n/a 08 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system 09 System Bypass Duct Status n/a 10 Date of System Airflow Rate Measurement 2024-04-09 11 Airflow Rate Protocol Utilized RA3.3 procedures for airflow rate measurement 12 Central Fan Ventilation Cooling System Status Not a CFVCS B. Hole for the placement of a Static Pressure Probe (HSPP), and Permanently Installed Static Pressure Probe (PSPP) in the Supply Plenum. Procedures for installing HSPP or PSPP are specified in RA3.3.1.1. 01 Method Used to Demonstrate Compliance with the HSPP/PSPP Requirement HSPP installed and labeled consistent with Figure RA3.3-1 NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. SPACE CONDITIONING SYSTEM AIRFLOW RATE CF3R-MCH-23-H (Page 2 of 4) Registration Number: 424-A020061538A-000-001-M23006A-M23A Registration Date/Time: 2024-04-09   18:03:44 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   18:04:52 C. Airflow Rate Measurement Apparatus and Procedure Information Instrument Specifications are given in RA3.3.1.1, and system airflow rate measurement apparatus information is given in RA3.3.2. 01 Airflow Rate Measurement Type used for this airflow rate verification. Traditional Flow Capture Hood according to procedure in RA3.3.3.1.4 02 Manufacturer of Airflow Measurement Apparatus Testo 03 Model number of Airflow Measurement Apparatus Testo420 04 Certification Status of the Airflow Measurement Apparatus Accuracy Certified by Manufacturer and listed on CEC Website at http://www.energy.ca.gov/title24/equipment_cert/ama_fas/index. html MCH-23a Forced Air System Airflow Rate Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed Compressor D. Forced Air System Airflow Rate Measurement The procedures for System Airflow Rate Verification are specified in Reference Residential Appendix RA3.3. 01 Required Minimum System Airflow Rate (cfm/ton)350 02 Required Minimum System Airflow Target (cfm)1050 03 Actual System Airflow Rate Measurement (cfm)1068 04 Compliance Statement:System airflow rate complies E. Additional Requirements 01 Air filters that meet the applicable requirements of Standards Section 150.0(m)12 or 150.0(m)13 were properly installed in the system during system air flow rate measurement identified on this Certificate of Verification. 02 The airflow rate measurement apparatus used to perform the airflow rate measurement identified on this Certificate of Verification was calibrated in accordance with the apparatus manufacturer's specifications and conforms to the instrumentation specifications given in RA3.3.1. 03 A visual inspection shall confirm that bypass ducts that deliver conditioned supply air directly to the space conditioning system return duct airflow are not used on newly constructed zonally controlled systems unless the Performance Certificate of Compliance indicates an allowance for use of a bypass duct. When a bypass duct is accounted for on the Performance Certificate of Compliance, the airflow rate shall conform to the specifications listed on the Certificate of Compliance. 04 All registers were fully open during the diagnostic test. 05 System fan was set at maximum speed during the diagnostic test. 06 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test. 07 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. SPACE CONDITIONING SYSTEM AIRFLOW RATE CF3R-MCH-23-H (Page 3 of 4) Registration Number: 424-A020061538A-000-001-M23006A-M23A Registration Date/Time: 2024-04-09   18:03:44 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   18:04:52 E. Additional Requirements 08 Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air handler fan speed. 09 Verification Status:Pass - all applicable requirements are met. 10 Correction Notes: The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table F. Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. SPACE CONDITIONING SYSTEM AIRFLOW RATE CF3R-MCH-23-H (Page 4 of 4) Registration Number: 424-A020061538A-000-001-M23006A-M23A Registration Date/Time: 2024-04-09   18:03:44 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   18:04:52 DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name: Angel Arechiga Documentation Author Signature: Company: iPermit Date Signed: 2024-04-09 Address: 31225 La Baya Drive CEA/ HERS Certification Identification (if applicable): RCN13516 City/State/Zip: Westlake Village CA 91362 Phone: 818-735-7876 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency. 5.I understand that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections, and I will take the necessary steps to ensure this requirement is accomplished. 6.I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy, and I will take the necessary steps to ensure this requirement is accomplished. BUILDER OR INSTALLER INFORMATION AS SHOWN ON THE CERTIFICATE OF INSTALLATION Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): DEH Mechanical Company Inc Responsible Builder or Installer Name: Tom Powers (authorized Angel Arechiga) CSLB License: 752819 HERS PROVIDER DATA REGISTRY INFORMATION Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) N/A HERS RATER INFORMATION HERS Rater Company Name: iPermit Responsible Rater Name: Angel Arechiga Responsible Rater Signature: Responsible Rater Certification Number w/ this HERS Provider: RCN13516 Date Signed: 2024-04-09 NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-A020061538A-000-001-M22007A-M22A Registration Date/Time: 2024-04-09   18:03:52 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   18:04:59 SPACE CONDITIONING SYSTEM FAN EFFICACY CF3R-MCH-22-H (Page 1 of 3) CERTIFICATE OF VERIFICATION Project Name: 58-892 Marbella Lot 60 Enforcement Agency: La Quinta, City of Dwelling Address: 58-892 Marbella Lot 60 Permit Number: PENDING City and Zip Code La Quinta, 92253 Permit Application Date: 2024-04-01 A. Ducted Cooling System Information 01 System Identification or Name System 2 02 System Location or Area Served Master 03 Indoor Unit Name or Description of Area Served 1 04 System Installation Type New 05 Nominal Cooling Capacity (tons) of Condenser 3 06 Condenser Speed Type n/a 07 Cooling System Zonal Control Type n/a 08 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system 09 System Bypass Duct Status n/a 10 Date of System Airflow Rate Measurement 2024-04-09 11 Airflow Rate Protocol utilized RA3.3 procedures for airflow rate measurement 12 Central Fan Ventilation Cooling System Status Not a CFVCS B. Fan Watt Measurement Apparatus and Procedure Information Instrument Specifications are given in RA3.3.1, and system fan watt measurement apparatus information is given in RA3.3.2.2. 01 Fan Watt Verification Device Used.Portable Watt Meter MCH-22a Forced Air System Fan Efficacy Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed Compressor NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. SPACE CONDITIONING SYSTEM FAN EFFICACY CF3R-MCH-22-H (Page 2 of 3) Registration Number: 424-A020061538A-000-001-M22007A-M22A Registration Date/Time: 2024-04-09   18:03:52 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   18:04:59 C. Forced Air System Fan Efficacy Measurement The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3 01 Actual Tested Watts 15 02 Actual Tested Airflow from MCH-23 (cfm)1068 03 Required Fan Efficacy (Watts/cfm)0.58 04 Actual Fan Efficacy (watts/cfm)0.01 05 Compliance Statement:System fan efficacy complies D. Additional Requirements 01 All registers were fully open during the diagnostic test. 02 System fan was set at maximum speed during the diagnostic test. 03 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test. 04 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value. 05 Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air handler fan speed. 06 Zoned cooling air distribution systems with single speed compressors shall meet both the airflow (cfm/ton) and fan efficacy (Watt/cfm) criteria in every zonal control mode. 07 Portable watt meters used for measurements of air handler watt draws shall be true power measurement systems (i.e. sensor plus data acquisition system) having an accuracy of +- 2% of reading or +- 10 Watts whichever is greater 08 Verification Status Pass - all applicable requirements are met. 09 Correction Notes The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. E. Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. SPACE CONDITIONING SYSTEM FAN EFFICACY CF3R-MCH-22-H (Page 3 of 3) Registration Number: 424-A020061538A-000-001-M22007A-M22A Registration Date/Time: 2024-04-09   18:03:52 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   18:04:59 DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name: Angel Arechiga Documentation Author Signature: Company: iPermit Date Signed: 2024-04-09 Address: 31225 La Baya Drive CEA/ HERS Certification Identification (if applicable): RCN13516 City/State/Zip: Westlake Village CA 91362 Phone: 818-735-7876 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency. 5.I understand that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections, and I will take the necessary steps to ensure this requirement is accomplished. 6.I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy, and I will take the necessary steps to ensure this requirement is accomplished. BUILDER OR INSTALLER INFORMATION AS SHOWN ON THE CERTIFICATE OF INSTALLATION Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): DEH Mechanical Company Inc Responsible Builder or Installer Name: Tom Powers (authorized Angel Arechiga) CSLB License: 752819 HERS PROVIDER DATA REGISTRY INFORMATION Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) N/A HERS RATER INFORMATION HERS Rater Company Name: iPermit Responsible Rater Name: Angel Arechiga Responsible Rater Signature: Responsible Rater Certification Number w/ this HERS Provider: RCN13516 Date Signed: 2024-04-09 NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-A020061538A-000-001-M25012A-M25A Registration Date/Time: 2024-04-09   18:04:43 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   18:05:50 REFRIGERANT CHARGE VERIFICATION CF3R-MCH-25-H (Page 1 of 4) CERTIFICATE OF VERIFICATION Project Name: 58-892 Marbella Lot 60 Enforcement Agency: La Quinta, City of Dwelling Address: 58-892 Marbella Lot 60 Permit Number: PENDING City and Zip Code La Quinta, 92253 Permit Application Date: 2024-04-01 A. System Information HERS Rater to field-verify all system information, discrepancies to be noted by overwriting entry. 01 Space Conditioning System Identification or Name System 2 02 Space Conditioning System Location or Area Served Master 03 Condenser (or package unit) make or brand GOODMAN 04 Condenser (or package unit) model number GSZH503610AB 05 Nominal Cooling Capacity (tons) of Condenser 3 06 Condenser (or package unit) serial number GSZH503610AB 07 Refrigerant Type R-410A 08 Other Refrigerant Type (if applicable)n/a 09 Liquid Line Filter Drier Installed According to Manufacturers Specifications (if applicable) Yes 10 System Installation Type New 11 Fault Indicator Display (FID) Status (Note: Even systems with a FID must have refrigerant charge verified by installer) This system does not have a FID device installed 12 Is the system of a type that the minimum airflow can be verified for all indoor units using an approved measurement procedure (RA3.3 or RA3.3.3)? Yes 13 Is the system of a type that approved refrigerant charge verification procedures can be used to verify compliance with the refrigerant charge verification requirements when temperatures are >= 55 °F (RA3.2.2, or RA1)? Yes, one of the Refrigerant charge verification procedures from RA3.2.2 or RA1 is applicable to this system and can be used to verify compliance 14 Date of Refrigerant Charge Verification for this system 2024-04-09 15 Refrigerant charge verification method used.Subcooling (outdoor temperature must be equal to or greater than 55 degF) 16 Person who performed the Refrigerant Charge Verification reported on this Certificate of Installation HERS rater 17 HERS Verification Compliance Requirement Status System does not qualify for group sampling NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. REFRIGERANT CHARGE VERIFICATION CF3R-MCH-25-H (Page 2 of 4) Registration Number: 424-A020061538A-000-001-M25012A-M25A Registration Date/Time: 2024-04-09   18:04:43 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   18:05:50 A. System Information HERS Rater to field-verify all system information, discrepancies to be noted by overwriting entry. 18 Refrigerant charge verification method used by HERS Rater.Subcooling MCH-25b - Refrigerant Charge Verification - Subcooling Method B. Metering Device Verification HERS Rater is required to visually field verify all information from CF2R. Subcooling Method can only be used on systems that have a variable metering device. 01 Refrigerant metering device Thermostatic Expansion Valve (TXV) 02 Subcooling Method applicability status Subcooling Method is applicable to this system. C. Instrument Calibration HERS Raters are required to calibrate their diagnostic tools. Procedures for instrument calibration are given in Reference Residential Appendix RA3.2.2 and RA3.2.2.2 01 Date of Digital Refrigerant Gauge Calibration 2024-03-25 02 Date of Digital Thermocouple Calibration 2024-04-03 03 Digital Refrigerant Gauge Calibration Status Calibration is current 04 Digital Thermocouple Calibration Status Calibration is current D. Measurement Access Hole (MAH) Verification HERS Raters are required to visually field verify MAH. Procedures for installing MAH are specified in Reference Residential Appendix RA3.2.2.3 01 Method Used to Demonstrate Compliance with the Measurement Access Hole (MAH) Requirement MAH installed and labeled consistent with Figure 3.2-1 E. Minimum System Airflow Rate Verification Procedures for verifying minimum system airflow are specified in Reference Residential Appendix RA3.3.3. 01 02 03 Indoor Unit Name or Description of Area Served Minimum Required System Airflow Rate (cfm)System Airflow Rate Verification Status 1 1050 System complies with minimum airflow rate requirements 04 SC System complies with Minimum System Airflow Rate Verification Notes: NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. REFRIGERANT CHARGE VERIFICATION CF3R-MCH-25-H (Page 3 of 4) Registration Number: 424-A020061538A-000-001-M25012A-M25A Registration Date/Time: 2024-04-09   18:04:43 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   18:05:50 F. Data Collection and Calculations HERS Rater must independently collect all data in this section. Procedures for determining Refrigerant Charge using the Standard Charge Verification Procedure are given in Reference Residential Appendix RA3.2.2 and RA3.2.2.2 01 Lowest Return Air Dry Bulb Temperature that Occurred During the Refrigerant Charge Verification Procedure ( °F) 80 02 Measured Condenser Air Entering Dry-Bulb Temperature (Tcondenser, db) 85 03 Outdoor Temperature Qualification Status Outdoor temperature is within range for using Subcooling refrigerant charge verification method 04 Measured Liquid Line Temperature (Tliquid) ( °F)88.9 05 Measured Liquid Line Pressure (Pliquid) (psig)305.9 06 Condenser Saturation Temperature (Tcondenser, sat) from Digital Gauge or P-T Table using Line F05 ( °F) 94.5 07 Measured Subcooling (Line F06 - Lilne F04 ( °F)5.6 08 Target Subcooling from Manufacturer ( °F)8 09 Compliance Statement:System complies with Subcooling Method - Must also pass metering device verification, next section G. Metering Device Verification HERS Rater must independently collect all data in this section. Procedures for the verification of proper metering device operation are specified in RA3.2.2.6.2 01 Measured Suction Line Temperature (Tsuction) ( °F)59.4 02 Measured Suction Line Pressure (Psuction) (psig)106.9 03 Evaporator Saturation Temperature (Tevaporator, sat) from Digital Gauge or P-T Table using Line G02 ( °F) 42.8 04 Measured Superheat (Line G01- Line G03) ( °F)16.6 05 Measured Superheat (Line G04) is between 3 °F and 26 °F (inclusive) Passes CEC requirement 06 Measured Superheat (Line G04) is within Manufacturer's Specifications ( if known) Yes, documentation to be provided upon request 07 Compliance Statement:Metering device verification passes H. Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. REFRIGERANT CHARGE VERIFICATION CF3R-MCH-25-H (Page 4 of 4) Registration Number: 424-A020061538A-000-001-M25012A-M25A Registration Date/Time: 2024-04-09   18:04:43 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   18:05:50 DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name: Angel Arechiga Documentation Author Signature: Company: iPermit Date Signed: 2024-04-09 Address: 31225 La Baya Drive CEA/ HERS Certification Identification (if applicable): RCN13516 City/State/Zip: Westlake Village CA 91362 Phone: 818-735-7876 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency. 5.I understand that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections, and I will take the necessary steps to ensure this requirement is accomplished. 6.I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy, and I will take the necessary steps to ensure this requirement is accomplished. BUILDER OR INSTALLER INFORMATION AS SHOWN ON THE CERTIFICATE OF INSTALLATION Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): DEH Mechanical Company Inc Responsible Builder or Installer Name: Tom Powers (authorized Angel Arechiga) CSLB License: 752819 HERS PROVIDER DATA REGISTRY INFORMATION Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) N/A HERS RATER INFORMATION HERS Rater Company Name: iPermit Responsible Rater Name: Angel Arechiga Responsible Rater Signature: Responsible Rater Certification Number w/ this HERS Provider: RCN13516 Date Signed: 2024-04-09   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-A020061538A-000-001-M20008A-M20A Registration Date/Time: 2024-04-09   18:04:09 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   18:05:16 DUCT LEAKAGE DIAGNOSTIC TEST CF3R-MCH-20-H (Page 1 of 4) CERTIFICATE OF VERIFICATION Project Name: 58-892 Marbella Lot 60 Enforcement Agency: La Quinta, City of Dwelling Address: 58-892 Marbella Lot 60 Permit Number: PENDING City and Zip Code La Quinta, 92253 Permit Application Date: 2024-04-01 A. System Information 01 Space Conditioning System Identification or Name System 3 02 Space Conditioning System Location or Area Served Casita 03 Indoor Unit Name or Description of Area Served Casita 04 Building Type from from parent CC Single family 05 Verified Low Leakage Ducts in Conditioned Space (VLLDCS) Credit from parent CC? No, credit is not taken 06 Verified Low Leakage Air Handling Unit Credit from parent CC?No, credit is not taken 07 Duct System Compliance Category New 08 Portions of Duct Located in Garage?No 09 Is the system type Small Duct High Velocity (SDHV) ?No MCH-20a - Completely New Duct System NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. DUCT LEAKAGE DIAGNOSTIC TEST CF3R-MCH-20-H (Page 2 of 4) Registration Number: 424-A020061538A-000-001-M20008A-M20A Registration Date/Time: 2024-04-09   18:04:09 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   18:05:16 B. Duct Leakage Diagnostic Test 01 Air Handling Unit Airflow (AHU Airflow) Determination Method Cooling system method 02 Condenser Nominal Cooling Capacity (ton)2 03 Indoor Unit Nominal Cooling Capacity 2 04 Heating Capacity (kBtu/h)n/a 05 Conditioned Floor Area Served by this HVAC System (ft2)1000 06 Measured AHU Airflow (cfm)n/a 07 Duct Leakage Test Conditions Test final 08 Duct Leakage Test Method Total leakage 09 Leakage Factor 0.05 10 Calculated Target Allowable Duct Leakage (cfm)40 11 Actual Duct Leakage Rate from Leakage Test Measurement (cfm)40 12 Compliance Statement System passes leakage test 13 Notes: C. Additional Requirements for Compliance 01 System was tested in its normal operation condition. No temporary taping allowed. 02 Outside air (OA) duct connections to the central forced air duct system shall not be sealed/taped off during duct leakage testing. OA ducts used for Central Fan Integrated (CFI) Indoor Air Quality ventilation systems, or Central Fan Ventilation Cooling Systems, that utilize dampers that open only when OA is required and automatically close when OA is not required, may configure the OA damper to the closed position during duct leakage testing. 03 All supply and return register boots were sealed to the drywall. 04 Building cavities were not used as plenums or platform returns in lieu of ducts. 05 If cloth backed tape was used it was covered with Mastic and draw bands. 06 All connection points between the air handler and the supply and return plenums are completely sealed. Visual Inspection at Final Construction Stage (applicable if system was tested at rough-in). After installing the interior finishing wall and verifying that the above rough-in tests was completed, the following procedure must be performed 07 For all supply and return registers, verify that the spaces between the register boot and the interior finishing wall are properly sealed. 08 If the house rough-in duct leakage test was conducted without an air handler installed, inspect the connection points between the air handler and the supply and return plenums to verify that the connection points are properly sealed. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. DUCT LEAKAGE DIAGNOSTIC TEST CF3R-MCH-20-H (Page 3 of 4) Registration Number: 424-A020061538A-000-001-M20008A-M20A Registration Date/Time: 2024-04-09   18:04:09 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   18:05:16 09 Inspect all joints to ensure that no cloth backed rubber adhesive duct tape is used. 10 Verification Status:Pass - all applicable requirements are met. 11 Correction Notes: The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. D. Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. DUCT LEAKAGE DIAGNOSTIC TEST CF3R-MCH-20-H (Page 4 of 4) Registration Number: 424-A020061538A-000-001-M20008A-M20A Registration Date/Time: 2024-04-09   18:04:09 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   18:05:16 DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name: Angel Arechiga Documentation Author Signature: Company: iPermit Date Signed: 2024-04-09 Address: 31225 La Baya Drive CEA/ HERS Certification Identification (if applicable): RCN13516 City/State/Zip: Westlake Village CA 91362 Phone: 818-735-7876 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency. 5.I understand that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections, and I will take the necessary steps to ensure this requirement is accomplished. 6.I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy, and I will take the necessary steps to ensure this requirement is accomplished. BUILDER OR INSTALLER INFORMATION AS SHOWN ON THE CERTIFICATE OF INSTALLATION Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): DEH Mechanical Company Inc Responsible Builder or Installer Name: Tom Powers (authorized Angel Arechiga) CSLB License: 752819 HERS PROVIDER DATA REGISTRY INFORMATION Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) N/A HERS RATER INFORMATION HERS Rater Company Name: iPermit Responsible Rater Name: Angel Arechiga Responsible Rater Signature: Responsible Rater Certification Number w/ this HERS Provider: RCN13516 Date Signed: 2024-04-09 NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-A020061538A-000-001-M23009A-M23A Registration Date/Time: 2024-04-09   18:04:27 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   18:05:47 SPACE CONDITIONING SYSTEM AIRFLOW RATE CF3R-MCH-23-H (Page 1 of 4) CERTIFICATE OF VERIFICATION Project Name: 58-892 Marbella Lot 60 Enforcement Agency: La Quinta, City of Dwelling Address: 58-892 Marbella Lot 60 Permit Number: PENDING City and Zip Code La Quinta, 92253 Permit Application Date: 2024-04-01 A. Ducted Cooling System Information 01 Space Conditioning System Identification or Name System 3 02 Space Conditioning System Description of Area Served Casita 03 Indoor Unit Name Casita 04 System Installation Type New 05 Nominal Cooling Capacity (tons)2 06 Condenser Speed Type n/a 07 Cooling System Zonal Control Type n/a 08 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system 09 System Bypass Duct Status n/a 10 Date of System Airflow Rate Measurement 2024-04-09 11 Airflow Rate Protocol Utilized RA3.3 procedures for airflow rate measurement 12 Central Fan Ventilation Cooling System Status Not a CFVCS B. Hole for the placement of a Static Pressure Probe (HSPP), and Permanently Installed Static Pressure Probe (PSPP) in the Supply Plenum. Procedures for installing HSPP or PSPP are specified in RA3.3.1.1. 01 Method Used to Demonstrate Compliance with the HSPP/PSPP Requirement HSPP installed and labeled consistent with Figure RA3.3-1 NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. SPACE CONDITIONING SYSTEM AIRFLOW RATE CF3R-MCH-23-H (Page 2 of 4) Registration Number: 424-A020061538A-000-001-M23009A-M23A Registration Date/Time: 2024-04-09   18:04:27 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   18:05:47 C. Airflow Rate Measurement Apparatus and Procedure Information Instrument Specifications are given in RA3.3.1.1, and system airflow rate measurement apparatus information is given in RA3.3.2. 01 Airflow Rate Measurement Type used for this airflow rate verification. Traditional Flow Capture Hood according to procedure in RA3.3.3.1.4 02 Manufacturer of Airflow Measurement Apparatus Testo 03 Model number of Airflow Measurement Apparatus Testo420 04 Certification Status of the Airflow Measurement Apparatus Accuracy Certified by Manufacturer and listed on CEC Website at http://www.energy.ca.gov/title24/equipment_cert/ama_fas/index. html MCH-23a Forced Air System Airflow Rate Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed Compressor D. Forced Air System Airflow Rate Measurement The procedures for System Airflow Rate Verification are specified in Reference Residential Appendix RA3.3. 01 Required Minimum System Airflow Rate (cfm/ton)350 02 Required Minimum System Airflow Target (cfm)700 03 Actual System Airflow Rate Measurement (cfm)720 04 Compliance Statement:System airflow rate complies E. Additional Requirements 01 Air filters that meet the applicable requirements of Standards Section 150.0(m)12 or 150.0(m)13 were properly installed in the system during system air flow rate measurement identified on this Certificate of Verification. 02 The airflow rate measurement apparatus used to perform the airflow rate measurement identified on this Certificate of Verification was calibrated in accordance with the apparatus manufacturer's specifications and conforms to the instrumentation specifications given in RA3.3.1. 03 A visual inspection shall confirm that bypass ducts that deliver conditioned supply air directly to the space conditioning system return duct airflow are not used on newly constructed zonally controlled systems unless the Performance Certificate of Compliance indicates an allowance for use of a bypass duct. When a bypass duct is accounted for on the Performance Certificate of Compliance, the airflow rate shall conform to the specifications listed on the Certificate of Compliance. 04 All registers were fully open during the diagnostic test. 05 System fan was set at maximum speed during the diagnostic test. 06 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test. 07 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. SPACE CONDITIONING SYSTEM AIRFLOW RATE CF3R-MCH-23-H (Page 3 of 4) Registration Number: 424-A020061538A-000-001-M23009A-M23A Registration Date/Time: 2024-04-09   18:04:27 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   18:05:47 E. Additional Requirements 08 Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air handler fan speed. 09 Verification Status:Pass - all applicable requirements are met. 10 Correction Notes: The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table F. Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. SPACE CONDITIONING SYSTEM AIRFLOW RATE CF3R-MCH-23-H (Page 4 of 4) Registration Number: 424-A020061538A-000-001-M23009A-M23A Registration Date/Time: 2024-04-09   18:04:27 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   18:05:47 DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name: Angel Arechiga Documentation Author Signature: Company: iPermit Date Signed: 2024-04-09 Address: 31225 La Baya Drive CEA/ HERS Certification Identification (if applicable): RCN13516 City/State/Zip: Westlake Village CA 91362 Phone: 818-735-7876 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency. 5.I understand that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections, and I will take the necessary steps to ensure this requirement is accomplished. 6.I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy, and I will take the necessary steps to ensure this requirement is accomplished. BUILDER OR INSTALLER INFORMATION AS SHOWN ON THE CERTIFICATE OF INSTALLATION Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): DEH Mechanical Company Inc Responsible Builder or Installer Name: Tom Powers (authorized Angel Arechiga) CSLB License: 752819 HERS PROVIDER DATA REGISTRY INFORMATION Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) N/A HERS RATER INFORMATION HERS Rater Company Name: iPermit Responsible Rater Name: Angel Arechiga Responsible Rater Signature: Responsible Rater Certification Number w/ this HERS Provider: RCN13516 Date Signed: 2024-04-09 NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-A020061538A-000-001-M22010A-M22A Registration Date/Time: 2024-04-09   18:04:37 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   18:05:47 SPACE CONDITIONING SYSTEM FAN EFFICACY CF3R-MCH-22-H (Page 1 of 3) CERTIFICATE OF VERIFICATION Project Name: 58-892 Marbella Lot 60 Enforcement Agency: La Quinta, City of Dwelling Address: 58-892 Marbella Lot 60 Permit Number: PENDING City and Zip Code La Quinta, 92253 Permit Application Date: 2024-04-01 A. Ducted Cooling System Information 01 System Identification or Name System 3 02 System Location or Area Served Casita 03 Indoor Unit Name or Description of Area Served Casita 04 System Installation Type New 05 Nominal Cooling Capacity (tons) of Condenser 2 06 Condenser Speed Type n/a 07 Cooling System Zonal Control Type n/a 08 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system 09 System Bypass Duct Status n/a 10 Date of System Airflow Rate Measurement 2024-04-09 11 Airflow Rate Protocol utilized RA3.3 procedures for airflow rate measurement 12 Central Fan Ventilation Cooling System Status Not a CFVCS B. Fan Watt Measurement Apparatus and Procedure Information Instrument Specifications are given in RA3.3.1, and system fan watt measurement apparatus information is given in RA3.3.2.2. 01 Fan Watt Verification Device Used.Portable Watt Meter MCH-22a Forced Air System Fan Efficacy Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed Compressor NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. SPACE CONDITIONING SYSTEM FAN EFFICACY CF3R-MCH-22-H (Page 2 of 3) Registration Number: 424-A020061538A-000-001-M22010A-M22A Registration Date/Time: 2024-04-09   18:04:37 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   18:05:47 C. Forced Air System Fan Efficacy Measurement The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3 01 Actual Tested Watts 15 02 Actual Tested Airflow from MCH-23 (cfm)720 03 Required Fan Efficacy (Watts/cfm)0.58 04 Actual Fan Efficacy (watts/cfm)0.02 05 Compliance Statement:System fan efficacy complies D. Additional Requirements 01 All registers were fully open during the diagnostic test. 02 System fan was set at maximum speed during the diagnostic test. 03 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test. 04 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value. 05 Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air handler fan speed. 06 Zoned cooling air distribution systems with single speed compressors shall meet both the airflow (cfm/ton) and fan efficacy (Watt/cfm) criteria in every zonal control mode. 07 Portable watt meters used for measurements of air handler watt draws shall be true power measurement systems (i.e. sensor plus data acquisition system) having an accuracy of +- 2% of reading or +- 10 Watts whichever is greater 08 Verification Status Pass - all applicable requirements are met. 09 Correction Notes The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. E. Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. SPACE CONDITIONING SYSTEM FAN EFFICACY CF3R-MCH-22-H (Page 3 of 3) Registration Number: 424-A020061538A-000-001-M22010A-M22A Registration Date/Time: 2024-04-09   18:04:37 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   18:05:47 DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name: Angel Arechiga Documentation Author Signature: Company: iPermit Date Signed: 2024-04-09 Address: 31225 La Baya Drive CEA/ HERS Certification Identification (if applicable): RCN13516 City/State/Zip: Westlake Village CA 91362 Phone: 818-735-7876 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency. 5.I understand that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections, and I will take the necessary steps to ensure this requirement is accomplished. 6.I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy, and I will take the necessary steps to ensure this requirement is accomplished. BUILDER OR INSTALLER INFORMATION AS SHOWN ON THE CERTIFICATE OF INSTALLATION Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): DEH Mechanical Company Inc Responsible Builder or Installer Name: Tom Powers (authorized Angel Arechiga) CSLB License: 752819 HERS PROVIDER DATA REGISTRY INFORMATION Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) N/A HERS RATER INFORMATION HERS Rater Company Name: iPermit Responsible Rater Name: Angel Arechiga Responsible Rater Signature: Responsible Rater Certification Number w/ this HERS Provider: RCN13516 Date Signed: 2024-04-09 NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-A020061538A-000-001-M25013A-M25A Registration Date/Time: 2024-04-09   18:04:47 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   18:05:55 REFRIGERANT CHARGE VERIFICATION CF3R-MCH-25-H (Page 1 of 4) CERTIFICATE OF VERIFICATION Project Name: 58-892 Marbella Lot 60 Enforcement Agency: La Quinta, City of Dwelling Address: 58-892 Marbella Lot 60 Permit Number: PENDING City and Zip Code La Quinta, 92253 Permit Application Date: 2024-04-01 A. System Information HERS Rater to field-verify all system information, discrepancies to be noted by overwriting entry. 01 Space Conditioning System Identification or Name System 3 02 Space Conditioning System Location or Area Served Casita 03 Condenser (or package unit) make or brand GOODMAN 04 Condenser (or package unit) model number GSZH502410AB 05 Nominal Cooling Capacity (tons) of Condenser 2 06 Condenser (or package unit) serial number 2403009323 07 Refrigerant Type R-410A 08 Other Refrigerant Type (if applicable)n/a 09 Liquid Line Filter Drier Installed According to Manufacturers Specifications (if applicable) Yes 10 System Installation Type New 11 Fault Indicator Display (FID) Status (Note: Even systems with a FID must have refrigerant charge verified by installer) This system does not have a FID device installed 12 Is the system of a type that the minimum airflow can be verified for all indoor units using an approved measurement procedure (RA3.3 or RA3.3.3)? Yes 13 Is the system of a type that approved refrigerant charge verification procedures can be used to verify compliance with the refrigerant charge verification requirements when temperatures are >= 55 °F (RA3.2.2, or RA1)? Yes, one of the Refrigerant charge verification procedures from RA3.2.2 or RA1 is applicable to this system and can be used to verify compliance 14 Date of Refrigerant Charge Verification for this system 2024-04-09 15 Refrigerant charge verification method used.Subcooling (outdoor temperature must be equal to or greater than 55 degF) 16 Person who performed the Refrigerant Charge Verification reported on this Certificate of Installation HERS rater 17 HERS Verification Compliance Requirement Status System does not qualify for group sampling NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. REFRIGERANT CHARGE VERIFICATION CF3R-MCH-25-H (Page 2 of 4) Registration Number: 424-A020061538A-000-001-M25013A-M25A Registration Date/Time: 2024-04-09   18:04:47 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   18:05:55 A. System Information HERS Rater to field-verify all system information, discrepancies to be noted by overwriting entry. 18 Refrigerant charge verification method used by HERS Rater.Subcooling MCH-25b - Refrigerant Charge Verification - Subcooling Method B. Metering Device Verification HERS Rater is required to visually field verify all information from CF2R. Subcooling Method can only be used on systems that have a variable metering device. 01 Refrigerant metering device Thermostatic Expansion Valve (TXV) 02 Subcooling Method applicability status Subcooling Method is applicable to this system. C. Instrument Calibration HERS Raters are required to calibrate their diagnostic tools. Procedures for instrument calibration are given in Reference Residential Appendix RA3.2.2 and RA3.2.2.2 01 Date of Digital Refrigerant Gauge Calibration 2024-03-25 02 Date of Digital Thermocouple Calibration 2024-04-03 03 Digital Refrigerant Gauge Calibration Status Calibration is current 04 Digital Thermocouple Calibration Status Calibration is current D. Measurement Access Hole (MAH) Verification HERS Raters are required to visually field verify MAH. Procedures for installing MAH are specified in Reference Residential Appendix RA3.2.2.3 01 Method Used to Demonstrate Compliance with the Measurement Access Hole (MAH) Requirement MAH installed and labeled consistent with Figure 3.2-1 E. Minimum System Airflow Rate Verification Procedures for verifying minimum system airflow are specified in Reference Residential Appendix RA3.3.3. 01 02 03 Indoor Unit Name or Description of Area Served Minimum Required System Airflow Rate (cfm)System Airflow Rate Verification Status Casita 1050 System complies with minimum airflow rate requirements 04 SC System complies with Minimum System Airflow Rate Verification Notes: NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. REFRIGERANT CHARGE VERIFICATION CF3R-MCH-25-H (Page 3 of 4) Registration Number: 424-A020061538A-000-001-M25013A-M25A Registration Date/Time: 2024-04-09   18:04:47 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   18:05:55 F. Data Collection and Calculations HERS Rater must independently collect all data in this section. Procedures for determining Refrigerant Charge using the Standard Charge Verification Procedure are given in Reference Residential Appendix RA3.2.2 and RA3.2.2.2 01 Lowest Return Air Dry Bulb Temperature that Occurred During the Refrigerant Charge Verification Procedure ( °F) 85 02 Measured Condenser Air Entering Dry-Bulb Temperature (Tcondenser, db) 88 03 Outdoor Temperature Qualification Status Outdoor temperature is within range for using Subcooling refrigerant charge verification method 04 Measured Liquid Line Temperature (Tliquid) ( °F)89.5 05 Measured Liquid Line Pressure (Pliquid) (psig)306.9 06 Condenser Saturation Temperature (Tcondenser, sat) from Digital Gauge or P-T Table using Line F05 ( °F) 95.4 07 Measured Subcooling (Line F06 - Lilne F04 ( °F)5.9 08 Target Subcooling from Manufacturer ( °F)8 09 Compliance Statement:System complies with Subcooling Method - Must also pass metering device verification, next section G. Metering Device Verification HERS Rater must independently collect all data in this section. Procedures for the verification of proper metering device operation are specified in RA3.2.2.6.2 01 Measured Suction Line Temperature (Tsuction) ( °F)62.4 02 Measured Suction Line Pressure (Psuction) (psig)219.0 03 Evaporator Saturation Temperature (Tevaporator, sat) from Digital Gauge or P-T Table using Line G02 ( °F) 40.1 04 Measured Superheat (Line G01- Line G03) ( °F)22.3 05 Measured Superheat (Line G04) is between 3 °F and 26 °F (inclusive) Passes CEC requirement 06 Measured Superheat (Line G04) is within Manufacturer's Specifications ( if known) Yes, documentation to be provided upon request 07 Compliance Statement:Metering device verification passes H. Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. REFRIGERANT CHARGE VERIFICATION CF3R-MCH-25-H (Page 4 of 4) Registration Number: 424-A020061538A-000-001-M25013A-M25A Registration Date/Time: 2024-04-09   18:04:47 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Report Generated: 2024-04-09   18:05:55 DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name: Angel Arechiga Documentation Author Signature: Company: iPermit Date Signed: 2024-04-09 Address: 31225 La Baya Drive CEA/ HERS Certification Identification (if applicable): RCN13516 City/State/Zip: Westlake Village CA 91362 Phone: 818-735-7876 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency. 5.I understand that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections, and I will take the necessary steps to ensure this requirement is accomplished. 6.I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy, and I will take the necessary steps to ensure this requirement is accomplished. BUILDER OR INSTALLER INFORMATION AS SHOWN ON THE CERTIFICATE OF INSTALLATION Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): DEH Mechanical Company Inc Responsible Builder or Installer Name: Tom Powers (authorized Angel Arechiga) CSLB License: 752819 HERS PROVIDER DATA REGISTRY INFORMATION Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) N/A HERS RATER INFORMATION HERS Rater Company Name: iPermit Responsible Rater Name: Angel Arechiga Responsible Rater Signature: Responsible Rater Certification Number w/ this HERS Provider: RCN13516 Date Signed: 2024-04-09   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Scan to Validate CHEERS REGISTRY PROJECT STATUS REPORT CERTIFICATE OF COMPLIANCE (CF1R) DATE DOCUMENT TITLE REGISTRATION NUMBER STATUS 04/09/2024 CF1R-ALT-02-E Residential HVAC Alterations 424-A020061538A-000-000-0000000-0000 F06 changed from ".80" to "0.8" F06 changed from ".80" to "0.8" F06 changed from ".80" to "0.8" CERTIFICATE OF INSTALLATION (CF2R) DATE DOCUMENT TITLE REGISTRATION NUMBER STATUS 04/09/2024 CF2R-MCH-01b-E HVAC, Ducts and Fans 424-A020061538A-000-001-M01001A-0000 B02 changed from "Location 1" to "Living area " B09 changed from "true" to "false" B02 changed from "Location 2" to "Master " B09 changed from "true" to "false" B02 changed from "Location 3" to "Casita " B09 changed from "true" to "false" C03 changed from "CentralGasFurnace" to "Electric" C05 changed from "AFUE" to "HSPF" C07 changed from "CentralSplitAC" to "CentralSplitHP" C03 changed from "CentralGasFurnace" to "Electric" C05 changed from "AFUE" to "HSPF" C07 changed from "CentralSplitAC" to "CentralSplitHP" C03 changed from "CentralGasFurnace" to "Electric" C05 changed from "AFUE" to "HSPF" C07 changed from "CentralSplitAC" to "CentralSplitHP" 1 04/09/2024 CF2R-MCH-20a-H Duct Leakage 424-A020061538A-000-001-M20005A-0000 04/09/2024 CF2R-MCH-22a-H Fan Efficacy 424-A020061538A-000-001-M22007A-0000 04/09/2024 CF2R-MCH-23a-H Airflow Rate 424-A020061538A-000-001-M23006A-0000 PROJECT SUMMARY Project Name:58-892 Marbella Lot 60 Address:58-892 Marbella Lot 60 City, State, Zip:La Quinta, CA 92253 Building Department:La Quinta, City of Permit Number:PENDING Building Energy Code:2022 Standards ENERGY CODE COMPLIANCE COMPLETE HERS VERIFIABLE MEASURES COMPLETE NOTICE: This compliance summary report has been generated by a registration platform provided by CHEERS using information that has been uploaded to that registration platform by third parties that are not affiliated or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this certificate. Page 1 of 3 - continued on next page - Scan to Validate CHEERS REGISTRY PROJECT STATUS REPORT CERTIFICATE OF INSTALLATION (CF2R) DATE DOCUMENT TITLE REGISTRATION NUMBER STATUS Casita 04/09/2024 CF2R-MCH-20a-H Duct Leakage 424-A020061538A-000-001-M20008A-0000 04/09/2024 CF2R-MCH-22a-H Fan Efficacy 424-A020061538A-000-001-M22010A-0000 04/09/2024 CF2R-MCH-23a-H Airflow Rate 424-A020061538A-000-001-M23009A-0000 Living room 04/09/2024 CF2R-MCH-20a-H Duct Leakage 424-A020061538A-000-001-M20002A-0000 04/09/2024 CF2R-MCH-22a-H Fan Efficacy 424-A020061538A-000-001-M22004A-0000 04/09/2024 CF2R-MCH-23a-H Airflow Rate 424-A020061538A-000-001-M23003A-0000 System 1 04/09/2024 CF2R-MCH-25b-H Refrigerant Charge 424-A020061538A-000-001-M25011A-0000 System 2 04/09/2024 CF2R-MCH-25b-H Refrigerant Charge 424-A020061538A-000-001-M25012A-0000 System 3 04/09/2024 CF2R-MCH-25b-H Refrigerant Charge 424-A020061538A-000-001-M25013A-0000 CERTIFICATE OF VERIFICATION (CF3R) DATE DOCUMENT TITLE REGISTRATION NUMBER STATUS 1 04/09/2024 CF3R-MCH-20a-H Duct Leakage 424-A020061538A-000-001-M20005A- M20A 04/09/2024 CF3R-MCH-22a-H Fan Efficacy 424-A020061538A-000-001-M22007A- M22A 04/09/2024 CF3R-MCH-23a-H Airflow Rate 424-A020061538A-000-001-M23006A- M23A NOTICE: This compliance summary report has been generated by a registration platform provided by CHEERS using information that has been uploaded to that registration platform by third parties that are not affiliated or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this certificate. Page 2 of 3 - continued on next page - Scan to Validate CHEERS REGISTRY PROJECT STATUS REPORT CERTIFICATE OF VERIFICATION (CF3R) DATE DOCUMENT TITLE REGISTRATION NUMBER STATUS Casita 04/09/2024 CF3R-MCH-20a-H Duct Leakage 424-A020061538A-000-001-M20008A- M20A 04/09/2024 CF3R-MCH-22a-H Fan Efficacy 424-A020061538A-000-001-M22010A- M22A 04/09/2024 CF3R-MCH-23a-H Airflow Rate 424-A020061538A-000-001-M23009A- M23A Living room 04/09/2024 CF3R-MCH-20a-H Duct Leakage 424-A020061538A-000-001-M20002A- M20A 04/09/2024 CF3R-MCH-22a-H Fan Efficacy 424-A020061538A-000-001-M22004A- M22A 04/09/2024 CF3R-MCH-23a-H Airflow Rate 424-A020061538A-000-001-M23003A- M23A System 1 04/09/2024 CF3R-MCH-25b-H Refrigerant Charge 424-A020061538A-000-001-M25011A- M25A System 2 04/09/2024 CF3R-MCH-25b-H Refrigerant Charge 424-A020061538A-000-001-M25012A- M25A System 3 04/09/2024 CF3R-MCH-25b-H Refrigerant Charge 424-A020061538A-000-001-M25013A- M25A NOTICE: This compliance summary report has been generated by a registration platform provided by CHEERS using information that has been uploaded to that registration platform by third parties that are not affiliated or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this certificate. Page 3 of 3