Loading...
2025 Ortiz Enterprises - Project 2011-05 Dune Palms Bridge - Change Order No. 23ta Qai fra - — GEM ojtlx DESER"I — TO: Jon McMillen, City Manager FROM: Bryan McKinney, P.E., Public Works Director/City Engineer Via: Carley Escarrega, Administrative Technician DATE: November 6, 2025 RE: Contract Change Order No. 23 Dune Palms Road Bridge Project No. 2011-05 Attached for your signatures is one (1) electronic Contract Change Order No. 23 between Ortiz Enterprises, Inc. and the City of La Quinta for the project referenced above. DESCRIPTION OF CHANGE This Contract Change Order allows for additional landscape time & materials Total $186,876.60 Please sign and return the original to the City Clerk for final distribution. REQUESTING DEPARTMENT TO CHECK THE ITEMS BELOW AS APPROPRIATE: X Contract payments will be charged to the construction account number: 401-0000-60188-111205-CT Authority to execute this agreement is based upon: City Manager's signature authority provided under Resolution No. 2019-021 for budgeted expenditures of $50,000 or less. _X— City Council approval on October 18, 2022 The following Budget Summary is provided: Project Budget $ 29,756,245 Contract Amount ($ 21,626,759.60) Change Order No. 1 - 22 ($ 1,066,369.97) This Contract Change Order No. 23 ($ 186,876.60) Balance Remaining $ 6,876,238.83 As indicated, adequate funding is available. 78-495 Calle Tampico La Quinta, CA 92253 760.777.7000 taQaiwra CALIFORNIA - Sheet 1 of 2 CONTRACT: Dune Palms Road Bridge Improvement Project PROJECT #: 2011-05 CONTRACTOR: ORTIZ ENTERPRISES, INC. 6 Cushing Suite 200 Irvine, CA 92618-4221 CONTRACT CHANGE ORDER NO. 023 Pursuant to the terms of the original Contract Agreement, you are hereby directed to make the herein described changes or do the following described work not included in the plans and specifications for this Contract. Unless otherwise stated all work shall conform to the terms, general conditions, and special provisions of the original Contract. DESCRIPTION OF CHANGE This change order provides payment for contract bid items that have overrun their estimated quantities and also for two items with no contract bid item. The contract bid items shall be adjusted pursuant to the attached spreadsheet. Quantities were measured and verified in the field and will be paid per contract unit price. Bid Item No. 3 Traffic Control Bid Item No. 4 RE Trailer Bid Item No. 4A Construction Monitoring Camera Bid Item No. 12 Suitable Backfill Material Bid Item No. 20 Concrete Sidewalk Bid Item No. 23 Concrete Cross Gutter Bid Item No. 26 Concrete Slope Protection Bid Item No. 28 6' Masonry Block Wall Bid Item No. 35 Concrete Collar Bid Item No. 36 24" HDPE Pipe Bid Item No. 49 4" Thick Decomposed Granite Bid Item No. 91 Sawcut & Remove AC Pavement Bid Item No. 96 Cold Mill AC Pavement Bid Item No. 97 Asphalt Concrete (T=4.5") Bid Item No. 98 Asphalt Concrete (T=0.1') Bid Item No. 101 6" Curb & Gutter Bid Item No. 102 8" Median Curb Bid Item No. 103 Concrete Sidewalk (W=5.5') 0.07 @ $175,000.00 = $ 12,250.00 3 MO @ $ 4,000.00/MO = $ 12,000.00 0.1 @ $ 20,000.00 = $ 2,000.00 47 CY @ $ 300/CY = $14,100.00 257 SF @ $ 16/SF = $ 4,112.00 5SF@$ 15.50/SF= $77.50 29 CY @ $710/CY = $ 20,590.00 9 LF @ $ 180/1-F = $ 1,620.00 3 EA @ $2,200/EA = $ 6,600.00 3 LF @ $150/1-F = $450.00 567 SF @ $ 7/SF $ 3,969.00 2,805 SF @ $1.8/SF = $5,049.00 366 SF @ $1/SF = $ 366.00 4,050 SF @ $ 3.2/SF = $ 12,960.00 366 SF @ $0.85/SF = $ 311.10 611 LF @ $ 22/1-F = $ 13,442.00 660 LF @ $ 19/1-F = $ 12,540.00 -941 SF @ $ 16/SF = ( $ 15,056.00) Bid Item No. 104 Concrete Driveway Approach Bid Item No. 105 Colored Stamped Concrete Median Bid Item No. 117 Concrete Slope Protection Bid Item No. 143 6" Schedule 40 PVC, I I D Conduit - c A] iroavi - 226 SF @ $ 26/SF = $ 5,876.00 1,554 SF @ $ 16/LF = $ 24,864.00 41 CY @ $ 710/CY = $ 29,110.00 212 LF @ $ 28/1-F = $ 5,936.00 Additional costs were incurred for curb and gutter removal and AC patch for the median curb for the South side widenings. These costs were tracked on a force account basis for an agreed lump sum of $ 13, 710.00. Subtotal of bid item overruns = $ 173,166.60 Total costs = $ 173,166.60 + $ 13,710.00 = $ 186,876.60 Original Contract Amount $ 21,626,759.60 Contract Change Orders No. 1 — 22 $ 1,066,369.97 Add This Change Order No. 023 $ 186,876.60 Revised Contract Total $ 22,880,006.17 By reason of this contract change order the time of completion is adjusted as follows: No time adjustment The contract completion date shall remain: 03/28/2026 Submitted By: Approved By: 11/06/25 ZO We, the undersigned Contractor, h given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we wikArovide all equipment, furnish all materials, perform all labor, except as may be noted above, and perform all services necessary to complete the above specified work, and hereby accept as full payment the amount shown above, which includes all directandindirect overhead expenses for any delays. Accepted By: 0"i X� Title: Project Manager Contractor: Ortiz Enterprises, I Date: 11/6/2025 2011-05 CCO 23 Final Audit Report Created: 2025-11-06 By: Carley Escarrega (cescarrega@laquintaca.gov) Status: Signed Transaction ID: CBJCHBCAABAAWESp6pcs63bcOsMpap1CgJHSMGGtRGrx "2011-05 CCO 23" History Document created by Carley Escarrega (cescarrega@laquintaca.gov) 2025-11-06 - 4:25:10 PM GMT Document emailed to uayon@laquintaca.gov for signature 2025-11-06 - 4:25:14 PM GMT Email viewed by uayon@laquintaca.gov 2025-11-06 - 4:25:25 PM GMT 4,. Signer uayon@laquintaca.gov entered name at signing as Ubaldo Ayon 2025-11-06 - 4:31:03 PM GMT Document e-signed by Ubaldo Ayon (uayon@laquintaca.gov) Signature Date: 2025-11-06 - 4:31:05 PM GMT - Time Source: server Document emailed to bmckinney@laquintaca.gov for signature 2025-11-06 - 4:31:07 PM GMT Email viewed by bmckinney@laquintaca.gov 2025-11-06 - 4:38:01 PM GMT 2025-11-06 Signer bmckinney@laquintaca.gov entered name at signing as Bryan McKinney 2025-11-06 - 4:38:31 PM GMT Document e-signed by Bryan McKinney (bmckinney@laquintaca.gov) Signature Date: 2025-11-06 - 4:38:33 PM GMT - Time Source: server Agreement completed. 2025-11-06 - 4:38:33 PM GMT 0 Adobe Acrobat Sign