BRES2019-0535Bin #
City of La Qulnta
Building &r Safety Division
78-495 Calle Tampico
La Quinta, CA 9225S - (760) 777-7012
Building Permit Application and Tracking Sheet
Permit #
13R�S Q1 t-aS3s
Project Address: I� y*v1 ,4 PA I j4G7e
Owner's Name: PAC_
A- P. Number: --7 ,. Z
Address: P.O.
tJ SOn �
City, ST, Zip:
� Arc- 9z
�'z Legal Description: /40 -IA"- ; j Z
Contractor:•:•:,�••:
Telephone: !r$�
- • •��..•�:.•.,.:.,...:::::.Y•-!
,,:,::. msa :3i: s; A z: ,•:...
Address: A
Project Description:
City, ST, Zip:f
,� Lam-- G
Telephone:
State Lie. # :
City Lie. TM:
Arch., Engr_, Designer:$
Address: I- O !T
City, ST, Zip:T/f�
Telephone: ly
State Lic_: G U :' -: »•<'«>-`<'->::-.>-:- _•:=-::>-->-
:<r::-
Construction Type Occupancy:
Project type (circle one): ew Add'n Alter Repair Demo
Name of Contact Person V
Sq. Ft.:
# Stories:
Units:
Telephone # of Contact Person:
Estimated Value of Project: f va a a v . 00
APPLICANT: DO NOT WRITE BELOW THIS LINE
4
Submittal
Req'd
Rec'd
TRACKING
PERMIT FEES
Plan Sets
Plan Check submitted
Item
Amount
Structural Calcs.
Reviewed, ready for corrections
Plan Check Deposit
Truss Calm
Called Contact Person
Plan Check Balance
Title 24 Cates.
Plans picked up
Construction
Flood plain plan
Plans resubmitted
Mechanical
Grading plan
2"' Review, ready for correctionsfissue
Electrical
.
Subcontactor List
Called Contact Person
Plumbing
Grant Deed
Plans picked up
S.M.I.
H.O.A. Approval
Plans resubmitted
Grading
IN HOUSE:-
Review, ready for correctionslissue
Developer Impact Fee
Planning Approval
Called Contact Person
A.I.P.P.
Pub. Wks. Appr
Date of permit issue
School Fees
Total Permit Fees
BREs-;�-D I I -Os-35
CITY OF LA QUINTA - PUBLIC WORKS DEPARTMENT GREEN SHEET
PUBLIC WORKS CLEARANCE FOR RELEASE OF BUILDING PERMIT
Form updated & effective 9/25/2009
Green Sheet approvals are forwarded to the Building & Safety Department directly by Public Works. Please DO
NOT submit the Green Sheet (Public Works Clearance) Packet to the Public Works Department until ALL
requirements listed below are complete. Incomplete applications or applications which cannot be processed will be
returned to applicant.
Date: 2 / 7 / 20 Developer: Sunlite Development, Inc.
Tract No.: 29894-2 Tract Name:
Lot No.(s): 218
Address(s): 53431 Via palacio Phone Number: (760 ) 340-9800
The following are the requirements for Public Works Clearance to authorize issuance of a building permit from the
Building & Safety Department:
® CUSTOM HOMES: PROVIDE ITEMS #2, #3, #4, #5 & #7 BELOW
❑ TRACT HOMES: PROVIDE ITEMS #1, #2, #3 & #5 BELOW
❑ COMMERCIAL BUILDINGS/OTHER: PROVIDE ITEMS #1, #2, #3, #5 & #7 BELOW
❑ WALLS, SIGNS, OTHER: PROVIDE ITEM #6 BELOW
1. Attach Pad Elevation Certificates in compliance with the approved design elevation for building pad
(maximum allowable deviation of +/- 0.1 foot). Pad Elevation Certificates must be current (within 6
months of current date). If a precise grading plan creates the pad for approval, please withhold green sheet
submittal until a Pad Elevation Certificate can be provided.
2. Attach geotechnical certification of grading plan compliance including compaction reports from a licensed
Soils Engineer. Recently rough graded residential developments which have a previously approved
geotechnical certification are exempt from this requirement.
3. Attach recorded final map or title information/grant deed showing proposed building locations are legal lots.
4. Complete the attached <1 acre per lot or inf ill project Fugitive Dust Control project information form, PM10
plan & agreement or provide alternative & valid City approved PM10 plan set reference number or hard copy
plan. PM10 plans for commercial & residential developments (beyond 1 lot) are submitted separately with
grading plans & are subject to additional requirements. A current PM10 certification number is required.
5. Attach a copy of the rough or precise grading plan to the Public Works Department showing building
location(s) for pad elevation verification. AO flood zone developments will require an approved flood plain
development plan.
6. Attach supporting documentation for wall plan, monument sign, grease trap or special facility installations.
7. Complete and sign the attached water quality management plan (WQMP) exemption form, if applicable. PW
approved building construction projects require either a WQMP or a completed WQMP exemption form.
Approved maps/plans may be viewed at the following link: http://www.la-guinta.org/PlanCheck/m search.aspx
I have reviewed and confirmed the requirements listed above as presented and find the improvements to be
sufficiently complete for construction of the proposed buildings/structures/walls/signs on the subject lot(s).
Pursuant to my findings,
the above project may be released for building permit issuance.
This section completed by City staff.
Recommended by: Date:
Public Works Distribution: ( Green Sheet to Building & Safety
( ) Green Sheet to Planning Department
Declined for approval for reason(s) as follow(s), please correct and resubmit:
TAChecklists - Forms & Applications\Forms & Applications\GREEN SHEET cover & PM10 less than 1 Acre Revised 10-02-12.doc
City of La Quinta - PM10 Fugitive Dust Control Project Information
Construction Phase PM10 Agreement (< 1 acre/lot or Infill Proiect)
Project Information
Project Contractor:
Project Phase
(check one)
® Construction
11 Demolition
Project Name: Sunlite Development, Inc.
Project Tract/Lot Numbers: 29894-2/Lot 218
Project Street Address: 53431 Via Palacio
Total Acres in Active
Construction (< 1 acre per
Lot): .41
Anticipated Start Date: 4 / 1 /20 Anticipated Completion Date: 3 / 1 /21
PM10 Contact Information
Please note: Dust control is required 24 hours a day, 7 days a week, regardless of
construction status. Person listed below is responsible for dust control during
business and non -business hours.
Name:
Paul Dewey
Title:
President
Company Name:
Sunlite Development, Inc.
Mailing Address:
P.O. Box 10668
City, State, ZIP Code:
Palm Desert, CA 92255
Primary Phone #:
760/340-9800
Fax #:
760/776-1290
24 Hour Emergency
Phone#:
760/272-7274
Cell Phone #:
760 272-7274
Email Address:
sunliteinc@dc.rr.com
PM10 Certificate #:
CV1803-005976-6034
The above stated property owner (or authorized representative):
❖ Shall act as his/her acknowledgement of dust control requirements and their enforceability, pursuant to
SCAQMD Rules 403, 403.1, 401, 402, 201, 203 and PERP;
❖ Shall constitute an Agreement to comply with all project conditions as identified in the approved dust
control plan.
Acknowledges that dust control is required twenty-four (24) hours a day, seven (7) days a week,
throughout the period of project performance, regardless of project size or status;
Shall ensure that each and every contractor, subcontractor and all other persons associated with the project
shall be in continuous compliance with all requirements of the approved dust control plan;
Shall take all necessary precautions to minimize dust, even if additional measures beyond those listed in the
dust control plan are necessary;
Shall authorize representatives of City/County to enter the property for inspection and/or abatement
purposes;
❖ Shall hold harmless the City/County and its representatives from liability for any actions related to this dust
contr an r any C=/Ct initiated abatement activities.
Lib
Signature of Property Owner or AA
hori d Representative D to
City of La Quinta - PM 10 Fugitive Dust Control Plan (< 1 acre per Lot or Infill Project)
This Fugitive Dust Control Plan shall take into account applicable SCAQMD Regulations Rule 403, 403.1, 401,
402, 201, 203 and Portable Equipment Registration Program (PERP).
❖ WATERING: Continuous watering is required to prevent dust and must occur a minimum of four (4) times
daily. Water shall be applied from an adequate sized metered water source to dry soils to prevent:
■ Visible dust emissions > 20% opacity
■ Visible dust emissions that travel > 100 feet from the source (within site)
■ Visible dust emissions that cross any property line
❖ EDUCATION: The responsible dust control Individual and key personnel shall attend SCAQMD PM10 class
and obtain PM10 certificate number prior to construction activity (training information may be obtained by
contacting SCAQMD at (909) 396-2183).
•: CONSTRUCTION & DEMOLITION ACTIVITIES: A copy of this approved Fugitive Dust Plan must be
kept on site. At least one short-term stabilization method must be used during off hours. At least one
long-term stabilization measure must be used within ten (10) days of ceasing activity.
❖ WEATHER MONITORING: Wind predictions shall be monitored.
❖ SIGNAGE: Approved signs shall be installed at a highly visible location. Please refer to the Coachella
Valley Fugitive Dust Control Plan Handbook for Construction Signage Guidelines.
❖ TRAFFIC: Construction traffic shall not be allowed on the pad, unless absolutely necessary. If vehicles
operate on pad, pad shall be kept firm and moist through hose watering and sprinklers; and a maximum
traffic speed of 15mph will be enforced. Fugitive Dust shall be prevented by fencing off site to prevent
unauthorized traffic on pad.
❖ PARKING: Parking is not allowed on pad. All vehicles must park on street at designated areas only.
❖ TRACK OUT: Provide 24 hour street cleaning and track out system as approved by City Public Works
inspectors. No dirt on public or private roads. Track out shall be cleaned up within one (1) hour of incident
and at the conclusion of each workday.
DIRT PILES: Dirt piles shall be limited to 50 cubic yards and built per California Building Code grading
requirements. Piles shall be kept moist or covered with tarp material. Larger dirt piles will require stockpile
or grading permit.
❖ FENCING: Provide PM10 fencing at perimeter of public roads and where applicable. Wood slat fencing can
be installed at rear of property and return 20 feet on either side if HOA restrictions apply. Block walls can
replace PM10 fencing during the construction phase.
❖ EQUIPMENT: Extra hoses and sprinklers shall be maintained on site.
❖ EXCAVATION MEASURES: All areas to be excavated or graded shall be pre -watered. Water shall also
be applied during excavation or grading operations.
❖ DUMP TRUCKS: Open top dump trucks shall be wet down, moist and covered with a tarp prior to leaving
site.
❖ INACTIVE SITE: Within 10 days of ceasing of activities, re -vegetate or permanently stabilize as required.
•:• RECORD KEEPING: Fugitive Dust Control Plan records (i.e. self inspection records, records of use of
chemical suppressants, etc.) shall be maintained for 3 years by the Property Owner (or Authorized
Representative)• Property Owner shall notify the City and SCAQMD within 10 days of completion of
project.
Water Quality Management Plan (WQMP) Exemption Form - Whitewater River Region
Documentation of Project Not Requiring a WQMP but Requiring Site Design BMPs and Source Control BMPs by
Entitlement Conditions of Approval or Permit Conditions — WQMP Required for the Listed Change of Land Uses
or for Changes of Pollutant Stream (All Questions Below Must be Answered "No" To Exempt Project)
Yes
No
Entitlement or construction of new single-family hillside residence(s) that create 10,000 square
feet, or more, of impervious area where the pre -development natural slope is 25% orgreater?
X
Entitlement or construction of new single-family hillside residence(s) that create 10,000 square
feet, or more, of impervious area where the pre -development natural slope is 10% or greater
where erosive soil conditions are known?
X
Entitlement or construction of new commercial and industrial development(s) of 100,000 square
feet or more?
X
Entitlement or construction of new automotive repair shop(s) including body, upholstery, paint,
exhaust, tire, transmission, engine or other automotive specialty repair. [Standard Industrial
Classification (SIC) codes 5013, 7532, 7533, 7534, 7537, 7538, and 75391?
X
Entitlement or construction of new retail gasoline outlet(s) disturbing greater than 5,000 square
feet?
X
Entitlement or construction of new restaurant(s) (or potential restaurant shell space) disturbing
than 5,000 square feet?
X
-greater
Entitlement or construction of new home subdivision(s) with 10 or more housing units?
X
Entitlement or construction of new parking lot(s) of 5,000 square feet or more, or with 25 or
more parking spaces, and potentially exposed to Urban Runoff?
X
Applicant
Information
Name and Title
Sunlite Development, Inc
Company
Sunlite Develol2ment, Inc.
Phone
760 340-9800
Email
sunliteinc@dc.rr.com
Project Information
Project Name
Type (SFH, Multi -Family, Commercial, Etc.)
Sunlite Development, Inc.
SFH
Location or Street Address
53431 Via Palacio
Nearest Cross Streets
Jefferson
Municipality/County/Zip Code
La Quinta 92253
Tract Number(s) and/or Assessor Parcel Number(s)
29894-2
Other Location Information
Watershed
Whitewater River
Source Control BMP Information
Size of Project Area (nearest 0.1 acre)
.41
Project Area managed with Site Design or Low
Impact Development (LID) BMPs (nearest 0.1 acre)
.41
Is the project subject to onsite retention by City
ordinance or policy?
NO
Name of the Entity that will implement, operate, and
maintain the Source Control BMPs
Sunlite Development, Inc.
Contact Name
Paul Dewey
Street or Mailing Address
P.O. Box 10668
City
Palm Desert
Zip Code
92255
Phone
760/340-9800
Check Item
To be
Performed
Source Control BMP Requirements - All Projects Require Non -Structural BMP Source Control
Non -Structural BMP (See Appendix H, Section 4.5.2.1)
X
Ongoing Irrigation System and Landscape Maintenance
X
Ongoing Litter Control
X
Ongoing Drainage System Inspection & Maintenance
X
Education/Training for Property Owner, Operators, Occupants, or Employees
X
Activity Restrictions — Prohibition of Debris Blowing/Sweeping/Washing into Street/Storm Drain,
Closed Trash Lids, Restriction of Vehicle Washing
X
Ongoing Street Sweeping at Private Streets and Private Parking Lots
Check Item
To be
Provided
Source Control BMP Requirements — Small Sloped Lots, Small Commercial, < 10 Unit
Subdivisions, <5,000 Square Ft. Parking Lots, Etc.
Structural BMP (See Appendix H, Section 4.5.2.2)
Storm Drain Inlet Stenciling and Signage
Landscape and Irrigation System Design to Minimize Erosion & Nuisance Runoff
Protection of Slopes and Channels to Minimize Erosion
Multi -Family Project Use of Community Car Wash Racks
Wash Water Controls for Food Preparation Areas to Use Sanitary Sewer
Fueling Area (Design & Maintenance) Including PCC Surface, Canopy & Spill Prevention
Air/Water Supply Area Drainage (Design & Maintenance) Including Spill Area Containment
Trash Storage Areas (Design & Maintenance) Including Attached Lids, Storm Water Controls
Loading Docks (Design & Maintenance) Including Storm Water Controls, Dry & Frequent Cleaning
Procedures
Maintenance Bays (Design & Maintenance) Including Indoor Location & Storm Water
Containment
Vehicle and Equipment Wash Areas (Design & Maintenance) Including Canopy & Containment
Outdoor Material Storage Areas (Design & Maintenance) Including Canopy & Containment
Outdoor Work Areas or Processing Areas (Design & Maintenance) Including Canopy &
Containment
CC&R's, Maintenance Agreements or Other mechanisms will be used to ensure the ongoing
operation, maintenance, funding, transfer and implementation of the project -specific WQMP
requirements. Legal description and plat stamped by Registered Surveyor to be attached to the
applicable CC&R or Maintenance Agreement for recordation at Riverside County. (Optional
Requirement to be reviewed on a Project by Project basis)
BMP Acknowledgement
The applicant shall comply with listed BMPs and applicable
provisions of the City's NPDES stormwater discharge permit,
LQMC Sections 8.70.010 et seq. (Stormwater Management
and Discharge Controls), and 13.24.170 (Clean Air/Clean
Water); Riverside County Ordinance No. 457; the California
Regional Water Quality Control Board — Colorado River Basin
Region Board Order No. 137-2008-0001 and the State Water
Resources Control Board's Order No. 99-08-DWQ.
Print Name ` p V D�
Title: 2 R
Date: 2-- / / / 20
Phone: (?�/,O) �'S Q
nt Certification
I certify that I have read this form in its entirety and
I
understand the City's submittal and review process and the
Signat re---6
requirements for this form. I understand and agree that if
during the processing of the form, it is determined the
Print Name: Paul Dewey
information contains errors or omissions, clarification and/or
supplemental information may be required and the
Title: President
preparation of such information may be considered, in the
Community Development Director's judgment, an
Date: 2 / 7 / 20
unreasonable delay and will result in a suspension of
processing time limits in accordance with the California Code
Phone: ( 760 )340-9800
of Regulations, Title 14, Section 15109.
Owner Certification
I certify under the penalty of the laws of the State of
California that I am the property owner of the property that
is the subject matter of this application and I am authorizing
and hereby do consent to the filling of this application and
acknowledge that the final approval by the City of La Quinta,
if any, may result in restriction, limitations and construction
obligations being imposed on this real property.
Signatui(e:—][i,UV1
Print Name: Paul Dewey
Title: President
Date: 2 / 7 / 20
Phone:( 760 I 340-9800