Specifications Project 2025-09 - Addendum 1 1 of 4 ADDENDUM NUMBER 1 TO: All Prospective Bidders and Plan Holders FROM: Ubaldo Ayón, Assistant Construction Manager DATE: January 2, 2026 SUBJECT: 2025-09 Dune Palms Mobile Estate Pool Abandonment The following shall be considered as incorporated into the project plans and specifications for the above referenced project. Portions of plans and specifications not specifically mentioned in this Addendum remain in force.  CLARIFICATIONS Note: All Clarifications shall be considered as included in the Bid Documents Question 1. Please provide the engineers estimate for this project. Response: $35,000 - $45,000. Question 2. Will there be an onsite job walk and or will access be granted to thoroughly view the site? Response: Yes, it was offered during the Pre-Bid Meeting. Bidders can go to Site, please let City know when you will be there. Question 3. Project requires two CMS boards two weeks prior to project start. Where are these to be located on the property? Response: One will be on Dune Palms NB and the second will be on property. Question 4. Project requires capping of the water service line five feet from edge of asphalt. Please confirm Response: Can be capped within the confines of the Pool Area. Question 5. Please confirm that the city supplied compaction tests will be ongoing as the base and fill material are placed. Response: Yes, at the discretion of the City. Question 6. At what lift depth of backfill are compaction tests to be performed? Response: Per Section 4000.7.0 - Unclassified fill material shall be placed in lifts of 8” max thickness. 2 of 4 Question 7. Please confirm that the City will perform compaction testing and that the contractor is not required to provide this service. Response: Correct, City will perform compaction testing Question 8. Please provide specification for backfill material. Response: The unclassified material will be accepted per section 300-4 Unclassified Fill. The following accepted materials include but are not limited to: sand and/or native local material. Material must be able to be compacted per the specifications. Clay, Silt, or organic materials will not be accepted. Question 9. Does the City have a source of backfill material or is this to be provided by the contractor? Response: Will need to be provided by Contractor. Question 10. Please provide further direction as to the electrical abandonment; will pulling the pool equipment breaker be sufficient or will the contractor be required to disconnect and pull electrical wiring feeding the pool area? If so please provide a markup map showing the location of the service panel for bidding purposes. Response: Electrical wires will need to be capped at the pool area limits. Breaker will need to be removed from the panel. Question 11. Please confirm there is a viable gate valve servicing the pool area water line so that the water line can be capped without incident. If no viable gate valve please provide direction as to terminating water service to the pool area. Response: There is a gate valve to the Site. The Contractor will need to coordinate before shutting water off. Shut off to the Site cannot be for more than 2 hours. Question 12. Please provide direction as to where the pool electrical will be terminated as no breaker panel or meter panel could be located on site. Response: Electrical wires will need to be capped at the pool area limits. Breaker will need to be removed from the panel. Question 13. Unclassified Excavation 6 section 300-2.1 calls for saw cutting and removing the asphalt concrete to complete the roadway section. Please provide further definition of this scope and specification for the roadway replacement if required for any reason. Response: It is assumed that the AC can be protected in place unless Contractor needs to remove AC to perform work. Question 14. There is an existing light pole within the pool confines. Is this light fixture to be removed or protected in place? Response: Protect light fixture in place. 3 of 4 Question 15. Bid item 8 calls for replacing fence at a final pay item of 50 LF. Much less fence will be required to access the site. Please confirm amount of fence required to be replaced. Response: City will pay the 50LF of fence regardless of actual amount per final pay item definition. Question 16. The existing wall will need to be removed to gain access. Is there any specific detail to its termination such as sack and patch or will a saw cut termination be satisfactory? Response: Sawcut will be sufficient. Question 17. Please provide a painting specification for the new fence. Response: Metal Fence shall be in accordance with City Standard Plan 784.1 and 784.2 modified to match the style of the Existing Site metal fence. Paint shall be paid as part of the bid item for Metal Fence. Question 18. Please provide a detail for the fabrication of the new gate including hinge and locking hardware specification. Response: Contractor shall match to the furthest extent possible the existing gate hinge and locking hardware. Question 19. How are we to contain the 3" of DG at the new fence and gate? Will a mow curb be required and if so please provide specification as to its size and reinforcement. Response: There is a wall around the majority of the site that will contain the DG. Where there is metal fence the AC will contain the DG. The contractor will be required to excavate for the required depth per the City Standard Plan 707. Question 20. Removal of the fence/wall will require slot patch repair of the asphalt parking lot. Please provide a detail including depth of AC and any required base material for the asphalt replacement. Response: This is per the specification section Unclassified Excavation 6 section 300-2.1. Full Depth AC will be accepted to be placed back. The assumed depth is 8". 3/4" Aggregate PG 70-10 is required for the AC. Question 21. Specifications call for breaking of pool deck and bond beam but allow the material to be placed in pool as backfill. Specs call for this material to be 3" or smaller which will not be feasible. Will the owner allow this spec to be changed to 6" to be a more practical size to increase production and decrease costs? Response: No, must be 3" diameter or smaller. 4 of 4 Question 22. Pool stairs extend deeper than 18" below grade. Please confirm that they only need to be removed the 18" depth. Response: Pool Stairs are required to be completely removed. Question 23. Bid item 8 calls for a final pay quantity although technical specifications section 9 Metal Fencing calls this as a field measured linear foot pay item. Please confirm if this item is fixed and or field measured and paid at the stated unit cost. Response: This item is Final Pay. The Contractor is hereby notified; Addendum No. 1 must be acknowledged and initialed as stipulated under the instructions to Bidders and submitted as part of the Bid. Failure to do so shall result in the City designating said bid as "Non-Responsive." APPROVED: Ubaldo Ayón, Assistant Construction Manager Attachments: 1. City Standard Plans 784.1 and 784.2 END OF ADDENDUM NUMBER 1 SCALE N.T.S. REVISIONS NO. DATE DESIGN AND DEVELOPMENT DEPARTMENT STANDARD PLAN NO. SHEET 1 OF 1 APPROVED BY: CITY OF LA QUINTA DATEBRYAN McKINNEY PUBLIC WORKS DIRECTOR/CITY ENGINEER R.C.E. NO. 49418 784.1 5' 3" 2' - 6 " 1' INSTALL MOUNTING BRACKET CONNECT FENCE PANEL TO POST BY WELD, TYPICAL 1 1/2"x1 1/2" SQ. TUBULAR STEEL POST @ 10' O.C. 1/2" SQ. PICKETS @ 4" O.C. 1x1 1/2" SQ. TUBULAR STEEL FRAME SHEET FLOW AWAY FROM POST NOTES: 1. ALL TUBULAR STEEL TO BE 12 GAUGE 2. 1 COAT PRIMER W/ 2 COATS FINISH PAINT 3. ALL CONNECTIONS TO BE WELD 4. TOP OF FOOTING TO BE CLEAR OF ALL SURFACE MATERIAL, UNLESS OTHERWISE NOTED. 95% COMPACTED SUBGRADE CONCRETE FOOTING 10' O.C. STEEL FENCE DETAIL 1" WELDED CAP ON ALL POSTS 11-4-2020 SCALE N.T.S. REVISIONS NO. DATE DESIGN AND DEVELOPMENT DEPARTMENT STANDARD PLAN NO. SHEET 1 OF 1 APPROVED BY: CITY OF LA QUINTA DATEBRYAN McKINNEY PUBLIC WORKS DIRECTOR/CITY ENGINEER R.C.E. NO. 49418 784.2METAL CONSTRUCTION NOTES METAL CONSTRUCTION NOTES 1. ALL MATERIALS AND WORKMANSHIP SHALL CONFORM TO ALL APPLICABLE GOVERNING CODES AND ORDINANCES. 2. ALLOW FOR ADJOINING CONSTRUCTION TRADES. 3. ALL CONSTRUCTION TO BE PLUMB AND TRUE UNLESS OTHERWISE NOTED ON PLANS. 4. ALL BOLTS TO BE NON RUSTING. 5. CAP ALL EXPOSED ENDS OF TUBING. 6. WELD ALL CONNECTIONS CONTINUOUS AND SOLID ON ALL SIDES. 7. REMOVE ALL SPLATTER AND SLAG AND GRIND ALL WELDS SMOOTH. 8. GIVE ALL SURFACES AN ACID BATH PRIOR TO PAINTING. 9. FINISH ALL SURFACES WITH ONE (1) COAT ZINC OXIDE PRIMER AND TWO (2) COAT OF A RUST INHIBITING ENAMEL. COLOR PER BUILDER/DEVELOPER UNLESS OTHERWISE INDICATED BY NOTES OR DETAILS FOR THESE PLANS. 10. WHEN SLOPING FENCES OR RAILS - RUN ALL RAILS PARALLEL WITH THE ADJACENT SURFACE OR GRADE AND HOLD ALL POSTS AND PICKETS PLUMB AND TRUE. STEEL FENCE SHAPES TO CONFORM TO A.S.T.M. A500 OR A501. 11-4-2020