HomeMy WebLinkAboutBRES2023-0246BUILDING PERMIT
DESIGN & DEVELOPMENT
DEPARTMENT
78-495 CALLE TAMPICO
LA QUINTA, CALIFORNIA 92253
Permit Type: Building Residential
Permit Number: BRES2023-0246
Property Address: 48219 CALLE FLORISTAS ST
APN: 646092010
Legal Description
Property Zoning:
Valuation: $30,000.00
PHONE (760) 777-7125
WWW.LAQUINTACA.GOV
APPLIED DATE: 08/10/2023
ISSUED DATE: 11/06/2023
CALIFORNIA
Owner: Danny Elmore
48219 Calle Florista, La Quinta, CA 92253
Applicant: Danny Elmore
48219 Calle Florista, La Quinta, CA 92253
Contractor: PFANNKUCHE CARPENTRY / 1077765
52523 AVENIDA RAMIREZ, LA QUINTA, CA 92253
PRIOR TO THE ISSUANCE OF THIS PERMIT FOR CONSTRUCTION, ALTERATION, IMPROVEMENT, DEMOLITION, OR REPAIR THE OWNER, APPLICANT AND/OR
CONTRACTOR UNDER PENALTY OF PERJURY HAVE AFFIRMED WHEN APPLICABLE, THROUGH THE SUBMITTAL OF FORMS OR BY OTHER ELECTRONIC MEANS, THE
FOLLOWING:
LICENSED CONTRACTOR OR OWNER -BUILDER DECLARATION (1 or 2)
1) They are licensed under provisions of Chapter 9 (commencing with
Section 7000) of Division 3 of the Business and Professions Code, and the
referenced
License is in full force and effect, or;
2) That they are exempt from the Contractors' State License Law for the
reason(s) indicated by either (2)(a) and/or (2)(b), or (2)(c) where he or
she is exempt from licensure by a valid exemption. [Section 7031.5,
Business and Professions Code: Any city or county that requires a permit
to construct, alter, improve, demolish, or repair any structure, prior to its
issuance, also requires the applicant for the permit to file a signed
statement that he or she is licensed pursuant to the provisions of the
Contractors' State License Law (Chapter (commencing with Section 7000)
of Division 3 of the Business and Professions
Code] Any violation of Section 7031.5 by any applicant for a permit
subjects the
applicant to a civil penalty of not more than five hundred dollars ($500).)
a) As owner of the property, or my employees with wages as their sole
compensation, will do all of or portions of the work, and the structure is
not intended or offered for sale (Section 7044, Business and Professions
Code: The Contractors' State License Law does not apply to an owner of
property who, through employees' or personal effort, builds or improves
the property, provided that the improvements are not intended or offered
for sale. If, however, the building or improvement is sold within one year of
completion, the Owner -Builder will have the burden of proving that it was
not built or improved for the purpose of sale.).
b) As owner of the property, will be exclusively contracting with licensed
c) Are exempt from licensure under the Contractors' State License Law.
As an Owner -Builder, they acknowledge that, except for their personal
residence in which they must have resided in for at least one year prior to
completion of the improvements covered by this permit, they cannot legally
sell a structure built as an owner -builder if it has not been constructed in
its entirety by licensed contractors. It is understood that a copy of the
applicable law, Section 7044 of the Business and Professions Code, is
available upon request when this application was submitted at the
following Web site:
http://www.leginfo.ca.gov/calaw.html.
DECLARATION REGARDING CONSTRUCTION LENDING AGENCY (If
applicable)
A construction lender will be used for completion of the improvements
covered by this permit and the name and information of which is on file for
public inspection during the regular business hours of the public entity.
Failure of the applicant to indicate the construction lender on the
application does not relieve that person of the requirement to give the
construction lender preliminary notice from that duty.
WORKERS' COMPENSATION DECLARATION (1, 2 or 3)
WARNING: FAILURE TO SECURE WORKERS' COMPENSATION COVERAGE IS
UNLAWFUL, AND SHALL SUBJECT AN EMPLOYER TO CRIMINAL PENALTIES AND
CIVIL FINES UP TO ONE HUNDRED THOUSAND DOLLARS ($100,000), IN ADDITION
TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN SECTION
3706 OF THE LABOR CODE, INTEREST, AND ATTORNEY'S FEES.
1) Has and will maintain a certificate of consent to self -insure for workers'
compensation, issued by the Director of Industrial Relations as provided for
by Section 3700 of the Labor Code, for the performance of the work for
which this permit is issued.
2) Has and will maintain workers' compensation insurance, as required by
Section 3700 of the Labor Code, for the performance of the work for which
this permit is issued.
3) Certifies that, in the performance of the work for which this permit is
issued, shall not employ any person in any manner so as to become subject
to the workers' compensation laws of California, and agree that, if should
become subject to the workers' compensation provisions of Section 3700 of
the Labor Code, shall forthwith comply with those provisions.
NOTICE TO APPLICANT (1, 2 and 3)
1) Each person upon whose behalf this application was made, each person
at whose request and for whose benefit work is being performed under or
pursuant to any permit issued as a result of this application, the owner, and
the applicant, each agrees to, and shall defend, indemnify and hold harmless
the City of La Quinta, its officers, agents, and employees for any act or
omission related to the work being performed under or following issuance of
this permit.
2) Any permit issued as a result of this application becomes null and void if
work is not commenced within 360 days from date of issuance of such
permit, or if cessation of work for 180 days will subject permit to
cancellation. On or after January 1, 2019, every permit issued shall become
invalid unless the work on the site authorized by such permit is commenced
within 12 months after its issuance, or if the work authorized on the site by
such permit is suspended or abandoned for a period of 12 months after the
time the work is commenced.
3) Certified that they read the application and state that the information
provided is correct. Agree to comply with all city and county ordinances and
state laws relating to building construction, and hereby authorize
representatives of this city to enter upon the above -mentioned property for
inspection purposes.
IMPORTANT: An Application for Permit was made to the Building Official,
subject to the conditions and restrictions set forth at the time of application,
which is now hereby an Issued Permit. If any part of the information being
supplied on this permit is inaccurate or untrue, please contact the City of La
Quinta at (760) 777-7125 immediately for correction.
Printed: 2/2/26 5:17 pm Page 1 of 4
BUILDING PERMIT
Permit Type: Building Residential
Permit Number: BRES2023-0246
Property Address: 48219 CALLE FLORISTAS ST
250SF KITCHEN REMODEL IN EXISTING SINGLE-FAMILY DWELLING [PCS ENGINEERING] THIS PERMIT DOES NOT INCLUDE PV
SYSTEM, POOL, SPA, BLOCK WALLS, DRIVEWAY APPROACH OR SIMILAR EXTERIOR STRUCTURES. 2022 CALIFORNIA BUILDING
CODES.
�nstructinn Deta
Residential Work Type Remodel Conditioned Square 0 Grading Required? N/A
Footage
Remodel Area Square 250 Number of Flag or 0 New Electrical Square 0
Footage Light Pole(s)? Footage
Number of 23 Number of Exhaust 1 Number of Gas 1
Receptacle/Switch/Lig Hood(s) Outlet(s)
ht(s)
Type Group Sq Ft Value
Invoice No. Fee
INV-00002068 Hourly Charge - City Building Staff
Remodel PC (<=100)
SMI - Residential
Remodel PC >100
Hourly Charge - Interwest Structural Plan Review
Zoning Clearance - Alt/Add - Residential
RECORDS MANAGEMENT FEE - MAJOR
Gas Piping System Outlets
Technology Enhancement Fee
Receptacle, switch, lighting, or other outlets
Building Standards Administration
Remodel>100
Remodel<=100
Gas Piping System Outlets PC
Receptacle, switch, lighting, or other outlets PC
Fee Amount
$78.75
$162.81
$3.90
$21.01
$187.50
$88.00
$22.00
$14.59
$8.00
$29.18
$1.20
$26.26
$59.52
$29.18
$29.18
Total for Invoice INV-00002068 $761.08
Amount Paid
$78.75
$162.81
$3.90
$21.01
$187.50
$88.00
$22.00
$14.59
$8.00
$29.18
$1.20
$26.26
$59.52
$29.18
$29.18
$761.08
Grand Total for Permit $761.08 $761.08
Workflow Step / Action Name Action Type Start Date End Date
Application Completeness Check v.1 08/24/2023 11:17 08/24/2023 11:17
----------------------------------------------------------------------------------------------------------------------------------------
Submittal Document Verification v.1 Generic Action 08/24/2023 11:17
Plan Check v.1
08/24/2023
0:00
----------------------------------------------------------------------------------------------------------------------------------------
Building Major Review v.1
Receive Submittal
08/24/2023
0:00
09/18/2023 13:37
----------------------------------------------------------------------------------------------------------------------------------------
Building Major Review v.2
Receive Submittal
09/18/2023
0:00
10/11/2023 11:19
---------------------------------------------------
Building Major Review v.3
-------------------------------------------------------------------------------------
Receive Submittal
10/13/2023
0:00
10/30/2023 11:53
----------------------------------------------------------------------------------------------------------------------------------------
Building Major Review v.4
Receive Submittal
10/31/2023
0:00
11/02/2023 5:39
Printed: 2/2/26 5:17 pm Page 2 of 4
BUILDING PERMIT
Permit Type: Building Residential
Permit Number: BRES2023-0246
Property Address: 48219 CALLE FLORISTAS ST
Permit Issuance v.1
11/02/2023 5:51 11/06/2023 10:58
---------------------------------------------------------------------------------------------------------------------------------------
Contractor / Owner -Builder Information v.1
Generic Action
11/02/2023 5:52
---------------------------------------------------------------------------------------------------------------------------
Verify & Invoice Fees v.1
Generic Action
-----------
11/02/2023 5:52
------------------------------------------------------------------------
Ready to Issue v.1
------------------------------------------
Generic Action
-------------------- -
11/02/2023 5:52
---------------------------------------------------------
Verify Fee Payment & Issue Permit v.1
------------------------------------
Generic Action
----------------------------------------- -
11/06/2023 10:57
---------------------------------------------------------
Print, Attach, and Email Building Permit v.1
------------------------------------
Create Report
----------------------------------------- -
11/06/2023 10:58 11/06/2023 10:58
Inspections - Do Not Pour Concrete Until Approved v.1
----------------------------------------------------------------------------------------------------------------------------------------
Setbacks v.1
Inspection
----------------------------------------------------------------------------------------------------------------------------------------
Underground Plumbing v.1
Inspection
----------------- -- -- -- -
Water Line v.1
Inspection
------------------------------------------------------------------------
Footing v.1
-- -- -- -- -- -- --------------------------------------------
Inspection
---------------------------------------------------------------------------------------------------------------------------------------
Slab v.1
Inspection
Inspections - Cover No Work Until Approved v.1
11/10/2023
0:00
---------------------------------------------------------------------------------------------------------------------------------------
Roof Nail v.1
Inspection
---------------------------------------------------------------------------------------------------------------------------------------
Okay to Wrap v.1
Inspection
---------------------------------------------------------------------------------------------------------------------------------------
Framing v.1
Inspection
11/10/2023
0:00
11/14/2023 15:26
---------------------------------------------------------------------------------------------------------------------------------------
Rough Electrical v.1
Inspection
11/10/2023
0:00
11/14/2023 15:26
---------------------------------------------------------------------------------------------------------------------------------------
Rough Mechanical v.1
Inspection
---------------------------------------------------------------------------------------------------------------------------------------
Rough Plumbing v.1
Inspection
11/10/2023
0:00
11/14/2023 15:27
---------------------------------------------------------------------------------------------------------------------------------------
Rough Fire Clearance v.1
Generic Action
---------------------------------------------------------------------------------------------------------------------------------------
Shower Pan v.1
Inspection
---------------------------------------------------------------------------------------------------------------------------------------
Insulation v.1
Inspection
11/15/2023
0:00
11/16/2023 13:51
---------------------------------------------------------------------------------------------------------------------------------------
Drywall Nail v.1
Inspection
11/17/2023
0:00
11/21/2023 10:06
---------------------------------------------------------------------------------------------------------------------------------------
Exterior Lath v.1
Inspection
---------------------------------------------------------------------------------------------------------------------------------------
Gas Test v.1
Inspection
---------------------------------------------------------------------------------------------------------------------------------------
Sewer Connection v.1
Inspection
Inspections - Masonry v.1
Inspections - Electrical for Meter Release v.1
-------------------------------------------- -- -- -- --
Temporary Power v.1
-- -- -- -- -- -- -- -- -- -- -----------------------------------------------
Inspection
----------------------------------------------------------------------------------------------------------------------------------------
Temp Use of Permanent Power v.1
Inspection
Inspections - Final v.1
02/14/2024
0:00
----------------------------------------------------------------------------------------------------------------------------------------
Final Fire v.1
Inspection
----------------------------------------------------------------------------------------------------------------------------------------
Final Building v.1
Inspection
02/14/2024
0:00
02/15/2024 12:27
Certificate of Occupancy v.1
-- -- -- -- --------------------------------------------------
------------------------------------------------------------------------
Certificate of Occupancy v.1
Create Report
Printed: 2/2/26 5:17 pm Page 3 of 4
BUILDING PERMIT
Permit Type: Building Residential
Permit Number: BRES2023-0246
Property Address: 48219 CALLE FLORISTAS ST
Construction or work for which a permit is required shall be subject to inspection by the building official and such construction or work
shall remain visible and able to be accessed for inspection purposes until approved. Approval as a result of an inspection shall not be
construed to be an approval of a violation of the provisions of the applicable code and other ordinances of the jurisdiction. Inspections
presuming to give authority to violate or cancel the provisions of the applicable code and other ordinances of the jurisdiction shall not be
valid. It shall be the duty of the owner or the owner's authorized agent to cause the work to remain visible and able to be accessed for
inspection purposes. Neither the building official nor the jurisdiction shall be liable for expense entailed in the removal or replacement of
any material required to allow inspection.
It shall be the duty of the holder of the building permit or their duly authorized agent to notify the building official when work is ready for
inspection. It shall be the duty of the permit holder to provide access to and means for inspections of such work that are required by this
code.
A building or structure shall not be used or occupied in whole or in part, and a change of occupancy of a building or structure or portion
thereof shall not be made, until the building official has issued a certificate of occupancy therefor as provided herein. Issuance of a
certificate of occupancy shall not be construed as an approval of a violation of the provisions of the applicable code and other ordinances
of the jurisdiction. Certificates presuming to give authority to violate or cancel the provisions of this code or other ordinances of the
jurisdiction shall not be valid.
A person shall not make connections from a utility, a source of energy, fuel, or power, or a water system or sewer system to any building
or system that is regulated by the applicable code and other ordinances of the jurisdiction for which a permit is required, until approved by
the buildinq official.
Printed: 2/2/26 5:17 pm Page 4 of 4
1w
INTERWEST
A swMbwr CORWO"
Bill to:
City of La Quinta
Ann Castro, Danny
Design and Development
Director
78-495 Calle Tampico
La Quinta, CA 92253
Remit to:
Interwest Consulting Group
P.O. Box 301069
Los Angeles, CA 90030-1069
Invoice #141850
October 10, 2023
Direct questions to
Erica Cuevas
ecuevas@interwestgrp.com
Professional services for the period October 1, 2023 through October 10, 2023
Residential - Addition - BRES2023-0246 - 48219 Calle Forest -
LAQ23-0127
Invoice Total (Please pay this amount) $373.75
Ref No. Project $ Amount
LAQ23-0127 Residential - Addition - BRES2023-0246 - 48219 Calle Forest - LAQ23-0127 $373.75
Employee
Karla Luther
Karla Luther
Title
ICC Certified Plans Examiner
Hours Rate
3.251 $115.00
Labor 3.25
Total
$373.75
$373.75
LAQ23-0127 Residential - Addition - BRES2023-0246 - 48219 Calle Forest - LAQ23-0127
Day Description Hours
10/10/2023 LAQ23-0127 3.25
Total 3.25
1 of 1
DESIGN & DEVELOPMENT DEPARTMENT
78-495 CALLE TAMPICO
LA QUINTA, CALIFORNIA 92253
(760) 777-7125 FAX (760) 777-7011
RESIDENTIAL PLAN CHECK CORRECTION LIST (os)
DATE: AUGUST 24, 2023
STATUS: FIRST REVIEW
PLAN CHECKED BY: DEISY MENDEZ/INTERWEST
TELEPHONE NUMBER: (760) 777-7002
ADDRESS: 48219 CALLE FLORISTAS ST
DESCRIPTION: KITCHEN REMODEL
APPLICANT: Danny Elmore
PLAN CHECK #: BRES2023-0246
This submittal has been checked for compliance with the 2022 California Residential, Mechanical, Electrical, Plumbing,
Energy, and Green Building Codes, and the City of La Quinta Municipal Code.
APPLICANT:
The following items are being returned to you for
correction:
1ST REVIEW PLAN SET
1ST REVIEW CORRECTION LIST
BUILDING DEPARTMENT STAFF:
DO NOT accept any resubmittal unless ALL of the
following items are included:
-RESPONSE LIST TO CORRECTION LISTS
-REVISED PLAN SET
-REVISED DOCUMENTS (AS NECESSARY)
-TRUSS CALCULATIONS
- CONTRACTOR INFORMATION
- DEBRIS MANAGEMENT PLAN (BURRTEC)
INSTRUCTIONS TO APPLICANT:
1) Provide a response to each comment on the following pages, noting specifically where the correction can be found.
Responses such as, "Sheet A-3," or, "Handrails shall be per CBC Section 1003," are not acceptable. Show or note
specifically how compliance with a code requirement is achieved. Responses such as, "Added note 16 on sheet A-3" are
appropriate and will help expedite your back check.
2) Corrections may not be made by handwriting on existing drawings. Revise original Plans and/or Calculations as
necessary.
3) Each sheet of resubmitted Plans and/or Calculations shall include the preparer's name and telephone number and shall
be electronically signed by the preparer. If the preparer is a licensed architect or engineer, all documents prepared by
that licensed individual shall also bear his/her stamp as prescribed by California Business and Professions Code Section
5536. Resubmittals will not be accepted with signatures missing.
Residential Plan Check Correction List Page 1 of 2
SECTION A - GENERAL
1) The City of La Quinta has elected to use Interwest Consulting for plan review of your project. In addition to the
comments provided by the City of La Quinta within this correction list please see the attached outside consultant
review comments. See Complete Review Comments Attached, for resubmittal please include a separate response
sheet for each set of review comments.
2) Provide on each sheet of resubmitted Plans and cover sheet of bound Calculations the preparer's name and telephone
number and electronic signature. If the preparer is a licensed architect or engineer, all documents prepared by that
licensed individual shall also bear his/her stamp as prescribed by California Business and Professions Code §5536.
Resubmittals will not be accepted with signatures missing.
3) Provide Planning Division approval for this Project. Please contact the Planning Division directly at (760) 777-7195
4) with questions regarding the following comment(s):
a) PENDING REVIEW —REACH OUT TO PLANNING FOR STATUS OR CHECK THE HUB ONLINE
5) Provide Riverside County Office of the Fire Marshall approval of this project. Contact Kohl Hetrick directly at (760) 777-
7074 with questions regarding the following comment(s):
a) PENDING REVIEW —REACH OUT TO FIRE FOR STATUS OR CHECK THE HUB ONLINE
2) Provide written evidence from Burrtec Waste, approving a waste management plan that diverts not less than 65% of
the construction materials from landfill for the project. Contact the District Environmental Coordinator directly at (760)
674-1026 for free assistance with the preparation of this plan.
SECTION B — MISCELLANEOUS COMMENTS
1) Red marks on Plans, even if not specifically mentioned in this list, indicate items needing correction. Revise Plans as
necessary and provide written response, noting where correction can be found.
2) Provide contractor information to complete building permit application form.
3) Provide proof of payment of school fees. While not required for resubmittal, this administrative item must be
addressed prior to issuance of building permit.
4) Inadequate information has been provided at this submittal to calculate fees for this project. Fee calculation will be
performed when Plans are complete.
END CITY REVIEW CORRECTION LIST - CORRECTION LIST CONTINUED BY INTERWEST CONSULTING GROUP ATTACHED
As further information is provided and reviewed, additional corrections may be required.
Residential Plan Check Correction List Page 2 of 2
August 22, 2023
CITY OF LA QUINTA - FIRST REVIEW
Permit No: BRES2023-0246
Interwest No.: LAQ23-0127
Non-Structural:.75-hours
Structural:.75-hours
City of La Quinta
Building Department
78-495 Calle Tampico
La Quinta, CA 92253
Plan Review: Remodel of (E) Kitchen
Address: 48219 Calle Floritas Street
0
r"T
INTERWEST
A SAFEbuiflt COMPANY
Interwest Consulting Group has completed a first code compliance review of the following documents on behalf of
the City of La Quinta:
1. Drawings: Digital copy of following:
a. Cover dated 08/10/2023 by Danny W. Elmore.
b. 1 through 6 dated 08/10/2023 by Danny W. Elmore.
C. Prescriptive compliance dated 08/07/2023 by Danny W. Elmore.
2. Structural Calculations: Digital copy dated 06/20/2023 by PCS Structural Solutions.
3. Energy Compliance Documentation: Attached to set dated 08/07/2023 by Danny W. Elmore.
4. Miscellaneous Documents: Digital copy of the following:
a. HOAApproval.
The applicable provisions of the 2022 California Building Standards Code were used as the basis of this review.
Plan review comments follow on the attached list.
Please submit an itemized response letter and complete and revised documents with directly to city of La Quinta
Building and Safety Department.
Sincerely,
INTERWEST CONSULTING GROUP
Karla Luther, CPE
Plans Examiner
cc: name, email@email.com
1500 S. Haven Ave I Suite 220
Ontario, CA 91761
909.295-3142 INTERWESTORP.COM
Remodel of Existing Kitchen
48219 Calle Floritas Street[Address]
8122123
PROJECT DATA:
City of La Quints - First Review
Interwest Project No. LAQ23-0127
Permit App: BRES2023-0246
Page 2 of 5
Occupancy Group:
Area (sq. ft.):
R3
TBD (Remodel)
Total Area:
TBD
Building Height:
TBD
Building Stories:
1
Type of Construction:
VB
Occupant Load:
<10
Sprinklered:
TBD
Valuation:
Unknown
Risk Category:
II
Site Class (seismic):
D-default
Seismic Design Category:
D
Special Wind Region:
Y
Snow Loads:
Y
GENERAL COMMENTS:
G1. The following plan review documents are based on the City of La Quinta Building Regulations. The following
comments reference the 2022 California Building Standards Code as amended by the authority having
jurisdiction unless otherwise noted.
G2. Please respond in writing to each plan review comment by marking this comment list or creating a response
letter. Indicate which detail, specification, or calculation shows the requested information. At minimum, the
following should be included with each plan review response:
• Page / sheet number(s), detail / specification number(s), etc., and include all applicable code
section(s).
Briefly explain in writing how the design is intended to comply with the applicable code sections.
Please provide a narrative of revisions made outside the plan review comments.
Complete and clear responses will expedite the re -check of this project.
G3. Please be sure to include on the re -submittal the architect's and /or engineer's stamp, signature, date of
signature, and registration number on all sheets of plans depicting structural designed elements and cover
sheets of calculations. CBPC 5536.1 and 6735.
INTERWEST
Remodel of Existing Kitchen
48219 Calle Floritas Street[Address]
8122123
PLAN REVIEW COMMENTS:
BUILDING AND LIFE SAFETY:
Al. Drawing Cover
City of La Quints - First Review
Interwest Project No. LAQ23-0127
Permit App: BRES2023-0246
Page 3 of 5
A. Provide a code analysis on the cover sheet of the plans stating: type of construction, occupancy,
number of stories, existing living and garage floor areas, floor areas of all additions, and whether
fire sprinklers are installed or not. (11106.1.1 CRC)
B. Please include in the plan the square footage of the proposed kitchen remodel.
C. Applications for which no permit is issued within 180 days following the date of application shall
automatically expire. Note on plans. (11105.3.2 CRC)
D. Every permit issued shall become invalid unless work authorized commences within 180 days
after its issuance or if the work authorized is suspended or abandoned for a period of 180 days.
A successful inspection must be obtained within 180 days. Note on plans. (11105.5 CRC)
The plans shall be drawn to scale. Please include the scale on each plan sheet.
A2. Drawing 2
A. Please provide a dimensioned site plan to verify the distance of the replaced opening from the
property line.
B. Provide full height cross -sections showing framing, plate height, overall height of the structure,
insulation location and R-value, foundation, finish grade, etc. Provide both lateral and
longitudinal sections.
C. Please identify in the note the location of detail 1 and label detail in the plan. (i.e., 1/2)
A3. Drawing 3
A. Please provide a dimensioned floor plan. Additional comments may apply.
B. Please provide a wall legend that shall include material, size and spacing. Including the exterior
wall in which the window is being replaced.
C. Please note on the cover sheet special inspection is required and indicate for which item special
inspection is needed.
D. Please identify in the note the location of detail 2. (i.e., 2/4)
INTERWEST
Remodel of Existing Kitchen
48219 Calle Floritas Street[Address]
8122123
A4. Drawing 5
A. Please identify in the plan the use of this drawing.
ENERGY COMPLIANCE:
Electrical Compliance:
EE1. Drawing 5
City of La Quints - First Review
Interwest Project No. LAQ23-0127
Permit App: BRES2023-0246
Page 4 of 5
A. All installed luminaires shall be high efficacy. Note on plans. (150(k)1A & Table 150.0-A CEnC)
Mechanical Compliance:
EM1. Drawing 5
A. The capacity of the kitchen hood exhaust shall comply with 150.0(o)1G iii b of the CEnC. The hood
shall meet or exceed either the minimum airflow in accordance with Table 150.0-E of the minimum
capture efficiency in accordance with the Table 150.0-E, and Table 150.0-G. Capture efficiency ratings
shall be determined in accordance with ASTM E3087 and listed in a product directory approved by
the Energy Commission. Please demonstrate the chosen method of compliance in the plan and
include the CFM of the fan. The CFM of the kitchen hood is based upon the specification of the above
noted table. Per the 2022 CEnC, it is no longer the standard 100 CFM. See Tables 150.0-E, and 150.0-
G for compliance options.
Envelope Compliance:
EC1
A. Please include in the plan the current 2022 Low Rise Residential Mandatory Measures Summary.
B. The prescriptive CF-1R form is out of date. Please provide a 2022 form.
(https://www.energy.ca.gov/filebrowser/download/4687)
C. Please include the climate zone and project type of the site in the Compliance document.
CaIGREEN:
CG1.
A. Include compliance with 2022 California Green Code. Print and incorporate into the plan set the
required mandatory measures forms.(https:Haiacalifornia.org/calgreen-checklists/)
STRUCTURAL:
INTERWEST
Remodel of Existing Kitchen City of La Quints - First Review
48219 Calle Floritas Street[Address] Interwest Project No. LAQ23-0127
8122123 Permit App: BRES2023-0246
Page 5 of 5
S1.
A. Please include in the plan the fastening schedule Table R602.3(1) CRC. (Table 2304.10.1 CBC)
B. Please call out in the plan the required shear wall type and make-up, per the structural calculations.
C. Please provide details of the shear transfer connections which transfer lateral forces from
horizontal diaphragms through intermediate elements and shear walls to the foundation. (2305.1
CBC, R301.1 CRC)
D. Please include in the plan a shear wall schedule.
E. To verify the proposed 2x8 ceiling joist at 16" o.c., please provide a dimensioned plan.
F. To verify the provided structural calculations for beams and supports, please provide a
dimensioned plan
G. Detail in the plan the attachment at the top and bottom of the new exterior wall supports.
H. The reference drawing provided in the structural calculations are useful but they are not legible.
Please provide a legible copy.
Please contact the listed reviewers between 9:00 A.M. and 4:00 P.M., M-F, with any questions.
[END]
INTERWEST
DESIGN & DEVELOPMENT DEPARTMENT
78-495 CALLE TAMPICO
LA QUINTA, CALIFORNIA 92253
(760) 777-7125 FAX (760) 777-7011
RESIDENTIAL PLAN CHECK CORRECTION LIST (os)
DATE: OCTOBER 11, 2023
STATUS: SECOND REVIEW
PLAN CHECKED BY: DEISY MENDEZ/INTERWEST
TELEPHONE NUMBER: (760) 777-7002
ADDRESS: 48219 CALLE FLORISTAS ST
DESCRIPTION: KITCHEN REMODEL
APPLICANT: Danny Elmore
PLAN CHECK #: BRES2023-0246
This submittal has been checked for compliance with the 2022 California Residential, Mechanical, Electrical, Plumbing,
Energy, and Green Building Codes, and the City of La Quinta Municipal Code.
APPLICANT:
The following items are being returned to you for
correction:
2ND REVIEW PLAN SET
2ND REVIEW CORRECTION LIST
BUILDING DEPARTMENT STAFF:
DO NOT accept any resubmittal unless ALL of the
following items are included:
-RESPONSE LIST TO CORRECTION LISTS
-REVISED PLAN SET
-REVISED DOCUMENTS (AS NECESSARY)
-TRUSS CALCULATIONS
- CONTRACTOR INFORMATION
- DEBRIS MANAGEMENT PLAN (BURRTEC)
INSTRUCTIONS TO APPLICANT:
1) Provide a response to each comment on the following pages, noting specifically where the correction can be found.
Responses such as, "Sheet A-3," or, "Handrails shall be per CBC Section 1003," are not acceptable. Show or note
specifically how compliance with a code requirement is achieved. Responses such as, "Added note 16 on sheet A-3" are
appropriate and will help expedite your back check.
2) Corrections may not be made by handwriting on existing drawings. Revise original Plans and/or Calculations as
necessary.
3) Each sheet of resubmitted Plans and/or Calculations shall include the preparer's name and telephone number and shall
be electronically signed by the preparer. If the preparer is a licensed architect or engineer, all documents prepared by
that licensed individual shall also bear his/her stamp as prescribed by California Business and Professions Code Section
5536. Resubmittals will not be accepted with signatures missing.
Residential Plan Check Correction List Page 1 of 2
SECTION A - GENERAL
1) The City of La Quinta has elected to use Interwest Consulting for plan review of your project. In addition to the
comments provided by the City of La Quinta within this correction list please see the attached outside consultant
review comments. See Complete Review Comments Attached, for resubmittal please include a separate response
sheet for each set of review comments.
2) Provide on each sheet of resubmitted Plans and cover sheet of bound Calculations the preparer's name and telephone
number and electronic signature. If the preparer is a licensed architect or engineer, all documents prepared by that
licensed individual shall also bear his/her stamp as prescribed by California Business and Professions Code §5536.
Resubmittals will not be accepted with signatures missing.
3) Provide written evidence from Burrtec Waste, approving a waste management plan that diverts not less than 65% of
the construction materials from landfill for the project. Contact the District Environmental Coordinator directly at (760)
674-1026 for free assistance with the preparation of this plan.
SECTION B — MISCELLANEOUS COMMENTS
1) Red marks on Plans, even if not specifically mentioned in this list, indicate items needing correction. Revise Plans as
necessary and provide written response, noting where correction can be found.
2) Provide contractor information to complete building permit application form.
3) Provide proof of payment of school fees. While not required for resubmittal, this administrative item must be
addressed prior to issuance of building permit.
4) Inadequate information has been provided at this submittal to calculate fees for this project. Fee calculation will be
performed when Plans are complete.
END CITY REVIEW CORRECTION LIST - CORRECTION LIST CONTINUED BY INTERWEST CONSULTING GROUP ATTACHED
As further information is provided and reviewed, additional corrections may be required.
Residential Plan Check Correction List Page 2 of 2
October 10, 2023
CITY OF LA QUINTA - SECOND REVIEW
Permit No: BRES2023-0246
Interwest No.: LAQ23-0127
Non -Structural: 2.75-hours
Structural:.5-hours
City of La Quinta
Building Department
78-495 Calle Tampico
La Quinta, CA 92253
Plan Review: Remodel of (E) Kitchen
Address: 48219 Calle Floritas Street
0
riv
INTERWEST
A SAFEbuilt COMPANY
Interwest Consulting Group has completed a second code compliance review of the following documents on behalf
of the City of La Quinta:
1. Drawings: Digital copy of following:
a. Cover dated 0911812023 by Danny W. Elmore.
b. 1, 2A, 2, 5 dated 09/18/2023 by Danny W. Elmore.
C. 3, 4, 6 dated 09/13/2023 by Danny W. Elmore.
d. 7through 10 dated None by None.
e. 11 dated 0910712023 by 8&W.
f. 12 through 26 dated 0910812023 by Joan Hacker.
g. 27 through 28 dated by None.
h. 29 through 31 dated None by None.
i. 32 through 36 dated None by None.
j. 37 dated None by None.
2. Structural Calculations: None this submittal.
3. Energy Compliance Documentation: Attached to set dated 0910812023 by Joan Hacker.
The applicable provisions of the 2022 California Building Standards Code were used as the basis of this review.
Plan review comments follow on the attached list.
Please submit an itemized response letter and complete and revised documents with directly to city of La Quinta
Building and Safety Department.
Sincerely,
INTERWEST CONSULTING GROUP
Karla Luther, CPE
Plans Examiner
1500 S. Haven Ave I Suite 220
Ontario, CA 91761
909.295-3142
INTERWESTGRP.COM
Remodel of Existing Kitchen
48219 Calle Floritas Street[Address]
10110123
cc: name, email@email.com
City of La Quints - Second Review
Interwest Project No. LAQ23-0127
Permit App: BRES2023-0246
Page 2 of 6
INTERWEST
Remodel of Existing Kitchen
48219 Calle Floritas Street[Address]
10110123
PROJECT DATA:
City of La Quints - Second Review
Interwest Project No. LAQ23-0127
Permit App: BRES2023-0246
Page 3 of 6
Occupancy Group:
Area (sq. ft.):
R3
250 (Remodel)
Total Area:
250
Building Height:
N/A
Building Stories:
1
Type of Construction:
VB
Occupant Load:
<10
Sprinklered:
N
Valuation:
Unknown
Risk Category:
II
Site Class (seismic):
D-default
Seismic Design Category:
D
Special Wind Region:
Y
Snow Loads:
Y
GENERAL COMMENTS:
G1. The following plan review documents are based on the City of La Quinta Building Regulations. The following
comments reference the 2022 California Building Standards Code as amended by the authority having
jurisdiction unless otherwise noted.
G2. Please respond in writing to each plan review comment by marking this comment list or creating a response
letter. Indicate which detail, specification, or calculation shows the requested information. At minimum, the
following should be included with each plan review response:
• Page / sheet number(s), detail / specification number(s), etc., and include all applicable code
section(s).
Briefly explain in writing how the design is intended to comply with the applicable code sections.
Please provide a narrative of revisions made outside the plan review comments.
Complete and clear responses will expedite the re -check of this project.
G3. Please be sure to include on the re -submittal the architect's and /or engineer's stamp, signature, date of
signature, and registration number on all sheets of plans depicting structural designed elements and cover
sheets of calculations. CBPC 5536.1 and 6735.
INTERWEST
Remodel of Existing Kitchen
48219 Calle Floritas Street[Address]
10110123
City of La Quints - Second Review
Interwest Project No. LAQ23-0127
Permit App: BRES2023-0246
Page 4 of 6
PLAN REVIEW COMMENTS:
The revised permit documents have been reviewed. The following comments are numbered per the original list and
require further response and/or revision. The format includes the original comment followed by a new or clarified
recheck comment in bold italic typeface, prefaced by PC2.
BUILDING AND LIFE SAFETY:
Al. Drawing Cover
No further comment. 10/10/2023 KL
A2. Drawing 2
No further comment. 10/10/2023 KL
A3. Drawing 3
A. Please provide a dimensioned floor plan. Additional comments may apply.
PC2. Partial comment remains. Please dimension the interior space. (i.e., distance from walls to island,
between the island and cabinets, length of island, etc.)
B. No further comment. 10/10/2023 KL
C. Please note on the cover sheet special inspection is required and indicate for which item special
inspection is needed.
PC2. Comment remains. Please add to the plan the note indicating for what special inspection is needed.
D. No further comment. 10/10/2023 KL
A4. Drawing 5
No further comment. 10/10/2023 KL
ENERGY COMPLIANCE:
Electrical Compliance:
EEL Drawing 5
No further comment. 10/10/2023 KL
INTERWEST
Remodel of Existing Kitchen
48219 Calle Floritas Street[Address]
10110123
Mechanical Compliance:
EM1. Drawing 5
City of La Quin to - Second Review
Interwest Project No. LAQ23-0127
Permit App: BRES2023-0246
Page 5 of 6
A. The capacity of the kitchen hood exhaust shall comply with 150.0(o)1G iii b of the CEnC. The hood
shall meet or exceed either the minimum airflow in accordance with Table 150.0-E of the minimum
capture efficiency in accordance with the Table 150.0-E, and Table 150.0-G. Capture efficiency ratings
shall be determined in accordance with ASTM E3087 and listed in a product directory approved by
the Energy Commission. Please demonstrate the chosen method of compliance in the plan and
include the CFM of the fan. The CFM of the kitchen hood is based upon the specification of the above
noted table. Per the 2022 CEnC, it is no longer the standard 100 CFM. See Tables 150.0-E, and 150.0-
G for compliance options.
PC2. Partial comment remains. Please clarify the proposed hood CFM. Per the above referenced Code, Table
150.0-G, the required CFM for a gas range, for the square footage of the SFD, is 70% CE or 180 CFM.
Envelope Compliance:
EC1
A. No further comment. 10/10/2023 KL
B. The prescriptive CF-1R form is out of date. Please provide a 2022 form.
(https://www.energy.ca.gov/filebrowser/download/4687)
PC2. Partial comment remains. (1) The square footage of the new window does not match the plan. Please
review and revise. (2) Per Energy compliance, please show in the plan the required overhang and fin of the
new window. (3) The roof slope shown in the Compliance appears not to corelate with the image of Google
Maps. Please review and revise. (4) Per the Compliance, show in the plan the U factor and SHGC of the new
glazing. (5) The 'Responsible Person's Declaration' area of the compliance document shall be completed
and signed by said individual. If the Author and Responsible party are the same, both areas of the document
shall be completed. (i.e., Designer) (6) The kitchen hood shall be included in the HERS Feature Summary.
C. No further comment. 10/10/2023 KL
CaIGRFFN-
CG1.
No further comment. 10/10/2023 KL
STRUCTURAL-
S1
INTERWEST
Remodel of Existing Kitchen
48219 Calle Floritas Street[Address]
10110123
City of La Quints - Second Review
Interwest Project No. LAQ23-0127
Permit App: BRES2023-0246
Page 6 of 6
A. No further comment. 10/10/2023 KL
B. No further comment. 10/10/2023 KL
C. No further comment. 10/10/2023 KL
D. No further comment. 10/10/2023 KL
E. No further comment. 10/10/2023 KL
F. No further comment. 10/10/2023 KL
G. Detail in the plan the attachment at the top and bottom of the new exterior wall supports.
PC2. Partial comment remains. The FOR shall stamp and sing detail #2 in the plan.
H. No further comment. 10/10/2023 KL (Thank you.)
Please contact the listed reviewers between 9:00 A.M. and 4:00 P.M., M-F, with any questions.
[END]
INTERWEST
DESIGN & DEVELOPMENT DEPARTMENT
78-495 CALLS TAMPICO
LA QUINTA, CALIFORNIA 92253
(760) 777-7125 FAX (760) 777-7011
RESIDENTIAL PLAN CHECK CORRECTION LIST
DATE: 10/30/2023
STATUS: THIRD REVIEW
PLAN CHECKED BY: DUANE CLAYTON
TELEPHONE NUMBER: 760-777-7084
ADDRESS: 48219 CALLE FLORISTA
DESCRIPTION: REMODEL
APPLICANT: DANNY ELMORE
PLAN CHECK #: BRES2023-0246
This submittal has been checked for compliance with the 2022 California Residential, Green Building and Energy Codes, and
the City of La Quinta Municipal Code.
APPLICANT:
The following items are being returned to you for
correction:
1-3 RD SUBMITTAL PLAN SET
THIS CORRECTION LIST
BUILDING DEPARTMENT STAFF:
DO NOT accept any resubmittal unless ALL of the
following items are included:
1— REVISED PLAN SET
THIS CORRECTION LIST WITH RESPONSES
INSTRUCTIONS TO APPLICANT:
1) Provide a written response to each comment on the following pages, noting specifically where the correction can be
found. Responses such as, "Sheet A-3," or, "Handrails shall be per CBC Section 1003," are not acceptable. Show or note
specifically how compliance with a code requirement is achieved. Responses such as, "Added note 16 on sheet A-3"
are appropriate and will help expedite your back check.
2) Corrections may not be made by handwriting on existing drawings. Revise originals and reprint Plans and/or
Calculations as necessary.
3) Return all red -marked Plans and/or Calculations with your resubmittal.
4) Each sheet of resubmitted Plans and/or Calculations shall include the preparer's name and telephone number and shall
be wet -signed by the preparer. If the preparer is a licensed architect or engineer, all documents prepared by that
licensed individual shall also bear his/her stamp as prescribed by California Business and Professions Code Section
5536. Resubmittals will not be accepted with signatures missing.
5) Return this list, your written responses, and all documents listed above with your resubmittal.
Residential Plan Check Correction List Page 1 of 2
SECTION A - GENERAL
1) No comments.
SECTION B — PRECISE / SITE PLAN / ZONING
1) No comments.
SECTION C - ARCHITECTURAL
1) No comments.
SECTION D - MECHANICAL
1) No comments.
SECTION E — ELECTRICAL
1) No comments.
SECTION F - PLUMBING
1) No comments.
SECTION G — ENERGY EFFICIENCY
1) Two separate energy reports have been included within the third submittal plan set. One is not registered (dated
10/12/2023), and the other is not signed by the preparer (dated 10/11/2023). Please include only one registered
energy report that is signed by the preparer with the next submittal. See previous plan review correction list from
I nterwest.
SECTION H - CALGREEN
1) No comments.
SECTION I - STRUCTURAL
1) No comments.
SECTION J — SOIL / FOUNDATION
1) No comments.
SECTION K - MISCELLANEOUS COMMENTS
1) No comments.
END CORRECTION LIST
As further information is provided and reviewed, additional corrections may be required.
Residential Plan Check Correction List Page 2 of 2
Jimenez 79-735 Oxford Dr.
Indio Ca. 92203
Special 760-250-0884
jsi _peoplepc.com
Inspections
DAILY REPORT OF INSPECTION
Building Permit No.: BRES2023-0246 Date of Inspection: 11-13-23
Project Name: Elmore Residence Job No.: 1588-23
Project Address: 48219 Calle Floristas La Quinta Ca
Architect: Structural Engineer: Bret a Maddox
General Contractor: Owner builder Sub Contractor:
TYPE OF INSPECTION: Concrete Masonry Steel Epoxy Others
Welder, Welding Operators & Certification Numbers:
Description of Work Inspected:
Epoxy 3. - 5/8 All thread rod for HDU4 new shred wall at kitchen / new window opening
Hole 3/4 X 9" as per RFI date 9-13-23
All holes were blown and brush clean
Epoxy Simpson XP exp 7-16-25
Epoxy Application as per manufacture Recommendation
Satisfactory
I hereby certify that I have inspected all of the above reported work, unless ortherwise noted, and to the best of my ability I have found this work
to comply with the approved plans, specifications & applicable building laws. Final report issued at project completion.
Inspector's Name Will Jimenez Inspector's Signature
Certification No. 5096154 ICC
All inspections based on a minimum of 4 hours:
over 4 hours will be 8 hours minimum Contractor's Representative
DocuSign Envelope ID: 21 E4258A-AC51-41 DE-BF97-8E12E74DF662
LAGUNA
r DE LA PAZ
June 7th, 2023
Danny Elmore
48219 Calle Floristas
La Quinta CA 92253
Re: Property Located at: 48219 Calle Floristas La Quinta, CA 92253
Architectural Approval for: Installation of New Window
Dear Danny,
Please consider this letter as written confirmation that the Architectural Committee has
approved your application for installation of new window.
The request has been approved as submitted. Please be aware that the homeowner is
responsible for any repair and painting that may be needed to stucco after the installation of
the new window. Our records show that your stucco 0182 Ivory Ridge by Vista Paint.
The Architectural Committee has a duty and responsibility to review all applications requesting
additions, alterations, improvements or modifications to the exterior of his/her residence. This
ensures that the architectural applications comply with the Architectural Application Guidelines
and Procedures and also the Association's Governing Documents. This maintains consistency,
conformity and harmony of the original design and the aesthetic beauty of the Laguna de la Paz
Community.
Should you have any questions regarding this or any Laguna de la Paz Homeowners Association
Rules or Regulations, please feel free to contact me at (760) 564-8864 or by email at
tina.bolden@manaementtrust.com.
On behalf of the Laguna de la Paz Homeowners Association Architectural Committee
Sincerely,
Tina Bolden
DocuSigned by:
Community Support Specialist Laguna de la Paz EE
�)
DD9A67F5F7E943A... 2023
Laguna de la Paz Homeowners Association • 48300 Vista de Nopal La Quetta CA 92253 • 760-564-8864 • Idlp-laqumta com
August 22, 2023
CITY OF LA QUINTA - FIRST REVIEW
Permit No: BRES2023-0246
Interwest No.: LAQ23-0127
Non-Structural:.75-hours
Structural:.75-hours
City of La Quinta
Building Department
78-495 Calle Tampico
La Quinta, CA 92253
Plan Review: Remodel of (E) Kitchen
Address: 48219 Calle Floritas Street
0
r"T
INTERWEST
A SAFEbuiflt COMPANY
Interwest Consulting Group has completed a first code compliance review of the following documents on behalf of
the City of La Quinta:
1. Drawings: Digital copy of following:
a. Cover dated 08/10/2023 by Danny W. Elmore.
b. 1 through 6 dated 08/10/2023 by Danny W. Elmore.
C. Prescriptive compliance dated 08/07/2023 by Danny W. Elmore.
2. Structural Calculations: Digital copy dated 06/20/2023 by PCS Structural Solutions.
3. Energy Compliance Documentation: Attached to set dated 08/07/2023 by Danny W. Elmore.
4. Miscellaneous Documents: Digital copy of the following:
a. HOAApproval.
The applicable provisions of the 2022 California Building Standards Code were used as the basis of this review.
Plan review comments follow on the attached list.
Please submit an itemized response letter and complete and revised documents with directly to city of La Quinta
Building and Safety Department.
Sincerely,
INTERWEST CONSULTING GROUP
Karla Luther, CPE
Plans Examiner
cc: name, email@email.com
1500 S. Haven Ave I Suite 220
Ontario, CA 91761
909.295-3142 INTERWESTORP.COM
Remodel of Existing Kitchen
48219 Calle Floritas Street[Address]
8122123
PROJECT DATA:
City of La Quints - First Review
Interwest Project No. LAQ23-0127
Permit App: BRES2023-0246
Page 2 of 5
Occupancy Group:
Area (sq. ft.):
R3
TBD (Remodel)
Total Area:
TBD
Building Height:
TBD
Building Stories:
1
Type of Construction:
VB
Occupant Load:
<10
Sprinklered:
TBD
Valuation:
Unknown
Risk Category:
II
Site Class (seismic):
D-default
Seismic Design Category:
D
Special Wind Region:
Y
Snow Loads:
Y
GENERAL COMMENTS:
G1. The following plan review documents are based on the City of La Quinta Building Regulations. The following
comments reference the 2022 California Building Standards Code as amended by the authority having
jurisdiction unless otherwise noted.
G2. Please respond in writing to each plan review comment by marking this comment list or creating a response
letter. Indicate which detail, specification, or calculation shows the requested information. At minimum, the
following should be included with each plan review response:
• Page / sheet number(s), detail / specification number(s), etc., and include all applicable code
section(s).
Briefly explain in writing how the design is intended to comply with the applicable code sections.
Please provide a narrative of revisions made outside the plan review comments.
Complete and clear responses will expedite the re -check of this project.
G3. Please be sure to include on the re -submittal the architect's and /or engineer's stamp, signature, date of
signature, and registration number on all sheets of plans depicting structural designed elements and cover
sheets of calculations. CBPC 5536.1 and 6735.
INTERWEST
Remodel of Existing Kitchen
48219 Calle Floritas Street[Address]
8122123
PLAN REVIEW COMMENTS:
BUILDING AND LIFE SAFETY:
Al. Drawing Cover
City of La Quints - First Review
Interwest Project No. LAQ23-0127
Permit App: BRES2023-0246
Page 3 of 5
A. Provide a code analysis on the cover sheet of the plans stating: type of construction, occupancy,
number of stories, existing living and garage floor areas, floor areas of all additions, and whether
fire sprinklers are installed or not. (11106.1.1 CRC)
B. Please include in the plan the square footage of the proposed kitchen remodel.
C. Applications for which no permit is issued within 180 days following the date of application shall
automatically expire. Note on plans. (11105.3.2 CRC)
D. Every permit issued shall become invalid unless work authorized commences within 180 days
after its issuance or if the work authorized is suspended or abandoned for a period of 180 days.
A successful inspection must be obtained within 180 days. Note on plans. (11105.5 CRC)
The plans shall be drawn to scale. Please include the scale on each plan sheet.
A2. Drawing 2
A. Please provide a dimensioned site plan to verify the distance of the replaced opening from the
property line.
B. Provide full height cross -sections showing framing, plate height, overall height of the structure,
insulation location and R-value, foundation, finish grade, etc. Provide both lateral and
longitudinal sections.
C. Please identify in the note the location of detail 1 and label detail in the plan. (i.e., 1/2)
A3. Drawing 3
A. Please provide a dimensioned floor plan. Additional comments may apply.
B. Please provide a wall legend that shall include material, size and spacing. Including the exterior
wall in which the window is being replaced.
C. Please note on the cover sheet special inspection is required and indicate for which item special
inspection is needed.
D. Please identify in the note the location of detail 2. (i.e., 2/4)
INTERWEST
Remodel of Existing Kitchen
48219 Calle Floritas Street[Address]
8122123
A4. Drawing 5
A. Please identify in the plan the use of this drawing.
ENERGY COMPLIANCE:
Electrical Compliance:
EE1. Drawing 5
City of La Quints - First Review
Interwest Project No. LAQ23-0127
Permit App: BRES2023-0246
Page 4 of 5
A. All installed luminaires shall be high efficacy. Note on plans. (150(k)1A & Table 150.0-A CEnC)
Mechanical Compliance:
EM1. Drawing 5
A. The capacity of the kitchen hood exhaust shall comply with 150.0(o)1G iii b of the CEnC. The hood
shall meet or exceed either the minimum airflow in accordance with Table 150.0-E of the minimum
capture efficiency in accordance with the Table 150.0-E, and Table 150.0-G. Capture efficiency ratings
shall be determined in accordance with ASTM E3087 and listed in a product directory approved by
the Energy Commission. Please demonstrate the chosen method of compliance in the plan and
include the CFM of the fan. The CFM of the kitchen hood is based upon the specification of the above
noted table. Per the 2022 CEnC, it is no longer the standard 100 CFM. See Tables 150.0-E, and 150.0-
G for compliance options.
Envelope Compliance:
EC1
A. Please include in the plan the current 2022 Low Rise Residential Mandatory Measures Summary.
B. The prescriptive CF-1R form is out of date. Please provide a 2022 form.
(https://www.energy.ca.gov/filebrowser/download/4687)
C. Please include the climate zone and project type of the site in the Compliance document.
CaIGREEN:
CG1.
A. Include compliance with 2022 California Green Code. Print and incorporate into the plan set the
required mandatory measures forms.(https:Haiacalifornia.org/calgreen-checklists/)
STRUCTURAL:
INTERWEST
Remodel of Existing Kitchen City of La Quints - First Review
48219 Calle Floritas Street[Address] Interwest Project No. LAQ23-0127
8122123 Permit App: BRES2023-0246
Page 5 of 5
S1.
A. Please include in the plan the fastening schedule Table R602.3(1) CRC. (Table 2304.10.1 CBC)
B. Please call out in the plan the required shear wall type and make-up, per the structural calculations.
C. Please provide details of the shear transfer connections which transfer lateral forces from
horizontal diaphragms through intermediate elements and shear walls to the foundation. (2305.1
CBC, R301.1 CRC)
D. Please include in the plan a shear wall schedule.
E. To verify the proposed 2x8 ceiling joist at 16" o.c., please provide a dimensioned plan.
F. To verify the provided structural calculations for beams and supports, please provide a
dimensioned plan
G. Detail in the plan the attachment at the top and bottom of the new exterior wall supports.
H. The reference drawing provided in the structural calculations are useful but they are not legible.
Please provide a legible copy.
Please contact the listed reviewers between 9:00 A.M. and 4:00 P.M., M-F, with any questions.
[END]
INTERWEST
8/23/23. 11:35 AM Invoice
0
INTERWEST
A SAFEbuilt COMPANY
INVOICE #90415
August 23, 2023
Jurisdiction No. BRES2023-0246
Interwest Job No. LAQ23-0127
Bill to: City of La Quinta Remit to: Interwest Consulting Group Direct questions to:
Attention Danny Castro P.O. Box 301069 € Erica Cuevas
Design & Development Director Los Angeles, CA 90030-1069 (970) 568-5034
78495 Calle Tampico € ecuevas@interwestgrp.com
La Quinta, CA 92253
Professional services for the period August 1 through August 23, 2023
RESIDENTIAL - ADDITION - BRES2023-0246 - 48219 CALLE FOREST -
LAQ23-0127
48219 Calle Florista
Invoice Total $187.50
Employee Title Day Hours Rate Total
Karla Luther I Plan Check Engineer 1 8/221 1.5 $125.001 $187.50
https://interwest.lucidbilIing.com/invoices/print 1/1
DocuSign Envelope ID: 21E4258A-AC51-41DE-BF97-8E12E74DF662
CALIFORNIA
Disclosures & Forms for Owner -Builders Applying for Construction Permits
IMPORTANT! NOTICE TO PROPERTY OWNER
Dear Property Owner
An application for a building permit has been submitted in your name listing yourself as the builder of the property
improvements specified at 48219 cane Flonsta, La Quinta, CA 92253
We are providing you with an Owner -Builder Acknowledgment and Information Verification Form to make you
aware of your responsibilities and possible risk you may incur by having this permit issued in your name as the
Owner -Builder. We will not issue a building permit until you have read, initialed your understanding of each
provision, signed, and returned this form to us at our official address indicated. An agent of the owner
cannot execute this notice unless you, the property owner, obtain the prior approval of the permitting authority.
OWNER'S ACKNOWLEDGMENT AND VERIFICATION OF INFORMATION
(( DIRECTIONS: Read and initial each statement below to signify you understand or verify this information.
1. 1 understand a frequent practice of unlicensed persons is to have the property owner obtain an "Owner-
113 iilder" building permit that erroneously implies that the property owner is providing his or her own labor and
material personally. I, as an Owner -Builder, may be held liable and subject to serious financial risk for any injuries
sustained by an unlicensed person and his or her employees while working on my property. My homeowner's
insurance may not provide coverage for those injuries. I am willfully acting as an Owner -Builder and am aware of
tie limits of my insurance coverage for injuries to workers on my property.
2. I understand building permits are not required to be signed by property owners unless they are responsible
fort construction and are not hiring a licensed Contractor to assume this responsibility.
WUyV;_protect
3. 1 understand as an "Owner -Builder" I am the responsible party of record on the permit. I understand that I
myself from potential financial risk by hiring a licensed Contractor and having the permit filed in his or
X1.
ame instead of my own.
4. 1 understand Contractors are required by law to be licensed and bonded in California and to list their license
ers onpermits and contracts.
5. I understand if I employ or otherwise engage any persons, other than California licensed Contractors, and
t& total value of my construction is at least five hundred dollars ($500), including labor and materials, I may be
considered an "employer" under state and federal law.
6. I understand if I am considered an "employer" under state and federal law, I must register with the state and
f eral government, withhold payroll taxes, provide workers' compensation disability insurance, and contribute to
unemployment compensation for each "employee." I also understand my failure to abide by these laws may subject
V7edential
,perious financial risk.
. 1 understand under California Contractors' State License Law, an Owner -Builder who builds single-family
structures cannot legally build them with the intent to offer them for sale, unless all work is performed by
licensed subcontractors and the number of structures does not exceed four within any calendar year, or all of the
lancial
performed under contract with a licensed general building Contractor.
I understand as an Owner -Builder if I sell the property for which this permit is issued, I may be held liable for
or personal injuries sustained by any subsequent owner(s) that result from any latent construction
defects in the workmanship or materials.
DocuSigned by:
W e /10/2023 Page 3 of 4
DD9A67F5F7E943A...
DocuSign Envelope ID: 21E4258A-AC51-41DE-BF97-8E12E74DF662
9. I understand I may obtain more information regarding my obligations as an "employer" from the Internal
kevenue Service, the United States Small Business Administration, the California Department of Benefit Payments,
and the California Division of Industrial Accidents. I also understand I may contact the California Contractors' State
License Board (CSLB) at 1-800-321-CSLB (2752) or www.cslb.ca.gov for more information about licensed
o tractors.
10. 1 am aware of and consent to an Owner -Builder building permit applied for in my name, and understand
flht I am the party legally and financially responsible for proposed construction activity at the following address:
48219 Calle Florista, La Quinta, CA 92253
11. 1 agree that, as the party legally and financially responsible for this proposed construction activity, I will
by all applicable laws and requirements that govern Owner -Builders as well as employers.
wi12. 1 agree to notify the issuer of this form immediately of any additions, deletions, or changes to any of the
mation I have provided on this form. Licensed contractors are regulated by laws designed to protect the public.
If/you contract with someone who does not have a license, the Contractors' State License Board may be unable to
assist you with any financial loss you may sustain as a result of a complaint- Your only remedy against unlicensed
Contractors may be in civil court. It is also important for you to understand that if an unlicensed Contractor or
employee of that individual or firm is injured while working on your property, you may be held liable for damages. If
you obtain a permit as Owner -Builder and wish to hire Contractors, you will be responsible for verifying whether or
not those Contractors are properly licensed and the status of their workers' compensation insurance coverage.
Before a building permit can be issued, this form must be completed and signed by the property owner and
returned to the agency responsible for issuing the permit. Note: A copy of the property owner's driver's
license, form notarization, or other verification acceptable to the agency is required to be presented when
the permit is issued to verify the -property owner's signature.
Signatiira of Prnnartv nwndr /f �j/i/�Ov/oDate.
DocuSigned by:
8/10/2023 Danny W. Elm re
__C 6)
DD9A67F5F7E943A...
Note: The following Authorization Form is required to be completed by the property owner only when
designating an agent of the property owner to apply for a construction permit for the Owner -Builder.
AUTHORIZATION OF AGENT TO ACT ON PROPERTY OWNER'S BEHALF
Excluding the Notice to Property Owner, the execution of which I understand is my personal responsibility, I hereby
authorize the following person(s) to act as my agent(s) to apply for, sign, and file the documents necessary to
obtain an Owner -Builder Permit for my project.
Scope of Construction Project (or Description of Work):
Project Location or Address:
Name of Authorized Agent:
Address of Authorized Agent:
I declare under penalty of perjury that I am the property owner for the address listed above and I personally filled
out the above information and certify its accuracy. Note: A copy of the owner's driver's license, form notarization, or
other verification acceptable to the agency is required to be presented when the permit is issued to verify the
property owner's signature.
Signature of Property Owner:LI'V,*111_-.///'Lf:����-- Date:
Page 4 of 4
CITY OF LA QUINTA
JOB ADDRESS 48219 CALLE FLORISTA PERMIT NUMBER BRES2023-0246 OWNER DANNY ELMORE BUILDER DANNY ELMORE
This form shall be posted on the job with the Building Inspection Card at all times in a conspicuous place. Only persons appearing on the list or their employees are
authorized to work on this job. Any changes to this list must be approved by the Building Division prior to commencement of work. Failure to comply will result in a stoopage of work
and/or the voidance of buildinq permmit. For each applicable trade, all information requested below must be completed by the applicant. "On File" is not an accepatble resonse.
TRADE/CLASSIFICATION
CONTRACTOR
STATE CONTRACTOR'S LICENSE
WORKER COMPENSATION INSURANCE
CITY BUSINESS LICENSE
Company Name
Classification
(e.g. A, B, c-s)
California
License
Number
Exp. Date
Carrier Name
(e.g. State Fund, CalComp)
Policy Numbers
(Format Varies)
Exp. Date
License Number
Exp. Date
EARTHWORK (C-12)
CONCRETE (C-8)
Pfannkuche Carpentry
B
1077765
/31/2025
769539
9/30/23
FRAMING (C-5)
Pfannkuche Carpentry
B
1077765
/31/2025
769539
9/30/2023
STRUCT. STEEL (C-51)
MASONRY (C-29)
PLUMBING (C-36)
Pfannkuche Carpentry
B
1077765
/31/2025
769539
9/30/23
LATH, PLASTER (C-35)
DRYWALL(C-9)
Pfannkuche Carpentry
B
1077765
/31/2025
769539
/30/23
HVAC (C-20)
ELECTRICAL (C-10)
Positive Connection
C10
900283
7/31/25
764701
9/30/24
ROOFING (C-39)
SHEET METAL (C-43)
FLOORING(C-16)
GLAZING(C-17)
Pfannkuche Carpentry
B
1077765
/31/2025
769539
9/30/23
INSULATION (C-2)
SEWAGE DISP. (C-42)
PAINTING (C-33)
CERAMIC TILE (C-54)
CABINETS (C-6)
FENCING (C-13)
LANDSCAPING (C-27)
POOL (C-53)
DocuSign Envelope ID: 5D781682-29FD-4942-A05D-6AA159EC6976
Building Permit Number: BRES2023-0246
--~� Project Description: SFR
Exempt: El
(Materials may contain hazardous wastes and
are not subject to recycling provisions)
Construction Debris Management Plan
Plan Submittal Date
Job Site Address
Owner's Name.
Number, Street, or PO Boxl
City, State, Postal Code
Owner's Phone Number
Owner's E-Mail Address
Project Manager's Name
Project Manager's Phone Number
Project Manager's E-mail Address
8/10/2023
48219 Calle Florista, La Quinta, CA 92253
Danny Elmore
48219 Calle Florista
La Quinta, CA 92253
509-989-0140
elmoredanny46(oDgmail.com
Gary Morlock
760-636-8098
garymorlock(cDgmail.com
Builder / Contractor
Steve Pfannkuche
Number, Street or PO Box
52523 Avenida Ramirez
City. State, Postal Code
La Quinta, CA 92253
Project Square Footage
240
Approval By Burrtec
Date of City Approval
Materials To Be Discarded:
Product
Tons
Trash
, Z
Not recyclable
Asphalt
0.00
Recyclable
Brick/Block
0.00
Recyclable
Cardboard
/
Recyclable
Commingled
0.00
Recyclable
Concrete
i
Recyclable
Drywall
, Z1,5"
Recyclable
Donated / Reuse*
0.00
Recyclable
*Describe Items
Product
Masonry (broken)
Plaster
Scrap Metal
Tile (floor)
Tile (roof)
Wood
Landscape Debris
Tons
0.00 Recyclable
3,0 Recyclable
0.00 Recyclable
l Recyclable
1 Recyclable
Recyclable
0.00 Recyclable
Totals; Recycle ______Trash Projected Diversion:_
0.0 2-j 7S �v #DIV/0!
DocuSign Envelope ID: 5D781682-29FD-4942-A05D-6AA159EC6976
I I I I
I understand it is the property owner's responsibility to submit copies of weight tickets or receipts to the District
Environmental Coordinator as these hauls occur. I hereby certify that completion, implementation and adherence of the
Debris Management Plan (DMP) for the above named project shall guarantee that at least 65% of the jobsite waste is
diverted from landfilling. The remaining material will be recycled or reused. I will divert, for recycling or re -use, remaining
materials generated from the first day of the project through the completion of the project in accordance with this plan. This
DMP is issued in the name of the property owner(s) and shall remain their property throughout the construction and/or
demolition project. A contractor serving as agent of the owner may obtain a DMP for the owner. However, the DMP is still
issued in the name of the property owner(s) and the owner retains legal responsibility for ensuring that the provisions of the
DMP are adhered to. The property owner(s) and general contractor shall be kept informed of the diversion progress through
bi-m,Qnft1p,pp13s. If self -hauling, all refuse material from this project site must be taken to an approved recycler or transfer
Owner / Developer / Project Manager / Superintendant
9/13/2023
Date
DocuSign Envelope ID: 5D781682-29FD-4942-A05D-6AA159EC6976
��' IjAItiI�:V.
4
'y OF T��'
Construction Debris Management Plan
Summary of Requirements
As of January 1, 2017, The Green Building Standards Code (CALGreen) requires that the construction
of most new structures in the State of California comply with sections 4.408 and 5.408 of the code in
accordance with Assembly Bill 939 requiring that no more than 35% of jobsite waste be disposed of as
trash at local land fill sites and transfer stations. Exceptions may be made for certain projects under
certain conditions.
The City of La Quinta is committed to the highest level of environmental respect, to conserving our
precious natural resources and setting an example to provide for a better world for generations to
come. Recycling helps keep reusable resources out of landfills and will also reduce disposal costs.
IMPORTANT: Burrtec Waste & Recycling Services is the City's franchise
hauler. If you choose to self -haul any recyclables or trash, you must
provide copies of all weight tickets and/or receipts from the transfer
station, landfill, or recycler as the job progresses. Clean-up companies
and other haulers are not permitted to haul waste or recyclables from the
City of La Quinta. Self -haul weight tickets should be submitted to: Mike
Veto, District Environmental Coordinator - mveto@burrtecdesert.com, or
faxed to (760) 340-0417, or mailed to: 41575 Eclectic Street, Palm
Desert, CA. 92260.