Loading...
HomeMy WebLinkAbout06-1049 (CSCS) Title 24Title 24 Report for: W ashingto Park (Submajor 5) x--46ashington Street —SLa Quinta, CA 92253e ' -Projedt'Designer: ,. • KKE Architects, Inc 525 East Colorado Boulevard (Fourth Floor) Pasadena, CA 91101 (626)796=8230 - CITY OF LAUIN Q TA • BUILDING & SAFETY DEPT. Report Prepared By: APPROVED FOR CO STRUCTION SIA GARESTANI, P. E.11 ' SPEC Engineering 1 DATE_2 06 BY 6800 Owensmouth Ave. #140(96_ 69 Woodland Hills, .CA 91303 K. (818) 592-6643 Job Number: 06-002 Date: 4/28/2006 The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is authorized by the California Energy Commission for use with both the Residential and Nonresidential 2005 Building Energy Efficiency Standards. This program developed byEnergySoft, LLC - www.enetgysoff.com. EnergyPro 4.1 by EnergySoft Job Number: 06-002 User Number: 3358 i r PERFORMANCE CERTIFICATE OF COMPLIANCE Part 1 of 3 PERF - PROJECT NAME Washington Park Subma'or 5 This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the DATE 4/28/2006 PROJECT ADDRESS 46-600 Washington Street La Quinta DATE OF PLANS os -o7 -os BUILDING CONDITIONED FLOOR AREA � I SIA GARESTANI P.E.. PRINCIPAL DESIGNER - ENVELOPE KKE Architects, Inc TELEPHONE (626) 796-8230 Biiildmg Permd # x; DOCUMENTATION AUTHOR SPEC Engineering TELEPHONE (818) 592-6643 Checked liy/Date EnforcementAgency Use GENERAL INFORMATION This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This certificate applies only to a Building using the performance compli be approach. The documentation preparer hereby certifies that the documentation Is accurate and comp!00 DATE OF PLANS os -o7 -os BUILDING CONDITIONED FLOOR AREA 12, 021 sy.Ft. SIA GARESTANI P.E.. CLIMATE ZONE 15 BUILDING TYPE NONRESIDENTIAL HIGH RISE RESIDENTIAL HOTEL/MOTEL GUEST ROOM PHASE OF CONSTRUCTION NEW CONSTRUCTION ❑ ADDITION ❑ EXISTING + ADDITION/ALTERATION STATEMENT OF COMPLIANCE This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This certificate applies only to a Building using the performance compli be approach. The documentation preparer hereby certifies that the documentation Is accurate and comp!00 DOCUMENTATION AUTHOR SIGNATURE SIA GARESTANI P.E.. The Principal Designer hereby certifys that the proposed building desig res din this set of construction docume is is consistent with the other compliance forms and worksheets, with t g ifications, and with any other calculations su . itted with this permit application. The proposed building as designed meets the/enrgy efficiency requirements contained in sections 110, 116, through 118, and 140, 142, 143 or 149 of Title 24, Part 6. ENV. LTG. MECH. F] F-] 1. 1 hereby affirm that I am eligible under a provisions of Division 3 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I am licensed in the State of California as a civil engineer, mechanical engineer, or I am a licensed architect. F] F] R 2. 1 affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code Section 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed contractor performing this work. ❑ F-1 3. 1 affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document because it pertains to a structure or type of work described as exempt pursuant to Business and Professions Code Sections 5537, 5538, and 6737.1. (These sections of the Business and Professions Code are printed in full in the Nonresidential Manual.) ENVELOPE COMPLIANCE Indicate location on plans of Note Block for Mandatory Measures ENV -1 Required Forms PRINCIPAL ENVELOPE DESIGNER - NAMES LIC. NO. DAT KKE Architects Inc 0% b ps Q� LIGHTING COMPLIANCE Indicate location on plans of Note Block for Mandatory Measures Lighting Compliance Not In The Scope Of Required Forms This-SQb PRINCIPAL LIGHTING DESIGNER - NAME SIGNATURE LIC. NO. DATE MECHANICAL COMPLIANCE Indicate location on plans of Note Block for Mandatory Measures Required For s ECH-1 MECH-2 MECH-3 MECH-5 PRINCIPAL MECHANICAL DESIGNER -NAME SIGNATU LIC. NO DATE SIA GARESTANI y� P.E. MZ 2,# o I EnergyPro 4.1 by EnergySoft User Number: 335 PzJob Number 06-002 Page:3 of 19 S PERFORMANCE CERTIFICATE OF COMPLIANCE Part2 of 3 PERF-' PROJECT NAME DATE Washington Park (Submaior 5) 4/28/2006 ENERGY COMPONENT Standard Design Space Heating Space Cooling Indoor Fans Heat Rejection Pumps & Misc. Domestic Hot Water Lighting Receptacle Process 0.22 263.71 32.28 0.00 0.00 58.85 165.26 82.18 0.00 TOTALS: 602.49 Percent better than Standard: Proposed Compliance Design Margin 0.04 -33.89 -2.26 0.00 0.00 3.06 0.00 0.00 o.00 635.55 -33.05 .a StaOtlaN, .�..>.-- .:•:' : _e . ProposaA .. . Conditioned Floor Area Unconditioned Floor Area Conditioned Footprint Area Fuel Type 12,021 Ce�f(!A 1 0 4 o 4 Natural Gas "Tgam Front Elevation 1,472 sqft. 658 sqft. 44.7% Left Elevation (N) F 9, 20 40 60 8.0 100120140180180 200 220240 260 280 0 kBtWsgO-yr -5.5% ( -5.5% exclud Building Orientation Number of Stories Number of Systems Number of Zones 270 deg Conditioned Floor Area Unconditioned Floor Area Conditioned Footprint Area Fuel Type 12,021 sqft. sqft. sqft. 1 0 4 o 4 Natural Gas Orientation Gross Area Glazinq Area Glazing Ratio Front Elevation 1,472 sqft. 658 sqft. 44.7% Left Elevation (N) 1,176 sqft. 0 sqft. 0.0% Rear Elevation E 1,472 sqft. 0 sqft. 0.0% Right Elevation (s) Total Roof 1,176 5,296 12,021 sgft. sqft. sqft. 0 658 E=� sqft. sqft. sqft. 0.0% Standard Proposed Lighting Power Density 1.500 W/sqft. 1.500 W/sgft. Prescriptive Env. Heat Loss 1,370 Btu/h 1,552 Btu/h Prescriptive Env. Heat Gain 133,94 Btu/h-F 166,462 Btu/h-F Remarks: I EnergyPro 4.1 by EnergySoft User Number: 3358 Job Number 06-002 Page:4 of 19 PERFORMANCE CERTIFICATE OF COMPLIANCE Part 3 of 3 PERF -1 PROJECT NAME DATE Washington Park (Submajor 5) 4/28/2006 ZONE INFORMATION Floor Inst Ctrl * Allowed LPD' {Proc i. Area LPD YCrealts 7Area; Tailored ;Loads: System Name Zone Name Occupancy Type (sgfL) (W/sq Y /s�p2� z 3 a RTU -1 Zone 1 Comp Bldg Retail and Wholesale 3,045 '1.50 ; RTU -2 Zone 2 Comp Bldg Retail and Wholesale 3,100 '1.50 RTU -3 Zone 3 Comp Bldg Retail and Wholesale 2,831 '1.50, i s Y, s u:;• RTU -4 Zone 4 Comp Bldg Retail and Wholesale 3,045 '1.50 # W c. .•q� ) Y � :'." 1. ., �im4 t �. $.5'{.x�+�" Z N{ 9.- 'f� ,:j2. i'a yap •'� � �� f .^� tp✓,.i, 091M`..,.M ,. • �,�§fir M`�hs::�' ' ��t� t ��`'i' �. �' is a,� f•^. n.�' ^>r*`� i .�•1.^,. "fin 44 5; A1p t vpa Notes: 1. See LTG -2-C 2. See LTG -4-C3. See LTG -5-C 4. See LTG -6-C Items above regwrespecial documentation' (items marked with asterisk, see LTG -2 -C by others) (by others) �xr Maw EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST ... • — — -U--.,.Y ....,..... r,oY ar.v...a. —LUMwn w uro morns spuLanou in ims cneCKIIST. i nese Items require special written justification and documentation, and special verification to be used with the performance approach. The local enforcement agency determines the adequacy of the justification, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation submitted. The HVAC System "CARRIER 50HJQ012" includes Demand Control Ventilation per Standards Section 121. The Zone "Zone 3" has a West Display Perimeter Credit of 66 ft. • L - - --r••-••-• --.+ — .4910 peon ovnnanee apprvacn appucation nave specifically been reviewed. Adequate written justification and documentation for their use have been provided by the applicant Authorized Sianature or Stavin EnergyPro 4.1 by EnergySoft User Number: 3358 Job Number: 06-002 Page:5 of 19 1 CERTIFICATE OF COMPLIANCE ENV -1-C PROJECT NAME`. DATE WaS'hin ton Park Subma'or 5 4/28/2006 OPAQUE SURFACES s # Surface Type Area U -Fac. Insulation Cay. Cont. Act. Am. Tilt Cond: Status Joint Appendix IV Reference Location / Comments 1 Wall 550. 0.065 R-19 R-0.0 0 90 New 09-A7 Zone 1 2 Roof 3,045 0.034 R-30 R-0.0 ` 0 0 New- 02-A26 Zone 1 3 Wall 374 0.065 R-19 R-0.0 0 90 New. 09-A7 Zone 2 4 Wall 248 0.065 R-19 R-0.01 180. -90 New 09-A7 Zone 2 5 Wall - 1,472 0.065 R-19 R-0.0 90 90 - New 09-A7 Zone 2 6 Roof 3,100 0.034 R-30 R-0.0 0 + • 0 New 02-A26 Zone 2 7 Wall 252 0.065 R-19 R-0.0. 0 90 New' 09-A7 Zone 3 8 Wall 252 0.065 R-19 • R-0.0 180 90 New 09-A77 Zone 3 9 Wall 8141 0.065 R-19 R-0.0 270 '90 New 09-A7 Zone 3 10 Roof 2,831 0.034. R-30 R-0.0 0 0 New 02-A26 Zone 3 11 Wall 676 0.065 R-19 R-0.0 180 • . 90 New 09-A7, Zone 4 12 Roof 3,045 0.034 R-30 R-0.0 0 = 0 New - 02-A26 Zone 4 , 1 FENESTRATION SURFACES More than or equal to 10,000 sq.fL of site -built fenestration area must include a label certificate either issued by NFRC or provide a CEC Default Label Certificate using the default U -factors from F S1AnAaMC T.M. 11R_A -A o rnA: ,. .:�..,n �... f:�...a :...�.. ___.��-'- -_'`-' -"-- --- -- _ .. .. .... _ - # IType Act. Cond. Area U -Fac 1- SHGC2 Am. Stat. Glazin4 Type Location/ Comments 1 Window Front 110 1.2801116-A 0.72 INFRC 270 New Double Clear Default NM Zone 3 2 3 4 Window Window Window Front (W) . Front Front 110 1.2801116-A 75 1.2801116-A 40 1.2801116-A 0.72 NFRC 0.72 NFRC 0.72 NFRC 270 270 270 New New . -New Double Clear Default(NM) Double Clear Default(NM) Double Clear Default NM Zone 3 Zone 3 Zone 3 t 5 6 7 8 Window Front Window .Front Window Front (W) Window Front • 28 1.250 NFRC 0.82 NFRCI; 75 1.2801116-A 0.72 NFRCI 110 1.280 116-A • 0.72 NFRCj 110 1.280 116 -Al 0.72 NFRC 270 New 270 New 270 ' New 270 New I Single Clear Default NM I Double Clear Default(NM) Double Clear Default(NM) Double Clear Default NM Zone 3 , Zone 3 Zone 3 Zone 3 ► 6.0 0.1 ' 6.0 6.0. 5 None 0.76 6.2 4.5 4.0 0.1 4.0- 4.0 - 6 None 0.76 • 11.0 6.7 6.0 0.1 -6.0 - 6.0 7 None 0.76 11.0 10.0 , 4.0 0.1 4.0 4.0 8 None 0.76 11.0-10.0 4.0 0.1 4.0" 4.0 111 UaHnr Ir -11 A -e nnfa % Tawsf...... c......a " -. - _ -'--...-_._ .._... ,....... V. a'i....,,.... Type: 11&B Default Table from Standards, COG Center of Glass, NFRC labeled Value - - EXTERIOR SHADING ` # 1 Exterior Shade Type None SHGC 0.76 Window Hgt. Wd. 11.0 10.0 Overhang Left Fin Right Fin ` Len: H t. LExt.RExt. Dist. Len. H t. Dist. Len. H t. 4.0 0.1 4:0 4.0 2 None 0.76 11.0. 10.0 4.0 ` 0.1 4.0 4.0 3 None 0.76 ".11.0 6.7 6.0 0.1 6.0 6.0 4 None 0.76 3.2 12.5 ► 6.0 0.1 ' 6.0 6.0. 5 None 0.76 6.2 4.5 4.0 0.1 4.0- 4.0 - 6 None 0.76 • 11.0 6.7 6.0 0.1 -6.0 - 6.0 7 None 0.76 11.0 10.0 , 4.0 0.1 4.0 4.0 8 None 0.76 11.0-10.0 4.0 0.1 4.0" 4.0 MINIMUM SKYLIGHT AREA FOR LARGE ENCLOSED SPACES _ ❑The proposed building contains an enclosed space with floor area greater than 25,000 sq.ft, a telling height greater than 15 feet and a LPD for general lighting of at least 0.5 W/sa.R if this box is checked ENV.A r mum An fillnA n.A .•A•-..-..w...w.-_ .._.__.._ ^----�-"-- ^--- -"- _ Run Initiation Time: 03/07/06 1 EnergyPro 4.1 by EnergySoft ' User Number: 3358 Run Code: 11417696T6 Job Number: 06-002 - Page:6 of 19 + f r CERTIFICATE OF COMPLIANCE MECH-1-C NAME DATE Washington Park (Submajor 5) 4/28/2006 Designer: . This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for mechanical systems. The designer is required to check the boxes by all acceptance tests that apply and list all equipment that requires an acceptance test. If all equipment of a certain type requires a test, list the equipment description and the number of systems to be tested in parentheses. The NJ number designates the Section in the Appendix of the Nonresidential ACM Manual that describes the test. Also indicate the person responsible for performing the tests (i.e. the installing contractor; design professional or an agent selected by the owner). Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Building Departments: SYSTEM ACCEPTANCE. Before an occupancy permit is granted for a newly constructed building or space, or a new space -conditioning system serving a building or space is operated for normal use, all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance. In addition a Certificate of Acceptance, MECH-I-A Form shall be submitted to the building department that certifies plans, specifications, installation certificates and operating and maintenance information meet the re uirements of Section 10-1 03 b and Title 24 Part 6 STATEMENT OF COMPLIANCE ❑ MECH-2-A: Ventilation System Acceptance Document -Variable Air Volume Systems Outdoor Air Acceptance -Constant Air Volume Systems. Outdoor Air Acceptance Equipment requiring acceptance testing Test required on all New systems both New Construction and Retrofit. ❑ MECH-3-A: Packaged HVAC Systems Acceptance Document Equipment requiring acceptance testing Test required on all New systems both New Construction and Retrofit. ❑ MECH-4-A: Air -Side Economizer Acceptance Document Equipment requiring acceptance testing Test required on all New systems both New Construction and Retrofit. Units with economizers that are installed at the factory and certified with the commission do not require equipment testing but do require construction inspection. ❑ MECH-5-A: Air Distribution Acceptance Document Equipment requiring acceptance testing This test required If the unit serves 5,000 ft2 of space or less and 25% or more of the ducts are in nonconditioned or semiconditioned space like an attic. New systems that meet the above requirements. Retrofit systems that meet the above requirements and either extend ducts, replace ducts or replace the packaged unit. ❑ MECH-6-A: Demand Control Ventilation Acceptance Document Equipment requiring acceptance testing All new DCV controls installed on new or existing packaged systems must be tested. ❑ MECH-7-A: Supply Fan Variable Flow Control Acceptance Document Equipment requiring acceptance testing All new VAV fan volume controls installed on new or existing systems must be tested ❑ MECH-8-A:-Hydronic System Control Acceptance Document -Variable Flow Controls Applies to chilled and hot water systems. -Automatic Isolation Controls Applies to new boilers and chillers and the primary pumps are connected to a common header. -Supply Water Temperature Reset Controls Applies to new constant flow chilled and hot water systems that have a design capacity greater than or equal to 500,000 Btufhr. -Water-loop Heat Pump Controls Applies to all, new watertoop heat pump systems where the combined loop pumps are greater than 5 hp. -Variable Frequency Controls Applies to all new distribution pumps on new variable flow chilled, hydronic heat pump or condenser water systems where the pumps motors are greater than 5 hp. Equipment requiring acceptance testing EnergyPro 4.1 by EnergySoft User Number: 3358 Job Number: 06-002 Page:7 of 19 [AIR SYSTEM REQUIREMENTS' Part 1 of 2` MECH-2-C PROJECT NAME DATE Washington Park Subma•or 5 4/28/2006 c SYSTEM FEATURES k ITEM OR SYSTEM TAG(S) Number of Systems E " AIR SYSTEMS, Central or Single Zone RTU -1' RTU -2 RTU -3 112(a) 10.3 EER 10.3 EER T-24 MANDATORY MEASURES. Section A 'Reference on Plans or Specification Heating Equipment Efficiency Cooling Equipment Efficiency Heat Pump Thermostat Furnace Controls Natural Ventilation Minimum Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation PRESCRIPTIVE MEASURES ., Calculated Heating Capacity x 1.43 2 ' Proposed Heating Capacity 2 Calculated Sensible Cooling Capacity x 1.212 Proposed Sensible Cooling Capacity 2' 1 Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heating Air Supply Reset Cooling Air Supply Reset Duct Sealing for Prescriptive Compliance 112(a) 3.30 COP 3.30 COP 3.30 COP 112(a) 10.3 EER 10.3 EER 10.3 EER 112(b) Yes Yes Yes 112(c), 115(a) n/a : _ n/a n/a 121(b) No No No 121(b) 1020 cfm . 1038 cfm 948 cfm 121 c No No •• No 121(c) ' Yes - Yes Yes 121(c). 122(e) Programmable Switch Programmable Switch Pro rammable Switch 122(e) Heating & Cooling Required Heating & Cooling Required Heating & Cooling Required 122 • Auto Auto i Auto 122(8) n/a ' n/a n/a 123 - 124 R-8.0 , - R-8.0 R-8.0 144 a & b n/a 'n/a' n/a 144 a & b 71,201 btuh ' 71,201 btuh 71,201 btuh 144 a & b n/a n/a n/a 144 a & b 103,439 btuh - 103,861 btuh 102536 btuh 144 (c)Constant Volume Constant Volume Constant Volume 144 (c) ' 144 (c)': _Yes Yes Yes 144 d . No No No 144 a _Fixed Tem Non-Inte Fixed Tem Non-Inte Fixed Tem Non-Inte 144 M. Constant Tem =' -Co-nstantTemp Constant Tem 144 (f) r ° Constant Temp Constant Temp Constant Temp 1144'(k) No , . ' No No 1: For each central and single zone air systems (or group of similar units) fill in the reference to sheet number and/or specification section and paragraph number where the required features are documented. If a requirement is not applicable, put "N/A" in the column. 2: Not required for hydronic heating and cooling. Either enter a value here or put in^reference,ot plans and specificatons per footnote 1. 3: Enter Yes if System is: Constant Volume, Single Zone; Serves < 5,000 sgft; Has > 25% duct in unconditioned space. Duct sealing is required for Prescriptive Compliance, see PERFA for performance method duct sealing requirements. ' f SIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2-C (PROJECT NAME DATE Washington Park (Submajor 5) 4/28/2006 SYSTEM FEATURES ITEM OR SYSTEM TAG(S) Number of Systems T-24 MANDATORY MEASURES Section Heating Equipment Efficiency Cooling Equipment Efficiency Heat Pump Thermostat Furnace Controls Natural Ventilation Minimum Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation PRESCRIPTIVE MEASURES Calculated Heating Capacity x 1.43 2 Proposed Heating Capacity 2 Calculated Sensible Cooling Capacity x 1.212 Proposed Sensible Cooling Capacity 2 Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heating Air Supply Reset Cooling Air Supply Reset Duct Sealing for Prescriptive Compliance AIR SYSTEMS, Central or Single Zone RTU -4 1 Reference on Plans or Specification 1 112(a) 3.30 COP 112(a) 10.3 EER 112(b) Yes 112(c), 115(a) n/a 121(b) No 121(b) 1020 cfm 121(c) No 121(c) Yes 121(c), 122(e) Programmable Switch 122(e) Heating & Cooling Required 122 Auto 122(g) n/a 123 124 R-8.0 144 a & b n/a 144 a & b 71,201 btuh 144 a & b n/a 144 a & b 103,453 btuh 144 c Constant Volume 144 (c) 144 c Yes 144 d No 144 a Fixed Tem Non-Inte 144 Constant Tem 144(f) Constant Temp 144 (k) No 1: For each central and single zone air systems (or group of similar units) fill in the reference to sheet number and/or specification section and paragraph number where the required features are documented. If a requirement is not applicable, put "N/A" in the column. 2: Not required for hydronic heating and cooling. Either enter a value here or put in reference of plans and specificatons per footnote 1. 3: Enter Yes if System is: Constant Volume, Single Zone; Serves < 5,000 sqft; Has > 25% duct in unconditioned space. Duct sealing is required for Prescriptive Compliance, see PERF -1 for performance method duct sealing requirements. N0TFR TO FIFI n - Fnr Rnilriinrn rlanftr►nan• i I-- r%—h. EnergyPro 4.1 by EnergySoft User Number: 3358 Job Number: 06-002 Page:9 of 19 OATER SIDE SYSTEM REQUIREMENTS Part 2 -of 2 MECH-24 PROJECT NAME, �.,., .. w =sr DATE Washington Park Subma'or 5 4/28/2006 SYSTEM FEATURES ' 2 WATER SIDE SYSTEMS: Chillers, Towers, Boilers, H dronic Loops ITEM OR SYSTEM ,TAG(S) Number of Systems T-24 - MANDATORY MEASURES,. Section Reference on Plans or Specification) Equipment Efficiency 112(a) Pipe Insulation PRESCRIPTIVE MEASURES ' Calculated Capacity 144 (a & b) Proposed Capacity 144 (a& b) ' Tower Fan Controls 144 h Tower Flow Controls 144 h Variable Flow System Design 144 • Chiller and Boiler Isolation 144 • CHW and HHW'Reset Controls - ' 144 WLHP Isolation Valves 144 ' VSD on CHW, CW & WLHP Pumps > 5 144 HP , DP Sensor. Location 144 • 1: For each chiller, cooling tower, boiler, and hydronic loop (or groups of similar equipment) fill in the reference to sheet number and/or specification section and paragraph number where the required features are documented. If a requirement is not applicable, put "N/A" in the column. a 2: Water side systems include wet side system using other liquids such as glycol or brine. - { Service Hot Water, Pool Heating ITEM OR SYSTEM TAG(S) DHW Heater Number of Systems 3 MANDATORY MEASURES Reference on Plans or Specification) - Water Heater Certification .113 (a) Water Heater Efficiency 113 b J. - Service Water Heating Installation . 113 (c) Pool and Spa Efficiency and Control 114 (a)' Pool and Spa Installation 114 b Pool Heater - No Pilot Light 115 (c) Spa Heater - No Pilot Light 115 d CHRONOMITE S-30 LP '98% h/a ' n/a -n/a n/a 1: For each water heater, pool heat and domestic water loop (or groups of similar equipment) fill in the reference to sheet number and/or specification section and paragraph number where the required features are documented. If a requirement is not applicable, put "N/A" ins the column. I Run Initiation Time: 03/07/06 14.04.36 Run Code: 1141769076 ' EnergyPro 4.1 by EnergySoft User Number. 3358 Job Number' 06-002 Page: 10 of 19 ti MECHANICAL VENTILATION MECH-3-C PROJECT NAME DATE Washington Park (Submajor 5) 1 4/28/2006 PRESCRIPTIVE REHEAT LIMITATION Section 144(d)) MECHANICAL VENTILATION Section 121(b)2) AREA BASIS OCCUPANCY BASIS VAV MINIMUM A B C D E F G H I J K L M N ZONE/SYSTEM n Wim» p a n T�3 °0 .. ao� 3 n�� ... y 3 Z 3 °� m 0 m� n 0�3 p �e r 00 �cn --a 3' ,» v3A �oC G) .�, C n c�; 3�<c D 7 p-* n®o 3c� � n �� a� A 0 o_ w3 3 4000 n - -n` H (D »� C391 7 7 ,. D w D Zone 1 3,045 0.221 670 68.01 15.0 1,0201 1,020 1,0201 1 RTU -1 Total 1,020 1,020 Zone 2 3,100 0.22 682 69.2 15.0 1,038 1,038 1,038 RTU -2 Total 1,038 1,038 Zone 3 2,83 0.22 623 63.2 15.0 948 948 948 RTU -3 Total 948 948 Zone 4 3,045 0.22 670 68.0 15.0 1,020 1,020 1,020 RTU -4 Total 1,020 1,020 Minimum ventilation to pgr SectionTable 121 -A E Based on fixed seat or the greater of the expected number of occupants and 50% of the CBC occupant load fore ress purposes fors aces without fixed seating. H Re uired Ventilation Air REO'D V.A. is the lamer of the ventilation rates calculated on and AREA or OCCUPANCY BASIS column D or G). 1 Must be greater than ore ual to H or use Transfer Air column N to make up the difference. J Design fan supply dm Fan CFM x 30%; or K Condition area ft. sq.) x 04 cfmtlt. sq. 0 or L Maximum of Columns H, J, K, or 300 dm M This must be less than or equal to Column L and greater that orequal to the sum of Columns H + N. N Transfer air must be provided where the Required Ventilation Air (column H) is greater than the Design Minimum Air (column M). Where required, transfer air must be greater than or equal to the difference between the Required Ventilation Air (column H) and the Design Minimum Air (column M), column H - M. EnergyPro 4.1 by EnergySoft User Number: 3358 Job Number: 06-002 Page:.11 of 19 MECHANICAL EQUIPMENT DETAILS Part 1 of 2 MECH-5-C PROJECT NAME Washington Park Subma'or 5 DATE 4/28/2006 CHILLER AND TOWER SUMMARY System Type Distribution Type Qty Rated Input Vol. (Gals.) Condition Status Ext R -Val. CHRONOMITE S-30 LP Efficiency Tons 3 PUMPS 0 Equipment Name Equipment Type Qty. Tot. Qty GPM BHP Motor Eff. Drive Eff. Pump Control QHW / BOILER SUMMARY Hot Water P mp Hot Water Piping Len th ft Add 1/2" Control # HP Type In Plenum Outside Buried Insulation CENTRAL SYSTEM RATINGS HEATING COOLING Aux. Condition System Name System Type Qtv Out ut kW Eff. Output Efficiency Status Economizer Type CARRIER 50HJQ012 Packaged DX 4 114,000 0.0 3.30 COP 119,40010.3 EER New Fixed Temp (Non-lnte ) CENTRAL SYSTEM FAN SUMMARY System Name Fan Type CARRIER 50HJQ012 Constant Volume Motor Location Energy Factor or RE Standby Loss or Pilot TANK INSUL. System Name System Type Distribution Type Qty Rated Input Vol. (Gals.) Condition Status Ext R -Val. CHRONOMITE S-30 LP Instant Elec No Pipe Insulation 3 9,429 0 New 0.98 n/a n/a Hot Water P mp Hot Water Piping Len th ft Add 1/2" Control # HP Type In Plenum Outside Buried Insulation CENTRAL SYSTEM RATINGS HEATING COOLING Aux. Condition System Name System Type Qtv Out ut kW Eff. Output Efficiency Status Economizer Type CARRIER 50HJQ012 Packaged DX 4 114,000 0.0 3.30 COP 119,40010.3 EER New Fixed Temp (Non-lnte ) CENTRAL SYSTEM FAN SUMMARY System Name Fan Type CARRIER 50HJQ012 Constant Volume Motor Location PP CFM BHP Motor Eff. Drive Eff. CFM BHP Motor Eff. Drive Eff. Draw -Through 4,000 0.80 77.0% 97.0% none EnergyPro 4.1 by EnergySoft User Number: 3358 Job Number: 06-002 Page: 12 of 19 ENVELOPE MANDATORY "MEASURES 'ENV -MM PROJECT NAME Wash DATE n Park (Submajor 5) DESCRIPTION Designer Enforcement ❑X § 118(a) Installed Insulating Material shall have been certified by the manufacturer to comply with the California Quality Standards for Insulating material, Title 20, Chapter 4, Article " 3 ] § 118(c) All Insulating Materials shall be Installed; in compliance with the flame spread rating and smoke density requirements of Sections 2602 and 707 of Title 24, Part 2. §117(a) All Exterior Joints and openings in the bulid Ing that are observable, sources of air . leakage shall be caulked, gas keted,.weatherstripped or otherwise sealed. IFX §116(b) Site Constructed Doors, Windows and Skylights shall be. caulked between the unit and the building, and shall be weatherstripped (except for unframed glass doors and fire doors). X❑ § 118(a)1 Manufactured Doors and Windows Installed shall have air. Infiltration rates not exceeding those shown in Table Number 1-E. of the Standards. Manufactured fenestration products must be labeled for U -value according to NFRC procedures. X❑ § 118(e) Demising Walls in Nonresidential Buildings:. ' The opaque portions of framed demising walls.in nonresidential buildings shall have Insulation with an installed R -value of no less than R-11 between framing members.' . ,. - .. 4 -. j EnergyPro By EnergySoft User Number: User Job Number: 06-002 Page: 13 of 19 MECHANICAL MANDATORY MEASURES Part 1 of 2MECH-MM PROJECT NAME DATE Washington Park (Submajor•5) 4/28/2006 DESCRIPTION Designer Enforcement Equipment and Systems Efficiencies 0 §111 Any appliance for which there is a California standard established in the Appliance Efficiency Regulations will comply with the applicable standard. §1`1 5(a) Fan type central furnaces shall not have a pilot light. 0 § 123 Piping, except that conveying fluids at temperatures between 60 and 105 degrees Fahrenheit, or within HVAC equipment, shall be insulated in accordance with Standards Section 123. § 124 Air handling duct systems shall be installed and insulated in compliance with Sections 601, 603 and 604 of the Uniform Mechanical Code. Controls. § 122(e) Each space conditioning system shall be installed with one of the following: D § 122(e)1A Each space conditioning system serving building types such as offices and manufacturing facilities (and all others not explicitly exempt from the requirements of Section 112 (d)) shall be installed with an automatic time switch with an accessible manual override that allows operation of the system during off -hours for up to 4 hours. The time switch shall be capable of programming different schedules for weekdays and weekends and have program backup capabilities that prevent the loss of the device's program and time setting for at least 10 hours if power is interrupted; or a§ 122(e)1I§ An occupancy sensor to control the operating. period of the system; or § 122(e)1C A 4 -hour timer that can be manually operated to control the operating period of the system. ` 0 § 122(e)2 Each space conditioning system shall be installed with controls that temporarily - restart and temporarily operate the system as required to maintain a'setback heating and/or a setup cooling thermostat setpoint. § 122(8) Each space conditioning system serving multiple zones with a combined conditioned floor area more than 25,000 square feet shall be provided with isolation zones. Each zone: shall not exceed 25,000 square feet; shall be . provided with isolation devices, such as valves or dampers, that allow the supply of heating or cooling to be setback or shut off independently of other isolation areas; and shall be controlled by a time control device as described above. § 122(a1£b) Each space conditioning system shall be controlled by an individual thermostat that responds to temperature within the zone. Where used to control heating, the control shall be adjustable down to 55 degrees F or lower: For cooling, the control shall be adjustable up to 85 degrees F or higher. Where used for both heating and cooling, the control shall be capable of providing a deadband of at least 5 degrees F within which the supply of heating and cooling is shut off or reduced to a minimum. X § 122(c) Thermostats shall have numeric setpoints in degrees Fahrenheit (F) and adjustable setpoint stops accessible only to authorized personnel.' § 112(b) Heat pumps shall be installed with controls to prevent electric resistance supplementary heater operation when the heating load.can be met by the heat pump alone. EnergyPro By EnergySoft User Number: User Job Number: 06-002 Page: 14 of 19 t IMECHANICAL MANDATORY MEASURES Part 2 of Z MECH-MM PROJECT NAME 1 ; DATE Washin ton Park Subma'or 5 4/28/2006 Description Designer Enforcement Ventilation FX 121(e) Controls shall be provided to allow outside air dampers or devices to be operated at the ventilation rates as specified on these plans. X] § 122(o Gravity or automatic dampers interlocked and closed on; fan shutdown shall be provided on the outside air intakes and discharges of all space conditioning and ` exhaust systems. X❑ § 122(o All gravity ventilating systems shall be provided with automatic or readily accessible manually operated dampers In all openings to the outside, except for combustion air' -openings. § 121(f)1 Air Balancing: The system shall be balanced In accordance with the National. Environmental Balancing Bureau (NEBB) Procedural Standards (1983), or Associated Air Balance Council (AABC) National Standards (1989); or n § 121(02 Outside Air Certification: The system shall provide the minimum outside air as shown on the mechanical drawings, and shall be measured and certified by the Installing licensed C-20 mechanical contractor and certified by (1) the design mechanical engineer, (2) the Installing licenced C-20.mechanical contractor, or (3) the, person with overall responsibility for the design of the ventilation system; or, ❑ § 121(03 Outside Air Measur®ment: The system shall be equipped with a calibrated local or remote device capable of measuring the quantity of outside air on a continuous basis and displaying that quantity on a readily accessible display dlvlce; or • .•. § 121(04 Another method approved by the Commission. . Service Water Heating Systems . 1�1§ 113(b)2 1f a circulating hot water system Is Installed,' shall have a control capable of automatically turning off the circulating pump(s) when hot water Isnot required.- X] § 113(b)3B Lavatories In restrooms of public facilities shall be equipped with controls to limit the outlet temperature to 110 degrees F. 1^1§ 113(b)3C Lavatories in restrooms of public facilities shall be equipped with one of the following: ' Outlet devices that limit the flow of hot water to a maximum of 0.5 gallons per ' minute. Foot actuated control valves, and outlet devices that limit the flow of hot water to a maximum of 0.75 gallons per minute: Proximity sensor actuated control valves, and outlet devices that limit the flow of hot. water to a maximum of 0.75 gallons per minute. Self-closing valves, and outlet devices that limit the flow of hot water to a maximum of 2.5 gallons per minute, and 0.25 gallons/cycle (circulating system). Self-closing valves, and outlet devices that limit the flow of hot water to a maximum ' of 2.5 gallons per minute, and 0.50 gallons/cycle (non -circulating system). Self-closing valves, and outlet devices that limit the flow of hot water to a maximum of 2.5 gallons per minute, and 0.75 gallons/cycle (foot switches and proximity sensor . controls). ` EnergyPro By EnergySoft User Number: User Job Number: 06-002 ' Page: 15 of 19 MVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE Washington Park Subma'or 5 4/28/2006 SYSTEM NAME FLOOR AREA RTU -1 3 045 Number of Systems 1 Heating System Output per System 114,000 Total Output (Btuh) 114,000 Output (Btuhlsgft) 37.4 Cooling System Output per System 119,400 Total Output (Btuh) 119,400 Total Output (Tons) 9.9 Total Output (Btuh/sgft) 39.2 Total Output (sgft/Ton) 306.0 Air System CFM per System 4,000 Airflow (cfm) 4,000 Airflow (cfm/sgft) 1.31 Airflow (cfm/Ton) 402.0 Outside Air (%) 25.5 Outside Air (cfmisgft) 0.33 Note: values above gl JEATING SYSTEM 26.0 of Outside Air 1020 cfm 69.9 of 'DOLING S 12.0 / 77.9 of Outside �� 1020 cfm 74.5/62.0 of Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK IICOILHTG.PEAK CFM I Sensiblel Latent I I CFM I Sensible 1,992 40,284 12,914 165 6,128 0 2,014 306 0 0 1,020 40,712 18,517 1,020 47,662 0 0 2,0141 1 306 85,0601 31 43 54 403 CARRIER 50HJQ012 103,439 5,414 71,201 Total Adjusted System Output 103,439 5,414 71,201 (Adjusted for Peak Design Conditions) at ARI conditions L- YCHROMETRICS (Airstream Tei 58.7 of 105.0 of Heating Coil TIME OF SYSTEM PEAK Jul 3 pm Jan 12am at Supply Fan 4000 cfm 105.0 of -� Supply Air Ducts 104.9 of ROOMS 70.0 of h Return Air Ducts 4 drstream Temperatures at 84.0 / 66.6 of. 55.0 / 53.7 of Cooling Coil Supply Fan 4000 cfm 55.0 / 53.7 of -� Supply Air Ducts 55.5 / 53.9 of 50.7% R.H. ROOMS 74.0 61.9 of h Return Air Ducts 4 EnergyPro 4.1 by EnergySoft User Number: 3358 Job Number: 06-002 Paoe:16 of 19 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE Washington Park Subma'or 5 4/28/2006 SYSTEM NAME FLOOR AREA RTU -2 3,100 Number of Systems 1 Heating System Output per System 114,000 Total Output (Btuh) 114,000 Output (Btuh/sgft) 36.8 Cooling System Output per System 119,400 Total Output (Btuh) 119,400 Total Output (Tons) 9.9 Total Output (Btuh/sgft) 38.5 Total Output (sgft/Ton) 311.6 Air System CFM per System 4,000 Airflow (cfm) 4,000 Airflow (cfm/sgft) 1.29 Airflow (cfmffon) 402.0 Outside Air (%) 25.9 Outside Air (cfm/sgft) 0.33 Note: values above given at ARI conditions 26.0 of Outside Air 1038 cfm 69.9 of 5A F OF Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK I COIL HTG. PEAK CFM I Sensiblel Latent I I CFM I Sensible 2,23 45,117 13,147 285 10,626 0 2,256 531 0 0 1,038 41,386 18,812 1,038 48,465 0 0 2,2561 531 91,045T 31,959 60154 CARRIER 50HJQ012 103,861 5,167 71,201 Total Adjusted System Output 103,861 5,167 71,201 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Jul 3 pm Jan 12 am 105.0 of Heating Coil Supply Fan 4000 cfm 105.0 OF -� Supply Air Ducts 104.9 of ROOMS 70.0 OF h Return Air Ducts 4 DOLING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Cooling Peak 112.0 / 77.9 OF 84.3 / 66.7 of 55.0 / 53.7 of 55.0 / 53.7 of Supply Air Ducts Outside Air 1038 cfm Cooling Coil Supply Fan 55.5 / 53.9 of 4000 cfm 50.7% R.H. ROOMS 74.5/62.1°F 74.0/61.9OF Return Air Ducts I EnergyPro 4.1 by EnergySoft User Number: 3358 Job Number 06-002 Page: 17 of 19 I l HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE Washington Park Subma'or 5 4/28/2006 SYSTEM NAME FLOOR AREA RTU -3 2,831 Number of Systems 1 Heating System Output per System 114,000 Total Output (Btuh) 114,000 Output (Btuh/sgft) 40.3 Cooling System Output per System 119,400 Total Output (Btuh) 119,400 Total Output (Tons) 9.9 Total Output (Btuh/sqft) 42.2 Total Output (sgft/Ton) 284.5 Air System CFM per System 4,000 Airflow (cfm) 4,000 Airflow (cfm/sqft) 1.41 Airflow (cfm/Ton) 402.0 Outside Air (%,) 23.7 Outside Air (cfm/sgft) 0.33 ote: values above given at ARI conditions :ATING SYSTEM PSYCHROMETRICS 26.0 of 59.2 of Outside Air 948 cfm 69.5 of 3.6 / 77.0 of 311� Outside Air 948 cfm 75.3/62.3 of SYSTEM Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK J I COIL HTG. PEAK CFM I Sensiblel Latent I I CFM I Sensible 5,659 114,423 12,006 1,209 45,026 0 5,721 2,251 0 0 948 33,547 17,463 948 43,852 0 0 5,7211 2,251 159,4 29 469 93 380 CARRIER 50HJQ012 102,536 7,537 71,201 Total Adjusted System Output 102,536 7,537 71,201 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK I Jul 5 pm I I Jan 12 am 105.0 of Heating Coil Supply Fan 4000 cfm 105.0 of —� Supply Air Ducts 104.5 of ROOMS 70.0 of �% Return Air Ducts 4 HROMETRICS (Airstream Temperatures at 83.2 / 66.2 of W 55.0 / 53.7 of Cooling Coil Supply Fan 4000 cfm 55.0/53.7 of —� Supply Air Ducts 56.3 / 54.2 of 50.5% R.H. ROOMS 74.0 / 61.8 of EnergyPro 4.1 by EnergySoft User Number: 3358 Job Number. 06-002 Page:18 of 19 i 1� 9' ,HVAC SYSTEM HE AND COOLING LOADS SUMMARY „ PROJECT NAME .d DATE Washington Park Subma'or 5 4/28/2006 SYSTEM NAME FLOOR AREA RTU -4 3.045 Number of Systems 1 Heating System Output per System 114,000 Total Output (Btuh) 114,000 Output (Btuh/sgft) 37.4 Cooling System Output per System 119,400 Total Output (Btuh) 119,400 Total Output (Tons) 9.9 Total Output (Btuh/sgft) 39.2 Total Output (sgft/Ton) 306.0 Air System CFM per System 4,000 Airflow (cfm) 4,000 Airflow (cfm/sgft) 1.31 Airflow (cfmlTon) 402.0 Outside Air (%) 25.5 Outside Air (cfm/sgft) 0.33 Note: values above given at ARI conditions EATING S 26.0 of 1 Outs 1020 cfm 69.9 of 112.0 / 77.9 of 311� Outside Air 1020 cfm 74.5/62.0 of 4.1 by Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK COIL HTG. PEAK CFM ISensiblel Latent CFMI Sensible 2,014 40,717 12,914 F 174 6,489 0 a 2,036 324 0 0 1,020 40,705 18,518 1,020 47,657 0 0 2,0361 324 85 545 31,432 54 795 CARRIER 50HJQ012 103,453 5,402 71,20 Total Adjusted System Output 103,453 5,402 71,201 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Jul 3 pm Jan 12 am 4YCHROMETRICS (Airstream Tei 58.7 of 105.0 of Heating Coil Supply Fan 4000 cfm 105.0 of -� Supply Air Duct 104.9 of ROOMS 70.0 of Return Air Duct drstream Temperatures at Ti 84.0 / 66.6 of M 55.0 / 53.7 of User Number: 3358 Cooling Coil Supply Fan 4000 cfm 55.0 / 53.7 of 4 Supply Air Ducts 55.5; 53.9 of 50.7% R.H. ROOMS 74.0 / 61.9 of Return Air Ducts Job Number: 06-002 19 of 19