Dokken Engineering - Cost ProposalCOST PROPOSAL 1
COST-PLIIS-FIXED FEE OR LUl1IP SUDI OR FIRM FIXED PRICE CONTRACTS
(DESIGN, ENGINEERING AND ENVIRONMENTAL STUDIES)
Note: Mark -Ups are Not Allowed Q Prime Consultant ❑ Subconsultant ❑ 2nd Tier Subconsultant
Consultant: DOKKEN ENGINEERING
Project No. 202 3-33 Contract No. TBD Date September 29. 2025
Project Name La Quinta Bridge Preventative Maintenance Program Plan
DiRECT LABOR
Classification/Title
Name
Range
Hours
Actual Hr Rate*
Principal in Charge
Charles Tornaci, PE*
$90.00 - S 150.00
24
S
94.00 S
Project Manager
Gabriel Hoxnteier, PE*
S80.00 - S140.00
318
S
80.00 S
QA/QC Review
Steve Kooyntan, PE*
S90.00 - S 150.00
28
S
95.00 S
Structures Design Lead
Gabriela Morales, PE*
$60.00 - S90.00
216
S
63.00 S
Roadway Design Lead
Megan Cunningham, PE*
S60.00 - S90.00
0
S
63.00 S
Senior Engineer 3
STAFF
$90.00 - $150.00
0
S
98.00 S
Senior Engineer 2
STAFF
S80.00 - $115.00
0
S
88.00 S
Senior Engineer 1
STAFF
S65.00 - S95.00
0
S
78.00 S
Associate Engineer 3
STAFF
S65.00 - S80.00
0
$
72.00 S
Associate Engineer 2
STAFF
S60.00 - $70.00
233
S
65.00 S
Associate Engineer I
STAFF
S50.00 - S65.00
0
S
60.00 S
Assistant Engineer 3
STAFF
$55.00 - S75.00
0
S
56.00 S
Assistant Engineer 2
STAFF
S44.00 - $57.00
390
S
49.00 S
Assistant Engineer I
STAFF
S35.00 - S48.00
0
S
43.00 S
Senior CAD
STAFF
S55.00 - S95.00
44
S
80.00 S
CAD/Detailer
STAFF
S45.00 - S75.00
300
S
50.00 S
Engineering Technician
STAFF
S25.00 - S55.00
2
S
39.00 S
Environmental Lead
Jeffery Little*
S70.00 - S 100.00
154
S
70.00 S
Environmental Manager
STAFF
S80.00 - S 120.00
is
S
95.00 S
Principal Planner
STAFF
S70.00 - S100.00
20
S
85.00 S
Senior Environmental Planner 2
STAFF
S60.00 - S90.00
168
S
70.00 S
Senior Environmental Planner 1
STAFF
S50.00 - S80.00
20
S
60.00 S
Associate Environmental Planner
STAFF
S39.00 - S59.00
56
S
50.00 S
Environmental Planner
STAFF
S33.00 - S45.00
302
S
39.00 S
Environmental Technician
STAFF
S20.00 - S40.00
0
S
30.00 S
Right of Way Manager
STAFF
S70.00 - Sl 10.00
65
S
79.00 S
Senior Right of Way Agent
STAFF
$55.00 - S85.00
108
$
62.00 S
Right of Way Agent
STAFF
S35.00 - $65.00
5
S
37.00 S
Right of Way Assistant
STAFF
S25.00 - $40.00
39
$
31.00 S
Right of Way Technician
STAFF
S20.00 - S30.00
41
S
25.00 S
Senior Appraiser
STAFF
S55.00 - S85.00
0
$
58.00 S
Appraiser
STAFF
S35.00 - S65.00
44
S
43.00 S
Appraiser Assistant
STAFF
$25.00 - S40.00
0
S
31.00 S
Appraiser Technician
STAFF
S20.00 - S30.00
0
S
25.00 S
2,595
LABOR COSTS
a) Subtotal Direct Labor Costs
S
154,687.00
b) Anticipated Salary Increases
S7.551.1 1
INDIRECT COSTS
d) Fringe Benefits (Rate: 103.480-o )
f) Overhead (Rate: 0.0000 )
It) General and Administrative (Rate:
FIXED FEE
62.77°o )
Total
2,256.00
25,440.00
2,660.00
13.608.00
15,145.00
19,1 10.00
3,520.00
15.000.00
78.00
10.780.00
1,710.00
1,700.00
11,760.00
1.200.00
2,800.00
11,778.00
5,135.00
6,696.00
185.00
1.209.00
1,025.00
1.892.00
c) TOTAL DIRECT LABOR COSTS [(a) + (b)] S 162,238.11
e) Total Fringe Benefits [(c) x (d)] S 167.883.99
g) Overhead [(c) x (t)] S
i) Gen & Admin [(c) x (h)] S 101,836.86
j) TOTAL INDIRECT COSTS [(e) + (g) + (01 $ 269,720.85
k) TOTAL FIXED FEE [(c) + (j)] x fixed fee
1290 1 $ 51,835.08
Page 1 of 4
1) CONSULTANT'S OTHER DIRECT COSTS (ODC) — ITEMIZE (Add additional pages if necessary)
Description of Item
Quantity Unit
Unit Cost
Total
Cultural Resources/Section 106 Compliance
1 Each
S 1.000.00 S
1.000.00
Title Reports
I Each
$ L500.00 S
L500.00
Appraisal Review Reports
1 Each
S 1200.00 S
1,200.00
i) TOTAL OTHER DIRECT COSTS $ 3,700.00
m) SUBCONSULTANTS' COSTS (Add additional pages ifnecessary)
• UNIC'O
•GEOCON
BURNE ENGINEERING
S 18.204.86
S 38.865.82
S 63,045.99
m) TOTAL SUBCONSULTANTS' COSTS $ 120,116.68
n) TOTAL OTHER DIRECT COSTS INCLUDING SLBCONSULTANTS [(I) + (m)] $ 123,816.68
TOTAL COST [(c) + 0) + (k) + (n)] $ 607,610.71
*Employees will be billed at their actual pay rates within the ranges specified above. When actual rates change, employees will be billed at their updated rate.
NOTES:
I. Key personnel must be marked with an asterisk (*) and employees that are subject to prevailing wage requirements nimt he narked with two asterisks (M*). All costs mast comply
with the Federal cost principles. Subconsultanta will provide their oast cost proposals.
2. The cost proposal tonnat shall not be amended. Indirect cost rates shall be updated on an annual basis in accordance with the consultant's annual accotntung period and established b%
a cognizant agency or accepted by Caltrans
3. Anticipated salary increases calculation (page 2) nntst accompany.
Page 2 of 4
COST PROPOSAL 1
COST -PLUS -FIXED FEE OR LUMP SUM OR FIRM FIXED PRICE CONTRACTS
(CALCULATIONS FOR ANTICIPATED SALARY INCREASES)
1. Calculate Average Hourly Rate for 1st year of the contract (Direct Labor Subtotal divided by total hours)
Direct Labor
Total Hours per Avg
5 Year
Subtotal per Cost
Cost Proposal Hourly
Contract
Proposal
Rate
Duration
S154,687.00
2,595 - $59.61
Year 1 Avg
Hourly Rate
1. Calculate hourly rate for all years (Increase the Average Hourly Rate for a year by proposed escalation %)
Avg Hourly Rate
Proposed Escalation
Year 1
$59.61
+ 3.0% =
$61.40
Year 2 Avg Hourly Rate
Year 2
$61.40
+ 3.0% =
S63.24
Year 3 Avg Hourly Rate
Year 3
S63.24
+ 3.0% =
S65.14
Year 4 Avg Hourly Rate
Year 4
$65.14
+ 3.0% =
S67.09
Year 5 Avg Hourly Rate
3. Calculate estimated hours per year (Multiply estimate % each year by total hours)
Estimated % Completed
Total Hours per Cost
Total Hours per
Each Year
Proposal
Year
Year 1 (2025)
10.0%
* 2,595
= 260
Estimated Hours Year I
Year 2 (2026)
40.000
* 2,595
= 1038
Estimated Hours Year 2
Year 3 (2027)
30.0%
* 2,595
= 779
Estimated Hours Year 3
Year 4 (2028)
20.0a.
* 2,595
- 519
Estimated Hours Year 4
Year 5 (2029)
0.0o0
* 2,595
= 0
Estimated Hours Year 5
Total
100.000%
Total
- 2.595
4. Calculate Total Costs including Escalation (Multiply Average Hourly Rate by the number of hours)
Avg Hourly Rate Estimated hours
Cost Per
(Calculated above) (Calculated Above)
Year
Year I
S59.61 * 260
S15,468.70
Estimated Hours Year 1
Year 2
$61.40 * 1038
= S63.731.04
Estimated Hours Year 2
Year 3
S63.24 * 779
= S49,232.23
Estimated Hours Year 3
Year 4
S65.14 * 519
= S33,806.13
Estimated Hours Year 4
Year 5
S67.09 * 0
= S0.00
Estimated Hours Year 5
Total Direct Labor Cost with Escalation
= S 162,23 I 1
Direct Labor Subtotal before Escalation
= S 154,687.00
Estimated total of Direct Labor Salary Increase
= S7,551.11
Transfer to Page 1
VOTES:
1. This is not the only way to estimate salary inct eases. Other methods will be accepted if the} clearly indicate the oo increase. the a of years of the contract. and a breakdomi of the labor
to be perforated each year.
_. An estimation that is based oft direct labor nndGplied by salary. increase °o tnultiphed by the 9 of years is not acceptable (i.e. $250,000 x 20u x 5 yrs = $25.000 n not an acceptable
nethodology)
3. This assmues that one year will be worked at the rate oil the cost proposal before salary increases are granted.
4. Calculatiom for autictpated salary escalation must be provided.
Page 3 of 4
COST PROPOSAL 1
Certification of Direct Costs:
I, the undersigited, certify to the best of my knowledge and belief that all direct costs identified on the cost proposal(s) in this contract are actual,
reasonable. allowable, and allocable to the contract in accordance with the contract temis and the following requirements:
I. Generally Accepted Accounting Principles (GAAP)
2. Terms and conditions of the contract
3. Title 23 United States Code Section 112 - Letting of Contracts
4. 48 Code of Federal Regulations Part 31 - Contract Cost Principles and Procedures
5. 23 Code of Federal Regulations Part 172 - Procurement, Management, and Administration of Engineering
and Design Related Service
6. 48 Code of Federal Regulations Part 9904 - Cost Accounting Standards Board (wlien applicable)
All costs must be applied consistently and fairly to all contracts. All documentation of compliance must be retained in the project files and be in
compliance with applicable federal and state requirements. Costs that are noncompliant with the federal and state requirements are not eligible for
reimbursement. Local governments are responsible for applying only cognizant agency approved or Caltrans accepted Indirect Cost Rate(s).
Prime Consultant or Subconsultant Certifvine:
Name**: John A. Memories, Jr.
Signature: /a
Email**: iklemunes(a)dokkenenoineerins.com
Title**: President
Date of Certification (mmidd,'yyyy): 9%29/2025
Phone Number: 916-858-0642
Address: 110 Blue Racine Road, Suite 200. Folsom. CA 95630-4713
**An individual executive or financial officer of the consultant's or subconsultant's organization at a level no lower than a Vice President or a Chief
Financial Officer, or equivalent, who has authority to represent the financial information utilized to establish the cost proposal for the contract.
List services me constntant is provisnrg under the proposes contract:
Engineering. Environmental, and Right of Way Services
Page 4 of 4
SAMPLE COST PROPOSAL
Required Cost Proposal Template To Be Determined By Agency
COST PROPOSAL I
COST -PLUS -FIXED FEE OR LUDIP SUNI OR FIRM FIXED PRICE CONTRACTS
(DESIGN, ENGINEERING AND ENVIRONMENTAL STUDIES)
Note: Mark -Ups are Not Allowed J Prime Consultant ,J Subconsultant J 2nd Tier Subconsultant
Consultant: UNICO Engineering, Inc.
Project No. TBD Contract No. TBD Date September-'), 2025
Project Name City of La Quinta j Bridge Preventative Maintenance Program
DIRECT LABOR
Classification/fitle
Name
Range
Hours
Actual Hr Rate
Total
Survey Manager
Rob Markes
$80.00 - $100.00
0
$
92.40
$
Senior Land Surveyor
Bill Tipple. PLS
$80.00 - $100.00
24
$
96.15
$
2.30T60
Land Surveyor
Todd Jordan, PLS
$40.00 - S60.00
8
S
56.00
$
448.00
Land Surveyor
Roy Porter, LSIT
S40.00 - $60.00
0
S
42.00
S
-
Party Chief
Staff
S70.00 - $90.00
16
S
92.62
$
1,481.92
Rodman
Staff
S70.00 - S90.00
16
S
85.17
S
1,362.72
Survey Technician Drafter
Staff
S 30.00 - S50.00
22
S
33.50
$
737.00
86
LABOR COSTS
a) Subtotal Direct Labor Costs
$
6,3 37.24
b) .Anticipated Salary Increases
$0.00
c) TOTAL DIRECT LABOR COSTS [(a) + (b)] S 6,337.24
INDIRECT COSTS
d) Fringe Benefits (Rate: 0.00'o ) c) Total Fringe Benefits [(c) x (d)] S
f) Overhead (Rate: 154.64% ) g) Overhead [(c) x (f)] S 9.799.91
h) General and Administrative (Rate: 0.00% i) Gen 8c Admin [(c) x (h)] S
j) TOTAL INDIRECT COSTS [(e) + (g) + (i)] $ 9,799.91
FIXED FEE k) TOTAL FIXED FEE [(c) + (j)] x fixed fee 1000 ] $ 1,613.71
1) CONSULTANT'S OTHER DIRECT COSTS (ODC) - ITEMIZE (.add additional pages if necessary)
Description of Item Quantity Unit Unit Cost Total
ODC - Per Diems 2 Per Diem $227.00 $ 454.00
i) TOTAL OTHER DIRECT COSTS $ 4-94.00
m) SUBCONSULTANTS' COSTS (Add additional pages if necessary)
m) TOTAL SI'BCONSULTANTS' COSTS S
n) TOTAL OTHER DIRECT COSTS INCLUDING SUBCONSULTANTS [(I) + (m)] S 454.00
TOTAL COST [(c) + 0) + (k) + (n)] S 18,204.86
NOTES:
1. Key personnel must be marked with an asterisk (•) and employees that are subject to prevailing wage requirements must be marked with two as(ensks (••). III costs unsi compl) with the Federal cost
principles. Subcomultnus will provide their own cost proposals.
2. The cost proposal fonniat shall not be anneuded. hndiiect cost rates shall be updated on an annul basis in accordance with the consuluuYs annual accounting period and established by a cosauzan
agency or accepted by Caltrans.
3. Anticipated salve increases calculation (page 2) must accompany.
Page 1 of 3
SAMPLE COST PROPOSAL
Required Cost Proposal Template To Be Determined By Agency
COST PROPOSAL 1
COST -PLUS -FIXED FEE OR LUMP SUDI OR F1RINI FIXED PRICE CONTRACTS
(CALCULATIONS FOR ANTICIPATED SALARY INCREASES)
1. Calculate Average Hourly Rate for 1st year of the contract (Direct Labor Subtotal divided by total hours)
Direct Labor
Total Hours per Avg
5 Year
Subtotal per Cost
Cost Proposal Hourly
Contract
Proposal
Rate
Duration
$6.337.24
86 = S73.69
Year I Avg
Hourly Rate
1. Calculate hourly rate for all years (Increase the Average Hourly Rate for a year by proposed escalation %)
Avg Hourly Rate
Proposed Escalation
Year I
S73.69
5.006 =
S77.37
Year 2 Avg Hourly Rate
Year 2
$77.37
+ 5.0% =
S81.24
Year 3 Avg Hourly Rate
Year 3
$81.24
+ 5.0% =
S85.30
Year 4 Avg Hourly Rate
Year 4
$85.30
+ 5.0% =
S8957
Year 5 Avg Hourly Rate
3. Calculate estimated hours per year (Multiply estimate % each year by total hours)
Estimated % Completed
Total Hours per Cost
Total Hours per
Each Year
Proposal
Year
Year 1
100.00b
* 86 =
86
Estimated Hours Year I
Year 2
0.0%
* 86 =
0
Estimated Hours Year 2
Year 3
0.0%
* 86 =
0
Estimated Hours Year 3
Year 4
0.006
* 86 -
0
Estimated Hours Year 4
Year 5
0.0o o
* 86 -
0
Estimated Hours Year 5
Total
I00.0°. o
Total
86
4. Calculate Total Costs including Escalation (Multiply Average Hourly Rate by the number of hour~)
Avg Hourly Rate
Estimated hours
Cost Per
(Calculated above)
(Calculated Above)
Year
Year 1
$73.69
* 86 =
S6.337.24
Estimated Hours Year I
Year 2
$77.37
* 0 =
S0.00
Estimated Hours Year 2
Year 3
$81.24
* 0 =
S0.00
Estimated Hours Year 3
Year 4
$85.30
* 0 =
S0.00
Estimated Hours Year 4
Year 5
S89.57
* 0 =
$0.00
Estimated Hours Year 5
Total Direct Labor Cost with Escalation =
$6.337.24
Direct Labor Subtotal before Escalation =
$6, 337.24
Estimated total of Direct Labor Salary Increase =
$0.00
Transfer to Page 1
NOTES:
1. This is not the onlc way to esimiaic mlary increases. Other methods will be accepted if tliec clearly Indicate the % increase. the # of Yeats of the contract. and a breakdown of the labor to be performed
each year.
2. Art estimation that is bated on cbrect labor multiplied by salary Increase °o i n ltiplied by the s of yews is not acceptable (i e. $250,000 x 2% x 5 yrs = $25A00 is not an acceptable methodology)
?. This assumes that one year will be worked at the Late ou the cost proposal before salary mciea es ate granted.
J. Calculations for anticipated %alai� ewalauon unist be provided.
Page 2 of 3
SAMPLE COST PROPOSAL
Required Cost Proposal Template To Be Determined By Agency
COST PROPOSAL I
Certification of Direct Costs:
I, the undersigned, certify to the best of my knowledge and belief that all direct costs identified on the cost proposal(s) in this contract are actual. reasonable• allowable,
and allocable to the contract in accordance with the contract terms and the following requirements:
1. Generally Accepted Accounting Principles (GAAP)
2. Terms and conditions of the contract
.. Title 23 United States Code Section 112 - Letting of Contracts
4. 48 Code of Federal Regulations Part 31 - Contract Cost Principles and Procedures
5. 23 Code of Federal Regulations Part 172 - Procurement. Management. and Administration of Engineering and
Desien Related Sen ice
6. 48 Code of Federal Reputations Part 9904 - Cost Accounting Standards Board (when applicable)
All costs must be applied consistently and fairly to all contracts. All documentation of compliance must be retained in the project tiles and be in compliance with
applicable federal and state requirements. Costs that are noncompliant with the federal and state requirements are not eligible for reimbursement. Local gocerments
are responsible for applying only cognizant agency approved or Caltrans accepted Indirect Cost Rate(s).
Prime Consultant or Subconsultant Certihios:
Name**: Cesar Monies de Oea, PE
Signature:
Email**: cesar@unicoenoineennc corn
Title**: President
Date of Certification (mm dd yyyy): 92 2025
Phone Number: 916.900.6623
Address: UN1CO Engineering 1450 Frazee Road. Suite 250, San Diego, CA 92108
**An individual executive or financial officer of the consultant's or subconsultant's organization at a level no lower than a Vice President or a Chief Financial Officer,
or equivalent. who has authority to represent the financial information utilized to establish the cost proposal for the contract.
List services the consultant is providing under the proposed contract:
Land Surveying Service.
Page 3 of 3
SAMPLE COST PROPOSAL
Required Cost Proposal Template To Be Determined By Agency
COST PROPOSAL 1
COST -PLUS -FIXED FEE OR LUMP SUM OR FIRM FLED PRICE CONTRACTS
(DESIGN. ENGINEERING AND ENVIRONMENTAL STUDIES)
Note: Mark -Ups are Not Allowed
U
Prime Consultant _I Subconsultant
J 2nd Tier Subconsultant
Consultant: Geocon Consultants, he.
Project No. TBD
Contract No. TBD Date
September 5, 2025
Project Name La Quinta - BPMP
DIRECT LABOR
Classification/Title
Name
Range Hours
Actual Hr Rate
Total
Principal Engineer/Geologist
Ewert, ,fuhrend, Staff
575.00 - 5125.00 8
$
125.00
S
1,000.00
Senior Engineer/Geologist/Scientist
Silva, Staff
$65.00 - $83.00 4
S
66.00
$
_164.00
Project Engineer/Geologist/Scientist
Staff
$50.00 - $58.00 20
S
58.00
S
1,160.00
Certified Asbestos Consultant
Dennig, Rice, Staff
S45.00 - $55.00 40
$
55.00
S
2,200A0
Certified Asbestos Consultant (PW)
Dennig, Rice, Staff
PW Rate 24
$
58.77
S
1.410.48
Certified Asbestos Consultant (PW-OT)
Dennig. Rice, Staff
PW Rate 6
$
88.16
S
528.96
Field Technician (PW)
Staff
PW Rate 16
$
51.56
$
824.96
GIS Specialist
Brown, Staff
S45.00 - $65.00 10
$
51.50
$
515.00
Word Processing
Ingraham, Staff
525.00 - $50.00 6
$
38.50
S
231.00
134
LABOR COSTS
a) Subtotal Direct Labor Costs
$
8,134.40
b) Anticipated Salary Increases
50.00
c) TOTAL DIRECT LABOR
COSTS f (a) + (b)]
$
8,134.40
INDIRECT COSTS
d) Fringe Benefits (Rate: 53.1 3% )
c) Total Fringe Benefits [(e) x (d)]
S
4.321.81
1) Overhead (Rate: 47.94% )
g) Overhead [(c) x (f)]
S
3,899.63
h) General and Administrative (Rate:
83.98% i) Gen & Admin [(c) x (h)]
S
6.831.27
j) TOTAL INDIRECT COSTS [(e) + (g) + (i)] $ 15,052.71
FIXED FEE k) TOTAL FIXED FEE [(c) + (j)] x fixed fee 10% ] $ 2,318.71
1) CONSULTANT'S OTHER DIRECT COSTS (ODC) - ITEMIZE (Add additional pages if necessary)
Description of Item
uantity
Unit
Unit Cost
Total
Per Diem
2
each
S
250.00
$
500.00
Truck
4
day
S
160.00
$
640.00
Hand Auger
I
each
S
50.00
$
50.00
Level D PPE
4
each
S
60.00
$
240.00
CPS
1
each
S
160.00
$
160.00
Total Lead
36
each
S
45.00
S
L620.00
Soluble Lead - WET Extract
16
each
S
80.00
S
1,280.00
Soluble Lead - WET Analysis
16
each
S
45.00
$
720.00
Soluble Lead - TCLP Extract
12
each
S
80.00
S
960.00
Soluble Lead - TC'LP Analysis
12
each
S
45.00
S
540.00
PLM
110
each
S
25.00
$
2.750.00
400 Point Count a,Gravimetric Reduction
20
each
S
90.00
$
1.800.00
1.000 Point Count
20
each
S
105.00
S
2.100.00
m) SUBCONSULTANTS' COSTS (Add additional pages if necessary)
i) TOTAL OTHER DIRECT COSTS $ 13,360.00
in) TOTAL SUBCONSULTANTS' COSTS
n) TOTAL OTHER DIRECT COSTS INCLUDING SUBCONSULTANTS [(I) - (m)] $ 13,360.00
TOTAL COST [(c) + (i) + (k) + (n)] $ 38,865.82
NOTES:
I. key personnel must be marked with an asterisk (`) and employees that are subject to prevailing wage requirements must be marked with two asterisks (*•). All costs must comply wilh the Fedeml cost
principles. Subconsultants will provide their owu cost proposals.
2. The cost proposal format shall not be anieuded. Indirect cost rates shall be updated on anannual basis in accordance with the consultant's annual accounting period and established by a cognizant
agency or accepted by Calf r ns.
3. Anticipated salary increases calculation (page 2) must accompany.
Page 1 of 2
SAMPLE COST PROPOSAL
Required Cost Proposal Template To Be Determined By Agency
COST PROPOSAL 1
Certification of Direct Costs:
I, the undersigned, certify to the best of my knowledge and belief that all direct costs identified on the cost proposal(s) in this contract are actual, reasonable,
allowable, and allocable to the contract in accordance with the contract terms and the following requirements:
I . Generally Accepted Accounting Principles (GAAP)
2. Terms and conditions of the contract
3. Title 23 United States Code Section 112 - Letting of Contracts
4. 48 Code of Federal Regulations Part 31 - Contract Cost Principles and Procedures
5. 23 Code of Federal Regulations Part 172 - Procurement, Management, and Administration of Engineering and
Design Related Setlice
6. 48 Code of federal Regulations Part 9904 - Cost Accounting Standards Board (when applicable)
All costs must be applied consistently and fairly to all contracts. All documentation of compliance must be retained in the project tiles and be in compliance with
applicable federal and state requirements. Costs that are noncompliant with the federal and state requirements are not eligible for reimbursement. Local governments
are responsible for applying only cognizant agency approved or Caltrans accepted Indirect Cost Rate(s).
Prime Consultant or Subconsultant C'ertifving:
Name**: Josh E Est, PG Title**: Vice President
l
Signature: Date of Certification (mm/dd/yyyy): 9/5/2025
Email**: ewertilbaeoconinc.com Phone Number: 916.852.91 l8
Address: 3160 Gold Vallev Drive, Suite 800, Rancho Cordova, CA 95742
**An individual executive or financial officer of the consultant's or subconsultant's organization at a level no lower than a Vice President or a Chief Financial
Officer, or equivalent, who has authority to represent the financial information utilized to establish the cost proposal for the contract.
List services me consunam is provioumg unaer ine proposea contract:
ADL Survey, and ACM; LCP Surveys
Page 2 of 2
SAMPLE COST PROPOSAL
Required Cost Proposal Template To Be Determined By Agency
COST PROPOSAL l
COST -PLUS -FIXED FEE OR LIMP SUNI OR FIRM FIXED PRICE CONTRACTS
(DESIGN, ENGINEERING AND ENVIRONMENTAL STUDIES)
Note: Mark -Ups are Not Allowed ❑ Prime Consultant Subconsultant ❑ 2nd Tier Subconsultant
Consultant: BURNE ENGINEERING
Project No. TBD Contract No. TBD Date September 25, 2025
Project Name LA QUINTA BRIDGE PREVENTATIVE MAINTENANCE PROGRAM PLAN
DIRECT LABOR
C lassificationfritle
QA,QC Manager
Sr. Bridge Engineer
Associate Engineer
Assistant Engineer
Sr. C'ADD Technician
Drafting Technician II
Drafting Technician I
Administrative
LABOR COSTS
a) Subtotal Direct Labor Costs
b) Anticipated Salary Increases
INDIRECT COSTS
d) Fringe Benefits (Rate: 38.4810 )
t) Overhead (Rate: 122.70% )
h) General and Administrative (Rate:
FIXED FEE
Name
Range
Hours
Actual Hr Rate
Total
Lori Burne
S74.00 - $86.00
10
S
74.00
S
740.00
Russ Nygaard
S70.00 - S82.00
186
S
70.00
S
13,020.00
Staff
S37.00'- S44.00
54
S
37.85
S
2,043.90
Staff
S28.00 - S31.00
0
S
28.00
$
-
Staff
S65.00 - S72.00
60
S
65.00
S
3.900.00
Staff
$35.00 - $ 39.00
28
S
35.02
$
980.56
State
S28.00 - S31.00
45
S
28.00
S
1,260.00
Staff
S35.00 - S39.00
0
S
35.00
$
-
383
0.00°6 )
S 21,944.46
zn nn
c) TOTAL DIRECT LABOR COSTS [(a) + (b)] S 21,944.46
c) Total Fringe Benefits [(c) x (d)] S 8.444.23
g) Overhead [(c) r (t)] S 26.925.85
i) Gen c& Admin [(c) x (h)] S -
j) TOTAL INDIRECT COSTS [(e) + (g) + (i)] $ 3i,370.08
k) TOTAL FIXED FEE [(c) + 0)] x fixed fee 10% ] S 5,731.45
1) CONSULTANT'S OTHER DIRECT COSTS (ODC) - ITEMIZE (Add additional pages if necessary)
Description of Item Quantity Unit Unit Cost Total
In) SUBCONSULTANTS' COSTS (Add additional pages if necessary)
i) TOTAL OTHER DIRECT COSTS $
m) TOTAL SUBCONSULTANTS'COSTS $
n) TOTAL OTHER DIRECT COSTS INCLUDING SUBCONSULTANTS [(1) + (m)] $
TOTAL COST [(c) t 0) + (k) + (n)] $ 63,045.99
NOTES:
1. Key personnel must be warked with an asterisk (') and employees that are subject to prevailingwage requireutents must be mmarked with two astensks ('•). All costs must comply with the Federal cost
principles. Subconsultans will provide their own cost proposals.
2. The cost proposal fomtat shall not be annended. Indirect cost rates shall be updated on in annual basis in accordance with the consultant's annual accounting period and egabinhed by a cognizant
agency or accepted by Caltrrim.
3. A ticipated salary increases calculation (page 2) must accompany.
Page 1 of 3
SAMPLE COST PROPOSAL
Required Cost Proposal Template To Be Determined By Agency
COST PROPOSAL 1
COST -PLUS -FIXED FEE OR LiAIP SUNNI OR FIRM FIXED PRICE CONTRACTS
(CALCULATIONS FOR ANTICIPATED SALARY INCREASES)
1. Calculate Average Hourly Rate for 1st year of the contract (Direct Labor Subtotal divided by total hours)
Direct Labor
Total Hours per Avg
5 Year
Subtotal per Cost
Cost Proposal Hourly
Contract
Proposal
Rate
Duration
$21,944.46
333 - $57.30
Year 1 Avg
Hourly Rate
1. Calculate hourly rate for all years (Increase the Average Hourly Rate for a year by proposed escalation %)
Avg Hourly Rate
Proposed Escalation
Year 1
$57.30
5.040 -
560.16
Year 2 Ave Hourly Rate
Year 2
$60.16
+ 5.00,0 -
563.17
Year 3 Avg Hourly Rate
Year 3
$63.17
+ 5.00,b =
566.33
Year 4 Avg Hourly Rate
Year 4
566.3 3
+ 5.0% =
569.64
Year 5 Ave Hourly Rate
3. Calculate estimated hours per year (Multiply estimate % each year by total hours)
Estimated % Completed
Total Hours per Cost
Total Hours per
Each Year
Proposal
Year
Year l
100A1tu
* 383 -
383
Estimated Hours Year 1
Year 2
0.09'0
* 383 =
0
Estimated Hours Year 2
Year 3
0.0° a
* 383 =
0
Estimated Hours Year 3
Year 4
0.0°0
* 383 =
0
Estimated Hours Year 4
Year 5
0.09u
* 383 _
0
Estimated Hours Year 5
Total
100.0%
Total -
333
4. Calculate Total Costs including Escalation (Multiply Average Hourly Rate by the number of hours)
Avg Hourly Rate
Estimated hours
Cost Per
(Calculated above)
(Calculated Above)
Year
Year 1
$57.30
* 383 -
521.944.46
Estimated Hours Year I
Year 2
$60.16
* 0 =
50.00
Estimated Hours Year 2
Year 3
$63.17
* 0
50.00
Estimated Hours Year 3
Year 4
$66.33
* 0 =
50.00
Estimated Hours Year 4
Year 5
$69.64
* 0 =
50.00
Estimated Hours Year 5
Total Direct Labor Cost with Escalation =
S21,944.46
Direct Labor Subtotal before Escalation =
S21,944.46
Estimated total of Direct Labor Salary Increase -
50.00
Transfer to Page 1
NOTES
I Tltrs is not the only tray to estimate salary increase. Other nretlrods will be accepted ifthey clearly indicate the on increase. Ilie # of years of the contract, and a breakdown of the labor to be lertomred
each tear
2. An equitation that is based on direct labor undtiplted by salary increase "o mtdtrphed by the 4 of vears is not acceptable. (t e. $250.000 x 2% x 5 yrs = $25.000 is not an acceptable i ethodology)
3 Tlns assumes that one year will be worked at the rate on the coat proposal before salanx increases are Panted.
4. Calculations for anticipated ,alary escalation mast be provided.
Page 2 of 3
SAMPLE COST PROPOSAL
Required Cost Proposal Template To Be Determined By Agency
COST PROPOSAL 1
Certification of Direct Costs:
1, the undersigned, certify to the best of my knowledge and belief that all direct costs identified on the cost proposal(s) in this contract are actual, reasonable. allowable,
and allocable to the contract in accordance with the contract terns and the following requirements:
1. Generally Accepted Accounting Principles (GAAP)
2. Terms and conditions of the contract
3. Title 23 United States Code Section 112 - Letting of Contracts
4. 48 Code of Federal Reeulations Part 31 - Contract Cost Principles and Procedures
5. 23 Code of Federal Regulations Pan 172 - Procurement, Management, and Administration of Engineering and
Design Related Sern'ice
6. 48 Code of Federal Reeulations Part 9904 - Cost Accountine Standards Board (when applicable)
All costs must be applied consistently and fairly to all contracts. All documentation of compliance must be retained in the project tiles and be in compliance with
applicable federal and state requirements. Costs that are noncompliant with the federal and state requirements are not eligible for reimbursement. Local govenrments
are responsible for applying only cognizant agency approved or Caltrans accepted Indirect Cost Rate(s).
Prime Consultant or Subconsultant C'ertifvine:
Name**: Lori Bume
Signature:
Email**: lori(Mburneenaineerino.com
Address: 5137 Golden Foothill Pkway :100, El Dorado Hills. CA 95762
Title**: President
Date of Certification (mm dd yyyy): 9 25 2025
Phone Number: 530-672-1600
**An individual executive or financial officer of the consultant's or subconsultant's organization at a level no lower than a Vice President or a Chief Financial Officer,
or equivalent, who has authority to represent the financial information utilized to establish the cost proposal for the contract.
iast services ine conbuttant is pro%wing unaer me
Structure Design
Page 3 of 3
R§DOKKEN
ENGINEERING
COST PROPOSAL - ESTIMATED HOURS BY TASK
LA QUINTA
BRIDGE PREVENTATIVE MAINTENANCE PROGRAM PLAN
DOKKEN ENGINEERING
TASK DESCRIPTION
d
a C
m V
E
F R
a
iL.7 L
iii
d o
E R
e
x v
CJ O
t7
ti 'a
E°
o
Y d
'U Q
a
w'
W R
'-' ro
u
i Yl
m
U 3
R
N
.d.,
E
N
`u
c
c
m
c
wrY
C
_`o
m
y
C
C
a
n
c
'+
F
u
C
L
C
'm
C
%,c,
„
"oe e
>. °'
E
c
= O
>
wo
000
i
c
U
E
C
i
>
a
0
C
'�
d
u
A
c
N
->
C
fy
C
U
vl
u
R
c
u
= ..
i
L
4]
C
C,
y
C
E
o "
e
R
a�i a
.V
O
<
d
o.
c
L
E
�
m
3
t
t
m
a
�'
°
m
O
y
ao
'
3
`0
2:
'�'
<
R
3
•-•.
t
F
�'
R
_3
O
C
y
`a
a
1011RS
ESCALATION
OTHER
DIRECT
COST
TOTAL COST
FULLY BURDENED RATE
$ 280.31
S 238.56
$ 283.29
$ 187.87
$ 193.83
$ 146.12
$ 238.56
$ 149.10
S 116.30
S 208.74
$ 283.29
S 253.47
S 208.74
$ 178,92
$ 149.10
$ 116.30
$ 235.58
$ 184.89
S 110.33
$ 92.44
$ 74.55
$ 128.23
Task f - Project Management
12
120
6
40
40
40
40
40
338
$ 1,188.07
S -
$ 76,118.74
1.1 - Project Management
12
120
6
40
40
40
40
40
338
$ 1,188.07
$ 76.118.74
Task 2 - Data Collection, Field Review, and Base Mapping
4
22
4
24
28
54
1136
$ 414.64
S -
S 26,565.56
2.1- Project Research
4
20
4
20
20
20
88
$ 287.82
S 18.440.14
2.2 - Utility Coordination
2
4
8
34
48
$ 126.82
$ 8,125.42
Task 3-Survey
18
1
12
3
33
$ 117.45
$ -
$ 7,524.93
3.1 - Project Survey Control
6
4
10
$ 36.12
$ 2,314.40
3.2 - Right of Way Surveys and Mapping
6
4
10
1 $ 36.12
$ 2.314.40
3.3 - Plats and Legal Descriptions
6
4
3
13
$ 45.20
S 2.896.13
Task 4 - Geotechnical Analysis (NOT USED)
d
$ -
$ -
S -
Task 5 - Environmental Approval
24
18
94
12
20
1 78
20
56
212
2
^,1
536
$ 1,480.38
S 1,000.00
$ 95,846.61
5.1 - Preliminary Environmental Study (PES)
8
2
20
2
4
10
16
2
64
$ 189.60
$ 12,147.47
5.2.1 - Phase 1 Initial Site Assessment (ISA)
2
8
20
2
8
32
72
$ 198.29
$ 1.2.704.18
5.2.2 - Phase U Preliminary Site Investigation (PSI) (OPTIONAL)
6
2
8
$ 30.27
$ 1,939.09
5.3 - Natural Environmental Study (NES)
2
2
4
2
20
30
44
104
$ 252.47
$ 16,175.78
5.4 - Cultural Resources/Section 106 Compliance
2
2
4
2
20
30
16
40
116
$ 337.61
$ 1,000.00
$ 22,630.26
5.5 • Water Quality Assessment Memo
2
2
22
2
18
40
86
$ 236.07
$ 15,124.92
5.6 - CEQA NOE and NEPA CE
2
2
22
2
18
40
86
$ 236.07
$ 15,124.92
Task 6 - Geometrical Approval Drawings
8
36
6
24
24
S6
16
82
252
$ 751.66
$ -
$ 48,158.28
6.1.1 - 30%Schematic - Roadway (Striping)
12
24
26
8
22
92
$ 270.14
$ 17,307.96
6.1.3 - 30% Schematic - Bridge
8
24
G
24
1
30
8
60
160
$ 461.52
$ 30,850.33
Task 7 - Final Plans, Specifications and Estimate (PS&E)
60
12
88
51
180
28
202
621
$ 1,7SS.35
$
$ 112,464.20
7.1.1 - 60%. Roadway (Striping)
8
25
30
8
28
99
$ 281.91
$ 18.061.70
7. L3 - 60% - Bridge
24
4
40
48
8
68
192
$ 547.32
$ 35,066.29
7.2.1 -90% - Roadway (Striping)
4
18
26
6
20
74
$ 207.17
$ 13,273.40
7.2.3 - 90% - Bridge
12
4
40
44
6
60
166
$ 463.55
$ 29.699.38
7.3.1 - 100%- Roadway (Striping)
4
8
8
10
30
$ 84.55
$ 5.416.95
7.3.3 - 100%- Bridge
8
4
8
24
1 16
60
S 170.85
S 10,946.49
Task 8 - Right of Way
2
8
2
25
103
5
39
41
44
269
$ 647.68
$ 2,700.00
$ 44,196.57
8.1 - ROW Coordination
8
8
$ 30.85
S 1,976.62
8.2 - ROW Tracking Table
2
5
7
14
$ 33.44
$ 2,142.38
8.3 - Obtain Title Reports and Title Research
2
2
2
4
10
$ 22.26
$ 1,500.00
S 2.926.17
8.4 - Property Owner Exhibit
2
8
2
4
1
2
19
$ 46.03
$ 2,949.30
8.5 - Appraisal Process
2
8
20
40
70
$ 140.30
$ 8.988.63
8.6- Obtain Appraisal Review Reports
1
2
2
4
9
$ 21.92
$ 1,200.00
$ 2,604.28
8.7 - Summary Statement
1
4
5
S 7.91
$ 506.67
8.8 - Negotiate for ROW
6
60
10
76
$ 219.86
S 14.086.56
8.9 - Escrow Coordination
•L
10
20
32
$ 68.24
b 4.372.34
8.10 - ROW Certificate Coordination
8
8
16
$ 33.98
$ 2,176.79
8.11 - File Closeout
2
3
10
$ 22.89
$ 1,466.83
Task 9 - Permitting
24
4
20
40
60
6
50
90
294
$ 840.21
$ -
S 53,831.69
9.1 . 1602 SAA
6
20
2
16
30
74
$ 212.84
$ 13.636.19
9.2 - 401 WQC
6
20
2
16
30
74
5 212.84
$ 13,636.19
9.3 - 404 NWP
6
20
2
18
30
76
$ 219.67
$ 14,074.05
9.4 - CVWB Encroarhment Permits
6
4
20
40
70
$ 194.87
$ 12,485.25
Task 10 - Construction Support
14
16
58
12
16
1
116
S 355.67
$ -
S 22,787.46
10.1 - Bid Advertisement
8
8
$ 11.24
$ 2,001.64
10.2 - Coustniction Administration
4
12
50
66
$ 211.18
S 13.529,86
10.3 - Record Drawings/As-Builts
2
4
8
12
16
42
$ 113.25
$ 7,255.96
$ -
$
TOTAL HOURS WITHOUT OPTIONAL TASKS
24
312
28
216
233
390
44
300
2
152
18
20
166 1
20
56
302
65
108
5
39
41 1
44
2,587
TOTAL COST WITHOUT OPTIONAL TASKS
$ 6.727.39
$ 74,430.72
$ 7,932.12
$ 40,579.06
$ 45,162.39
S 56,986.02
$ 10,496.64
$ 44.730.00
S 232.60
$ 31,728.48
$ 5,099.22
$ 5,069.40
$ 35,068.32 1
S 3,578.40
$ 8,349.60
$ 35,122.00
$ 15,312.57
S 19,967.47
S 551.67
$ 3,G05.24
$ 3,056.55 I
S 5,641-94
S 7,520.84
S 3,700.00
S 485,554.95
TOTAL HOURS WITH OPTIONAL TASKS1 24 318 1 28 1 216 1 233 1 390 44 300 2 1 154 1 18 1 20 168 1 20 1 56 1 302 65 108 S 1 39 1 41 1 44 2,595
TOTAL COST WITH OPTIONAL TASKS1 $ 6.727.39 1 $ 75,862.08 1 $ 7.932.12 1 $ 40,579.06 1 S 45,162.39 1 $ 56,986.02 $ 10,496.64 $ 44,730.00 $ 232.60 1 $ 32,145.96 1 $ 5,099.22 1 $ 5,069.40 $ 35,068.32 1 $ 3.578.40 1 S 8.349.60 1 $ 35,122.00 $ 15,312.57 $ 19.967.47 1 S 551.67 1 $ 3,605.24 1 $ 3,056.55 1 $ 5,641.94 $ 7,551.11 $ 3,700.00 $ 487,494.04
Page 1 of 3
R§DOKKEN
ENGINEERINC
COST PROPOSAL - ESTIMATED HOURS BY TASK
LA QUINTA
BRIDGE PREVENTATIVE MAINTENANCE PROGRAM PLAN
UNICO
GEOCON
TASK DESCRIPTION
_
=
_
v:C
?
h
t
-
y
a
H
m
•�
'L
a
u
o
w
TOTAL
HOURS
LABOR COST
ESCAIATIO
N
OH RATE
FEE
OTHER
DIRECT
COST
TOTAI. COST
`m
m
c
'oo
c
a`
u
ar
E
m
C
u
y
`m
•�
n
°
ai
a
v
° 3
" a
m"
[-
,y°, O
N 3
d
u
.-
a
`"
a
.o
TOTAL
HOURS
OTHER
DIRECT
COST
TOTAL COST
FULLY BURDENED RATE
S 269.32
$ 1S6.86
$ 259.43
$ 238.56
$ 93.83
154.64%
10.00%
$ 391.94
$206.95
$ 181.86
$ 172.46
$ 184.28
$ 276.43
$ 161.67
S 161.48
$1.20.72
Task 1- Project Management
$ -
$ -
S -
S -
S -
$ -
S
$ -
1.1 - Project Management
$ -
$ -
$ -
$ -
S -
Task 2 - Data Collection, Field Review, and Base Mapping
$ -
$ -
$ -
S -
S -
S -
$ -
S -
2.1 . Project Research
$ -
$ -
S -
S -
$ -
2.2 - Utility Coordination
$ -
S -
$ -
$ -
$ -
Task 3 - Survey
24
8
16
16
22
86
S 6,337.24
$ -
S 9,799.91
S 1,613.71
$ 454.00
$ 18,204.86
S
$ -
3.1 - Project Survey Control
8
4
4
16
S 1,159.16
$ 1,792.53
$ 295.17
$ 3,246.85
$ -
3.2 - Right of Way Surveys and Mapping
16
12
12
16
56
$ 4.207.88
$ 6,507.07
$ 1,071.49
$ 454.00
$ 12.240.44
$ -
3.3 . Plats and Legal Descriptions
8
6
14
$ 970.20
$ 1,500.32
$ 247.05
$ 2.717.57
$ -
Task 4 - Geotechnical Analysis (NOT USED)
$ -
$ -
$ -
$
$ -
$ -
$
$ -
Task 5. Environmental Approval
$ -
$
$ -
$ -
$ -
$ -
8
4
20
40
24
6
16
10
6
134
########
$ 38,865.82
S.1 - Preliminary Environmental Study (PES)
$ -
$ -
$ -
$ -
$ -
5.2.1 - Phase I Initial Site Assessment (ISA)
$ -
$ -
$ -
$ -
$ -
5.2.2 - Phase 11 Preliminary Site Investigation (PSI) (OPTIONAL)
$ -
S -
$ -
$ -
8
4
20
40
24
6
16
10 (+
134
$ 13.360.00
$ 38,865.82
5.3 - Natural Environmental Study (NES)
$
$
$
$
I
$ -
5.4 - Cultural Resourres/Section 106 Compliance
$ -
$ -
$ -
$ -
S -
5.5 - Water Quality Assessment Memo
$ -
$ -
$ -
$ -
S -
5.6 - CEQA NOE and NEPA CE
$
$
$
$
$
I
Task 6 - Geometrical Approval Drawings
$
$ -
$ -
S -
S -
$ -
S -
$ -
6.1.1 - 30%Schematic . Roadway (Striping)
S -
S -
$ -
$ -
$ -
6.1.3 - 30% Schematic - Bridge
S
$
$
$
$
Task 7 - Final Plans, Specifications and Estimate (PS&E)
S -
S -
S -
$ -
S
$ -
S -
S -
7.1.1 - 60%- Roadway (Striping)
$ -
$ -
S -
$ -
$ -
7.1.3 - 60%- Bridge
$ -
$ -
$ -
$ -
$ -
7.2.1 - 90%- Roadway (Striping)
$ -
$ -
$ -
$ -
$ -
7.2.3 - 90%- Bridge
$
$
$
$
$
7.3.1 . 100%- Roadway (Striping)
$ -
$ -
$ -
$ -
$ -
7.3.3 - 100%- Bridge
$ -
$ -
S
$ -
$ -
Task 8 - Right of Way
S
$
$
$
S
S
S
$
8.1 - ROW Coordination
$ -
$ -
$ -
$ -
$
8.2 - ROW Tracking Table
$ -
$ -
$ -
$ -
$ -
8.3 - Obtain Title Reports and Title Research
$ -
$ -
$ -
$ -
$ -
8.4 - Property Owner Exhibit
$ -
$ -
$ -
$ -
$ -
8.5 - Appraisal Process
$ -
$ -
$ -
$ -
$ -
8.6 - Obtain Appraisal Review Reports
$ -
$ -
$ -
$ -
$ -
8.7 - Summary Statement
$ -
$ -
$ -
$ -
$ -
$ -
8.8 - Negotiate for ROW
$ -
$ -
$ -
S -
8.9- Escrow Coordination
$ -
$ -
$ -
$ -
$ -
8.10 - ROW Certificate Coordination
$ -
$ -
$ -
$ -
$ -
8.11 -File Closeout
$ -
$ -
$ -
$ -
S -
Task 9 - Permitting
$ -
$ -
$ -
S -
S -
$
$
$
9.1 - 1602 SAA
$ -
$ -
$ -
$ -
$ -
9.2-401 WQC
$ -
$ -
$ -
$ -
I
$ .
9.3-404 NWP
$ -
$ -
$ -
$ -
$ -
9.4 - CVWB Encroachment Permits
$ -
$ -
$-
Task 10 -Construction Support
S -
$ -
S -
S
S
S -
S
$ -
10.1 - Bid Advertisement
$ -
$ -
$ -
$ -
$ -
10.2 - Construction Administration
$ -
$ -
$ -
$ -
$ -
10.3 - Record Drawings/As-Builus
S -
$ -
$ -
S -
$ -
TOTAL HOURS WITHOUT OPTIONAL TASKS
24
8
16
16
22
86
TOTAL COST WITHOUT OPTIONAL TASKS
S 6,463.68
$ 1,254.87
S 4,150.92
$ 3,817.03
S 2,064.37
$ 6,337.24
$ - I
S 9,799.91
$ 1,613.71
$ 454.00
S 18,204.86
$ -
$ -
S -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
S -
TOTAL HOURS WITH OPTIONAL TASKS1 24 1 8 1 16 1 16 1 22 1 86 1 1 1 1 1 1 1 8 1 4 1 20 40 1 24 1 6 16 10 1 6 1 134
TOTAL COST WITH OPTIONAL TASKS1 $ 6,463.68 1 $ 1,254.87 1 $ 4,150.92 1 $ 3.817.03 1 $ 2,064.37 1 1 S 6,337.24 1 $ $ 9,799.911 $ 1;613.71 1 $ 454.00 1 $ 18,204.86 1 $ 3,135.S5 I $. 827.79 1 $ 3,637.24 1 $ 6,898.21 1 $ 4,422.63 1 $ 1,658,58 1 $ 2,586.70 1 $ 1,614.81 1 $ 724.31 1 $ 13,360.00 1$ 38,865.82
Page 2 of 3
R§DOKKEN
E N C i N E E R i N C
COST PROPOSAL - ESTIMATED HOURS BY TASK
LA QUINTA
BRIDGE PREVENTATIVE MAINTENANCE PROGRAM PLAN
TASK DESCRIPTION
BURNE ENGINEERING
GRAND
TOURS
HOURS
GRAND
TOTAL
OTHER
DIRECT
COSTS
GRAND TOTAL
COST
A
°a°
b0
m°
�
CA
a
r
p
a
A
u
E
e
0
=
m
F
ro
e
C
TOTAL
HOURS
TOTAL COST
FULLY BURDENED RATE
$ 212.60
$ 201.11
S 108.74
S 186.74
S 100.61
S 80.44
Task I - Project Management
20
20
S 4,022.17
3S8
$ -
S 80,140.91
1.1 . Project Management
20
20
$ 4.022.17
358
S 80.140.91
Task 2 - Data Collection, Field Review, and Base Mapping
14
8
22
$ 3,685.46
158
$ -
$ 30,251.02
2.1 - Project Research
14
8
22
S 3,685.46
110
$ 22.125.60
2.2. Utility Coordination
S -
48
$ 8,125.42
Task 3 - Survey
S
119
S 454.00
S 25,729.79
3.1 - Project Survey Control
$ -
26
$ 5.561.25
3.2 - Right of Way Surveys and Mapping
$ -
66
$454.00
$ 14,554.84
3.3 - Plats and Legal Descriptions
$ -
27
S 5,613.70
Task 4 - Geotechnical Analysis (NOT USED)
$ -
$ -
$ -
Task 5 - Environmental Approval
$ -
670
$14,360.00
S 134,712.43
5.1 • Preliminary Environmental Study (PES)
$ -
64
$ 12.147.47
5.2.1 - Phase I Initial Site Assessment (ISA)
$ -
72
$ 12.704.18
5.2.2 • Phase 11 Preliminary Site Investigation (PSI) (OPTIONAL)
$ -
142
$13.360.00
S 40,804.91
5.3. Natural Environmental Study (NES)
$ -
104
$ 16,175.78
5.4 - Cultural Resources/Section 106 Compliance
S -
116
$1,000.00
$ 22,630.26
5.5 - Water Quality Assessment Memo
$ -
86
$ 15,124.92
5.6 - CEQA NOE and NEPA CE
$ -
86
$ 15,124.92
Task 6 - Geometrical Approval Drawings
2
30
10
32
8
82
$ 14,326.57
334
$ -
S 62,484.86
6.1.1 - 30%Schematic - Roadway (Striping)
$ -
92
S 17,307.96
6.1.3 - 30% Schematic - Bridge
2
30
10
32
8
82
$ 14,326.57
242
S 45.176.90
Task 7 - Final Plans, Specifications and Estimate (PS&E)
6
112
34
28
20
45
245
S 38,358.02
866
$
$ 150,822.22
7.1.1 •60% • Roadway (Striping)
$ -
99
S 18,061.70
7.1.3 - 60% - Bridge
2
40
18
16
20
29
125
1 $ 17.759.90
317
S 52.826.19
7.2.1 - 90%- Roadway (Striping)
$ -
74
S 13,273.40
7.2.3 - 90%- Bridge
2
32
16
8
8
66
$ 10,738.05
232
S 40,437.43
7.3.1 - 100%- Roadway (Striping)
S
30
$ 5,416.95
7.3.3 - 100%-Bridge
2
40
4
8
54
$ 9,860.07
114
$ 20.806.55
Task 8 - Right of Way
S
269
$ 2,700.00
$ 44,196.57
8.1 - ROW Coordination
$ -
8
S 1.976.62
8.2 - ROW Tracking Table
$ -
14
$ 2,142.38
8.3 - Obtain Title Reports and Title Research
$ -
10
$1.500.00
$ 2,926.17
8.4 - Property Owner Exhibit
$ -
19
$ 2,944.30
8.5 - Appraisal Process
S -
70
$ 8,988.63
8.6 - Obtain Appraisal Review Reports
$ -
9
$1.200.00
$ 2,604.28
8.7 - Summary Statement
$ -
5
S 506.67
8.8 - Negotiate for ROW
$ -
76
$ 14,086.56
8.9 - Escrow Coordination
$ -
32
$ 4,372.34
8.10 - ROW Certificate Coordination
S -
16
$ 2,176.79
8.11 - File Closeout
$ -
10
S 1.466.83
Task 9 - Permitting
$ -
294
S
$ 53,831.69
9.1 - 1602 SAA
$ -
74
S 13.636.19
9.2 - 401 WQC
S -
74
$ 13,636.19
9.3 - 404 NWP
S -
76
S 14,074.05
9.4 - CVWB Encroachment Permits
$ -
70
$ 12.485.25
Task 10 - Construction Support
2
30
2
14
S 2,653.77
130
$ -R566,805.801
10.1 - Bid Advertisement
2
4
6
$ 1,229.64
14
10.2 • Construction Administration
4
4
S 804.43
70
10.3 - Record Drawings/As-Builts
2
2
4
$ 619.70
46
$
TOTAL HOURS WITHOUT OPTIONAL TASKS
10
186
54
60
28
45
383
3,056
TOTAL COST WITHOUT OPTIONAL TASKS
$ 2,126.01
$ 37,406.20
$ 5,872.08
$ 11.204.62
S 2,817.13
S 3,619.95
$ 63,045.99
$ 4,154
TOTAL HOURS WITH OPTIONAL TASKS1 10 1 186 1 54 1 60 1 28 1 45 1 383 1 3,198
TOTAL COST WITH OPTIONAL TASKS1 $ 2,126.011 $ 37,406.20 1 $ 5,872.08 1 $ 11,204.62 1 $ 2,817.13 $ 3,619.95 $ 63,045.99 $ 17,514.00 1 S 607,610.71
Page 3of3