Loading...
HomeMy WebLinkAboutBRES2022-1086DESIGN & DEVELOPMENT DEPARTMENT 78-495 CALLE TAMPICO LA QUINTA, CALIFORNIA 92253 Permit Type: Permit Number: Property Address: APN: Legal Description Property Zoning: Valuation: Building Residential BRES2022-1086 57600 CORAL MOUNTAIN CT 762440035 Lot 3 MB 340/36 TR 29963 RL, 3 $731,576.70 Declaration / Acknowledgement BUILDING PERMIT athita CALIFORNIA PHONE (760) 777-7125 WWW.LAQUINTACA.GOV APPLIED DATE: 12/29/2022 ISSUED DATE: 06/28/2023 Owner: Kevin Murray 11035 Technology Place, #100, San Diego, CA 92127 Applicant: Contractor: Michael Kiner 70177 Highway 111, Suite 200, Rancho Mirage, CA 92270 Drew Hudson / 818121 40905 Amador Drive, Indio, CA 92203 PRIOR TO THE ISSUANCE OF THIS PERMIT FOR CONSTRUCTION, ALTERATION, IMPROVEMENT, DEMOLITION, OR REPAIR THE OWNER, APPLICANT AND/OR CONTRACTOR UNDER PENALTY OF PERJURY HAVE AFFIRMED WHEN APPLICABLE, THROUGH THE SUBMITTAL OF FORMS OR BY OTHER ELECTRONIC MEANS, THE FOLLOWING: LICENSED CONTRACTOR OR OWNER -BUILDER DECLARATION (1 or 2) 1) They are licensed under provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code, and the referenced License is in full force and effect, or; 2) That they are exempt from the Contractors' State License Law for the reason(s) indicated by either (2)(a) and/or (2)(b), or (2)(c) where he or she is exempt from licensure by a valid exemption. [Section 7031.5, Business and Professions Code: Any city or county that requires a permit to construct, alter, improve, demolish, or repair any structure, prior to its issuance, also requires the applicant for the permit to file a signed statement that he or she is licensed pursuant to the provisions of the Contractors' State License Law (Chapter (commencing with Section 7000) of Division 3 of the Business and Professions Code] Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($500).) a) As owner of the property, or my employees with wages as their sole compensation, will do all of or portions of the work, and the structure is not intended or offered for sale (Section 7044, Business and Professions Code: The Contractors' State License Law does not apply to an owner of property who, through employees' or personal effort, builds or improves the property, provided that the improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the Owner -Builder will have the burden of proving that it was not built or improved for the purpose of sale.). b) As owner of the property, will be exclusively contracting with licensed c) Are exempt from licensure under the Contractors' State License Law. As an Owner -Builder, they acknowledge that, except for their personal residence in which they must have resided in for at least one year prior to completion of the improvements covered by this permit, they cannot legally sell a structure built as an owner -builder if it has not been constructed in its entirety by licensed contractors. It is understood that a copy of the applicable law, Section 7044 of the Business and Professions Code, is available upon request when this application was submitted at the following Web site: http://www.leginfo.ca.gov/calaw.html. DECLARATION REGARDING CONSTRUCTION LENDING AGENCY (If applicable) A construction lender will be used for completion of the improvements covered by this permit and the name and information of which is on file for public inspection during the regular business hours of the public entity. Failure of the applicant to indicate the construction lender on the WORKERS' COMPENSATION DECLARATION (1, 2 or 3) WARNING: FAILURE TO SECURE WORKERS' COMPENSATION COVERAGE IS UNLAWFUL, AND SHALL SUBJECT AN EMPLOYER TO CRIMINAL PENALTIES AND CIVIL FINES UP TO ONE HUNDRED THOUSAND DOLLARS ($100,000), IN ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN SECTION 3706 OF THE LABOR CODE, INTEREST, AND ATTORNEY'S FEES. 1) Has and will maintain a certificate of consent to self -insure for workers' compensation, issued by the Director of Industrial Relations as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. 2) Has and will maintain workers' compensation insurance, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. 3) Certifies that, in the performance of the work for which this permit is issued, shall not employ any person in any manner so as to become subject to the workers' compensation laws of California, and agree that, if should become subject to the workers' compensation provisions of Section 3700 of the Labor Code, shall forthwith comply with those provisions. NOTICE TO APPLICANT (1, 2 and 3) 1) Each person upon whose behalf this application was made, each person at whose request and for whose benefit work is being performed under or pursuant to any permit issued as a result of this application, the owner, and the applicant, each agrees to, and shall defend, indemnify and hold harmless the City of La Quinta, its officers, agents, and employees for any act or omission related to the work being performed under or following issuance of this permit. 2) Any permit issued as a result of this application becomes null and void if work is not commenced within 360 days from date of issuance of such permit, or if cessation of work for 180 days will subject permit to cancellation. On or after January 1, 2019, every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 12 months after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 12 months after the time the work is commenced. 3) Certified that they read the application and state that the information provided is correct. Agree to comply with all city and county ordinances and state laws relating to building construction, and hereby authorize representatives of this city to enter upon the above -mentioned property for inspection purposes. IMPORTANT: An Application for Permit was made to the Building Official, subject to the conditions and restrictions set forth at the time of application, which is now hereby an Issued Permit. If any part of the information being supplied on this permit is inaccurate or untrue, please contact the City of La Quinta at (760) 777-7125 immediately for correction. Printed: 4/3/26 10:33 am Page 1 of 7 BUILDING PERMIT Permit Type: Permit Number: Property Address: Building Residential BRES2022-1086 57600 CORAL MOUNTAIN CT application does not relieve that person of the requirement to give the construction lender preliminary notice from that duty. Printed: 4/3/26 10:33 am Page 2 of 7 BUILDING PERMIT Permit Type: Building Residential Permit Number: BRES2022-1086 Property Address: 57600 CORAL MOUNTAIN CT Use of Permit MURRAY / 8,200SF DWELLING/VB/RES-3/CLASS A-FR/13D *** NEW (8,200SF) 2-STORY SINGLE FAMILY DWELLING [VB/RES-3/CLASS A-FR/13D] THIS PERMIT DOES NOT INCLUDE PV SYSTEM, POOL, SPA, BLOCK WALLS, DRIVEWAY APPROACH OR SIMILAR EXTERIC STRUCTURES. 2019 CALIFORNIA BUILDING CODES. REVISION #1 - ADD (2) FIREPLACES, ADD SUNKEN BATH, TRELLIS CHANGES, ADD MECHANICAL CHASE + REVIEW OF DEFERRED TRUSS DESIGNS. REV. 2 - INSTALL A TOTAL OF [3] ADDITIONAL SUBPANELS IN GARAGE UTILITY CLOSET, IN EXTERIOR UTILITY CLOSET WITH MAIN SERVICE PANEL AND AT EXTERIOR WEST FACING WALL OF GUEST HOUSE. 2022 CALIFORNIA BUILDING CODES. Construction Details Residential Work Type Dwelling - Single Family Detached Patio Square Footage 2495 Conditioned Square 8200 Garage Square 1117 Footage Footage Fire Sprinkler Square 8200 Construction Type V-B Footage Code Edition 2019 Number of Floors 2 Number of Bedrooms 3 Number of Units 1 Building/Unit R-3: 1 &amp; 2 Family Grading Required? Yes, New Dwelling Occupancy Dwellings Classification(s) Dwelling Units per 0.465 Number of Flag or 0 New Electrical Square 13279 Acre (CVMSHCP) Light Pole(s)? Footage Number of Forced Air 7 Number of Wall/Floor 1 Number of Air 7 Furnace(s) Heater(s) Handling Unit(s) Number of Ventilation 10 Number of Exhaust 1 Number of Plumbing 48 Fan(s) Hood(s) Fixtures/Traps Number of Roof Drains 1 Number of Water 1 Water System Install Yes Heater(s) or Alteration? Sewer Connection? Yes Zoning RL Number of Gas Outlet(s) General Plan Lot Number Legal Description 1 LDR City Limits 3 Centerlines Lot 3 MB 340/36 TR 29963 Within La Quinta Limits 17585 Subdivision Name TR 29963 Lot Size 12417 Valuation Details Type Group Sq Ft Value Printed: 4/3/26 10:33 am Page 3 of 7 BUILDING PERMIT Permit Type: Permit Number: Property Address: Building Residential BRES2022-1086 57600 CORAL MOUNTAIN CT Financial Information Invoice No. INV-00006046 Fee Partial Inspection Fee Total for Invoice INV-00006046 INV-00007245 Partial Inspection Fee Total for Invoice INV-00007245 INV-00007861 Building Staff Time Credit Card Convenience Fee Total for Invoice INV-00007861 INV-00009569 Partial Inspection Fee Total for Invoice INV-00009569 INV-00010273 Re -Inspection Fee Total for Invoice INV-00010273 INV-00016052 Building Staff Time Total for Invoice INV-00016052 PERMIT-BRES2022-108 DIF - COMMUNITY CULTURAL 6 WATER HEATER/VENT TECHNOLOGY ENHANCEMENT FEE RESIDENTIAL - CUSTOM HOME >7KSF ROOF DRAIN RESIDENTIAL - CUSTOM HOME >7KSF PC FIRE NEW RESIDENITIAL PC WATER SYSTEM INST/ALT/REP GAS SYSTEM, 1-4 OUTLETS WATER SYSTEM INST/ALT/REP PC EXHAUST HOOD DIF - FIRE PROTECTION FIXTURE/TRAP PC MULTI -SPECIES RESIDENTIAL 0-8 UNITS - 2022 UPDATE BSAS SB1473 FEE AIR HANDLER WALL HEATER PC DIF - MAINTENANCE FACILITIES RESIDENTIAL, EA ADDITIONAL 1,000SF SMI - RESIDENTIAL WALL HEATER FIRE NEW RESIDENTIAL ART IN PUBLIC PLACES - RESIDENTIAL GAS SYSTEM, 1-4 OUTLETS PC TUMF 2023 - SINGLE FAMILY DWELLING FIXTURE/TRAP RECORDS MANAGEMENT FEE - MAJOR NEW CONSTRUCTION PERMIT 2022 ROOF DRAIN PC VENT FAN RESIDENTIAL, FIRST 1,000SF PC FURNACE PC RESIDENTIAL, FIRST 1,000SF BUILDING SEWER Fee Amount Amount Paid $87.53 $87.53 $87.53 $87.53 $87.53 $87.53 $87.53 $87.53 $350.00 $350.00 $8.75 $8.75 $358.75 $358.75 $87.53 $87.53 $87.53 $87.53 $87.53 $87.53 $87.53 $87.53 $131.25 $131.25 $131.25 $131.25 $956.00 $956.00 $14.59 $14.59 $8.00 $8.00 $43.77 $43.77 $14.59 $14.59 $218.84 $218.84 $87.00 $87.00 $14.59 $14.59 $14.59 $14.59 $14.59 $14.59 $14.59 $14.59 $369.00 $369.00 $700.32 $700.32 $1,515.00 $1,515.00 $30.00 $30.00 $306.39 $306.39 $14.59 $14.59 $313.00 $313.00 $193.44 $193.44 $95.11 $95.11 $29.18 $29.18 $87.00 $87.00 $1,328.94 $1,328.94 $29.18 $29.18 $2,550.00 $2,550.00 $700.32 $700.32 $22.00 $22.00 $4,582.35 $4,582.35 $14.59 $14.59 $145.90 $145.90 $57.77 $57.77 $204.26 $204.26 $175.07 $175.07 $29.18 $29.18 Printed: 4/3/26 10:33 am Page 4 of 7 BUILDING PERMIT Permit Type: Permit Number: Property Address: Building Residential BRES2022-1086 57600 CORAL MOUNTAIN CT VENT FAN PC DIF - LIBRARY DIF - TRANSPORTATION NEW CONSTRUCTION - SINGLE FAMILY RESIDENTIAL AIR HANDLER PC BUILDING SEWER PC FURNACE EXHAUST HOOD PC WATER HEATER/VENT PC NEW CONSTRUCTION PLAN CHECK 2022 RESIDENTIAL, EA ADDITIONAL 1,000SF PC DIF - CIVIC CENTER DIF - PARK IMPROVEMENTS Total for Invoice PERMIT-BRES2022-1086 $58.40 $397.00 $4,009.00 $161.00 $102.13 $20.42 $306.39 $5.84 $8.75 $2,871.28 $79.69 $1,230.00 $2,106.00 $58.40 $397.00 $4,009.00 $161.00 $102.13 $20.42 $306.39 $5.84 $8.75 $2,871.28 $79.69 $1,230.00 $2,106.00 $26,249.64 $26,249.64 Grand Total for Permit $27,089.76 $27,089.76 Workflow / Inspections Workflow Step / Action Name Plan Check v.1 Action Type Start Date End Date Deferred Submittals v.1 Receive Submittal 08/30/2023 10:11 04/24/2024 9:17 Linked Solar Permit v.1 Create Sub Permit Linked Fire Sprinkler Permit v.1 Create Sub Permit 04/24/2024 9:17 04/18/2025 12:33 Rov+siens-vim 08/30/2023 0:00 Revision Submittal v.1 Receive Submittal 08/30/2023 0:00 12/15/2023 15:22 Building Revision Review v.1 Receive Submittal 12/15/2023 0:00 01/08/2024 15:42 Building Revision Review v.1 Receive Submittal 07/07/2025 0:00 07/14/2025 14:19 Building Revision Review v.2 Receive Submittal 05/16/2024 0:00 06/05/2024 11:18 Building Revision Review v.3 Receive Submittal 06/25/2024 0:00 07/10/2024 15:16 Inspections v.1 12/29/2022 0:00 TEMPORARY POWER v.1 Inspection Inspections - Do Not Pour Concrete Until Approved v.1 08/21/2023 14:50 Setbacks v.1 Inspection Underground Plumbing v.1 Inspection 09/28/2023 16:14 09/29/2023 10:46 Underground Mechanical v.1 Inspection 08/21/2023 14:50 08/21/2023 14:50 Underground Gas v.1 Inspection 08/22/2024 0:00 08/22/2024 10:06 Underground Gas v.1 Inspection Underground Gas v.2 Inspection 06/30/2025 14:07 06/30/2025 14:10 Water Line v.1 Inspection Template Footing v.1 Inspection 11/21/2023 0:00 11/21/2023 14:44 Template Footing v.1 Inspection 11/21/2023 0:00 11/21/2023 14:48 Template Footing v.2 Inspection 11/21/2023 0:00 Drypack v.1 Inspection 12/08/2023 0:00 12/11/2023 10:49 Footing v.1 Inspection 12/11/2023 0:00 12/14/2023 16:12 Footing v.2 Inspection 12/14/2023 0:00 12/18/2023 10:08 Printed: 4/3/26 10:33 am Page 5 of 7 BUILDING PERMIT Permit Type: Permit Number: Property Address: Building Residential BRES2022-1086 57600 CORAL MOUNTAIN CT Footing v.3 Inspection 12/19/2023 0:00 12/20/2023 14:45 Slab v.1 Inspection 12/20/2023 0:00 12/20/2023 14:45 Inspections - Cover No Work Until Approved v.1 03/29/2024 0:00 Roof Nail v.1 Inspection 04/01/2024 0:00 04/02/2024 15:02 Roof Nail v.2 Inspection 04/18/2024 0:00 04/19/2024 10:58 Roof Nail v.3 Inspection 06/10/2024 0:00 06/12/2024 11:26 Roof Nail v.4 Inspection 07/01/2024 0:00 07/02/2024 10:43 Okay to Wrap v.1 Inspection 08/15/2024 0:00 08/19/2024 9:59 Okay to Wrap v.2 Inspection 09/11/2024 0:00 09/16/2024 9:59 Framing v.1 Inspection 03/29/2024 0:00 04/01/2024 10:34 Framing v.2 Inspection 09/25/2024 0:00 09/26/2024 16:59 Framing v.3 Inspection 09/30/2024 0:00 10/01/2024 10:53 Framing v.4 Inspection 10/07/2024 0:00 10/09/2024 15:17 Framing v.5 Inspection 10/01/2025 10:14 10/01/2025 14:19 Rough Electrical v.1 Inspection 09/25/2024 0:00 09/26/2024 16:56 Rough Electrical v.2 Inspection 10/01/2024 0:00 10/01/2024 10:53 Rough Electrical v.3 Inspection 10/07/2024 0:00 10/09/2024 15:19 Rough Electrical v.4 Inspection 10/01/2025 10:14 10/01/2025 14:15 Rough Mechanical v.1 Inspection 09/25/2024 0:00 09/26/2024 16:50 Rough Mechanical v.2 Inspection 10/01/2024 0:00 10/01/2024 10:54 Rough Mechanical v.3 Inspection 10/07/2024 0:00 10/09/2024 14:24 Rough Plumbing v.1 Inspection 09/25/2024 0:00 09/26/2024 16:55 Rough Plumbing v.2 Inspection 10/01/2024 0:00 10/01/2024 10:54 Rough Plumbing v.3 Inspection 10/07/2024 0:00 10/09/2024 14:25 Rough Fire Clearance v.1 Generic Action 08/20/2024 17:56 Shower Pan v.1 Inspection 12/04/2024 0:00 12/05/2024 9:30 Shower Pan v.2 Inspection 12/05/2024 0:00 12/06/2024 9:51 Insulation v.1 Inspection 10/10/2024 0:00 10/14/2024 15:32 Drywall Nail v.1 Inspection 11/04/2024 0:00 11/05/2024 10:17 Drywall Nail v.2 Inspection 04/25/2025 15:51 04/25/2025 15:53 Exterior Lath v.1 Inspection 10/28/2024 0:00 10/29/2024 9:34 Exterior Lath v.2 Inspection 11/04/2024 0:00 11/05/2024 10:12 Exterior Lath v.3 Inspection 04/25/2025 15:51 04/25/2025 15:58 Gas Test v.1 Inspection 09/11/2024 0:00 09/16/2024 9:59 Sewer Connection v.1 Inspection 08/30/2024 0:00 09/03/2024 14:03 Sewer Connection v.2 Inspection 09/03/2024 0:00 Inspections - Masonry v.1 Inspections - Electrical for Meter Release v.1 04/24/2025 0:00 Temporary Power v.1 Inspection Temp Use of Permanent Power v.1 Inspection 04/24/2025 0:00 04/25/2025 15:52 Inspections - Final v.1 04/16/2025 11:34 10/01/2025 14:19 Final Fire v.1 Inspection 04/16/2025 11:34 04/18/2025 12:33 Final Building v.1 Inspection 06/25/2025 0:00 06/30/2025 14:15 Final Building v.2 Inspection 10/01/2025 10:15 10/01/2025 14:19 Printed: 4/3/26 10:33 am Page 6 of 7 BUILDING PERMIT Permit Type: Building Residential Permit Number: BRES2022-1086 Property Address: 57600 CORAL MOUNTAIN CT Certificate of Occupancy v.1 10/01/2025 14:21 10/01/2025 14:22 Certificate of Occupancy v.1 Create Report 10/01/2025 14:21 10/01/2025 14:22 Inspections - Public Works v.1 10/22/2025 16:22 10/24/2025 12:05 Final Public Works v.1 Inspection 10/22/2025 16:22 10/23/2025 14:55 Final Public Works v.2 Inspections - Final v.1 Inspection 10/23/2025 0:00 10/24/2025 12:05 Final Building v.1 Inspection Inspections Construction or work for which a permit is required shall be subject to inspection by the building official and such construction or work shall remain visible and able to be accessed for inspection purposes until approved. Approval as a result of an inspection shall not be construed to be an approval of a violation of the provisions of the applicable code and other ordinances of the jurisdiction. Inspections presuming to give authority to violate or cancel the provisions of the applicable code and other ordinances of the jurisdiction shall not be valid. It shall be the duty of the owner or the owner's authorized agent to cause the work to remain visible and able to be accessed for inspection purposes. Neither the building official nor the jurisdiction shall be liable for expense entailed in the removal or replacement of any material required to allow inspection. It shall be the duty of the holder of the building permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspections of such work that are required by this code. Certificate of Occupancy A building or structure shall not be used or occupied in whole or in part, and a change of occupancy of a building or structure or portion thereof shall not be made, until the building official has issued a certificate of occupancy therefor as provided herein. Issuance of a certificate of occupancy shall not be construed as an approval of a violation of the provisions of the applicable code and other ordinances of the jurisdiction. Certificates presuming to give authority to violate or cancel the provisions of this code or other ordinances of the jurisdiction shall not be valid. Service Utilities A person shall not make connections from a utility, a source of energy, fuel, or power, or a water system or sewer system to any building or system that is regulated by the applicable code and other ordinances of the jurisdiction for which a permit is required, until approved by the building official. Printed: 4/3/26 10:33 am Page 7 of 7 CITY OF LA QUINTA - PUBLIC WORKS DEPARTMENT GREEN SHEET PUBLIC WORKS CLEARANCE FOR RELEASE OF BUILDING PERMIT Form updated & effective 9/25/2009 Green Sheet approvals are forwarded to the Building & Safety Department directly by Public Works. Please DO NOT submit the Green Sheet (Public Works Clearance) Packet to the Public Works Department until ALL requirements listed below are complete. Incomplete applications or applications which cannot be processed will be returned to applicant. Date: 4 / 17 / 23 Developer: Michael Kiner Associates Tract No.: 28119 Tract Name: Lot No.(s):3 Address(s): 57600 Coral Mountain Ct. Phone Number: (760 ) 340-3360 The following are the requirements for Public Works Clearance to authorize issuance of a building permit from the Building & Safety Department: ❖ CUSTOM HOMES: PROVIDE ITEMS #2, #3, #4, #5 & #7 BELOW ❖ TRACT HOMES: PROVIDE ITEMS #1, #2, #3 & #5 BELOW ❖ COMMERCIAL BUILDINGS/OTHER: PROVIDE ITEMS #1, #2, #3, #5 & #7 BELOW ❖ WALLS, SIGNS, OTHER: PROVIDE ITEM #6 BELOW 1. Attach Pad Elevation Certificates in compliance with the approved design elevation for building pad (maximum allowable deviation of +/- 0.1 foot). Pad Elevation Certificates must be current (within 6 months of current date). If a precise grading plan creates the pad for approval, please withhold green sheet submittal until a Pad Elevation Certificate can be provided. 2. Attach geotechnical certification of grading plan compliance including compaction reports from a licensed Soils Engineer. Recently rough graded residential developments which have a previously approved geotechnical certification are exempt from this requirement. 3. Attach recorded final map or title information/grant deed showing proposed building locations are legal lots. 4. Complete the attached <1 acre per lot or infill project Fugitive Dust Control project information form, PM10 plan & agreement or provide alternative & valid City approved PM10 plan set reference number or hard copy plan. PM10 plans for commercial & residential developments (beyond 1 lot) are submitted separately with grading plans & are subject to additional requirements. A current PM10 certification number is required. 5. Attach a copy of the rough or precise grading plan to the Public Works Department showing building location(s) for pad elevation verification. AO flood zone developments will require an approved flood plain development plan. 6. Attach supporting documentation for wall plan, monument sign, grease trap or special facility installations. 7. Complete and sign the attached water quality management plan (WQMP) exemption form, if applicable. PW approved building construction projects require either a WQMP or a completed WQMP exemption form. Approved maps/plans may be viewed at the following link: http://www.la-quinta.org/PlanCheck/m search.aspx I have reviewed and confirmed the requirements listed above as presented and find the improvements to be sufficiently complete for construction of the proposed buildings/structures/walls/signs on the subject lot(s). Pursuant to my findings, the above project may be released for building permit issuance. This section completed by City staff. Recommended by: Date: / / Public Works Distribution: ( ) Green Sheet to Building & Safety ( ) Green Sheet to Planning Department Declined for approval for reason(s) as follow(s), please correct and resubmit: T:\Checklists - Forms & Applications\Forms & Applications\GREEN SHEET cover & PM10 less than 1 Acre Revised 9-25-09.doc City of La Quinta - PM10 Fugitive Dust Control Project Information Construction Phase PM10 Agreement (<1 acre/lot or Infill Project Project Information Project Contractor: Drew Hudson Project Phase (check one) Project Name: New SFR Coral Mtn Ct. Project Tract/Lot Numbers: 28119 Lot 3 11 Construction Project Street Address: 57600 Coral Mountain Ct Demolition Total Acres in Active Construction (<1 acre per Lot): 2.15 Anticipated Start Date: 4 / 17 / 23 Anticipated Completion Date: 4 / 17 / 23 PM10 Contact Information Please note: Dust control is required 24 hours a day, 7 days a week, regardless of construction status. Person listed below is responsible for dust control during business and non -business hours. Name: Noble Mandeville Title: General Manager Company Name: Gen3 Earthworks Mailing Address: 54960 Avenida Diaz City, State, ZIP Code: La Quinta CA 92253 Primary Phone #: 7605780686 Fax #: N/A 24 Hour Emergency Phone#: Cell Phone #: 760-578-0686 Email Address: gen3earthworks@att.net PM10 Certificate #: CV-2011-010147-10167 The above stated property owner (or authorized representative): ❖ Shall act as his/her acknowledgement of dust control requirements and their enforceability, pursuant to SCAQMD Rules 403, 403.1, 401, 402, 201, 203 and PERP; ❖ Shall constitute an Agreement to comply with all project conditions as identified in the approved dust control plan. ❖ Acknowledges that dust control is required twenty-four (24) hours a day, seven (7) days a week, throughout the period of project performance, regardless of project size or status; ❖ Shall ensure that each and every contractor, subcontractor and all other persons associated with the project shall be in continuous compliance with all requirements of the approved dust control plan; ❖ Shall take all necessary precautions to minimize dust, even if additional measures beyond those listed in the dust control plan are necessary; ❖ Shall authorize representatives of City/County to enter the property for inspection and/or abatement purposes; ❖ Shall hold harmless the City/County and its representatives from liability for any actions related to this dust control plan or any1City/County initiated abatem-nt activities. Signature of Property Owner or Authorized Representative 4/17/23 Date T:\Checklists - Forms & Applications\Forms & Applications\GREEN SHEET cover & PM10 less than 1 Acre Revised 9-25-09.doc City of La Quinta - PM10 Fugitive Dust Control Plan (<1 acre per Lot or Infill Project) This Fugitive Dust Control Plan shall take into account applicable SCAQMD Regulations Rule 403, 403.1, 401, 402, 201, 203 and Portable Equipment Registration Program (PERP). ❖ WATERING: Continuous watering is required to prevent dust and must occur a minimum of four (4) times daily. Water shall be applied from an adequate sized metered water source to dry soils to prevent: Visible dust emissions >20% opacity Visible dust emissions that travel >100 feet from the source (within site) Visible dust emissions that cross any property line ❖ EDUCATION: The responsible dust control Individual and key personnel shall attend SCAQMD PM10 class and obtain PM10 certificate number prior to construction activity (training information may be obtained by contacting SCAQMD at (909) 396-2183). ❖ CONSTRUCTION & DEMOLITION ACTIVITIES: A copy of this approved Fugitive Dust Plan must be kept on site. At least one short-term stabilization method must be used during off hours. At least one long-term stabilization measure must be used within ten (10) days of ceasing activity. ❖ WEATHER MONITORING: Wind predictions shall be monitored. ❖ SIGNAGE: Approved signs shall be installed at a highly visible location. Please refer to the Coachella Valley Fugitive Dust Control Plan Handbook for Construction Signage Guidelines. ❖ TRAFFIC: Construction traffic shall not be allowed on the pad, unless absolutely necessary. If vehicles operate on pad, pad shall be kept firm and moist through hose watering and sprinklers; and a maximum traffic speed of 15mph will be enforced. Fugitive Dust shall be prevented by fencing off site to prevent unauthorized traffic on pad. ❖ PARKING: Parking is not allowed on pad. All vehicles must park on street at designated areas only. ❖ TRACK OUT: Provide 24 hour street cleaning and track out system as approved by City Public Works inspectors. No dirt on public or private roads. Track out shall be cleaned up within one (1) hour of incident and at the conclusion of each workday. ❖ DIRT PILES: Dirt piles shall be limited to 50 cubic yards and built per California Building Code grading requirements. Piles shall be kept moist or covered with tarp material. Larger dirt piles will require stockpile or grading permit. ❖ FENCING: Provide PM10 fencing at perimeter of public roads and where applicable. Wood slat fencing can be installed at rear of property and return 20 feet on either side if HOA restrictions apply. Block walls can replace PM10 fencing during the construction phase. ❖ EQUIPMENT: Extra hoses and sprinklers shall be maintained on site. ❖ EXCAVATION MEASURES: All areas to be excavated or graded shall be pre -watered. Water shall also be applied during excavation or grading operations. ❖ DUMP TRUCKS: Open top dump trucks shall be wet down, moist and covered with a tarp prior to leaving site. ❖ INACTIVE SITE: Within 10 days of ceasing of activities, re -vegetate or permanently stabilize as required. ❖ RECORD KEEPING: Fugitive Dust Control Plan records (i.e. self inspection records, records of use of chemical suppressants, etc.) shall be maintained for 3 years by the Property Owner (or Authorized Representative). Property Owner shall notify the City and SCAQMD within 10 days of completion of project. T:\Checklists - Forms & Applications\Forms & Applications\GREEN SHEET cover & PM10 less than 1 Acre Revised 9-25-09.doc Water Quality Management Plan (WQMP) Exemption Form - Whitewater River Region Documentation of Project Not Requiring a WQMP but Requiring Site Design BMPs and Source Control BMPs by Entitlement Conditions of Approval or Permit Conditions — WQMP Required for the Listed Change of Land Uses or for Changes of Pollutant Stream (All Questions Below Must be Answered "No" To Exempt Project) Yes No Entitlement or construction of new single-family hillside residence(s) that create 10,000 square feet, or more, of impervious area where the pre -development natural slope is 25% or greater? ✓ ❑ Entitlement or construction of new single-family hillside residence(s) that create 10,000 square feet, or more, of impervious area where the pre -development natural slope is 10`)/0or greater where erosive soil conditions are known? ❑ ✓ Entitlement or construction of new commercial and industrial development(s) of 100,000 square feet or more? ❑ Entitlement or construction of new automotive repair shop(s) including body, upholstery, paint, exhaust, tire, transmission, engine or other automotive specialty repair. [Standard Industrial Classification (SIC) codes 5013, 7532, 7533, 7534, 7537, 7538, and 7539]? ❑ 1/ Entitlement or construction of new retail gasoline outlet(s) disturbing greater than 5,000 square feet? ❑ 1 Entitlement or construction of new restaurant(s) (or potential restaurant shell space) disturbing greater than 5,000 square feet? ❑ ✓ Entitlement or construction of new home subdivision(s) with 10 or more housing units? ❑ Entitlement or construction of new parking lot(s) of 5,000 square feet or more, or with 25 or more parking spaces, and potentially exposed to Urban Runoff? ✓ Applicant Information Name and Title Michael Kiner Company Michael Kiner Associates Phone 760-275-6137 Email michael@thekinergroup.com Project Information Project Name Type (SFH, Multi -Family, Commercial, Etc.) New SFR Coral Mtn Ct. SFH Location or Street Address 57600 Coral Mountain Ct Nearest Cross Streets Ave 58 and Madison St Municipality/County/Zip Code La Quinta Tract Number(s) and/or Assessor Parcel Number(s) Tract 28119 Lot 3 / APN 762-440-035 Other Location Information Watershed Whitewater River Source Control BMP Information Size of Project Area (nearest 0.1 acre) 2.1 Project Area managed with Site Design or Low Impact Development (LID) BMPs (nearest 0.1 acre) 0.68 Is the project subject to onsite retention by City ordinance or policy? Yes, added and incorporated into plans. Name of the Entity that will implement, operate, and maintain the Source Control BMPs Owner - Private Contact Name Drew Hudson Street or Mailing Address 40905 Aamdor Drive City Indio Zip Code 92203 Phone 760-275-6137 T:\Checklists - Forms & Applications\Forms & Applications\GREEN SHEET cover & PM10 less than 1 Acre Revised 9-25-09.doc Check Item To be Performed Source Control BMP Requirements - All Projects Require Non -Structural BMP Source Control Non -Structural BMP (See Appendix H, Section 4.5.2.1) ✓ Ongoing Irrigation System and Landscape Maintenance ✓ Ongoing Litter Control ✓ Ongoing Drainage System Inspection & Maintenance Education/Training for Property Owner, Operators, Occupants, or Employees Activity Restrictions — Prohibition of Debris Blowing/Sweeping/Washing into Street/Storm Drain, Closed Trash Lids, Restriction of Vehicle Washing ✓ Ongoing Street Sweeping at Private Streets and Private Parking Lots Check Item To be Provided Source Control BMP Requirements — Small Sloped Lots, Small Commercial, <10 Unit Subdivisions, <5,000 Square Ft. Parking Lots, Etc. Structural BMP (See Appendix H, Section 4.5.2.2) Storm Drain Inlet Stenciling and Signage Landscape and Irrigation System Design to Minimize Erosion & Nuisance Runoff Protection of Slopes and Channels to Minimize Erosion Multi -Family Project Use of Community Car Wash Racks Wash Water Controls for Food Preparation Areas to Use Sanitary Sewer Fueling Area (Design & Maintenance) Including PCC Surface, Canopy & Spill Prevention Air/Water Supply Area Drainage (Design & Maintenance) Including Spill Area Containment u Trash Storage Areas (Design & Maintenance) Including Attached Lids, Storm Water Controls Loading Docks (Design & Maintenance) Including Storm Water Controls, Dry & Frequent Cleaning Procedures Maintenance Bays (Design & Maintenance) Including Indoor Location & Storm Water Containment Vehicle and Equipment Wash Areas (Design & Maintenance) Including Canopy & Containment Outdoor Material Storage Areas (Design & Maintenance) Including Canopy & Containment Outdoor Work Areas or Processing Areas (Design & Maintenance) Including Canopy & Containment CC&R's, Maintenance Agreements or Other mechanisms will be used to ensure the ongoing operation, maintenance, funding, transfer and implementation of the project -specific WQMP requirements. Legal description and plat stamped by Registered Surveyor to be attached to the applicable CC&R or Maintenance Agreement for recordation at Riverside County. (Optional Requirement to be reviewed on a Project by Project basis) BMP Acknowledgement The applicant shall comply with listed BMPs and applicable provisions of the City's NPDES stormwater discharge permit, LQMC Sections 8.70.010 et seq. (Stormwater Management and Discharge Controls), and 13.24.170 (Clean Air/Clean Water); Riverside County Ordinance No. 457; the California Regional Water Quality Control Board — Colorado River Basin Region Board Order No. R7-2008-0001 and the State Water Resources Control Board's Order No. 99-08-DWQ. Signature. • Print Name: Michael Kiner Title: General Manager Date: 4 / 17 / 23 Phone: (760 ) 340-3360 T:\Checklists - Forms & Applications\Forms & Applications\GREEN SHEET cover & PM10 less than 1 Acre Revised 9-25-09.doc Applicant Certification I certify that I have read this form in its entirety and understand the City's submittal and review process and the requirements for this form. I understand and agree that if during the processing of the form, it is determined the information contains errors or omissions, clarification and/or supplemental information may be required and the preparation of such information may be considered, in the Community Development Director's judgment, an unreasonable delay and will result in a suspension of processing time limits in accordance with the California Code of Regulations, Title 14, Section 15109. Signature: . Print Name: Title: General Michael Kiner Manager Date: 4 Phone: 1 76 / 11 / 23 - ) 340-3360 Owner Certification I certify under the penalty of the laws of the State of California that I am the property owner of the property that is the subject matter of this application and I am authorizing and hereby do consent to the filling of this application and acknowledge that the final approval by the City of La Quinta, if any, may result in restriction, limitations and construction obligations being imposed on this real property. Signature: Print Name: Title: Date: / / Phone:) ) SECTION A - GENERAL 1) The City of La Quinta has elected to use Interwest Consulting for plan review of your project. In addition to the comments provided by the City of La Quinta within this correction list please see the attached outside consultant review comments. See Complete Review Comments Attached, for resubmittal please include a separate response sheet for each set of review comments. 2) Provide on each sheet of resubmitted Plans and cover sheet of bound Calculations the preparer's name and telephone number and electronic signature. If the preparer is a licensed architect or engineer, all documents prepared by that licensed individual shall also bear his/her stamp as prescribed by California Business and Professions Code §5536. Resubmittals will not be accepted with signatures missing. 3) Provide Riverside County Office of the Fire Marshall approval of this project. Contact Kohl Hetrick directly at (760) 777- 7074 with questions regarding the following comment(s): a) See 15t Review Plan Set Markup Summary, comments provided in Red. 4) Provide written evidence of Public Works Division approval of this Project. Contact the Public Works Division directly at (760) 777-7125. SUBMIT EROSION CONTROL PLAN SEPARATELY TO PUBLIC WORKS FOR REVIEW. WDID NUMBER REQUIRED. WILL REVIEW WHEN SUBMITTED TO PUBLIC WORKS. olfr SUBMIT PM-10 DUST CONTROL PLAN SEPARATELY TO PUBLIC WORKS FOR REVIEW. die UPLOAD SOILS REPORT FOR PAD PREPARATION RECOMMENDATIONS REFERENCED ON PGP. Walls have been moved and PUE note added ADDED TO PGP ON PRECISE GRADING PLAN .dj-APPROVED PAD ELEVATION FOR LOT 3 IS 472.5. .010 yeBOT ELEVATION FOR BASIN 1 SHOULD BE AT 464.5 PER APPROVED ROUGH GRADING PLAN. SHOW 10' PUE BEHIND PL ALONG STREET. RELOCATE PROPOSED WALLS AND GATES OUT OF THE PUE AREA. 00)0 SHOW PROPOSED PERIMETER WALLS WITH TF AND TW ELEVATIONS. FILL IN SOILS REPORT INFO. CORRECT CONSTRUCTION NOTE #8 - DETAIL ON SHT 3 AND THERE'S NO WQMP REPORT FOR THIS PROJECT. NOTED GREEN SHEET SUBMITTED SOILS REPORT SUBMITTED AND REFERENCED ON PAGE 1 OF THE PGP. REVISED ON PGP ADDED TO PAGE 1 ADDED TO PGP REVISED 5) Provide written evidence from Burrtec Waste, approving a waste management plan that diverts not less than 65% of the construction materials from landfill for the project. Contact the District Environmental Coordinator directly at (760) 674-1026 for free assistance with the preparation of this plan. SECTION B — MISCELLANEOUS COMMENTS 1) Red marks on Plans, even if not specifically mentioned in this list, indicate items needing correction. Revise Plans as necessary and provide written response, noting where correction can be found. 2) Provide contractor information to complete building permit application form. 3) Provide proof of payment of school fees. While not required for resubmittal, this administrative item must be addressed prior to issuance of building permit. 4) Inadequate information has been provided at this submittal to calculate fees for this project. Fee calculation will be performed when Plans are complete. END CITY REVIEW CORRECTION LIST - CORRECTION LIST CONTINUED BY INTERWEST CONSULTING GROUP ATTACHED As further information is provided and reviewed, additional corrections may be required. Residential Plan Check Correction List Page 2 of 2 PLEASE READ AND FILL OUT THIS DOCUMENT APPROPRIATELY. EVEN SMALL PROJECTS MUST DO THEIR PART. PM 10 DUST (POWDERY DUST OF 10 MICRONS OR SMALLER DIAMETER) HAS BEEN IDENTIFIED AS A POTENTIALLY SERIOUS HEALTH THREAT. THIS FINE DUST CAN LODGE DEEP IN THE LUNGS AND HAS BEEN ASSOCIATED WITH BRONCHITIS AND OTHER RESPIRATORY ILLNESSES. DESERT DUST CAN BE PARTICULARLY UNHEALTHFUL, BEING ASSOCIATED WITH "DESERT LUNG SYNDROME"AND LUNG INFECTIONS CAUSED BY FUNGAL SPORES CARRIED IN DESERT DUST. CHILDREN, VIE ELDERLY, AND PERSONS WITH RESPIRATORY CONDITIONS. ARE PARTICULARLY SENSITIVE TO FINE DUST. BUT EVERYONE IS ADVERSELY AFFECTED BY THE RELATIVELY HIGH LEVELS OF PM THAT OCCUR IN THE COACHELLA VALLEY. LARGER SAND PARTICLES CAN BE TURNED INTO THIS DUST THROUGH THE GRINDING ACTION OF TIRES ON ROADWAYS AND THROUGH REPETITIVE PLOWING AND DISHING OPERATIONS.' PROJECT DATA (SEE ATTACHED PLAN ALSO) DATE: MAY 2023 PROJECT NAME: LOT 3, TRACT 29963 / CORAL MOUNTAIN COURT STREET ADDRESS / SITE LOCATION: LOT 3, TRACT 29963 / CORAL MOUNTAIN COURT ADJOINING PROPERTY INFO. (FOR SENSITIVITY, TYP. WINDS BLOW N.W.TO S.E.) EASTERLY: EXISTING RESIDENCE APN 762-480-001, 762-480-002 SOUTHEASTERLY: EXISST RESIDENCE APN 762-480-003 SOUTHERLY: VACANT LOT SOUTHWESTERLY: EXIST RESIDENCE - APN 762-440-033 WESTERLY: EXISTING RESIDENCE - APN 762-440-034 NORTHWESTERLY: EXISTING RESIDENCE - APN 762-200-016 NORTHERLY: EXISTING RESIDENCE - APN 762-200-015 NORTHEASTERLY;EXISTING RESIDENCE - APN 762-200-035, 762-210-001 CURRENT LAND USAGE -RESIDENTIAL PROPOSED LAND USAGE -RESIDENTIAL LAND USE PERMIT NO.: RESIDENTIAL -' IN PROCESS M/B TRACT 29963 LOT 3. PARCEL SIZE:93,654, 2.15 ACRES A.P.N. 762-440-035 EARTHWORK QUANTITIES ESTIMATE TOTAL AREA TO BE DISTURBED 1.705 ACRES 74,263 SQ. FT. STRIPPING & SUBSIDENCE LOSSES (TYP. 0.3' X AREA/27CF/CY.) 1402 C.Y. RAW CUT VOLUME : 1862 C.Y. RAW IMPORT VOLUME: 0 C.Y. RAW EXPORT VOLUME: 1092 C.Y. CUT AFTER SHRINKAGE: 1676 C.Y. IMPORT AFTER SHRINKAGE: 0 C.Y. COMPACTED FILL VOLUME: 700 C.Y. COMPACTED EXPORT VOLUME: 983 C.Y. (SEE HAUL ROUTE DETAIL ON ATTACHED PLAN IF ANY IMPORT OR EXPORT, EXCEPT TRASH.) PHASING OF GRADING ACTIVITIES THE AMOUNT OF ACTIVE DISTURBED AREA MUST BE LIMITED TO WHAT CAN BE EFFECTIVELY WATERED 4 TIMES PER DAY BY EITHER SPRINKLERS OR WATER TRUCKS. TYPICAL 2000 GALLON WATER TRUCKS CAN EFFECTIVELY WATER ABOUT 4 ACRES PER HOUR. THEREFORE AN 8HR. WORKDAY DIVIDED BY A 4 WATE&INGS PER DAY TIMES 4 AC./HR=8 ACRES PER TRUCK. SINCE WATER TRUCKS ARE ALLOWED TO WORK 7 DAYS A WEEK, 24 HOURS A DAY, IN SOME LOCATIONS, UP TO 24 AC. PER TRUCK MAY BE ACHIEVED THAT WAY, WITH SPECIAL PERMISSION. LARGER PROJECTS MUST HAVE MORE TRUCKS, MORE HOURS, MORE SPRINKLES, OR LESS DISTURBED AREA AT ANY ONE TIME. AREAS ALREADY GRADED OR STOCKPILED MUST BE STABILIZED WITH CHEMICALS, HYDROMULCH, OR VEGETATION, BEFORE ADDITIONAL AREAS CAN BE STRIPPED FOR GRADING. THE PHASING PATTERN BELLOW SHALL BE SHOWN IN THE REFERENCE MAP ON THIS SHEET AT UPPER RIGHT. DRIVING ROUTES THROUGH A PROJECT MUST BE COUNTED IN ALL PHASES WHERE THEY ARE ONLY TREATED WITH WATER. IT IS BETTER TO TREAT THEM WITH AND APPROVED "OIL" ( LIKE ENVIROKLEEN) OR SIMILAR NON -CRUSTING DUST PALLIATIVE, TO SAVE WATER. PHASE "A" ROUGH GRADING (SITE PREPARATION / MOBILIZATION) SUB -PHASE APPROX. DATE DISTURBED AC. SPRINKLER AC. WATER TRUCK AC. # OF TRUCKS Al MAY 1, 2023 TO JUNE 30 2023, DISTURBED AREA 1.7 AC., SPRINKLER 1.7 AC., WATER SOURCE (EX. WM) A2 A3 PHASE "B" ROUGH GRADING (MASS GRADING OF STREETS, PADS RET. BASINS, PERIMETER WALL) SUB -PHASE APPROX. DATE DISTURBED AC. SPRINKLER AC. WATER TRUCK AC. # OF TRUCKS B1 MAY. 1, 2023 TO JUNE 30 2023, DISTURBED AREA 1.7 AC., SPRINKLER 1.7 AC., WATER SOURCE (EX. WM) B2 B3 PHASE "C" FINISH GRADING (MAJOR UTILITY AND STREET CONSTRUCTION) SOB -PHASE APPROX. DATE DISTURBED AC. SPRINKLER AC. WATER TRUCK AC. # OF TRUCKS C1 SEPT 30, 2023 TO OCT 30 1 2023, DISTURBED AREA 0.3 AC, SPRINKLER 0.3 AC., WATER SOURCE (EX. WM) C2 C3 PHASE "D" FINISH GRADING (BUILDING UTILITIES, BUILDING CONSTRUCTION, LANDSCAPING) SUB -PHASE APPROX. DATE DISTURBED AC. SPRINKLER AC. WATER TRUCK AC. # OF TRUCKS D1 NOV. 1, 2023 TO NOV 15 2023, DISTURBED AREA 0.2 , SPRINKLER 0.2 AC., WATER SOURCE (EX. WM) D2 D3 FUGITIVE PM10 DUST CONTROL MEASURES HERE IS THE SUMMARIZED MATRIX OF REQUIRED DUST MITIGATION MEASURES IDENTIFIED BY PHASE: ABCD X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X x x x x x PRE -GRADING SITE WATERING (IRRIGATION SYSTEM FOR MIN. 72 HRS.) SIGNS POSTED ON SITE WITH 24 HR. PHONE NUMBER(S) FOR DUST CONTROLLER SAND FENCING (ON ALL SIDES OF PROJECT LACKING EXISTING MASONRY WALLS) SITE WATERING 7 DAY A WEEK (IRRIGATION SYSTEM, MIN. 4 TIMES PER 24 HRS. OR BY WATERING TRUCKS, MIN. 4 TIMES PER 24 HRS., 1 TRUCK / 8 ACRES PERIMETER SPRINKLER SYSTEM (SIDES, CONTINUOUS NIGHT WATERING WHEN WINDY) GRAVEL (MIN. 1.5" DIAM. X 4" DEEP AT OFF-STREET STORAGE AND PARKING AREAS) WHEEL CLEANING AT TRUCKS EXITS "RUMBLE STRIPS", DRIVE -THROUGH PONDS, GRAVEL AREAS, ETC. DETAIL EXITS, METHOD REFERENCE MAP AT AT RIGHT INACTIVE AREA SOIL STABILIZERS (POLYMER, HYDROMULCH, APPROVED OIL, OR PLANTS) ACTIVE AREA SOIL STABILIZERS (ENVIROKLEEN "OIL", OR SIMILAR WETTING AGENTS) STOP ALL VEHICLE ACTIVITY EXCEPT WATER TRUCKS WHEN WIND > 25 MPH STREET SWEEPING WHENEVER NEEDED PERMANENT VEGETATION /LANDSCAPING BLOCK WALLS ROAD PAVING NOTE: THESE CONTROL METHODS ARE DISCUSSED IN DETAIL IN THE "DUST CONTROL PLAN REVIEW GUIDANCE FOR LOCAL GOVERNMENT" FROM THE SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT. AVAILABLE FROM THE CITY OF LA QUINTA OR THE S.C.A.Q.M.D. PROJECT RECORD KEEPING/REPORT: RECORD ALL ACTIVITIES, CONTRACTS AND MATERIALS PURCHASES ASSOCIATED WITH BLOWSAND/FUGITIVE DUST PROGRAM. WEEKLY REPORTS SHOULD BE SUBMITTED TO THE PUBLIC WORKS DEPARTMENT FOR REVIEW. THIS "FEEDBACK" WILL EVENTUALLY HELP THE CITY TO DETERMINE WHAT METHODS 'OF DUST CONTROL ARE MOST EFFECTIVE IN BOTH SHORT TERM AND LONG TERM SITUATIONS. SEE THE REPORT FORM THAT'S AVAILABLE FROM THE CITY OR IN THE AFORESAID DOCUMENT. FUGITIVE PMIo DUST CONTROL PROGRAM DETAILS EACH MITIGATION MEASURE OR CONTROL PROGRAM SHALL BE DESCRIBED IN DETAIL BELOW AND ON ADDITIONAL SHEETS AS NECESSARY, PLEASE USE THE REQUIRED DUST CONTROL PLAN EXHIBIT (AT RIGHT OR ATTACHED) TO INDICATE THE LOCATION OF-ONSITE WATER AVAILABILITY, STAGING AREAS TEMPORARY IRRIGATION LINES, TRUCK/WHEEL WASHERS, TEMPORARY SAND AND FENCING, CONSTRUCTION PHASING WORKER'S PARKING AREA'S, GRAVELED ENTRANCE/EXIT, AND OTHER THINGS AS NEEDED. PHASE "A": ROUGH GRADING (SITE PREP. & MOBILIZATION) GENERAL REQUIREMENTS 1. WRITTEN AND NOTARIZED PERMISSION LETTERS SHALL BE SUBMITTED TO THE PUBLIC WORKS DEPARTMENT FROM ANY ADJACENT LAND OWNER WHOSE PROPERTY WILL BE USED IN ANY MANNER FOR CONSTRUCTION, STAGING, ACCESS, ETC., PRIOR TO ANY SUCH USAGE. THE OWNER AND AUTHORIZED DUST CONTROLLER FOR THIS PROJECT WILL BE RESPONSIBLE . A DUST CONTROLLER SECURITY OF $2,000 PER ACRE, OR AS OTHERWISE APPROVED BY THE CITY ENGINEER, SHALL BE POSTED FOR ALL AREAS TO BE DISTURBED BY THE PROJECT, BOTH ON -SITE AND OFF -SITE. DISTURBANCE OF SITE AREAS NOT INCLUDED IN THIS AGREEMENT SHALL BE REASON FOR THE CITY ASSESS ADDITIONAL CHARGES, AND POSSIBLY STOP ALL WORK AT THE SITE UNTIL THE EXTENT OF THE DISTURBED IS MEASURED. THEREFORE, IF IT IS SUSPECTED THAT OFF -SITE AREAS MAY BE DISTURBED DURING THE WORK, SHOW THEM ON THIS PLAN AND MAKE THE APPROPRIATE ARRANGEMENTS IN ADVANCE. 2. SAND FENCING, OF EITHER THE WOOD AND WIRE OR PLASTIC TYPE, SHALL BE INSTALLED AROUND THE PERIMETER OF PROJECT ON ALL SIDES THAT DO NOT HAVE EXISTING MASONRY WALLS OR SIMILAR SOLID FENCING OR HEDGED. THIS SERVICES THE MULTIPLE PURPOSES OF: CATCHING SOME WINDBLOWN DUST; REDUCING WIND SPEEDS ON THE PROJECT PERIMETER, AND RESTRICTING VEHICULAR ACCESS POINTS INTO THE PROJECT. THIS RESTRICTED PERIMETER, AND RESTRICTING VEHICULAR ACCESS POINTS INTO THE PROJECT. THIS RESTRICTED ACCESS HELPS REDUCE DAMAGE TO ANY "CRUST" OF STABILIZED SOIL ON THE PROJECT, AND ALLOWS PLACING OF THE EXIT WHERE "TRACK OUT" CAN BE STOPPED PER # 5 BELOW. 3. PRE -WATERING SHALL COMMENCE AT LEAST THREE (3) DAYS PRIOR TO ACTUAL GRADING USING A TEMPORARY ON -SITE IRRIGATION SYSTEM. CONNECTION TO A NY EXISTING WATER SYSTEM SHALL BE DONE IN COMPLIANCE WITH C.V.W.D. TEMPORARY WATER LINES SHALL BE INSTALLED WITH A MINIMAL DISTURBANCE OF A NY OFF -SITE AREAS THEY PASS THROUGH. WHEN THE GRADING BEGINS, A SPRINKLER SYSTEM SHALL BE PLACED A ROUND THE PERIMETER OF THE PROJECT, WITH FREQUENT WATERING, ESPECIALLY IN THE TYPICAL L Y WINDY EVENINGS. PLACING THE PERIMETER SPRINKLERS ON THE SANO FENCE KEEPS THEM SAFE A NO EFFECTIVE. WATERING FOR AREAS NOT COVERED BY THE SPRINKLERS SHALL BE PROVIDED BY WATER TRUCKS. (ONE TRUCK PER 8 ACRES FOR 8 HR. WORKDAYS. SEE ABOVE.) 4. ACTIVITY AREAS SUCH AS: EQUIPMENT STORAGE AREA, MATERIALS STORAGE AREA, TEMPORARY OFFICE TRAILERS, AND EMPLOYEE PARKING, SHOULD BE LOCATED IF POSSIBLE ON EXISTING PAVED SURFACES, IF TRAFFIC WOULD NOT BE AFFECTED. IN LIEU OF EXISTING PAVING, A SOIL STABILIZER THAT DOES NOT REQUIRE CONSTANT WATERING, SUCH AS A WASHED GRAVEL, OR "BIODEGRADABLE OIL". COULD BE USED FOR THE INITIAL STAGING AREA. ANY CHEMICALS USED MUST BE CLEARED WITH THE CITY AND REGIONAL WATER QUALITY CONTROL BOARD. PHASE "A": ROUGH GRADING (SITE PREP. & MOBILIZATION) CONTINUED 5. THE TIRES OF VEHICLES BEING USED ON -SITE SHOULD BE INSPECTED AND WASHED IF NECESSARY TO STOP TRACKING OF DIRT ONTO PUBLIC STREETS. IF EXTENSIVE EXPORT OR IMPORT OF DIRT IS TO BE DONE, A PAVED OR GRAVELED WHEEL WASHING AREA AT LEAST 12' WIDE BY 100' LONG SHOULD BE PROVIDED AT THE EXIT, TO FACILITATE THE INSPECTION A NO CLEANING OF TIRES. "RUMBLE STRIPS' MADE FROM LUMBER, RAILROAD TRACK, OR SIMILAR MATERIALS CAN HELP REDUCE THE MUD GETTING ONTO THE CLEANING AREA. STREET SWEEPING A NO WASHING IS STILL TYPICALLY REQUIRED, BUT MAY BE REDUCED BY PROPER USE OF A "WHEEL WASHING AREA" LIKE THIS. THEY ARE REQUIRED ON PROJECTS OVER 5 ACRES OR WITH OVER 5,000 CUBIC YARDS OF IMPORT OR EXPORT. 6. A STANDARD SIGN WITH THE FOLLOWING INFORMATION MUST BE POSTED ON THE SITE, AT LEAST ONE SIGN PER FRONTING STREET. THE SIGN MUST INCLUDE: THE GRADING PERMIT NUMBER, THE PROJECT NAME, MAP NUMBER IF APPROPRIATE, THE AUTHORIZED DUST CONTROLLER PHONE (S.C.A.Q.M.D) PHONE NUMBER. THE SIGN MUST BE OBTAINED AND INSTALLED BY THE DEVELOPER USING THE SAMPLE FORMAT. THE SIGN MUST BE PRESENT AT THE PRE -CONSTRUCTION MEETING AND PHONE NUMBER ACTIVE AND CURRENT AT ALL TIMES. FAILURE OF THE CONTACT SYSTEM MAY BE CONSIDERED GROUNDS FOR TEMPORARY OR PERMANENT CANCELLATION OF THE PERMIT. 7. VEHICLES TRAVELING ON DIRT AND/OR ON UNPAVED ROADS SHOULD RESTRICT THEIR SPEED TO 15 M.P.H. MAXIMUM. SIGNS TO THAT EFFECT SHOULD BE PLACED AT THE PROJECT ENTRANCE ON PROJECTS OVER 5 ACRES TO IMPROVE COMPLIANCE. 8. WHEN WINO SPEEDS EXCEED 25 MPH, BY CONTINUOUS ANEMOMETER READING, OR IN GUSTS AT LEAST TWICE WITHIN A THIRTY MINUTE PERIOD, MEASURED ON THE SITE, VEHICULAR ACTIVITY ON THE SITE SHALL CEASE, EITHER VOLUNTARILY, OR BY CITY OR A.Q.M.O. INSPECTOR NOTIFICATION, EXCEPT FOR WATER TRUCKS A ND SPRINKLER -TENDING VEHICLES, IF ANY. SITE SPECIFIC DETAILS: (PLEASE DESCRIBE A NY SPECIFIC OR ADDITIONAL CONTROL MEASURE PROPOSED.) 1. PRE -WATERING METHOD (AS SHOWN IN 3. OR AS DETAILED HERE): SPRINKLERS FROM EX. WM WATER AVAILABILITY, INITIAL STAGE: YES, EX. WM 2. OFF -SITE WORK PERMISSION NEEDED: NONE PROPOSED 3. ACCESS WILL BE CONTROLLED BY: GATE AT VISTS GALOPE. 4. INITIAL STAGING AREA: ON SITE AND ALONG NORTH PROPERTY LINE EQUIPMENT STORAGE: ALONG NORTH PROPERTY LINE TEMPORARY OFFICE: TRAILER A LONG NORTH PROPERTY LINE EMPLOYEE PARKING: ON SITE 5. WHEEL WASHING PROVISIONS: IF NEEDED 6. SPEED RESTRICT/ON SIGN LOCATION: AT ENTRY GATE 7. NUMBER OF POSTED 'DUST CONTROL SIGNS" : 1 (TYP. 1 PER FRONTING ROAD OR 1 PER 660 FEET OF FRONTAGE) 8. LONG-TERM STABILIZATION: 9. OTHER PRELIMINARY WORK: 10. WITHIN 10 DAYS OF CEASING ACTIVITY, ANDPERATOR SHALL IMPLEMENT A T LEAST ONE OF THE FOLLOWING LONG-TERM STABILIZATION TECHNIQUES FOR ANY DISTURBED SURFACE AREA WHERE CONSTRUCTION ACTIVITIES ARE NOT SCHEDULED FOR 30 DAYS: A. RE -VEGETATION THAT RESULTS IN 75% GROUND COVER PROVIDED THAT AN ACTIVE WATERING SYSTEM IS IN -PLACE AT ALL TIMES; OR B. ESTABLISHMENT OF A STABILIZED SURFACE THROUGH WATERING WITH PHYSICAL ACCESS RESTRICTIONS SURROUNDING THE AREA; OR C. USE OF CHEMICAL STABILIZERS TO ESTABLISH A STABILIZED SURFACE WITH ACCESS RESTRICTION SURROUNDING THE AREA. ALL STABILIZERS SHALL HAVE MIXED WITH THEM A GREEN COLORANT PER MANUFACTURER'S RECOMMENDATIONS A NO SATISFACTION OF THE CITY STAFF INSPECTION. P ASE "3": OUG- GRADI\G (VASS GAD \G, P= RIMETER) GENERAL REQUIREMENTS 1. HAULING PROCEDURES: SITE BALANCED 2. ALL STRIPPED , GRADED OR OTHERWISE DISTURBED AREAS SHALL BE STABILIZED BY SOME APPROPRIATE MEANS. AREAS ACTIVELY BEING GRADED CAN USUALLY BE STABILIZED BY APPLYING LOTS OF WATER. DISTURBED AREAS NOT ACTIVELY BEING WORKED MAY BE EFFECTIVELY TREATED WITH SOME MORE DURABLE SOIL STABILIZER, SUCH A S HYDROMULCH, TO AVOID CONSTANT WATERING. THE PREFERRED METHOD OF SITE WATERING IS BY SPRINKLER, ESPECIALLY A ROUND THE PERIMETER. SPRINKLERS MUST BE SET TO RUN ON WEEKENDS AND EVENINGS WHEN WATER TRUCK DRIVERS ARE NOT AVAILABLE. A TYPICAL WATER TRUCK CANDNLY HANDLE WELL ABOUT 4 ACRES. 3. IF PERIMETER BLOCK WALLS ARE TO BE BUILT THEY SHOULD BE GIVEN A HIGH PRIORITY SINCE THEY WILL HELP TO CATCH BLOWSAND AND COULD THEREBY REDUCE THE A MOUNT OF STREET SWEEPING REQUIRED. SITE SPECIFIC DETAILS: (PLEASE DESCRIBE A NY SPECIFIC OR ADDITIONAL CONTROL MEASURE PROPOSED.) 1. HAULING PROCEDURES: SOURCE MATERIAL IS LOCATED IN THE MANSION CLUB THE MADISON CLUB IN LA QUINTA. HAUL ROUTE SHOWN ON MAP, RIGHT, SHALL BE MONITORED FOR TRACK OUT AND STREET SWEEPER TRUCKS SHALL CLEAN ROUTE AT LEAST TWICE PER DAY OR AS NEEDED. WATER TRUCK CLEANUP SHALL BE REQUIRED TO WASH DOWN REMAINING DIRT, AS NECESSARY. PATH FOR ROSS AVENUE SHALL BE CLEANED DAILY AT END OF WORK. COORDINATION TO BE MAINTAINED WITH MADISON CLUB GOLF COURSE MAINTENANCE. INTERIOR CLUB STREET SHALL BE SWEPT AND WASHED DOWN AS NECESSARY, TWICE DAILY MINIMUM. 2. SOIL STABILIZATION METHODS: ACTIVE AREA WATERING SCHEDULE: (MIN. 4 TIMES PER 24 HRS.) WATER FROM EX. FH. WEEKEND WATERING SCHEDULE: ALL WEEKEND (MIN. 4 TIMES PER 24 HRS.) . INACTIVE AREA STABILIZATION METHOD(S) AREAS NON -OPERATIVE LONGER THAN 10 DAYS: (ACRYLIC POLYMER W/ GREEN COLORANT, HYDROMULCH, PLANTINGS, BIODEGRADABLE "OIL", OR AS SHOWN HERE) 3. PERIMETER BLOCK WALL SCHEDULE: NO SCHEDULE 4. LONG-TERM STABILIZATION: PLANTING AND MULCH 5. OTHER: 6. WITHIN 10 DAYS OF CEASING ACTIVITY, ANDPERATOR SHALL IMPLEMENT ATLEAST ONE OF THE FOLLOWING LONG-TERM STABILIZATION TECHNIQUES FOR A NY DISTURBED SURFACE AREA WHERE CONSTRUCT/ON A CTIVITIES A RE NOT SCHEDUL ED FOR 30 DAYS: A: RE -VEGETATION THAT RESULTS IN 75% GROUND COVER PROVIDED THAT AN ACTIVE WATERING SYSTEM IS IN -PLACE AT ALL TIMES; OR B: ESTABLISHMENT OF A STABILIZED SURFACE THROUGH WATERING WITH PHYSICAL ACCESS RESTRICTIONS SURROUNDING THE AREA; OR C: ACCESS OF CHEMICAL STABILIZERS TO ESTABLISH A STABILIZED SURFACE WITH ACCESS RESTRICT/ON SURROUNDING THE AREA. ALL STABILIZERS SHALL HAVE MIXED WITH THEM A GREEN COLORANT PER MANUFACTURER'S RECOMMENDATIONS A NO SATISFACTION OF THE CITY STAFF INSPECTION. IHASE "C": FINS GRADI\G (UT L_ITY & STREET CO GENERAL REQUIREMENTS 1. DIRT STOCKPILED NEXT TO UTILITY TRENCHES SHALL BE KEPT WATERED OR OTHERWISE STABILIZED OR COVERED TO HELP COUNTERACT THEIR HIGH PROFILE EXPOSURE TO THE WIND. 2. ALL PREVIOUSLY ROUGH GRADED AREAS THAT WILL BE INACTIVE IN THIS PHASE SHOULD BE TREATED WITH A DURABLE SOIL STABILIZER OR GROUND COVER SYSTEM. IF A VEGETATED GROUND COVER IS UTILIZED IT IS ONLY NECESSARY TO GET IT INITIALLY ESTABLISHED. THE ROOT SYSTEM A ND TOP STUBBLE MAY BE SUFFICIENT TO HOLD THE DUST EVEN IF WATERING IS DISCONTINUED. 3. FOR TRACTS, MULTIPLE PARCELS, A ND EXTENSIVE COMMERCIAL SITES, PAVED ACCESS TO THE BUILDING SITES WILL BE REQUIRED PRIOR TO FRAMING OF THE BUILDINGS. THIS CONSTRUCTION STAGE USUALLY INDICATES AN INCREASE IN THE NUMBERS OF WORKERS AND THEIR VEHICLES. AL SO, THE PAVED ACCESS IS RECOMMENDED FOR FIRE FIGHTING PURPOSES. IF PAVING IS DESIRED BEFORE ALL UTILITIES A NO/ OR LATERALS ARE INSTALLED, THE BASE LIFT OF ASPHALT IS SUFFICIENT FOR ACCESS. THE A .C. CAN BE "CAPPED" LATER, LEAVING A FINAL SURFACE THAT IS FREE OF UTILITY CUTS AND PATCHES. 4. AS PAVED ACCESS /S EXTENDED , THE STAGING AREA CAN BE MOVED CLOSER TO THE BUILDING SITES. THE STORAGE AND OFFICE TRAILERS, EQUIPMENT. AN EMPLOYEE PARKING CAN BE MOVED ONTO PAVED PORTIONS OF THE SITE. SITE SPECIFIC DETAILS: (PLEASE DESCRIBE A NY SPECIFIC OR ADDITIONAL CONTROL MEASURE PROPOSED.) 1. TRENCH STOCKPILE TREATMENT: (WATER AS NECESSARY) WATER EX. WM AS NEEDED 2. INACTIVE AREA TREATMENT.- (SEAL WITH HYDROMULCH, ACRYLIC POLYMER, PLANTINGS, ETC.) 3. STREET PAVING SCHEDULE: ALREADY PAVED STREET 4. STAGING AREA MOVEMENT SCHEDULE: 5. OTHER: PHASE "D": FINISH GRADING (BLDG. UTIL., BLDG. CONST. LANDSCAPE) GENERAL REQUIREMENTS 1. ALL INACTIVE AREAS SHOULD HAVE BEEN STABILIZED BY THIS STAGE. IF PREVIOUSLY COVERED, THE ACTUAL BUILDING PADS MAY NOW NEED TO BE STRIPPED, SCARIFIED,AND RECOMPACTED FOR BUILDING PAD COMPACTION AND ELEVATION CERTIFICATIONS. DUST WOULD BE KEPT DOWN BY WATERING, USUALLY BY TEMPORARY SPRINKLERS. 2. TRENCHING FOR BUILDING UTILITIES, DRYWELL CONSTRUCTION, POOLS, A NO TENNIS COURT CONSTRUCTION FORM THE BULK OF EARTHWORK AFTER THE PADS HAVE BEEN CERTIFIED. TEMPORARY SPRINKLERS MAY STILL BE USED ON THE BUILDING SITE FOR DUST CONTROL PRIOR TO THE BEGINNING OF FRAMING. TREATMENT WITH A BIODEGRADABLE "OIL" APPROVED FOR DUST CONTROL IS RECOMMENDED WHERE IT IS DIFFICULT TO WATER. 3. ESTABLISHING THE LANDSCAPE AND SPRINKLER SYSTEM A ROUND THE PERIMETER OF LARGE PROJECTS SHOULD BE DONE AT THIS STAGE. PLANTINGS A ROUND THE PERIMETER SERVE AS A WINO BUFFER A NO COLLECTION SYSTEM FOR DUST AND SAND. IT IS GOOD TO HAVE DUST AND SAND WELL UNDER CONTROL PRIOR TO THE BUILDING PHASE FOR THE SAKE OF CERTAIN GLUING A ND PAINTING PROCESSES THAT CAN BE RUINED BY BLOWSAND OR DUST. 4. DISTURBED AREAS A ROUND BUILDINGS SHOULD BE WATERED BY HAND FOR DUST CONTROL UNTIL SUCH TIME THAT THE SPRINKLER SYSTEM IS FULLY FUNCTIONAL AND GROUND COVER AND/OR LANDSCAPING IS ESTABLISHED. IF WATERING IS DIFFICULT DUE TO BUILDING INTERFERENCE, CHEMICAL OR MULCH TREATMENTS ARE AVAILABLE THAT CAN STABILIZE THE SOIL WITHOUT FREQUENT WATERING. 5. CONSTRUCTION DUST SUCH AS FROM CEMENT. PLASTER, PAINT OVERSPRAY, WOOD CUTTING, GRINDING OPERATIONS, ETC., SHOULD BE MINIMIZED ALSO. A PERIMETER BARRIER OF SPRINKLERS A NO PLANTINGS CAN SERVE TO CATCH SOME OF THIS POTENTIALLY HAZARDOUS MATERIAL AS WELL AS NATURAL DUST AND BLOWSAND. CONCENTRATIONS OF CONSTRUCTION DUSTS CAN RESULT FROM WASHING OF EQUIPMENT AND SHOULD BE PROPERLY DISPOSED OF BEFORE THEY CAN DRY OUT AND BLOW OR BE WASHED ACROSS PROJECT BOUNDARIES. 6. NOTE THAT SWALES SHOULD BE INSPECTED BY CITY PRIOR TO SETTING OF PERMANENT GROUND COVER OR OTHER PLANTS. SITE SPECIFIC DETAIL S: (PLEASE DESCRIBE A NY SPECIFIC OR ADDITIONAL CONTROL MEASURE PROPOSED) 1. BUILDING PAD WATERING: WATER TRUCK 2. FORMWORK AND TRENCH WATERING: (BY HAND WATERING AS NECESSARY) 3. PERIMETER LANDSCAPE SCHEDULE: (AS SOON AS POSSIBLE) 4. OTHER: ABATEMENT OF DUST MITIGATION FAILURE AN IRREVOCABLE LICENSE IS HEREBY GRANTED OR CAUSED TO BE GRANTED TO PERMIT THE CITY OR THEIR DESIGNEE TO ENTER UPON THE SITE UNDER THE FOLLOWING CIRCUMSTANCES: A. B. C. D. 2. 3. E. F. IN THE EVENT THAT WIND SPEEDS IN EXCESS OF 25 M.P.H. A RE FORECAST TO OCCUR BY THE SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT (S.C.A.Q.M.O.) FOR A PARTICULAR DAY; IN THE EVENT OF ANDN-SITE ANEMOMETER THAT CONFORMS TO ALL S.C.A.Q.M.D. STANDARDS REGISTERING 2 WIND GUSTS IN EXCESS OF 25 M.P.H. WITHIN A CONSECUTIVE JO MINUTE PERIOD; OR IN THE EVENT FUGITIVE DUST EMISSIONS ARE VISIBLE FOR A DISTANCE OF 50 FEET FROM ANY BOUNDARY LINE; OR THE CITY IS UNABLE, BY TELEPHONE, TO ESTABLISH A PERSONAL CONTACT WITH THE "AUTHORIZED DUST CONTROLLER" AFTER A 60 MINUTE CONSECUTIVE PERIOD WHICH SHALL START WITH THE FIRST TELEPHONE CALL , WHETHER ANSWERED OR NOT; THEN THE CITY WILL UNDERTAKE TO INITIATE ONE OR ALL OF THE BELOW LISTED ACTIONS: THE CITY WILL CAUSE THE CESSATION OF ANY ON -SITE ACTIVITY, INCLUDING BUT NOT LIMITED TO EARTH MOVING, CONSTRUCTION, DEMOLITION OR VEHICULAR MOVEMENT AND MANEUVERING. ANY WATER TRUCKS OR VEHICLES SERVICING SPRINKLERS WOULD CONTINUE. IN THE EVENT THAT ANDN-SITE IRRIGATION SYSTEM IS NOT INSTALLED AND/OR OPERATIONAL, THE CITY WILL CAUSE THE SITE TO BE WATERED OR TREATED WITH DUST CONTROL CHEMICALS. THE DUST CONTROL SECURITY REMAINING, ADDITIONAL COSTS MAY BE ASSESSED AGAINST THE OWNER OF THE PROJECT. IN THE EVENT ANDN-SITE IRRIGATION SYSTEM IS INSTALLED , BUT ITS CONTROL CLOCK HAS NOT TURNED THE SYSTEM ON WHEN NEEDED , THE CITY MAY TAKE ALL NECESSARY STEPS TO TURN ON THE SYSTEM. IF IT IS INACCESSIBLE BEHIND LOCKED GATES OR LOCKED CONTROL BOXES, A NO THE CITY CAN NOT FIND THE APPROPRIATE KEYS, THE CITY MAY CUT OR BREAK LOCKS AS NECESSARY. IF, IN THE OPINION OF THE CITY ENGINEER OR HIS DESIGNEE, THE INTENSITY, FREQUENCY OR DURATION OF FUGITIVE DUST EMISSIONS FROM THE SITE CONSTITUTES A HAZARD TO THE SAFETY OF THE PUBLIC, BY INTRUSION BEYOND THE PROJECT BOUNDARY, THE CITY ENGINEER OR HIS DESIGNEE OR AGENT MAY IMMEDIATELY ENTER UPON THE SITE OR IMMEDIATELY TAKE OTHER SUCH ACTION AS MAY BE NECESSARY TO REMEDY THE HAZARD, SUCH AS, BUT NOT LIMITED TO COMMENCING WATERING ON THE SITE OR ORDERING THE CESSATION OF ANY EMISSION -GENERATING ACTIVITY OCCURRING ON -SITE. ANY OF THE ABOVE ACTIONS MAY BE CONSTRUED AS AN ABATEMENT FOR WHICH THE CITY WILL "BACK CHARGE" THE GENERAL CONTRACTOR, DEVELOPER, AND/OR THE OWNER AS THE CITY SHALL DEEM APPROPRIATE. PLAN PREPARER'S CERTIFICATION THIS PI.AN WAS PREPARED PER S.C.A.Q.M.D. ORDINANCES. DRP IS NOT RESPONSIBLE FOR FIELD MONITORING OF CONSTRUCTION ACTIVITIES AND FOR ANY DEVIATIONS FROM THIS PLAN.S.C.A.Q.M.O. PREPARED BY: DANIEL PATNEAUDE SIGNATURE: COMPANY NAME: DRP ENTERPRISES LLC CIVIL EN( COMPANY ADDRESS: PO BOX 4428, PALM SPRINGS, CA 9226.5 CONTACT NUMBER: (206) 734-7765 s LICENSED CONTRACTOR'S DECLERATION I HEREBY CONFIRM THAT I AM LICENSED UNDER THE PROVISIONS OF CHAPTER 9 (COMMENCING WITH SECTION 7000 OF DIVISION 3 OF THE BUSINESS AND PROFESSIONS CODE) AN THAT,J..44Y LICENSE IS IN FULL FORCE AND EFFECT. LICENSE CLASS: NUMBER: B9I2A/STATE LIC-OWSZ$5 /CITY CONTRACTOR'S NAME: Drew Hudson COMPANY NAME: K.P. Hudson Construction COMPANY ADDRESS: 40905 Amador Dr., Indio, CA 92203 CONTACT PHONE NUMBE • DA : 760_275 6137 NIGHT: - - - --- ---- --- CONTRACTOR'S SIGNATURE. J-j " DATE: 5- [S-1-3CONTRALTO ` • M D # CV 2304-012965-13966 RESPONSIBLE DUST CONTROL PERSON I CERTIFY THAT I HAVE READ THIS FUGITIVE DUST CONTROL PLAN AND UNDERSTAND THAT I AM RESPONSIBLE FOR THE COMPLIANCE OF THIS PROJECT TO THE DUST CONTROL PROVISIONS NOTED OR REFERENCED HEREIN, AS THE AUTHORIZED RESPONSIBLE PERSON FOR THIS PROJECT I WILL LIST MY PHONE NUMBER ON THE REQUIRED SITE SIGNS, AND I WILL RESPOND TO DUST COMPLAINTS WITHIN THE 1 HOUR LIMIT. I UNDERSTAND THAT DUST CONTROL IS REQUIRED 24 HOURS PER DAY 7 DAYS PER WEEK, FROM THE DATE THAT THE PROJECT IS FIRST DISTURBED IN ANY WAY FROM THE NATURAL VEGETATED CONDITION, AND CONTINUE UNTIL THE TIME THAT THE PROJECT SITE AND ALL IMPROVEMENTS ARE COMPLETED A NO THE PROJECT SITE IS ACCEPTABLY RE -VEGETATED AND PAVED. ALSO CERTIFY THAT I HAVE ATTENDED AN AQMD SEMINAR ON FUGITIVE DUST CONTROL. Noble Mandeville NAME: COMPANY NAME: Gen 3 Earthworks ADDRESS: 54-960 Ave. Diaz, La Quinta, CA 92253 CONTACT PHONE NUMBER: (24 HOURS) 760-568-5000 AQMO CERTIFICATION NUMBER) CV 2304-012965-13966 SIGNATURE: OWNER'S CERTIFICATION TO INSURE IMPLEMENTATION OF THE DUST CONTROL MITIGATION MEASURE, A FINANCIAL SECURITY OF $2,000/PROJECT ACREAGE SHALL BE REQUIRED PRIOR TO THE ISSUANCE OF ANY PERMIT. ANY FINANCIAL SECURITIES COLLECTED UNDER THE PROVISIONS OF THIS REQUIREMENT SHALL BE HELD BY THE CITY OF LA QUINTA FOR POTENTIAL USE IN MITIGATING SOURCES OF FUGITIVE DUST NOT ADEQUATELY MITIGATED BY THE PROPERTY OWNER/S OR RESPONSIBLE DUST CONTROL PERSON. ALL UNUSED SECURITY SHALL BE RETURNED TO THE PROPERTY OWNER ONCE THE CITY HAS ACCEPTED THE FINAL IMPROVEMENT A NO ISSUED CERTIFICATES OF OCCUPANCY. I CERTIFY THAT I HAVE READ THIS FUGITIVE DUST CONTROL A ND UNDERSTAND THAT I AM RESPONSIBLE FOR THE COMPLIANCE OF THIS PROJECT TO THE DUST CONTROL PROVISIONS NOTED OR REFERENCED HEREIN. I UNDERSTAND THAT THE DUST CONTROL SECURITY THAT I'VE POSTED WITH THE CITY OF LA QUINTA MAY BE USED BY THE CITY, A NO ADDITIONAL CHARGES, IF NEEDED, TO MITIGATE ANY VISIBLE EMISSIONS OR FUGITIVE DUST. IF I FAIL TO KEEP THE DUST UNDER CONTROL. I UNDERSTAND THAT DUST CONTROL IS REQUIRED 24 HOURS PER DAY, 7 DAYS PER WEEK FROM THE INITIAL DATE THAT THIS SITE IS DISTURBED IN ANY WAY FROM THE NATURAL VEGETATED CONDITION, AND SHALL CONTINUE UNTIL THE TIME THAT THE PROJECT SITE AND ALL IMPROVEMENTS ARE COMPLETED AND THE PROJECT SITE IS ACCEPTABLY RE -VEGETATED AND PAVED. RESPONSIBILITY FOR THE DUST CONTROL ON THE SITE CAN NOT BE TRANSFERRED SOLELY BY TRANSFERRING ALL OR A PORTION OF THIS PROPERTY TO OTHER CONTRACTORS, BUILDERS, OR OWNER. A REPLACEMENT PM10 PLAN AND DUST CONTROL SECURITY SHALL BE SUBMITTED FOR A NY TRANSFERRED PORTION OF THE PROJECT. I CERTIFY THAT I HAVE READ THIS APPLICATION AND THAT THE INFORMATION CONTAINED HEREIN IS TRUE A NO CORRECT. I AGREE TO COMPLY WITH THE CITY FUGITIVE DUST ORDNANCE, AQMD RULE 403, 403.1 AND THE FINAL COACHELLA VALLEY S.I.P. AND ALL LAWS RELATING TO CLEARING, GRADING, LANDSCAPING, AND BUILDING OPERATIONS. I AUTHORIZE REPRESENTATIVE OF THE CITY OF LA QUINTA TO ENTER UPON THE ABOVE MENTIONED PROPERTY FOR INSPECTION A NO/OR ABATEMENT PURPOSES, AND I AGREE TO HOLD HARMLESS THE CITY OF LA QUINTA AND ITS REPRESENTATIVE FROM LIABILITY FOR ANY ACTIONS RELATED TO THIS PERMIT. OWNER'S NAME: MURRAY FAMILY OWNER'S ADDRESS: 11035 Technology Pl., #100, San Diego, CA 92127 CONTACTS PHONE NUMBERS: PAY: (S -583 615 NIGHT () _ OWNER'S S.C.A.Q.M.D. #__ OWNER'S SIGNATURE(S) ' _ /___ ` DATE5`i -2-12 APPLICATION CONSENT APPLICATION FOR APPROVAL OF A LOCAL AIR QUALITY MANAGEMENT (L.A.Q.M.P.) PLAN IS HEREBY MADE TO THE CITY ENGINEER OR HIS DESIGNEE, AS PART OF A GRADING PERMIT APPLICATION, SUBJECT TO THE CONDITIONS AND RESTRICTIONS SET FORTH HEREIN: 1. EACH PERSON UPON WHOSE BEHALF THIS APPLICATION IS MADE AND EACH PERSON AT WHOSE REQUEST AND FOR WHOSE BENEFIT WORK IS PERFORMED UNDER AND PURSUANT TO ANY PERMIT ISSUED AS A RESULT OF THIS APPLICATION AGREES T0, AND SHALL INDEMNIFY A NO HOLD HARMLESS THE CITY OF LA QUINTA, ITS OFFICERS, A GENTS A ND EMPLOYEES. 2. ANY PERMIT ISSUED AS A RESULT OF THIS APPLICATION BECOMES NULL AND VOID IF WORK IS NOT COMMENCED WITHIN 90 DAYS FROM THE DATE OF ISSUANCE OF SUCH PERMIT. 3. THE APPLICANT, OWNER, CONTRACTOR(S), SUBCONTRACTOR(S) OR OTHER AGENTS, HEIRS OR ASSIGNEES SHALL CONFORM TO THE ATTACHED DUST CONTROL PLAN AS APPROVED BY THE CITY SAID PLAN INCLUDES NOTES AND/OR DRAWINGS OF TEMPORARY OR PERMANENT CONTROL METHODS OR DEVICES PROPOSED TO BE USED. THIS L.A.Q.M.P. SHALL BE CONSIDERED A N ADDENDUM TO, AND A NECESSARY PART OF, ANY GRADING, STOCKPILE, IMPROVEMENT, OR DEMOLITION PLANDTHERWISE REQUIRED FOR CITY PERMITS. 4". BY AGREEING TO CONFORM TO THIS PLAN AS APPROVED BY THE CITY, THE OWNER A NO DESIGNATED "AUTHORIZED DUST CONTROLLER" DO ALSO AGREE TO ABIDE BY THE PROVISIONS OF THE ABATEMENT PROCEDURES A S SHOWN ABOVE. NOTE TO CONTRACTOR THE DUST CONTROL ORDINANCE REQUIRES THAT A NY FUGITIVE DUST CONTROL PLAN PREPARER, ENVIRONMENTAL OBSERVER, AND AT LEAST ONE REPRESENTATIVE OF A NY ON -SITE GENERAL CONTRACTOR OR SUBCONTRACTOR INVOLVED IN SOIL DISTURBANCE ACTIVITIES TO COMPLETE THE A.Q.M.O. COACHELLA VALLEY FUGITIVE DUST CONTROL CLASS AND HAVE DUST CONTROL AS THE PRIMARY RESPONSIBILITY WITH THE AUTHORITY TO IMMEDIATELY EMPLOY ADDITIONAL DUST CONTROL EFFORTS. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING A RECORD OF ALL DUST CONTROL ACTIVITIES EITHER SETFORTH BY THIS PI.ANDR ADDITIONAL METHODS EMPLOYED IN THE FIELD. THE CONTRACTOR SHALL UTILIZE THE STANDARD FORM IN THE S.C.A .Q.M.O. MANUAL FOR DAILY SELF -INSPECTION RECORD KEEPING. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING QUALIFIED INDIVIDUALS TO MAINTAIN THESE RECORDS AND TO EMPLOY ALL DUST CONTROL METHODS AND FACILITIES AT ALL TIMES DURING THE PROJECT'S DURATION. ALL DUST CONTROL METHODS SHALL CONFORM TO THE CITY OF LA QUINTA ORDINANCE NO. 39 1. A COPY IS AVAILABLE ON-LINE AT L.A-QUINTA.ORG. NOTE: OWNER IS THE RESPONSIBLE PARTY FOR ALL DUST CONTROL 96" CITY OF LA QUINTA BRES 2023-XXXX CORAL MOUNTAIN COURT LOT 3 IF YOU SEE DUST COMING FROM THIS PROJECT PLEASE CALL: (760) 574 - 9267 IF YOU DON'T GET A RESPONSE WITHIN ONE HOUR, PLEASE CALL THE CITY OF LA QUINTA PUBLIC WORKS AT (760)416-5315 REPORT THE PERMIT OR PROJECT NUMBER AND PHONE NUMBER ABOVE, OR CALL THE A.Q.M.D. AT I-800-CUT-SMOG (I-800-288-7664) fy_ 6 WIND FENC G TH STRAW W !DLE BOOMS A. BASE OF FEN �,-1, SE-1, SE-5 % •, SAN BAG BARRIER PER SE-8 STREET SWE NNG PER SE-7 INDEX MAP SCALE: I "=50' DUST CONTROL SIGN DETAIL NTS 2.5" 3" 3" -�- 6" 15" 1.5" 1.5" PM 10 SECURITY $2,000.00/ACRE=$5,000.00 NOTE: MONITORING CHECKLIST PER CVFDC HAND BOOK SECTION 6.2 EARTHWORK: RAW CUT: 100 CY RAW FILL: 85 CY IMPORT: 0 CY RRIER -r-469 469.5. 6' WIND FENCING WITH STRAW WADD AT BASE OF FEN• WE-1, SE-1, SE - BOOMS 0 20' 40' SAND BAGBARRIER PER SE-8 BOOMS 80' SCALE: 1 "=40' SAND BAG BA PER SE- MADISON ST. AVENU 54 J Y QUZ trERWTAGE 058TH AVE. SITE O 0 AIRPORT BLVD 2 VICINITY MAP 60TH AVE. NTS DIAL TOLL FREE %44, 1-800-227-2600 AT LEAST TWO DAYS BEFORE YOU DIG UNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA DATE BY MARK APPR. DATE ENGINEER REVISIONS CITY DATE CHECKED BY APPROVED BY: / /23 BRYAN MCKINNEY, P.E. CITY ENGINEER R.C.E. NO. 49418 DATE EXP DATE 9-30-24 PREPARED UNDER THE DIRE_T SUPERVISION OF: Jo' E C. SINGER RCE 6900 DRP ENTERPRISES LLC DANIEL PATNEAUDE MAILING ADDRESS: PO BOX 4428 PALM SPRINGS, CA 92263 206-734-7765 IN THE CITY OF LA QUINTA, CALIFORNIA SCALE: AS NOTED PM 10 FUGITIVE DUST CONTROL PLAN LOT 3, TRACT 29963 / CORAL MOUNTAIN COURT TRACT MAP 29963, MB 340/036 APN 762-440-035 IN THE SE PORTION OF SECTION _, -_- ---, SBNI FOR JOB No SHEET No, 1 OF 1 SHTS FILE No. DESIGNED BY: DRP DRAWN BY: DRP CHECKED BY:JCS DATE DATE: 5-6-2023 Re: 57600 Coral Mountain Kohl and Deisy, Please see the attached — 1. Permitted Grading Plan 2. Revised Landscape Plan 3. CVWD fire flow analysis of adjacent fire hydrant 4. Revised Site Plan I believe that this addresses all of the FM's requests. We have a grading permit. Regards, Michael Kiner 760-250-4000 ce, at 4Qimrw DESIGN & DEVELOPMENT DEPARTMENT 78-495 CALLE TAMPICO LA QUINTA, CALIFORNIA 92253 (760) 777-7125 FAX (760) 777-7011 CERTIFICATION OF BUILDING AREA STREET ADDRESS OF JOB: 57600 CORAL MOUNTAIN CT APN: 762440035 DESCRIPTION OF WORK: NEW SFR SQUARE FOOTAGE: 8200 SQ FT OWNER'S NAME: KEVIN MURRAY For questions regarding this letter, please contact: City of La Quinta Permit Center (760) 777-7125 Coachella Valley Unified School District 87-225 Church St Thermal, CA 92274 (760) 848-1880 Desert Sands Unified School District 47-950 Dune Palms Road La Quinta, CA 92253 (760) 771-8515 Please note: This letter verifies conditioned square footage. Please can your School District to verify school fees, requirement for cashier's check or money order and hours of operation. DEFERRED TRUSS SUBMITTAL REQUEST Date: 4/8/23 Permit Application Number: BRES2022-1086 Project Street Address: 57600 Coral Mountain Ct. Applicant: Michael Kiner Associates Policy Conditions and Acknowledgment: z — ,I II UR\11— BRES2022-1086 CITY OF LA QUINTA BUILDING DIVISION REVIEWED FOR CODE COM PUANCE BY:Deisy Mendez DATE 06/22/2023 Limited to Custom Residential Prefabricated Wood Trussed Roof Projects Submittal Package Shall Consist of Electronically Stamped and Signed Truss Calculations with Engineer of Record's Acceptance and a Roof Truss Layout City Anticipated Initial Review Time is Ten (10) Working Days with Rechecks of Five (5) Workings Days Fee for Plan Review and Processing will be the Actual Hourly Cost Incurred by the City Consultant and the Hourly Cost per the Applicable Fee Schedule for City Staff Approval and Payment of Fees are Required Prior to Request for Roof Nail Inspection, No Exceptions By signing this form, the applicant agrees to, and will be solely responsible for any delays incurred by not complying with, the timelines, conditions, and requirements as identified. Signature: Note: Applicant may print out and sign by hand and then return a scanned ronv hack for review and approval City Staff Approved By: 78495 Calle Tampico I la Quints, California 92253 1760.777.7000 I www,laquintaca.gov CAL FIRE - RIVERSIDE UNIT RIVERSIDE COUNTY FIRE DEPARTMENT BILL WEISER — FIRE CHIEF OFFICE OF THE FIRE MARSHAL — LA QUINTA 78495 Calle Tampico, La Quinta, CA 92253 • Phone (760) 777-7074 • www.rvcfire.org June 22, 2023 Kevin Murray 11035 Technology Place #100 San Diego, CA 92127 Re: Residential Fire Access & Water / ESS Plan Review — MURRAY RESIDENCE 57600 Coral Mountain Court, La Quinta, CA 92253 C2ithd-a CALIFORNIA The plans you submitted for the above referenced project have been reviewed by Riverside County Fire Department - Office of the Fire Marshal personnel and are approved with the following conditions. 1) Fire access shall be provided in compliance with CFC 503.1.1. *Civil Engineer Certification of improved access elements shall be provided prior to Final for Occupancy. AFFECTS PG2023- 0013/GRP2023-0002 CASES. SHALL CERTIFY THE 2" COMPACTED DECOMPOSED GRANITE (DG) AS ABLE TO SUPPORT 40,000-POUNDS OVER 2-AXLES FIRE APPARATUS. a. Adequate Fire Turnaround in compliance with Technical Policy #16-001 is required. b. Adequate Fire Turnout in compliance with Technical Policy #16-001 is required. 2) Property/Unit Addressing shall be provided. Minimum 4-inch tall numbers of contrasting color to their background shall be displayed on the structure and viewable from the roadway or posted at the driveway entrance and maintained visible. 3) Vehicle Gates/barricades restricting fire access to the structure are required to be provided with KNOX emergency access. (CFC 503.6) 4) The proposed structure requires a fire flow of 1,500 gallons per minute from a single hydrant located within 600-feet of all exterior portions of the structure. (CFC 507.5.1 & APPENDIX B) 5) Public/Private fire hydrants located in front of the property shall be provided with a minimum 3-feet radius around the hydrant of clearance of any obstructions, including vegetation. 6) Dwelling Units shall maintain a minimum 3-feet clear width Egress Court from emergency escape windows and doors of sleeping rooms and shall deposit to the front of the property or public way. These courts shall be traversable pathways, free of obstructions and landscaping intrusions. (Ref. CBC 1028.4 / CRC R311.1) a. Landscaping and hardscaping as proposed in the associated Landscape Plans shall be fully installed at time of Final for Occupancy inspection request. 7) Energy Storage Systems shall comply with CFC 1207.11. a. Fire Detection - Areas shall be protected by smoke alarms. A listed heat detector shall be installed in locations within dwelling units and attached garages where smoke alarms cannot be installed based on their listing. b. Protection from Impact — ESS installed in a location subject to vehicle damage shall be protected by approved barriers. c. Operating Temperatures — ESS system manuals shall be consulted. Compliance with the maximum operating ambient temperatures shall be complied with. Provision of HVAC climate control may be necessary. 8) A Residential Fire Sprinkler system shall be installed in compliance with CRC R313. CA Licensed Contractor (C-16) shall submit plans and details for review and approval prior to system installation and Rough Inspections. The Fire Department approved plans and conditions letter must be at the job site. Applicant shall be responsible to contact the Fire Department to schedule inspections. Requests for inspections are to be made at least 48 hours in advance and may be arranged by calling (760)777-7131. All questions regarding the meaning of these conditions should be referred to the Office of the Fire Marshal staff at (760)777-7074. Kohl Hetrick - Fire Safety Specialist (E) GMU WALL 501 SETEAC< CONNECT 66" H WROUGHT IRON FENCING INTO THE EXISTING PILASTER. 66" H WROUGHT IRON FENCING 721 - 21 11 2 (E) GMU WALL CONCRETE DECK \i A.G. CONDENSOR 5'-6" H GMU WALLS FOOL EQUIPMENT 73141�� 2 5'-6" H GMU WALLS COMPACTED DECOMPOSED GRANITE, TYP. A W/A STEEL EDGE BORDER. SURFACE SHALL BE ENGINEERED TO SUPPORT FIRE APPARATUS LOAD CAPABILITIES. EXISTING FIRE HYDRANT 6'-0" H MASONRY WALLS MIN. 6" BEHIND EASEMENT MAILBOX 66" H ELECTRIC GATES GATE INTERCOM GATES SHALL HAVE AN APPROVED MEANS OF EMERGENCY OPERATION. FIRE MI SC. LEANOUS PERMIT IS REQUIRED SEPARATELY FOR VIEW AND APPROVAL OF GATE INSTALLATION. CONCRETE PAVERS (2) 16" X 16" PILASTERS EXISTING CURD A`'C ROO CONCRETE DEGK GAS METER 10' 0" UTILITY EASEMENT / S'-O" H CHAIN LINK FENCING SHOWER J29 3/' S89° 44 44V CONCRETE PAD TRASH ENCLOSURE A.G. COMPRESSORS S'-6" H GMU WALLS 5'-6" H CMU WALLS 66" H WROUGHT IRON FENCING \\ \\ COIN ETE DEGK \\ \\ \\ \\ \\ \\ \\ \\ \\ 57 1° /' / \ ARASE PLANTER MA I \ HOUSE WOOD DECKING PLANTER CONCRETE PAVERS PLANTER COMPACTED DECOMPOSED GRANITE, TYP. IN/A STEEL EDGE BORDER (E) GMU WALL COMPACTED DECOMPOSED GRANITE, TYP. IN/ A STEEL EDGE BORDER s01� SETA 5'-6" H GMU WALL A. CONDENSORS 66" H WROUGHT IRON FENCING INTERSECTS IN/ EX I ST'G GMU WALL A FIRE DEPARTMENT ON PARCEL ACCESS 15 REQUIRED AND SHALL GOMPLY !'l I TH RVG FIRE TEGHN I GAL POI_ I GY # 16 —OO I , THE ENTIRE DR I VENAY UP TO THE I6 DIAMETER TURN AROUND SHALL COMPLY. * NOTE: ALL MEASUREMENTS SUPERSEDE SCALE. ALL DIMENSIONS, LOCATIONS * CONDITIONS MUST BE VERIFIED IIIN- FIELD" Lots shall be graded to drain surface water away from foundation walls with a minimum fall of 6 inches within the first 10 feet (R401.3). This project is subject to NPDES and SUSMP regulations. Provide the following: a. The project architect or engineer of record, or authorized qualified designee, shall sign a statement on the plans to the effect: "As the architect/engineer of record, I have selected appropriate BMPs to effectively minimize the negative impacts of this project's construction activities on storm water quality. The project owner and contractor are aware that the selected BMPs must be installed, monitored, and maintained to ensure their effectiveness. The BMPs not selected for implementation are redundant or deemed not applicable to the proposed construction activities." Name Position Date b. One or more acres. In addition to the above requirements, developments located adjacent to or directly discharging into environmentally sensitive areas, in a hillside area, or those that will result in the disturbance of one acre or more in size, shall have their construction plans include features meeting the applicable construction activities BMPs (CA-1 through CA-40) and erosion and sediment control BMPs (ESC-1 through ESC-56) published in the "California Storm Water Best Management Practice Handbooks (Construction Activity) (1993)" to ensure that every construction site meets the requirement of these regulations during the time of construction. Furthermore, these projects shall be required to prepare and submit to the city a storm water pollution prevention plan (SWPPP). The SWPPP shall include appropriate construction site BMPs listed in this subsection. Prior to permit issuance, under penalty of perjury, the owner or agent having the property owner's consent shall sign a statement on the plans to the effect stating that: I certify that the proposed work will not destroy or unreasonably interfere with any access or utility easement belonging to others and located on my property, but in the event such work does destroy or unreasonably interfere with such easement, a substitute easement(s) satisfactory to the holder(s) of the easement will be provided.A Signature Print Name Title Date PLAN NOTES SEPARATE PE I`' I TS �=QU I SEED FO : POOL, SPA AND 1`' ASONRY V\ALLS SEE 6RAD A\D LANDSCAP I NCB PLANS FOB ADD I T I O\AL SITE I NFO�" AT I ON BRES2022-1086 CITY OF LA QU I NTA BUILDING DIVISION REVIEWED FOR CODE COM PIJAN CE BY:Deisy Mendez DATE 06/22/2023 NEW (8,200SF) 2-STORY SINGLE FAMILY DWELLING [VB/RES-3/CLASS A-FR/13D] THIS PERMIT DOES NOT INCLUDE PV SYSTEM, POOL, SPA, BLOCK WALLS, DRIVEWAY APPROACH OR SIMILAR EXTERIOR STRUCTURES. 2019 CALIFORNIA BUILDING CODES. sift PLAN II - O 10 II REVISIONS 1Q 03/15/23 MK iiLLI CT 0 O 0 0 Q UJ 1,::!0, gtiOLI IJ, W Ck Z pn0pnn V Q t NI O O O la R 0 O sT 0 ir. wi Q r. Q e 141 '''' , (m z O d Ni Z O � , A MEW GFSEMDEMGE FOGFSo Lil-HIE HU = A = ) A Y hi A MIL, Y 07600 COAQL MONJlvITQilGvI cn LA Cp?NJOG�I i�lQ9 C� 42\ No. R )/7 OF �Q 29 3) 23 c/0 drawn DRS protect no. - checked MK file reviewed drawing no. . 0 d04ate -10-23A—I scale Sladden Engineering November 3, 2022 BRES2022-1086 45090 Golf Center Parkway, Suite F, Indio, California 92201 (760) 863-0713 6782 Stanton Avenue, Suite C, Buena Park, CA 90621 (714) 523-0952 450 Egan Avenue, Beaumont, CA 92223 (951) 845-7743 www.Sladdenengineering.com Michael Kiner Associates, Inc. 70177 Highway 111, Suite 200 Rancho Mirage, California 92270 Subject: Proposal for Geotechnical Update 1 ll 22 11 tibti CI OF LA QUINTA BUILDING DIVISION REVIEWED FOR CODE COM PIJANCE BY:Deisy Mendez DATE: 06/22/2023 Pursuant to your request, we are pleased to submit the following proposal to provide a geotechnical update for the project referenced below. We propose to provide the services described on a fixed fee basis. The fees for the completed update will be $1500.00. The completed report should be available within one week of authorization to proceed. Execution of this agreement verifies and is written authorization as the responsible billing party and obligates you for payment of services rendered as outlined in this contract. Upon acceptance of this agreement, please sign one copy and return it to our office along with payment in the amount of $1500.00 as authorization to proceed with requested Geotechnical Update. Sladden Engineering accepts the following forms of payment, Check, Cash and Credit Cards (Discover, MasterCard and Visa). Additional work required to respond to governmental agency comments will be billed at fee schedule rates in affect at time of work. Please review the attached Terms and Conditions rev 3.0 2/09 as they form part of this agreement. IN WITNESS WHEREOF, the parties hereby execute this agreement upon the terms and conditions stated above and in the attached Terms and Conditions rev 3.0 dated 2/09. Respectfully submitted SLADDEN ENGINEERING Brett L. Anderson Principal Engineer Telephone: 760-340-3360 Project Address: APN 762-440-036 Coral Mountain Court La Quinta, California Signature Michael Kiner Name (print) Architect Title 11/3/22 Date PROJECT SUMMARY Project Name: Address: City, State, Zip: Building Department: Permit Number: Building Energy Code: CHEERS REGISTRY PROJECT STATUS REPORT Murray NEW Coral Mountain Court APN 762-440-036-2 La Quinta, CA 92253 La Quinta, City of BRES2022-1086 2022 Standards HERS VERIFIABLE MEASURES ENERGY CODE COMPLIANCE CERTIFICATE OF COMPLIANCE (CF1R) DATE DOCUMENT TITLE 07/11/2024 CF1R-PRF-01-E Performance Compliance REGISTRATION NUMBER Scan to Validate COMPLETE O COMPLETE O 424-P010127696A-000-000-0000000-0000 CERTIFICATE OF INSTALLATION (CF2R) DATE DOCUMENT 07/02/2025 CF2R-ELC-01-E 07/02/2025 CF2R-ENV-01-E 07/02/2025 CF2R-ENV-03-E 07/02/2025 CF2R-ENV-04-E 10/09/2024 CF2R-ENV-21-H 10/09/2024 CF2R-ENV-22-H 07/02/2025 CF2R-LTG-01-E 07/06/2025 CF2R-MCH-01a-E 07/06/2025 CF2R-MCH-27a-H 07/02/2025 CF2R-MCH-32-H 07/02/2025 CF2R-PLB-02-E 07/02/2025 CF2R-PVB-01-E TITLE Electric Ready Fenestration Insulation Installation Roofing Radiant Barrier QII QII Lighting HVAC, Ducts and Fans Mechanical Ventilation Local Mechanical Exhaust Single Family Hot Water Photovoltaic Systems - continued on next page - REGISTRATION NUMBER 424-P010127696A-000-001-001007A-0000 424-P010127696A-000-001-E01004A-0000 424-P010127696A-000-001-E03005A-0000 424-P010127696A-000-001-E04006A-0000 424-P010127696A-000-001-E21001A-0000 424-P010127696A-000-001-E22002A-0000 424-P010127696A-000-001-L01009A-0000 424-P010127696A-000-001-M01012A-0000 424-P010127696A-000-001-M27013A-0000 424-P010127696A-000-001-M32011A-0000 424-P010127696A-000-001-B02010A-0000 424-P010127696A-000-001-P01008A-0000 STATUS STATUS CHEERS NOTICE: This compliance summary report has been generated by a registration platform provided by CHEERS using information that has been uploaded to that registration platform by third parties that are not affiliated or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this certificate. Page 1 of 6 CHEERS REGISTRY PROJECT STATUS REPORT CERTIFICATE OF INSTALLATION (CF2R) DATE HVAC 1 07/06/2025 07/06/2025 07/06/2025 07/06/2025 HVAC 2 07/06/2025 07/06/2025 07/06/2025 07/06/2025 HVAC 3 07/06/2025 07/06/2025 07/06/2025 07/06/2025 HVAC 4 07/06/2025 07/06/2025 07/06/2025 07/06/2025 DOCUMENT TITLE CF2R-MCH-20a-H CF2R-MCH-21-H CF2R-MCH-22a-H CF2R-MCH-23a-H CF2R-MCH-20a-H CF2R-MCH-21-H CF2R-MCH-22a-H CF2R-MCH-23a-H CF2R-MCH-20a-H CF2R-MCH-21-H CF2R-MCH-22a-H CF2R-MCH-23a-H CF2R-MCH-20a-H CF2R-MCH-21-H CF2R-MCH-22a-H CF2R-MCH-23a-H Duct Leakage Duct Location Fan Efficacy Airflow Rate Duct Leakage Duct Location Fan Efficacy Airflow Rate Duct Leakage Duct Location Fan Efficacy Airflow Rate Duct Leakage Duct Location Fan Efficacy Airflow Rate - continued on next page - Scan to Validate REGISTRATION NUMBER STATUS 424-P010127696A-000-001-M20015A-0000 424-P010127696A-000-001-M21014A-0000 424-P010127696A-000-001-M22017A-0000 424-P010127696A-000-001-M23016A-0000 424-P010127696A-000-001-M20021A-0000 424-P010127696A-000-001-M21020A-0000 424-P010127696A-000-001-M22023A-0000 424-P010127696A-000-001-M23022A-0000 424-P010127696A-000-001-M20027A-0000 424-P010127696A-000-001-M21026A-0000 424-P010127696A-000-001-M22029A-0000 424-P010127696A-000-001-M23028A-0000 424-P010127696A-000-001-M20033A-0000 424-P010127696A-000-001-M21032A-0000 424-P010127696A-000-001-M22035A-0000 424-P010127696A-000-001-M23034A-0000 0 e t Al Ilk. di O O CHEERS NOTICE: This compliance summary report has been generated by a registration platform provided by CHEERS using information that has been uploaded to that registration platform by third parties that are not affiliated or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this certificate. Page 2of6 CHEERS REGISTRY PROJECT STATUS REPORT CERTIFICATE OF INSTALLATION (CF2R) DATE DOCUMENT TITLE HVAC 5 Scan to Validate REGISTRATION NUMBER STATUS 07/06/2025 CF2R-MCH-20a-H Duct Leakage 424-P010127696A-000-001-M20037A-0000 07/06/2025 CF2R-MCH-21-H Duct Location 424-P010127696A-000-001-M21036A-0000 07/06/2025 CF2R-MCH-22a-H Fan Efficacy 424-P010127696A-000-001-M22039A-0000 07/06/2025 CF2R-MCH-23a-H Airflow Rate 424-P010127696A-000-001-M23038A-0000 HVAC 6 07/06/2025 CF2R-MCH-20a-H Duct Leakage 424-P010127696A-000-001-M20041A-0000 07/06/2025 CF2R-MCH-21-H Duct Location 424-P010127696A-000-001-M21040A-0000 07/06/2025 CF2R-MCH-22a-H Fan Efficacy 424-P010127696A-000-001-M22043A-0000 07/06/2025 CF2R-MCH-23a-H Airflow Rate 424-P010127696A-000-001-M23042A-0000 HVAC 7 07/06/2025 CF2R-MCH-20a-H Duct Leakage 424-P010127696A-000-001-M20045A-0000 07/06/2025 CF2R-MCH-21-H Duct Location 424-P010127696A-000-001-M21044A-0000 07/06/2025 CF2R-MCH-22a-H Fan Efficacy 424-P010127696A-000-001-M22047A-0000 07/06/2025 CF2R-MCH-23a-H Airflow Rate 424-P010127696A-000-001-M23046A-0000 New HVAC1 07/06/2025 CF2R-MCH-25f-E Refrigerant Charge 424-P010127696A-000-001-M25018A-0000 07/06/2025 CF2R-MCH-25f-E Refrigerant Charge 424-P010127696A-000-001-M25048A-0000 07/06/2025 CF2R-MCH-25f-E Refrigerant Charge 424-P010127696A-000-001-M25050A-0000 07/06/2025 CF2R-MCH-25f-E Refrigerant Charge 424-P010127696A-000-001-M25052A-0000 07/06/2025 CF2R-MCH-25f-E Refrigerant Charge 424-P010127696A-000-001-M25054A-0000 - continued on next page - 0 e t Al Ilk. 4 O O ,,,,,rti llll CHEERS NOTICE: This compliance summary report has been generated by a registration platform provided by CHEERS using information that has been uploaded to that registration platform by third parties that are not affiliated or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this certificate. Page 3 of 6 CHEERS REGISTRY PROJECT STATUS REPORT CERTIFICATE OF INSTALLATION (CF2R) DATE 07/06/2025 07/06/2025 07/06/2025 07/06/2025 07/06/2025 DOCUMENT TITLE CF2R-MCH-26-H High SEER & EER CF2R-MCH-26-H High SEER & EER CF2R-MCH-26-H High SEER & EER CF2R-MCH-26-H High SEER & EER CF2R-MCH-26-H High SEER & EER New HVAC2 07/06/2025 CF2R-MCH-25f-E Refrigerant Charge 07/06/2025 CF2R-MCH-26-H High SEER & EER New HVAC3 07/06/2025 07/06/2025 CF2R-MCH-25f-E Refrigerant Charge CF2R-MCH-26-H High SEER & EER Scan to Validate REGISTRATION NUMBER 424-P010127696A-000-001-M26055A-0000 424-P010127696A-000-001-M26053A-0000 424-P010127696A-000-001-M26051A-0000 424-P010127696A-000-001-M26049A-0000 424-P010127696A-000-001-M26019A-0000 424-P010127696A-000-001-M25024A-0000 424-P010127696A-000-001-M26025A-0000 424-P010127696A-000-001-M25030A-0000 424-P010127696A-000-001-M26031A-0000 CERTIFICATE OF VERIFICATION (CF3R) DATE 10/09/2024 10/09/2024 07/06/2025 07/02/2025 HVAC 1 07/06/2025 07/06/2025 07/06/2025 DOCUMENT CF3R-ENV-21-H CF3R-ENV-22-H CF3R-MCH-27a-H CF3R-MCH-32-H CF3R-MCH-20a-H CF3R-MCH-21-H CF3R-MCH-22a-H TITLE QII QII Mechanical Ventilation Local Mechanical Exhaust Duct Leakage Duct Location Fan Efficacy - continued on next page - REGISTRATION NUMBER 424-P010127696A-000-001-E21001A- E21A 424-P010127696A-000-001-E22002A- E22A 424-P010127696A-000-001-M27013A- M27A 424-P010127696A-000-001-M32011A- M32A 424-P010127696A-000-001-M20015A- M20A 424-P010127696A-000-001-M21014A- M21A 424-P010127696A-000-001-M22017A- M22A STATUS 0 O 0 O STATUS O O O CHEERS NOTICE: This compliance summary report has been generated by a registration platform provided by CHEERS using information that has been uploaded to that registration platform by third parties that are not affiliated or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this certificate. Page 4of6 CHEERS REGISTRY PROJECT STATUS REPORT CERTIFICATE OF VERIFICATION (CF3R) DATE DOCUMENT TITLE 07/06/2025 CF3R-MCH-23a-H Airflow Rate HVAC 2 07/06/2025 CF3R-MCH-20a-H Duct Leakage 07/06/2025 CF3R-MCH-21-H Duct Location 07/06/2025 CF3R-MCH-22a-H Fan Efficacy 07/06/2025 CF3R-MCH-23a-H Airflow Rate HVAC 3 07/06/2025 CF3R-MCH-20a-H Duct Leakage 07/06/2025 CF3R-MCH-21-H Duct Location 07/06/2025 CF3R-MCH-22a-H Fan Efficacy 07/06/2025 CF3R-MCH-23a-H Airflow Rate H VAC 4 07/06/2025 CF3R-MCH-20a-H Duct Leakage 07/06/2025 CF3R-MCH-21-H Duct Location 07/06/2025 CF3R-MCH-22a-H Fan Efficacy 07/06/2025 CF3R-MCH-23a-H Airflow Rate HVAC 5 07/06/2025 CF3R-MCH-20a-H Duct Leakage 07/06/2025 CF3R-MCH-21-H Duct Location 07/06/2025 CF3R-MCH-22a-H Fan Efficacy 07/06/2025 CF3R-MCH-23a-H Airflow Rate REGISTRATION NUMBER 424-P010127696A-000-001-M23016A- M23A 424-P010127696A-000-001-M20021A- M20A 424-P010127696A-000-001-M21020A- M21A 424-P010127696A-000-001-M22023A- M22A 424-P010127696A-000-001-M23022A- M23A 424-P010127696A-000-001-M20027A- M20A 424-P010127696A-000-001-M21026A- M21A 424-P010127696A-000-001-M22029A- M22A 424-P010127696A-000-001-M23028A- M23A 424-P010127696A-000-001-M20033A- M20A 424-P010127696A-000-001-M21032A- M21A 424-P010127696A-000-001-M22035A- M22A 424-P010127696A-000-001-M23034A- M23A 424-P010127696A-000-001-M20037A- M20A 424-P010127696A-000-001-M21036A- M21A 424-P010127696A-000-001-M22039A- M22A 424-P010127696A-000-001-M23038A- M23A - continued on next page - Scan to Validate STATUS 0 0 0 0 0 0 0 CHEERS NOTICE: This compliance summary report has been generated by a registration platform provided by CHEERS using information that has been uploaded to that registration platform by third parties that are not affiliated or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this certificate. Page 5 of 6 CHEERS REGISTRY PROJECT STATUS REPORT CERTIFICATE OF VERIFICATION (CF3R) DATE HVAC 6 07/06/2025 07/06/2025 07/06/2025 07/06/2025 HVAC 7 07/06/2025 07/06/2025 07/06/2025 07/06/2025 New HVAC1 07/06/2025 07/06/2025 07/06/2025 07/06/2025 07/06/2025 New HVAC2 07/06/2025 New HVAC3 07/06/2025 DOCUMENT CF3R-MCH-20a-H CF3R-MCH-21-H CF3R-MCH-22a-H CF3R-MCH-23a-H CF3R-MCH-20a-H CF3R-MCH-21-H CF3R-MCH-22a-H CF3R-MCH-23a-H CF3R-MCH-26-H CF3R-MCH-26-H CF3R-MCH-26-H CF3R-MCH-26-H CF3R-MCH-26-H CF3R-MCH-26-H CF3R-MCH-26-H TITLE Duct Leakage Duct Location Fan Efficacy Airflow Rate Duct Leakage Duct Location Fan Efficacy Airflow Rate High SEER & EER High SEER & EER High SEER & EER High SEER & EER High SEER & EER High SEER & EER High SEER & EER REGISTRATION NUMBER 424-P010127696A-000-001-M20041A- M20A 424-P010127696A-000-001-M21040A- M21A 424-P010127696A-000-001-M22043A- M22A 424-P010127696A-000-001-M23042A- M23A 424-P010127696A-000-001-M20045A- M20A 424-P010127696A-000-001-M21044A- M21A 424-P010127696A-000-001-M22047A- M22A 424-P010127696A-000-001-M23046A- M23A 424-P010127696A-000-001-M26019A- M26A 424-P010127696A-000-001-M26049A- M26A 424-P010127696A-000-001-M26051A- M26A 424-P010127696A-000-001-M26053A- M26A 424-P010127696A-000-001-M26055A- M26A 424-P010127696A-000-001-M26025A- M26A 424-P010127696A-000-001-M26031A- M26A Scan to Validate NOTICE: This compliance summary report has been generated by a registration platform provided by CHEERS using information that has been uploaded to that registration platform by third parties that are not affiliated or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this certificate. STATUS r Page 6 of 6 oso Domestic Water System Flow Analysis Coachella Valley Water District 75515 Hovley Lane East Palm Desert, CA 92211 Domestic Water System Flow Analysis (Hydraulic Model) GEO 06-07-21-3 PZ 23-14727 Requested By: Michael Kiner Date: 5/8/2023 Billing Address: 70177 Highway 111, Ste 200 Rancho Mirage, Ca 92270 APN: 762-440-035 Req. Fire Flow: 1 ,500gpm at 20psi for hours. Contact Name: Michael Kiner Address: Project Name 57600 Coral Mt. Court, La Quinta Murray Residence Phone: 760-340-3360 Email: Michael@thekinergroup.com Cell: 760-250-4000 Analysater is DomestFlow Flow Analysis Location: Hydrant in front of 57600 Coral Mountain Ct. APN 762-440-035 i Flow Analysis Description **Model CVWD Domestic Test 1 Information Water Test 2 CVWD Only** Hydraulic Model Test 3 Results Test 4 Requested Flow NOTE Domestic system flow available without exceeding CVWD's criteria. Elevation (Ft): -30 None Steady State, Dynamic (psi): 85.5 Residual Pressure (psi): 76.3 Fire Flow Tested (gpm): 1,550 N/A Combined Total: N/A Tested Model Junction: 122945 Duration: 2 hours Demand Conditions: Peak Day Demand (PDD) Reservoir No./Level (s): Reservoir 6726/21.4' Pumps Operating No's: Pumps On Pressure Zone and HGL: Lake Cahuilla (145') Model: CVWD_DOMESTICWATER_0520322 Comments: The domestic water system is capable of providing 1,550 gpm for 2 hours that satisfies CVWD's minimum pressure, velocity, and/or head loss criteria. This simulated system flow analysis may not include all facilities that may be required for this development/project. Please check with Development Services for further information on all required facilities. The theoretical flow to drop the residual pressure to 20 psi is 4,500 gpm. Please note the theoretical flow exceeds CVWD's design criteria on the domestic water network. qq These results are based on hydraulic modelling and not a guarantee that CVWD's domestic water system will have the capacity to supply water to the project at the flows or pressures indicated. It is important to note that the capacity of the on -site fire system, meters, service lines, backflow assemblies and other appurtenances were not considered in this analysis, which may alter actual flows or pressures. Due to continuous changes in the system, CVWD only considers this system flow analysis valid for six months from date of modelling/analysis. These system flow analysis comments are for plan check purposes only. The ultimate design responsibility resides with the Engineer -of -Record for this Project. Should you have any questions or need additional information, please contact me at (760) 398-2661, ext. 2 3 9 7 . Completed By: Date: 51/6/73 Page 1 of 1 ENG DS-016 (1/1/23) 65` 0 N If) U1 I In 0 NCO r .44 655154=IRR 18 269 )4 0 d 4 Q 57 _J Q CY IRR O U 0 13 29963 840 40 IRR UI 316 315 80- 840026 IRR (30887) MOUNTAIN I I I 1 1 11 12 TRACT Hydrant to be tested 20 656602 57-615 840042 57-715 TRACT 30834 21 656600 22 656544 80-492 co (U I Building Permit Number: Project Description: SFR Exempt: ❑ (Materials may contain hazardous wastes and are not subject to recycling provisions) Construction Debris Management Plan Plan Submittal Date Job Site Address Owner's Name Number, Street, or PO Box City. State, Postal Code Owner's Phone Number Owner's E-Mail Address Project Manager's Name Project Manager's Phone Number Project Manager's E-mail Address Builder / Contractor Number. Street or PO Box City, State, Postal Code Project Square Footage Approval By Burrtec Date of City Approval 57600 Coral Mountain Court, La Quinta CA Kevin Murray 11035 Technology Place, #100 San Diego, CA 92127 858-583-4615 kevin@madeforgood.com Drew Hudson 760-275-6137 drew a(�builtbvhudson.com KP Hudson Construction 40-905 Amador Dr Indio, CA 92203 9,269 Materials To Be Discarded: Product Trash Asphalt Brick/Block Cardboard Commingled Concrete Drywall Donated / Reuse* *Describe Items Tons 0.00 0.00 3 0.00 0.00 Not recyclable Recyclable Recyclable Recyclable Recyclable Recyclable Recyclable Recyclable Product Masonry (broken) Plaster Scrap Metal Tile (floor) Tile (roof) Wood Landscape Debris Tons 0.00 J' ,--- 0.00 i,.— I 0.00 Recyclable Recyclable Recyclable Recyclable Recyclable Recyclable Recyclable Totals: Recycle 0.0 Trash 0.0 Projected Diversion: #DIVIO! I understand it is the property owner's responsibility to submit copies of weight tickets or receipts to the District Environmental Coordinator as these hauls occur. I hereby certify that completion, implementation and adherence of the Debris Management Plan (DMP) for the above named project shall guarantee that at least 65% of the jobsite waste is diverted from landfilling. The remaining material will be recycled or reused. I will divert, for recycling or re -use, remaining materials generated from the first day of the project through the completion of the project in accordance with this plan. This DMP is issued in the name of the property owner(s) and shall remain their property throughout the construction and/or demolition project. A contractor serving as agent of the owner may obtain a DMP for the owner. However, the DMP is still issued in the name of the property owner(s) and the owner retains legal responsibility for ensuring that the provisions of the DMP are adhered to. The property owner(s) and general contractor shall be kept informed of the diversion progress through bi-monthly reports. If self -hauling, all refuse material from this project site must be taken to an approved recycler or transfer Owner / Developer / Project Manager / Superintendant Date Construction Debris Management Plan Summary of Requirements As of January 1, 2017, The Green Building Standards Code (CALGreen) requires that the construction of most new structures in the State of California comply with sections 4.408 and 5.408 of the code in accordance with Assembly Bill 939 requiring that no more than 35% of jobsite waste be disposed of as trash at local land fill sites and transfer stations. Exceptions may be made for certain projects under certain conditions. The City of La Quinta is committed to the highest level of environmental respect, to conserving our precious natural resources and setting an example to provide for a better world for generations to come. Recycling helps keep reusable resources out of landfills and will also reduce disposal costs. IMPORTANT: Burrtec Waste & Recycling Services is the City's franchise hauler. If you choose to self -haul any recyclables or trash, you must provide copies of all weight tickets and/or receipts from the transfer station, landfill, or recycler as the job progresses. Clean-up companies and other haulers are not permitted to haul waste or recyclables from the City of La Quinta. Self -haul weight tickets should be submitted to: Mike Veto, District Environmental Coordinator - mveto@burrtecdesert.com, or faxed to (760) 340-0417, or mailed to: 41575 Eclectic Street, Palm Desert, CA. 92260. Coachella Valley Unified School District 87-225 Church St., Thermal, CA 92274 Phone No. (760) 848-1(134 Project Name: Owner's Name: Project Address: Kevin Murray 'I his Box For District Ilse only DIN .'LOI'E R FITS PAID OfAREA tij ' /jGI� ` •TWO AMOUNT 3/�/pL� r1'� Lr.Vrl. ONE AMOUNT i)2r8" LEVEL AMOUNT. MITIGATION AMOUNT: COMoM/IND. AMOUNT: UAl I? ilo1-?j-rII RECEIPT. CHECK M. ObIcty-i 3 INITIALS 1 CERTIFICATE OF COMPLIANCE (California Education Code 17620) Kevin Murray 57600 Coral Mountain Ct LA (2l>Lt va-u, l ga15�5 Project Description: New SFD APN: 762-440-035 Tract #: Type of Development: Residential XX Date: May 8, 2023 Phone No. Lot #'s: Commercial Industrial Total Square Feet of Building Area: 8200 SQ. FT Certification of Applicant/Owners: The person signing certifies that the above information is correct and makes this statement under penalty of perjury and further represents that he/she is authorized to sign on behalf of the owner/developer. Dated: S— /2 - 2.) Signature: SCHOOL DISTRICT'S REQUIREMENTS FOR THE ABOVE PROJECT HAVE BEEN OR WILL BE SATISFIED IN ACCORDANCE WITH ONE OF THE FOLLOWING: (CIRCLE ONE) Education Code Gov. Code Project Agreement Existing Not Subject to Fee 17620 65995 Approval Prior to 1/1/87 Requirement Number of Sq.Ft. Amount per Sq.Ft. Amount Collected 8,200.00 $ 4.79 $39,278.00 Building Permit Application Completed: Yes/No By: Liliana Aguirre, Budget Analyst Certificate issued by: Liliana Aguirre, Budget Analyst Signature: NOTICE OF 90 DAY PERIOD FOR PROTEST OF FEES AND STATEMENT OF Section 66020 of the Government Code asserted by Assembly Bill 3081, effective January 1, 1997, requires that this District pr vide (1) written notice to the project appellant, at the time of payment of school fees, mitigation payment or other exactions ("Fees"), of the 90-day period to pro a imposition of these Fees and (2) the amount of the fees. Therefore, in accordance with section 66020 of the Government code and other applicable law, this Notice shall serve to advise you that the 90-day protest period in regard to such Fees or the validity thereof, commences with the payment of the fees or performance of any other requirements as described in section 66020 of the Government code. Additionally, the amount of the fees imposed is as herein set forth, whether payable at this time or in whole or in part prior to issuance of a Certificate of Occupancy. As in the latter, the 90 days starts on the date hereof. This Certificate of Compliance is valid for thirty (30) days from the date of issuance. Extension will be granted only for good cause, as determined by the School District, and up to three (3) such extensions may be granted. MV:chnydocs/devtecs/iticatc acompliance form updated 3-2007 11/2010 STRUCTURAL ENGINEERING, INC. CIVIL AND STRUCTURAL ENGINEERING Palm Desert Tel: 760-360-9998 Fax: 760-360-9903 Email: Reza@rastructural.com www.Rastructural.com STRUCTURAL OBSERVATION REPORT EXTERIOR FRAMING ONLY September 3, 2024 City of La Quinta Building And Safety Department Re.: Murray Residence 57600 Coral Mountain Ct, La Quinta, CA. Dear to whom it may concern, We have performed structural observation per 2019 C.B.C. section 1704 for the framing condition prior to stucco at exterior only. Based on our visual observation and to the best of our knowledge and experience, we believe that the exterior framing that was completed at the time of our visit, per approved plans. Please note that this letter does not include or waive the responsibility for the City or the Special Inspectors from determining compliance with the approved plans. Please contact me should you need additional information regarding this approval. Respectfully, Reza Asgharpour, P.E. 77570 Springfield Lane, Ste D, Palm Desert CA 92211 STRUCTURAL ENGINEERING, INC. CIVIL AND STRUCTURAL ENGINEERING Palm Desert Tel: 760-360-9998 Fax: 760-360-9903 Email: Reza@rastructural.com www.Rastructural.com STRUCTURAL OBSERVATION REPORT FRAMING ONLY September 13, 2024 City of La Quinta Building And Safety Department Re.: Murray Residence 57600 Coral Mountain Ct, La Quinta, CA. Dear to whom it may concern, We have performed structural observation per 2019 C.B.C. section 1704 for the framing condition prior to drywall and stucco. Based on our visual observation and to the best of our knowledge and experience, we believe that the framing was completed at the time of our visit, per approved plans. Please note that this letter does not include or waive the responsibility for the City or the Special Inspectors from determining compliance with the approved plans. Please contact me should you need additional information regarding this approval. Respectfully, Reza Asgharpour, P.E. *THIS IS ELECTRONIC SIGNATURE 77570 Springfield Lane, Ste D, Palm Desert CA 92211 STRUCTURAL ENGINEERING, INC. CIVIL AND STRUCTURAL ENGINEERING Palm Desert Tel: 760-360-9998 Fax: 760-360-9903 Email: Reza@rastructural.com www.Rastructural.com March 14, 2023 City Of La Quinta Building & Safety Department Attn: Karl Luther, CPE (Interwest Consultants) Subject: Plan Check Response Letter for Plan Check No: BRES2022-1086(Ist Check)[Interwest#LAQ22-0163] Murray Residence, 57-600 Coral Mountain Ct, La Quinta, CA. RESPONSE TO STRUCTURAL PLAN CHECK CORRECTIONS S 1. Roof trusses to be on deferred submittal per Architect. We have added truss deferred note on structural plans. Refer to sheets GN, S-1, S-2 & S-3 for added note. S2. See attached soils engineer report. We have already referenced information on general notes sheet GN. S3. Structural calculations already consider solar panels dead load of 4psf, refer to page 1. Also we have denoted weight on general notes sheet GN. We have included weight where applicable for gravity design of joists/beams & also in lateral resisting elements design. S4. See added nailing schedule on general notes sheet GN S5. The Hardy Frame Panels have been tested by an approved agency, refer to ICC ESR-2089. We have included the manufacture provided installation sheets as a supplement to our structural package. We do not stamp the HFX sheets, they have already been tested & approved. They are provided for contractor to follow manufacture requirements/recommendations. S6-1. Please refer to our foundation plans sheets S-1.1 & S-1.2, we callout all applicable details from sheets SD1 & SDIA that provide all necessary information for shear transfer from diaphragms to foundations. S6-2. Footings have been drawn to scale on foundation plans & footing sizes along with anchor bolt requirements can be found on foundation details (main detail is 1/SD1) and shear wall schedule on plans. S6-3. We already provided pad footing calculations, refer to pages 262-279. S7. Reaction at steel column 013 is about 1 kip, which Pad P1 is more than sufficient to withstand those loads. Please refer to calculation for pad footing P1 on pages 262-264. S8-1. We already callout location of deck joists D1 on framing plan sheet S-2.1. Refer to patio by master bedroom. S8-2. We already show floor framing on sheet S-2.1. All proper information & detailing is called out on this sheet. S8-3. We are using manufactured hardy frame panels at garage. S9. 013A is referring to window sill 2-2x6 right underneath 013. [It is the same opening location] S10. No comment provided. Please contact me should you need additional information regarding this response letter. Respectfully, Reza Asgharpour, P.E. 77570 Springfield Lane, Ste D, Palm Desert CA 92211 RTIFICATE OF OCCUPANCY DESIGN AND DEVELOPMENT DEPARTMENT This Certificate is issued pursuant to the requirements of Chapter 1 Section R110 of the California Residential Code, certifying that, at the time of issuance, this structure was in compliance with the provisions of the Building Code and the various ordinances of the City regulating building construction and/or use. BUILDING ADDRESS: 57600 CORAL MOUNTAIN CT Use Classification: Building Residential Permit No.: BRES2022-1086 Occupancy Group: R-3: 1 & 2 Family Type of Construction: V-B Dwellings Code Edition: 2019 By: Edward Ghera Date: 10/1/2025 12:00:OOAM Building Official: AJ ORTEGA atigrai GEM of the DESERT — Land Use Zone: RL Sprinkler Installed: YES Sprinkler Required: YES Owner of Building: Kevin Murray Address: 11035 Technology Place, #100 City, ST, ZIP: San Diego, CA 92127 POST IN A CONSPICUOUS PLACE