BSAP2025-0008 Inspection Checklist Address: 79516 Morning Glory Ct, La Quinta, CA 92253 Approval ID: SA20250210-6019-9-447-B AHJ: La Quinta, CA Scope of work:7.47 kW DC Solar System-Roof Mount PV General Guidelines The installer shall follow the manufacturer's instructions for all installed equipment and shall have them available at the time of inspection. All wire sizes shown are, unless indicated otherwise, a minimum and the installer may upsize them at their discretion. All OCPD ratings shown must match the inspection checklist and be installed per the equipment manufacturer's instructions, any ratings that do not match the inspection checklist are valid reasons for inspection failure. Conduit sizing to be confirmed at time of inspection. Contractor to provide conduit fill calculations where requested by inspector Where distribution equipment, such as the main service panel or subpanel buses, are fed simultaneously by a primary source(s) of electricity and one or more other power sources, interconnection shall have a method of compliance at each panel board with both a primary source and other power source(s). Diagram MSP A Generation Sources Location Location A -(N) Inverter 1 Main Service Panel Equipment Pass If grounding electrode is rod, pipe or plate, then supplemental electrode is properly installed. Exception: If a single rod, pipe, or plate grounding electrode has a resistance to earth of 25 ohms or less, the supplemental electrode shall not be required. EGC is installed ensuring continuity to all system components and finally to grounding electrode. Single Phase Grid Voltage 240 V Approval ID: SA20250210-6019-9-447-B Reviewed for Code compliance 04-07-2025 SolarAPP+™Page 1/30 NEC 2020 IRC 2021 PV (v2.8.12-1741697901 - prod) Busbar 1 Pass Existing Main Service Panel Existing Main Service Panel busbar ampere rating 200 A Rating of the OCPD protecting the Existing Main Service Panel 200 A Backfeed breakers are at opposite load ends of the panel. For center fed panels, backfeed breakers are on one side of main breaker and not both in the panel. Equipment Point of Interconnection Pass Utility Service Rating 200 A Either the connected equipment is within line of sight and closer than 10ft to the point of interconnection or a disconnect/isolation means are installed. There is no existing Utility interactive power production source connected to the home's electric service. - Only the utility interactive power production sources and/or photovoltaic modules specified on this inspection checklist list are present on site. DC and AC conductors are copper, Class B or Class C, and THWN-2, NM or PV Wire, or they are a jacketed multiconductor cable assembly listed and identified for the application. All power terminals are rated to 75°C or greater, labeled for use with Copper Class B or Class C wires, and accept at least 8 AWG wire. Conductors are properly terminated and wired according to the code. Where Equipment Grounding Conductors (EGC) or Grounding Electrode Conductors (GEC) are not routed with circuit conductors, they are a minimum of 6 AWG or they are protected from physical damage There is a minimum working clearance according to the code; for all components that may require service, the standing area of the workspace shall not contain obstructions, abrupt changes in grade, or irregularities. Existing service equipment is rated for 10kAic Approval ID: SA20250210-6019-9-447-B Reviewed for Code compliance 04-07-2025 SolarAPP+™Page 2/30 NEC 2020 IRC 2021 PV (v2.8.12-1741697901 - prod) Inverter Pass Inverter architecture String Inverter with DC- DC Converters EGC Wire Size Inverter 1 10 AWG Overcurrent Protective Device rating Inverter 1 40 A AC Wire size Inverter 1 8 AWG Maximum number of THWN-2 conductors in a PV inverter AC output circuit raceway, excluding any equipment grounding conductors.3 wires Inverter 1 model number SE7600H-US [240V] Inverter 1 manufacturer SolarEdge Technologies Ltd. Maximum number of THWN-2 DC conductors in raceway, excluding any equipment grounding conductors.4 wires Maximum number of DC PV wire or USE-2 conductors in raceway, excluding any equipment grounding conductors.0 wires Minimum DC Wire Gauge (PV Wire) for a single series string 12 AWG Minimum DC Wire Gauge (THWN-2 Wire) for a single series string 12 AWG DC strings EGC is a minimum of 10 AWG Presence of Rapid Shutdown switch label per Fire Bulletin Approval ID: SA20250210-6019-9-447-B Reviewed for Code compliance 04-07-2025 SolarAPP+™Page 3/30 NEC 2020 IRC 2021 PV (v2.8.12-1741697901 - prod) Roof and PV Array Pass The system will be installed on a permitted structure Racking System Model Number NXT Horizon Racking System Manufacturer Unirac The module and racking system shall be installed per the racking manufacturer's installation instructions regarding grounding and bonding, fire, and load ratings Attachment points of the mounting system are staggered Yes Maximum spacing in inches between adjacent attachment points of the mounting system 48 in Roof penetration sealant method has been installed per the manufacturer's instructions. The distance from the lowest point of the module to the roof surface does not exceed 10 in The roof structure appears to be structurally sound, without signs of alterations or significant structural deterioration or sagging. Quantity and spacing of structural attachments match the installation instructions per manufacturer. Array conductors are secured and supported. Installed so as not to damage the cable, at intervals not exceeding 1.4 m (4.5 ft) and within 300 mm (12 in.) of every cable entry into enclosures such as outlet boxes, junction boxes, cabinets, or fittings. PV Module model number TSM-415NE09RC.05 PV Module manufacturer Trina Solar PV Module quantity 18 Module fire rating type 1 DC-DC converter Manufacturer Solaredge DC-DC converter Model Number S440 All rooftop conduits are mounted at least ⅞” above the roof surface. All conductors installed without raceway are listed as PV Wire, USE-2 or Type distributed generation (DG) cable Roof Plane 1 Pass Pitch 4/12 Roof Covering Clay and concrete tile Approval ID: SA20250210-6019-9-447-B Reviewed for Code compliance 04-07-2025 SolarAPP+™Page 4/30 NEC 2020 IRC 2021 PV (v2.8.12-1741697901 - prod) Fire Pass Percentage of the Roof with a Solar Array 10.07 % Fire Pathways, venting and access in accordance with the SolarAPP Fire Bulletin and/or the AHJ requirements therein Disconnecting Means are in compliance with the SolarAPP Fire Bulletin Signage, Placards, Directories and Markings in accordance with the SolarAPP Fire Bulletin Maximum AC operating current in labels [NEC 690.54]32 A Maximum AC operating voltage in labels [NEC 690.54]240 V Corrections Approval ID: SA20250210-6019-9-447-B Reviewed for Code compliance 04-07-2025 SolarAPP+™Page 5/30 NEC 2020 IRC 2021 PV (v2.8.12-1741697901 - prod) SolarAPP+™ Fire Bulletin Disconnecting Means SolarAPP+™ Fire Bulletin PV System PV system disconnecting means shall be provided in accordance with the 2020 National Electrical Code® (NEC), NFPA 70.(R) [690.13] A Rapid Shutdown switch shall be provided at a readily accessible location outside the building in accordance with the 2020 National Electrical Code® (NEC), NFPA 70.® [690.12(C)] Signs, Placards, Directories, and Markings Guidance SolarAPP+™ Fire Bulletin General All labeling shall comply with Articles 690 and 705 of the 2020 National Electrical Code® (NEC), NFPA 70 All labeling shall comply with Section 324 of the 2021 International Residential Code All labeling shall comply with [NEC 110.21 (B)] Rapid Shutdown Label Buildings with more than one rapid shutdown type:A detailed plan view diagram showing each PV system and a dotted line around areas that remain energized after the rapid shutdown switch is operated. [NEC 690.56(C)(2)] Rapid Shutdown (PV Hazard Control) switch:This switch shall have a label not greater than 3 feet from the switch that states the following: RAPID SHUTDOWN SWITCH FOR SOLAR PV SYSTEM [NEC 690.56(C)(1)] Roof Access, Egress, and Ventilation SolarAPP+™ Fire Bulletin General Access and minimum spacing shall be provided for access to specific areas of the roof, emergency egress from the roof and opportunities for smoke ventilation in accordance with the 2021 International Residential Code [IRC 324.6] References: Ridge Setbacks - [IRC R324.6.2] Sprinklered Occupancies - [IRC R324.6.2.1] Pathways - [IRC 324.6.1] Emergency escape and rescue openings - [IRC R324.6.3] Exceptions: Detached, non-inhabitable structures [IRC R324.6 Ex. 1] Low-slope roofs with pitch of less than or equal to 2:12; this exception may not be valid depending on the jurisdiction. [IRC R324.6 Ex. 3] Carbon Monoxide, Smoke & Heat Detectors SolarAPP+™ Fire Bulletin Approval ID: SA20250210-6019-9-447-B Reviewed for Code compliance 04-07-2025 SolarAPP+™Page 6/30 NEC 2020 IRC 2021 PV (v2.8.12-1741697901 - prod) Guidance: Where required, Carbon Monoxide and smoke detectors shall be provided in accordance with the code or an Affidavit has been provided by the customer. 2021 International Residential Code.[R314, R315] Fire Classification SolarAPP+™ Fire Bulletin PV System Rooftop-mounted PV systems shall have the same fire classification as the roof assembly required in 2021 International Residential Code. [R902.4; R324.4.2] Building-integrated photovoltaic products installed as the roof covering shall be tested, listed, and labeled for fire classification. [IRC R902.3, R324.5.2] Building-integrated photovoltaic products installed as the roof covering shall comply with the minimum requirements for fire classification set by the jurisdiction. [IRC R902.1] Product Certifications SolarAPP+™ Fire Bulletin PV System PV panels and modules shall be listed and labeled to UL 1703 and/or both UL 61730-1 and UL 61730-2 [NEC 690.4(B)] [IRC R324.3.1] Inverters shall be listed and labeled to UL 1741 [NEC 690.4(B)] [IRC R324.3.1] Hazard Control System Hazard control system shall be listed and labeled to UL 3741 [NEC 90.7; 110.3(C); 690.4(B); 690.12(B)(2)(1); 690.12(D)] Approval ID: SA20250210-6019-9-447-B Reviewed for Code compliance 04-07-2025 SolarAPP+™Page 7/30 NEC 2020 IRC 2021 PV (v2.8.12-1741697901 - prod) Signs, Placards, Directories, and Markings SolarAPP+™ Fire Bulletin Service Disconnect "SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN" TURN RAPID SHUTDOWN SWITCH TO THE "OFF" POSITION TO SHUT DOWN PV SYSTEM AND REDUCE SHOCK HAZARD IN ARRAY. Simple Diagram Here Location: At each service equipment location to which the PV systems are connected. Code: [NEC 690.56(C)] RSD Initiation Device RAPID SHUTDOWN SWITCH FOR SOLAR PV SYSTEM Location: Rapid shutdown initiation device. Code: [NEC 690.56(C)(2)] Point of Interconnection "CAUTION: MULTIPLE SOURCES OF POWER" (LAYOUT OR DESCRIPTION) Location: Service location or approved readily accessible location Code: [NEC 705.10; 706.21(A)] WARNING: DUAL POWER SOURCE SECOND SOURCE IS PV SYSTEM Location: Electrical Equipment containing overcurrent devices in circuits supplying power to a busbar or conductor supplied from multiple sources Code: [NEC 705.12 (C)] WARNING: POWER SOURCE OUTPUT CONNECTION - DO NOT RELOCATE THIS OVERCURRENT DEVICE WARNING: THIS EQUIPMENT FED BY MULTIPLE SOURCES. TOTAL RATING OF ALL OVERCURRENT DEVICES EXCLUDING MAIN SUPPLY OVERCURRENT DEVICE, SHALL NOT EXCEED AMPACITY OF BUSBAR Approval ID: SA20250210-6019-9-447-B Reviewed for Code compliance 04-07-2025 SolarAPP+™Page 8/30 NEC 2020 IRC 2021 PV (v2.8.12-1741697901 - prod) Location: At back-feed breaker if using 120% rule (if applicable) Code: [NEC 705.12(B)(3)(2)] Location: At distribution equipment adjacent to the back-fed breaker from the power source when using this "sum of breakers" code compliance rule. Code: [NEC 705.12(B)(3)(3)] PHOTOVOLTAIC POINT OF INTERCONNECTION MAXIMUM AC OPERATING CURRENT: MAXIMUM AC OPERATING VOLTAGE: Location: All interactive system(s) points of interconnection. Code: [NEC 690.54] DC Circuit Raceways and Enclosures PHOTOVOLTAIC POWER SOURCE Location: Unless located and arranged so the purpose is evident, labels will be required for DC Circuit Raceways and Enclosures, conduit, and combiner/junction boxes. Code: [NEC 690.31(D)(2)] PV System Disconnect WARNING: ELECTRIC SHOCK HAZARD TERMINALS ON LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION Location: DC Disconnecting Means where terminals on both line and load side may remain energized. Example language or equivalent. Code: [NEC 690.13(B)] PV SYSTEM DISCONNECT Location: Each PV System Disconnect (May be AC or DC) Code: [NEC 690.13(B)] DC String Inverters Equipment Disconnects PHOTOVOLTAIC DC DISCONNECT Approval ID: SA20250210-6019-9-447-B Reviewed for Code compliance 04-07-2025 SolarAPP+™Page 9/30 NEC 2020 IRC 2021 PV (v2.8.12-1741697901 - prod) WARNING: ELECTRIC SHOCK HAZARD TERMINALS ON THE LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION Location: Each PV system disconnecting means where line and load may be energized in the open position Code: [NEC 690.13(B)] Location: Each PV system disconnecting means. Code: [NEC 690.13(B)] PV SYSTEM MAXIMUM VOLTAGE: Location: At each DC PV system disconnecting means. Code: [NEC 690.53] Roof Access and Ventilation Diagrams SolarAPP+™ Fire Bulletin Ridge Setbacks PV Less Than 33% Roof Area (66% for homes with sprinkler systems) [IRC R324.6.2] PV More Than 33% Roof Area (66% for homes with sprinkler systems) [IRC R324.6.2.1] Hips & Valley Setbacks PV Less Than 33% Roof Area - Street Access (66% for homes with sprinkler systems) [IRC R324.6.1] PV More Than 33% Roof Area - Street Access (66% for homes with sprinkler systems) [IRC R324.6.1] PV Less Than 33% Roof Area - Driveway Access (66% for homes with sprinkler systems) [IRC R324.6.1] PV More Than 33% Roof Area - Driveway Access (66% for homes with sprinkler systems) [IRC R324.6.1] Emergency Escape & Rescue Opening Minimum 3' Emergency Escape Pathway [IRC R324.6.3] Approval ID: SA20250210-6019-9-447-B Reviewed for Code compliance 04-07-2025 SolarAPP+™Page 10/30 NEC 2020 IRC 2021 PV (v2.8.12-1741697901 - prod) FIRE SAFETY CODE REQUIREMENTS Does the home have sprinkler systems?No Percentage of Roof Area covered with PV Total Array Area / Total Roof Area 10.07% Roof Access and Ventilation Diagrams Fire Safety Ridge Setbacks PV Less Than 33% Roof Area (66% for homes with sprinkler systems) or per AHJ appendix. Emergency Escape & Rescue Opening Minimum 3’ Emergency Escape Pathway Hips and Valley Setbacks PV Less Than 33% Roof Area - Street Access (66% for homes with sprinkler systems) or per AHJ appendix. PV Less Than 33% Roof Area - Driveway Access (66% for homes with sprinkler systems) or per AHJ appendix. Powered by TCPDF (www.tcpdf.org) Approval ID: SA20250210-6019-9-447-B Reviewed for Code compliance 04-07-2025 SolarAPP+™Page 11/30 NEC 2020 IRC 2021 PV (v2.8.12-1741697901 - prod) INPUTS Permit Details [80.19(H) ; R105.3] GENERAL Project Information Project Title Johnny Utter Address 79516 Morning Glory Ct, La Quinta, CA 92253 Homeowner's full name Johnny Utter Confirm that you have verified the homeowner's information and right to install on the property. Yes AHJ La Quinta, CA This project's scope includes Photovoltaic Panels Yes Code Cycle 2020/2021 NEC Code Cycle 2020 IRC Code Cycle 2021 Scope of Work 7.47 kW DC Solar System-Roof Mount PV Project Valuation is required for calculating the AHJ permit fee Yes Approval ID: SA20250210-6019-9-447-B Reviewed for Code compliance 04-07-2025 SolarAPP+™Page 12/30 NEC 2020 IRC 2021 PV (v2.8.12-1741697901 - prod) Project Valuation 28386 PV System Size AC (kW)7.62 kW PV System Size DC (kW)7.47 kW Confirm you have reviewed SolarAPP+ eligibility:Yes The system will be installed on a permitted structure Yes Will this system be installed on a new construction?No Installation Applicability and Compliance All work will comply with the 2020 National Electrical Code (NFPA 70), the International Code Council 2021 I-Codes, Minimum Design Loads and Associated Criteria for Buildings and Other Structures (ASCE/SEI 7-16), UL Standards, Manufacturer's instructions, and Municipal requirements. Yes Inspection Guidelines The installer is responsible for following the manufacturer's instructions for all installed equipment and for having them ready for review upon inspector request. All wire sizes shown are a minimum, unless indicated otherwise, and the installer may upsize them at their discretion. All OCPD ratings shown must match the inspection checklist and be installed per the equipment manufacturer's instructions, any ratings that do not match the inspection checklist are valid reasons for inspection failure. Where distribution equipment, such as the main service panel or subpanel buses, are fed simultaneously by a primary source(s) of electricity and one or more other power sources, interconnection shall have a method of compliance at each panel board with both a primary source and other power source(s). Approval ID: SA20250210-6019-9-447-B Reviewed for Code compliance 04-07-2025 SolarAPP+™Page 13/30 NEC 2020 IRC 2021 PV (v2.8.12-1741697901 - prod) FIRE I hereby affirm that I will comply with all requirements and guidelines as set out by the SolarAPP Fire Bulletin. Yes Does the home have sprinkler systems?No Total array area 383.63 sqft Total roof area 3808 sqft Percentage of Roof Area covered with PV Total Array Area / Total Roof Area 10.07 % See Fire Setback Diagram attached.Less Than 33/66 Approval ID: SA20250210-6019-9-447-B Reviewed for Code compliance 04-07-2025 SolarAPP+™Page 14/30 NEC 2020 IRC 2021 PV (v2.8.12-1741697901 - prod) STRUCTURAL General The weight of the PV system in lbs/sq ft [IRC R301.4]2.69 psf The AHJ default ground snow load is [IRC Table R301.2; IRC Fig R301.2(3) R301.2(4)] 0 lb/sqft The site specific ground snow load will be overridden by the local design ground snow load Yes The design snow load is 0 lb/sqft Proposed maximum spacing in inches between adjacent attachment points of the mounting system 48 in Will attachment points of the mounting system be staggered?Yes The number of roof surfaces at different slopes and/or orientations that will be used for installation are: .Note: 1 means all roofs used have the same orientation. 1 Type of mounting for the PV system Flush mount The AHJ default wind speed is 110 MPH The site specifc wind speed will be overridden by the local design wind speed Yes Design wind speed 110 MPH Mounting Planes Mounting Plane Type 1 Maximum distance from the lowest point of the module to the roof 6 in Approval ID: SA20250210-6019-9-447-B Reviewed for Code compliance 04-07-2025 SolarAPP+™Page 15/30 NEC 2020 IRC 2021 PV (v2.8.12-1741697901 - prod) Mounting Plane Type 1 The current roof covering is [IRC Section R905; R308.4]Clay and concrete tile The pitch of the roof surface is [IRC Section R905]4/12 Wind Speed Is the solar module and mounting system rated by the manufacturer to withstand the upward force of the local wind speed (110 MPH) and evenly distribute load into the supporting structure at the proposed maximum spacing, and confirmed in UL 1703 or 61730 (Part 1 & 2), and 2703 listings? [IRC R324.4.1.2; R324.3.1] Yes Roof Condition Does the roof structure appear to be structurally sound, without signs of alterations or significant structural deterioration or sagging? Yes Approval ID: SA20250210-6019-9-447-B Reviewed for Code compliance 04-07-2025 SolarAPP+™Page 16/30 NEC 2020 IRC 2021 PV (v2.8.12-1741697901 - prod) ELECTRICAL Equipment Architecture type used for all inverters in this project String Inverter with DC-DC Converters Inverter 1 Inverter 1 Model Number SE7600H-US [240V] Datasheet for Inverter 1: See attached. [NEC 90.7; 110.3(C)]SolarEdge 3000-11400.pdf Inverter 1 Manufacturer:SolarEdge Technologies Ltd. Is Inverter 1 UL 1741 listed? [NEC 110.3(C); 690.4(B)] What is the maximum fuse rating allowed on Inverter 1?60 A Inverter 1 Maximum Continous Output Power 7.62 kW Where will inverter 1 be interconnected?Main Service Panel Inverter 2 Where will inverter 2 be interconnected?0 Modules Module 1 Model Number TSM-415NE09RC.05 Datasheet for Module 1: See attached. [NEC 90.7; 110.3(C)]TRINA-TSM-415NE09RC.05.pdf Approval ID: SA20250210-6019-9-447-B Reviewed for Code compliance 04-07-2025 SolarAPP+™Page 17/30 NEC 2020 IRC 2021 PV (v2.8.12-1741697901 - prod) Modules Module 1 Manufacturer Trina Solar Module 1 is UL 1703 or UL 61730 (Part 1 & 2) listed [NEC 110.3(C); 690.4(B)] Module 1 quantity 18 Module open circuit voltage with record low temperature correction 53.56 V Module short circuit current with average high temperature correction [NEC 690.8(A)(1)(a)(1)] 13 A Is the PV module bifacial?No Module fire rating type 1 Racking System Racking System Model Number NXT Horizon Racking System Manufacturer Unirac Datasheet for Racking System: See attached. [NEC 90.7; 110.3(C)]NEXT HORIZON.pdf Is the Racking System UL 2703 listed for grounding and bonding with the PV module models specified in this SolarAPP project? [NEC 90.7; 110.3(C); 690.43(A)] Yes The combination of modules and racking system shall have the same fire classification as the roof assembly. [IRC R324.4.2; R902.4] Yes Name/description of roof penetration sealant method to be used.Geocell Datasheet for sealant method: See attached.Geocell.pdf Approval ID: SA20250210-6019-9-447-B Reviewed for Code compliance 04-07-2025 SolarAPP+™Page 18/30 NEC 2020 IRC 2021 PV (v2.8.12-1741697901 - prod) Racking System You have agreed to install the sealant method per the manufacturer's instructions for the means of accomplishing weather proofing [IRC R324.4.3] Yes Fire classification [IRC R324.4.2]A Compatible roof pitch regime Both Compatible module fire rating types 1,2,3,10,19,22,25,29,30 Maximum gap between the roof and the lowest point of the module 10 in Compatible Roof Types Thermoset/Thermoplastic single- ply roofing,Asphalt or composition shingles,Clay and concrete tile,Metal roof shingles or panels,Mineral-surfaced roll roofing,Built-up roofs Rapid Shutdown The AC module, microinverter, or DCDC converter installed on each module is listed for UL 1741 or UL 3741 as PVRSS or PVRSE and used to comply with requirements for Rapid Shutdown both inside and outside the array. [NEC 690.12] 0 The DC-DC converter and PV inverter models are tested and certified to work in combination Yes Site Conditions Ambient Dry Bulb Extreme Record Low Temperature (°C) [NEC 690.7(A)]1 °C Ambient Dry Bulb Average High Temperature (°C)50 °C Single Phase Grid Voltage 240 V Approval ID: SA20250210-6019-9-447-B Reviewed for Code compliance 04-07-2025 SolarAPP+™Page 19/30 NEC 2020 IRC 2021 PV (v2.8.12-1741697901 - prod) Existing Systems Is there an existing Utility interactive power production source connected to the home's electric service? No Existing System 1 Inverter manufacturer for existing system circuit #1 N/A Inverter model for existing system circuit #1 N/A What is the quantity of inverters in the existing system circuit #1 N/A Where are the existing system circuits of inverter #1 interconnected?N/A Total output power of existing system circuit #1 0 kW Total output current of existing system circuit #1 0 A Installation Details Are DC and AC conductors copper, Class B or Class C, and THWN-2, NM, USE-2, PV Wire, or jacketed multiconductor cable assembly listed and identified for the application? [NEC 690.8(B); 690.31(A); 690.31(C); 310.15(A);310.15(B)] Yes Are all rooftop conduits mounted at least 7/8" above the roof surface [NEC 310.15(B)(2)]: Yes Are all conductors installed without raceway listed as PV Wire, USE-2 or Type distributed generation (DG) cable? [NEC 690.31(C)(1)] Yes Are all power terminals rated to 75°C or greater, labeled for use with Copper Class B or Class C wires, and accept at least 8 AWG wire? [NEC 110.14] Yes Approval ID: SA20250210-6019-9-447-B Reviewed for Code compliance 04-07-2025 SolarAPP+™Page 20/30 NEC 2020 IRC 2021 PV (v2.8.12-1741697901 - prod) Where Equipment Grounding Conductors (EGC) or Grounding Electrode Conductors (GEC) are not routed with circuit conductors, they are a minimum of 6 AWG or they are protected from physical damage [NEC 250.120(C); 250.64(B)(3)] Yes DC strings EGC is a minimum of 10 AWG Yes Module voltage and current DC specifications fall within allowable range of connected equipment Yes All equipment is listed for the application, rated equal to or greater than the connected overcurrent device and installed per the manufacturer's instructions. Documentation shall be provided at time of inspection. Yes Is there a utility available fault current greater than 10kA at the service?No String Inverter with DC-DC Converters Maximum PV Source Circuit Voltage Max quantity modules in DC series string 9 modules Does the quantity of series connected DC-DC converters exceed the manufacturer's instructions to ensure a maximum string voltage of 600V? No DC-DC converter manufacturer Solaredge DC-DC converter Model Number S440 Module open circuit voltage is below the DC-DC converter maximum DC input voltage. The maximum DC input voltage for the DC-DC converter is 60 V Module short circuit current is below the DC-DC converter maximum DC input current. The maximum DC input current for the DC-DC converter is 18.75 A Datasheet for DCDC converter See attached.Solaredge S440,S500,S500B,S650B.pdf Approval ID: SA20250210-6019-9-447-B Reviewed for Code compliance 04-07-2025 SolarAPP+™Page 21/30 NEC 2020 IRC 2021 PV (v2.8.12-1741697901 - prod) PV Source Circuit PV module series strings from solar arrays to the PV inverter are combined in parallel No See Table 6 for selection of the minimum DC wire size. Input maximum number of current carrying PV Wire or USE-2 conductors in raceway 0 Input maximum number of current carrying THWN-2 conductors in raceway 4 wires The minimum DC THWN-2 wire size is based on the Table 6 below.12 AWG Table 6 [NEC Table 310.15(C)(1); Table 310.15(B)(2); Table 310.15(B)(16); 690.8(A)(1); 690.8(B)] Inverter Output Circuit See Table 3.2 below for selection of minimum Inverter output wire size and Table 3.1 for the inverter output overcurrent protection size. Inverter 1: Inverter Continuous Output Current = Power / Site Voltage:31.73 A Approval ID: SA20250210-6019-9-447-B Reviewed for Code compliance 04-07-2025 SolarAPP+™Page 22/30 NEC 2020 IRC 2021 PV (v2.8.12-1741697901 - prod) Inverter Output Circuit Table 3.1 [NEC 240.4(D); table 310.15(C)(1); table 310.15(B)(2); table 310.16; 690.8; 690.9; 705.30; 220.5 (B)] Table 3.2 [NEC 240.4(D); table 310.15(C)(1); table 310.15(B)(2); table 310.16; 690.8; 690.9; 705.30; 220.5 (B)] Inverter 1 - See Table 3.1 for the minimum Overcurrent Protection Device rating. [NEC 690.9(A); 690.9(B); Table 240.6(A)] 40 A Inverter 1 Overcurrent Protection Device rating [NEC 690.9(A); 690.9(B)]40 A Input maximum number of AC current carrying THWN-2 conductors in raceway:3 wires Inverter 1 - See Table 3.2 for selection of the AC wire size in raceway 8 AWG Approval ID: SA20250210-6019-9-447-B Reviewed for Code compliance 04-07-2025 SolarAPP+™Page 23/30 NEC 2020 IRC 2021 PV (v2.8.12-1741697901 - prod) Grounding & Bonding See Table 5 for selection of Equipment Grounding Conductor wire gauge. Inverter 1 - Equipment Grounding Conductor (EGC) based on overcurrent protective device: 10 AWG Table 5 [NEC Table 250.122] Electrical Work Main Panel Upgrades and Main Breaker Derates A Main Panel Upgrade is being performed.No A Main Breaker Derate is being performed.No Busbars Busbar quantity 1 Busbar 1 Busbar name Existing Main Service Panel Busbar name parameters passed to table 35.3 No,Yes,Main Service Panel,-,No,-,-,- Is this a combiner panel?No Approval ID: SA20250210-6019-9-447-B Reviewed for Code compliance 04-07-2025 SolarAPP+™Page 24/30 NEC 2020 IRC 2021 PV (v2.8.12-1741697901 - prod) Is this an existing busbar?Yes Select the type of existing busbar Main Service Panel Ratings Existing Main Service Panel busbar ampere rating 200 A Rating of the OCPD protecting the Existing Main Service Panel 200 A Feeder Interconnection Generation source connected at the feeders of the Existing Main Service Panel No Are you connecting your power production sources to the Existing Main Service Panel feeders at a location other than the downstream end of the feeder? [NEC 705.12 (B) (3) (6); 705.12 (B) (1) (a); 705.12 (B) (1) (b)] N/A Interconnection compliance Backfeed from Generation Sources at Point of Interconnection A at the Existing Main Service Panel 31.73 A Total backfeed at the Existing Main Service Panel 31.73 A Maximum continous current at the Existing Main Service Panel 39.67 A The Existing Main Service Panel is subject to backfeed.Yes Compliance method for the Existing Main Service Panel 120% rule 120% Rule: Where two sources, one a primary power source and the other another power source, are located at opposite ends of a busbar that contains loads, the sum of 125 percent of the power source(s) output circuit current and the rating of the overcurrent device protecting the busbar shall not exceed 120 percent of the ampacity of the busbar. [NEC 705.12 (B) (3) (2)] Approval ID: SA20250210-6019-9-447-B Reviewed for Code compliance 04-07-2025 SolarAPP+™Page 25/30 NEC 2020 IRC 2021 PV (v2.8.12-1741697901 - prod) Interconnection compliance Is there a Main Breaker protecting the busbar from generation sources interconnected at its feeders? No Service Service OCPD Location Existing Main Service Panel Service OCPD Rating 200 A The combined rating of the service disconnects is a minimum of 100A in one-family dwellings and 60A in all other dwellings types. [NEC 230.79; 230.80] Utility Service Rating 200 A Point of Connection Either the connected equipment is within line of sight and closer than 10ft to the point of interconnection or a disconnect/isolation means are installed. [NEC 690.15 (A)] Point of Connection at Service Feeders Supply Side Connection Are you connecting your power production sources in a supply side connection using listed equipment in accordance with [NEC 705.11]? No Supported Tie-Ins A new sub panel is being installed No The point of interconnection is at the existing subpanel No Approval ID: SA20250210-6019-9-447-B Reviewed for Code compliance 04-07-2025 SolarAPP+™Page 26/30 NEC 2020 IRC 2021 PV (v2.8.12-1741697901 - prod) Main Service Panel type Regular The busbar quantity per busbar category is aligned with the list of SolarAPP supported tie-ins. A Main Service Panel has been found in the busbar inputs. SolarAPP Supported Tie-Ins ID 58 SolarAPP Supported Tie-Ins ID parameters PV,,No,No,No,No,No,Main Service Panel,Regular,No,No Generation Sources Interconnection Point of Interconnection Configuration Main Service Panel Interconnection found at subpanel feeders No Location A - Name Main Service Panel Location A - Generation Sources (N) Inverter 1 Location A - Total output current 31.73 A Total output current from all generation sources 31.73 A Approval ID: SA20250210-6019-9-447-B Reviewed for Code compliance 04-07-2025 SolarAPP+™Page 27/30 NEC 2020 IRC 2021 PV (v2.8.12-1741697901 - prod) Approval ID: SA20250210-6019-9-447-B Reviewed for Code compliance 04-07-2025 SolarAPP+™Page 28/30 NEC 2020 IRC 2021 PV (v2.8.12-1741697901 - prod) CERTIFICATIONS Workers' Comp By applying for this permit, you represent and warrant that you (i) have (and will have during the performance of the work) all valid approvals, certifications, and licenses required for the performance of the work for which this permit is issued, (ii) carry (and will carry during the performance of the work) all necessary insurance required by law or governmental authority in the jurisdiction and (iii) will comply with all applicable laws required in the performance of the work. Yes Approval ID: SA20250210-6019-9-447-B Reviewed for Code compliance 04-07-2025 SolarAPP+™Page 29/30 NEC 2020 IRC 2021 PV (v2.8.12-1741697901 - prod) SolarAPP PV Eligibility 10/29/2024 System New rooftop residential retrofit PV systems Installed by contractor with all licenses required by jurisdiction Each residence must have a unique utility meter Electrical The project must comply with the applicable National Electric Code 600V maximum series string voltage Single phase 240V or 208V residential utility services only Aluminum wires are only allowed for backup initiation device feeders Must use 600V rated PV wire, or equivalent, for exposed, rooftop DC conductors Must use 90 deg C rated insulated wire Max 2 DC strings in parallel Inverter output circuit conductors must be THWN-2, or listed NM Terminals must be rated to 75 deg C, labeled for use with Cu wires, and accept minimum 8 AWG wire Microinverters or AC Modules branch circuit overcurrent protection device must be rated for a maximum of 20A Permitted to install on up to or equal to 400A service Permitted to install on up to or equal to 200A service disconnect Permitted to install on up to or equal to 225A busbars May include an existing PV system with one (1) module type and multiple PV inverters May install only 1 PV module model May install up to 2 inverters for string inverters May install up to 1 inverter model for microinverters and AC modules Conduit may not be schedule 80 PVC Modules and inverters must be listed in the California Energy Commission’s database of approved equipment Energy storage systems and batteries must be listed in the California Energy Commission’s database of approved equipment Rapid shutdown cannot be satisfied using the method: No exposed wiring or conductive parts [690.12(B)(2)(3)] No trenching allowed May include up to two (2) points of interconnection to premises wiring systems No new loads, only new monitoring circuits are allowed Equipment listed for continuous use at 100% of its rating is not considered May install only 1 racking system model Height of rooftop conduit > = 7/8" Flat plate PV modules only Structural Detached one- and two-family dwellings and townhomes not more than three stories above grade plane in height with a separate means of egress Accessory structures to one- and two-family dwellings and townhomes not more than three stories above grade plane in height Penetrations within 4 ft of the fire-rated property line on the roof of a townhome shall not be permitted. Installations in multi-family structures or R-2 occupancies shall not be permitted. Installations on mobile homes governed by Heath and Safety Code and/or Housing and Urban Development regulations shall not be permitted. The project must comply with the applicable International Residential Code PV system + hardware weight is less than or equal to 4.0 psf No ground mounted systems No carports or non-permanent structures No modifications, alterations, or upgrades to the structure At least 20% of each tilt-up mounted array must be contained under 2 feet above the roof The new system must be installed on a permitted structure No wood shake or wood shingle roofing allowed with a new rooftop PV system Limit of 10" above the roof for flush mount PV arrays on pitched (>2/12) roof surfaces Metal roof or low-slope roof installations in areas with > 15psf snow load are not supported Fire The project must comply with the applicable International Residential Code Powered by TCPDF (www.tcpdf.org) Page 1/1 Powered by TCPDF (www.tcpdf.org) Approval ID: SA20250210-6019-9-447-B Reviewed for Code compliance 04-07-2025 SolarAPP+™ Page 30/30 NEC 2020 IRC 2021 PV (v2.8.12-1741697901 - prod)