Loading...
HomeMy WebLinkAboutIn-Site Landscape Architecture, IncLANDSCAPE IN-SltE ARCHITECTURE, INC. :s Providing creative design solutions for outdoor environments. CITY OF LA QUINTA REQUEST FOR PROPOSAL ON -CALL LANDSCAPE ARCHITECTURE SERVICES May 22, 2026 Local Satellite Office 67-458 Rio Vista Drive Cathedral City, CA, 92234 CALIFORNIA 2907 Shelter Island Drive #105-417 San Diego, CA 92106 619-795-7603 NORTH CAROLINA 8209 Market St., Ste A-264 Wilmington, NC 28411 910-617-8254 NEW YORK P.O. Box 356 Orchard Park, NY 14127 716-508-8341 www.insitelandarch.com TABLE OF CONTENTS 1. Cover Letter 2. Firm Background, Qualifications, and Experience 3. References of California government agencies 4. Complete Pricing List/Fee Schedule 5. Complementary Services and Prices Offered by Proposer 6. Staffing and Project Organization 7. Subcontracting Services 8. Disclosures 9. Acknowledgment of Insurance Requirements 10. Non -Collusion Affidavit 11. Acknowledgment of Addenda STATEMENT OF QUALIFICATIONS STATEMENT OF QUALIFICATIONS LANDSCAPE IN- JIE ARCHITECTURE, F INC 05/22/26 City of La Quinta Attn: Carley Escarrega, Administrative Technician 78495 Calle Tampico La Quinta, California 92253 Tim Jachlewski, President, PLA, ASLA, Landscape Architect (CA) LLA #4547, (NC) LLA #2341, (NY) RLA #001646, (TX) RLA#4029, (AZ) RLA #83714, (GA) #LA002046 Re: REQUEST FOR PROPOSAL ON -CALL LANDSCAPE ARCHITECTURE SERVICES Dear Ms. Escarrega, In -Site Landscape Architecture, Inc. is pleased to submit our Statement of Qualifications for the RFQ - On -Call Landscape Architecture Services for the City of La Quinta. In -Site provides outstanding professional services to our clients. Our team members have designed hundreds of park, recreation, trail, streetscape, and landscape architectural projects over the last 32+ years. We recently completed two local projects for the City of La Quinta and four local projects for the City of Palm Desert. We are excited to continue bringing this vast range of experience to the City of La Quinta. Our project success and client satisfaction are attributed to: 1.) relevant knowledge, skills, and abilities; 2.) good professional "chemistry" with clients and team members; 3.) creativity in design and problem solving; 4.) very strong graphic, written, and verbal communication skills; and 5.) overall reliability. Ron Moreno, our proposed Project Manager, lives and works locally from our satellite office at 67-458 Rio Vista Drive, Cathedral City, CA, 92234 Cathedral City, CA. If necessary, we may also contract with the following subconsultants: Michael Baker International (for topographic survey and/or civil engineering), Visual Concepts Lighting, Inc, (for lighting and electrical engineering), and Verdantas for (Geotechnical Engineering). If you would like to contact our team regarding our qualifications, you may reach me at 619-795- 7603 ext 1, or email timPinsitelandarch.com. We have the necessary experience, resources, availability, and enthusiasm to begin working with the City of La Quinta immediately. All information and pricing provided is valid for at least 90 days. Any individual who will perform work for the City is free of any conflict of interest. All addendums are acknowledged as received. Sincerely, Tim Jach ewski, resident, PLA, ASLA CALIFORNIA NORTH CAROLINA (mailing) NEW YORK (P.C.) 2907 Shelter Island Dr, #105-417 8209 Market St, Ste A-264 PO Box 356 San Diego, CA 92106 Wilmington, NC 28411 Orchard Park, NY 14127 619-795-7603 910-617-8254 716-508-8341 www.insitelandarch.com STATEMENT OF QUALIFICATIONS FIRM BACKGROUND In -Site Landscape Architecture, Inc., a California Corporation, was founded September 28, 2007 in San Diego, CA. Our Mission: To provide creative design solutions for outdoor environments while honoring God through client relations, service excellence, design creativity, and business ethics. Our Vision: To champion the stewardship of the earth by balancing the needs of people and the environment. In -Site Landscape Architecture, Inc. specializes in parks and recreation, master planned communities, trails, environmental restoration, streetscapes, mixed -use, urban planning, HOA landscape renovation design, wineries, resorts, hotels, schools, libraries, churches, healthcare facilities, commercial, residential, and governmental consulting throughout California, Arizona, Texas, North Carolina, Georgia, and New York State. In -Site Landscape Architecture, Inc. breaks conventional design processes by: Creatively engaging the client and project stakeholders; Implementing imaginative design themes and concepts through technically sound solutions; and by bringing heart, passion, and enthusiasm into every project. LWI Tax Payer ID: 26-1197169 Years in Business: 18 (Planning, Design, Construction Support Services) SERVICES • Site Analysis • Site Master Planning • Community Outreach / Workshops • Computer Simulations • Computer 3D Modeling • Computer 3D Animations • Dynamic Project Presentations • Design Guidelines • Landscape Standards • Agency Approvals • Construction Documents • Construction Administration Local Satellite Office 67-458 Rio Vista Drive Cathedral City, CA, 92234 CALIFORNIA 2907 Shelter Island Drive #105-417 San Diego, CA 92106 619-795-7603 NORTH CAROLINA 8209 Market St., Ste A-264 Wilmington, NC 28411 910-617-8254 NEW YORK P.O. Box 356 Orchard Park, NY 14127 www.insitelandarch.com STATEMENT OF QUALIFICATIONS 21 i The Griffin Club Recreation Center - La Quinta, CA Randall Henderson Trailhead - Palm Desert, CA (3D rendering) Below: Fritz Burns Park Renovation Project - La Quinta, CA (under construction) In -Site Landscape Architecture, Inc. prides ourselves on enhancing each project's visual identity that is unique to that project's sense -of -place through innovative, low -maintenance, and water -efficient landscape ar- chitectural design including streetscapes, parks, trails, and open space areas. While some of our projects are "blank slate" new development, many of them transform aging or underutilized infrastructure into high -perform- ing, drought -tolerant landscape assets that significantly enhance the local character while minimizing long-term operational and water costs. Our firm produces high -end designs for both public and private clients. We are currently working as prime consul- tant for the City of Palm Desert on two park renovation projects, the City of La Quinta for one park renovation project, the City of Menifee for a new 10-acre nature park, and the County of Riverside on a new 32-acre sports park. We have also prepared plans for over 40 HOA turf reno- vation/ landscape renovation design projects and over 50 Commercial turf renovation/ landscape renovation design projects totaling over 1.8 million square feet. In -Site also often serves as Prime Consultant on our projects leading the team of civil, electrical, structural, and geotechnical engineering subconsultants. STATEMENT OF QUALIFICATIONS MUNICIPAL CLIENT AND PRIVATE CLIENT EXPERTISE In -Site Landscape Architecture, Inc. is currently serving as the as -needed Landscape Architect Consultant for the City of San Marcos, City of Carlsbad, and County of Onslow. We are also currently serving as the Prime Consultant for several Park projects for the County of Riverside, City of Menifee, City of Palm Desert, City of La Quinta, and Santee Lakes Recreation Preserve. We have a broad range of public and private expertise including: Parks and Recreation Projects Altair Central Park —Temecula, CA Altair Couplet Park —Temecula, CA Altair Village Parks- Temecula, CA Aliso Canyon Park — AlisoViejo, CA Aquatic Park at Winchester Ranch- Riverside, CA* Arbor Ridge Community Park- Beaumont, CA* Arboretum Park at Winchester Ranch- Riverside, CA* Buffalo Outer Harbor Development Planning- Buffalo, NY** Civic Center Park Renovation- Palm Desert, CA Delaware Park -Japanese Garden- Buffalo, NY** Diamond Valley Lake- Recreational Planning- Riverside, CA* Dog Park at Winchester Ranch- Riverside, CA* Edison Avenue Linear Park and Trail — Chino, CA El Caballo Park Master Plan — Escondido, CA Farmers Market Park at Winchester Ranch- Riverside, CA* Freedom Park Renovation- Palm Desert, CA Fritz Burns Park Renovation - La Quinta, CA Front Park- Buffalo, NY** Galleron Park — Riverside, CA* Gorgeview Park- Niagara Falls, NY** Harvest Park- Valley Center, CA JFK Park- Buffalo, NY** Jones Point Park Enhancement Planning- Alexandria, VA** Lake Murray Park- Playground Initiative- San Diego, CA Larkin Park —Buffalo, NY LaSalle Park- Buffalo, NY** Luz del Sol Park — San Jacinto, CA* Madigan Park — Riverside, CA* McCarthy Park- Buffalo, NY** Mockingbird Ridge Passive Park- Riverside, CA* Morgan Hill Park —Riverside, CA* New York SOPR&HP - DeVaux State Park** New York SOPR&HP - East River Wetlands Enhancement** New York SOPR&HP - Ecotourism Initiative** New York SOPR&HP - Goat Island State Park** New York SOPR&HP - Joseph Davis State Park** New York SOPR&HP - Knox Farm State Park** New York SOPR&HP - Saint Mary of the Angels State Park** New York SOPR&HP - Woodlawn Beach State Park** Orchard Run Linear Park —Valley Center CA Pacific Highlands Ranch Verana Park —San Diego, CA Pacific Highlands Ranch Unit 27 Park — San Diego, CA Pacific Highlands Ranch Unit 28 Park —San Diego, CA Palma Village Park Renovation- Palm Desert, CA Park Circle Private Linear Park —Valley Center, CA Passive Park at Winchester Ranch- Riverside, CA* Quail Valley Nature Park- Menifee, CA Queen Anne's Park— MD** Rock Academy Preschool Park —San Diego, CA Rock Church and Academy Park —San Diego, CA Sacred Rocks Reserve — Boulevard, CA Santa Rosa Plateau Visitor Center Project — Murrieta, CA Santee Lakes Recreation Preserve —Santee, CA _A IN-�Itl LANDSCAPE AROiiIECTURE INC Shearwater Creek Pocket Park —Temecula, CA Sikes Adobe Historic Farmstead Park Master Plan — Escondido Solera Estates Park — Riverside CA South Buffalo Redevelopment Plan- Buffalo, NY** Sperry Park- Buffalo, NY** Sports Ranch at Sommers Bend —Temecula, CA Sunset Cliffs Natural Park Master Plan — San Diego, CA* Sycamore Canyon Park- San Diego, CA* Villages of Old Town- Village Green —Temecula, CA* Tijuana River Valley Regional Park Trails and Habitat Enhance- ment —San Diego, CA* Underground Railroad "Freedom Memorial"- Buffalo, NY** Veterans Park and Community Center— Chula Vista, CA* Village West Parks and Recreation —Temecula, CA* Willert Park- Buffalo, NY** Winchester Ranch Sports Park CD's- Riverside, CA Winchester Ranch Sports Park Master Plan- Riverside, CA* Yucaipa Regional Park— RV Camp Expansion —Yucaipa, CA* Community Recreation Centers Arbor Ridge Recreation Center- Beaumont, CA* Eclipse Recreation Center— Escondido, CA Morgan Hill Recreation Center- Riverside, CA* Orchard Run Recreation Center North — Valley Center Orchard Run Recreation Center South —Valley Center Park Circle Recreation Center —Valley Center, CA Shearwater Creek Recreation Center —Temecula, CA Summerwind Ranch Recreation Center- Calimesa, CA* The Griffin Club Recreation Center— La Quinta, CA Trails and Bikeways Altair Trail and BikewaySystem—Temecula, CA Black Bench Community Trails- Banning, CA* Bridlewood Community Trail- Riverside, CA* Buffalo River Trail — Buffalo, NY** Erie County Riverwalk Class I Regional Bikeway— Buffalo, NY** Estates at StoneBridge Trails Planning- San Diego, CA* Long Valley Wash Trail —Temecula, CA Mission Trails Regional Park — W. Sycamore Region- San Diego* Mockingbird Ridge Equestrian Trail- Riverside, CA* Morgan Hill Equestrian Trail — Riverside, CA* Niagara Riverwalk Trail- Niagara Falls, NY** Orchard Run Trail System —Valley Center, CA Pacific Highlands Ranch Trailhead —San Diego, CA Park Circle Trail System — Valley Center, CA Randall Henderson Trailhead- Palm Desert, CA Roripaugh Ranch Trail System —Temecula, CA Sacred Rocks Reserve — Boulevard, CA Salt Creek Class I Bikeway and Trail System — Riverside, CA* Santa Ana River Trail — Riverside, CA Serrano Creek Restoration and Trail — Orange Co., CA * project completed by Tim Jachlewski while Principal of Van Dyke Landscape Architects ** project completed by Tim Jachlewski while project manager at Parsons Corp. STATEMENT OF QUALIFICATIONS Streetscape/ Community Development Projects Altair —Temecula, CA Arbor Ridge — Beamont, CA* Aspire Mixed -use — Escondido, CA BDM Otay Mesa Mixed -use- San Diego, CA Black Bench — Banning, CA* Black Canyon Estates — Ramona, CA* Branson Creek— Hollister, MO Bridlewood — Riverside, CA* Cedar Valley Apartments- Hamburg, NY College Park (Edison Avenue) — Chino, CA CREI South Escondido Multi -family- Escondido, CA Del Prado Multi -family —Escondido, CA Duro Road Housing —Valley Center, CA East 31st Street Multi -family- National City, CA Elmwood Avenue Multi -family- Buffalo, NY Estancia Bernardo — Escondido, CA Griffin Ranch — La Quinta, CA Lake Atlin Community —San Diego, CA Luz del Sol — San Jacinto, CA* Main -LaSalle Place — Buffalo, NY** Mariner's Landing Apartments — National City, CA Mesa College Drive Multi -Family- San Diego, CA Mill Race Commons Mixed -use— Buffalo NY Mockingbird Ridge — Riverside, CA* Morgan Hill — Riverside, CA* Mount Palomar Winery Residential —Temecula, CA North Santa Fe Multi -family- Vista, CA Orchard Run —Valley Center, CA Pacific Highlands Ranch, Units 26, 27, 28—SD, CA Palm Avenue Multi -family- National City, CA Park Circle —Valley Center, CA Parkview Townhomes- Escondido, CA Plaza Del Rey Apartments — National City, CA Rhodes Crossing Multi -family- San Diego, CA Riker Ranch —San Diego, CA Rio Vista Villages- Cathedral City, CA* Riverview Village —San Diego, CA Saturn Boulevard —San Diego, CA Seneca Street Infill Mixed -use Project— Buffalo, NY Santa Fe Vista Multi -Family- Vista, CA Shady Oak — Valley Center, CA Shawood at Sommers Bend —Temecula, CA Shawood at Magnoila Ranch- Eastvale, CA Shearwater Creek —Temecula, CA Solera Estates — Riverside CA Sommers Bend —Temecula, CA Summerly— Lake Elsinore, CA Summerwind Ranch—Calimesa, CA* The Estates at StoneBridge- San Diego, CA* The Ivy Multi -family— Escondido, CA Tuscany Hills- South Korea Vermont Multi -family— Escondido, CA Villages of Old Town Temecula —Temecula, CA* Vista Grande- Otay Ranch Phase 2 — Chula Vista, CA Washington Square- Santa Ana, CA Wayfare Station- Santa Clarita, CA Willert Park Village- Buffalo, NY** Willow Ridge- Riverside, CA Winchester Ranch- Riverside, CA* A LANDSCAPE ARC3irrEC .1ROiilECTURE INC Commerical Turf Retrofit and Water Conservation Projects 106th St.- Dallas 217 Dist.- Beaverton 33rd St.- Orlando Airport Way- Portland Backlot- North Hollywood Bake Pkwy.- Lake Forest Beaverton I.C.- Beaverton Bradshaw- Sacramento Broadway 101- Mesa Broadwood 251- Mesa Buttes B.P.- Tempe Canyon- San Diego Cobb International -Atlanta Corporate Way- Atlanta Corte Del Abeto- Carlsbad Elwood Industrial Park- Phoenix Expressway Corp. Ctr.- Tempe Fairway- Houston Gateway University -Tempe GSW Circle I- Dallas Hannover Industrial- Bay Area Harl I.C.- Tempe Hesperian- Bay Area Hohokam 250-Tempe Horn- Sacramento Huntwood- Bay Area Junction- Bay Area Kinghurst Circle- Houston Kyrene Commerce- Tempe Market St.- Dallas Mesa Ridge- Mesa Mt. Diablo Industrial- Bay Area North Cabot- Bay Area Columbia Com. Pk.- Portland Northgate- Dallas Orion Commerce Park- Tempe Pac Trust Monatgue- Bay Area Pacific Ind.- Portland Park Lane- Tempe Peachtree Industrial- Atlanta Pleasant Hill- Bay Area Pointsettia- Vista Portland Airport Ctr.- Portland Priest B.P.- Tempe Mineral Rd. I.C.- Tempe Rockley- Houston Roeser Commerce Ctr.- Phoenix Royal 35- Dallas Rubicon Business -Atlanta Sierra Court- Bay Area Solano Way- Bay Area South Atlanta- Atlanta Southwest B.P.- Houston Stonecrest B.P.- Houston Tigard Park B.C. 252-Tigard Waples St.- San Diego Westbelt- Houston Young Court- Atlanta HOA Turf Retrofit and Water Conservation Projects Alva Road HOA Bay Scene Condominiums Beacon Street HOA Bernardo Greens Phases 1-4 Cambridge HOA Camino Villas HOA Chapala HOA Coronado Terrace Apartments Electra Condominiums Fashion Hills HOA Fashion View HOA Genesee Highlands HOA La Jolla Canyon HOA La Jolla Woods HOA La Mans HOA La Mesa Village HOA Phases 1-2 Las Brisas HOA Lucera HOA Mount La Jolla HOA Mountain View HOA Oaks North HOA Orlando Woods HOA Pacific Regent La Jolla HOA Pomerado HOA River Colony HOA Sunridge Vista HOA Sunrise Point HOA Tierra Mesa HOA The Landing HOA Torrey Highlands HOA Trilogy HOA Union Square HOA Phases 1-3 University Canyon East HOA Uptown District HOA Villa Antigua HOA Villa Dominique HOA Villa La Jolla Condominiums Villa La Jolla HOA Village Palos Verdes HOA Vista Terrace Apartments Woodlands HOA * project completed by Tim Jachlewski while Principal of Van Dyke Landscape Architects — project completed by Tim Jachlewski while project manager at Parsons Corp. STATEMENT OF QUALIFICATIONS EXPERIENCE 32 years of landscape architectural professional practice experience: 2007-Present: President - In -Site Landscape Architecture, Inc. 2000-2007: Principal/ Project Manager -Van Dyke Landscape Architects, Inc. 1994-2000: Project Manager - Parsons Transportation Group of NY Project related experience includes site analysis, community outreach, planning group and public agency presentations/ approvals (Planning Commissions, City Councils, and California Coastal Commission), master planning, conceptual development, schematic design, construction documents, construction administration/ observation. Experience also includes landscape architectural design for tentative tract maps, specific plans, environmental impact reports, and landscape design guidelines. Project types include parks and recreation, master planned communities, trails, environmental restoration, streetscapes, mixed -use, urban planning, wineries, resorts, hotels, schools, libraries, churches, healthcare facilities, commercial, residential, and governmental consulting throughout Southern California and Western New York. Tim's passion for design, art, and the environment fuel his goal of bringing "nature to people" in urbanized areas and "people to nature" in preserved environments. He understands the mental, emotional, and spiritual benefits of exposure to nature and excels at creating functional, aesthetically pleasing, and artistic outdoor environments that create, preserve, or enhance each project's sense of place. Tim served as president of the San Diego Chapter of the American Society of Landscape Architects and served on the Water Conservation Technical Committee as editor, contributor, or author for a number of Chapter position papers including: "Water Conservation'; "The Value of Parks'; "Regionally Appropriate Landscapes'; "Use of Turf Grass'; "Vegetative Erosion Control'; "The Value of Trees'; "Golf Course Water Conservation'; "HOA Water Conservation'; "Reclaimed, Recycled, and Re -purified Water'; "The Value of Native Plants'; "Water Quality". "Fire Safety and Landscaping", "Grey Water and Rainwater Collection'; and "Revegetation/ Restoration". Tim strives to provide creative design solutions, clear graphic, written, and verbal communication, and positive professional chemistry with team members for all In -Site's projects. TI M JACH LEWSKI J R. President, PLA, ASLA REGISTRATIONS Licensed Landscape Architect, California (#4547) Licensed Landscape Architect, North Carolina (#2341) Registered Landscape Architect, New York (#001646) Registered Landscape Architect, Texas (#4029) Registered Landscape Architect, Arizona (#83714) Registered Landscape Architect, Georgia #LA002046 ) ASSOCIATIONS American Society of Landscape Architects, 1994-Present • President, SD Chapter, 2012 • President Elect, SD Chapter, 2011 • Vice President of Community Outreach, SD Chapter, 2009-2011 A.C.E. Mentor— Patrick Henry High School, 2009/2010 EDUCATION B.L.A. (Bachelor of Landscape Architecture) State University of N.Y. College of Environmental Science and Forestry at Syracuse University, 1994 (Rank: 1/55) STATEMENT OF QUALIFICATIONS Civic Center Park— Palm Desert, CA Responsible as Principal Landscape Architect for the community outreach, schematic plan, construction documents, and construction support services for this City of Palm Desert park improvement project. The plan includes a new playground, enhanced pavements, benches, drinking fountain, BBQ grills, picnic tables, trash receptacles, lighting/electrical coordination, desert planting and irrigation. Freedom Park Renovation — Palm Desert, CA Responsible as Principal Landscape Architect for the community outreach, schematic plan, construction documents, and construction support services for this City of Palm Desert park improvement project. The plan includes enhancements to the existing Freedom Memorial, new Freedom sculpture, playground renovation, outdoor fitness center, restroom improvements, enhanced pavements, benches, drinking fountain, BBQ grills, picnic tables, trash receptacles, lighting/electrical coordination, desert planting and irrigation. Randall Henderson Trailhead — Palm Desert, CA Responsible as Principal Landscape Architect for the community outreach, schematic plan, construction documents, and construction support services for this City of Palm Desert trailhead improvement project. The plan includes a new parking, shade shelter, benches, and trailhead improvements. Palma Village Park— Palm Desert, CA Responsible as Principal Landscape Architect for the schematic plan, construction documents, and construction support services for this City of Palm Desert park improvement project. The plan includes a new shade shelter, enhanced pavements, benches, drinking fountain, BBQ grill, picnic tables, trash receptacles, lighting/electrical coordination, desert planting and irrigation. Fritz Burns Park Renovation — La Quinta, CA Responsible as Principal Landscape Architect and prime consultant for the park master plan, public outreach, 3D renderings, 3D animations, opinion of probable construction cost estimate, and CD's for this 6-acre, $9-million park renovation project. The plan includes the conversion of two ten- nis courts into 8 pickleball courts, water playground/pool expansion, restrooms, picnic areas, shaded gathering plaza, playground expansion and enhancements, shaded promenade with seating, public art, lawn areas, shade structures, parking lot reconfiguration, EV chargers, and additional parking. The Griffin Club —La Quinta, CA Set against the backdrop of the breathtaking Santa Rosa Mountains, this $8-million, 6.4-acre luxury Spanish Colonial private recreation center includes a recreation building, series of outdoor verandas, intimate courtyards, short -course Olympic sized swimming pool, splash park, tennis stadium, tennis courts, pickleball courts, off -leash dog run, putting green, recreational lawn areas, outdoor kitchen, dining areas, and walking paths that meander through the desert landscape. The grounds incorporate aesthetics that would be found at a high -end luxury resort. Responsible as Principal Landscape Architect for preparing the site master plan, construction budget, 3D renderings, and site construction documents/administration. Sports Ranch at Sommers Bend —Temecula, CA Responsible as Principal Landscape Architect for the park master plan, preliminary grading design, cost estimates, construction documents, coordination of lighting/civil engineering/architectural design, and construction administration for this 19.7-acre, $11.8-million City of Temecula public park located in the Sommers Bend community. The Park includes two baseball fields, two artificial turf soccer fields, two basketball courts, open lawns, picnic areas, playground, "nature play" areas and trails, native plant habitats, concessions building, restrooms, maintenance building and yard, entry monument signage, connections to the Long Valley Wash trail system, storm water management bioretention areas, and parking. Construction was completed 2022. Harvest Park —Valley Center, CA Responsible as Principal Landscape Architect for the master plan, illustrative graphic exhibits, 3D renderings, 3D animation, cost estimates, lighting/civil engineering/architectural design coordination, site construction documents, and site construction administration for this central gathering green space within the Park Circle master planned community. STATEMENT OF QUALIFICATIONS Dainued KEYP E RSO N N qJ Winchester Sports Park —Riverside, CA Responsible as Principal Landscape Architect and prime consultant for the cost estimates, construction documents, lighting/civil engineering/architectural design coordination, and construction administration for this 32-acre $28.3-million, County of Riverside public park. Quail Valley Nature Park— Menifee, CA Responsible as Principal Landscape Architect for the community outreach, park master plan, 3D renderings, preliminary grading design, cost estimates, construction documents, lighting, coordination of civil engineering/architectural design, and construction administration for this 10.45-acre, public park. Park amenities include ADA accessible nature trails, nature -based play elements, a fitness area, gathering space, park shelter, parking lot, and solar bollard lights. The project also includes non-native invasive species removal and native habitat restoration. Santee Lakes Recreation Preserve —Santee, CA The Preserve is a 190-acre linear park situated on a series of lakes that collect, treat, and store recycled water for use within Padre Dam Municipal Water District. Responsible as Principal Landscape Architect for the site planning and design of the 20-year, $60-million Dynamic Vision Plan, $1.6-million Phase 1 park improvement/ trail/road/parking project from concept through construction and $9-million Phase 2 general store/restaurant/administration/lakeside trail/park improvement/parking project from concept through Construction. Santa Rosa Plateau Ecological Reserve Visitor Center Improvement Project—Murrieta, CA Responsible, as co -lead consultant, for site analysis, conceptual design, photo simulations, and construction documents/administration for this 10-acre project. The visitor center is located on the 9,000-acre ecological reserve in southwestern Riverside County. Sommers Bend —Temecula, CA Responsible as Principal Landscape Architect for the Specific Plan, Schematic Plans, construction documenta, and construction administration for almost 40 projects including: • City of Temecula Median L.S. Plans (2.3 miles) • Long Valley Wash Habitat Creation and Mitigation (16 acres) • Park and Ride / Trailhead (50 cars and 6 trailers) • Equestrian and multi -use trails (9.75 miles) • Calle Girasol/ Nicolas Rd Habitat (4.27-acres) • Density Core Multi -family including off -leash dog run, ninja warrior fitness course, and parks • Native Slope Restoration and Water Quality Basins (over 1.1 million square feet) • HOA Street Improvement L.S. Plans (4.3 miles) • Luxury Model Homes (6 complexes) • Numerous in -tract landscape plans • Irrigation Master Planning for 27 P.O.C.'s City of San Marcos As -Needed Landscape Architect Consulting — San Marcos, CA Serving as Principal Landscape Architect for as needed consulting servives since 2022. Projects include parks, trails, streetscapes, and other public works projects. The most recent project includes site improvement design and a 120" box Deodar Cedar Christmas tree at City Hall. Rock Academy and Church - San Diego, CA Responsible for the site master plan, photo simulations, grading and re- taining wall design coordination, construction documents, and construction administration for the park, gathering pla- za, playgrounds, artificial turf playfield, and site hardscape and landscape improvements. The $55 million design/build project is heavily utilized by the 14,000-person congregation and school facility (Pre -School —12th grade). It is located in Point Loma at the Historic Naval Training Center redevelopment known as Liberty Station. The park and gathering plaza feature a virtual journey through the Bible, from creation to salvation, using landscape symbolism. JRMC Palomar Medical Office Campus — Escondido, CA Responsible for site design, photo renderings, and con- struction documents for this proposed medical office campus adjacent to the new Palomar Hospital in Escondido, California. A large central landscape feature connects the two main medical office buildings and offers a healing garden setting for patients and employees to enjoy. STATEMENT OF QUALIFICATIONS EXPERIENCE 13 years of landscape architectural professional practice experience 2017-Present: Project Manager and Director of Irrigation Design In -Site Landscape Architecture, Inc. 2013-2017: Project Manager/ Irrigation Designer - Summers Murphy & Partners, Dana Point, CA Ron is a bilingual self-starter with a background in landscape architecture and irrigation design. He has been involved in projects in California, Nevada, Arizona, Washington, Oregon, and Texas. He i! responsible for project management, site design, irrigation water use master plans, irrigation construction documents, water use calculations, and construction support services. Freedom Park— Palm Desert, CA Responsible as Project Manager for the community outreach, schematic plan, construction documents, and construction support services for this City of Palm Desert park improvement project. Randall Henderson Trailhead — Palm Desert, CA Responsible as Project Manager for the community outreach, schematic plan, con- struction documents, and construction support services for this City of Palm Desert trailhead improvement project. Palma Village Park - Palm Desert, CA Responsible as Project Manag- er for the schematic plan, construction documents, and construction support. Civic Center Park— Palm Desert, CA Responsible as Construction Project Manager for this City of Palm Desert park improvement project. The plan includes a new playground, enhanced pavements, benches, drinking fountain, BBQ grills, picnic tables, trash recepta- cles, lighting/electrical coordination, desert planting and irrigation. Fritz Burns Park Renovation — La Quinta, CA Responsible for the park master plan and public outreach presentations and support for this 6-acre, $9-million park master plan project. Harvest Park and Park Circle — Valley Center, CA Responsible for the irrigation construction documents and construction administration for this County of San Diego public park located in the Park Circle master planned community. Also responsible for the irrigation master plan, CD's and CA for Three Private Recreation Complexes, Four Private Linear Parks, Trails and Pathways, streetscape improvements, Community Garden, Moosa Creek Native Riparian Enhancements, and Dog Play Areas. Winchester Sports Park - Riverside, CA Responsible for the co -project management, construction documents, for this 32-acre $28.3-million, County of Riverside public park. Sports Ranch and Sommers Bend —Temecula, CA Responsible for the irrigation design, construction document support, and construction administration for this 19.7-acre, $11.8-million City of Temecula public park located in the Sommers Bend community. Responsible for irrigation design, construction document support, and construction administration for almost 40 projects including: RON MORENO Project Manager REGISTRATION California Landscape Architect licensure (in process) EDUCATION B.S. (Bachelor of Science in Landscape Architecture) Cal Poly, Pomona, 2013 EXPERTISE • Project Management • Construction Administration • Site Design • Water conservation practices • Irrigation design and project management of complex, large-scale projects • Irrigation Water Use Master Plans • Irrigation Demand analysis • Recycled water use irrigation plans and processing STATEMENT OF QUALIFICATIONS EXPERIENCE 14 years of landscape architectural professional practice experience 2020-Present: Landscape Architect/Project Manager In -Site Landscape Architecture, Inc. 2014-2020: Project Manager/Designer - MJS Landscape Architecture, Newport Beach, CA 2013-2014: Landscape Designer Molly Wood Garden Design, Costa Mesa, CA 2008-2012 Landscape Staff, Back to Natives Restoration, Irvine, CA Alex has extensive project management experience with landscape architecture projects. Alex collaborates well with civil engineers, architects, and other consultants to creatively solve design problems. He is responsible for management of projects from design through construction and communicates with clients and stakeholders to ensure a quality product within budget. He has experience working on a range of project types and scales including entitlements, parks, recreation, trails, master planned communities, multi -family residential, and commercial projects. City of San Marcos As -Needed Landscape Architect Consulting Responsible as Project Manager for as needed consulting servives since 2022. Projects include parks, trails, streetscapes, and other public works projects. Quail Valley Nature Park— Menifee, CA Responsible as Project Manager for the community outreach, park master plan, 3D renderings, preliminary grading design, cost estimates, construction documents, lighting, coordination of civil engineering/architectural design, and construction administration for this 10.45-acre, public park. Park amenities include ADA accessible nature trails, nature -based play elements, a fitness area, gathering space, park shelter, parking lot, and solar bollard lights. Civic Center Park— Palm Desert, CA Responsible as Project Manager for the schematic plan, construction documents, and construction support services for this City of Palm Desert park improvement project. The plan includes a new playground, enhanced pavements, benches, drinking fountain, BBQ grills, picnic tables, trash receptacles, lighting/ electrical coordination, desert planting and irrigation. Fritz Burns Park Master Plan - La Quinta, CA Responsible for assistance with the park master plan, public outreach, 3D renderings, 3D animations, opinion of probable construction cost estimate, and CD's for this 6-acre, $8-million park renovation project. Sommers Bend - Temecula, CA Responsible for private park/ greenbelt including playground, shade shelter, warrior fitness course, dog park, as well as trail overlooks, native plant restoration, storm water quality basis and luxury model homes. ALEX KOUTZOUKIS Landscape Architect, PLA REGISTRATION Licensed Landscape Architect, California (#6327) Bachelor of Science: Landscape Architecture, Minor Landscape Restoration University of California, Davis, 2012 EXPERTISE • Project Management • Site Design • Technical skills • Construction detailing • 3D Visualization expert • Plant material selection • Native planting design Wayfare Station Park - Santa Clarita, CA Responsible for private park and greenbelt including playground, shade shelters, picnic areas, bandshell/stage, seating areas, and open lawn recreational areas. STATEMENT OF QUALIFICATIONS EXPERIENCE 40 years of landscape architectural design experience 2024-Present: In -Site Landscape Architecture, Inc. Project Manager/Designer 2005-2024: David Neault Associates, Inc. Director of Design/Project Manager 1996-2005: Teshima Design Group Project Manager/Designer 1995-1996 Nowell +Associates Project Manager/Designer 1988-1995 Western Land Concepts Draftsman/Designer 1986-1988 Wimmer Yamada Landscape Architecture, Inc. Draftsman/Designer Project types include park and recreation projects, waterparks, commercial high-rise projects, educational projects, medical facilities, civic projects, veteran memorials, wineries, resorts, hotels, community master -planning, demonstration gardens, private residential, mixed -use projects, trails and bikeways, churches, and HOA common areas. Projects include: Murrieta Veterans Memorial* - Murrieta, CA Responsible as Project Manager for the Conceptual Designs and Construction Drawings and Construction Administration for the Veterans Memorial Walls, Obe- lisk and Honor Garden City of San Marcos As -Needed Landscape Architect Consulting Responsible as Project Manager for as needed consulting servives since. Projects include San Marcos Boulveard medians. Quail Valley Nature Park— Menifee, CA Responsible as Senior Project Designer for the park master plan, 3D renderings, for this 10.45-acre, public park. Park amenities include ADA accessible nature trails, nature -based play elements, a fitness area, gathering space, park shelter, parking lot, and solar bollard lights. The project also includes non-native invasive species removal and native habitat restoration. Santa Rosa Plateau Ecological Reserve Visitor Center Project— Murrieta, CA Responsible, Project Designer, for site analysis, conceptual design, photo simulations, and construction documents/ administration for this 10-acre project. Freedom Park— Palm Desert, CA Responsible as Senior Project Designer for the schematic plan, construction documents, and construction support services for this City of Palm Desert park improvement project. Randall Henderson Trailhead — Palm Desert, CA Responsible as Senior Project Designer for the schematic plan, construction docu- ments, and construction support services for this City of Palm Desert trailhead improvement project. SHANE PRESTON Senior Project Designer EXPERTISE • Extensive planting design knowledge of Southern California plants • Construction Documents • Construction Details • 2D and 3D Landscape Architectural Rendering Expert • Graphic Arts • Master Planning * Project completed by Shane Preston while Project Manager / Designer at David Neault Associates Landscape Architecture, Inc. STATEMENT OF QUALIFICATIONS EXPERIENCE 2025-Present: Project Designer In -Site Landscape Architecture, Inc. 2023-2025: Project Designer (Part-time) In -Site Landscape Architecture, Inc. 2017-2023: Intern (Part-time) In -Site Landscape Architecture, Inc. Joshua is a well-educated and driven addition to In -Site. He primarily provides project support work including research, base map preparation, demolition plans, and AutoCAD drafting. He has been involved in projects in California, Washington, Arizona, Texas, New York, North Carolina, Georgia, and Florida. His main passion is native environment project integration and preservation/restoration, especially of riverine and wetland systems. He excels at research on the plant types and roles in the areas of relevant projects as well as how the beauty and uniqueness of these areas may be conveyed through these projects to their clients and end users through informative, elegant, and practical design features. Relevant Projects: Freedom Park— Palm Desert, CA Responsible as Project Designer for the site demolition plans for this City of Palm Desert park improvement project. Randall Henderson Trailhead — Palm Desert, CA Responsible as Project Designer for the existing native plant invenotry for this City of Palm Desert trailhead improvement project. Winchester Sports Park— Riverside, CA Responsible for AutoCAD drafting support. This 32-acre $28.3-million, County of Riverside public park includes four baseball fields, seven soccer fields, four basketball courts, two tennis courts, six pickleball courts, open lawns, playground, six shade structures, eleven shade sails, picnic areas, Salt Creek trail, concessions building, restrooms, entry monument signage, maintenance yard, storm water management bioretention, and parking. Lewis Howard Campground - Holly Ridge, NC Responsible for site reconnaissance, research, and selection of native plants used in the design. The site design includes numerous recreational amenities including a splash pad, playground, food truck/ picnic grove, sand beach on an existing pristine spring -fed pond, dock/ performance stage, pickleball courts, dog run, restrooms, boat launch, boat dock, paddleboard and kayak rental building, parking, trails, wetland protection, storm water quality management swales and basins, and habitat creation/ restoration. BKM Office Park Renovation Projects - 50+ projects located in California, Arizona, Washington, Texas, Georgia, and Florida. Responsible for base map preparation, schematic plans, demolition plans, planting plans, and client coordination. Projects were designed to fit Client specifications, maintain the Client's aesthetic, and achieve water conservation goals of the varied areas in which they are located. JOSHUA JACHLEWSKI Project Designer EDUCATION B.A. (International Relations: Strategic Intelligence, Spanish minor, Film minor) Liberty University, 2022 B.A. (International Relations: Politics and Policy) Liberty University, 2022 TECHNICAL SKILLS • AutoCAD • Microsoft Office • Adobe Creative Suite (Photoshop, InDesign) INTERESTS • Environmental Conservation • Ecosystems and Habitats • River systems and aquatic life • Native flora and fauna STATEMENT OF QUALIFICATIONS EXPERIENCE 2026-Present: Project Designer In -Site Landscape Architecture, Inc. 2025: Landscape Designer Drab To Fab 2018-2024: Field Supervisor Sage Hill Ranch Gardens Daniel has experience with landscape design projects, team coordination, and best practices for water conservation and land use. Responsibilities and abilities, previous and current, include: • Meet with clients to assess needs, discuss goals, and develop design concepts through collaborative brainstorming sessions. • Conduct site measurements, documentation, and drafting/pro- ducing detailed plans, sketches, and digital layouts. • Create planting palettes and source hardscape and softscape materials aligned with client vision and site conditions. • Prepare budgets, coordinate with subcontractors, and oversee installation to ensure design intent and quality. • Support maintenance crews by monitoring plant health, soil con- ditions, and irrigation systems across diverse plant species. • Assist installation teams hands-on with planting, irrigation setup, and on -site problem solving. • Led daily operations and supervised farm activities including planting, harvesting, composting, and irrigation management. • Recruited, trained, and managed farm employees, fostering a collaborative and educational work culture. • Managed inventory of crops, tools, and agricultural products while ensuring quality control and efficiency. • Plan and oversee all farm operations including crop rotation, suc- cession planting, composing, and integrated pest management. • Innovate and apply water -conserving strategies such as irrigated cover cropping and passive rainwater harvesting. • Host public seminars and hands-on workshops teaching the fun- damentals of regenerative and no -till agriculture. • Manage farm infrastructure, marketing, harvesting, and sales with a focus on ecology stewardship and community impact. Office Park Renovation Projects - Numerous projects located in California, Arizona, Washington, Texas, Georgia, and Florida. Responsible for planting plans. Randall Henderson Trailhead — Palm Desert, CA Responsible for community outreach suppport on this project to cre- ate a driveway, parking lot, restrooms, and entryway for the beautiful nature trail in Palm Desert. Banning Armory— Banning, CA Responsible for site inventpry and community outreach. San Marcos City Hall — San Marcos, CA Responsible for site construction and planting plans for a new 120" box Deodar Cedar Christmas Tree at San Marcos City Hall. DANIEL JIMENEZ Project Designer EDUCATION Bachelor of Science (BS) Landscape Architecture California Polytechnic State University Pomona, 2025 TECHNICAL SKILLS • AutoCAD • Land F/X • Plant Master • Rhino • Twinmotion • Adobe Creative Suite (Photoshop, Illustrator, InDesign, Premiere Pro, Lightroom) • ArcGIS • Microsoft Office ___ STATEMENT OF QUALIFICATIONS EXPERIENCE 2026-Present: Project Designer In -Site Landscape Architecture, Inc. 2022-2024: Landscape Designer Campus Planning & Landscape Architecture, UC Davis 2021-2022: Landscape Architecture Intern Campus Planning & Landscape Architecture, UC Davis 2021-2022: Undergraduate Student Researcher Nature Heals Research Project 2020-2021: Stewardship Plan & Grounds Mgmt. Coordinator Student Living and Learning Community 2020-2021: Gateway Ambassador Hunt Hall, UC Davis Lucien has experience with landscape design projects, 3D modeling, team coordination, data collection, and graphic design. Responsibilities and abilities used in previous projects include: • Developed planning documents, designed campus facilities, participated in construction administration, and coordinated the department's work with maintenance operations and facilities under the supervision of the Campus Landscape Architect. • Created design development and construction documents in collaboration with partnered disciplines and consultants. Documents ranged in scale and included layout plans, grading, drainage, planting, irrigation, and construction details. • Hired, managed, and mentored new interns, provided training in drafting and rendering software, and delegated and redlined project components. • Cataloged campus site infrastructure and mapped landscape classifications using ArcGIS to support resource management, deferred maintenance planning and operations, and coordination with ongoing construction projects. • Created 3D models, site renderings, site inventories, and analyses to support project proposals, as well as a award -winning graphics, including a website. • Coordinated and organized events in collaboration with allied departments. • Developed a five-year stewardship plan for an unmanaged natural lot adjacent to UC Davis' core campus, based on feedback and knowledge gathered through connecting with long-term community stakeholders. • Performed site analysis, including site history, topography, plant identification, and irrigation systems, to create landscape documents detailing existing conditions. CHAOXUN (LUCIEN) YUAN Project Designer EDUCATION Bachelor of Science (BS) Landscape Architecture (Honors) University of California, Davis, 2022 Honors Thesis - "UC Davis Sheepmowers" AWARDS/HONORS Student ASLA Honor Award, Communications Category, 2023 LAF Olmsted Scholar, 2022 Henry A. Jastro Scholarship, 2018-2022 Land8 + ASLA: "Best of 2022" Social Media Award TECHNICAL SKILLS • AutoCAD • LandF/X • Vectorworks • Rhinoceros 3D • Sketchup • Lumion • Enscape • Adobe Creative Suite (Photoshop, Illustrator, Indesign) • ArcGIS Pro • Bluebeam STATEMENT OF QUALIFICATIONS COMMUNICATION In -Site excels at effective written, verbal, and graphic communication. We will provide web -based monthly City/ stakeholder group meetings including meeting agendas followed up with meeting notes listing action items, responsible party, and due dates. We will also hold internal sub consultant meetings as needed to coordinate a co- hesive project and responses to the City. We also excel at effective, realistic 2D and 3D renderings and animations, detailed plan views, and dynamic Powerpoint Presentations which will successfully communicate design concepts to the City staff, City officials, stakeholders, and the public. 3D Rendering -County of San Diego Harvest Park and adjacent private recreation center 3D Animation Fritz Burns Park Renovation Project - La Quinta, CA 2D Photo Simulation on Existing Photo Freedom Park Memorial Enhancements - Palm Desert CA Post Construction Photo- County of San Diego Harvest Park and adjacent private recreation center Plan Graphic (enlargement to show detail) Winchester Sports Park -Riverside, CA 3D Rendering and Powerpoint Presentation Randall Henderson Trailhead - Palm Desert, CA STATEMENT OF QUALIFICATIONS SCHEMATIC DESIGN In -Site will prepare typical plan view sample designs, photo overlay renderings, 3D renderings, and plant palette options to the City to obtain the City's preferences when considering aesthetics, capital costs, maintenance costs, and water use. The following are examples of photo overaly options from a different project. (Note: the examples are intended to illustrate how the goals of the project may be achieved with different landscape treatments.) 96 Atl�t r +f► CAN''+ SAMPLE As pp- Y LOW-WATER BACKGROUND HEDGES MEDIUM SIZED, LOW WATER SHRUBS .: SMALL LOW-WATER GRASSES SAMPLE Be LARGE ACCENTSUCCULENTS ROCK COBBLE STRIP 4.- SHREDDED BARK M U LCH l LOW-WATER BACKGROUND HEDGES J f *` LOW-WATER GROUNDCOVERS LOW-WATER ACCENTS SAMPLE Ce '1 CRUSHED GRAVEL OR DECOMPOSED GRANITE COBBLE STRIP PRELIMINARY COST ESTIMATES Our team will quantify the improvements at the preliminary stage and provide a preliminary opinion of probable construction cost estimate based on known industry pricing and previous recent project bids from similar projects. THE `GREEN OFFICE' / REGIONAL ACCESSIBILITY Since In -Site Landscape Architecture, Inc. was founded in 2007, the company has pioneered the sustainable "Green Office" model. For over 18 years, all employees work from home satelitte offices to x �. reduce our company's carbon footprint and to improve employees' work/life balance and productivity by eliminating typical time-consum- ing Southern California commuting. This has also allowed us to attract top talent in the Southern California region. Our staff works from Cathedral City, Temecula, Costa Mesa, Escondido, San Diego, and North Carolina. Local satellite office: 67-458 Rio Vista Drive Cathedral City, CA 92234 STATEMENT OF QUALIFICATIONS CONSTRUCTION DOCUMENTS - QUALITY ASSURANCE Accurate plans equate to accurate bidding and minimize construction change orders. Thorough plan checking is essential for this to occur. The quality control/quality assurance for this project includes four steps. It is based on the ISO 9001(International Organization for Standardization) procedures for design and engineering firms. Plans are reviewed by the plan checker (project manager or principal). All items that are checked and are correct are highlighted in yellow. This ensures that the plan reviewer has checked all items. Incorrect items are noted in red. As corrections are made by the designer, the comments are highlighted in blue. This ensures that the designer has addressed each comment. The revised plans are compared to the check set by the plan checker. If the comments are revised correctly, the comment is circled in purple on the check set. This ensures the plan checker's comments were correctly understood, properly revised, and properly printed to PDF. 3" DEPTH PRO GOLD WARNING TRACK-MTX - AV 951-677-6106 OR APPROVED EQUAL (INSTALL P INSTRUCTIONS) 4. 8' HIGH FENCE -SEE DETAIL C-28, SHEET L.1-9 5. 8' HIGH COVERED DUGOUT AND BULLPEN FENCE AND 6-6" GATES -SEE DETAIL C-28. SHEET L.1-9 (NOTE: FIELD SIDE OF DUGOUT AND BULL PEN SHALL BE 12' HIGH FENCE PER CALLOUT NO. 6) STATEMENT OF QUALIFICATIONS I��J— CJ E LANDSCAPE 1 ARCHITECTURE, INC SCOPE OF WORK Project Understandin. Tim Jachlewski, President, PLA, ASLA, Landscape Architect (CA) LLA #4547, (NC) LLA #2341, (NY) RLA #001646, (TX) RLA#4029, (AZ) RLA #83714, (GA) #LA002046 Consultant Understands they must be prepared to immediately enter into the City's Agreement for Contract Services for the services described in this RFP and must be available to the City on an as -needed basis for a two-year agreement term, with an option to extend two additional one-year terms. I. INTRODUCTION The City of La Quinta is seeking a professional landscape architectural firm to provide on -call landscape and irrigation support services for a variety of landscape improvements within its publicly owned right of way. The City may choose to contract with one or more firms that provide such services. There is no promise or guarantee of work, made or implied, by the City and all work that may be assigned is subject to approval and funding for each project. II. SCOPE OF SERVICES UNDERSTANDING Services and products associated with these on -call services may include, but may not be limited to: 1. Attending meetings and preparing presentations and agenda reports for city advisory boards, commissions and the City Council when said meetings relate to projects covered by the contract; 2. Preparing feasibility studies for new, renovation, and alteration projects; 3. Preparing inventories of existing landscape conditions in publicly owned right of way; 4. Developing landscape themes and concept drawings which are consistent with the City's water conservation goals and objectives; S. Coordinating with neighborhood home owner groups and soliciting feedback and input on community related landscape/irrigation improvements; 6. Providing value engineering and preparing plans, specifications and estimates for assigned landscape and irrigation improvement projects, which may include utilizing the City's software systems and Bluebeam; 7. Processing assigned projects for the City entitlement, which may include, but not be limited to approval by the Planning Commission, Building and Safety Department, Facilities Department, Engineering Department and City Council; 8. Perform construction support services which may include construction oversight and inspection, observation, responding to bidder requests for information, submittal review, warranty review, contractor progress payment review and project close out. 9. Prepare a project specific rendering(s). The rendering(s) shall be in color and shall be isometric or'bird's eye' to provide depth. CALIFORNIA NORTH CAROLINA NEW YORK (P.C.) 2907 Shelter Island Dr, #105-417 8209 Market St, Ste A-264 PO Box 356 San Diego, CA 92106 Wilmington, NC 28411 Orchard Park, NY 14127 619-795-7603 910-617-8254 716-508-8341 www.insitelandarch.com SCOPE OF SERVICES Description of Services: Typical Design Scope Example shall include, but not be limited to: Task 1: Project Management Consultant shall be responsible for project management activities throughout the life of the contract including managing the project schedule, setting up meetings, field reviews, and managing the project team. The Consultant will include an appropriate number of meetings with City staff. The consultant may be required to attend a City Council meeting. The consultant will be expected to attend the pre -bid meeting and will respond to contractor requests for clarification during the bid process. Expected deliverables include monthly progress reports, schedule updates, meeting agendas, and minutes. Task 2: Site Visit and Review Consultant shall be responsible for in -person review of existing site conditions for grading issues, utilities and other existing site improvements. Task 3: Utility Coordination Consultant shall perform utility coordination, identify points of connections and coordinate same through affected utility providers, and obtain all necessary clearances from affected utility providers. Expected deliverables include any utility agreements as necessary. Task 4: CVWD Approvals and Application Consultant shall prepare irrigation water budget calculations and submit them to CVWD for approval. Consultant shall also prepare Turf Removal Application assist in submitting the CVWD application for turf removal rebate. Task 5: Conceptual Planting Plan Consultant shall prepare a conceptual landscape plan for review by staff. Upon review and refinement of the concept, consultant will prepare a planting plan for the project site with a legend that calls out plant material by Latin and common names. Photos of proposed plant material will be included as part of the presentation. After meeting and review of comments by the City, consultant will prepare a final color rendered preliminary plan for presentation. Task 6: Plans. Specifications. and Estimate Prepare project plans, specifications and engineer's estimates of probable construction costs. • Plans will likely include: Title Sheet, General Plan/Notes Sheet(s), Demolition Sheets, Layout Sheets (As Necessary), Landscape Sheets, Irrigation Sheets, and Detail Sheets. All construction notes and legends shall represent only the items on that plan. Project Estimate should identify appropriate bid items and quantities. Project estimate shall match the project specification bid schedule. Costs should be based on the historical cost index associated with the identified bid items. (Note: Opinion of construction cost provided by Consultant is based on the information available to Consultant and on the basis of Consultant's experience and qualifications, and represents its judgement. However, since the Consultant has no control over the cost of labor, materials, equipment or services furnished by others, or over the construction contractor's methods of determining prices, or over competitive bidding or market conditions, Consultant does notguarantee that proposals, bids, or actual construction cost will not vary from the opinion of probable construction cost that the Consultant prepares.) SCOPE OF SERVICES Project Specifications and Bid Documents will likely include the detailed project description, preparation of bid schedules, bid item descriptions, payment methods, special provisions, technical specifications, and any specification detail sheets or standard plans. Task 7: Project Rendering(s) Consultant shall prepare a project specific rendering(s). The rendering(s) shall be in color and shall be isometric or'bird's eye' to provide depth. Task 8: Bid and Construction Support Consultant will assist the City during the bid and construction phases by responding to Requests for Information (RFI) and provide clarification on its plans as necessary. Consultant shall provide Construction Observation Services upon request by the City. The following Construction Services are anticipated: • Review rock, wall, and boulder layout • Review of plant material locations prior to installation • Review of irrigation mainline test • Review of emitter placement • Review final installation and irrigation coverage • Final punch list • Consultant will be responsible for the preparation of "As -Built" plans based on changes made during construction, identified by the contractor and resident engineer. (Note: Although the Consultant may observe and discuss potential problems with the Client/ Owner or the Client/ Owner's contractor(s), the site visits are not construction inspections or a guarantee that there will not be construction deficiencies. Contractor submittals, such as shop drawings and samples are reviewed by the Consultant only to determine if they conform to the Consultant's design intent. Consultant's review of submittals shall not constitute approval of safety precautions or construction means, methods, techniques, sequences or procedures. Consultant's review of Contractor's payment applications to determine if the amount of work represented as complete is generally consistent with the Consultant's observations during its site visits shall be subject to any noted qualifications by the Consultant. Client understands that the frequency of the Consultant's site visits may limit Consultant's ability to review certain payment applications. Consultant's review shall not be a representation that Consultant has supervised the work, or that Consultant has reviewed how or for what purpose Contractor has used or intends to use Owner's payments.) Task 9: Review PS&E Landscape and Irrigation documents by others as requested by others Exclusions: Consulting services relating to any of the following tasks were not included in the preparation of the budget amounts shown on this Agreement: 1. Setting property corners or boundary determination 2. Construction surveying/ construction staking 3. Final As -built Surveying 4. Any certification not specifically set forth in the above scope 5. Traffic Studies, Traffic Counts, Intersection Studies and Traffic Signal Modifications 6. Environmental Studies SCOPE OF SERVICES 7. Dry Utility design, coordination and Utility Potholing 8. Plan and Map Check fees 9. Acoustical Studies 10. Retaining Wall, Perimeter Wall or Sound Wall Plans and/or Structural Design 11. Services related to Hazardous Wastes and Hazardous Material Abatement and Environmental Issues 12. Mapping Services including but not limited to Legal descriptions, Record of Survey, Condominium Mapping or Parcel Maps 13. On and Off -Site Water and Sewer Improvement Plans 14. Calculating Building Service line sizing (water, sewer and fire protection) 15. Water Quality Management Plans 16. Artwork by others (Plans, Details, Specifications, Structural Engineering, Structural Calculations) 17. Electrical wire circuit tracing of the existing system 18. Commissioning of color changing lighting for art work by others 19. Architectural plans 20. Agencies fees 21. Agency submittals 22. Phase 2 or Phase 3 Environmental Audits 23. Consultant does not make decisions for the client at the construction site other than for Consultant's design/plan without their approval. 24. Any other services not specifically set forth in the above Scope of Services. 3 • REFERENCES OF CALIFORNIA GOVERNMENT AGENCIES LANDSCAPE ARCHr ECTURE INC 66�IENT REFERENCESM Freedom Park/Randall Henderson Trailhead/Palma Village Park/Civic Center Park -Palm Desert, CA City of Palm Desert Shawn Muir, Assistant Community Services Manager Public Works/Engineering 73510 Fred Waring Drive Palm Desert, CA 92260 (760) 776-6481 smuir@palmdesert.gov Volue of contract(s): $400,051/$25,350/$32,760 City of San Marcos As -Needed Landscape Architecture Consulting - San Marcos, CA City of San Marcos Tim Selke, Public Works Manager 201 Mata Way San Marcos, CA 92069 (760) 752-7550 x 3224 tse I ke @ sa n-m a rcos. n et Value of contract: $300,000 Winchester Sports Park - Riverside, CA County of Riverside Transportation & Land Management Agency Michael Maldonado, TLMA Administrative Services Manager —Agency Operations 4080 Lemon St 14th Floor Riverside, CA 92501 (951) 955-6053 mimaldonado@rivco.org Volue of contract: $515,300 Fritz Burns Park Rennovation/City Operations Yard - La Quinta, CA City of La Quinta Ubaldo Ay6n I Assistant Construction Manager Public Works/Engineering 78495 Calle Tampico La Quinta, CA 92253 (760) 777-7051 uayon@laquintaca.gov Value of contract(s): $501,340/$22,600 Sports Ranch at Sommers Bend/Butterfield Stage Road Medians/Sommers Bend - Temecula, CA City of Temecula (Public Portions of Project) Stacy Fox, Park & Landscape Maintenance Supervisor 41000 Main Street Temecula, CA 92590 (951) 308-6306 Stacy. Fox@TemeculaCA.gov pr See the following pages for project descriptions See Resumes for key personnel roles Value of contract(s): $349,130/$494,430 JT_CI LANDSCAPE L �l J ARCkiIlECTURE NC STATEMENT OF QUALIFICATIONS I I ll�T-SITE R"°�RFRE FRITZ BURNS PARK RENOVATION La Qu i nta, CA Responsible for the park master plan, public outreach, 3D renderings, 3D animations, opinion of probable construction cost estimate, and CD's for this 6-acre, $9-million park renovation project. The plan includes the conversion of two tennis courts into 8 pickleball courts, water playground/pool expansion, restrooms, picnic areas, shaded gathering plaza, playground expansion and enhancements, shaded promenade with seating, public art, lawn areas, shade structures, parking lot reconfiguration, EV chargers, and additional parking. STATEMENT OF QUALIFICATIONS r .911 &79 . 4"__ - • Merit Award - American Society of Landscape Architects, NY Upstate, 2015 • Published - Landscape Architect & Specifier News Magazine, 2015 LANDSCAPE • THE GRIFFIN CLUB Recreation Center - La Quinta, CA Set against the backdrop of the breathtaking Santa Rosa Mountains, this $8-million, 6.4-acre luxury Spanish Colonial private recreation center includes a recreation building, series of outdoor verandas, intimate courtyards, short -course Olympic sized swimming pool, splash park, tennis stadium, tennis courts, pickleball courts, off -leash dog run, putting green, recreational lawn areas, outdoor kitchen, dining areas, and walking paths that meander through the desert landscape. The grounds incorporate aesthetics that would be found at a high -end luxury resort. Responsible for preparing the site master plan, construction budget, 3D renderings, and site construction documents/administration. STATEMENT OF QUALIFICATIONS i GRIFFIN RANCH MODEL HOME COMPLEX La Qu i nta, CA Set against the backdrop of the breathtaking Santa Rosa Mountains, this luxury model home complex includes four model homes, pools, waterfalls, spas, shaded outdoor kitchens, water features, fire features, dining and lounge areas, a putting green, and beautiful desert landscape. LANDSCAPE ARCHr ECTURE WC STATEMENT OF QUALIFICATIONS FREEDOM PARK RENOVATION Palm Desert, CA Responsible as prime consultant for the community outreach, schematic plan, construction documents, and construction support services of this City of Palm Desert park improvement project. The plan includes enhancements to the existing Freedom Memorial, new "Freedom sculpture", playground renovation (as an Inclusive Play National Demonstration Site), nature-themed area, outdoor fitness center, restroom improvements, enhanced pavements, benches, drinking fountain, BBQ grills, picnic tables, trash receptacles, lighting/ electrical coordination, desert planting, and irrigation. STATEMENT OF QUALIFICATIONS J.r,L d 3x llN-SI E IwoscAPE AROffiECfURE NC RANDALL HENDERSON TRAI LH EAD Palm Desert, CA Responsible as prime consultant for the community outreach, schematic plan, 3D renderings, construction documents, and construction support services for this City of Palm Desert trailhead improvement project. The plan includes a new parking, shade shelter, benches, and trailhead improvements. ° ..Sill , ::• - �, + g c STATEMENT OF QUALIFICATIONS -- 3 477 ; M , r-- kx W' Q a r J,'Jik �'�1 y • V CIVIC CENTER PARK Palm Desert, CA Responsible for community outreach, schematic plan, construction documents, and construction support services for this $2.8-million City of Palm Desert park improvement project. The plan includes a new expanded playground, cast-in-place/boulder seating, benches, enhanced pavement, drinking fountain, BBQ grills, picnic tables, trash receptacles, lighting/electrical coordination, desert planting, and irrigation. CIVIC CENTER PARK Playground Upgrade Project STATEMENT OF QUALIFICATIONS 1 �f r llN-SI E .0- AROffiECfURE NC PALMA VILLAGE PARK Palm Desert, CA Responsible for the schematic plan, construction documents, and construction support services for this City of Palm Desert park improvement project. The plan includes a new shade shelter, enhanced pavements, benches, drinking fountain, BBQ grill, picnic tables, trash receptacles, lighting/electrical coordination, desert planting, and irrigation. STATEMENT OF QUALIFICATIONS IN�►511L' RCH ECLYRENC SOMMERS BEND Temecula, CA Responsible for landscape architectural consulting for the Specific Plan Amendment No. 3, conceptual plans, 3D Renderings, construction documents, and construction administration for multiple sections of this 460-acre, 1,880-unit community including: • City of Temecula Public Park "Sports Ranch at Sommers Bend" (19.7-Acres) • Long Valley Wash Habitat Creation and Mitigation (16 acres) • Park and Ride / Trailhead (50 cars and 6 trailers) • Equestrian and multi -use trails (9.75 miles) • Calle Girasol/ Nicolas Rd Habitat (4.27-acres) • Density Core Multi -family including off -leash dog run, ninja warrior fitness course, and parks • Native Slope Restoration and Water Quality Basins (over 1.1 million square feet) • City of Temecula Median L.S. Plans (2.3 miles) • HOA Street Improvement L.S. Plans (4.3 miles) • Luxury Model Homes (6 complexes) • Numerous in -tract landscape plans • Irrigation Master Planning for 27 P.O.C.'s STATEMENT OF QUALIFICATIONS II�T-SI E LANDSCAPE WC r + +Yi MR• !K ' •t SPORTS RANCH AT SOMMERS BEND Temecula, CA Responsible for the park master plan, preliminary grading design, cost estimates, construction documents, coordination of lighting/civil engineering/architectural design, and construction administration for this 19.7-acre, $11.8-million City of Temecula public park located in the Sommers Bend community. The Park includes two baseball fields, two artificial turf soccer fields, two basketball courts, open lawns, picnic areas, playground, "nature play" areas and trails, native plant habitats, concessions building, restrooms, maintenance building and yard, entry monument signage, connections to the Long Valley Wash trail system, storm water management bioretention areas, and parking. Construction was completed 2022. STATEMENT OF QUALIFICATIONS . - - - - - •i • Golden Nugget Awards (Several), 2024 LANDSCAPE 1 W- t ' X K'41# & 4T, M ►- `SHAWOOD' AT SOMMERS BEND Temecula, CA Responsible for landscape architectural conceptual plans, 3D Renderings, construction documents, and construction administration for the model home complex and front yard typical landscape. The model complex includes three home plans and features the following amenities: • Shawood Experience Center • Pool • Fire features • Outdoor kitchens • Shade structures • Patios, sitting areas, lounge areas • Outdoor dining areas • Recreational lawn areas • Bocce court • Naturalized play areas • Enhanced paving • Decorative retaining walls, stairs • Native and water -wise plantings A SHAWOOD home unites more than a thousand years of Japanese culture with technological precision born from decades of design research done by its parent company, Sekisui House. STATEMENT OF QUALIFICATIONS QUAIL VALLEY NATURE PARK Menifee, CA In -Site is serving as prime consultant for the City of Menifee for the design of this new 10.45-acre nature park in the Quail Valley community. Responsible for the public outreach, master plan, illustrative graphic exhibits, 3D renderings, 3D animation, cost estimates, solar lighting design, civil engineering/ architectural design coordination, site construction documents, and site construction administration. The park will be the only public park within a 5-mile radius of the underserved community. Park amenities include ADA accessible nature trails, nature -based play elements, a fitness area, gathering space, park shelter, parking lot, and solar bollard lights. The project also includes non-native invasive species removal and native habitat restoration. STATEMENT OF QUALIFICATIONS e ease ea • Project of the Year Finalist, San Diego Business Journal, 2021 • Feature Article, Park and Rec Business Magazine, April 2016 I1� T-SI I.RcmnY PE lei ►7 L AR�-0�TURE Wl. SANTEE LAKES RECREATION PRESERVE Santee, CA Santee Lakes Recreation Preserve is a 190-acre linear park situated on a series of lakes that collect, treat, and store recycled water for use within Padre Dam Municipal Water District. Responsible for the site planning and design of the 20-year, $60-million Dynamic Vision Plan, $1.6-million Phase 1 park improvement/ trail/road/parking project from concept through construction and $9-million Phase 2 general store/ restaurant/administration/lakeside trail/ park improvement/parking project from concept through Construction. In -Site worked closely with the director of Park and Recreation and the building architect (PWA) on the Dynamic Vison Plan that supports the preserve's desire for future growth and functional needs, including an improved park entrance, outdoor "super site" wedding and event venue, expanded fishing docks, splash park, zipline and landmark water tower, general store and grill area, administration/teen center/event area, clubhouse redesign including adult pool, family pool, splash park, concert/performance amphitheater, dog run, pickleball courts, bocce ball courts, and shuffleboard courts, a yurt cabin village, aquatic park with cable ski course, new resort pool facility and numerous picnic areas throughout the park. STATEMENT OF QUALIFICATIONS Im DSCAPE ll�T-SI E C"rrECfURE WC HARVEST PARK Valley Center, CA Responsible for the master plan, illustrative graphic exhibits, 3D renderings, 3D animation, cost estimates, lighting/civil engineering/architectural design coordination, site construction documents, and site construction administration for this central gathering green space within the Park Circle master planned community. This 2.6-acre County of San Diego public park includes a trail system, nature play areas, shade shelters, bandshell, exercise station, basketball courts, horseshoe pits, bocce courts, open lawn areas, restrooms, and a historic water tower from the original on -site dairy that was relocated to the park site and was repurposed as a community landmark and park sign. In -Site designed the park concurrently with an adjacent private recreation center, adjacent green infrastructure ephemeral stream which doubles as a nature play area, and a future dining and shopping center that will blur the line between public and private development. Construction completed in 2022. STATEMENT OF QUALIFICATIONS I LANDSCAPE 04TME. llN-SI E RINC THE `HANGOUT' RECREATION CENTER Valley Center, CA Responsible for the open landscape architectural conceptual plans, illustrative graphic exhibits, 3D renderings/animations, site construction documents and site construction administration for this private recreation center in the Park Circle master -planned community. The recreation center includes a pool, spa, outdoor kitchen, fire tables, a California Room, event space and parking. The site was strategically designed in conjunction with the adjacent Harvest Park, retail center and surrounding residential. s I,i _a r J11- R K• w ii' 17 A STATEMENT OF QUALIFICATIONS -is - 1 LANDSCAPE ARCHrIECTME. INC 17:77- LEWIS HOWARD CAMPGROUND Holly Ridge, NC Responsible for the site master plan, conceptual grading and drainage design, native planting construction documents, and illustrative graphic exhibits for this 50-acre, 150-site, RV campground. The site design includes numerous recreational amenities including a splash pad, playground, food truck/picnic grove, sand beach on an existing pristine spring -fed pond, dock/performance stage, pickleball courts, dog run, restrooms, boat launch, boat dock, paddleboard and kayak rental building, parking, trails, wetland protection, storm water quality management swales and basins, and habitat creation/restoration. 7 f -r REHABILITATION INSTITUTE Escondido, CA Responsible for the site design, site 3D renderings, site construction documents, and site construction support for this state-of-the-art, 52-bed inpatient acute rehabilitation hospital dedicated to the treatment and recovery of individuals who have experienced the debilitating effects of a severe injury or illness. The main courtyard serves an outdoor rehabilitation therapy facility, a healing and relaxation garden, and patient and staff outdoor dining area. Several types of surfaces are used to provide patients with different challenges to walk on including acid -etched concrete, unit pavers, and decorative gravel. The courtyard also includes a putting green, pitching green, wheelchair ramp, pedestrian (street corner) ramp, and small staircase for therapy. The project is adjacent to the main Palomar Medical Center hospital and was designed to cohesively blend with the medical campus. STATEMENT OF QUALIFICATIONS y IN-SI Im E RCWTECM E �1Kim OFFICE CAMPUS Escondido, CA Responsible for site design, photo renderings, construction on documents and administration on for this three -building, two -site, medical office campus adjacent to the Palomar Hospital in Escondido, California. A large central landscape feature connects the two main medical office buildings and offers a healing garden setting for patients and employees to enjoy. The gardens include many complimentary landscape plantings including native plant species, plants of varying textures and sizes, flowering plants that attract butterflies, hummingbirds and song birds and plant species of varying seasonal interest. The gardens also include two small rock water features to attract birds and serve as focal points. The central landscape feature also doubles as a bioretention on water quality feature that captures and naturally treats stormwater from the adjacent parking areas. STATEMENT OF QUALIFICATIONS a r r M f 1 1 1 �'T_J F � 1 1� I NARDIN ACADEMY Buffalo, NY The Nardin Academy gymnasium and campus courtyard redesign project includes a new gym, wellness center, and campus renovations that serve the high school, elementary school, and pre-school. As a sub -consultant to Schneider Architectural Services PC, In -Site prepared the site master plan, site 3D renderings, site 3D animations, and site construction documents. Site amenities include basketball, pickleball, four square, a "ga-ga" pit, recreational turf, bird and butterfly garden, playground, preschool play area, outdoor lunch court, ADA access upgrades, and on -site parking. Construction was completed in 2021. AEI STATEMENT OF QUALIFICATIONS ECLIPSE TOWNHOMES Escondido, CA Responsible for the landscape master plan, 2D and 3D renderings, construction documents, and construction administration. The project consists of 32 luxury townhomes featuring a modern recreational center with pool, spa, California room, patio spaces, fire pit, shade pergolas, and playground. Smaller pockets of recreational lawn are spread through the community. Low water use plants accent the architecture and storm water quality biofiltration swales are planted with native grasses and rushes. �Bob— rnii�n STATEMENT OF QUALIFICATIONS f � - IN-►511L' ARCH ECLYRENC N%% '. .�� • . !J r FPCE Cr- eU ALTAIR STREETSCAPE GUIDELINES Temecula, CA Responsible for the design guidelines of the Altair community streetscapes. This community features a variety of street types each represented in the guidelines by section and axonometric illustration. These drawings clearly communicate the design intent and provide all the necessary information. The street types include: • Perimeter bypass road with separate bikeway • Public B and C Streets • Split lane with trail system • Private street with urban parkway • Private street with planted parkway • One-way street around park • Bridges • Private connector streets. STATEMENT OF QUALIFICATIONS "I have worked with In -Site Landscape Architecture, Inc for the past 5 years on the Sommers Bend residential development that includes over 460 acres, 1,506 residential units spread over 22 planning areas, and a sports park. During both the entitlement and construction documents period of the project In -Site has been organized, responsive, and has addressed comments that has kept the project moving forward with delay. In -Site has worked close with City Staff and the City's landscape consultant to produce appealing street scenes, front yard landscaping, and HOA maintained areas that are of the highest quality" Scott Cooper, Associate Planner II City of Temecula "As the lead landscape architect on design and implementation at the Sommers Bend Master planned community, In -Site Landscape Architecture was instrumental in bringing the vision and needs of the client to reality. Their attention to detail and ability to work seamlessly with all approval agencies and contractors lead to faster turnaround times on plan check approvals and the client's construction schedule. The team offered cross functionality at our development team meetings with consultants and city that lead to being proactive to future issues that may have risen in the field. We are grateful to have In -Site involved in the design from the beginning to set the tone and look of the community that the residents will enjoy for years! Trent Heiner, Senior Project Manager Woodside Homes Southern California Division "Having designed over 30 parks, plan checked over 70 parks and built over 50 parks over the last 25 years, I can truly say, In -Site Landscape Architecture is the highest quality design firm in the industry. Their overall professionalism is second to none. Great quality control, clear and legible accurate plans and expedient response times is unparalleled. Their ability to balance quality architecture with functional sustainable park designs, without incurring unnecessary expenses, provide value to the end user. In -Site has set a standard in landscape architecture that few can compare to.' James Potter, Vice President, Construction Division Adame Landscape, Inc. "It has been a pleasure working with the team at In -Site Landscape Architecture, Inc. Together we have worked on some very high profile projects that demanded a sophisticated expertise in land design. The professional staff at In -Site has been extremely attentive to our client's program requirements and have integrated seamlessly with our architectural team to produce highly successful and creative landscape design solutions. Their contributions at client meetings and in the preparation of presentation materials is the most professional consulting experience I've encountered in my over 40 years of practicing architecture! Jake Schneider, AIA, CEO Schneider Architectural Services, PC Schneider Real Estate Services, LLC Schneider Development Services, LLC Schneider Construction Services, LLC "I would like to express my full support and unreserved recommendation for In -Site Landscape Architecture. As co -lead designers of the Santa Rosa Plateau Ecological Reserve Visitor Center Improvement Project, they were instrumental in helping to enhance visitors' experiences to the Reserve. With their expertise in structural and public use design, a keen knowledge and appreciation of educational/interpretive methods, and a personable and professional demeanor that was evident throughout the entire project, they made the venture both successful and fulfilling. I would highly recommend their organization and their skilled employees for any and all future projects." Robert Hicks, Park Interpreter Riverside County Regional Park and Open -Space District AIA, CEO ___ STATEMENT OF QUALIFICATIONS CLI�NMONIALS, "In Site was retained to be a key part of designing and constructing the Griffin Club in La Quinta, CA. Working with Tim and his team was a real joy. Their design and technical skills are second to none, and they consistently work to keep any detail from falling through the cracks. What a great addition to the team" Scott McFerran, Owner's Representative Decatur Advisors LLC "The Rock Church and Academy Project was a 206,000 square -foot re -use of the existing Naval Training Center. Tim was the Landscape Architect that took an original landscape concept that was prepared by a third party and completely redesigned the exterior component of the project so that it took on the same level of Biblical significance as the sanctuary and other key elements in the building design. We now have an exterior with a purpose. It does everything we wanted it to do and it serves as a beautiful entry point into Liberty Station as well. We are well pleased." Miles McPherson, Senior Pastor Rock Church "I've worked with In -Site Landscape Architecture on Winery projects in the Temecula Wine Country. The firm has provided high quality expertise and attention to detail that has made our projects stand out from the rest. The company's hands on approach and commitment to the success of the project are second to none" Bradley Hay Hunsaker & Associates Engineers "My leadership team had the pleasure of working with In -Site Landscape Architecture to redesign our preschool playground. Tim also worked with our previous leadership to successfully design our Elementary and Upper School playgrounds. We found him to be a man of his word, conscious of meeting deadlines, and staying within our schools budgetary constraints. He and his staff have the knowledge and creative ability to be cutting edge, while being mindful of student safety, and meeting or exceeding specific school building code requirements. We look forward to working with him in the near future." Scott Marshall, Headmaster Rock Academy "We knew we loved the location of our newly purchased building, but the property offered nothing aesthetically pleasing. In -Site Landscape Architecture, Inc. took the time to listen to our vision for the property and to understand our business. The result is a beautifully landscaped and serene outdoor area that supports our work with families and our love of nature. Our employees love to relax outdoors during breaks. Most importantly, however, this area created an extension of our usable space for entertaining clients and the women who help infertile families have babies. They even brought in some fun aspects for the children who often visit. We highly recommend In -Site Landscape Architecture, Inc. as a company that values your vision and ideas while bringing in their own expertise to design and transform your property." Darlene M. Pinkerton, Founder and CEO A Perfect Match, Inc., Allison Avenue Office Building "We worked with In -Site Landscape Architecture on two design/build proposals (schematic phases) for Sharp Cancer Center and Sharp Downtown Wellness Center and were very pleased with their commitment to the team and their creativity. Tim has an exceptional ability to read an owner and transform that understanding into a beautiful design while remaining vigilant of the budget" Dennis J. Uthe, LEED AP, Hensel Phelps Construction Co. STATEMENT OF QUALIFICATIONS "I have worked with In -Site Landscape Architecture, Inc for the past 5 years on the Sommers Bend residential development that includes over 460 acres, 1,506 residential units spread over 22 planning areas, and a sports park. During both the entitlement and construction documents period of the project In -Site has been organized, responsive, and has addressed comments that has kept the project moving forward with delay. In -Site has worked close with City Staff and the City's landscape consultant to produce appealing street scenes, front yard landscaping, and HOA maintained areas that are of the highest quality" Scott Cooper, Associate Planner II City of Temecula "As the lead landscape architect on design and implementation at the Sommers Bend Master planned community, In -Site Landscape Architecture was instrumental in bringing the vision and needs of the client to reality. Their attention to detail and ability to work seamlessly with all approval agencies and contractors lead to faster turnaround times on plan check approvals and the client's construction schedule. The team offered cross functionality at our development team meetings with consultants and city that lead to being proactive to future issues that may have risen in the field. We are grateful to have In -Site involved in the design from the beginning to set the tone and look of the community that the residents will enjoy for years! Trent Heiner, Senior Project Manager Woodside Homes Southern California Division "Having designed over 30 parks, plan checked over 70 parks and built over 50 parks over the last 25 years, I can truly say, In -Site Landscape Architecture is the highest quality design firm in the industry. Their overall professionalism is second to none. Great quality control, clear and legible accurate plans and expedient response times is unparalleled. Their ability to balance quality architecture with functional sustainable park designs, without incurring unnecessary expenses, provide value to the end user. In -Site has set a standard in landscape architecture that few can compare to.' James Potter, Vice President, Construction Division Adame Landscape, Inc. "It has been a pleasure working with the team at In -Site Landscape Architecture, Inc. Together we have worked on some very high profile projects that demanded a sophisticated expertise in land design. The professional staff at In -Site has been extremely attentive to our client's program requirements and have integrated seamlessly with our architectural team to produce highly successful and creative landscape design solutions. Their contributions at client meetings and in the preparation of presentation materials is the most professional consulting experience I've encountered in my over 40 years of practicing architecture! Jake Schneider, AIA, CEO Schneider Architectural Services, PC Schneider Real Estate Services, LLC Schneider Development Services, LLC Schneider Construction Services, LLC "I would like to express my full support and unreserved recommendation for In -Site Landscape Architecture. As co -lead designers of the Santa Rosa Plateau Ecological Reserve Visitor Center Improvement Project, they were instrumental in helping to enhance visitors' experiences to the Reserve. With their expertise in structural and public use design, a keen knowledge and appreciation of educational/interpretive methods, and a personable and professional demeanor that was evident throughout the entire project, they made the venture both successful and fulfilling. I would highly recommend their organization and their skilled employees for any and all future projects." Robert Hicks, Park Interpreter Riverside County Regional Park and Open -Space District ___ STATEMENT OF QUALIFICATIONS LCLIENTI"IMONIALSJ "When interviewing companies to partner with us on our Dynamic Vision Plan (our 20-year Park and Campground Vision Plan), In -Site Landscape Architecture, Inc. was the unanimous pick due to their reputation in the industry, quality work, and enthusiastic interest in our project. The In -Site team did not disappoint. Personally, it was a thrill to work with a team who understood vision planning and embraced exploring our Park's future through an innova- tive lens." Laura Evans, Director of Park and Recreation Santee Lakes Recreation Preserve "We highly recommend working with In -Site Landscape Architecture. From park planning to parking lots, In -Site is a one stop shop for tasteful, practical and creative design solutions for exterior land and streetscapes. They are able to understand the client's big picture plan and execute it with the required details. Tim is easy to work with and really listens to his clients to find the best solutions." Leslie Zemsky, Vice President Larkin Development Group "Adding In -site Landscape Architecture to our project team has be a truly great benefit to our firm, and our clients. Tim and his team brings stunning design and rendering imagery to the site and building exterior development of projects. In -site is our go to Landscape Architect firm" Thomas R. Kujawa, AIA Schneider Architectural Services, PC "We have utilized In -Site and Tim Jachlewski before he formed In -Site for over 19 years. He is always creative and reliable. Schedules and budgets on large projects are key elements in keeping timelines and project financial pro- jections on plan. Beyond the numbers is the interaction with other consultants and most importantly the govern- ment agencies. In all areas In -Site has and continues to excel. In the school of thought that a consultant doesn't cost you but saves you money, we are fortunate to have the availability of their services." Rob Honer, Principal, and Wade Hall, Principal Ambient Communities "Thank you for your integrity and expertise. Not only have you been a true pleasure to work with but the results are above and beyond expectations. You have captured my vision! Debera Nelson Fossanova Vineyards and Estate "It has been a pleasure to work with In -Site Landscape Architecture. They are the type of Firm that you can truly call a partner; they honor their commitments and are there to assist you every step of the way. I can truly tell you that having In -Site on the team helped the project move forward smoothly in the midst of some very tough chal- lenges. We look forward to working with In -Site again in the near future". Samer K. Kawar, AIA, CDT, Associate / Lead Architect BCA Architects "The lion's share of the Griffin Club design fell on In -Site. It was such a pleasure working with your company. That entire team was awesome and a truly unique experience in my career. You are one of our best consultants" Larry Liebel, Project Manager Lennar STATEMENT OF QUALIFICATIONS Sports Ranch at Sommers Bend Published as feature article and cover of Park and Rec Business Magazine, December 2022 Sommers Bend "Master Planned Community of the Year". SoCal Marne, 2021 "Best Model Complex Landscape Design", SoCal Marne, 2021 Santee Lakes Recreation Preserve General Store and Administration Building Project "Outstanding Urban or Land Development Project" ASCE, 2023 "Honor Award", American Public Works Association, 2023 "Project of the Year Finalist San Diego Business Journal, 2021 Santee Lakes Recreation Preserve Dynamic Vision Plan Published as feature article in Park and Rec Business Magazine, April 2016 Wagon Wheel Creek Restoration and Stormwater Management Project "Flood Management Project of the Year", American Society of Civil Engineers - Orange County Branch, 2018 El Caballo Park Master Plan "Merit Award", American Society of Landscape Architects - San Diego, 2016 The Griffin Club "Merit Award", American Society of Landscape Architects — New York Upstate Chapter, 2015 Published in Landscape Architect and Specifier News, April 2015 Allison Avenue Office Building "Merit Award", American Society of Landscape Architects — New York Upstate Chapter, 2015 Santa Ana River Perennial Stream Restoration Project - Reach 9 Phase 2B "Environmental Engineering Project Award". American Society of Civil Engineers - Orange County Branch, 2015 Bernardo Greens Turf Retrofit Project Landscape Beautification Award — California Landscape Contractors Association San Diego Chapter, 2015 Certified Wildlife Habitat - National Wildlife Federation, 2015 Sikes Adobe Historic Farmstead Park Master Plan — San Dieguito River Park American Society of Landscape Architects San Diego Chapter - Community Grant recipient, 2013 Santa Rosa Plateau Ecological Reserve Visitor Center Improvement Project "Merit Award", American Society of Landscape Architects - San Diego, 2012 "Honorable Mention", California Trails and Greenways Committee, 2011 Private Residence "Home of the Year" — San Diego Home / Garden Lifestyles Magazine, 2012 Southern California Edison Data Center LEED GOLD Certification, 2012 Southwest College Snack Bar / Cafe LEED SILVER Certification, 2011 Rock Church and Academy Park Published in Landscape Architect and Specifier News, June 2011 STATEMENT OF QUALIFICATIONS Riverside County Guide to California Friendly Landscaping* "Best Practices Award". American Planning Association - Inland Empire, 2008 Sunset Cliffs Natural Park Master Plan* "Planning and Communication Award", American Society of Landscape Architects - San Diego The Estates at StoneBridge* "Planning and Communication Award", American Society of Landscape Architects - San Diego Underground Railroad Freedom Memorial - Broderick Park** "Planning Award", American Planning Association — Western New York Highland Area Redevelopment Plan** "Planning Award", American Planning Association — Western New York Main -LaSalle Revitalization Plan** "Planning Award", American Society of Landscape Architects— Western New York "Planning Award", American Planning Association — Western New York South Buffalo Redevelopment Plan** "Honorable Mention", American Planning Association — Western New York Willert Park Village** National Recognition by HUD - Federal "Planning Award", American Planning Association — Western New York JFK Park** Featured article in Landscape Architect and Specifier News "1st Place", Interlocking Pavement Magazine * Project completed by Tim Jachlewski while Principal/project manager of Van Dyke Landscape Architects, Inc. ** Project completed by Tim Jachlewski while project manager at Parsons Transportation Group of N.Y., Inc. •• STATEMENT OF QUALIFICATIONS 4 COMPLETE PRICING LIST/FEE SCHEDULE LANDSCAPE ARCHr ECTURE INC � <J 1 IT_ CJ � � LANDSCAPE ARCHITECTURE, INC. HOURLY RATES In -Site Landscape Architecture. Inc.: Principal Landscape Architect: $190.00 Project Manager: $140.00 Landscape Architect: $140.00 Project Designer I1I: $120.00 Project Designer I1: $90.00 Project Designer I: $70.00 Tim Jachlewski, President, PLA, ASLA, Landscape Architect (CA) LLA #4547, (NC) LLA #2341, (NY) RLA #001646, (TX) RLA#4029, (AZ) RLA #83714, (GA) #LA002046 Subconsultants if necessary (Hourly rates shown below plus add 10% prime consultant mark up): Michael Baker International fMBII: Senior Principal $356.00 Senior Project Manager $280.00 Project Manager $270.00 Structural Engineer $245.00 Technical Manager $235.00 Senior Engineer $205.00 Senior Planner $200.00 Surface Water Lead $190.00 Electrical Engineer $180.00 Landscape Architect $175.00 Design Engineer $175.00 Senior GIS Analyst $160.00 Project Engineer $165.00 Project Planner $160.00 Environmental Specialist $155.00 Senior Designer/Survey Analyst $155.00 GIS Analyst $155.00 Surface Water Technician $140.00 Designer/Planner $130.00 Project Coordinator $130.00 Environmental Analyst/Staff Planner $120.00 Design Technician $130.00 Permit Processor $120.00 Assistant Engineer/Planner $110.00 Office Support/Clerical $95.00 1 Person Survey Crew $225.00. 2 Person Survey Crew $365.00 Project Manager $315.00 Professional Land Surveyor $250.00 Project Surveyor $230.00 Supervision (1 hour per every 8 Crew hours) $215.00 CADD Data Processing $210.00 Visual Concepts Lighting (VCL) Senior Associate/Engineer $250.00 Project Manager $180.00 Lighting/Electrical Designer $115.00 Drafter $90.00 Verdantas: $310.00 Rate Increases: Due to increases in wages/benefits, fees and hourly rates are subject to an equal annual increase based on the Consumer Price Index (CPI-U) published by the Bureau of Labor Statistics. CALIFORNIA NORTH CAROLINA NEW YORK (P.C.) 2907 Shelter Island Dr, #105-417 8209 Market St, Ste A-264 PO Box 356 San Diego, CA 92106 Wilmington, NC 28411 Orchard Park, NY 14127 619-795-7603 910-617-8254 716-508-8341 www.insitelandarch.com STATEMENT OF QUALIFICATIONS COMPLEMENTARY SERVICES AND PRICES OFFERED BY PROPOSER If requested by the City (if necessary for the project), Consultant may provide the following services utilizing sub consultants: • Topographic Survey • Geotechnical testing and Report • Civil Engineering Services • Lighting and Electrical Design Services STATEMENT OF QUALIFICATIONS STATEMENT OF QUALIFICATIONS RLA, Principal -in -Charge In -Site Landscape Arch. RLA, Landscape Architect In -Site Landscape Arch. t Project Manager In -Site Landscape Arch. Project Designer In -Site Landscape Arch. All personnel listed are adequate, available, and able to complete the work order tasks based on their level of experience and project roles. RLA - Registered Landscape Architect Senior Project Designer In -Site Landscape Arch. Project Designer In -Site Landscape Arch. (Subconsultants shown are ,f,w optional and may be used if requested by the City or necessary for the scope of work for their corresponding professional licenses.) Project Designer Lighting and Electrical Geotechnical Report In -Site Landscape Arch. Visual Concepts Lighting Verdantas • STATEMENT OF QUALIFICATIONS STATEMENT OF QUALIFICATIONS INTERNATIONAL SERVICES • Architecture • Aviation Engineering • Construction Services • Electrical Engineering • Environmental, Planning, Regulatory Permitting • Geospatial • Homeland Security • Land / Urban Development • Municipal / Civil / Public Works • Traffic Planning and Engineering • Transportation Engineering • Highway & Roadway Design • Signals, Signing & Striping, Traffic Control Plans • Traffic Operations & ITS • Mobility Planning (Multimodal) • Complete Streets Planning & Design • Active Transportation (Ped & Bike, SRTS, First Mile/Last Mile) • Grant Writing & Management • Assessment of Transportation Impacts • Safety Implementation (HSIP, ADA, LRSP, SSARP, & SS4A) • Construction Management & Inspection • Telecommunications & Utilities • Water Resources • Surface Water Michael Baker International, Inc. (Michael Baker) was founded in 1940 as a civil engineering and surveying firm and quickly attained recog- nition as a premiere environmental planning, engineering, survey and construction management firm. Today, we continue to leverage our collective expertise and experience to make the communities we serve better. We strive to make them safer, more accessible, more environmentally sustainable and more livable. We facilitate their transformation supported by differentiating innovation, technologies and dedicated employees. We are change agents, leading our partners around the world into the future. Our greatest differentiator, though, is our employees who demonstrate a world -class ability to solve complex problems. We reward innovation and collaboration that leads to the best solutions for our clients. Michael Baker is a full -service engineering services firm with exper- tise in multimodal planning, roadway safety and design, stakeholder engagement, and traffic operations. For over 85 years, Michael Bak- er's nationwide staff of more than 4,900 has brought dedication and passion to transportation planning projects both large and small. We have successfully performed similar services for cities, counties, and agencies. Since 2004, Visual Concepts Lighting, Inc. stands as a leading full -ser- vice electrical engineering firm, dedicated to the intricate art of sustain- able lighting design. While our capabilities span the entire spectrum of electrical engineering, we have honed our focus and expertise on outdoor lighting, epitomizing a 'Fusion of Light' that transforms spaces —from high -end residential landscapes to picturesque streetscapes and dynamic municipal ball fields. At Visual Concepts Lighting, our design philosophy is rooted in a seamless journey, guiding clients from lighting concept to construction -ready plans. With a robust foundation of over 30 years of hands-on electrical field experience and a cumulative 45 years of design prowess, we are committed to delivering designs that align with the true intent of our clients. Our approach aims to eliminate costly change orders, ensuring the successful realization of efficient and effective electrical systems. Visual Concepts has a rich history in working with many municipal agencies across Southern California for on -call engineering services. STATEMENT OF QUALIFICATIONS Verdantas Inc. (Verdantas) is an engineering firm dedicated to provid- ��e rd a ntas ing our clients with expertise in engineering consulting, the environ- ment, and its supporting infrastructure. Founded in 2020 and employ- ing more than 1,500 professionals in 46 states, Verdantas has grown exponentially in the last four years, strategically acquiring firms includ- ing Southern California's premier geotechnical consultant, Leighton Consulting, Inc. With the addition of Leighton's legacy team, Verdantas has the advantage of more than 63 years of experience delivering industry -leading geotechnical engineering, environmental consulting, and materials testing and inspection services to local communities. Our team has geotechnical expertise for design and construction of new and improvement public projects including, but not limited to, community parks, sports fields, conservation preserves, pedestrian/ bike trails, flood control channels, and creeks. Verdantas has worked in the City of Palm Desert serving on projects including the Berger Road Improvement Project and the San Pablo Corridor Improvements Project, as well as other projects within the city including College of the Desert and University Park. Resources: Our team can provide the following team members as neeeded: Landscape Architects = 8 Project Designers = 6 Professional Civil Engineers =140 Engineers in Training = 83 STATEMENT OF QUALIFICATIONS EXPERIENCE Mr. Pope works in Michael Baker's Palm Desert Office. He has resided in the Coachella Valley all of his life and has seen the many changes that have shaped the landscape of this beautiful valley. He is experi- enced with Autocad Land Development Desktop software including Civil and Survey modules, Autocad Civil 3D, along with various da- ta -base packages for hydrology/hydraulics and map checking protocols. Mr. Pope has extensive knowledge in the writing of legal descriptions, area calculations and mapping which includes Parcel Maps, Tract Maps and Lot Line Adjustments. He works closely with Michael Baker's Public Works personnel in providing necessary base mapping, right-of-way analysis and property research through various parcel information programs and close contact with various title companies locally. With 20 years of experience in the consulting engineering industry, Mr. Pope has developed unique skills in the preparation of parcel, tract and ALTA/ACSM plats along with civil design plans including sewer, water, storm sewer, hydrology calculations, and street plan and profile design. Relevant projects include: Civic Center Park — Palm Desert, CA Civil Department Manager. The project will include removal and replacement of the existing concrete flatwork adjacent to the existing playground equipment and restroom building. His responsibilities include managing staff tasked to prepare the improvement plans, scheduling with the client and assisting with site design as needed for project completion. Freedom Park Renovation — Palm Desert, CA Responsible as Civil Department Manager for this City of Palm Desert park improvement project. Randall Henderson Trailhead — Palm Desert, CA Responsible as Civil Department Managerr for this City of Palm Desert trailhead improve- ment project. The plan includes a new parking, shade shelter, benches, and trailhead improvements. Rancho Las Flores Park Master Plan - Phase 1 — City of Coachella, CA Project Manager. Responsible for mapping services. Michael Bak- er provided professional landscape architecture and civil engineering services to the City of Coachella for the design and development of a community sports park. The 25-acre park included a major lighted soccer complex, football field, baseball and softball fields, playgrounds, picnic areas, splash fountain, restrooms, shade structures, a new public street, parking lot improvements, landscaping, irrigation, and associ- ated improvements. Services included the preparation of conceptual design alternatives, a two phased master plan, and final plans, specifi- cations and estimates. Marriott Shadow Ridge Resort — Palm Desert, California Marriott Ownership Resorts. Project Manager. Responsible for mapping ser- vices. Michael Baker provided surveying and mapping services for Phase 9 of the Marriott Desert Springs Villas North Development, which will include the ultimate build -out of 999 attached vacation res- idential time-share dwelling units (villas), an 18-hole golf course, sales center, and restaurant. The villas are grouped in 51 buildings with ap- proximately 20 villas per building. Michael Baker assisted with various parcel map waivers through the City of Palm Desert for re -configuring the previously mapped lots along with vacation of several emergency vehicle access easements. � J l 4k WILLIAM A. POPE Company: INTERNATIONAL Project Role: Civil Engineering Department Manager AFFILIATIONS Project Management Institute (PMI) Building Industry Association of Southern California (BIA) Vocational/Technical, Surveying and Mapping Course, Mount San Jacinto Community College, College of the Desert, 2005 STATEMENT OF QUALIFICATIONS EXPERIENCE Mr. Alcocer has extensive experience in land development and client relations, including projects within the commercial, residential, and institutional sectors. As project manager his responsibilities include the design and production of grading, sewer, water, and street & storm drain plans. He has been with MBI for 12 years. His software skill and experience include an advanced understanding level ofAutoCAD Civil 3D. Relevant projects include: Civic Center Park —Palm Desert, CA Project Manager. Francisco serves as the project managerforthe Civic Center Park hardscape upgrades currently being designed forthe City of Palm Desert. The project will include removal and replacement of the existing concrete flatwork adjacent to the existing playground equipment and restroom building. His responsibilities include managing staff tasked to prepare the improvement plans, scheduling with the client and assisting with site design as needed for project completion. Freedom Park Renovation— Palm Desert, CA Responsible as civil project manager for this City of Palm Desert park improvement project. Randall Henderson Trailhead —Palm Desert, CA Responsible as civil project manager for this City of Palm Desert trailhead improvement project. The plan includes a new parking, shade shelter, benches, and trailhead improvements. Terra Lago Four Seasons Project — Indio, California K. Hovnanian Companies of California. Project Manager. Responsible for managingthe project by coordinating staff, client needs, budgeting, and scheduling. Also overseeing final engineering tasks such as utility, grading, site, demolition, and a horizontal control plan. The Terra Lago Four Seasons project consisting of an ultimate build -out of 827 residential, single-family lots. Terra Lago is being built over several phases with seven separate final maps that will be recorded within the City of Indio. Mountain View Estates Project — Cathedral City, California Desert Housing Venture. Project Manager. Responsible for managing the project by coordinating staff, client needs, budgeting, and scheduling. Also overseeing final engineering tasks such as utility, grading, site, demolition, and a horizontal control plan. The Mountain View Estates project consisting of an ultimate build -out of 110 residential, single-family lots. Mountain View Estates is being built in two phases including two separate final maps that will be prepared and recorded within the City of Cathedral City. The Thermal Club — Thermal, California Project Manager. Responsible for managing the project by coordinating staff, client needs, budgeting, and scheduling. Also overseeing final engineering tasks such as utility, grading, site, demolition, and a horizontal control plan. The Thermal Club project consisting of an ultimate build -out of over two hundred residential units. Eisenhower Central Plant Expansion — Rancho Mirage, California Project Manager. Responsible for managingthe project by coordinating staff, client needs, budgeting, and scheduling. Also overseeingfinal engineering tasks such as utility, grading, site, demolition, and a horizontal control plan. The Cardiovascular Building Expansion consist of two multi story buildings with various ADA paths of travel. Floor and Decor Project — La Quinta, California Civil Associate. Assisted with design and plan production for a composite utility, and precise grading plan using Civil 3D. The plans included extensive demolition work which was addressed through the conceptual design phase of development. A thorough set of site demolition plans, a new loading dock and coordination with several of the existing underground utilities was performed. The site improvements needed to be brought back up to current California Building Codes with the City of La Quinta Building and Safety and Engineer- ing Departments. FRANCISCO ALCOCER Company: I N T E R N AT 1 0 N A L Project Role: Civil Engineering Project Manager AFFILIATIONS Institute of Transportation Engineers (ITE) Building Industry Association of Southern California (BIA) EDUCATION B.S., 2012 Civil Engineer, California State Polytechnic University, Pomona STATEMENT OF QUALIFICATIONS EXPERIENCE Brent is a self -motivated and detail -oriented geologist with a broad skillset that has been successfully applied to geotechnical, geophysical, forensic, and construction materials testing projects. Areas of expertise include geotechnical and geophysical field methods, geologic mapping and surveying, project management, proposal and report compilation, client communication and business development. He has 11 Years of Industry Experience and 3 Years of experience at Verdantas. Verdantas Inc. is an engineering firm dedicated to providing our clients with expertise in engineering consulting, the environment, and its supporting infrastructure. Founded in 2020 and employing more than 1,500 professionals in 46 states, Verdantas has grown exponentially in the last four years, strategically acquiring firms including Southern California's premier geotechnical consultant, Leighton Consulting, Inc. With the addition of Leighton's legacy team, Verdantas has the advantage of more than 63 years of experience delivering industry - leading geotechnical engineering, environmental consulting, and materials testing and inspection services to local communities. Our team has geotechnical expertise for design and construction of new and improvement public projects including, but not limited to, community parks, sports fields, conservation preserves, pedestrian/bike trails, flood control channels, and creeks. Verdantas has worked in the City of Palm Desert serving on projects including the Berger Road Improvement Project and the San Pablo Corridor Improvements Project, as well as other projects within the city including College of the Desert and University Park. Relevant Projects include: Winchester Sports Park— Riverside, CA Project Geologist -Performed geologic investigation for this 32-acre $28.3-million, County of Riverside public park that includes four baseball fields, seven soccer fields, four basketball courts, two tennis courts, six pickleball courts, open lawns, playground, six shade structures, eleven shade sails, picnic areas, Salt Creek trail, concessions building, restrooms, entry monument signage, maintenance yard, storm water management bioretention, and parking. BRENT ADAM Project Geologist, CEG Company: verdantas Project Role: Project Geologist LICENSES/ CERTIFICATIONS CA— Engineering Geologist - 2769 CA — Professional Geologist - 9653 Community Recreation Center Renovation — Temecula, CA. Project Geologist -Performed geologic investigation for the proposed improvements at EDUCATION the Temecula CRC, which included building additions, new landscaping, a splash BS, Earth Sciences, pad and associated improvements. Also provided construction observation and University of California, Santa Cruz materials testing services. Palma Village Park Renovations — Palm Desert, CA Project Geologist. Per- formed geologic investigation for the proposed improvements at Palma Village Park, which included a new gazebo and associated improvements. Temecula Rainbow Rockfall Hazard — Temecula, CA Project Geologist. Provided geologic mapping, observation, and hazard mitigation recommendations for emergency repair efforts following a significant rockfall event along Rainbow Valley Road in the city of Temecula. Riverside Gateway Project Suite — Riverside, CA Project Geologist. Provided geotechnical investigation, geologic reconnaissance, and geohazard review, including mitigation recommendations for preliminary design of proposed improvements at nine park sites along the Santa Ana RiverTrail within the city of Riverside. STATEMENT OF QUALIFICATIONS EXPERIENCE Bashir has more than 18 years of performing construction soils and materials testing as well as geotechnical exploration project coordination. He serves as key personnel providing project management support, including site and subcontractor coordination, geotechnical analysis, lab test results evaluation, and report preparation. His development and growth from a field technician to a associate engineer allows him to understand the full project life cycle and support Verdantas'turnkey geotechnical and materials services. Verdantas Inc. is an engineering firm dedicated to providing our clients with expertise in engineering consulting, the environment, and its supporting infrastructure. Founded in 2020 and employing more than 1,500 professionals in 46 states, Verdantas has grown exponentially in the last four years, strategically acquiring firms including Southern California's premier geotechnical consultant, A6ii Leighton Consulting, Inc. With the addition of Leighton's legacy team, Verdantas has the advantage of more than 63 years of experience delivering industry lead- ing geotechnical engineering, environmental consulting, and materials testing and inspection services to local communities. BASHIR SAIID Our team has geotechnical expertise for design and construction of new and PE, Associate Engineer, Group Leader improvement public projects including, but not limited to, community parks, sports fields, conservation preserves, pedestrian/bike trails, flood control Company: channels, and creeks. Verdantas has worked in the City of Palm Desert serving on projects including the Berger Road Improvement Project and the San Pablo a rd a etas Corridor Improvements Project, as well as other projects within the city including College of the Desert and University Park. Relevant Projects: Project Role: Winchester Sports Park— Riverside, CA Project Geologist -Performed geologic Project Geologist, Project investigation for this 32-acre $28.3-million, County of Riverside public park that Engineer includes four baseball fields, seven soccer fields, four basketball courts, two tennis courts, six pickleball courts, open lawns, playground, six shade structures, LICENSES/ eleven shade sails, picnic areas, Salt Creek trail, concessions building, restrooms, entry monument signage, maintenance yard, storm water management CERTIFICATIONS bioretention, and parking. CA — Civil Engineer - #93187 Palma Village Park Renovations — Palm Desert, CA Project Geologist. CFR 1910.120 OSHA 40-Hour Training Performed geologic investigation for the proposed improvements at Palma Village Park, which included a new gazebo and improvements. CFR 1910.120 OSHA 8-Hour Refresher Training Sports Ranch at Sommers Bend — Temecula, CA Project Engineer. Performed the geotechnical exploration for the design and construction of a new CPN Nuclear Gauge Certification community sports park. Conducted senior quality review of the geological aspect of the geotechnical report. The 20-acre park boasts two baseball fields, two Confined Space Entry Training soccer fields, two basketball courts, a new playground multiple pavilion shelters with picnic tables, benches, and BBQs. EDUCATION Del Webb at Rancho Mirage Active Adult Community — Rancho Mirage, BS, Mathematics, University at Albany CA. Project Engineer during the geotechnical investigations to support design options and City of Rancho Mirage requirements. The geotechnical studies comprised of drilled test borings and test pits to further refine soil conditions and related grading recommendations for both onsite and offsite improvements. The 484-acre site will be home to a 1,200+ unit active adult community inclusive of a community park and pedestrian trail and bridge. STATEMENT OF QUALIFICATIONS EXPERIENCE Ken has been in the electrical field for more than 40 years with experience in both construction as well as electrical engineering design. For the last 20 years, he has been working on the engineering side of the industry with an emphasis in lighting design. His actual field experience has given him a tremendous edge over his competition in that he knows firsthand HOW an electrical system is installed, which he is then able to more clearly translate this to the design documents. This approach has enabled him to keep costly change orders down to a minimum for his client's benefit. Ken serves as Vice President of the IES in San Diego. Ken's experience has caught the attention of many municipal agencies and has been called upon to offer expert advice on lighting ordinances as well as lighting design guide criteria. He also serves as a lighting judge for certain venues and teaches outdoor Lighting Fundamentals for the San Diego chapter of the IESNA. Since our establishment in 2004, Visual Concepts Lighting, Inc., stands as a leading full -service electrical engineering firm, dedicated to the intricate art of sustainable lighting design. While our capabilities span the entire spectrum of electrical engineering, we have honed our focus and expertise on outdoor lighting, epitomizing a 'Fusion of Light' that transforms spaces —from high -end residential landscapes to picturesque streetscapes and dynamic municipal ball fields. At Visual Concepts Lighting, our design philosophy is rooted in a seamless journey, guiding clients from lighting concept to construction -ready plans. With a robust foundation of over 30 years of hands-on electrical field experience and a cumulative 45 years of design prowess, we are committed to delivering designs that align with the true intent of our clients. Our approach aims to eliminate costly change orders, ensuring the successful realization of efficient and effective electrical systems. Visual Concepts has a rich history in working with many municipal agencies across Southern California for on -call engineering services. Relevant Projects include: • Arts & Music Line — La Quinta, Coachella, and Indio, CA • Civic Center Park - Palm Desert, CA • Freedom Park - Palm Desert, CA • Randall Henderson Trailhead - Palm Desert, CA • Fritz Burns Park - La Quinta, CA • Harvest Park (County of San Diego) — Valley Center, CA • Park Circle — Valley Center, CA • Santa Rosa Plateau Visitor Center Project— Murrieta, CA • Sports Ranch at Sommer Bend —Temecula, CA • The Griffin Club Recreation Center— La Quinta, CA • Winchester Sports Park - Riverside, CA • Fosia Park —Carson, CA KEN PEREZ SR. President Company: Project Role: Lighting/Electrical Engineering CERTIFICATIONS Lighting applications certification (AGI-32) thru "Lighting Analyst Inc" Lighting fundamentals thru "Illumination Engineering Society of North America" UCSD-1998, HVAC, DDC Controls Certification MEMBERSHIPS IES-Illumination Engineering Society — Past Vice President for over 5 years EDUCATION Mesa College, 1978, National Electrical Code • Oasis Street Beautification Streetscape — Indio, CA • SDSU Snapdragon Stadium Parks — San Diego, CA On -going classes in lighting fundamental, applications, Title-24 and LIBC, NEC, CEC STATEMENT OF QUALIFICATIONS STATEMENT OF QUALIFICATIONS I��J— CJ E LANDSCAPE 1 ARCHITECTURE, INC Disclosure: Tim Jachlewski, President, PLA, ASLA, Landscape Architect (CA) LLA #4547, (NC) LLA #2341, (NY) RLA #001646, (TX) RLA#4029, (AZ) RLA #83714, (GA) #LA002046 In -Site Landscape Architecture, Inc. affirmatively states there is no negative history of any alleged significant prior or ongoing agreement failure, any civil or criminal litigation or investigation pending, which involved the proposer or in which the proposer has been judged guilty or liable within the last five (5) years. Sincerely, Tim Jach ewski,` resident, PLA, ASLA CALIFORNIA NORTH CAROLINA NEW YORK (P.C.) 2907 Shelter Island Dr, #105-417 8209 Market St, Ste A-264 PO Box 356 San Diego, CA 92106 Wilmington, NC 28411 Orchard Park, NY 14127 619-795-7603 910-617-8254 716-508-8341 www.insitelandarch.com 96 ACKNOWLEDGMENT OF INSURANCE REQUIREMENTS LANDSCAPE ARCHr ECTURE INC 4auigra CALItORNIA ATTACHMENT 2 INSURANCE REQUIREMENTS ACKNOWLEDGEMENT Must be executed by proposer and submitted with the proposal Timothy Jachlewski Jr In -Site Landscape Architecture, Inc. (name) hereby acknowledge and confirm that (name of company) has reviewed the City's indemnification and minimum insurance requirements as listed in Exhibits E and F of the City's Agreement for Contract Services (Attachment 1); and declare that insurance certificates and endorsements verifying compliance will be provided if an agreement is awarded. I am President of In -Site Landscape Architecture, Inc. (Title) (Company) Commercial General Liability (at least as broad as ISO CG 0001): ® $1,000,000 per occurrence/$2,000,000 aggregate OR ❑ $2,000,000 per occurrence/$4,000,000 aggregate ❑ $5,000,000 per occurrence/$5,000,000 aggregate Must include the following endorsements: General Liability Additional Insured General Liability Primary and Non-contributory Commercial Automobile Liability (at least as broad as ISO CA 0001): ® $1,000,000 combined single limit for bodily injury and property damage ® Auto Liability Additional Insured Workers' Compensation (per statutory requirements): ® Statutory Limits / Employer's Liability $1,000,000 per accident or disease Must include the following endorsements: Workers' Compensation Endorsement with Waiver of Subrogation; OR Workers' Compensation Declaration of Sole Proprietor (if applicable) Professional Liability (Errors and Omissions): ® Errors and Omissions liability insurance with a limit of not less than $1,000,000 per claim Cyber Liability ❑ $1,000,000 per occurrence/$2,000,000 aggregate Page 11of15 AFRO® CERTIFICATE OF LIABILITY INSURANCE DATE(MM/DDIYYYY) 03/05/2026 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT Marilyn Bagby NAME: Lowe-Tillson Insurance & Assoc. PHONE o Ext : (301) 258-7773 (A/CC, No): (301) 258-5111 No, 2403 Research Boulevard E-MAIL mbagby@lowetillson.com ADDRESS: INSURER(S) AFFORDING COVERAGE NAIC # Suite 350 INSURERA: Pacific Employers Insurance Company 22748 Rockville MD 20850-3778 INSURED INSURER B : Hartford Casualty 29424 In -Site Landscape Architecture INSURER C : Hartford Fire 19682 2907 Shelter Island Drive INSURER D : #105-417 INSURER E : San Diego CA 92106 INSURER F : COVERAGES CERTIFICATE NUMBER: CL2622344463 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACTOR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR LTR TYPE OF INSURANCE INSD WVD POLICY NUMBER POLICY EFF (MMIDDIYYYY) POLICY EXP (MMIDD/YYYY) LIMITS X COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE $ 2,000,000 CLAIMS -MADE � OCCUR DAMAGE PREM SESO(Ea occurrence) $ 1,000,000 _7RETED MED EXP (Any one person) $ 5,000 PERSONAL&ADV INJURY $ 2,000,000 A D96634286 11/15/2025 11/15/2026 GEN'LAGGREGATE LIMITAPPLIES PER: GENERAL AGGREGATE $ 4,000,000 POLICY JECT LOC PRODUCTS - COMP/OP AGG $ 4,000,000 Employee Benefits $ OTHER: AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT (Ea accident) $ 1,000,000 BODILY INJURY (Per person) $ ANY AUTO A OWNED SCHEDULED AUTOS ONLY AUTOS D96634286 11/15/2025 11/15/2026 BODILY INJURY (Per accident) $ X PROPERTY DAMAGE (Per accident) $ HIRED X NON -OWNED AUTOS ONLY AUTOS ONLY UMBRELLA LIAB OCCUR EACH OCCURRENCE $ HCLAIMS-MADE AGGREGATE $ EXCESS LIAB DED I I RETENTION $ $ B WORKERS COMPENSATION Y / N AND EMPLOYERS' LIABILITY ANY PROPRIETOR/PARTNER/EXECUTIVE OFFICER/MEMBER EXCLUDED? (Mandatory in NH) N / A 42WECAX9BA4 04/29/2026 04/29/2027 �/ PER OTH- X STATUTE ER E.L. EACH ACCIDENT 1,000,000 $ E.L. DISEASE - EA EMPLOYEE $ 1,000,000 If yes, describe under DESCRIPTION OF OPERATIONS below E.L. DISEASE - POLICY LIMIT 1,000,000 $ Per Claim Limit $1,000,000 C Professional Liability -Claims Made -Full Prior Acts-3/6/2023. 420HO511930 03/06/2026 03/06/2027 Aggregate -All Claims $2,000,000 Retention -Per Claim/Agg $5,000/$15,000 DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required) CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN Insured's Proof of Coverage ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE /K . @ 1988-2015 ACORD CORPORATION. All rights reserved. ACORD 25 (2016/03) The ACORD name and logo are registered marks of ACORD STATEMENT OF QUALIFICATIONS NON -COLLUSION AFFIDAVIT FORM Must be executed by proposer and submitted with the proposal Timothy Jachlewski Jr 4auigra CALItORNIA ATTACHMENT 3 (name) hereby declare as follows: I am President of In -Site Landscape Architecture, Inc. (Title) (Company) the party making the foregoing proposal, that the proposal is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the proposal is genuine and not collusive or sham; that the proposer has not directly or indirectly induced or solicited any other proposer to put in a false or sham proposal, and has not directly or indirectly colluded, conspired, connived, or agreed with any proposer or anyone else to put in a sham proposal, or that anyone shall refrain from proposing; that the proposer has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the proposal price of the proposer or any other proposer, or to fix any overhead, profit, or cost element of the proposal price, or of that of any other proposer, or to secure any advantage against the public body awarding the agreement of anyone interested in the proposed agreement; that all statements contained in the proposal are true; and, further, that the proposer has not, directly or indirectly, submitted his or her proposal price or any breakdown thereof, or the contents thereof, or divulged information or data relative hereto, or paid, and will not pay, any fee to any corporation, partnership, company, association, organization, proposal depository, or to any member or agent thereof to effectuate a collusive or sham proposal. I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct. Proposer Signature: Proposer Name: Proposer Title: Company Name: Address: Timothy Jachlewski Jr President In -Site Landscape Architecture, Inc. 2907 Shelter Island Drive #105-417 San Diego, CA 92106 Page 12of15 STATEMENT OF QUALIFICATIONS ATTACHMENT 4 ACKNOWLEDGEMENT OF RECEIPT OF ADDENDA Must be executed by proposer and submitted with the proposal; If no addenda has been issued, mark "N/A" under Addendum No. indicating Not Applicable and sign ADDENDUM NO. I SIGNATURE INDICATING RECEIPT 1 Timothy Jachlewski Jr President Page 13 of 15 DATE: May 12, 2026 taQaiicra it, _ TO: All Prospective On -Call Landscape Architecture Services RE: RFP On -Call Landscape Architecture Services ADDENDUM NUMBER 1 The following shall be considered as incorporated into the Request for Proposal (RFP) for the above - referenced services. Portions of RFP not specifically mentioned in this Addendum remain in force. ■ REQUEST FOR PROPOSAL Question 1: Is there a page limit for the proposal? If so, do table of contents and section dividers count towards the limit? Answer 1: No, there is not a page limit for the proposal. Question 2: In section II, item #7, the RFP states "Processing assigned projects for the City entitlement." Can you please elaborate on what the responsibilities of the consultant will be for this service? Answer 2: The scope of the work would include preparing exhibits, plans, and calculations as needed to receive the various department permits or approvals for a project. An example would be for a new park where the Public Works Department would need to work with Planning on the requirements for the new park like parking spaces and with the Building Department on the potential buildings like a restroom. Question 3: In section III, item #2, (j), the RFP is asking for a project schedule. It is challenging to provide this without knowing the scope of the project. Can you please provide a sample project on which to base a project schedule? Answer 3: This can be removed from the proposal requirements. See below for revised. Request for Proposal (Page 8) - Section III. Proposal Format, Item No. 2, Currently reads: 2. Firms Background, Qualifications, and Experience, including the following: (a) Number of years in business (b) Taxpayer identification number (c) Number of years planning, construction, and design services (d) Resumes of the Project Manager and key personnel who will be responsible for performance if any agreement results from this RFP IV orm a Tampico I la 0 0omla 922531160.117.1000 I wwrw.laquntaa.gov ta �W , I %I IF, IR" A. - (e) Firm ownership and if incorporated, list the state in which the firm is incorporated and the date of incorporation (f) If the firm is a subsidiary of a parent company, identify the parent company (g) Statement of Qualifications — A listing of proposed personnel, including personal experiences and individual resumes for prime and sub -consultants. Consultant's and sub -consultant experience with similar work, including names and current phone numbers of reference for listed projects. (h) Project Understanding and Approach — A description of the firm's project understanding and how the consultant team will approach the project. (i) Scope of Work — A description of the tasks, sub -tasks, and deliverables that will be provided. The Scope of Work should be presented in a logical format that can be easily attached to the Professional Services Agreement. (j) Project Schedule — A comprehensive Gantt Chart schedule is to be submitted describing the nature and scheduling of proposed tasks and reflecting July 1, 2026 as the start date. Request for Proposal (Pape 8) - Section III. Proposal Format, Item No. 2, is revised to read: 2. Firms Background, Qualifications, and Experience, including the following: (a) Number of years in business (b)Taxpayer identification number (c) Number of years planning, construction, and design services (d) Resumes of the Project Manager and key personnel who will be responsible for performance if any agreement results from this RFP (e) Firm ownership and if incorporated, list the state in which the firm is incorporated and the date of incorporation (f) If the firm is a subsidiary of a parent company, identify the parent company (g) Statement of Qualifications — A listing of proposed personnel, including personal experiences and individual resumes for prime and sub -consultants. Consultant's and sub -consultant experience with similar work, including names and current phone numbers of reference for listed projects. (h) Project Understanding and Approach — A description of the firm's project understanding and how the consultant team will approach the project. (i) Scope of Work — A description of the tasks, sub -tasks, and deliverables that will be provided. The Scope of Work should be presented in a logical format that can be easily attached to the Professional Services Agreement. Question 4: In section III, item #4, the RFP is asking for a complete pricing list (or fee schedule). It is challenging to provide this without knowing the scope of the project. Can you please provide a sample project on which to base a fee? Answer 4: This would be a pricing list of the hourly wage and other expenses. See below for example: taQaLItra CALIFORNIA - NORMAL HOURLY RATES Principal Landscape Architect/Principal Planner..................................................................$= per hour LandscapeArchitect..............................................................................................................._ per hour Project Manager/Associate...................................................................................................._per hour Irrigation Designer......................................................................................................... ..._ per hour SeniorDesigner......................................................................................................................_per hour Professional Staff / Specification Writer..................................................................................M per hour Designer...................................................................................................................................= per hour Draftsperson.................................................................................................. .....=per hour ...................... Administrative Staff.......................................................................................................=per hour OUTSIDE CONSULTANTS Services of outside consultants not listed in this proposal, at our direct cost, plusWo of the actual cost of their services for coordination. REI MBURSABLES Reimbursable items, such as the cost of reprographic services, soil samples, and travel outside the Coachella Valley will be charged at our cost plusw.. RATE INCREASES Due to increases in wages/benefits, fees and hourly rates are subject to an annual increase based on the Consumer Price Index (CPI-U) published by the Bureau of Labor Statistics. Question 5: Under the Submission Requirements, it says the "Proposals must be submitted via email, hand delivery, or mail", and also says "Submit (1) paper original in a sealed envelope and email an electronic original, as a single document in a .PDF format..." Can you please confirm if the City is okay with one submittal type, either just an emailed copy, or just a hand delivered /hardcopy, or does the City want both submittal versions, an emailed and hand delivered /hardcopy? Answer 5: Submit both an email submittal and one (1) hardcopy. Question 6: Section 111.2(i) requests a description of tasks, sub -tasks, and deliverables that will be provided. Due to the on -call nature of this contract, specific task order scope and scheduling cannot be identified at this point. What would the City like to receive from proposers for this section? taQaiicr� Answer 6: Please provide a description for the various scope items that the City would receive as part of a typical landscape improvements project. For example scope would be provided for Project Management, Master Planning, Plan Preparation, Bid and Construction Support. Question 7: The RFP states the City may contract with one or more firms. Is there a target number of firms the City intends to select, and will selected firms be placed on a rotation or will task orders be assigned at the City's discretion? Answer 7: The City will select one (1) to three (3) consultants. Task orders will be assigned at the City's discretion. Question 8: What are the City's top three priority projects under this On -Call contract? Answer 8: Master Planning and Execution of Citywide Irrigation Improvements; Master Planning and Execution of Dog Parks; and the Expansion and Improvements to Existing Parks and Parkways. The Consultant is hereby notified, Addendum No. 1 must be acknowledged as required under Section 6, Addenda and submitted as part of the RFP. Failure to acknowledge and incorporate addenda will not relieve the proposer from the responsibility to meet all terms and conditions of the RFP and any subsequent addenda. APPROVED: 71L ,4 ,�Jba A n Jr. (May 12, 2026 15:38:23 PDT) Ubaldo Ayon Assistant Construction Manager END OF ADDENDUM NUMBER 1