Loading...
HomeMy WebLinkAboutBRES2024-0195BUILDING PERMIT DESIGN & DEVELOPMENT PHONE (760) 777-7125 DEPARTMENT Q"fra WWW.LAQUINTACA.GOV 78-495 CALLE TAMPICO APPLIED DATE: 05/08/2024 ta LA QUINTA, CALIFORNIA 92253 ISSUED DATE: 09/30/2025 CALIFORNIA Permit Type: Building Residential Owner: Casey Chapman Permit Number: BRES2024-0195 53220 AVENIDA JUAREZ, LA QUINTA, CA 92253 Property Address: 53220 AVENIDA JUAREZ Applicant: Casey Chapman APN: 774041010 1238 Via Candelas, Oceanside, CA 92056 Legal Description Lot 15 MB 19/30 SANTA CARMELITA VALE Contractor: Property Zoning: *(�NTA UNIT 18 Valuation: $20,000.00 PRIOR TO THE ISSUANCE OF THIS PERMIT FOR CONSTRUCTION, ALTERATION, IMPROVEMENT, DEMOLITION, OR REPAIR THE OWNER, APPLICANT AND/OR CONTRACTOR UNDER PENALTY OF PERJURY HAVE AFFIRMED WHEN APPLICABLE, THROUGH THE SUBMITTAL OF FORMS OR BY OTHER ELECTRONIC MEANS, THE FOLLOWING: LICENSED CONTRACTOR OR OWNER -BUILDER DECLARATION (1 or 2) 1) They are licensed under provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code, and the referenced License is in full force and effect, or; 2) That they are exempt from the Contractors' State License Law for the reason(s) indicated by either (2)(a) and/or (2)(b), or (2)(c) where he or she is exempt from licensure by a valid exemption. [Section 7031.5, Business and Professions Code: Any city or county that requires a permit to construct, alter, improve, demolish, or repair any structure, prior to its issuance, also requires the applicant for the permit to file a signed statement that he or she is licensed pursuant to the provisions of the Contractors' State License Law (Chapter (commencing with Section 7000) of Division 3 of the Business and Professions Code] Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($500).) a) As owner of the property, or my employees with wages as their sole compensation, will do all of or portions of the work, and the structure is not intended or offered for sale (Section 7044, Business and Professions Code: The Contractors' State License Law does not apply to an owner of property who, through employees' or personal effort, builds or improves the property, provided that the improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the Owner -Builder will have the burden of proving that it was not built or improved for the purpose of sale.). b) As owner of the property, will be exclusively contracting with licensed c) Are exempt from licensure under the Contractors' State License Law. As an Owner -Builder, they acknowledge that, except for their personal residence in which they must have resided in for at least one year prior to completion of the improvements covered by this permit, they cannot legally sell a structure built as an owner -builder if it has not been constructed in its entirety by licensed contractors. It is understood that a copy of the applicable law, Section 7044 of the Business and Professions Code, is available upon request when this application was submitted at the following Web site: http://www.leginfo.ca.gov/calaw.htm1. DECLARATION REGARDING CONSTRUCTION LENDING AGENCY (If applicable) A construction lender will be used for completion of the improvements covered by this permit and the name and information of which is on file for public inspection during the regular business hours of the public entity. Failure of the applicant to indicate the construction lender on the application does not relieve that person of the requirement to give the construction lender preliminary notice from that duty. WORKERS' COMPENSATION DECLARATION (1, 2 or 3) WARNING: FAILURE TO SECURE WORKERS' COMPENSATION COVERAGE IS UNLAWFUL, AND SHALL SUBJECT AN EMPLOYER TO CRIMINAL PENALTIES AND CIVIL FINES UP TO ONE HUNDRED THOUSAND DOLLARS ($100,000), IN ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN SECTION 3706 OF THE LABOR CODE, INTEREST, AND ATTORNEY'S FEES. 1) Has and will maintain a certificate of consent to self -insure for workers' compensation, issued by the Director of Industrial Relations as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. 2) Has and will maintain workers' compensation insurance, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. 3) Certifies that, in the performance of the work for which this permit is issued, shall not employ any person in any manner so as to become subject to the workers' compensation laws of California, and agree that, if should become subject to the workers' compensation provisions of Section 3700 of the Labor Code, shall forthwith comply with those provisions. NOTICE TO APPLICANT (1, 2 and 3) 1) Each person upon whose behalf this application was made, each person at whose request and for whose benefit work is being performed under or pursuant to any permit issued as a result of this application, the owner, and the applicant, each agrees to, and shall defend, indemnify and hold harmless the City of La Quinta, its officers, agents, and employees for any act or omission related to the work being performed under or following issuance of this permit. 2) Any permit issued as a result of this application becomes null and void if work is not commenced within 360 days from date of issuance of such permit, or if cessation of work for 180 days will subject permit to cancellation. On or after January 1, 2019, every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 12 months after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 12 months after the time the work is commenced. 3) Certified that they read the application and state that the information provided is correct. Agree to comply with all city and county ordinances and state laws relating to building construction, and hereby authorize representatives of this city to enter upon the above -mentioned property for inspection purposes. IMPORTANT: An Application for Permit was made to the Building Official, subject to the conditions and restrictions set forth at the time of application, which is now hereby an Issued Permit. If any part of the information being supplied on this permit is inaccurate or untrue, please contact the City of La Quinta at (760) 777-7125 immediately for correction. Printed: 7/13/26 10:30 am Page 1 of 5 BUILDING PERMIT Permit Type: Building Residential Permit Number: BRES2024-0195 Property Address: 53220 AVENIDA JUAREZ REMODEL/ REPLACE WINDOWS THRU OUT DWELLING + INSTALL NEW ELECTRIC FIRE PLACE AT LIVING ROOM AREA + KITCHEN REMODEL+ ATTACHED SIDE COVER PATION + PANORAMIC WINDOW AT LIVING ROOM AREA[ENGINEERING] 2022 CALIFORNIA BUILDING CODES.. REVISION 1- REVISED STRUCTURAL DESIGN FOR ATTACHED COVER PATIO [ENGINEERING] 2022 CALIFORNIA BUILDING CODES. Residential Work Type Remodel Conditioned Square 1779 Garage Square 450 Footage Footage Fire Sprinkler Square 0 Code Edition 2022 Number of Floors 1 Footage Number of Bedrooms 3 Original Valuation 20000.00 Number of 30 Receptacle/Switch/L ig ht(s) Temporary Power No Service? Number of Water 1 Heater(s) Sewer Connection? No Was the Density No Bonus applied to this project? Is this a Student No Housing Development? City Limits Within La Quinta Limits Centerlines 100632 Number of Units 1 Remodel Area Square 1779 Footage Number of Residential 3 Appliances Number of Forced Air 0 Furnace(s) Water System Install No or Alteration? Septic System? No Residential Cove Development Name (No longer in Use) Zoning RC Grading Required? No Number of 11 Door/Window Retrofit/Repair Electrical Service? No Number of Plumbing 13 Fixtures/Traps Back Flow Prevention No Device? Is it Renter or Owner Owner Occupied? Is this Project No considered infill? General Plan MHDR Subdivision Name SANTA CARMELITA VALE Lot Number LA QUINTA UNIT 18 Lot Size 696.879 Legal Description Type Group Sq Ft Value III Lot 15 MB 19/30 SANTA CARMELITA VALE LA QUINTA UNIT 18 Printed: 7/13/26 10:30 am Page 2 of 5 Permit Type Building Residential BUILDING PERMIT Permit Number: Property Address BRES2024-0195 53220 AVENIDA JUAREZ Invoice No. Fee Fee Amount Amount Paid INV-00014988 Plan Check/Permit Extension Processing $122.66 $122.66 Total for Invoice INV-00014988 $122.66 $122.66 INV-00017492 Remodel Each Additional 500SF PC $87.88 $87.88 Building Staff Time $915.00 $915.00 Fixture/Trap PC $198.38 $198.38 Building Standards Administration $1.00 $1.00 Appliances, Residential $45.78 $45.78 Receptacle, switch, lighting, or other outlets PC $38.11 $38.11 Door/Window, Retro/Repair PC $75.06 $75.06 Digital Archiving and Records Management Fee $23.00 $23.00 Water Heater/Vent PC $9.15 $9.15 Remodel PC (< 100) $170.25 $170.25 SMI - Residential $2.60 $2.60 Fixture/Trap $198.38 $198.38 Building Staff Time $183.00 $183.00 Receptacle, switch, lighting, or other outlets $61.01 $61.01 Remodel Each Additional 500SF $109.84 $109.84 Appliances, Residential PC $45.78 $45.78 Technology Enhancement Fee $8.00 $8.00 Water Heater/Vent $15.26 $15.26 Door/Window, Retro/Repair $89.70 $89.70 Remodel (< 100) $62.24 $62.24 Total for Invoice lNV-00017492 $2,339.42 $2,339.42 INV-00018686 Hourly Charge - City Building Staff $183.00 $183.00 Hourly Charge - Bureau Veritas Structural 2023 $217.50 $217.50 Total for Invoice lNV-00018686 $400.50 $400.50 INV-00020252 Re -Inspection Fee $91.53 $91.53 Total for Invoice lNV-00020252 $91.53 $91.53 Grand Total for Permit $2,954.11 $2,954.11 Workflow Step / Action Name Action Type Start Date End Date Revisions v.1 10/02/2025 0:00 11/03/2025 10:22 ----------------------------------------------------------------------------------------------------------------------------------------- Building Revision Review v.1 Receive Submittal 10/02/2025 0:00 10/14/2025 14:20 ----------------------------------------------------------------------------------------------------------------------------------------- Building Revision Review v.2 Receive Submittal 10/17/2025 0:00 11/03/2025 10:22 Application Completeness Check v.1 05/09/2024 14:16 05/16/2024 10:37 ----------------------------------------------------------------------------------------------------------------------------------------- Submittal Document Verification v.1 Generic Action 05/09/2024 14:16 Plan Check v.1 05/16/2024 0:00 07/24/2025 9:46 ----------------------------------------------------------------------------------------------------------------------------------------- Building Review v.1 Receive Submittal 05/16/2024 0:00 05/24/2024 9:29 ----------------------------------------------------------------------------------------------------------------------------------------- Building Review v.2 Receive Submittal 07/01/2024 0:00 07/22/2024 8:37 ----------------------------------------------------------------------------------------------------------------------------------------- Building Review v.3 Receive Submittal 08/14/2024 0:00 09/17/2024 17:10 ----------------------------------------------------------------------------------------------------------------------------------------- Building Review v.4 Receive Submittal 11/06/2024 0:00 11/22/2024 16:23 ----------------------------------------------------------------------------------------------------------------------------------------- Building Review v.5 Receive Submittal 01/28/2025 0:00 02/06/2025 16:56 ----------------------------------------------------------------------------------------------------------------------------------------- Building Review v.6 Receive Submittal 04/01/2025 0:00 04/22/2025 10:09 Printed: 7/13/26 10:30 am Page 3 of 5 BUILDING PERMIT Permit Type: Building Residential Permit Number: BRES2024-0195 Property Address: 53220 AVENIDA JUAREZ Building Review v.7 Receive Submittal 05/30/2025 0:00 06/19/2025 9:03 ----------- - - - - - ------ Building Review v.8 ------------------------ Receive Submittal - - - - 07/08/2025 - - - 0:00 - - - - - - - - - - 07/24/2025 9:46 Permit Issuance v.1 07/24/2025 9:48 09/30/2025 7:50 ----------------------------------------------------------------------------------------------------------------------------------------- Contractor / Owner -Builder Information v.1 Generic Action 07/24/2025 9:48 ----------------------------------------------------------------------------------------------------------------------------------------- Verify & Invoice Fees v.1 Generic Action 09/15/2025 8:47 ----------------------------------------------------------------------------------------------------------------------------------------- Ready to Issue v.1 Generic Action 09/30/2025 7:49 ----------------------------------------------------------------------------------------------------------------------------------------- Verify Fee Payment & Issue Permit v.1 Generic Action 09/30/2025 7:49 ----------------------------------------------------------------------------------------------------------------------------------------- Print, Attach, and Email Building Permit v.1 Create Report 09/30/2025 7:50 09/30/2025 7:50 Inspections - Do Not Pour Concrete Until Approved v.1 ----------------------------------------------------------------------------------------------------------------------------------------- 09/30/2025 0:00 Setbacks v.1 Inspection ----------------------------------------------------------------------------------------------------------------------------------------- Underground Plumbing v.1 Inspection ----------------------------------------------------------------------------------------------------------------------------------------- Water Line v.1 Inspection ----------------------------------------------------------------------------------------------------------------------------------------- Footing v.1 Inspection 09/30/2025 0:00 09/30/2025 16:55 ----------------------------------------------------------------------------------------------------------------------------------------- Footing v.2 Inspection 11/05/2025 0:00 11/06/2025 13:33 ---------------------------------------------------------------------------- Footing v.3 - - - - - - ------------ Inspection - - ---------- 11/10/2025 0:00 - - - - - - - --- 11/12/2025 14:41 ----------------------------------------------------------------------------- Slab v.1 - - - - ---------------- Inspection - - ---------- - - - - - - - --- Inspections - Cover No Work Until Approved v.1 09/30/2025 0:00 ----------------------------------------------------------------------------- Roof Nail v.1 - - ---------------------------------------- Inspection - - - - - --- ----------------------------------------------------------------------------- Okay to Wrap v.1 - - Inspection - - ------------------------------------------------------------------------ Framing v.1 - - - - - - - - - Inspection - - - - - - - ----- 09/30/2025 - 0:00 - - - - - - - - - - 09/30/2025 16:56 - - ------------------------------------------------------------------------ Framing v.2 - - - - - - - - - Inspection - - - - - - - - 12/16/2025 ----- 17:03 - - - - - - - - - - 12/17/2025 12:18 - - ------------------------------------------------------------------------ Framing v.3 - - - - - - - - - Inspection - - - - - - - - 01/02/2026 - - - 16:10 - - - - - - - - - - 01/05/2026 8:52 --------------------------------------------------------------------------- Framing v.4 Inspection 01/12/2026 0:00 01/13/2026 14:46 - - - ---------------- - - - - - - - - - - - - - - - - - - - Framing v.5 - - - - - - - - - - - - - - - - - Inspection - - - - - - - - 01/14/2026 - - - 0:00 - - - - - - - - - - 01/15/2026 15:07 --- ------------------------------------------------------------------------ Framing v.6 - - - - - - - - - Inspection - - - - - - - ----- 02/12/2026 - 0:00 - - - - - - - - - - 02/13/2026 11:57 --- ------------------------------------------------------------------------ Framing v.7 - - - - - - - - - Inspection - - - - - - -------- 02/19/2026 0:00 - - - - - - - - - - 02/20/2026 12:49 ----------------------------------------------------------------------------------------------------------------------------------------- Rough Electrical v.1 Inspection ----------------------------------------------------------------------------------------------------------------------------------------- Rough Mechanical v.1 Inspection ----------------------------------------------------------------------------------------------------------------------------------------- Rough Plumbing v.1 Inspection ----------------------------------------------------------------------------------------------------------------------------------------- Rough Fire Clearance Bldg v.1 Inspection ----------------------------------------------------------------------------------------------------------------------------------------- Shower Pan v.1 Inspection ----------------------------------------------------------------------------------------------------------------------------------------- Insulation v.1 Inspection ----------------------------------------------------------------------------------------------------------------------------------------- Drywall Nail v.1 Inspection ----------------------------------------------------------------------------------------------------------------------------------------- Exterior Lath v.1 Inspection ----------------------------------------------------------------------------------------------------------------------------------------- Gas Test v.1 Inspection ----------------------------------------------------------------------------------------------------------------------------------------- Sewer Connection v.1 Inspection Inspections - Masonry v.1 Inspections - Electrical for Meter Release v.1 ------------------------ - - ---------------------------------------------- - - - - ------------------------------------------------ - Temporary Power v.1 Inspection ---------------------------------------------------------------------------- - - - ----------------------------------------------------- Temp Use of Permanent Power v.1 Inspection Inspections - Final v.1 02/27/2026 15:58 03/09/2026 7:50 - - - - ------------------------ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Final Building v.1 Inspection 02/27/2026 15:58 03/02/2026 12:01 - - - - ------------------ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Final Building v.2 Inspection 03/05/2026 0:00 03/09/2026 7:50 to of inry v.1 Printed: 7/13/26 10:30 am Page 4 of 5 Permit Type: Building Residential BUILDING PERMIT Permit Number: BRES2024-0195 Property Address: 53220 AVENIDA JUAREZ Create Report Construction or work for which a permit is required shall be subject to inspection by the building official and such construction or work shall remain visible and able to be accessed for inspection purposes until approved. Approval as a result of an inspection shall not be construed to be an approval of a violation of the provisions of the applicable code and other ordinances of the jurisdiction. Inspections presuming to give authority to violate or cancel the provisions of the applicable code and other ordinances of the jurisdiction shall not be valid. It shall be the duty of the owner or the owner's authorized agent to cause the work to remain visible and able to be accessed for inspection purposes. Neither the building official nor the jurisdiction shall be liable for expense entailed in the removal or replacement of any material required to allow inspection. It shall be the duty of the holder of the building permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspections of such work that are required by this code. A building or structure shall not be used or occupied in whole or in part, and a change of occupancy of a building or structure or portion thereof shall not be made, until the building official has issued a certificate of occupancy therefor as provided herein. Issuance of a certificate of occupancy shall not be construed as an approval of a violation of the provisions of the applicable code and other ordinances of the jurisdiction. Certificates presuming to give authority to violate or cancel the provisions of this code or other ordinances of the iurisdiction shall not be valid. A person shall not make connections from a utility, a source of energy, fuel, or power, or a water system or sewer system to any building or system that is regulated by the applicable code and other ordinances of the jurisdiction for which a permit is required, until approved by the building official. Printed: 7/13/26 10:30 am Page 5 of 5 Qaigr(v �C� CALIFORNIA Considering Becoming an Owner -Builder? Important information you need to know BEFORE pulling your permit! The term "Owner -Builder" can mean three different things: "Owner as Worker", "Owner as Contractor" or "Owner as Employer" Understand each has Benefits or Risk, and it is possible to combine them! Hiring a California Licensed Contractor means you do not personally perform any of the construction work, the permit is not taken out in your name, you are not personally responsible for the construction and you are not an Owner -Builder. Instead, you become a "Customer" and California law provides you the benefit of protection from poor workmanship, failure to finish the job and financial risk due to worker injury. Benefit/Risk: Highest Benefits and the Least amount of Risk Owner -as -Worker is a type of Owner -Builder where you personally perform the construction work, the permit is taken out in your name and you are personally responsible for the construction management, knowledge, workmanship, and completion of the job. You benefit by not paying others to perform this work for you and your risk depends on your own ability to complete the job successfully. Benefit/Risk: Possible Benefit with Low Financial Risk Owner -as -Contractor is a type of Owner -Builder where you personally act as your own General Contractor, the permit is taken out in your name and you hire California licensed sub -contractors to perform portions of the construction work. WARNING: The benefit of protection provided by law when you hire only California licensed sub- contractors can turn to serious financial risk if you hire unlicensed contractors to perform any the work. Benefit/Risk: Possible Benefit and Significant Financial Risk Owner -as -Employer is a type of Owner -Builder where you pay any individual to perform any construction work valued at more than $500.00, the permit is taken out in your name and you are personally responsible for their employment requirements, supervision, performance, safety and welfare while on your property. WARNING: Cost savings benefit can turn to serious financial risk if you fail to deduct payroll taxes or provide workers compensation insurance for each worker. Benefit/Risk: —.-...,.,_with Significant Financial Risk OWNERS BEWARE AND CONSIDER THE RISK BEFORE ACCEPTING FULL RESPONSIBILITY FOR YOUR CONSTRUCTION PERMIT For more information visit the California State License Board Website at http://www.cslb.ca.gov/ Page 1 of 4 Assembly Bill 2335 amends California Health and Safety Code, Section 19825, regarding disclosures and verifications required for all applicants seeking Owner -Builder construction permits. These new application requirements provide an enhanced level of consumer awareness and protection for property owners accepting the risks associated with Owner -Builder construction permits. "The Legislature hereby finds and declares that there is an urgent and statewide public interest in assuring that building contractors comply with the Contractors License Law... and provisions of law relating to Workers' Compensation Insurance for building construction, that property owners are informed about, and protected from, fraudulent representations, liability for worker's injuries, liability for material and labor costs unpaid by contractors, licensing requirements, and employer's tax liabilities when improving their property as owner -builders" THIS OFFICE WILL BE ENFORCING THESE REQUIREMENTS AS FOLLOWS: If Licensed Contractor is the Permit Holder Verify Applicant's License Applicability & Status (with CSLB) Prior to Issuing Permit Property Owner Protected by Contractors License Law New Construction Permit Application Who is to be the Responsible Party? (Permit Holder) Verify Property Owner's Identification & Signature Verify Property Owner's Designation & Signature on AUTHORIZED AGENT Form (if applicable) Property Owner is Legally Noticed by Owner -Builder Law If Property Owner is the Permit Holder Verify Property Owner's Acknowledgment & Approval to Assume Liability for the Construction Project, by Verifying Completion of the NOTICE TO PROPERTY OWNER Form Prior to Issuing Permit Page 2 of 4 t(v Qa 0 tr(v CALIFORNIA Disclosures & Forms for Owner -Builders Applying for Construction Permits IMPORTANT! NOTICE TO PROPERTY OWNER Dear Property Owner: An application for a building permit has been submitted in your name listing yourself as the builder of the property improvements specified at53220 Avenida Juarez We are providing you with an Owner -Builder Acknowledgment and Information Verification Form to make you aware of your responsibilities and possible risk you may incur by having this permit issued in your name as the Owner -Builder. We will not issue a building permit until you have read, initialed your understanding of each provision, signed, and returned this form to us at our official address indicated. An agent of the owner cannot execute this notice unless you, the property owner, obtain the prior approval of the permitting authority. OWNER's ACKNOWLEDGMENT AND VERIFICATION OF INFORMATION DIRECTIONS: Read and initial each statement below to signify you understand or verify this information. CC 1. 1 understand a frequent practice of unlicensed persons is to have the property owner obtain an "Owner - Builder" building permit that erroneously implies that the property owner is providing his or her own labor and material personally. I, as an Owner -Builder, may be held liable and subject to serious financial risk for any injuries sustained by an unlicensed person and his or her employees while working on my property. My homeowner's insurance may not provide coverage for those injuries. I am willfully acting as an Owner -Builder and am aware of the limits of my insurance coverage for injuries to workers on my property. CC 2 1 understand building permits are not required to be signed by property owners unless they are responsible for the construction and are not hiring a licensed Contractor to assume this responsibility. CC 3. 1 understand as an "Owner -Builder" I am the responsible party of record on the permit. I understand that I may protect myself from potential financial risk by hiring a licensed Contractor and having the permit filed in his or her name instead of my own. CC 4. 1 understand Contractors are required by law to be licensed and bonded in California and to list their license numbers on permits and contracts. CC 5. 1 understand if I employ or otherwise engage any persons, other than California licensed Contractors, and the total value of my construction is at least five hundred dollars ($500), including labor and materials, I may be considered an "employer" under state and federal law. CC 6. 1 understand if I am considered an "employer" under state and federal law, I must register with the state and federal government, withhold payroll taxes, provide workers' compensation disability insurance, and contribute to unemployment compensation for each "employee." I also understand my failure to abide by these laws may subject me to serious financial risk. CC 7 1 understand under California Contractors' State License Law, an Owner -Builder who builds single-family residential structures cannot legally build them with the intent to offer them for sale, unless all work is performed by licensed subcontractors and the number of structures does not exceed four within any calendar year, or all of the work is performed under contract with a licensed general building Contractor. CC $ 1 understand as an Owner -Builder if I sell the property for which this permit is issued, I may be held liable for any financial or personal injuries sustained by any subsequent owner(s) that result from any latent construction defects in the workmanship or materials. Page 3 of 4 CC 9 1 understand I may obtain more information regarding my obligations as an "employer" from the Internal Revenue Service, the United States Small Business Administration, the California Department of Benefit Payments, and the California Division of Industrial Accidents. I also understand I may contact the California Contractors' State License Board (CSLB) at 1-800-321-CSLB (2752) or www.cslb.ca.gov for more information about licensed contractors. cc 10. 1 am aware of and consent to an Owner -Builder building permit applied for in my name, and understand that I am the party legally and financially responsible for proposed construction activity at the following address: 53220 AVENIDA JUAREZ CC 11. 1 agree that, as the party legally and financially responsible for this proposed construction activity, I will abide by all applicable laws and requirements that govern Owner -Builders as well as employers. CC 12. 1 agree to notify the issuer of this form immediately of any additions, deletions, or changes to any of the information I have provided on this form. Licensed contractors are regulated by laws designed to protect the public. If you contract with someone who does not have a license, the Contractors' State License Board may be unable to assist you with any financial loss you may sustain as a result of a complaint. Your only remedy against unlicensed Contractors may be in civil court. It is also important for you to understand that if an unlicensed Contractor or employee of that individual or firm is injured while working on your property, you may be held liable for damages. If you obtain a permit as Owner -Builder and wish to hire Contractors, you will be responsible for verifying whether or not those Contractors are properly licensed and the status of their workers' compensation insurance coverage. Before a building permit can be issued, this form must be completed and signed by the property owner and returned to the agency responsible for issuing the permit. Note: A copy of the property owner's driver's license, form notarization, or other verification acceptable to the agency is required to be presented when the permit is issued to verify the property owner's signature. Signature of Property Owner: Date: 9/10/2025 Casey Chapman, Sole Member OPH Consultants LLC Note: The following Authorization Form is required to be completed by the property owner only when designating an agent of the property owner to apply for a construction permit for the Owner -Builder. AUTHORIZATION OF AGENT TO ACT ON PROPERTY OWNER'S BEHALF Excluding the Notice to Property Owner, the execution of which I understand is my personal responsibility, I hereby authorize the following person(s) to act as my agent(s) to apply for, sign, and file the documents necessary to obtain an Owner -Builder Permit for my project. Scope of Construction Project (or Description of Work): Project Location or Address: Name of Authorized Agent: Phone: Address of Authorized Agent: I declare under penalty of perjury that I am the property owner for the address listed above and I personally filled out the above information and certify its accuracy. Note: A copy of the owner's driver's license, form notarization, or other verification acceptable to the agency is required to be presented when the permit is issued to verify the property owner's signature. Signature of Property Owner: Date: Page 4 of 4 Q � z � � CY Q J LL 0 � � � V G 0 ƒ o § Eta /m\( (D m =�_ 32�\ �}&u o 0 m �#_� m=aE a) k�E z 2§§ / C 0 0 OL co (n * \ \ E /�°° _ �03 ®±�2 Lu z ; o.Eu §8± u (h .»E §E! u:2 .22 I}= -3a @§Ek \-)} \ ��� m M2/ LU co 2\ u2>_ .wes n a&§\ §tk m3m 22u tea§ 9\2 o- co C e < > \;2/ CN co U �§§\ LU > k§) 22\{ X/\\ @ k °Lo 04 ) ) z \ CL ] LU LU w k z m wy - / \ \ \ I- CD CDa . cc) CD j "0« cli j / ) ) LU z |$ ; CD (0 (0Z /E \ k \ \ \ �� k \ \ \ a \ \ \ \ L 2 z ) z ) z ƒ z ) \ \ 0 z z � Eu F- t t § �� \ \ \ / \ 3 f� �f \ \ \ \ in \ \ \ \ + � LL _ LL LL \ \lu } } \ \ \_ \ § . \ \ \ \ .j k f■4) 3 3 / 00 ��� CD \ ) \ z o § � ) � a( �® c = _ _ f / / { \ \ \ \ k m z z z z / / / / & / ] 2 2 ] ° \ \ < \ g g g g \ \ \ \ § 2 } 7 M \ \ § « } lu / ■ 2 / 2 u 4 - z - § § S § z k § z / ) j \ 2 LU 2 \ § ° ; § w § \ z 2 k- m z 2§ z LU\ LL� )§ § w k§- m 0 IL 2))\ 9L City of La Quinta Permit # BRES2024-0195 REV October 9, 2025BVNA# 28683381 Project Description: Trellis Revision Project Address: 53220 Avenida Juarez Application/ Permit #: BRES2024-0195 REV Occupancy: R-3 Type of Construction: V-B Sprinklers: - Stories: - Floor Area (s.f.): - Fire Hazard Severity Zone/ WUI:- Flood Zone: - Fire Alarm: - Bureau Veritas has completed the first plan review of the below listed documents on behalf of the City of La Quinta Building & Safety Department: GENERAL INSTRUCTIONS 1. This plan review has been made to verify conformance to minimum requirements of codes and ordinances adopted by the City of La Quinta. Codes in effect for this project include the 2022 editions of the California Building Code (CBC), California Residential Code (CRC), California Green Building Code (CGBC), California Plumbing Code (CPC), California Mechanical Code (CMC), California Electrical Code (CEC), and California Energy Code (CEnC). The CBC is based on the 2021 editions of the International Building Code, which was published by the International Code Council. The CPC and CIVIC are based on the 2021 edition of the Uniform Plumbing and Mechanical Codes, respectively, which were published by IAPMO. The CEC is based on the 2020 edition of the National Electrical Code published by the National Fire Protection Association (NFPA). Applicable code sections are referenced after each item in this list. 2. These plans and documents have been reviewed for compliance with the applicable code requirements and instructions of the jurisdiction. The stamping of these plans shall not be held to permit or be an approval of a violation of any applicable codes and/or standards nor relieve the owner, design professional of record or contractor of compliance with any applicable codes and/or standards. Plan review of documents does not authorize construction to proceed in violation of any federal, state, nor local regulation. 3. The review does not necessarily include errors and omissions. Complete compliance is the responsibility of the designer. 4. All comments shall be resolved on the plans prior to the recommendation to the governing body for approval. 5. The comments identified in other sections of this review require clarifications/corrections before this plan check can be completed. 6. For reference for explanations in the examiner's comment sections, italic text refers to the initial submittals, bold text on second submittals, and underlined text on third submittals. 7. Please annotate your response in the areas on each comment, please see the comment section, 8. Submit a list showing any changes to the plan or previously submitted documents that are not the result of the plan check comments. Please "cloud" and/or "delta" all revisions made on plans due to this comment list as well as any other design changes. Page 1 of 2 Pu VF City of La Quinta a Permit # BRES2024-0195 REV October 9, 2025 mC7 O BVNA# 28683381 28 IN ORDER TO PROCESS THIS PLAN REVIEW PLEASE PROVIDE THE NAME AND PHONE NUMBER OF THE INDIVIDUAL WHO PREPARED THESE PLAN REVIEW RESPONSES NAME: PHONE: Please provide ONE full COMPLETE electronic submittal, with supporting documentation, and answers to ALL comments listed in the comment section and submit to: City of La Quinta, 78495 Calle Tampico, La Quinta, CA 92253 Respectfully Submitted, Arch/Access/Struc: Ernesto Pedroza, M.S.lernesto.pedrozalr(a)-bureauveritas.com1626.325.9800 Please write the sheet number, detail number, and/or location indicating where the comment is located. Please be specific as to where comment items have been addressed so that recheck may be expedited. To aid in the plan review process —please indicate in the space adjacent to each comment or on a separate sheet, the sheet and the exact location on the sheet where corrections have been made (e.g., Detail S of Sheet 3). Please "cloud" and/or "delta" all revisions made on plans due to this comment list as well as any other design changes. STRUCTURAL COMMENTS 1. Clarify drag between trellis and existing framing. [§1603.1 CBC] RESPONSE: END OF COMMENTS Page 2 of 2 r 600 N Rosemead Blvd, Ste 231 Pasadena, CA 91101 626.321*9810 220 Technology Drive, Ste 100 Irvine, CA 92618 714.431.4192 250 N Westlake Blvd, Ste 150 Westlake Village, CA 91362 805.230.2888 us.bureauveritas.mm Email: imine.admin@bureauveritas.wm LETTER OF TRANSMITTAL To: City of La Quinta DATE 78-495 Calle Tampico October 27, 2025 La Quinta, CA 92253 ta Qai�tra GEM of the DESERT — DESIGN & DEVELOPMENT DEPARTMENT 78-495 CALLE TAMPICO LA QUINTA, CALIFORNIA 92253 (760) 777-7125 RESIDENTIAL PLAN CHECK CORRECTION LIST DATE: MAY 24, 2024 STATUS: FIRST REVIEW PLAN CHECKED BY: AJ ORTEGA TELEPHONE NUMBER: (760) 777-7018 ADDRESS: 53-220 AVENIDA JUAREZ DESCRIPTION: REMODEL / CHANGEOUTS APPLICANT: CASEY CHAPMAN PLAN CHECK #: BRES2024-0195 This submittal has been checked for compliance with the 2022 California Residential, Mechanical, Electrical, Plumbing, Green Building and Energy Codes, and the City of La Quinta Municipal Code. APPLICANT: The following items are being returned to you for correction: 1ST REVIEW CORRECTION LIST BUILDING DEPARTMENT STAFF: DO NOT accept any resubmittal unless ALL of the following items are included: REVISED PLAN SET STRUCTURAL CALCULATIONS ENERGY DOCUMENTS INSTRUCTIONS TO APPLICANT: • Provide a response to each comment on the following pages, noting specifically where the correction can be found. Responses such as, "Sheet A-3," or, "Handrails shall be per CBC Section 1003," are not acceptable. Show or note specifically how compliance with a code requirement is achieved. Responses such as, "Added note 16 on sheet A-3" are appropriate and will help expedite your back check. • Corrections may not be made by handwriting on existing drawings. Revise original Plans and/or Calculations as necessary. • Each sheet of resubmitted Plans and/or Calculations shall include the preparer's name and telephone number and shall be electronically signed by the preparer. If the preparer is a licensed architect or engineer, all documents prepared by that licensed individual shall also bear his/her stamp as prescribed by California Business and Professions Code Section 5536. Resubmittals will not be accepted with signatures missing. Residential Plan Check Correction List Page 1 of 5 SECTION A - GENERAL 1) Provide the Assessor's Parcel Number (APN) and complete legal description of project on the first sheet of Plans. 2) Provide on each sheet of resubmitted Plans and cover sheet of bound Calculations the preparer's name and telephone number and electronic -signature. If the preparer is a licensed architect or engineer, all documents prepared by that licensed individual shall also bear his/her stamp as prescribed by California Business and Professions Code §5536. Resubmittals will not be accepted with signatures missing. 3) Note on Plans: "All construction shall comply with the 2022 California Residential, Mechanical, Electrical, Plumbing, Green Building and Energy Codes and the La Quinta Municipal Code." Remove notes referencing other codes. 4) Note on Plans: "All `or equal' substitutions must be submitted to and approved by the Building Official prior to installation of the item." 5) Note on Plans: "The developer / contractor / owner is responsible for the verification of existing curb location from property line(s) by a Registered Land Surveyor." 6) Provide Planning Division approval for this project. Please contact the Planning Division directly at (760) 777- 7125 with questions regarding the proposed construction. Additional information is necessary to route to planning for approval, see Municipal Code comments below. 7) In addition to the comments provided for the scope of work proposed, for this submittal to resolve the Active Code Case please provide the following additional items: a) The changeout out of fenestration surfaces reviewed on application for permit BRES2024-0009 does not propose the framing required at the addition of the folding door or removal of openings. Provide a design by a licensed architect or engineer in accordance with the California Residential Code, including vertical and lateral calculations, for the proposed installation. A comprehensive structural review will be performed at the next submittal. b) Provide at least one wall receptacle outlet within thirty-six (36) inches of the outside edge of each bathroom basin. The receptacle outlet shall be located on a wall or partition that is adjacent to the basin or basin countertop, located on the countertop, or installed on the side or face of the basin cabinet. In no case shall the receptacle be located more than twelve (12) inches below the top of the basin. (CEC §210.52(D)) c) Kitchen, pantries, breakfast rooms, dining rooms, and similar area receptacles shall comply with the following: (CEC §210.52(C)): i) Provide a receptacle outlet at each wall counter space 12 inches or wider. ii) Provide receptacle outlets at each wall counter so that no point along the wall line is more than 24 inches, measured horizontally from a receptacle outlet in that space. iii) Provide at least one receptacle outlet at each island counter space with a long dimension of 24 inches or greater and a short dimension of 12 inches or greater. iv) Provide at least one receptacle outlet at each peninsular counter space with a long dimension of 24" or greater and a short dimension of 12" or greater. A peninsular countertop is measured from the connecting edge. d) Provide one island/peninsular receptacle for the first 9sf, or fraction thereof, of counter space and one additional outlet for each additional 18sf or fraction thereof of counterspace. (CEC 210.52 (C)(2)). e) Dishwasher circuits shall be provided with Class A GFCI protection for personnel. (CEC 422.5(A)) f) All 15- and 20-ampere, 125- and 250-volt receptacles in dwelling units, including attached and detached garages and accessory buildings to dwelling units shall be listed tamper -resistant receptacles. (CEC 406.12) Residential Plan Check Correction List Page 2 of 5 g) Replacement of receptacles in any areas specified in 210.12 (A-C) shall be arc -fault protected by either a listed outlet branch -circuit type arc -fault circuit -interrupter type receptacle, a receptacle protected by a listed outlet branch -circuit type arc -fault circuit -interrupter type receptacle, or a receptacle protected by a listed combination type arc -fault circuit -interrupter type circuit breaker. (CEC 406.4(D)(4)) SECTION B — PRECISE / SITE PLAN / ZONING 1) Provide a complete site plan showing north arrow, property lines and lot dimensions, location of existing curbs, all existing and proposed structures, setback dimensions, utility locations, and (if utilized) location of private sewage disposal system. (CRC §R106.1.1) a) Show on Site Plan the location, physical size, and capacity of propane tank, demonstrating required clearances between the tank and structures. (CRC §R106.1.1) b) Propane tank shall be screened from view from surrounding properties. Specify screening method on Site Plan. (LQMC §9.60.140.B.2) 2) Provide garage with minimum net clear interior dimensions not less than 20 feet by 20 feet. (LQMC §9.150.070.C, Table 9-11, 9.150.080.B.8) Relocated water heater obstructs the required space. SECTION C -ARCHITECTURAL 1) Specify the make, model number, and ICC Evaluation Report Number (or UL Listing Number) of factory -built fireplaces and/or fire features. (CRC §R106.1.1) Proposed gas fireplaces shall be a direct -vent sealed combustion type and have provided a current paper copy of its listing report to demonstrate compliance. (CALGreen §4.503.1) SECTION D - MECHANICAL 1) Provide permanent, substantial protection for water heater in garage from vehicle impact. (CIVIC §305.1.1) Not applicable if vehicle parking area is obstructed by water heater, see above comment. 2) Show on Plans a disconnect adjacent to and in sight of the water heating unit. (CIVIC §301.4) Show required working clearances to disconnect per CEC §110.26(A). SECTION E — ELECTRICAL 1) For new water heater circuit, if allowed to remain and not moved back to original location, specify conduit size from service panel to water heater; number of conductors, their size, material, and insulation type. 2) Provide the following information on Electrical Plan: Fixture Legend: Types, Wattages, Efficacy, etc.; Show how light switching controls comply with California Energy Code §§ 110.9 and 150(k). 3) Note on Electrical Plan: "All 120-volt, single phase, 15- and 20-ampere branch circuits supplying outlets or devices installed in dwelling unit kitchens, family rooms, dining rooms, living rooms, parlors, libraries, dens, bedrooms, sunrooms, recreation rooms, closets, hallways, laundry areas or similar rooms or areas shall be protected by an listed arc -fault circuit interrupter, combination type, installed to provide protection of the branch circuit or by any of the other means described in 210.12(A)(2) through (6)." (CEC §210.12(A)) 4) Note on Electrical Plan: "Modified, replaced, or extended 120-volt, single phase, 15- and 20-ampere branch circuits supplying outlets or devices installed in dwelling unit kitchens, family rooms, dining rooms, living rooms, parlors, libraries, dens, bedrooms, sunrooms, recreation rooms, closets, hallways, laundry areas or similar rooms or areas shall be protected by either a listed combination -type AFCI located at the origin of the branch circuit or a listed outlet branch -circuit type AFCI located at the first receptacle outlet of the existing branch circuit." (CEC §210.12(B)) Residential Plan Check Correction List Page 3 of 5 Informational item: Please note that this requirement requires protection of the entire branch circuit supplying outlets (luminaires, fans, smoke alarms, etc.) and the devices within dwelling unit. 5) Note on Plans: "Luminaires (light fixtures) in tub or shower enclosures shall be labeled `suitable for damp location'." (CEC §410.10(D)) SECTION F - PLUMBING 1) Provide an access panel (12" x 12" minimum) to bathtub trap connection, if a slip joint connection is utilized. (CPC §402.10) 2) Note on Plans: "Hot -mopped shower pan shall be inspected upon completion of hot -mopping and shall be filled with water for inspection." (CPC §408.7) 3) Note on Plans: "Provide a combination pressure and temperature relief valve at all water heaters, set to open at not more than 150 psi. The drainpipe shall extend to outside of building and terminate not more than 2 feet nor less than 6 inches above the ground and point downward with the end unobstructed. Any other termination location shall require approval by the Building Official." (CPC §608.3, 608.4, 608.5) 4) Provide a schematic piping plan (see Figure 1216.1.1 pg.218 for an example) showing all fuel burning appliances and their fuel demand. Show pipe lengths and sizes. (CPC Chapter 12 and Tables) SECTION G — ENERGY EFFICIENCY 1) Provide complete energy calculations showing compliance with the 2022 California Energy Code for the changeout of the HVAC Equipment and Water Heater, including registration identification from a certified HERS provider if applicable. Due to lack of information in this submittal, a comprehensive review will be performed at next submittal. 2) All installed luminaires shall meet the requirements in Table 150.0-A. Specify in lighting schedule for each luminaire, the luminaire and lamp types, wattage and whether light source requires certification with Reference Joint Appendix JAB, such as required for all screw -base luminaires and recessed down lighting. (CEnC §150.0(k)1A) 3) The number of electrical boxes that are more than 5 feet above the finished floor and do not contain a luminaire or other device shall be no greater than the number of bedrooms. These electrical boxes must be served by a dimmer, vacancy sensor control, or fan speed control. (CEnC §150.0(k)1 B) 4) All down light luminaires recessed in ceilings (not just those in insulated ceilings) must meet the following requirements: (CEnC §150.0(k)1C) a) Shall contain light sources that are certified JA8 compliant that are not of the screw -based type; and b) Those that are enclosed, such as those often used in showers, must utilize a JA8-E compliant lamp rated for use at elevated temperatures; and c) Be listed for zero -clearance insulation contact (IC Rated) by a nationally recognized testing lab that are certified airtight per ASTM E283-04 (air leakage less than 2.0 CFM at 75 Pascals); and d) Have a gasket or caulked sealing between the luminaire housing and ceiling; and e) Allow readily accessible ballasts for maintenance or replacement without needing to cut holes in the ceilings. 5) In bathrooms, garages, laundry rooms, utility rooms, and walk-in closets at least one luminaire must be controlled by a vacancy sensor. (CEnC §150.0(k)21) 6) All lighting in habitable spaces must be controlled by either a dimmer or vacancy sensor. (CEnC §150.0(k)2J) 7) Outdoor lighting permanently mounted to the building must be controlled by one of the following combinations and a manual ON/OFF switch that does not override the chosen combination: (CEC §150.0(k)3) a) Photocell and motion sensor b) Photo control and automatic time switch Residential Plan Check Correction List Page 4 of 5 c) Astronomical time clock SECTION H - STRUCTURAL / SOIL / FOUNDATION 1) The installed patio cover does not comply with City Standard Requirements. Provide a design by a licensed architect or engineer in accordance with the California Residential Code, including vertical and lateral calculations, for the proposed installation. A comprehensive structural review will be performed at the next submittal. Important note to Engineer of Record: If these corrections require revisions to structural calculations, in response to these corrections, do NOT simply submit copies of a few supplemental calculations. For resubmittal, incorporate any new or supplemental calculations into the complete set of structural calculations and resubmit as one complete file. Failure to provide documentation in this manner will delay approval of your client's project. Incomplete sets, loose pages will not be assembled by the Design & Development Department. SECTION I - MISCELLANEOUS COMMENTS 1) Provide contractor information to complete building permit application form. 2) Provide a complete list of subcontractors. 3) Inadequate information has been provided at this submittal to calculate fees for this project. Fee calculation will be performed when Plans are complete. END CORRECTION LIST As further information is provided and reviewed, additional corrections may be required. Residential Plan Check Correction List Page 5 of 5 ta Qai�tra GEM of the DESERT — DESIGN & DEVELOPMENT DEPARTMENT 78-495 CALLE TAMPICO LA QUINTA, CALIFORNIA 92253 (760) 777-7125 RESIDENTIAL PLAN CHECK CORRECTION LIST DATE: JULY 19, 2024 STATUS: SECOND REVIEW PLAN CHECKED BY: AJ ORTEGA TELEPHONE NUMBER: (760) 777-7018 ADDRESS: 53-220 AVENIDA JUAREZ DESCRIPTION: REMODEL / CHANGEOUTS APPLICANT: CASEY CHAPMAN PLAN CHECK #: BRES2024-0195 This submittal has been checked for compliance with the 2022 California Residential, Mechanical, Electrical, Plumbing, Green Building and Energy Codes, and the City of La Quinta Municipal Code. APPLICANT: The following items are being returned to you for correction: 2ND REVIEW CORRECTION LIST 2ND REVIEW PLAN SET MARKUPS (SEE FILE HISTORY IN ATTACHMENTS) BUILDING DEPARTMENT STAFF: DO NOT accept any resubmittal unless ALL of the following items are included: REVISED PLAN SET REVISED STRUCTURAL CALCULATIONS REVISED ENERGY DOCUMENTS INSTRUCTIONS TO APPLICANT: • Provide a response to each comment on the following pages, noting specifically where the correction can be found. Responses such as, "Sheet A-3," or, "Handrails shall be per CBC Section 1003," are not acceptable. Show or note specifically how compliance with a code requirement is achieved. Responses such as, "Added note 16 on sheet A-3" are appropriate and will help expedite your back check. • Corrections may not be made by handwriting on existing drawings. Revise original Plans and/or Calculations as necessary. • Each sheet of resubmitted Plans and/or Calculations shall include the preparer's name and telephone number and shall be electronically signed by the preparer. If the preparer is a licensed architect or engineer, all documents prepared by that licensed individual shall also bear his/her stamp as prescribed by California Business and Professions Code Section 5536. Resubmittals will not be accepted with signatures missing. Residential Plan Check Correction List Page 1 of 5 SECTION A - GENERAL 1) Resolved. 2) Provide on each sheet of resubmitted Plans and cover sheet of bound Calculations the preparer's name and telephone number and electronic -signature. If the preparer is a licensed architect or engineer, all documents prepared by that licensed individual shall also bear his/her stamp as prescribed by California Business and Professions Code §5536. Resubmittals will not be accepted with signatures missing. 3) Resolved. 4) Resolved. 5) Resolved. 6) Provide Planning Division approval for this project. Please contact the Planning Division directly at (760) 777- 7125 with questions regarding the proposed construction. Additional information is necessary to route to planning for approval, see Municipal Code comments below. Comment still remains, show proposed propane tank location and required screening, and then relocated water heater does not comply. 7) In addition to the comments provided for the scope of work proposed, for this submittal to resolve the Active Code Case please provide the following additional items: a) The changeout out of fenestration surfaces reviewed on application for permit BRES2024-0009 does not propose the framing required at the addition of the folding door or removal of openings. Provide a design by a licensed architect or engineer in accordance with the California Residential Code, including vertical and lateral calculations, for the proposed installation. A comprehensive structural review will be performed at the next submittal. Engineering not provided and not included in the scope of work. b) Resolved. c) Kitchen, pantries, breakfast rooms, dining rooms, and similar area receptacles shall comply with the following: (CEC §210.52(C)): Comments still remains, kitchen layout and the receptacles locations do not comply. i) Provide a receptacle outlet at each wall counter space 12 inches or wider. ii) Provide receptacle outlets at each wall counter so that no point along the wall line is more than 24 inches, measured horizontally from a receptacle outlet in that space. iii) Provide at least one receptacle outlet at each island counter space with a long dimension of 24 inches or greater and a short dimension of 12 inches or greater. iv) Provide at least one receptacle outlet at each peninsular counter space with a long dimension of 24" or greater and a short dimension of 12" or greater. A peninsular countertop is measured from the connecting edge. d) Provide one island/peninsular receptacle for the first 9sf, or fraction thereof, of counter space and one additional outlet for each additional 18sf or fraction thereof of counterspace. (CEC 210.52 (C)(2)). e) Dishwasher circuits shall be provided with Class A GFCI protection for personnel. (CEC 422.5(A)) f) Resolved. g) Resolved. 8) NEW: Clearly show on the plans the "NEW" and "EXISTING" work to remain. Based on available photos and permit history there is work not being included which is currently out of compliance and must be corrected to resolve the code case. This includes but is not limited to, the folding door, extent of kitchen remodel work, the water heater installation, the propane tank, lighting and electrical, and the pool bath/powder room. Residential Plan Check Correction List Page 2 of 5 SECTION B — PRECISE / SITE PLAN / ZONING 1) Provide a complete site plan showing north arrow, property lines and lot dimensions, location of existing curbs, all existing and proposed structures, setback dimensions, utility locations, and (if utilized) location of private sewage disposal system. (CRC §R106.1.1) There is not an "Existing Tank" - Provide previously requested information to determine compliance, show on plans as "NEW" and include within scope of work on cover sheet. a) Show on Site Plan the location, physical size, and capacity of propane tank, demonstrating required clearances between the tank and structures. (CRC §R106.1.1) b) Propane tank shall be screened from view from surrounding properties. Specify screening method on Site Plan. (LQMC §9.60.140.B.2) 2) Provide garage with minimum net clear interior dimensions not less than 20 feet by 20 feet. (LQMC §9.150.070.C, Table 9-11, 9.150.080.B.8) Relocated water heater obstructs the required space. Comment still remains and has been verified by the revised plan set showing the installation within the minimum 20' by 20'. SECTION C -ARCHITECTURAL 1) Resolved. SECTION D - MECHANICAL 1) Provide permanent, substantial protection for water heater in garage from vehicle impact. (CIVIC §305.1.1) Not applicable if vehicle parking area is obstructed by water heater, see above comment. The location of water heater is within required vehicle parking area, relocate water heater. 2) Show on Plans a disconnect adjacent to and in sight of the water heating unit. (CIVIC §301.4) Show required working clearances to disconnect per CEC §110.26(A). SECTION E — ELECTRICAL 1) For new water heater circuit, if allowed to remain and not moved back to original location, specify conduit size from service panel to water heater; number of conductors, their size, material, and insulation type. Comment still remains. 2) Resolved. 3) Resolved. 4) Resolved. 5) Resolved. SECTION F - PLUMBING 1) Provide an access panel (12" x 12" minimum) to bathtub trap connection, if a slip joint connection is utilized. (CPC §402.10) 2) Resolved. 3) Resolved. 4) Provide a schematic piping plan (see Figure 1216.1.1 pg.218 for an example) showing all fuel burning appliances and their fuel demand. Show pipe lengths and sizes. (CPC Chapter 12 and Tables) Residential Plan Check Correction List Page 3 of 5 SECTION G — ENERGY EFFICIENCY 1) Provide complete energy calculations showing compliance with the 2022 California Energy Code for the changeout of the HVAC Equipment and Water Heater, including registration identification from a certified HERS provider if applicable. Due to lack of information in this submittal, a comprehensive review will be performed at next submittal. Comment still remains, the energy report has not been provided for the mechanical and plumbing alterations proposed, nor does it accurately show the extent of fenestration alterations. 2) Resolved. 3) Resolved. 4) Resolved. 5) Resolved. 6) Resolved. 7) Resolved. SECTION H - STRUCTURAL / SOIL / FOUNDATION 1) The installed patio cover does not comply with City Standard Requirements. Provide a design by a licensed architect or engineer in accordance with the California Residential Code, including vertical and lateral calculations, for the proposed installation. A comprehensive structural review will be performed at the next submittal. The structural plan does not identify required beams and has not been provided for folding door installation. A comprehensive structural review is still pending based on incomplete information being provided at 2"d Review. 3 —_—_—_—_--—--- "*�f _--_—_—__------ -�I 8---------- - --_AI ____--__--__-_--_----I -� II II • II II Important note to Engineer of Record: If these corrections require revisions to structural calculations, in response to these corrections, do NOT simply submit copies of a few supplemental calculations. For resubmittal, incorporate any new or supplemental calculations into the complete set of structural calculations and resubmit as one complete file. Residential Plan Check Correction List Page 4 of 5 Failure to provide documentation in this manner will delay approval of your client's project. Incomplete sets, loose pages will not be assembled by the Design & Development Department. SECTION I - MISCELLANEOUS COMMENTS 1) Provide contractor information to complete building permit application form. 2) Provide a complete list of subcontractors. 3) Inadequate information has been provided at this submittal to calculate fees for this project. Fee calculation will be performed when Plans are complete. END CORRECTION LIST As further information is provided and reviewed, additional corrections may be required. Residential Plan Check Correction List Page 5 of 5 ta Qai�tra GEM of the DESERT — DESIGN & DEVELOPMENT DEPARTMENT 78-495 CALLE TAMPICO LA QUINTA, CALIFORNIA 92253 (760) 777-7125 RESIDENTIAL PLAN CHECK CORRECTION LIST DATE: SEPTEMBER 17, 2024 STATUS: THIRD REVIEW PLAN CHECKED BY: AJ ORTEGA TELEPHONE NUMBER: (760) 777-7018 ADDRESS: 53-220 AVENIDA JUAREZ DESCRIPTION: REMODEL / CHANGEOUTS APPLICANT: CASEY CHAPMAN PLAN CHECK #: BRES2024-0195 This submittal has been checked for compliance with the 2022 California Residential, Mechanical, Electrical, Plumbing, Green Building and Energy Codes, and the City of La Quinta Municipal Code. APPLICANT: The following items are being returned to you for correction: 3RD REVIEW CORRECTION LIST BUILDING DEPARTMENT STAFF: DO NOT accept any resubmittal unless ALL of the following items are included: REVISED PLAN SET REVISED STRUCTURAL CALCULATIONS ENERGY DOCUMENTS (8.5 X 11" PDF) WATER HEATER INFORMATION INSTRUCTIONS TO APPLICANT: • Provide a response to each comment on the following pages, noting specifically where the correction can be found. Responses such as, "Sheet A-3," or, "Handrails shall be per CBC Section 1003," are not acceptable. Show or note specifically how compliance with a code requirement is achieved. Responses such as, "Added note 16 on sheet A-3" are appropriate and will help expedite your back check. • Corrections may not be made by handwriting on existing drawings. Revise original Plans and/or Calculations as necessary. • Each sheet of resubmitted Plans and/or Calculations shall include the preparer's name and telephone number and shall be electronically signed by the preparer. If the preparer is a licensed architect or engineer, all documents prepared by that licensed individual shall also bear his/her stamp as prescribed by California Business and Professions Code Section 5536. Resubmittals will not be accepted with signatures missing. Residential Plan Check Correction List Page 1 of 5 SECTION A - GENERAL 1) Resolved. 2) Provide on each sheet of resubmitted Plans and cover sheet of bound Calculations the preparer's name and telephone number and electronic -signature. If the preparer is a licensed architect or engineer, all documents prepared by that licensed individual shall also bear his/her stamp as prescribed by California Business and Professions Code §5536. Resubmittals will not be accepted with signatures missing. 3) Resolved. 4) Resolved. 5) Resolved. 6) Provide Planning Division approval for this project. Please contact the Planning Division directly at (760) 777- 7125 with questions regarding the proposed construction. Additional information is necessary to route to planning for approval, see Municipal Code comments below. Comment still remains, show proposed propane tank location and required screening, and then relocated water heater does not comply. Comment still applies, see below corrections. 7) In addition to the comments provided for the scope of work proposed, for this submittal to resolve the Active Code Case please provide the following additional items: a) The changeout out of fenestration surfaces reviewed on application for permit BRES2024-0009 does not propose the framing required at the addition of the folding door or removal of openings. Provide a design by a licensed architect or engineer in accordance with the California Residential Code, including vertical and lateral calculations, for the proposed installation. A comprehensive structural review will be performed at the next submittal. Engineering not provided and not included in the scope of work. Comment still appears to apply; revised calculations not provided and structural plans still show no work in this area. b) Resolved. c) Kitchen, pantries, breakfast rooms, dining rooms, and similar area receptacles shall comply with the following: (CEC §210.52(C)): Comments still remains, kitchen layout and the receptacles locations do not comply. Comment still applies; see item 8 — New or Existing Electrical work not identified. i) Provide a receptacle outlet at each wall counter space 12 inches or wider. ii) Provide receptacle outlets at each wall counter so that no point along the wall line is more than 24 inches, measured horizontally from a receptacle outlet in that space. iii) Provide at least one receptacle outlet at each island counter space with a long dimension of 24 inches or greater and a short dimension of 12 inches or greater. iv) Provide at least one receptacle outlet at each peninsular counter space with a long dimension of 24" or greater and a short dimension of 12" or greater. A peninsular countertop is measured from the connecting edge. d) Provide one island/peninsular receptacle for the first 9sf, or fraction thereof, of counter space and one additional outlet for each additional 18sf or fraction thereof of counterspace. (CEC 210.52 (C)(2)). e) Dishwasher circuits shall be provided with Class A GFCI protection for personnel. (CEC 422.5(A)) f) Resolved. g) Resolved. 8) Clearly show on the plans the "NEW" and "EXISTING" work to remain. Based on available photos and permit history there is work not being included which is currently out of compliance and must be corrected to resolve the code case. This includes but is not limited to, the folding door, extent of kitchen remodel work, the water Residential Plan Check Correction List Page 2 of 5 heater installation, the propane tank, lighting and electrical, and the pool bath/powder room. Comment still applies; the identification of New and Existing work throughout plans is not identified. For example the electrical plan as currently shown would suggest a complete rewire of the dwelling, if this is so please be prepared to expose all covered work. SECTION B — PRECISE / SITE PLAN / ZONING 1) Provide a complete site plan showing north arrow, property lines and lot dimensions, location of existing curbs, all existing and proposed structures, setback dimensions, utility locations, and (if utilized) location of private sewage disposal system. (CRC §R106.1.1) There is not an "Existing Tank" - Provide previously requested information to determine compliance, show on plans as "NEW" and include within scope of work on cover sheet. Comment still applies, see below corrections. a) Show on Site Plan the location, physical size, and capacity of propane tank, demonstrating required clearances between the tank and structures. (CRC §R106.1.1) Clearances to property lines and buildings on the site not provided, unable to determine compliance — The minimum setback from the dwelling or other buildings and to property lines for a 120 Gallon Tank is 5'. b) Propane tank shall be screened from view from surrounding properties. Specify screening method on Site Plan. (LQMC §9.60.140.B.2) 2) No Longer Applicable. 3) NEW: Ground mounted mechanical equipment such as water heaters may be located within the rear yard areas. For lots of five thousand (5,000) square feet or less, said equipment can be in the front yard if there is a wall around the yard, or it is screened by a masonry wall. In a side yard of five (5) feet or less only if approved by the design and development director if findings are made that extenuating circumstances exist. (LQMC §9.60.075) Either relocate water heater or contact the planning division directly (see item 2) to discuss options for obtaining approval to relocate to the side yard. SECTION C -ARCHITECTURAL 1) Resolved. SECTION D - MECHANICAL 1) No Longer Applicable. 2) Show on Plans a disconnect adjacent to and in sight of the water heating unit. (CIVIC §301.4) Show required working clearances to disconnect per CEC §110.26(A). SECTION E — ELECTRICAL 1) For new water heater circuit, if allowed to remain and not moved back to original location, specify conduit size from service panel to water heater; number of conductors, their size, material, and insulation type. Comment still remains. 2) Resolved. 3) Resolved. 4) Resolved. 5) Resolved. SECTION F - PLUMBING 1) Resolved. Residential Plan Check Correction List Page 3 of 5 2) Resolved. 3) Resolved. 4) Provide a schematic piping plan (see Figure 1216.1.1 pg.218 for an example) showing all fuel burning appliances and their fuel demand. Show pipe lengths and sizes. (CPC Chapter 12 and Tables) 5) NEW: Remove "Waterproof detail for shower tile" and "Access Panel" details as these are not applicable to the project based on the scope of work proposed. 6) NEW: Provide water heater information from manufacturer to determine whether exterior installation is allowed. SECTION G — ENERGY EFFICIENCY 1) Provide complete energy calculations showing compliance with the 2022 California Energy Code for the changeout of the HVAC Equipment and Water Heater, including registration identification from a certified HERS provider if applicable. Due to lack of information in this submittal, a comprehensive review will be performed at next submittal. Comment still remains, the energy report has not been provided for the mechanical and plumbing alterations proposed, nor does it accurately show the extent of fenestration alterations. Comment still applies; the report provided within plan set does not demonstrate compliance with HVAC Equipment or Water Heater, nor does it have the additional fenestration for the folding door, see item 7(a). Additionally, report is required to be provided in 8.5 x 11" PDF format as a separate attachment upload. 2) Resolved. 3) Resolved. 4) Resolved. 5) Resolved. 6) Resolved. 7) Resolved. SECTION H - STRUCTURAL / SOIL / FOUNDATION 1) The installed patio cover does not comply with City Standard Requirements. Provide a design by a licensed architect or engineer in accordance with the California Residential Code, including vertical and lateral calculations, for the proposed installation. A comprehensive structural review will be performed at the next submittal. The structural plan does not identify required beams and has not been provided for foldinq door installation. A comprehensive structural review is still pending based on incomplete information being provided at 2"d Review. Submittal is still incomplete to provide a comprehensive review, see item 7(a). Important note to Engineer of Record: If these corrections require revisions to structural calculations, in response to these corrections, do NOT simply submit copies of a few supplemental calculations. For resubmittal, incorporate any new or supplemental calculations into the complete set of structural calculations and resubmit as one complete file. Failure to provide documentation in this manner will delay approval of your client's project. Incomplete sets, loose pages will not be assembled by the Design & Development Department. SECTION I - MISCELLANEOUS COMMENTS 1) Provide contractor information to complete building permit application form. Residential Plan Check Correction List Page 4 of 5 2) Provide a complete list of subcontractors. 3) Inadequate information has been provided at this submittal to calculate fees for this project. Fee calculation will be performed when Plans are complete. END CORRECTION LIST As further information is provided and reviewed, additional corrections may be required. Residential Plan Check Correction List Page 5 of 5 ta Qai�tra GEM ofthe DESERT — DESIGN & DEVELOPMENT DEPARTMENT 78-495 CALLE TAMPICO LA QUINTA, CALIFORNIA 92253 (760) 777-7125 RESIDENTIAL PLAN CHECK CORRECTION LIST DATE: FEBRUARY 6, 2025 STATUS: FIFTH REVIEW PLAN CHECKED BY: AJ ORTEGA TELEPHONE NUMBER: (760) 777-7018 ADDRESS: 53-220 AVENIDA JUAREZ DESCRIPTION: REMODEL / CHANGEOUTS APPLICANT: CASEY CHAPMAN PLAN CHECK #: BRES2024-0195 This submittal has been checked for compliance with the 2022 California Residential, Mechanical, Electrical, Plumbing, Green Building and Energy Codes, and the City of La Quinta Municipal Code. APPLICANT: The following items are being returned to you for correction: 5T" REVIEW CORRECTION LIST BUILDING DEPARTMENT STAFF: DO NOT accept any resubmittal unless ALL of the following items are included: REVISED PLAN SET REVISED STRUCTURAL CALCULATIONS (COMPLETE SET FOR ENTIRE SCOPE OF WORK) ENERGY DOCUMENTS (8.5 X 11" PDF) (COMPLETE SET FOR ENTIRE SCOPE OF WORK) INSTRUCTIONS TO APPLICANT: • Provide a response to each comment on the following pages, noting specifically where the correction can be found. Responses such as, "Sheet A-3," or, "Handrails shall be per CBC Section 1003," are not acceptable. Show or note specifically how compliance with a code requirement is achieved. Responses such as, "Added note 16 on sheet A-Y are appropriate and will help expedite your back check. • Corrections may not be made by handwriting on existing drawings. Revise original Plans and/or Calculations as necessary. • Each sheet of resubmitted Plans and/or Calculations shall include the preparer's name and telephone number and shall be electronically signed by the preparer. If the preparer is a licensed architect or engineer, all documents prepared by that licensed individual shall also bear his/her stamp as prescribed by California Business and Professions Code Section 5536. Resubmittals will not be accepted with signatures missing. Residential Plan Check Correction List Page 1 of 4 SECTION A - GENERAL 1) Resolved. 2) Provide on each sheet of resubmitted Plans and cover sheet of bound Calculations the preparer's name and telephone number and electronic -signature. If the preparer is a licensed architect or engineer, all documents prepared by that licensed individual shall also bear his/her stamp as prescribed by California Business and Professions Code §5536. Resubmittals will not be accepted with signatures missing. 3) Resolved. 4) Resolved. 5) Resolved. 6) Provide Planning Division approval for this project. Please contact the Planning Division directly at (760) 777- 7125 with questions regarding the proposed construction. Additional information is necessary to route to planning for approval, see Municipal Code comments below. Comment still remains, show proposed propane tank location and required screening, and then relocated water heater does not comply. Comment still applies, see below corrections. Propane tank still proposed within 5' of property line and no screening of equipment shown, still unable to send to planning for review. 7) In addition to the comments provided for the scope of work proposed, for this submittal to resolve the Active Code Case please provide the following additional items: a) The changeout out of fenestration surfaces reviewed on application for permit BRES2024-0009 does not propose the framing required at the addition of the folding door or removal of openings. Provide a design by a licensed architect or engineer in accordance with the California Residential Code, including vertical and lateral calculations, for the proposed installation. A comprehensive structural review will be performed at the next submittal. Engineering not provided and not included in the scope of work. Comment still appears to apply, revised calculations not provided and structural plans still show no work in this area. Provide a complete structural calculation package, see Note in Section H to Engineer of Record, additionally the supplement calculations provided for the opening show design to 2019 CBC, update to 2022 California Building Code. b) Resolved. c) Resolved. d) Resolved. e) Resolved. f) Resolved. g) Resolved. 8) Resolved. SECTION B — PRECISE / SITE PLAN / ZONING 1) Provide a complete site plan showing north arrow, property lines and lot dimensions, location of existing curbs, all existing and proposed structures, setback dimensions, utility locations, and (if utilized) location of private sewage disposal system. (CRC §R106.1.1) There is not an "Existing Tank" - Provide previously requested information to determine compliance, show on plans as "NEW" and include within scope of work on cover sheet. Comment still applies, see below corrections. Comment still applies, but also see plumbing section for discrepancies in the gas system overall. Residential Plan Check Correction List Page 2 of 4 a) Show on Site Plan the location, physical size, and capacity of propane tank, demonstrating required clearances between the tank and structures. (CRC §R106.1.1) Clearances to property lines and buildings on the site not provided, unable to determine compliance — The minimum setback from the dwelling or other buildings and to property lines for a 120 Gallon Tank is 5'. b) Propane tank shall be screened from view from surrounding properties. Specify screening method on Site Plan. (LQMC §9.60.140.B.2) 2) No Longer Applicable. 3) Resolved. SECTION C -ARCHITECTURAL 1) Resolved. SECTION D - MECHANICAL 1) No Longer Applicable. 2) Resolved. SECTION E — ELECTRICAL 1) For new water heater circuit, if allowed to remain and not moved back to original location, specify conduit size from service panel to water heater; number of conductors, their size, material, and insulation type. Comment still remains. The electrical information being requested was not shown, additionally the schedule shows water heater as gas unit. 2) Resolved. 3) Resolved. 4) Resolved. 5) Resolved. SECTION F - PLUMBING 1) Resolved. 2) Resolved. 3) Resolved. 4) Provide a schematic piping plan (see Figure 1216.1.1 pg.218 for an example) showing all fuel burning appliances and their fuel demand. Show pipe lengths and sizes. (CPC Chapter 12 and Tables) Comment still remains, reconcile gas fixtures. Should not include water heater and fireplace. Also see example in reference, schematic is incomplete and does not include developed length. 5) Resolved. 6) Provide water heater information from manufacturer to determine whether exterior installation is allowed. Comments still remains, unit is shown as gas unit. 7) NEW: Similar to a previous review comment, the plumbing plans now include a DWV and Water Isometric, that also doesn't appear to be specific to this project. Revise plan to clearly show on the "NEW"and "EXISTING" work to remain. If no work in this area is proposed please remove. Residential Plan Check Correction List Page 3 of 4 SECTION G — ENERGY EFFICIENCY 1) Provide complete energy calculations showing compliance with the 2022 California Energy Code for the changeout of the HVAC Equipment and Water Heater, including registration identification from a certified HERS provider if applicable. Due to lack of information in this submittal, a comprehensive review will be performed at next submittal. Comment still remains, the energy report has not been provided for the mechanical and plumbing alterations proposed, nor does it accurately show the extent of fenestration alterations. Comment still applies; the report provided within plan set does not demonstrate compliance with HVAC Equipment or Water Heater, nor does it have the additional fenestration for the folding door, see item 7(a). Additionally, report is required to be provided in 8.5 x 11" PDF format as a separate attachment upload. Comment still applies. 2) Resolved. 3) Resolved. 4) Resolved. 5) Resolved. 6) Resolved. 7) Resolved. SECTION H - STRUCTURAL / SOIL / FOUNDATION 1) The installed patio cover does not comply with City Standard Requirements. Provide a design by a licensed architect or engineer in accordance with the California Residential Code, including vertical and lateral calculations, for the proposed installation. A comprehensive structural review will be performed at the next submittal. The structural plan does not identify required beams and has not been provided for folding door installation. A comprehensive structural review is still pending based on incomplete information being provided at 2nd Review. Submittal is still incomplete to provide a comprehensive review, see item 7(a). Provide a complete structural calculation package, partial supplemental calculations are not allowed. Additionally, the supplement calculations provided for the opening show design to 2019 CBC, update to 2022 California Building Code. Important note to Engineer of Record: If these corrections require revisions to structural calculations, in response to these corrections, do NOT simply submit copies of a few supplemental calculations. For resubmittal, incorporate any new or supplemental calculations into the complete set of structural calculations and resubmit as one complete file. Failure to provide documentation in this manner will delay approval of your client's project. Incomplete sets, loose pages will not be assembled by the Design & Development Department. SECTION I - MISCELLANEOUS COMMENTS 1) Provide contractor information to complete building permit application form. 2) Provide a complete list of subcontractors. 3) Inadequate information has been provided at this submittal to calculate fees for this project. Fee calculation will be performed when Plans are complete. END CORRECTION LIST As further information is provided and reviewed, additional corrections may be required. Residential Plan Check Correction List Page 4 of 4 ta 0"fra - GEM of the DESERT — DESIGN & DEVELOPMENT DEPARTMENT 78-495 CALLE TAMPICO LA QUINTA, CALIFORNIA 92253 (760) 777-7125 RESIDENTIAL PLAN CHECK CORRECTION LIST DATE: FEBRUARY 6, 2025 STATUS: 6TH REVIEW PLAN CHECKED BY: JULIO ANAYA TELEPHONE NUMBER: (760) 777-7043 ADDRESS: 53-220 AVENIDA JUAREZ DESCRIPTION: REMODEL / CHANGEOUTS APPLICANT: CASEY CHAPMAN PLAN CHECK #: BRES2024-0195 This submittal has been checked for compliance with the 2022 California Residential, Mechanical, Electrical, Plumbing, Green Building and Energy Codes, and the City of La Quinta Municipal Code. APPLICANT: BUILDING DEPARTMENT STAFF: The following items are being returned to you DO NOT accept any resubmittal unless ALL of for correction: the following items are included: 6T" REVIEW CORRECTION LIST REVISED PLAN SET REVISED STRUCTURAL CALCULATIONS (COMPLETE SET FOR ENTIRE SCOPE OF WORK) ENERGY DOCUMENTS (8.5 X 11" PDF) (COMPLETE SET FOR ENTIRE SCOPE OF WORK) INSTRUCTIONS TO APPLICANT: • Provide a response to each comment on the following pages, noting specifically where the correction can be found. Responses such as, "Sheet A-3," or, "Handrails shall be per CBC Section 1003," are not acceptable. Show or note specifically how compliance with a code requirement is achieved. Responses such as, "Added note 16 on sheet A-Y are appropriate and will help expedite your back check. • Corrections may not be made by handwriting on existing drawings. Revise original Plans and/or Calculations as necessary. • Each sheet of resubmitted Plans and/or Calculations shall include the preparer's name and telephone number and shall be electronically signed by the preparer. If the preparer is a licensed architect or engineer, all documents prepared by that licensed individual shall also bear his/her stamp as prescribed by California Business and Professions Code Section 5536. Resubmittals will not be accepted with signatures missing. Residential Plan Check Correction List Page 1 of 4 SECTION A - GENERAL 1) Resolved. 2) Resolved 3) Resolved. 4) Resolved. 5) Resolved. 6) Provide Planning Division approval for this project. Please contact the Planning Division directly at (760) 7777125 with questions regarding the proposed construction. Additional information is necessary to route to planning for approval, see Municipal Code comments below. Comment still remains, show proposed propane tank location and required screening, and then relocated water heater does not comply. Comment still applies, see below corrections. Screening of equipment required at south property line, propane tank shall be screened from view from surrounding properties. still unable to send to planning for review. 7) In addition to the comments provided for the scope of work proposed, for this submittal to resolve the Active Code Case please provide the following additional items: a) The changeout out of fenestration surfaces reviewed on application for permit BRES2024-0009 does not propose the framing required at the addition of the folding door or removal of openings. Provide a design by a licensed architect or engineer in accordance with the California Residential Code, including vertical and lateral calculations, for the proposed installation. A comprehensive structural review will be performed at the next submittal. Engineering not provided and not included in the scope of work. Comment still appears to apply, revised calculations not provided and structural plans still show no work in this area. Provide a complete structural calculation package, see Note in Section H to Engineer of Record, additionally the supplement calculations provided for the opening show design to 2019 CBC, update to 2022 California Building Code. b) Resolved. c) Resolved. d) Resolved. e) Resolved. f) Resolved. g) Resolved. 8) Resolved. 9) Provide a Sheet index 10) Provide a vicinity map with north arrow on the first sheet of plans, covering at least a two -block area, locating this project. 11) Provide the Assessor's parcel number and complete legal description of project on the first sheet of plans. SECTION B — PRECISE / SITE PLAN / ZONING 1) Resolved 2) No Longer Applicable. 3) Resolved. SECTION C -ARCHITECTURAL 1) Resolved. SECTION D - MECHANICAL 1) No Longer Applicable. 2) Resolved. SECTION E — ELECTRICAL 1) For new water heater circuit, if allowed to remain and not moved back to original location, specify conduit size from service panel to water heater; number of conductors, their size, material, and insulation type. Comment still remains. The electrical information being requested was not shown, additionally the schedule shows water heater as gas unit. 2) Resolved. 3) Resolved. 4) Resolved. 5) Resolved. SECTION F - PLUMBING 1) Resolved. 2) Resolved. 3) Resolved. 4) Resolved. 5) Resolved. 6) Provide water heater information from manufacturer to determine whether exterior installation is allowed.. 7) NEW: Similar to a previous review comment, the plumbing plans now include a DWV and Water Isometric, that also doesn't appear to be specific to this project. Revise plan to clearly show on the "NEW' and "EXISTING" work to remain. If no work in this area is proposed, please remove. Clarify scope of work unable to determine the plumbing alterations. Residential Plan Check Correction List Page 3 of 4 SECTION G — ENERGY EFFICIENCY 1) Provide complete energy calculations showing compliance with the 2022 California Energy Code for the changeout of the HVAC Equipment and Water Heater, including registration identification from a certified HERS provider if applicable. Due to lack of information in this submittal, a comprehensive review will be performed at next submittal. Comment still remains, the energy report has not been provided for the mechanical and plumbing alterations proposed, nor does it accurately show the extent of fenestration alterations. Comment still applies; the report provided within plan set does not demonstrate compliance with HVAC Equipment or Water Heater, nor does it have the additional fenestration for the foldinq door, see item 7(a). Additionally, report is required to be provided in 8.5 x 11 " PDF format as a separate attachment upload. Comment still applies. 2) Resolved. 3) Resolved. 4) Resolved. 5) Resolved. 6) Resolved. 7) Resolved. SECTION H - STRUCTURAL / SOIL / FOUNDATION 1) The installed patio cover does not comply with City Standard Requirements. Provide a design by a licensed architect or engineer in accordance with the California Residential Code, including vertical and lateral calculations, for the proposed installation. A comprehensive structural review will be performed at the next submittal. The structural plan does not identify required beams and has not been provided for folding door installation. A comprehensive structural review is still pending based on incomplete information being provided at 2nd Review. Submittal is still incomplete to provide a comprehensive review, see item 7(a). Provide a complete structural calculation package, partial supplemental calculations are not allowed. Additionally, the supplement calculations provided for the opening show design to 2019 CBC, update to 2022 California Building Code. Important note to Engineer of Record: If these corrections require revisions to structural calculations, in response to these corrections, do NOT simply submit copies of a few supplemental calculations. For resubmittal, incorporate any new or supplemental calculations into the complete set of structural calculations and resubmit as one complete file. Failure to provide documentation in this manner will delay approval of your client's project. Incomplete sets, loose pages will not be assembled by the Design & Development Department. - Structural Drawings are incomplete for a plan reviews. Please ensure to include all structural drawings in re -submittal. SECTION I - MISCELLANEOUS COMMENTS 1) Provide contractor information to complete building permit application form. 2) Provide a complete list of subcontractors. 3) Inadequate information has been provided at this submittal to calculate fees for this project. Fee calculation will be performed when Plans are complete. END CORRECTION LIST As further information is provided and reviewed, additional corrections may be required. Residential Plan Check Correction List Page 4 of 4