Loading...
HomeMy WebLinkAboutGriffith Good Faith Effort (2011-05) Part AGRIFFITH V!41 CO ram h- M PAN 3050 East Birch Street, Brea, Ca. 92821 City of La Quinta Dune Palms Road Bridge Improvements Good Faith Effort Part A. Intvitation to Bid GRIFFITH `terGOMPAN Y License No. 88 12200 Bloomfield Ave. Santa Fe Springs, Ca. 90670 Phone: 562-929-1128 Fax: 562-864-8970 An Egual Onmggzi E3n I r Is requesting quotations from all qualified DBE Sub -contractors and Material suppliers performing commercially useful functions for the following project: City of La Quinta Dune Palms Road Bridge Improvements Project Description: The purpose of the project is to replace the existing low water crossing spanning the Coachella Valley Storm Water Channel (CVSC) at Dune Palms Road with a bridge crossing. The proposed work includes the roadway approach reconstruction to meet the proposed bridge structure elevation; street widening; construction of curb, curb/gutter, sidewalk, trail, retaining walls, median paving, driveway approaches, concrete slope protection and 6-foot tall garden wall; asphalt pavement with aggregate base; bridge construction; crack scaling and slurry sealing of roadway within construction limits; construction of a catch basins and drywells along with 18" and 24" HDPE N-12 pipe; signing and striping; landscaping and irrigation; and undergrounding of existing overhead utility poles. Project will also require the construction and removal of a bypass road, along with CVWD water main and sanitary sewer relocations. The sewer relocations will require the Contractor to prepare and implement a sewer bypass plan, which will need to be approved by CVWD. Contractor will also be required to demolish two mobile homes along with the single-family home as noted in the plans, includes the clearing of each housing pad and disconnecting all utilities connections to the structures. All project work and incidental items to complete the project shall be performed in accordance with the plans, specifications, and other provisions of the contract. All the above improvements are to be constructed in a workmanlike manner, leaving the entire project in a neat and presentable condition. Plans & Specs: hltpF:Ilwnw.drnphux.cumishluaw2weu10Gjxi9dl:',r113d581'!'gl7xN81Vyc8b855tP1►a'd1=0 DBE Goal: 21% Bids open October 5, 2022 at 2:00 PM uate-s for Services and Sul )lies M uesled for the ro I lowi niz items for bid includi1 p,, but not Iimiled it, Sawcut & Removal AC Pavement. Sews al & Remove Canc Slope Protection, Unctmiffied ExcavAl tun (Roadway). Unclassified Fill (Roadway), Suitable Baekfiill Material, Asphalt Concrete, Clr ss 2 AWegate liana, AC Dike. Curb & Gutter, Median Curb, Median Curb. Concrete Driveway Approach, Colored Stamped Concitta Median, Concrete Slop# Praleetlnn. Curb Ramp, Masonry Block Wa11. Schedule 40 PVC, landscaping Sleeve. Th rek Decomposed Granite, Install landscaping Plant Wteriat & Irrigation, Crushed Rack (Apache Brown). Crushed Rock (Deserl Gold). Minus - Buia Costa Rubble, Doeoinpaxcd Gmnite - Brimslorie, SntiCaue Ezcayallan (Rot Wall), SWClu ra Backbit (Rot Wol1), Suuetuml Concrete (Rct Wall), Bar Rainrmcing Steel (Bel Wal1), Mobitimtian, Rest hlanagetnent Practices, Traffic Conlrol, Resident Engineers Trailer, Conti diction Monitoring Cameos, Clearing & Grubhrng, Ilnclawfied Excavation (Roadway), Suitable Barkiill Material, Cotntruu & Remove Bypass Rand, Asphalt Concrete, Crushed Misc Base. Curb & Gutter. Media" Curb, Ce ne"na Sidewalk, Concrete Dri.away Appwacli, Coucreta Crow Gancc, Cancrciv PasYmcni. Retaining Wall. Concrale Slope Protection, Curb Ramp, Masonry Block Wall, Catch Basin, Catch IIAxin / Drywcll System, Storm Drain Mnnholc. Rccaasuuct to Gnde, SO Manhole, Storm Drain Gullet rvltlrale, Storm Drain Outlet wlGmu. Concrete Collor, HDPE to-12, WTJoinl SD Pipe, Man Fencing (Retaining Walt), Maul Gale Assembly, Chain Link Fcnce, Wide Vehicle Gate w/ Lock, Temporary Pence. Meter Pedestal, Pipe Gate. Schedule go PVC, City Comm Cenduil, PullBox, Signing_ Sniping & Pavement Markers, Landscaping Sleeve. Adjust In Grade Storm Drain Manhole, Thick Dmonposed Crranirc, Remove Comaurnications M13Naull, Install f.endscaping Plant Matenel & Irrigation, Crushed Rock, Baja Crests Rubble, DccomPonied Granile - Brimstone, Structure EKraValrau (Bridge), Structure SAckrdl (Bridge), Structure Excavation Met Wa11), Structure 13ackfdl (Rel Wall). Castdn-Drilled-Ho[vPdmg. Cass-In•Drdted-Hale-Pilong. PrestressingCast-ln-Place C#norele, Street unit Conutl0. Brtdge Polymor Fiber, Structural C'onc(tte (Bridge I'uoting), SiructumI Connate IBridge), 51rucmtal Concrete, SauctuenI Concute, Approach Slab, Minor Concrete (Median Paving, Colored and Stampedy, Joint Seal Assembly, Bar Relnfufcing Steel (Budge). Bar Rainforci ng Steel (Rol Wall), Concrete Ban rer, Mewl Rs it ing(Br idge). Bridge Lighting & Pull Ilexes, Miscellaneous MeuI - Cundiril Soppon System (Bridge), Remove Sewer Manhole- Remove Pipe, Recnnstracl Sewer Manhole, 48" Scwct Manhole, 12" PVC Sewer Pipe, 18" PVC Sewer Pipe, Remove SlfucturaI 51mcmeni. Remove 16" Steel Slcave, Structural Encasement, Sower Bypass, I g" CL 3:SO PIP watemiain wl Resit. Jis, Zinc Coated & V Bic Poly IVaapped, Rcmovc Blind Flange, RonnDw Water Main, 3G" Steel Sloave, Sawcut & Rcmovt AC Pavement, Cold Miff AC Pnvtmant, Signing, Striping & Pavemcnl Mat kern, PVC, Larrdscapi rig Sleeve, Water Seiv Kc Nanifeld Recomtraction, li sta111andscapirW Pant MaterinI & Inigalion, Crushed Rock, Storm Drain Miller w/Grote, Coil¢rete'fmil, Metal Railing (Trail Retaining Walls), MOW Rail mg (Tta it Uiidercrossing), install City Fumtslred In Pavomani Solnr Guide Light, Thermoplasilc banding (Undercrossing), Solid White Suipe, Patnt Bridge Se1C1 & ]Exterior Gtfdrr, F&I Solfrt Panels wl Eleurical Connections, Schedule 40 PVC, CV Link Conduit, Pull Box. Thick Deemripased CrrAniie. Concaeta Wedge Curb, Dry Utility Trenching, Largo Vault, Salt. 40 PVC.11D Cundvii, Riser far Pole, Crack Scal & ape it Slurty Seal, Adjust to Grade Sever Kbnholt Lid & Frame la Grade, Athos[ Sewer Cteanout so Gmde, Relocate Sewer Cleuaut. Reconsirucl Sewer Marihole, Adjusl to Grade, Water Votive Can and Lid. Relocate Ali Vat Assembly, Trucking, Equipment! Rental. NOTE: Griffith Company is willing to break items of work into smaller increments to assist DBE Contractors and Suppliers in obtaining work on this project 100% Performance and Payment bonds required. Subcontractor's must possess a current contractor's license. Please contact us for details. Please call if you need assistanee in obtaining; boilditly , insurauice, c ui intent, materials, andlar suMllics. Ittcjµdr.with yguur bid the Time rrtluirrti for Perfarmancc.of yq� s bt cs sYR.ibat tie _ can establish a I; lexible Timefmme for your work. 11lans; & S-Pteciftcnl,-R-1 arc available for viewing at our once or obtained from the -Owner or portions mayBe cinailed upon request. 1. Business Name: 2. Submilting a bid: 11 Yes []No Maybe 3" Contact Person: 4, Phone #: 5. Fax #: 6. Email "" 7, CertNumber: 8 DIRNumber: 11 9.❑Material Supplier or T Sub -;fin 9tur (License )[): Other. 10, Work items we are bidding: For questions regarding this Invitation please call Jake Weigand at (562) 929-1128 Please return this form by fax to: (562) 864-8970 or email to: jwelgand@griffltheorn nV.net We intend to seriously negotiate with qualified firms for project participation. Please call if aid is needed in obtaining bondinu, lines ofcrcdit, insurance, equipment, materials, supplies, plans or related technical assistance. 8/31/22,'5:20 PM Contractors Estimate DGS DVBE Resource Packet Earthwork Takeoffs Online DVBE certification is h@ra2 Los Angeles DBEIMBE/WBE ARTICLES EDITORIALS RESOURCES a LINKS City of San Diego Si.BE - FIX PPr gmm SBE/DVBE Search minulky j3ttskness Develo m n Agmy ,Ccintractvrs Esii>Inate-ruin Certified k1S:F Irrtlr ��iui ! tk'us IhrUllratlutt eln�'r Z00? CE Focus - Focus Paper Advert,ement d,ro Augwt]Q, 74Gn. � 4�OQ R� �i}+ GRIFFITH q16-w;741COM PAN Y CA Contractors License #88 12200 Bloomfield Ave. Santa Fe Springs, Ca. 90670 Griffith Company an Equal Opportunity Employer is requesting sub -bids from all qualified subcontractors and suppliers including certified DR)F firms performing a commercially useful function for referenced project: City Project No. 2011-05 Federal Project No. BRNBIL (537) DUNE PALMS ROAD BRIDGE IMPROVEMENTS City of La Quints DBE Goal: 21% Bids open September 26th, 2022 @ 10:00 AM Scope of Work: Sawcut At Removal AC Pavement, Sawcut & Remove Conc. Slope Protection, Unclassified Excavation (Roadway), Unclassified Fill (Roadway), Suitable Backfill Material, Asphalt Concrete, Class 2 Aggregate Base, AC Dike, Curb & Gutter, Median Curb, Median Curb, Concrete Driveway Approach, Colored Stamped Concrete Median, Concrete Slope Protection, Curb Ramp, Masonry Block Wall, Schedule 40 PVC, Landscaping Sleeve, Thick Decomposed Granite, Install Landscaping Plant Material & Irrigation, Crushed Rock (Apache Brown), Crushed Rock (Desert Gold), Minus - Baja Crests Rubble, Decomposed Granite - Brimstone,. Structure Excavation (Ret Wall), Structure Backfill (Ret Wall), Structural Concrete (Ret Wall), Bar Reinforcing Steel (Ret Wall), Mobilization, Best Management Practices, Traffic Control, Resident Engineers Trailer, Construction Monitoring Camera, Clearing & Grubbing, Unclassified Excavation (Roadway), Suitable Back 111 Material, Construct & Remove Bypass Road, Asphalt Concrete, Crushed Misc. Base, Curb & Gutter, Median Curb, Concrete Sidewalk, Concrete Driveway Approach, Concrete Cross Gutter, Concrete Pavement, Retaining Wall, Concrete Slope Protection, Curb Ramp, Masonry Block Wall, Catch Basin, Catch Basin / Drywell System, Storm Drain Manhole, Reconstruct to Grade, SD Manhole, Storm Drain outlet w/Grate, Storm Drain Outlet w/Grate, Concrete Collar, HDPE N-12, WT Joint SD Pipe, Meta! Fencing (Retaining Wail), ?metal Gate Assembly, Chain Link Fence, Wide Vehicle Gate w/ Lock, Temporary Fence, Meter Pedestal, Pile Gate, Schedule 80 PVC, City Comm. Conduit, Pull Box, Signing, Striping & Pavement Markers, Landscaping Sleeve, Adjust to Grade Storm Drain Manhole, Thick Decomposed Granite, Remove Communications MH/Vault, Install Landscaping Plant Material & irrigation, Crushed Rock, Baja Cresta Rubble, Decomposed Granite - Brimstone, Structure Excavation (Bridge), Structure Baciffill (Bridge), Structure Excavation (Ret Wall), Structure Backfill (Ret Wall), Cast -In - Drilled -Hole -Piling, Cast -In -Drilled -Hole -Piling, Prestressing Cast -In -Place Concrete, Structural Concrete, Bridge Polymer Fiber, Structural Concrete (Bridge Footing), Structural Concrete (Bridge), Structural Concrete, Structural Concrete, Approach Stab, Minor Concrete (Median Paving, Colored and Stamped), Joint Seal Assembly, Bar Reinforcing Steel (Bridge), Bar Reinforcing Steel (Ret Wall), Concrete Barrier, Metal Railing (Bridge), Bridge Lighting & Pull Boxes, Miscellaneous Metal -- Conduit Support System (Bridge), Remove Sewer Manhole, Remove Pipe, Reconstruct Sewer Manhole, 48" Sewer Manhole, 12" PVC Sewer Pipe, 18" PVC Sewer Pipe, Remove Structural (incasement, Remove 36" Steel Sleeve, Structural Encasement, Sewer Bypass, IS" CL 350 DIP Watermain w/ Rwtr, its, Zinc Coated & V Bio Poly Wrapped, Remove Blind Flange, Remove Water Main, 36' Steel Sleeve, Sawcut & Remove AC Pavement, Cold Mill AC Pavement, Signing, Striping & Pavement Markers, PVC, Landscaping Sleeve, Water Service Manifold Reconstruction, Install Landscaping Plant Material & Irrigation, Crushed Rock, Storm Drain outlet w1orate, Concrete Trail, Metal Railing ('frail Retaining Walls), Metal Railing (Trail Undercrossing), Install City Furnished In Pavement Solar Guide Light, Thermoplastic Banding (Undercrossing), Solid White Stripe, Paint Bridge Soffit & Extetior Girder, F&I Soffit Panels w/ Electrical Connections, SChsduk40.P,= CVLiok Cotiduit, Puli Box, ThickAecomposrd Granite, Concrete MkAgre. Curug. Dry Utility Trenching, Large Vault, Sch. 40 PVC, tID Conduit, Riser for Pole, Crack Seal & Type 11 Slurry Seal, Adjust to Grade Sewer Manhole Lid & Frame to Grade, Adjust Sewer Cleanout to Grade, Relocate Sewer Cleanou% Reconstruct Sewer Manhole, Adjust to Grade, Water Valve Can and Lid, Relocate Air Vac Assembly, Trucking, Equipment Rental. PROJECT PLANS & SPECS: W&A- w Qnlxex.eonztshluaw2w 4j�)` li]xT1 ye8h8551FKn Id Griffith Company will work with interested subcontractors to identify opportunities to break down items into economically feasible packages. Requirements: Griffith Company is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons, and Carpenters Unions. I GD% performance and payment bonds required for the full amount of the subcontract price. -A 7we" Caltrens "DBE" Goals on Federally Funded Projects View sample BID ESTIMATE Find Certified Firms San Francisco LBEIMBEIWBE NEWS A Eff M FEDERAL BIDDING OPPORTUNITIES aprons Curren ly Advertised LrvJuh SAM SYSTEM FOR AWARD M NtGEEMM SMBE/SWBE Qle-ry. Elite SDVOB Network 1/2 www.contractorsestimate.com/focuseds/088022.htmi 8/31/22„ 5:20 PM Contractors Estimate Subcontractors must possess a current contractor's license, insurance and worker's compensation insumncc coverage meeting Griffith's requirements. A copy of the insurance requirements and ag cements can be obtained by contacting the Estimator. Please call if you nerd assistance in obtaining banding, insurance, equipment, materials, and/or supplies. Griffith Company intends to work cooperatively with all qualified firms seeking work on this project. Griffith Company is an Equal Opp Griffith Company 12200 Bloomfield Ave. Santa Fe Springs, Ca. 90670 Phone 562-929-1128 Fax 562-864-8970 Contact: Jake Weigand Email: jyrrjget�@ inSE?8rly,¢CI Published on August 30, 2022 @ 4:00 p.m by Contractor's Estimate, Inc. Located at h�]n Ilwnrur_rnniractnrsestimatk ¢UIn This advertisement will run until the bid date What are we abous2 Contact ius HOME 2/2 www.contractorsesbmate.com/focusads/088022.html 9/26/22,, 8:30 AM Contractors Estimate CE Focus - Focus Paper DGS DVBE Resource Packet Earthwork Takeoffs Online DVBE certification is liere[ Los Angeles DBE/MBENVBE ARTICLES A EDITORIALS RESOURCES A LINKS CJ1y of San D1cgo SLBE -ELBE rzogram SRf,/DVl31E S5urgk arilBusiness Deveio m n Agmy. Adwd.—M d.fe Augu,t 30. don G Rl F F I T H ■C0 M PANY CA Contractors License #88 12200 Bloomfield Ave. Santa Fe Springs, Ca. 90670 Grid'ith Company an Equal Opportunity Employer is requesting sub -bids from all qualified suhrayo►racrors and suppliers Including cerdljled DBEfrrms performing a commercially useful function for referenced project: City Project No. 2011-05 Federal Project No. BRNBEL (537) DUNE PALMS ROAD BRIDGE IMPROVEMENTS City of Le Quints DBE Goal: 21% ***NEW BID DATE/TIME: October 5, 2022 at 2:00pm*** ***Addendum 1-3 have been issued*** Scope of Work: Sawcut & Removal AC Pavement, Sawcut & Remove Cone. Slope Protection, Unclassified Excavation (Roadway), Unclassified Fill (Roadway), Suitable Backfiil Material, Asphalt Concrete, Class 2 Aggregate Base, AC Dike, Curb & Gutter, Median Curb, Median Curb, Concrete Driveway Approach, Colored Stamped Concrete Median, Concrete Slope Protection, Curb Ramp, Masonry Black Well, Schedule 40 PVC, Landscaping Sleeve, Thick Decomposed Granite, install Landscaping Plant Material & Irrigation, Crushed Rock (Apache Brown), Crushed Rack (Desert Gold), Minus - Baja Cresta Rubble, Decomposed Granite - Brimstone, Structure Excavation (Ret Wall), Structure Backfill (Ret Wall), Structural Concrete (Rat Wall), Bar Reinforcing Steel (Ret Wail), Mobilization, Best Management Practices, Traffic Control, Resident Engineers Trailer, Construction Monitoring Camera, Clearing & Grubbing, Unclassified Excavation (Roadway), Suitable Backfill Material, Construct & Remove Bypass Read, Asphalt Concrete, Crushed Misc. Base, Curb & Gutter, Median Curb, Concrete Sidewalk, Concrete Driveway Approach, Concrete Cross Gutter, Concrete Pavement, Retaining Wall, Concrete Slope Protection, Curb Ramp, Masonry Block Wall, Catch Basin, Catch Basin / Drywell System, Storm Drain Manhole, Reconstruct to Grade, SD Manhole, Storm Drain Outlet w/Grate, Storm Drain Outlet w/Grate, Concrete Collar, HDPE N-12, WT Joint SD Pipe, Metal Fencing (Retaining Wall), Metal Gate Assembly, Chain Link Fence, Wide Vehicle Gate w/ Lack, Temporary Fence, Meter Pedestal, Pipe Gate, Schedule 80 PVC, City Comm. Conduit, Pail Box, Signing, Striping & Pavement Markers, Landscaping Sleeve, Adjust to Grade Storm Drain Manhole, Thick Decomposed Granite, Remove Communications MH/Vault, Install Landscaping Plant Material & Irrigation, Crushed Rack, Baja Crests Rubble, Decomposed Granite - Brimstone, Structure Excavation (Bridge), Structure Back ilI (Bridge), Structure Excavation (Ret Walk), Structure BackfilI (Ret Wail), Cast -In - Drilled -Hole -Piling, Gist -in -Drilled -Hole -Piling, Prestressing Cast -In -Place Concrete, Structural Concrete, Bridge Polymer Fiber, Structural Concrete (Bridge Footing), Structural Concrete (Bridge), Structural Concrete, Structural Concrete, Approach Slab, Minor Concrete (Median Paving, Colored and Stamped), Joint Seal Assembly, Bar Reinforcing Steel (Bridge), Bar Reinforcing Steel (Rot Wall), Concrete Barrier, Metal Railing (Bridge), Bridge Lighting & Pull Boxes, Miscellaneous Metal - Conduit Support System (Bridge), Remove Sewer Manhole, Remove Pipe, Reconstruct Sewer Manhole, 48" Sewer Manhole, 12" PVC Sewer Pipe, IS" PVC Sewer Pipe, Remove Structural Encasement, Remove 36" Steel Sleeve, Structural Encasement, Sewer Bypass, 18" CL 350 DIP Watermain wl Restr. Its, Zinc Coated & V Bio Poly Wrapped, Remove Blind Flange, Remove Water Main, 36' Steel Sleeve, Sawcut & Remove AC Pavement, Cold Mill AC Pavement, Signing, Striping & Pavement Markers, Y�,.J-aud4cnping Sleeve, Water Service. Manifold Recanstrucii A41%Wl ia caF�pp,,)alant Material &,Imgation, Crushed Rock, Storm Drain Outlet wlGrate, Concrete Trail, Metal Railing (Trail Retaining Walls), Metal Railing (Trail Undercrossing), Install City Furnished In Pavement Solar -Guide Light, Thermoplastic Banding (Undercrossing), Solid White Stripe, Paint Bridge Soffit & Exterior Girder, F&I Soffit Panels w/ Electrical Connections, Schedule 40 PVC, CV Link Conduit, Pull Box, Thick Decomposed Granite, Concrete Wedge Curb, Dry Utility Trenching, Large Vault, Sch. 40 PVC, HD Conduit, Riser for Pole, Crack Seal & Type Il Slurry Scat, Adjust to Grade Sewer Manhole Lid & Frame to Grade, Adjust Sewer Cleanout to Grade, Relocate Sewer Cleanout, Reconstruct Sewer Manhole, Adjust to Grade, Water Valve Can and Lid, Relocate Air Vac Assembly, Trucking, Equipment Rental. PROJECT PLANS & SPECS: limns://www.drnphax&i ila u I j AAB P LyY�O 7,w,~ Zz Caltrans "DBE" Goals on Federally Funded Projects View sample BID ESTIMATE Find Certified Firms San Francisco LBEIMBE/WBE NEf A EVEN FEDERAL BIDDING Pp RLULV.11EES Caltr•artS Currently AdvW11Kd P4.11R b SAM SYSTEM FOR AWARD MANAGEMENT SMBE/SWBE Query Elite SDVOB Network 1/2 www.00ntractorsestimate.com/focusads/088022.htmi 9/26/22, 8:30 AM Contractors Estimate Griffith Company will work with interested subcontractors to identify opportunities to break down items into economically feasible packages. Requirements: Griffith Company is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons, and Carpenters Unions. 100% performance and payment bonds required for the full amount of the subcontract price. Subcontractors must possess a current contractor's license, insurance and worker's compensation insurance coverage meeting Griffith's requirements. A copy of the insurance requirements and agreements can be obtained by contacting the Estimator. Please call if you need assistance in obtaining bonding, insurance, equipment, matena]s, and/or supplies. Griffith Company intends to work cooperatively with ail qualified firms seeking work on this project. Griffith Company is an Equal Opp Griffith Company 12200 Bloomfield Ave. Santa Fe Springs, Ca. 90670 Phone 562-929-1128 Fax 562-864-8970 Contact: Jake Weigand Email: jNsjgaud ftq thcomn>3ttypp! Published on August 30, 2022 ® 4:00 p.m. by Contractor's Estimate, Inc. Located at This advertisement will run until the bid date What are we about? Contact us Terms HOME www.00ntractorsesbmate.comlfocusads/088022.html 2/2 9/28/22, 4:05 PM Contractors Estimate DGS DVBE Resource Packet Earthwork Takeoffs Online DVBE certification is herel Los Angeles OBE/MBEIwBE ARTICLES a EDITORIALS RESOURCES a LINKS City of San Diego SLBE-ELBE P4gra- SBE/DVBE Search Minorlt3, Husinak. De el pnLe t Agmy ;- Contractors S'c, iiflod 9CS I'tude and Ferns 1'ntllcnilon short, x002 CE Focus - Focus Paper Advorti,m+x,d dio ftzM 30, 2022 ®4A0 pm.lhro* bid opming data GRIFFITH C0 M P A N Y CA Contractors License #88 12200 Bloomfield Ave. Santa Fe Springs, Ca. 90670 GriKah Company an Equal Opportunity Employer is requesting sub -bids from all qualif2ed subcnntractars and suppliers including certified DBE firms performing a commercially useful function for referenced project: City Project No. 2011-05 Federal Project No. BRNBIL (537) DUNE PALMS ROAD BRIDGE IMPROVEMENTS City of La Quints DBE Goal: 21% ***NEW BID DATE/TIME: October 5, 2022 at 2:00pm*** ***Addendum 1-4 have been issued*** Scope of Work: Sawcut & Removal AC Pavement, Sawcut & Remove Cone. Slope Protection, Unclassified Excavation (Roadway), Unclassified Fill (Roadway), Suitable Backfill Material, Asphalt Concrete, Class 2 Aggregate Base, AC Dike, Curb & Gutter, Median Curb, Median Curb, Concrete Driveway Approach, Colored Stamped Concrete Median, Concrete Slope Protection, Curb Ramp, Masonry Block Wall, Schedule 40 PVC, Landscaping Sleeve, Thick Decomposed Granite, Install Landscaping Plant Material & Irrigation, Crushed Rock (Apache Brown), Crushed Rock (Desert Gold), Minus - Baja Crests Rubble, Decomposed Granite - Brimstone, Structure Excavation (Ret Wall), Structure Backfill (Ret Wall), Structural Concrete (Rot Wall), Bar Reinforcing Steel (Ret Wall), Mobilization, Best Management Practices, Traffic Control, Resident Engineers Trailer, Construction Monitoring Camera, Clearing & Grubbing, Unclassified Excavation (Roadway), Suitable Backfill Material, Construct & Remove Bypass Road, Asphalt Concrete, Crushed Misc. Base, Curb & Gutter, Median Curb, Concrete Sidewalk, Concrete Driveway Approach, Concrete Cross Gutter, Concrete Pavement, Retaining Wall, Concrete Slope Protection, Curb Ramp, Masonry Block Wall, Catch Basin, Catch Basin I Dryweli System, Storm Drain Manhole, Reconstruct to Grade, SD Manhole, Storm Drain Outlet w/Grate, Storm Drain Outlet w/Grate, Concrete Collar, HDPE N-12, WT Joint SD Pipe, Metal Fencing (Retaining Wall), Metal Gate Assembly, Chain Link Fence, Wide Vehicle Gate wl Lock, Temporary Fence, Meter Pedestal, Pipe Gate, Schedule 80 PVC, City Comm. Conduit, Pull Box, Signing, Striping & Pavement Markers, Landscaping Sleeve, Adjust to Grade Storm Drain Manhole, Thick Decomposed Granite, Remove Communications MHIVault, Install Landscaping Plant Material & Irrigation, Crushed Rock, Baja Cresta Rubble, Recomposed Granite- Brimstone, Structure Excavation (Bridge), Structure Backfill (Bridge), Structure Excavation (Ret Wall), Structure Backfill (Ret Wall), Cast -In - Drilled -Hole -Piling, Cast-In-Drilled-Hole^Pilin$, Prestressing Cast•in-Place Concrete, Structural Concrete, Bridge Polymer Faber, Structural Concrete (Bridge Fooling), Structural Concrete (Bridge), Structural Concrete, Structural Concrete, Approach SIab, Minor Concrete (Median Paving, Colored and Stamped), Joint Seal Assembly, Bar Reinforcing Steel (Bridge), Bar Reinforcing Steel (Ret Wall), Concrete Barrier, Metal Railing (Bridge), Bridge Lighting & Pull Boxes, Miscellaneous Metal - Conduit Support System (Bridge), Remove Sewer Manhole, Remove Pipe, Reconstruct Sewer Manhole, 48" Sewer Manhole, 12" PVC Sewer Pipe, 18" PVC Sewer Pipe, Remove Structural Encasement, Remove 36" Steel Sleeve, Structural Encasement, Sewer Bypass, 18" CL 350 DIP Watermain w/ Restr•. its, Zinc Coated & V Bio Poly Wrapped, Remove Blind Flange, Remove Water Main, 36" Steel Sleeve, Sawcut & Remove AC Pavement, Cold Mill AC Pavement, Signing, Striping & Pavement Markers PVC, Landscaping Sleeve, ,$' vice�uiiq�djterpatst7uctian, lostall Landscaping Plant Materiel & Iniga44k Crushed Rock, Storm Drain Outlet w/Grate, Concrete Trail, Metal Railing (Trail Retaining Walls), Metal Railing (Trail Undercrossing), install City Furnished In Pavement Solar Guide Light, Thermoplastic Banding (Undercrossing), Solid White Stripe, Paint Bridge Soffit & Exterior Girder, F&I Soffit Panels w/ Electrical Connections, Schedule 40 PVC, CV Link Conduit, Pull Box, Thick Decomposed Granite, Concrete Wedge Curb, Dry Utility Trenching, Large Vault, Sch. 40 PVC, III) Conduit, Riser for Pole, Crack Seal & Type 11 Slurry Seal, Adjust to Grade Sewer Manhole Lid & Frame to Grade, Adjust Sewer Clcanout to Grade, Relocate Sewer Cleanout, Reeonstruct Sewer Manhole, Adjust to Grade, Water Valve Can and Lid, Relocate Air Vac Assembly, Trucking, Equipment Rental, PROJECT PLANS & SPECS: 111111 IIwww.drs�pha nil•1 + l jx19d/AA13p5ji1�1 $j Ye8hA5$xPICa4dl=0 Caltrans "DBE" Goals on Federally Funded Projects View sample BID ESTIMATE Find Certified Firms San Francisco LBEIMBEfWBE NEWS A In VE i rJarm CurmnAy AdYmillkW l wi=ft Wu d. �: .� tr 1' SMBVB-WU1 Query F litc SRV-0-R- Network 1/2 www.contractorsestimate.com/focusads/088022.htmi 9/28/22.4:05 PM Contractors Estimate Griffith Company will work with interested subcontractors to identify opportunities to break down items into economically feasible packages. Requirements: Griffith Company is signatory to operating Engineers, Laborers, Teamsters, Cement Masons, and Carpenters Unions. I GO% performance and payment bonds required for the full amount of the subcontract price. Subcontractors must possess a current contractor's license, insurance and worker's compensation insurance coverage meeting Griffith's requirements. A copy of the insurance requirements and agreements can be obtained by contacting the Estimator. Please call if you need assistance in obtaining banding, insurance, equipment, materials, and/or supplies. Griffith Company intends to work cooperatively with all qualified firms seeking work on this project. Griffith Company is an Equal Opp Griffith Company 12200 Bloomfield Ave. Santa Fe Springs, Ca. 90670 Phone 562-929-1128 Fax 562-864-8970 Contact: Jake Weigand Email: j3YcjgWId@9dfflIbQ=WWYAM Published on August 30, 2022 g 4:00 p.m. by Contractor's Estimate, Inc. Located at This adverdwxu_nt will ttm until the bid date What arc we abouCt Contact -us w M= HOME 2/2 www.contractorsestlmate.com/focusads/088022.html 8/31/22r 5:19 PM Contractors Estimate ill DGS DVBE Resource Packet Earthwork Takeoffs Online DVBE certification is Izerel Los Angeles DSE/MBE/WBE ARTICLES EDITORIALS RESOURCES_ LINK C1]y of San Diego SLBE-Elm rrugram SBE1D J, L SSarch Minor i y Buslness Development Agency CE Trade - Trade Paper 30, 2022 ® 4:00 p.m Oro* bid opining drk G R I F F I T H TEAICQM PAN CA Contractors License #88 12200 Bloomfield Ave. Santa Fe Springs, Ca. 90670 Grljfith Company an Equal Opportunity Employer Ls requesdng sub -bids from all quallfred subcontractors and suppliers including cert fed DBL, flrmr performing a commercially useful funrdon for referenced project: City Project No. 2011-05 Federal Project No. BRNBIL (537) DUNE PALMS ROAD BRIDGE IMPROVEMENTS City of La Quints DBE Goal: 21% Bids open September 26tb, 2022 @ 10:00 AM scope or Work: Sawcut & Removal AC Pavement, Sawcut & Remove Cone. Slope Protection, Unclassified Excavation (Roadway), Unclassified Fill (Roadway), Suitable Backfill Material, Asphalt Concrete, Class 2 Aggregate Base, AC Dike, Curb & Gutter, Median Curb, Median Curb, Concrete Driveway Approach, Colored Stamped Concrete Median, Concrete Slope Protection, Curb Ramp, Masonry Blook Wall, Schedule 40 PVC, Landscaping Sleeve, Thick Decomposed Granite, install Landscaping Plant Material & Inigation, Crushed Rock (Apache Brownj, Crushed Rock (Desert Gold), Minus — Baja Crests Rubble, Decomposed Granite — Brimstone, Structure Excavation (Act Wall), Structure Backfill (Rot Wall), Structural Concrete (Rot Wall), Bar Reinforcing Steel (Rot Wall), Mobilization, Best Management Practices, Traffic Control, Resident Engineers Trailer, Construction Monitoring Camera, Clearing & Grubbing, Unclassified Excavation (Roadway), Suitable Backfill Material, Construct & Remove Bypass Road, Asphalt Concrete, Crushed Misc. Base, Curb & Gutter, Median Curb. Concrete Sidewalk, Concrete Driveway Approach, Concrete Cross Gutter, Concrete Pavement, Retaining Wall, Concrete Slope Protection, Curb Ramp, Masonry Block Wall, Catcb Basin, Catch Basin 1 Drywell System, Storm Drain Manhole, Reconstruct to Grade, SD Manhole, Storm Drain outlet w/Crrate, Storm Drain Outlet w/Crate, Concrete Collar, HDPE N-12, WT Joint SD Pipe, Metal Fencing (Retaining Wall), Metal Gate Assembly, Chain Link Fence, Wide Vehicle Gate wl Lack, Temporary Fence, Meter Pedestal, Pipe Gate, Schedule 80 PVC, City Comm. Conduit, Pull Box, Signing, Striping & Pavement Markers, Landscaping Sleeve, Adjust to Grade Storm Drain Manhole, Thick Decomposed Granita, Remove Communications MH/Vauit, Install Landscaping Plant Material & Irrigation, Crushed Rock, Baja Crests Rubble, Decomposed Granite — Brimstone, Structure Excavation (Bridge), Structure Backfill (Bridge), Structure Excavation (Ret Wall), Structure Backfill (Ret Wall), Cast -In -Drilled -Hole -Piling, Cast -In -Drilled -Hole -Piling, Prestressing Cast - In -Place Concrete, Structural Concrete, Bridge Polymer Fiber, Structural Concrete (Bridge Footing), Structural Concrete (Bridge), Structural Concrete, Structural Concrete, Approach Slab, Minor Concrete (Median Paving, Colored and Stamped), Joint Seal Assembly, Bar Reinforcing Steel (Bridge), Bar Reinforcing Steel (Rot Wall), Concrete Barrier, Metal Railing (Bridge), Bridge Lighting & Put Boxes, Miscellaneous Metal — Conduit Support System (Bridge), Remove Sewer Manhole, Remove Pipe, Reconstruct Sewer Manhole, 48" Sewer Manhole, 12" PVC Sewer Pipe, 18" PVC Sewer Pipe, Remove Structural Encasement, Remove 36" Steel Sleeve, Structural Encasement, Sewer Bypass, IS" CL 350 DIP Watermain w/ Restr. Its, Zinc Coated & V Bio Poly Wrapped, Remove Blind Flange, Remove Water Main, 36" Steel Sleeve, Sawcut & Remove AC Pavement, Cold Mill AC pavement, Signing, Striping & Pavement Markers, PVC, Landscaping Sleeve, Water Service Manifold Reconstruction, Install Landscaping Plant Material & Irrigation, Crusbed Rock, Storm Drain Outlet w/Grate, Concrete Trail, Metal Railing (frail Retaining Walls), Metal Railing (T)raiI Undercrossing), Install City Furnished in Pavement Solar Guide Light, Thermoplastic Banding (UndercrossingJ Solid White Stripe, Paint Bridge Soffit & Exterior Girder, F&I Soffit Panels w/ Electrical Connections, Schedule 40 PVC, CV Link Conduit, Pali Box, Thick Decomposed Granite, Concrete Wedge Curb, Dry Utility Trenching, Large Vault, Sch. 40 PVC, TID Conduit, Riser for Pole, Crack Seal & Type Il Slurry Seal, Adjust to Prade flowe r Manhole Lid & Frame to Grade, Adjust Sewer Cloanout to GradePBeeiaeate Sarver Cleanout; Reconstruc Sewer Manhole, Adjust to Grade, Water Valve Can and Lid, Relocate Air Vac Assembly, Trucking, Equipment Rental PROJECT PLANS & SPECS: hUps:l/www. I abox.comishluntiti,:��rp1�Gj��U N0yJ&US1ffA_2di^[] Griffith Company will -work with interested subcontractors to identify opportunities to break down items into economically feasible packages. Requirements: Griffith Company is signatory to Operating Engineers, Laborers,'1'eamsiem Cement Masons, and Carpenters Unions. 100% performance and payment bonds required for the full amount of the subcontract price. Subcontractors must possess a current contractor's license, insurance and worker's compensation insurance coverage meeting Griffith's requirements. A copy of the insurance requirements and agreements can be obtained by contacting the Estimator. Please call if you need assistance in obtaining bonding, insurance, equipment, materials, and/or 7,6eW4 Caltrans "DBE" Goals on Federally Funded Projects View sample BID ESTIMATE Find Certified Firms San Francisco LBEIMBEIWBE NEW EVE T ff.aER& BIDDING OPPORTUNITIES ltr n Currently, Advertised PPr jsdei SAM SYSTEM FOR AWARD MANAGEMENT SMBE/SWBE QQuery Elite SDVOB Network 1/2 www.contractorsestimate.com/tradeads/088022.htmi 8131/2215:19 PM Contractors Estimate supplies. Griffith Company intends to work cooperatively with all quaiif ad firms seeking work on this project. Griffith Company is an Equal ❑p,t Griffith Company 12200 Bloomfield Ave. Santa Fe Springs, Ca. 90670 Phone 562-929-1128 Fax 562-864-8970 Contact: Jake Weigand Email: jmTjgud®gt1Tl,jtIssmp»Y� . Published on August 30, 2022 @ Alt p.m. by Contractor's Estimate, Inc. Located at ! This advertisement will run until the bid date What are we about? Cznmct u n= HOME www.contractorsesbmate.com/tradeads/088022.html 212 - 9/26/220 8:32 AM Contractors Estimate DGS DVBE Resource Packet Earthwork Takeoffs Online DVBE certification is erel Los Angeles DBE/MBEIWBE ARTICLES A EDITORIALS RESOURCES A LINKS U1Y_RrS#1 g4 SLBE-ELBE Frogmin SBE/DVBE Search _�1�l4Yi1y Business Pcycl pment Agency Es t t•i1 3 � ,<_ 1 ai�si t = tt F .FP.f _ :.f� tkifr) CE Trade - Trade Paper Advoremmmm dam AurA[ 30. M2 ® 4:00 ➢ m Ihmugh bidgm-Wg d-te G RI F F I T H �C0 M P A N Y CA Contractors License #88 12230 Bloomfield Ave. Santa Fe Springs, Ca. 90670 Griffloh Company an Fqual Opportunity Employer is requesting su&bids from all qualified subcontractors and suppliers including certified DBE firms performing a commercially usef"Ifuncrion for referenced project. City Project No. 2011-05 Federal Project No. BRNBIL (537) DUNE PALMS ROAD BRIDGE IMPROVEMENTS City of La Quints DBE Goal: 21% ***NEW BID DATE/TIME: October 5, 2022 at 2:00pm*** ***Addendum 1-3 have been issued*** Scope of Work: Sawcut & Removal AC Pavement. Sawcut & Remove Conc. Slope Protection, Unclassified Excavation (Roadway), Unclassified Fill (Roadway), Suitable Backfill Material, Asphalt Concrete, Class 2 Aggregate Base, AC Dike, Curb & Gutter. Median Curb, Median Curb, Concrete Driveway Approach, Colored Stamped Concrete Median, Concrete Slope Protection, Curb Ramp, Masonry Block Wall, Schedule 40 PVC, Landscaping Sleeve, Thick Recomposed Granite, Install Landscaping Plant Material & Irrigation, Crushed Rock (Apache Brown), Crushed Rock (Desert Gold), Minus — Baja Crests. Rubble, Decomposed Granite -- Brimstone, Structure Excavation (Ret Wall). Structure Backfill (Ret Wall), Structural Concrete (Ret Wall), Bar Reinforcing Steel (stet Wall), Mobilization, Best Management Practices, Traffic Control, Resident Engineers Trailer, Construction Monitoring Camera, Clearing & Grubbing, Unclassified Excavation (Roadway), Suitable Backfill Material, Construct & Remove Bypass Road, Asphalt Concrete, Crushed Misc. Base, Curb & Gutter, Median Curb, Concrete Sidewalk, Concrete Driveway Approach, Concrete Cross Gutter, Concrete Pavement, Retaining Wall, Concrete Slope Protection, Curb Ramp, Masonry Block Wall, Catch Basin, Catch Basin / Drywall System, Storm Drain Manhole, Reconstruct to Grade, SD Manhole, Storm Drain Outlet w/Grate, Storm Drain Outlet w/Onde, Concrete Collar, HDPE N-12, f W Joint SD Pipe, Metal Fencing (Retaining Wall), Metal Gate Assembly, Chain Link Fence. Wide Vehicle Gate wl Lock, Temporary Fence, Meter Pedestal, Pipe Gate, Schedule 80 PVC, City Comm. Conduit, Pull Box, Signing, Striping & Pavement Markers, Landscaping Sleeve, Adjust to Grade Storm Drain Manhole, Thick Decomposed Granite, Remove Communications MHNauIt, Install Landscaping Plant Material & irrigation, Crushed Rock, Baja Cresta Rubble, Decomposed Granite— Brimstone, Structure Excavation (Bridge), Structure Backfill (Bridge), Structure Excavation (Ret Wall), Structure Backfill (Re( Wall), Cast -in -Drilled -Bole -Piling, Cast -In -Drilled -Hole -Piling, Prestressing Cast - In -Place Concrete, Structural Concrete, Bridge Polymer Fiber, Structural Concrete (Bridge Footing) Structural Concrete (Bridge), Structural Concrete, Structural Concrete, Approach Slab, Minor Concrete (Median Paving, Colored and Stamped), Joint Seal Assembly, Bar Reinforcing Steel (Bridge), Bar Reinforcing Steel (Ret Wall), Concrete Barrier, Metal Railing (Bridge), Bridge Lighting & Pull Boxes, Miscellaneous Metal -- Conduit Support System (Bridge), Remove Sewer Manhole, Remove Pipe, Reconstruct Sewer Manhole, 48" Sewer Manhole, 12" PVC Sewer Pipe, IS" PVC Sewer Pipe, Remove Structural Encasement, Remove 36" Steel Sleeve, Structural Encasement, Sewer Bypass, 18" CL 350 DIP Watermain w/ Itestr. its, Zinc Coated & V Bio Poly Wrapped, Remove Blind Flange, Remove Water Main, 36" Steel Sleeve, Sawcut & Remove AC Pavement, Cold Mill AC Pavement, Signing, Striping & Pavement Markers, PVC, Landscaping Sleeve, Water Service Manifold Reconstruction, Install Landscaping Plant. Material & Irrigation, Crushed Rock, Storm Drain Outlet w/Grate, Concrete Trail, Metal Railing (Trail Retaining Walls), Metal Railing (Trail Undercrossingjt4asiali Giay Famished in Pavement Solar Guide Light; Thermoplastic Banding (Undercrossing), Solid White Stripe, Paint Bridge Soffit & Exterior Girder, F&I Soffit Panels w/ Electrical Connections, Schedule 40 PVC, CV Link Conduit, Pull Box, Thick Decomposed Granite, Concrete Wedge Curb, Dry Utility Trenching, Large Vault, Sch. 40 PVC, III] Conduit, Riser for Pale, Crack Seal & Type 11 Slurry Seal, Adjust to Grade Sewer Manhole Lid & Frame to Grade, Adjust Sewer Cleanout to Grade, Relocate Sewer Clesttout, Reconstruct Sewer Manhole, Adjust to Grade, Water Valve Can and Lid, Relocate Air Vac Assembly, Trucking, Equipment Rental. PROJECT PLANS & SPECS: illlpsJ/wsvw dronbox.camisttluaw2wcu l0fijx14d1AABU5tstPYp�lZL'3.$.l�y� Griffith Company will work with interested subcontractors to identify opportunities to break down items into economically feasible packages. Caltrans "DBE" Goals on Federally Funded Projects View sample BID ESTIMATE Find Certified Firms San Francisco LBEIMBE/WBE 8 EVENlr� E90MM r IMN OPPORTUNITLES Caltrpp cArmatly Advertised r"j". SMSEI5E QWy Elite SDVOB Network /2 www.contractorsestimate.com/tradeads/088022.htmi 9/26/22, 8:32 AM Contractors Estimate Requirements. Griffith Company is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons, and Carpenters Unions. 100% perfonnance and payment bonds required far the' fulI amount of the subeontrac. price. Subcontractors must possess a current contractor's license, insurance and worker's compensation insurance coverage meeting Griffith's requirements. A copy of the insurance requirements and agreements can be obtained by Contacting the Estimator. Please call if you need assistance in obtaining bonding, insurance, equipment, materials, and/or supplies. Griffith Company intends to work cooperatively with all qualified firms seeking work on this project. Griffith Company is an Equal Opp Griffith Company 12200 Bloomfield Ave. Santa Fe Springs, Ca. 90670 Phone 562-929-1128 Fax 562-864-8970 Contact: Jake Weigand Email: j3WgMd.®g1-- Published on August 30, 2022 @ 4:00 p.m. by Contractor's Estimate, Inc. Located at W www This advertisement will run until the bid date what are we about? Contacts • Terms HOME www.contractorsestimate.com/tradeadsIO88022.html 212 9/28/22; 4:04 PM Contractors Estimate �14,,,Contractors Edits ale.,tin, rw� Certified 1M:S I}u(he and I•urtot I'tiIklie ntiait since I(lllt CE 7)rade - Trade Paper Advmd—mt d.W Aup-130,2022®4:00 P-mf1 mo bid op-h*d-tc — _ r%fY.fSIF,4 GRIFFITH �,Z `�49 C O M P A N Y Coltrane DGS "DBE" Goals DVBE Resource CA Contractors License #88 on Federally Packet Funded Projects 12200 Bloomfield Ave. Santa Fe Springs, Ca. 90670 Earthwork Gri tlr Company an E uaI O arrant Employer Is re requesting sub -bids from allqualified subcontractors and View sample if+ P Y a PP tY 4 � f Takeoffs suppliers including certified DBE firms performing a commercially usefuifunedon for referenced project: BID ESTIMATE Online DVBE City Project No. 2011-05 Find Federal Project No. BRNBltL (537) Certified certification is DUNE PALMS ROAD BRIDGE IMPROVEMENTS er i City of La Quints Firms DBE Goal: 21% Los Angeles San Francisco DBEIMBENVEIE BigSeplern�er27tLBE/MBEIWBE ***NEW BID DATE/TIME: October 5, 2022 at 2:00pm*** ARTICLES NEW a ***Addendum 14 have been issued*** A EDITORIALS EVENT 5ce{rc of lynrk: Sawcut &Removal AC Pavement, Sawcut & Remove Canc. Slope Protection, Unclassified Excavation (Roadway), Unclassified Fill (Roadway), Suitable Backfill Material, Asphalt Concrete, CIass 2 Aggregate FEDERAL RESOURCES - Base, AC Dike, Curb & Gutter, Median Curb, Median Curb, Concrete Driveway Approach, Colored Stamped BIDDING a Concrete Median, Concrete Slope Protection, Curb Ramp, Masonry Black Wall, Schedule 40 PVC, Landscaping OPPORTUNITIES LINKS Sleeve, Thick Decomposed Granite, Install Landscaping Plant Material & Irrigation, Crusbed Rock (Apache Brown), Crushed Rock (Desert Gold), Minus -- Baja Crests Rubble, Decomposed Granite - Brimstone, Structure Excavation altran -U-Y-4f San D3egQ 1 (Ret Wall), Structure Backfill (Ret Wall), Structural Concrete (Ret Wall), Bar Reinforcing Steel (Rat Wall), ntl SLBE - FLBF 4obiiixation, Hest Management Practices, Traffic Control, Resident Engineers Trailer, Construction Monitoring Currently Emig= Camera, Clearing & Grubbing, Unclassified Excavation (Roadway), Suitable Backfill Material, Construct & Remove Advertised Bypass Read, Asphalt Concrete, Crushed Mise. Base, Curb & Gutter, Median Curb. Concrete Sidewalk, Concrete Projects S1lFJDV2E&greh, Driveway Approach, Concrete Cross Gutter, Concrete Pavement, Retaining Wall, Concrete Slope Protection, Club Inorl y Bus{rress Ramp, Masonry Block Wall, Catch Basin, Catch Basin 1 Drywell System, Storm Drain Manhole, Reconstruct to SAM SYSTEM Development Grade, SD Manhole, Storm Drain Outlet w/Grate, Storm Drain Outlet w/Grate, Concrete Collar, HDPE N-12, WT FOR AWARD Joint SD Pipe, Metal Fencing (Retaining Wall), Metal Gate Assembly, Chain Link Fence, Wide Vehicle Gate w/ Lock, MANAGEMENT Agency Temporary Fence, Meter Pedestal, Pipe Gate, Schedule 80 PVC, City Comm. Conduit, Pull Box, Signing, Striping & Pavement Markers, Landscaping Sleeve, Adjust to Grade Storm Drain Manhole, Thick Decomposed Granite, Remove SMBE/SWBE Communications MTVVault, install Landscaping Plant Material & Irrigation, Crushed Rock, Baja Crests Rubble, Ql1e_-rY Decomposed Granite - Brimstone, Structure Excavation (Bridge), Structure Backfill (Bridge), Structure Excavation (Rot Wall), Structure Backfill (Ret Wall), Cast -In -Drilled -Hole -Piling, Cast -In -Drilled -Hole -Piling, Prestressing Cast- Elite SDVOB In-Placc Concrete, Structural Concrete, Bridge Polymer Fiber, Structural Concrete (Bridge Footing), Structural Network Concrete (Bridge), Structural Concrete, Structural Concrete, Approach Slab, Minor Concrete (Median Paving, Colored and Stamped), Joint Seal Assembly, Bar Reinforcing Steel (Bridge), Bar Reinforcing Steel (Ret Wall), Concrete Barrier, Metal Railing (Bridge), Bridge Lighting & Pull Boxes, Miscellaneous Metal - Conduit Support System (Bridge), Remove Sewer Manhole, Remove Pipe, Reconstruct Sewer Manhole, 49" Sewer Manhole, 12" PVC Sewer Pipe, 18" PVC Sewer Pipe, Remove Structural Encasement, Remove 36" Steel Sleeve, Structural Encasement, Sower Hypes, 18" CL 350 DIP Watermain w/ Restr. its, Zinc Coated & V Bio Poly Wrapped, Remove Blind Flange, Remove Water Main, 36" Steel Sleeve, Sawcut & Remove AC Pavement, Cold Mill AC Pavement, Signing, Striping & Pavement Markers, PVC, Landscaping Sleeve, Water Service Manifold Reconstruction, Install Landscaping Plant Material & Irrigation, Crushed Rock, Storm Drain Outlet w/Grate, Concrete Ttaii, Metal Railing (Trail Retaining Walla)t Metai RriRng ('trail Undererosaing), Install City Furnished in Pavement Solar Guido light; Therrr *2aGa Banding (Undercrossing), Solid White Stripe, Paint Bridge Soffit & Extcrior Girder, F&I Soffit Panels wl Electrical Conneclioas, Schedule 40 PVC, CV Link Conduit, Pull Box, Thick Decomposed Granite, C6 icrcte Wedge Curb, Dry Utility Trenching, Large Vault, Sch. 40 PVC, III) Conduit, Riser for Pole, Crack Seal & Type 11 Slurry Seal, Adjust to Grade Sewer Manhole Lid & Frame to Grade, Adjust Sewer Cleanout to Grade, Relocate Sewer Cleanout, Reconstruct Sewer Manhole, Adjust to Grade, Water Valve Can and Lid, Relocate Air Vac Assembly, Trucking, Equipment Rental PROJECT PLANS & SPECS: / x14cl1AA[3i158PYQ$�YrRhS[SStPif$7d1=0 11lIRSJ1dW 1 - Griffith Company will work with interested subcontractors to identify opportunities to break down items into economically feasible packages. 1/2 www.contractorsestimate.com/tradeads/088022.htmi " 9/28/22r 4:04 PM Contractors Estimate Requirements: Griffith Company is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons, and Catpenters Onions. 100% perfonnance and payment bonds required for the full amount of the subcontract price. Subcontractors must possess a current contractor's license, insurance and worker's compensation insurance coverage meeting Griffith's requirements. A copy of the insurance requirements and agreements can be obtained by contacting the Estimator, Please call 1f you need assistance in obtaining bonding, insurance, equipment, materials, and/or supplies. Griffith Company intends to work cooperatively with all qualified firms seeking work on this project. Griffith Company is an Equal Opp Griffith Company 12200 Bloomfield Ave. Santa Fe Springs, Ca. 90670 Phone 562-929-1128 Fax 562-864-8970 Contact: Jake Weigand Email: jw- jg 9Lifiilli=MPfll_y= Published on August 30, 2022 @ 4:00 p.m. by Contractor's Estimate, Inc. Located at + :1I This advertisement will run until the bid date _ What are 3Kabout? COW&U us Tom HOME 2/2 www.00ntractorsestimate.com/tradeads/088022.html