HomeMy WebLinkAboutGriffith Good Faith Effort (2011-05) Part GGRIFFITH
r:;;A C
0
M
PANY
3050 East Birch Street, Brea, Ca. 92821
City of La Quinta
Dune Palms Road Bridge Improvements
Good Faith Effort
Part G.
DBE GOOD FAITH EFFORTS DOCUMENTATION
Bidders Name: Griffith Company
Contract No.: City of La Quinta
S. List the names of agencies and the dates on which they were contacted to provide assistance in contacting, recruiting, and using DBE firms. if the agencies were contacted in writing,
provide copies of supporting documents.
Agencies contacted:
Dune Palms Road Bridge Improvements Type of Contact
Date contacted Federal Agencies contacted:
9/1/2022 US Small Business Administration: Advertised project
https://www.sba.gov/contracting/findi - overnment-customers subcontractin on US SBA
sub -net.
State Agencies contacted:
8/31/2022 Caltrans - Office of Business and Economic Opportunity **NEW SITE**
https://caltrans.dbesystem.com/
8/31/2022 Caltrans - Office of Business and Economic Opportunity
htt s: dot.ca. ov ra rams civil-ri hts dbe-search
Local Organizations contacted:
9/1/2022 American Indian Chamber of Commerce of California
traey .adproweb.com Los Angeles, CA
9/l /2022
9/1/2022
9/l/2022
8/30/2022
Asian Business Association
info@abala.org_
Los Angeles, CA
Orange County Inland Empire Small Business Development
sbdc@fullerton.edu Fullerton, CA 92831
Online Search
see list for firms
Online Search
see list for firms
Emailed ITB
and requested
assistance
Emailed ITB
and requested
assistance
Emailed ITB
and requested
assistance
I PTAC Emailed ITB
ptac@rccd.edu Inland Empire, CA and requested
assistance
Local Referral Organization: Contractor's Estimate, Inc. (www.contractorsestimate.com)
_ 9 - Awarding Dq artnNftEtoatrl+ed- bidder -
Always comewl the &yarding Departtnen7for your bid. risk if !here are ally �aeci�ic .I'rvZecl oa' 1'rv� unt
Requiremenis needed to complete your Goad Faith Effort. Specifically ask iJ, Additirrnal advertising or Additional
Listin s in government or other publications like SBA or Caltrans is required. Ask if they have Opt -In- or Primes
adverdvhm or help listino that you'll need to join for the bid. Ask for any other information needed jor your good
faith effort.
Firefox https://ewebl.sba.gov/subnet/client/dsp_solicitation business_details.c...
Solicitation Detail All Solicitations from this Business Business Information
Business Name: Griffith Company
Type of Businesses Being
Solicited
Disadvantaged Business Enterprise Solicitation (SOL) /
(DBE) NSS POC
NAICS Code First Name: Jack
238110 Poured Concrete Foundation Last Name: Weigand
and Structure Contractors
Phone: 562-929-1128
Fax: 562-864-8970
Additional NAICS Code
Email:
• 237990 ;561730 ;238120 ;423990
jweigand _griffithcompany.net
;561990 ;238990 ;238910 ;237310 ;
Place of Performance
Solicitation (SOL) /
CA: Riverside
NSS Brief Description:
City of La Quinta - Dune Palms Road
Performance Start Date
Bridge Improvements. Plans & Specs:
https://www.dropbox.com
10/26/2022
/sh/uaw2weu 106jxl9d
/AAB058PYgUzN8Nye8b85StPKa?dI=0Solicitation (SOL) /
DBE Goal: 21%
NSS Closing Date
09/26/2022 10:00 AM
Files Attached:
Time Zone: PDT
/City of LaQuinta - ITB.pdf
Back
Solicitation
(SOL) /
NSS
No. SOL-2011-05.
1 of 1 9/1/2022, 8:10 AM
Griffith Com an @ riffithcom an .net
From: Griffith Company@griffithcompany.net <gfeassist34@contractorsestimate.com>
Sent: Thursday, September 1, 2022 8:09 AM
To: 'tracy@adproweb.com'
Subject: Requesting DBE Assistance for City of La Quinta - Dune Palms Road Bridge Improvements
Attachments: City of LaQuinta - ITB.pdf
American Indian Chamber of Commerce of California
_W;1.:f :1 ._ -i
Hello,
Griffith Company is bidding on the City of La Quinta - Dune Palms Road Bridge Improvements as a general contractor
and is requesting bid proposals from all DBE subcontractors and suppliers. To better help us with obtaining our goals, we
are requesting your assistance in supplying us with any DBE listings/referrals you may have to offer. In addition, please
post and or distribute the attached Invitation to bid on any bulletin boards you may have for DBE firms to view. If you
have any questions or need additional information, please reply to this email or contact the Estimator: estimator: Jack
Weigand, Estimator: jweigand@griffithcompany.net
Thank You
Griffith ComDanv Reouests Sub -bids from All Qualified & Certified DBE Subcontractors/Suppliers for:
Contracting Agency: City of La Quinta
Project: Dune Palms Road Bridge Improvements
DBE Goal: 21%
Bids open September 26, 2022, at 10:00 AM
Plans & Specs: https://www.dropbox.com/sh/uaw2weulO6ixi9dlAABO58PYgUz Ne8b85StPKa?d1=0
Griffith Company an Equal Opportunity Employer requests sub quotes from all qualified subcontractors and suppliers
including certified DBE firms performing commercially useful function for the following items of work, including but
not limited to: Sawcut & Removal AC Pavement, Sawcut & Remove Conc. Slope Protection, Unclassified Excavation
(Roadway), Unclassified Fill (Roadway), Suitable Backfill Material, Asphalt Concrete, Class 2 Aggregate Base, AC Dike,
Curb & Gutter, Median Curb, Median Curb, Concrete Driveway Approach, Colored Stamped Concrete Median, Concrete
Slope Protection, Curb Ramp, Masonry Block Wall, Schedule 40 PVC, Landscaping Sleeve, Thick Decomposed Granite,
Install Landscaping Plant Material & Irrigation, Crushed Rock (Apache Brown), Crushed Rock (Desert Gold), Minus — Baja
Cresta Rubble, Decomposed Granite — Brimstone, Structure Excavation (Ret Wall), Structure Backfill (Ret Wall),
Structural Concrete (Ret Wall), Bar Reinforcing Steel (Ret Wall), Mobilization, Best Management Practices, Traffic
Control, Resident Engineers Trailer, Construction Monitoring Camera, Clearing & Grubbing, Unclassified Excavation
(Roadway), Suitable Backfill Material, Construct & Remove Bypass Road, Asphalt Concrete, Crushed Misc. Base, Curb &
Gutter, Median Curb, Concrete Sidewalk, Concrete Driveway Approach, Concrete Cross Gutter, Concrete Pavement, -
Retaining Wall, Concrete Slope Protection, Curb Ramp, Masonry Block Wall, Catch Basin, Catch Basin / Drywell System,
Storm Drain Manhole, Reconstruct to Grade, SD Manhole, Storm Drain Outlet w/Grate, Storm Drain Outlet w/Grate,
Concrete Collar, HDPE N-12, WTJoint SD Pipe, Metal Fencing (Retaining Wall), Metal Gate Assembly, Chain Link Fence,
Wide Vehicle Gate w/ Lock, Temporary Fence, Meter Pedestal, Pipe Gate, Schedule 80 PVC, City Comm. Conduit, Pull
Box, Signing, Striping & Pavement Markers, Landscaping Sleeve, Adjust to rade'Storm ❑rain Manhole, Thick
Decomposed -Granite, Remove Communications MH/Vault,-Install Landscaping Plant Material & Irrigation, Crushed Rack,
Baja Cresta Rubble, Decomposed Granite — Brimstone, Structure Excavation (Bridge), Structure Backfill (Bridge),
Structure Excavation (Ret Wall), Structure Backfill (Ret Wall), Cast -In -Drilled -Hole -Piling, Cast -In -Drilled -Hole -Piling,
Prestressing Cast -In -Place Concrete ,'Structural Concrete, Bridge Polymer Fiber, Structural Concrete (Bridge Footing),
Structural Concrete (Bridge), Structural Concrete, Structural Concrete, Approach Slab, Minor Concrete (Median Paving,
Colored and Stamped), Joint Seal Assembly, Bar Reinforcing Steel (Bridge), Bar Reinforcing Steel (Ret Wall), Concrete
Barrier, Metal Railing (Bridge), Bridge Lighting & Pull Boxes, Miscellaneous Metal —Conduit Support System (Bridge),
Remove Sewer Manhole, Remove Pipe, Reconstruct Sewer Manhole, 48" Sewer Manhole, 12" PVC Sewer Pipe, 18" PVC
Sewer Pipe, Remove Structural Encasement, Remove 36 Steel Sleeve, Structural Encasement, Sewer Bypass, 18" CL 350
DIP Watermain w/ Restr. Jts, Zinc Coated & V Bio Poly Wrapped, Remove Blind Flange, Remove Water Main, 36" Steel
Sleeve, Sawcut & Remove AC Pavement, Cold Mill AC Pavement, Signing, Striping & Pavement Markers, PVC,
Landscaping Sleeve, Water Service Manifold Reconstruction, Install Landscaping Plant Material & Irrigation, Crushed
Rock, Storm Drain Outlet w/Grate, Concrete Trail, Metal Railing (Trail Retaining Walls), Metal Railing (Trail
Undercrossing), Install City Furnished In Pavement Solar Guide Light, Thermoplastic Banding (Undercrossing), Solid
White Stripe, Paint Bridge Soffit & Exterior Girder, F&I Soffit Panels w/ Electrical Connections, Schedule 40 PVC, CV Link
Conduit, Pull Box, Thick Decomposed Granite, Concrete Wedge Curb, Dry Utility Trenching, Large Vault, Sch. 40 PVC, III)
Conduit, Riser for Pole, Crack Seal & Type II Slurry Seal, Adjust to Grade Sewer Manhole Lid & Frame to Grade, Adjust
Sewer Cleanout to Grade, Relocate Sewer Cleanout, Reconstruct Sewer Manhole, Adjust to Grade, Water Valve Can and
Lid, Relocate Air Vac Assembly, Trucking, Equipment Rental.
Requirements: Griffith Company is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons, and
Carpenters Unions. 100% performance and payment bonds required for the full amount of the subcontract price.
Subcontractors must possess a current contractor's license, insurance and worker's compensation insurance coverage
meeting Griffith's requirements. A copy of the insurance requirements and agreements can be obtained by contacting
the Estimator. Please call if you need assistance in obtaining bonding, insurance, equipment, materials, and/or supplies.
Griffith Company intends to work cooperatively with all qualified firms seeking work on this project. Griffith Company is
an Equal Opportunity Employer. Griffith Company will work with interested subcontractors to identify opportunities to
break down items into economically feasible packages.
Griffith Company
CA Contractors License #88
12200 Bloomfield Ave. Santa Fe Springs, Ca. 90670
Phone: 562-929-1128 Fax: 562-864-8970
G RI F F I T H
,`�/G0MPANY
Griffith Company@griffithcompany.net
From: Griffith Company@griffithcompany.net <gfeassist34@contractorsestimate.com>
Sent: Thursday, September 1, 2022 8:08 AM
To: 'ptac@rccd.edu'
Subject: Requesting DBE Assistance for City of La Quinta - Dune Palms Road Bridge Improvements
Attachments: City of LaQuinta - ITB.pdf
I E PTAC
ptac@rccd.edu
Hello,
Griffith Company is bidding on the City of La Quinta - Dune Palms Road Bridge Improvements as a general contractor
and is requesting bid proposals from all DBE subcontractors and suppliers. To better help us with obtaining our goals, we
are requesting your assistance in supplying us with any DBE listings/referrals you may have to offer. In addition, please
post and or distribute the attached Invitation to bid on any bulletin boards you may have for DBE firms to view. If you
have any questions or need additional information, please reply to this email or contact the Estimator: estimator: Jack
Weigand, Estimator: jweigand@griffithcompaiiy.net
Thank You
Griffith Comoanv Reauests Sub -bids from All Qualified & Certified OBE Subcontractors/Suppliers for:
Contracting Agency: City of La Quinta
Project: Dune Palms Road Bridge Improvements
DBE Goal: 21%
Bids open September 26, 2022, at 10:00 AM
Plans &Specs: h11gL.ZLwww.dropbox.comJchJuaw2weu106'xl9d/AAB0S8PYgUzN8Nye8k. 8_ StPKa?d1=0
Griffith Company an Equal Opportunity Employer requests sub quotes from all qualified subcontractors and suppliers
including certified DBE firms performing commercially useful function for the following items of work, including but
not limited to: Sawcut & Removal AC Pavement, Sawcut & Remove Conc. Slope Protection, Unclassified Excavation
(Roadway), Unclassified Fill (Roadway), Suitable Backfill Material, Asphalt Concrete, Class 2 Aggregate Base, AC Dike,
Curb & Gutter, Median Curb, Median Curb, Concrete Driveway Approach, Colored Stamped Concrete Median, Concrete
Slope Protection, Curb Ramp, Masonry Block Wall, Schedule 40 PVC, Landscaping Sleeve, Thick Decomposed Granite,
Install Landscaping Plant Material & Irrigation, Crushed Rock (Apache Brown), Crushed Rock (Desert Gold), Minus — Baja
Cresta Rubble, Decomposed Granite — Brimstone, Structure Excavation (Ret Wall), Structure Backfill (Ret Wall),
Structural Concrete (Ret Wall), Bar Reinforcing Steel (Ret Wall), Mobilization, Best Management Practices, Traffic
Control, Resident Engineers Trailer, Construction Monitoring Camera, Clearing & Grubbing, Unclassified Excavation
(Roadway), Suitable Backfill Material, Construct & Remove Bypass Road, Asphalt Concrete, Crushed Misc. Base, Curb &
Gutter, Median Curb, Concrete Sidewalk, Concrete Driveway Approach, Concrete Cross Gutter, Concrete Pavement,
Retaining Wall, Concrete Slope Protection, Curb Ramp, Masonry Block Wall, Catch Basin, Catch Basin / Drywell System,
Storm Drain Manhole, Reconstruct to Grade, SD Manhole, Storm Drain Outlet w/Grate, Storm Drain Outlet w/Grate,
Concrete Collar, HDPE N-12, WT Joint SD Pipe, Metal Fencing (Retaining Wall), Metal Gate Assembly, Chain Link Fence,
Wide Vehicle Gate w/ Lock, Temporary Fence, Meter Pedestal, Pipe Gate, Schedule 80 PVC, City_ _Comm. Conduit, ull
Box, Signing, Striping & Pavement Markers, Landscaping Sleeve, Adjust to Grade Storm Drain Manhole, Thick
Decomposed Granite, Remove Communications MH/Vault, Install Landscaping Plant Material & Irrigation, Crushed Rock,
Baja Cresta Rubble, Decomposed Granite —Brimstone, Structure Excavation (Bridge), Structure Backfill (Bridge),
Structure Excavation (Ret Wall), Structure Backfill (Ret Wall), Cast -In -Drilled -Hole -Piling, Cast -In -Drilled -Hole -Piling,
Prestressing Cast -In -Place Concrete, Structural Concrete, Bridge Polymer Fiber, Structural Concrete (Bridge Footing),
Structural Concrete (Bridge), Structural Concrete, Structural Concrete, Approach Slab, Minor Concrete (Median Paving,
Colored and Stamped), Joint Seal Assembly, Bar Reinforcing Steel (Bridge), Bar Reinforcing Steel (Ret Wall), Concrete
Barrier, Metal Railing (Bridge), Bridge Lighting & Pull Boxes, Miscellaneous Metal —Conduit Support System (Bridge),
Remove Sewer Manhole, Remove Pipe, Reconstruct Sewer Manhole, 48" Sewer Manhole, 12" PVC Sewer Pipe, 18" PVC
Sewer Pipe, Remove Structural Encasement, Remove 36" Steel Sleeve, Structural Encasement, Sewer Bypass, 18" CL 350
DIP Watermain w/ Restr. Jts, Zinc Coated & V Bio Poly Wrapped, Remove Blind Flange, Remove Water Main, 36" Steel
Sleeve, Sawcut & Remove AC Pavement, Cold Mill AC Pavement, Signing, Striping & Pavement Markers, PVC,
Landscaping Sleeve, Water Service Manifold Reconstruction, Install Landscaping Plant Material & Irrigation, Crushed
Rock, Storm Drain Outlet w/Grate, Concrete Trail, Metal Railing (Trail Retaining Walls), Metal Railing (Trail
Undercrossing), Install City Furnished In Pavement Solar Guide Light, Thermoplastic Banding (Undercrossing), Solid
White Stripe, Paint Bridge Soffit & Exterior Girder, F&I Soffit Panels w/ Electrical Connections, Schedule 40 PVC, CV Link
Conduit, Pull Box, Thick Decomposed Granite, Concrete Wedge Curb, Dry Utility Trenching, Large Vault, Sch. 40 PVC, III)
Conduit, Riser for Pole, Crack Seal & Type II Slurry Seal, Adjust to Grade Sewer Manhole Lid & Frame to Grade, Adjust
Sewer Cleanout to Grade, Relocate Sewer Cleanout, Reconstruct Sewer Manhole, Adjust to Grade, Water Valve Can and
Lid, Relocate Air Vac Assembly, Trucking, Equipment Rental.
Requirements: Griffith Company is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons, and
Carpenters Unions. 100% performance and payment bonds required for the full amount of the subcontract price.
Subcontractors must possess a current contractor's license, insurance and worker's compensation insurance coverage
meeting Griffith's requirements. A copy of the insurance requirements and agreements can be obtained by contacting
the Estimator. Please call if you need assistance in obtaining bonding, insurance, equipment, materials, and/or supplies.
Griffith Company intends to work cooperatively with all qualified firms seeking work on this project. Griffith Company is
an Equal Opportunity Employer. Griffith Company will work with interested subcontractors to identify opportunities to
break down items into economically feasible packages.
Griffith Company
CA Contractors License #88
12200 Bloomfield Ave. Santa Fe Springs, Ca. 90670
Phone: 562-929-1128 Fax: 562-864-8970
G RI F F I T H
wm0064:14C0 M P A N Y
Griffith Corn pany0griffithcompan .net
From: Griffith Company@griffithcompany.net<gfeassist34@contractorsestimate.com>
Sent: Thursday, September 1, 2022 8:07 AM
To: sbdc@fullerton.edu'
Subject: Requesting DBE Assistance for City of La Quinta - Dune Palms Road Bridge Improvements
Attachments: City of LaQuinta - ITB.pdf
Orange County Inland Empire Small Business Development
sbdc@fullerton.edu
Hello,
Griffith Company is bidding on the City of La Quinta - Dune Palms Road Bridge Improvements as a general contractor
and is requesting bid proposals from all DBE subcontractors and suppliers. To better help us with obtaining our goals, we
are requesting your assistance in supplying us with any DBE listings/referrals you may have to offer. In addition, please
post and or distribute the attached Invitation to bid on any bulletin boards you may have for DBE firms to view. If you
have any questions or need additional information, please reply to this email or contact the Estimator: estimator: Jack
Weigand, Estimator: jweigand@griffithcompany.net
Thank You
Griffith Comoanv Reauests Sub -bids from All Qualified & Certified DBE Subcontractors/Suppliers for:
Contracting Agency: City of La Quinta
Project: Dune Palms Road Bridge Improvements
DBE Goal: 21%
Bids open September 26, 2022, at 10:00 AM
Plans & Specs: littps:l/www.d_ropbox.Camish/Llaw2weLjlOfjxi9ci/A A805SPY[:IL3zN8N eSb85StPKa?d1=0
Griffith Company an Equal Opportunity Employer requests sub quotes from all qualified subcontractors and suppliers
including certified DBE firms performing commercially useful function for the following items of work, including but
not limited to: Sawcut & Removal AC Pavement, Sawcut & Remove Conc. Slope Protection, Unclassified Excavation
(Roadway), Unclassified Fill (Roadway), Suitable Backfill Material, Asphalt Concrete, Class 2 Aggregate Base, AC Dike,
Curb & Gutter, Median Curb, Median Curb, Concrete Driveway Approach, Colored Stamped Concrete Median, Concrete
Slope Protection, Curb Ramp, Masonry Block Wall, Schedule 40 PVC, Landscaping Sleeve, Thick Decomposed Granite,
Install Landscaping Plant Material & Irrigation, Crushed Rock (Apache Brown), Crushed Rock (Desert Gold), Minus — Baja
Cresta Rubble, Decomposed Granite — Brimstone, Structure Excavation (Ret Wall), Structure Backfill (Ret Wall),
Structural Concrete (Ret Wall), Bar Reinforcing Steel (Ret Wall), Mobilization, Best Management Practices, Traffic
Control, Resident Engineers Trailer, Construction Monitoring Camera, Clearing & Grubbing, Unclassified Excavation
(Roadway), Suitable Backfill Material, Construct & Remove Bypass Road, Asphalt Concrete, Crushed Misc. Base, Curb &
Gutter, Median Curb, Concrete Sidewalk, Concrete Driveway Approach, Concrete Cross Gutter, Concrete Pavement,
Retaining Wall, Concrete Slope Protection, Curb Ramp, Masonry Block Wall, Catch Basin, Catch Basin / Drywell System,
Storm Drain Manhole, Reconstruct to Grade, SD Manhole, Storm Drain Outlet w/Grate, Storm Drain Outlet w/Grate,
Concrete Collar, HDPE N-12, WTJaint S❑ Pipe, Metal Fencing (Retaining Wall), Metal Gate Assembly, Chain Link Fence,
Wide Vehicle Gate w/ Lock, Temporary Fence, Meter Pedestal, Pipe Gate, Schedule 80 PVC, C y Comm. Conduit, Pull
Box, Signing, Striping 8► Pavement Markers, Landscaping Sleeve, Adjust to Grade Storm ❑rain Manhole, Thick
Decomposed Granite, Remove Communications MH/Vault, Install Landscaping Plant Material & Irrigation, Crushed Rock,
Baja Cresta Rubble, Decomposed Granite — Brimstone, Structure Excavation (Bridge), Structure Backfill (Bridge),
Structure Excavation (Ret Wall), Structure Backfill (Ret Wall), Cast -In -Drilled -Hole -Piling, Cast -In -Drilled -Hole -Piling,
Prestressing Cast -In -Place Concrete, Structural Concrete, Bridge Polymer Fiber, Structural Concrete (Bridge Footing),
Structural Concrete (Bridge), Structural Concrete, Structural Concrete, Approach Slab, Minor Concrete (Median Paving,
Colored and Stamped), Joint Seal Assembly, Bar Reinforcing Steel (Bridge), Bar Reinforcing Steel (Ret Wall), Concrete
Barrier, Metal Railing (Bridge), Bridge Lighting & Pull Boxes, Miscellaneous Metal — Conduit Support System (Bridge),
Remove Sewer Manhole, Remove Pipe, Reconstruct Sewer Manhole, 48" Sewer Manhole, 12' PVC Sewer Pipe, 18" PVC
Sewer Pipe, Remove Structural Encasement, Remove 36 Steel Sleeve, Structural Encasement, Sewer Bypass, 18" CL 350
DIP Watermain w/ Restr. Jts, Zinc Coated & V Bio Poly Wrapped, Remove Blind Flange, Remove Water Main, 36" Steel
Sleeve, Sawcut & Remove AC Pavement, Cold Mill AC Pavement, Signing, Striping & Pavement Markers, PVC,
Landscaping Sleeve, Water Service Manifold Reconstruction, Install Landscaping Plant Material & Irrigation, Crushed
Rock, Storm Drain Outlet w/Grate, Concrete Trail, Metal Railing (Trail Retaining Walls), Metal Railing (Trail
Undercrossing), Install City Furnished in Pavement Solar Guide Light, Thermoplastic Banding (Undercrossing), Solid
White Stripe, Paint Bridge Soffit & Exterior Girder, F&l Soffit Panels w/ Electrical Connections, Schedule 40 PVC, CV Link
Conduit, Pull Box, Thick Decomposed Granite, Concrete Wedge Curb, Dry Utility Trenching, Large Vault, Sch. 40 PVC, III)
Conduit, Riser for Pole, Crack Seal & Type II Slurry Seal, Adjust to Grade Sewer Manhole Lid & Frame to Grade, Adjust
Sewer Cleanout to Grade, Relocate Sewer Cleanout, Reconstruct Sewer Manhole, Adjust to Grade, Water Valve Can and
Lid, Relocate Air Vac Assembly, Trucking, Equipment Rental.
Requirements: Griffith Company is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons, and
Carpenters Unions. 100% performance and payment bonds required for the full amount of the subcontract price.
Subcontractors must possess a current contractor's license, insurance and worker's compensation insurance coverage
meeting Griffith's requirements. A copy of the insurance requirements and agreements can be obtained by contacting
the Estimator. Please call if you need assistance in obtaining bonding, insurance, equipment, materials, and/or supplies.
Griffith Company intends to work cooperatively with all qualified firms seeking work on this project. Griffith Company is
an Equal Opportunity Employer. Griffith Company will work with interested subcontractors to identify opportunities to
break down items into economically feasible packages.
Griffith Company
CA Contractors License #88
12200 Bloomfield Ave. Santa Fe Springs, Ca. 90670
Phone: 562-929-1128 Fax: 562-864-8970
�GRIFFITH
owm- COMPANY
Griffith Com an @ riffithcom an .net
From: Griffith Company@griffithcompany.net<gfeassist34@contractorsestimate.com>
Sent: Thursday, September 1, 2022 8:06 AM
To: 'info@abala.org'
Subject: Requesting DBE Assistance for the City of La Quinta - Dune Palms Road Bridge Improvements
Attachments: City of LaQuinta - ITB.pdf
Asian Business Association
inWahaia.ore
Hello,
Griffith Company is bidding on the City of La Quinta - Dune Palms Road Bridge Improvements as a general contractor
and is requesting bid proposals from all DBE subcontractors and suppliers. To better help us with obtaining our goals, we
are requesting your assistance in supplying us with any DBE listings/referrals you may have to offer. In addition, please
post and or distribute the attached Invitation to bid on any bulletin boards you may have for DBE firms to view. If you
have any questions or need additional information, please reply to this email or contact the Estimator: estimator: Jack
Weigand, Estimator: iweigand@griffithcompany.net
Thank You
Griffith Comvanv Reauests Sub -bids from All Qualified & Certified DBE Subcontractors/Suppliers for:
Contracting Agency: City of La Quinta
Project: Dune Palms Road Bridge Improvements
DBE Goal: 21%
Bids open September 26, 2022, at 10:00 AM
Plans & Specs: litti)s://www.drophox.coill/sh/uaw2WeUI06'xl9d AAB058PY UzNBNV e8b85StPKa?di-0
Griffith Company an Equal Opportunity Employer requests sub quotes from all qualified subcontractors and suppliers
including certified DBE firms performing commercially useful function for the following items of work, including but
not limited to: Sawcut & Removal AC Pavement, Sawcut & Remove Conc. Slope Protection, Unclassified Excavation
(Roadway), Unclassified Fill (Roadway), Suitable Backfill Material, Asphalt Concrete, Class 2 Aggregate Base, AC Dike,
Curb & Gutter, Median Curb, Median Curb, Concrete Driveway Approach, Colored Stamped Concrete Median, Concrete
Slope Protection, Curb Ramp, Masonry Block Wall, Schedule 40 PVC, Landscaping Sleeve, Thick Decomposed Granite,
Install Landscaping Plant Material & Irrigation, Crushed Rock (Apache Brown), Crushed Rock (Desert Gold), Minus - Baja
Cresta Rubble, Decomposed Granite - Brimstone, Structure Excavation (Ret Wall), Structure Backfill (Ret Wall),
Structural Concrete (Ret Wall), Bar Reinforcing Steel (Ret Wall), Mobilization, Best Management Practices, Traffic
Control, Resident Engineers Trailer, Construction Monitoring Camera, Clearing & Grubbing, Unclassified Excavation
(Roadway), Suitable Backfill Material, Construct & Remove Bypass Road, Asphalt Concrete, Crushed Misc. Base, Curb &
Gutter, Median Curb, Concrete Sidewalk, Concrete Driveway Approach, Concrete Cross Gutter, Concrete Pavement,
Retaining Wall, Concrete Slope Protection, Curb Ramp, Masonry Block Wall, Catch Basin, Catch Basin / Drywell System,
Storm Drain Manhole, Reconstruct to Grade, SD Manhole, Storm Drain Outlet w/Grate, Storm Drain Outlet w/Grate,
Concrete Collar, HDPE N-12, WTJoint SD Pipe, Metal Fencing (Retaining Wall), Metal Gate Assembly, Chain Link Fence,
Wide Vehicle Gate w/ Lock, Temporary Fence, Meter Pedestal, Pipe Gate, Schedule 80 PVC, City Comm. Conduit, Pull
Box, Signing, Striping & Pavement Markers, Landscaping Teeve, Adjust to Grade Storm Drain Manhole, Thick
Decomposed Granite, Remove Communications MH/Vault; Cnstall Landscaping Plant Material & Irrigatiori, Crushed Rock,
Baja Cresta Rubble, Decomposed Granite - Brimstone, Structure Excavation (Bridge), Structure Backfill (Bridge),
Structure Excavation (Ret Wall), Structure Backfill (Ret Wall), Cast-In-Drilled=Hole-Piling, Cast -In -Drilled -Hole -Piling,
Prestressing Cast-lh-Place Concrete, Structural Concrete, Bridge Polymer Fiber, Structural Concrete (Bridge Footing),
Structural Concrete (Bridge), Structural Concrete, Structural Concrete, Approach Slab, Minor Concrete (Median Paving,
Colored and Stamped), Joint Seal Assembly, Bar Reinforcing Steel (Bridge), Bar Reinforcing Steel (Ret Wall), Concrete
Barrier, Metal Railing (Bridge), Bridge Lighting & Pull Boxes, Miscellaneous Metal - Conduit Support System (Bridge),
Remove Sewer Manhole, R-,nove Pipe, Reconstruct Sewer Manhole, 48" Sewer Manhole, 12'' PVC Sewer Pipe, 18" PVCr
Sewer Pipe, Remove Structural Encasement, Remove 36" Steel Sleeve, Structural Encasement, Sewer Bypass, 18" CL 350
DIP Watermain w/ Restr. Jts, Zinc Coated & V Bio Poly Wrapped, Remove Blind Flange, Remove Water Main, 36" Steel
Sleeve, Sawcut & Remove AC Pavement, Cold Mill AC Pavement, Signing, Striping & Pavement Markers, PVC,
Landscaping Sleeve, Water Service Manifold Reconstruction, Install Landscaping Plant Material & Irrigation, Crushed
Rock, Storm Drain Outlet w/Grate, Concrete Trail, Metal Railing (Trail Retaining Walls), Metal Railing (Trail
Undercrossing), Install City Furnished In Pavement Solar Guide Light, Thermoplastic Banding (Undercrossing), Solid
White Stripe, Paint Bridge Soffit & Exterior Girder, F&I Soffit Panels w/ Electrical Connections, Schedule 40 PVC, CV Link
Conduit, Pull Box, Thick Decomposed Granite, Concrete Wedge Curb, Dry Utility Trenching, Large Vault, Sch. 40 PVC, IID
Conduit, Riser for Pole, Crack Seal & Type II Slurry Seal, Adjust to Grade Sewer Manhole Lid & Frame to Grade, Adjust
Sewer Cleanout to Grade, Relocate Sewer Cleanout, Reconstruct Sewer Manhole, Adjust to Grade, Water Valve Can and
Lid, Relocate Air Vac Assembly, Trucking, Equipment Rental.
Requirements: Griffith Company is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons, and
Carpenters Unions. 100% performance and payment bonds required for the full amount of the subcontract price.
Subcontractors must possess a current contractor's license, insurance and worker's compensation insurance coverage
meeting Griffith's requirements. A copy of the insurance requirements and agreements can be obtained by contacting
the Estimator. Please call if you need assistance in obtaining bonding, insurance, equipment, materials, and/or supplies.
Griffith Company intends to work cooperatively with all qualified firms seeking work on this project. Griffith Company is
an Equal Opportunity Employer. Griffith Company will work with interested subcontractors to identify opportunities to
break down items into economically feasible packages.
Griffith Company
CA Contractors License #88
12200 Bloomfield Ave. Santa Fe Springs, Ca. 90670
Phone: 562-929-1128 Fax: 562-864-8970
GRIFFITH
�G0 M P A N Y