HomeMy WebLinkAboutMCM Con. Exhibit 15-G Construciton Contract DBE CommitmentEXHIBIT 15-G CONSTRUCTION CONTRACT DBE COMMITMENT
1. Local Agency: City of La Quinta 2. Contract DBE Goal: °
3. Project Description: 2011-05 DWne Palms RQad Brlcfg Im r v
4. Project Location: Dune Palms Road Spanningh Il 5 ormw t r Channel
5. Bidder's Name: MCM Construction, Inc. 6. Prime Certified DBE: ❑ 7. Bid Amount: $21 955 640 00
8. Total Dollar Amount for ALL Subcontractors: 8 337 773.37 9. Total Number of ALL Subcontractors 12
10. Bid
11. Description of Work, Service, or
12. DBE
13. DBE Contact Information
14. DBE
Dollar
Item
Materials Supplied
Certification
(Must be certified on the date bids are opened)
Amount
Number
Number
77-90
Sewer & Water
42597
SRK Engineering
2615 Auto Park Way Escondido, CA 92029
(760) 294-4012
7 P
Form/Pour/Strip Barrier
43430
Dees Burke Engineering Constructors, LLC
$307,824.00
207 W State St. Ontario, CA 91762
(626)228-3670
42, 44-45,
Electrical
45752
Mendoza Bulsess Enterprise Inc. DBA Mex Electric
$1,045,777.00
50, 75-76,
PO Box 430 Colton, CA 92324
125,129-133
(951) 900-4287
13(P), 18-
Flatwork/Slope Protection
47038
R.L. Hayes, Jr. Construction Company
1506 West Gage Ave. Los Angeles, CA 90047
$1,988,912.24
24,26(P), 27,
159,101-106,
(562) 543-4970
121-122,
133
65(P)
Bearings
51028
Bridge Rubber Bearing, LLC DBA BR8 LLC
$21,750.00
15467 State Hwy 64 W Tyler, TX 75704
(903) 500-2086
bli,P)
i52(P)64(P)
,
Structural Concrete Quality Control
35308
Sequoia Consultants, Inc.
3611 W Grove Ave. Orange, CA 92865
$203,210.00
-68(P), 73(P)
i Ierpi
n14� 01-1`1' 103�1p
Local Agency to Complete this Section upon Execution of Award
4,688,700.24
21. Local Agency Contract Number: 2011-05 15. TOTAL CLAIMED DBE PARTICIPATION
22. Federal -Aid Project Number: BRNBIL (537) 21.36 %
23. Bid Opening Date:
24. Contract Award Date:
IMPORTANT: Identify all DBE firms being claimed for credit, regardless
25. Award Amount: of tier. Names of the First Tier DBE Subcontractors and their respective
item(s) of work listed above must be consistent, where applicable with
then mes and items of the work in the "Subcontractor List" submitted
Local Agency certifies that all DBE certifications are valid and information with our hi Written fir tifln a! ach listed DBE is required.
on this form is complete and accurate.
in1n712022
26. Local Agency Representative's Signature 27. Date 16. Preparer's Signature 17. Date
Richard NlcCak 16
28. Local Agency Representative's Name 29. Phone 18. Preparer's Name 19. Phone
30. Local Agency Representative's Title 20. Preparer's Title
DISTRIBUTION: 1. Original - Local Agency
2. Copy - Caltrans District Local Assistance Engineer (DLAE). Failure to submit to DLAE within 30
days of contract execution may result in de -obligation of federal funds on contract.
3. Include additional copy with award package.
ADA Notice: For individuals with sensory disabilities, this document is available in alternate formats. For information call (916) 654-6410 or TDD
(916) 654- 3880 or write Records and Forms Management, 1120 N Street, MS-89, Sacramento, CA 95814.
Federal Requirements Forms for Federal -Aid Construction Projects 1270-9
Exhibit 15-G Construction Contract DBE Commitment
I®�
SRI(ENGINEERING
October 5th, 2022
General Contractor
Project: City of La Quinta - Dune Palms Road Bridge
DBE Water and Sewer Proposal
DIR 1 1000045353
License 11017836
DBE 142597
SRK Engineering (SRK) proposes to provide labor, material, and equipment to complete the water and
sewer bid items as indicated below. SRK.Engineering is providing this proposal based on plans,
specifications, addendums (4) and clarifications (A and B) per reference documents provided. SRK
Engineering is a Disadvantaged/Woman Owned/Small Business Enterprise, signatory to the Operating
Engineers and Laborer Unions.
Please see below for pricing breakdown and scope details.
Bidltem
Bid Description
QTY
Units
Unit Price
Total
1
Mobilization
1
LS
$63,000.00
$ 63,000.00
77
Remove Sewer Manhole
3
EA
$ 5,800.00
$ 17,400.00
78
Remove Pipe
201
LF
$ 66.00
$ 13,266.00
79
Reconstruct Sewer Manhole
7.4
LF
$ 1,500.00
$ 11,100.00
80
48" Sewer Manhole
4
EA
$ 21,500.00
$ 86,000.00
81
12" PVC Sewer Pipe
49
LF
$ 450.00
$ 22,050.00
82
18" PVC Sewer Pipe
166
LF
$ 390.00
$ 64,740.00
83
IRemove Structural Encasement
43
LF
$ 252.00
$ 10,836.00
84
J Remove 36" Steel Sleeve
73
LF
$ 75.00
$ 5,475.00
85
IStructural Encasement
50
LF
$ 325.00
$ 16,250.00
86
Isewersypass
1
LS
$ 40,000.00
$ 40,000.00
87
18" CL 350 DIP Watermain w/Restr, Jts, Zinc Coated
670
LF
$ 950.00
$ 636,500.00
88
Remove Blind Flange
2
EA
$ 7,500.00
$ 15,000.00
89
Remove Water Main
646
LF
$ 135.00
$ 87,210.00
90
36" Steel Sleeve
24
LF
$ 1,350.00
$ 32,400.00
TOTAL $ 1,121,227.00
Inclusions/Qualifications:
- Labor, material, equipment, and supervision to install the items listed
- Excavate, install, and backfill new utilities listed above
- All tie-ins for SRK Engineering's work only
- Potholing for SRK Engineering's work only
- Trench shoring, if necessary, included as needed for pipeline installed by SRK Engineering
2615 Auto Park Way I Escondido I CA 192029
Phone 760-294-4012 1 Fax 760-560-1634
1�1
SRI(ENGINEERING
DIR 1 1000045353
License 1 1017836
DBE 142597
Temporary trench plating as needed
- Temporary HMA patch (3"-4") on street (maintenance excluded)
SRK to use native material for trench zone backfill
Trash Dumpsters for our own pipe removals
One Malailization for all work (additional mobilizations will be billed at rate below)
General Contractor to Provide to SRK En ineerin :
- Concrete Washout
- Ample 'Laydown' space onsite
- Construction Water as needed
- Portable Toilet facilities
- Survey and staking for underground utility installation
- Traffic control to allow SRK productive, unimpeded access to work including 2 day full closure as
needed
- All demo of adjacent homes prior to SRK mobilization, install IID conduit, and III) shoofly prior to SRK
mobilization
Mobilization payment with first SRK payment regardless is owner has paid mobilization item
Exclusions:
- Handling and disposal of contaminated and/or hazardous soils
- Haul off excess spoils (all dirt and rubble spoils to be left onsite)
- Dewatering, sampling and/or ground water testing, groundwater mitigation.
- Rock blasting or breaking and hard excavation
- Landscaping and erosion control repair and replacement
- Repair and relocation/replacement of any existing irrigation piping or wiring
- Clearing and grubbing
- Demo, removal, and abandonment of existing Utilities (unless otherwise noted)
- Survey/Staking
- Traffic Control
- Slurry Seal for any roadway trenching resurfacing, repair of traffic loops
Inspection & soils testing
- Permits and Fees of any kind
- Monitoring and/or inspection of any kind
- Noise Control or monitoring
- OT or Saturday work
- BMP installation and/or maintenance
- Bond Expense (if required, bond rate is noted below)
- Special Insurance of any kind
- Buy America Pricing for materials
2615 Auto Park Way I Escondido I CA 192029
Phone 760-294-4012 1 Fax 760-560-1634
SRHENGINEERING
DIR 1 1000045353
License 11017836
DBE 142597
Conditions:
Prices above are based on prompt payment for work completed
This proposal includes 1EA mobilization, additional mobilizations to be billed at $12,000EA
Prices subject to change after final drawings are issued and all questions/RFI's are answered
SRK to mob in after removal of overhead utilities and demolition of parcel at North East corner
Prior to commencement of construction operations, a mutually agreeable contract shall be
negotiated and executed by both parties.
SRK Engineering is signatory to the Operating Engineers and Laborers Unions.
This proposal is firm for 60 days.
If bonding is required, please add at the rate of 1.1% of total contract value.
Thank you for the opportunity to quote this project. Please contact Jeremy Kirkpatrick at
ikirk�atrick srken�.com or 760-443-6087 if you have any questions.
Sincerely,
Sherry Rebueno Kirkpatrick, PE
President
SRK Engineering
2615 Auto Park Way I Escondido I CA 192029
Phone 760-294-4012 1 Fax 760-560-1634
CLOSE WINDOW 'i's
Certified Profile
Business & Contact Information
BUSINESS NAME
SRK Engineering
OWNER
Mrs. Sherry Kirkpatrick
ADDRESS
2615 Auto Park Way
*105
Escondido, CA 92029 mapj
PHONE
760-294-4012 Ext. 100
FAX
760-300-3888
EMAIL
skirkp ric srkeng.com
WEBSITE
httpsalwww.srkeng neering.com/
ETHNICITY
Asian -Pacific American
GENDER
Female
COUNTY
San Diego (CA)
Certification Information
CERTIFYING AGENCY Los Angeles County Metropolitan Transportation Authority
CERTIFICATION TYPE DBE - Disadvantaged Business Enterprise
CERTIFIED BUSINESS DESCRIPTION Engineering and Construction Contracting & Management
Commodity Codes
Code
Description
NAICS 541330
Engineering services
NAICS 237110
Water and Sewer Line and Related Structures Construction
NAICS 237310
Highway, Street, and Bridge Construction
NAICS 237990
Other Heavy and Civil Engineering Construction
NAICS 238110
Poured Concrete Foundation and Structure Contractors
NAICS 238120
Structural Steel and Precast Concrete Contractors
NAICS 238140
Masonry Contractors
NAICS 238190
Other Foundation, Structure, and Building Exterior Contractors
NAICS 541370
Surveying and Mapping (except Geophysical) Services
NAICS 541380
Testing Laboratories and Services
NAICS 541618
Other Management Consulting Services
NAICS 541620
Environmental consulting services
NAICS 541990
All Other Professional, Scientlfic, and Technical Services
Additional Information
WORK DISTRICTS/REGIONS All work districts/regions
CUCP PUBLIC DIRECTORY CERTIFICATION 42597
NUMBER
Dees Burke Engineering Constructors, LLC Proposal DIBIE
207 W State Street
Ontario, CA 91762
www.dbeconstructors.com DEES i BURKE
ENGINEERING CONSTRUCTORS
Phone:626-228-3670
Fax:(626) 228-3521
CA License # 1012305
DIR # 1000036375
To:
MCM Construction
Attn: ESTIMATOR
6413 32nd St.
North Highlands, CA 95660
Estimator
Todd Wingo
CA DBE CERT ID: 43430
CA DIGS SB CERT ID: 2001615
LA METRO SB CERTIFIED: 7416
Project:
Dune Palms Road Bridge
Proposal: 221005D
Date: 10/5/2022
Email Phone
todd@dbeconstructors.com P16) 838-3692
Bid Item Description
73 Concrete Barrier (Type 732SW MOD)
Quantity UOM Unit Price Extended Price
968.00 LF 318.00 307,824.00
Proposal Total: $ 307,824.00
Page 1 of 4
Dees Burke Engineering Constructors, LLC
207 W State Street Proposal '
Ontario, CA 91762
www.dbeconstructors.com DEES I BURKE
ENGINEERING CONSTRUCTORS
Addendums noted: 1, 2, 3, 4
Formliner and test panel included.
Price is based on 2 (two) mobilizations. Additional mobilizations will be $7,500 each.
Our pricing is based on completion of DBE's work by July 1, 2025. Please add $51F for any type barrier remaining on July 1, 2025 and an additional
$51F at 6 month intervals thereafter.
DBE Excludes:
1) Temporary Concrete Washouts.
2) Traffic Control & Night Work.
3) Preparing for architectural painting & staining treatment and/or colored concrete. (Prime contractor to supply color for dry finish).
4) Footings.
5) Concrete.
6) Rebar, including inspection or verification of rebar placed by others.
7) Drill & Bond Dowel.
8) Excavation & Backfill.
9) Sandblasting of construction joints.
10) Furnish and installation of metal tube, grate and rail work.
11) Pilasters.
12) End blocks at approach slabs.
13) Painting.
DBE Quallfications:
1) All work to be performed in accordance with DBE Constructors, LLC general terms and conditions
Page 2 of 4
Dees Burke Engineering Constructors, LLC Proposal
l _
207 W State Street p I
Ontario, CA 91762
www.dbeconstructors.com D E E S I B U R K E
ENGINEERING CONSTRUCTORS
General Terms and'Conditions
DEES BURKE ENGINEERING CONSTRUCTORS, LLC
GENERAL TERMS & CONDITIONS FOR STRUCTURE BARRIER RAIL WORK
DBE INCLUDES:
1. Forming, placing & finishing concrete railing from finished grade, bridge deck, top of retaining wall, or top of pile cap unless otherwise specified in
the proposal.
2. Placing embedded items such as deck drains, post pockets, expansion joints, weakened plane joints, and cover plates. All embedded items to be
fumished and removed by Contractor.
3. Water cure. DBE will place (not secure) Prime Contractor's rugs. Cure Compound: DBE will spray Prime Contractor's curing compound.
4. DBE's prices include all tabor, equipment and material to complete the items of work listed above unless otherwise specified. DBE has based its
pricing and this proposal on all of the items listed above being awarded to DBE. Items may be added or deleted only with the approval of DBE. DBE
shall have the right to modify and increase its unit prices if not all of the items listed above are awarded to DBE.
5. All quoted work shall be constructed in accordance with the Standard Specifications for Public Works Construction, Caltrans Standard Plans and
Specifications dated 2018, and the ConlractlDesign documents provided to DBE at the time of this proposal.
PRIME CONTRACTOR MUST PROVIDE AT NO COST TO DBE:
1. Line & grade furnished, installed & maintained; square pile caps to line and grade width of rail;
2. Ready mix concrete F.O.B. jobsite for tailgate placement in accordance with DBE's schedule;
3. Concrete pumping. If pumping is required, Contractor to provide boom pump. If line pump is provided, Contractor to also provide labor to drag
hose and lift to top of barrier;
4. Rebar and electrical furnished, installed & adjusted to line and grade. DBE takes no responsibility for rebar or electrical not installed correctly by
others.
5. Sandblasting bridge deck, retaining wall, top of footing or HE section, piles or pile cap to receive barrier rail;
6. Excavation or backfill to industry standard: Minimum clear distance of 18" required from face of formed footing. All excavation to be +0.0 to 0.1 feet
from bottom of "HE" Section;
7. Footings, piles, pile caps, retaining walls or wing walls unless otherwise specified on our proposal;
8. Curing compound & maintenance of the cure;
9. Working access, minimum of 12 feet width, the full length of the rail for our boom truck & ready mix concrete trucks on one side and 20" minimum
clear on opposite side of barrier rail for forming system and workers;
10. Adequate lights fumished, installed & maintained at all work locations when night work is required;
11. CAL -OSHA safety railing to Include protective cover over environmentally sensitive areas, waterways, or traffic, 20" dear from edge of deck or face
of wall for all types of concrete barrier rails.
12. On -site construction water.
13. All weather access to all work areas.
DBE EXCLUDES:
1. Installing sign bolts, forming & pouring sign or light pedestals or pilasters & furnishing & installing utility pipes or conduits & any decorative coatings,
paint or sealers;
2. Sandblasting barrier rail, including architectural treatment, unless specifically included;
3. Weekend or night work, unless specifically included;
4. Vandalism repairs, including graffiti removal, after the barrier rail is placed & finished;
5. All inspection and quality control costs;
6. Furnishing embeds such as, but not limited to, deck drains, post pockets, expansion joints, styrofoam, expansion paper, miscellaneous metal, and
anchor bolts. Installation of any embeds requiring our steel forms to be drilled or cut will be done and at the expense of the contractor including the
repair of the metal forms ;
7. Traffic control, notifications and traffic control signage;
8. Spoil disposal (DBE will sweep into piles to be disposed by others);
9. Test panels, unless specifically included;
10. Performance and Payment Bonds and Bond premiums.
11. Permits and fees.
12. Builders Risk Insurance and Railroad Protective Insurance.
13. Utility relocation, protection or utilities and service interrupt fees. Prime Contractor to be responsible for providing a minimum of 20 feet clearance
For DBE's boom equipment from any energized overhead utility.
14. Installation, maintenance and removal, or any responsibility for, Storm Water Pollution Prevention measures. All storm water run-off to be directed
away from DBE work area. Any damage caused by DBE will be repaired by DBE.
15. Security measures, watchmen, grading, dewatering and/or dust control.
16, Sanitary facilities in accordance with OSHA regulations.
17. Engineering, testing, surveying, staking and as -built drawings. Prime Contractor to supply survey for line and grade.
18. Temporary K-Rail, crash cushions, temporary delineation and removal of existing metal beam guard rail.
19. Excavation, Backfill and Shoring.
20. Installation, maintenance and removal of pedestrian access.
21. Street sweeping.
22. Partnering and DRB costs.
23. Temporary concrete washouts.
24. Cold weather concrete protection, including placing, maintaining and removing thermal blankets, and cold weather protection plans.
25. Furnish and installation of pipe sleeves for metal guard rails. Pipe sleeves to be installed by others prior to DBE placing concrete or to be drilled by
others after barrier is completed.
26, Furnish, installation, and removal of scuppers, unless specifically included.
27. All other work/items not specifically included.
28. Project Safety Representative.
Page 3 of 4
Dees Burke Engineering Constructors, LLC Proposal
207 W State Street pro p ,
Ontario, CA 91762 A
www.dbeconstrucLors.com DEES i BURKE
ENGINEERING CONSTRUCTORS
DELAYS: DBE IS NOT RESPONSIBLE FOR DELAYS DUE TO THE FOLLOWING:
1. Lack thereof, or incorrect Prime Contractor or other subcontractor -furnished materials;
2. Late ready mix concrete delivery in excess of Y2 hour;
3. Lack thereof, or inadequate access;
4. Structure not ready.
5. Time lost due to the above or other delays out of the control of DBE including, without limitation, changed work, acts of God, inclement weather, acts
of any government agency or third party, acts of terror, unsuitable ground conditions, differing site conditions or delays caused by or & in the control of
the Contractor or its other Subcontractors or the Owner will be charged at Caltrans rates and markups and DBE will receive an extension of time to
complete its work as is necessary as a result of such causes.
PAYMENT SCHEDULE:
Monthly progress payments will be due thirty (30) days from the date of DEE s invoice or seven (7) days after receipt from the Owner, whichever is
earlier. Prime Contractor shall pay prompt payment penalties al 2% per month per state statute and interest on all amounts due and unpaid. If POme
Contractor faits to make payment when due, DBE shall have the right to stop work on forty-eight (48) hours' notice without any tiabilily for project delay.
Retention rate is not to exceed that withheld by the Owner. All retention will be released thirty-five (35) days after completion of DEE's work. DBE will
be allowed to furnish securities in an escrow account in lieu of retention being withheld.
FORCE ACCOUNT WORK:
DBE is to receive all mark up with the exception of the percentage allowed to the Prime Contractor in the Prime Contract.
WORK SCHEDULE:
1. DBE requires 64 day preliminary written notice of move -in date, with final written notice given three weeks in advance.
2. DHE's work shall progress as bid per the contract documents in a linear progression most efficient to complete DSE's scope of work.
3. This proposal is based on a standard 8-hour shift, 5 days per week, with DEE's work to be performed in continuous operations, or as the job staging
allows, in accordance with a mutually agreeable schedule, without delay by others. Prime Contractor shall furnish to DEE electronic copies of CPM
baseline schedule and monthly updates.
4. If the baseline or any subsequent schedule dictates work being performed after the completion date set forth above. DEE shall have the right to
receive increased payments from Prime Contractor and/or Owner to account for labor, equipment, and/or material price escalation and Prime
Contractor shall also grant time extension(s) to DBE.
INDEMNIFICATION:
DBE and Prime Contractor (the "Indemnitor") will indemnify and defend the other (the "Indemnitee") for the Indemnitor's proportionate share of
responsibility for the cause of any claims for injury or damages except to the extent arising out of the Indemnitea's negligence, whether in whole or in
part, Additionally, DBE will not provide a waiver of subrogation unless it is required by the Prime Contract.
CHANGES:
DEE reserves the right to review and approve all Contract Change Orders relating to DBE work items prior to submittal and acceptance. Additional or
changed work will be performed upon the completion of an executed Change Order, but Prime Contractor shall pay DBE for extra or changed work if
DBE is given written or oral direction by Prime Contractor or Owner to proceed with such work.
COVID-19:
To the extent that there is a condition of the project as awarded or implemented which requires that non -vaccinated workers are to be tested, all costs
for any and all such testing are excluded. Further, to the extent that there is a requirement imposed that all workers must be vaccinated or have a
recognized exception due to religious or medical reasons, and such a mandate causes damages, including delay, loss of productivity and/or
escalation, as well as other resulting damages, all such costs and damages and compliance are expressly excluded and shall be fully compensabte to
DBE.
Page 4 of 4
CLOSE WINDOW
Certified Profile
Print
Business & Contact Information
Dees Burke Engineering Constructors, DBA Dees Burke Engineering
BUSINESS NAME
Constructors, LLC
OWNER
Dena Bryn Burke
ADDRESS
207 W State Street
Ontario, CA 91762 Imapj
PHONE
626-228-3670
FAX
626-228-3521
EMAIL
hryn ciec n uctors
WEBSITE
)itt he on to
ETHNICITY
Caucasian
GENDER
Female
COUNTY
Los Angeles (CA)
Certification Information
CERTIFYING AGENCY Los Angeles County Metropolitan Transportation Authority
CERTIFICATION TYPE DBE - Disadvantaged Business Enterprise
CERTIFIED BUSINESS DESCRIPTION Specialize in cast -in -place concrete barrier railing and polyester concrete overlay
Commodity Codes
Code Description _ -_ -- _ -- - - --- ---- —
NAICS 237310 Highway, Street, and Bridge Construction
NAICS 238990 All Other Specialty Trade Contractors
Additional Information
WORK DISTRICTS/REGIONS Los Angeles
CUCP PUBLIC DIRECTORY CERTIFICATION 43430
NUMBER
m
Ln
N Z
0
m
u
f.A
A
A
�+F+N
A
A
A
f+f+f+
A
W
W
rF+rN
w
w
N
N
OV1
ul
p
VAi
N
�•'
3
In
A
W
N
N
0
W
Co
F,
O
l0
ul
w
x
v
M1i
Q V
y
ul
O1
ul
A
w1;
O
v
w
m
Z
C
W>
O
2
n
to
^
2
A
2
A
2
A
2
A<
m
W
O
2
Ao
r
m
W
O
x
A
0
A
y
r
a $,
G ro
3
O�
o
c)0
O
D
c
x
0
M
G1
�
o
wbD
m�
k o a
N,
m
O
<<<n
l"<
v
I3
w
z
�m
•vnZC
n
h
ZK�P1
a
r
e
o Z
O
v
v
Z
r
r
cC;
m
Q
z
goz
C
n
--�r�o
n��n_n
0
0
0
0❑=
z
❑
v
n
n�
ti
ro
'^
z
zzzzcnz
❑❑
O❑
D
�.�m
O
C
C�
Or
p
?
c? c
c
-I
c
c
c
z
z
rn
m
V
z
t�i
c
W
O
z
m
Y+ b
m
O
p
O
in
❑
N w
=
z
C70C
0�3
Ow
❑
n
z
x
z
u
LA
>Ln
-<
C
w
v
0
Z
m
2
7
R
A
u
0
to
m
o
[p
a
v
m
A
L
D
OG)
w
❑
N
ao
W 3
Z
N
C
G]
o
n
a
A
O
.v
V
v
m
3 0
n
�
o
O
m
W
a
a
a
A
n
co
m
m
0
m N
W
W
Du
O
O
z
O
D
OR
D
D
T
T
m
T
D
m
D
T
G
D
11
G
G
D
D
m
D
FA
3 O
C
N
O
W
F+
O
A
llo
F+
!-+
F�
1�
01
N
A
N
D
O
0
0
O
O
N
2
O
G1
O
C
{A
•w
3
0
W
N
O
N
.W,
O
Vy
O
O
N
yn
M
O
~
�
in O
O n,,.u,L
A
w
N
I wA/
O
r
N
cn
DO
N
ow
O
N
aoowinoo
O
O
O
w
N
O
m
�
O
to
oo
O
In
p
p
O-
O
p
0
0
0
0
0o
O
C
t
N
vO
r
O
0
o
0
o
4
o
0
o
0
0
0
o
0
o
0
o
O
O
o
O
o
O
O
0
o
0
C
0
o
0
o
0
0
pp
0
N
7
N
N
0
F+
p
v1
W
•VT
NO
Fes+
00
•vf
F-
1p
-N
N
VT
W
O
Fes+
O
00
'v>
NA
'UT
N
-uT
F�
OM
V1
f
'
AM
In
Vt
In
0O
-1
O
Op
A
Op
O
O
p•O
O
O
O
O
-J
C;1
M.C"SIC81
+
OVOOOO
Qpo0
0
0
p
0
p
0
00
0
p
0
9
N S
x o
D
zO z
In lr
m
3 O r �
D —n'-D
r7 (Dn
n s (D
a . Ul m
Z - co N
0 O v
co
3 D N
W 0
30
X a
i• i A`
o !n
x .p
i
F+
a p n
N;� O a •VI .A �W N� N�� P N 4-1 W N � y �O m V P fJ1 L� W
o• G ] O 2 ZVVZ rw W I�
navp�aad3c��a� r+n3nnan�Ma m�a A.
m¢ 'o w N a mm m m 3 +� 0�. I o m O
o
aFq
m w �o?R mmC.)MaH a d O
C 3 a° L! wr UI m � N O w til n O 0• d
.� °ly c O •x9 >• w 7 N n p 6 'd•. 7 p C N S m Q= m Z
$ r c` w w► c 3 O3p �_ �! _ m °� w C r
m V g ry N tD
N m m _. C n w w N d ^' n,
� Im
3 �0.3 nap m o }o o N� 3� nmi °;fD ,� ? a• o v w O m o m ' 3 p o a X. 3 .t
°w o'0�•n rj m o c_£io nd �d.Co
n S 0 3 V` n ti n N m 7 G 7 3 w p a S R
c c p a d w m y � m X a o rt w° w m O m o m
» " Vf v- nZ m e c n o .w
a° e a y D no' !!1 i I r w A ac, N m N 3 m ° o p a c o o o ts
❑ S n
r n o Ol D A Q o Q{ 1377 . v A y m N 9 (DD p 3: y 7 '°-' OCC- 7
C Q° R m C .ni F :�-' [w 0 7 0 T` b a N In p m n a P T ,O w nm C C -M
`� w X
o '0 a iv W o'er°' C to �' n a w n 0 w m d O t o °: >> N vi
o i, smna rm' ° w °7au�, 0 3 m ��E g rGa m, c c t'D
°c 01 0 w o. m m ICI
R= in W T 7 w S 3 d
a° 2 n n m c i" Z <w« c �° o° n m ~ a E 3 '� 0 3 c o v w, c im,�p] n
m a ° m c E w» m n m ° G. P y n m m>> n
w O m S '°% 3 p^ .,•. m Q^° w �N+ m m Iwll S d .fir
S j N O O N d N < C w 7r m o} w d C7 im S w y� • � Ih
v o n a a o P- H n 3� no � o v a �^° m °, w w° °
o y" � ° v } o '3,mi 3o-q "V. O w m p T a °, a\� R�1 0
m ° 3 d m �n m _ m m m W^
in m San a5 w 4 n °rro `l G o'Dr ?o
a n ° c w m m n w o ° N S m 7 0 m s^ m °^ N 0. ( x
N °c i., o o D» n .^. m m o f w *ri. 3 c m. H c . m w w ° N D
,0O„ � tr� R O O y w< C w -� G n n w Q «d.. r� n d D� In d 7 w =� N V =' n C
N a
c` a _ ^� m° v' c m °^ 3' 3 n v "' c m ar CL C d w
o n o 3 4 C'1 p w l p n CO v) N
Q. G •• O, y _ N `3
�XQ, ° Z u�i Imo �w X, umi m A y m CL
° n m��"� �, �c� p ..
'O M yDi m
3° m o w S° m v s w a T a m' >5 m i
ram f Cm a n n a p x s ?; y►ka 3 m 3 u 0 m° to 3 n 1n p
G. v 0 x r K N m o• m •^• th F
s �++ w
o c Z 2 o, i N dlfi 'D 7 m y q q G-n n w 0 ^ 7> > 0 d
av o o O ii' xwv o Qw 3 w Xa aR n o
° j.e n'w p ° � - w 40 3 c '•t o �� a c N
° 3 o y n m o m n a P N w m ° O 0 ^I
o f Z c c N vo q mm m a m mo n b m p m c c p
° � 7 X w 9 n P p N
N o a n 'm^. m c m n c i -os 3 3 T y 3 m 'w °0 3 m v° m m A d
c° o�: n m nm ° n m p d A G w o w m n
{3 7 i
-�^• D 3 n c [7 3 �• °�' w o m en - c m Y n•• 0
m m a.° c fl' o, m vvi ° n ° +»
'o E »w c c n ao o-m m, cm a 3 wT
y m n n, W N 4 N N S S D C7 i E a a 3 itn � x j C j 0 x j >•
O m y an d -+ P o rip
-m -' ti o. n rZ1 m
w w c 7 n f•2'o�y my c o,d O
o c cco m m- "` m >> c m m 0 u3 0 a m c w X 3 ,e o 'm m C
`•4` m e vi w n w 1 w w ry 7
w v m 7 n d O o �^ °• CL m a X 7 d i w o N (n cn
nl ' i a o^.den a3n n'3 'm adw $3wgO n '0 9'i D ....
D o . m CL o o w d u o c o w° 3 °: c m'-° % r o°
3 r �'c° �°n °0 3 n �mE �3 m oLq mom I o -rl o0
m n w m v w p d 7 ^ c o w c O a o03
D w m a c ti O m �°� 'm n w'��r S ° -0 -n i,
c a n c o ff D 3 ° a 4 N m o ; �' m en TO m n '� "
n U ry ° m D ei' a m 4i 0 4 y, •. 6. O �' 0 0 ^ ... G) ^ O N O] m
j C O N F Vml N O q w O r.
Z27 �' an d C c*. N V in- nr W �l
n < n w w 's E 3 S m ^ w a N 3 N .�
D o ° o' D ti - o w-1 CL s e 10 °
o r v o a m° a n ^ a 3 w m n m CL m lnv
o Z n m m x m m -mi ,7°„ n G) X o w O w cr
•c w m en n cr, m w m- m ur 3 m m m E a
n u c a w c w -q s m m �= w 4 m o� 1 3 o D
O m Q ,o m a -� 3' nn u c w o y °
Z n m cr c f° n v c m w O c 3 +� < m
^I ^$ n m o: o <' 1 �s 5 c 11 p G)
o- ° nw a ^'Cin m o� a m * �a c w m
Y m m n x o » w £ C m( m d E° c' v= 3 3 v r
y m X w p m N a o n m 9 o n o. w° 3 v D 3 D m co'
;0 r< cuw^> j °3-- g y eau In �z m0uoin
m N 9 � Q w a• o : d c x o a o z rri � N• 4* vN
Q N .. x X 1, C7 3 w m
m m� a \ 03 rm m 2v c �'� E-moo Gov+#
D c° w y 3Z �' m 3 3 3 w 0 o vw� Zp00Ln
m n o a X 3 X v°+ X cr m a o re) °oo Ln
O 7 w w 4, N rp '- m w v n 7 n 3# D N
N 0 IDtO � c n N n� a �� N a� 7 Co CD
a w. o £ n in a) m- 3 0
3 g n m °n ° Xo
w VI m °s CL n a N 7 w i aT y m 0, 7 f7
020
o
m
m 7 m a s 3 ': a ° E Lo
o va m I m? m a m <
Certified Profile
CLOSE WINDOW 12
Print
Business & Contact Information
BUSINESS NAME
OWNER
ADDRESS
PHONE
FAX
EMAIL
ETHNICITY
GENDER
COUNTY
Certification Information
CERTIFYING AGENCY
CERTIFICATION TYPE
CERTIFIED BUSINESS DESCRIPTION
[CCO.17oditymmCodes
NAICS 238210
NA CS 238990
Mendoza Business Enterprises, Inc., DBA MEX Electric
Mr. Peter Mendoza
1460 E. Cooley Drive, Suite 101
Colton, CA 92324 mmaapj
951-900-4287
951-352-2498
accounting@m6emex.com
Hispanic American
Male
Riverside (CA)
Los Angeles County Metropolitan Transportation Authority
DBE - Disadvantaged Business Enterprise
Electrical construction: wiring and installation
Electrical Contractors and Other Wiring Installation Contractors
All Other Specialty Trade Contractors
Additional Information
WORK DISTRICTS/REGIONS Riverside
CUCP PUBLIC DIRECTORY CERTIFICATION 45752
NUMBER
To: Pon Burch. Page: 2 of 3 2071 :24 GMT 15622868410 From: Raymond lee Hayes 1,
R. L. HAVES, JR. CONSTRUCTION COMPANY
GENERAL BUILDING "B"& GENERAL ENGINEERING "A" CONTRACTOR LIC. #44373,8
1506 West Gage Avenue, Los Angelvs, CA 90041
Website www.r1hayaconstruction.com e-mail ray@r1hayesconstruction-com
(%2) �286-.8410 Fax (562) 235-4658 Cell
i�ii,9491P_I�
Co,i�y _ofLA(M_eiro File 49254) bfklgo. PIW-LR-
R. L. Hayes D�B 0, as b v (WjIM 41
1000432614 Bond Rate is 3%: is pleas to provide a.cost prpposal to furni'sh labor, equipment, and materials for the itenis,
of work .as described below.
Quantities,ore'ap.por�xir4.lte.,.j3.ijI i.ag will be. foraptu quantity ii of '10 Working day 0
ral. qua ity placed at unit pricos, A minimn8
Nate; required prior to rnove4ji. I 09/o.of contract price -to. be billed for.r.nobilization, One nlow,in. included, ad4itiQ_nqI.TnQYe-In S.
at $2500:00. Some items can be picked separately. Quote good:fo.r 120 days..
jProposal
#325 Good for.110 Days
CITY OF LA QlANTA,CFORNIA ALI
t
-
I __ __ -, -, - - — -4
11�Une"Palms --
-R94d Bridge Improvements.
I
;Coachella Valley Storm Water Channel (C'V8Q at Dune Palms Road with a bridge crossing.
FEDF Bid Set
�RAL AIID PROJECT #Bj(NBEL(537) status:
LA UINTA PROJECT #2011 - Date: J081 5/22
Revision sion ADDtN•[--Q.
Item No.
,m Code.
i Item DescriptW U111s,
Qts; Unit Price
ToW 1,98.8,912
1*0'I'AL 8 LYrE N4BE, R 2022
1: SCA I.A II ON i 5'--o j) c i. yeae iv io 311 i (I po it IT o 1':�oj)su
(ICI 10 ti) $ -
TOTAL BUDGET EXCLUDING ESCALATION
11988,912.
13
Concrete Slope Protection on
ST'
4,500
9.78
$ 44;01 0.00�
bypass
18
19
$ 3Z,677.12--
$ 1-7
T
6" Curb & Gutter (D LF
NiQlian Curb (D) LF
Concrete Sidewalk (W=5.5') (D) e SF
448
5.81
4;1 4.8'.
$ 7194
$ 3 0_. 07
1 11.29
20
I
2.1
Conerew, Dirivoway Approach (D) 1 S17
1,034
y
S 15.47
$ 15'995.9&--
Colored Stamped Concrete Median 1
22
SF
Concrete Cross Gutter SF
711
$ 2314
$ .1655 23.64
$ 16,536.15
_3
1
11215
$ 13-61
8`7 Concrete Pavement SF
Concrete Slqgt: Protection (D) CY
1,142
1,210
$ 1.5.22
$ 607.60
$ 17;38_1.24-
$ 735,196.00
26
27
Curb Ramp (.Case A) (D) EA
1
$13,544.00
13,.544.00-�-
69
Minor. Con.crete (Methan Paving,
CY
116
$ 974.31
$ 113,019.96�—
A.Colored and Stamped) (F)
101
6" Curb Gutter (D
347
:$ 8.9.58
W.32.50
.$ 31,084.2(n
02
N
_R'
8" Median Curb (D) LF
1
ioq._jT$
$ 69,022.50
103
.104:..
10.5
.
L Concrete Sldwwalk (W= .5,') �(.D) SF
Concr-p-te-Driv'eway.Appr.oacb..,(D) i SF
Colored Stamped Concrete Media" SF '1
4;90.9
M
1,360
$ -9.84
$ 20,:83
$ 13.51
$ 48,304.56
$ 15,66.0�.09__
$ 18,373.60--
(D)
1
$ 13,5 44.00
106
- T
R Curb amp (ca's-e, AEA
) (D)
$ 13,544.00
To: Ron Burch. Page: 3 of 3 2022-10-04 23:41:24 GMT 15622868410 From: Raymond Lee Hayes Jr
= z
R. L. HAYES, Jlt. CONSTRUCTION COMPANY
GENERAL BUII DING " B"& GENERAL gNG-ME_RTNG_ "A" CONTRACTOR�Li . #443738
1506 West Gage ;Avenue, Los. Angeles, CA 90041
Website www.rlhayesconst;ruction.com e-mail ray*rlhaye constlruction.com
(5,62)..543-4970 Office (562) 286=8410 Fax (:562) 235-4658 Cell
l 1-7 IC011craw..Slope Protection (D) CY 905 $. _ 687.65 $ - 55.3,558.25rt—
1 Cbncrcte Trail.(r-6*) SF v 13,50^ � - _ t (].t}5 $ _ 142,284.00
---.....__. ..
—122 1CUrb Ramp (Case $, Type 1) EA $ 6>77Q.OS S 13,540.100.
133 Concrete Wedge Curb u� - - LF 288 1 $ 55,40 ! $ 15,955.20
Inclusions! � of concrete.
eaeral cleanap of our work Apls3icait<le eurin� - T —
Typical Wa6hes -- —
1 �Beinforeing Steel
fj
Exclusions: -
Permits and Fees )General Surve &. La out
_- Dgineering Testing,.& all InspecfgConstruction Staicin
S.WPP &. "Water Control Excavations, .ShorinWBraeing of Excavation and Grading
—
RelocxtionlPrutectionof:existing
Sub -Grade Preparation E
Traffic Control _ _ _•_-
ALL W.ORK•TO BE CO11ZPLETED'UJ A' W.ORI~:LYKE MANNER ACCORDrN.G TO.PROJECT
PLANS FOR CONSTRUCTION ON Coachella. Valley Storm Water Channel (CVSC) at Dune Palms Road
with a bridge erossin SO RE t R TO ADDENDUM 1, 2, 3, & 4
Tha•e0u."
L. Aaye3,.Jr. Construction
To: Ron Eurc4
r
Page: 1 of 3 2022-10-04 23:41:24 GMT 15622868410
From: Raymond Lee Hayes Ji
FAX COVER SHEET
TO Ron Burch
COMPANY MCM Construction, Inc.
FAXNUMBER 19163340562
FROM Raymond Lee Hayes Jr
DATE 2022-10-04 23:41:00 GMT
RE City Of La Quinta, California, Dune Palms Road Bridge
Improvements.
COVER MESSAGE
Hi Estimating Department,
Here is my quote forthe Dune Palms Road Bridge Improvements Project.
Thank you,
Raymond Lee Hayes, Jr.
R. L. Hayes, Jr. Construction Company
Certified Profile
CLOSE WINDOW ja
Print
Business & Contact Information
BUSINESS NAME
i
OWNER
ADDRESS
PHONE
FAX
EMAIL
WEBSITE
ETHNICITY
GENDER
COUNTY
Certification Informatior
CERTIFYING AGENCY
CERTIFICATION TYPE
CERTIFIED BUSINESS DESCRIPTION
Commodity Codes
Code
NAICS 237310
NAICS 236220
NAICS 238110
Additional Information
Raymond Lee Hayes, Jr. Construction Company, DBA
Construction Co
Mr. Raymond Lee Hayes, Jr.
1506 West Gage Avenue
LOS ANGELES, CA 90047 map]
562-235-4658
562-286-8410
rAymondleehayesjr2yah2Q C -M
j>MNAllhayesjr nstr o tail m
Black American
Male
Los Angeles (CA)
Los Angeles County Metropolitan Transportation Authority
DBE - Disadvantaged Business Enterprise
General contracting; building services, specializing in concrete
Description
Highway, Street, and Bridge Construction
Commercial and Institutional Building Construction
Poured Concrete Foundation and Structure Contractors
WORK DISTRICTS/REGIONS Los Angeles<br>Orange<br>Rlverside
CUCP PUBLIC DIRECTORY CERTIFICATION 47038
NUMBER
QUOTE
Bid Date 09/26/2022
State CA
County/City City of La Quinta
Project # 2011-05, BRNBIL(537)
Description Dune Palms Road Bridge Improvements
To
All Bidders
Item # I Qty J FOB:BRB
Bridge Rubber Bearing, LLC
\vllt 15467 State Hwy 64 W
'\'I,, Tyler, TX -75704
®R Phone # 903 500 2086
— LLC — Fax # 903 222 3502
krishna brid erubberbearin .com
www brid erubberbearin .corn
Quote # n 2 3 O
Descriptions
1 20 Laminated Elastomeric Bearing pads with 10 Shims
5 x 16 x 16 TWL inches
2 20 Galvanized sheet metal
0.079 x 20 x 20
(�,'---Is7u
Unit price 4
Sub total $ Remarks
$892
$17,840
$108
$2,160
1 BSc)
CALTRANS- DBE APPROVED
We are manufacturer of Bearing pads.
Our proposal eligible 100 % towards DBE goal.
Price includes Shop drawing and inhouse testing.
Total Cost $20,000
Bearing Pads will be manufactured --as per CA DOT Sec: 51 — Elastomeric Bearing Pads
Materials will be as per Table 51-3.02
Material CR 55 DURO
Delivery: 2-3 weeks after receiving approved drawing www.bridgerubbierbearingl.com
BRB LLCs' terms and conditions attached and will be applicable for this quote.
Krishna Cell- 206 683 4865 R-2
Bridge Rubber Bearing, LLC dba BRB LLC
Certified Profile
CLOSE WINDOW I
Print
Business & Contact Information
BUSINESS NAME
OWNER
ADDRESS
PHONE
FAX
EMAIL
WEBSITE
ETHNICITY
GENDER
COUNTY
Certification Information
CERTIFYING AGENCY
CERTIFICATION TYPE
CERTIFIED BUSINESS DESCRIPTION
Commodity Codes
Code
CA WCC C8779
I
NAICS 237310
NAICS 326291
NAICS 332312
Bridge Rubber Bearing,
Mr. Krishnamoorthy Palaniappan
15467 State Hwy 64
Tyler, TX 75704 [map]
206-683-4865
903-222-3502
krishnaebridgerobberbearing.con
httis Ilwww.brldgerubberh�a�ing•(
Asian -Pacific American
Male
Smith (TX)
California Department of Transportation
DBE - Disadvantaged Business Enterprise
Highway, Street, and Bridge Construction
Rubber Product Manufacturing for Mechanical Use
Fabricated Structural Metal Manufacturing
Description
CONSTRUCTION RELATED - NOT LICENSED IN CALIFORNIA
Highway, Street, and Bridge Construction
Rubber Product Manufacturing for Mechanical Use
Fabricated Structural Metal Manufacturing
Additional Information
WORK DISTRICTS/REGIONS
CUCP PUBLIC DIRECTORY CERTIFICATION
NUMBER
All work districts/regions
51028
S=7
CONSUL I A N rs
Cost Estimate
QC Services for Structural Concrete
Contract No.: Dunes Palm Road Bridge
Date: September 26, 2022
Bid Item : Structural Concrete
Remarks:
1 Estimate is based on 8 hour Straight -Time shifts, Monday through Friday.
2 Overtime will be charged at $160.50/hour and Double time at $214/hour.
3 Union Tester rates quoted are valid through June 30, 2023, after which an annual escalation rate of $40/shift for each
Tester will be added onto the shift rate.
A 9`SD
+ ayo
Certified Profile
CLOSE WINDOW
Print
Business & Contact Information
BUSINESS NAME
OWNER
ADDRESS
PHONE
FAX
EMAIL
WEBSITE
ETHNICITY
GENDER
COUNTY
Certification Information
CERTIFYING AGENCY
CERTIFICATION TYPE
i
CERTIFIED BUSINESS DESCRIPTION
h
Commodity Codes
Code Description
Sequoia Consultants, Inc.
MR. PRIYANGA DESILVA
361 W. GROVE AVENUE
ORANGE, CA 92865 rmapJ
714-974-6316 Ext. 101
714-974-6193
DdesfIva case quaia on.cam
h ttp_:_//www,M u of acon. C2rn
Subcontinent Asian American
Male
Orange(CA)
California Department of Transportation
DBE - Disadvantaged Business Enterprise
Testing Laboratories
NAICS 541380 Testing Laboratories and Services
NAICS 541330 Engineering services
Additional Information
WORK DISTRICTS/REGIONS All work districts/regions
CUCP PUBLIC DIRECTORY CERTIFICATION 35308
NUMBER