Loading...
HomeMy WebLinkAboutMCM Con. Good Faith Effort (2011-05) 3-A' jMp1TD11i711tlCi101�111C.i; Attachment #3 C. The items of work made available to DBE firms including those unbundled contract work items into economically feasible units to facilitate DBE participation, It is the bidder's responsiblitiy to demonstrate that sufficient work to facilitate DBE participation in order to meet or exceed the DBE contract goal. Items of Work Bidder Normally Breakdown of Amount Percentage Performs Item Items ($) Of (Y/N) Contract See next page Attachment 3 - Dune Palms Rd. City of La Quinta MCM CONSTRUCTION, INC. $21,955,640.00 is MCM's Bid Total ITEM OF WORK OFFERED BIDDER NORMALLY PERFORMS ITEM Item Broken Down to Facilitate Participation Established Flexible Timeframes for Performance and Delivery Schedules Amount ($ Percentage of Contract Aggregate No Yes Yes $125,440.00 0.57% Bearings No Yes Yes $20,000.00 0.09% CIDH Yes Yes Yes $1,935,320.00 8.81% Clearing & Grubbing No Yes Yes $232,500.00 1.06% Construction Monitoring Camera No Yes Yes $25,000.00 0.11% Drainage/Misc. Iron & Steels No Yes Yes $28,000.00 0.13% Electrical No Yes Yes $691,104.00 3.15% Fencing Joint Seals No No Yes Yes Yes Yes $213,160.00 $162,900.00 0.97% 0.74% Landscaping Masonry No No Yes Yes Yes Yes $106,035.00 $167,400.00 0.48% 0.76% Metal Railing Minor Concrete No No Yes Yes Yes Yes $1,048,610.00 $333,764.00 4.78% 1.52% Misc. Metals Paint & Stain Concrete No No Yes Yes Yes Yes $70,000.00 $10,000.00 0.32% 0.05% Paving/HMA No Yes Yes $86,466.00 0.39% Pipe No Yes Yes $40,600.00 0.18% Plane Asphalt Concrete No Yes Yes $174,580.00 0.80% Prestressing Ready -Mix Rebar No No No Yes Yes Yes Yes Yes Yes $420,000.00 $855,000.00 $1.851,068.00 1.91% 3.89% 8.43% Roadway Excavation Signal & Lighting No No Yes Yes Yes Yes $66,400.00 $350,000.00 0.30% 1.59% Slurry Seal No Yes Yes $136,650.00 0.62% Striping/Marking, Signs, & Pavement Marker No Yes Yes $116,260.00 0.53% Structural Concrete Quality Control No Yes Yes $200,000.00 0.91% Traffic Control Yes Yes Yes $500,000.00 2.28% Underground Utilities No Yes Yes $1,122,824.00 5.11% TOTALS $11,089,081.00 50.51%