Loading...
HomeMy WebLinkAbout00_NBIL(537)_2011-05_GFE Evaluation MEMORANDUM To: PROJECT FILE Dune Palms Road Bridge Date: 10/11/2022 Federal-Aid Project #: BR-NBIL(537) Bid Opening Date: October 5, 2022 Bidder: Ortiz Enterprises, Inc. (hereinafter called “Low Bidder”) Type of Work: New four-lane bridge (replace low-water crossing) Bid Amount: $21,635,759.60 From: City of La Quinta EVALUATION OF GOOD FAITH EFFORTS The City of La Quinta established a Disadvantaged Business Enterprise (DBE) goal of 21 % for this construction contract. The Low Bidder commits 17.19 % DBE participation. The City of La Quinta’s evaluation of the apparent low bidder’s Good Faith Efforts is based on Section 9.9 of the Local Assistance Procedures Manual and Appendix A in Part 26 of Title 49 of the Code of Federal Regulations. The efforts of the Low Bidder were reviewed by the City of la Quinta Public Works Department from the information provided in Exhibit 15-H: Proposer/Contractor Good Faith Efforts signed and submitted by Jeff Ortiz, Secretary of Ortiz Enterprises, Inc.. The City of La Quinta determined that the Low Bidder did demonstrate Good Faith Efforts to meet the DBE participation goal of this project for the reasons cited in this evaluation. EVALUATION A. Items of work the bidder made available to DBE firms The Low Bidder did make 100 % of the total scope of work available for DBE’s to participate in the bidding. 46.7 % were tasks which the Low Bidder usually subcontracts, but 53.3 % were tasks which the Low Bidder usually performs by himself (Exhibit ‘C’ from Low Bidder’s Good Faith Efforts documentation). The tasks were offered per bid item to the DBE’s (152 units) to facilitate a wide range of DBE participation and to even enable smaller DBE’s to participate. B. Solicitation effort documentation The Low Bidder contacted initially more than 250 DBE’s and followed up with emails and phone calls to check if they are planning to bid or if they would need assistance in any sort in respect to providing a bid (Exhibit ‘B’ – contact log, from Low Bidder’s Good Faith Efforts documentation). The Low Bidder solicited through electronic media and direct phone contact. The Low Bidder searched for qualified DBE’s according to specific work codes within but not limited to southern California (https://ucp.dot.ca.gov/querySubmmit.htm) and made the appropriate work items for the respective DBE’s available. The search in the CUCP database returned 259 DBE records for the respective work codes. The RFQ was publicly advertised 9/8/2022. All of the DBE’s received the initial solicitation email on 9/8/2022. The Low Bidder followed up by phone and / or email in between 9/20 and 10/3/2022 with 115 of the DBE’s. He reached 64 directly, left voice messages or got a busy signal with 43 of them, and he sent 8 follow up emails. As a result to this reminder 21 DBE’s said that they would bid and 5 answered “maybe”. C. Rejected DBE documentation The Low Bidder received fifteen (15) quotes whereof he accepted eight (8) DBS’s as a subcontractors and as service and / or material supplier (see table below). A total of seven (7) DBE’s were rejected due to significant price differences (from 20 to 60% higher) compared to the respective non-DBE subcontractors or suppliers (Exhibit ‘D’ from Low Bidder’s Good Faith Efforts documentation). In relation to the total bid amount selecting these DBE’s would have increased the construction costs by $1,116,417.00 (5.2%) to a total of $22,754,176.60. Bid item Name of Firm DBE Total Difference to low 1, 77-90 SRK Engineering YES $1,121,227.00 25, 26, 28, 3, 34, 68, 71, 72, 73 Integrity Steel LA Steel* DRS Marvela Steel NO YES YES YES $1,943,250.00 $2,288,515.00* $2,323,461.00 $2,596,975.00 $345,265.00 $380,211.00 $653,725.00 *Ortiz decided to spend $1,000,000.00 to utilize partial DBE through 2nd tier sub LA Steel 47, 49, 51-54, 56, 109, 111-114, 132 Griffith Landscaping Diversified Landscape NO YES $140,786.00 $226,727.00 $85,941.00 29-31, 33-35, 118 R. Dugan YES $119,513.00 18-24, 27, 69,101-106, 122, 133 Universal Construction YES $392,272.00 1, 42, 44, 45, 50, 75, 76, 125, 129-131, 138-145 Mendoza Business Enterprise YES $1,045,777.00 67 partial Bridge Rubber Bearing YES $20,000.00 Fence Supplies Triumph Geo-Synthetics YES $18,612.00 SWPP Reporting SWPP Queen YES $10,275.00 37-40, 43, 74, 123, 124 Trinity Fence Alcorn Fence NO YES $986,713.00 $1,248,274.00 $261,561.00 1, 61, 62 Foundation Pile Geo-Structural Mahaffey NO YES YES $1,295,830.00 $1,719,480.00 $1,905,420.00 $423,650.00 $609,590.00 No quotes were rejected for being only marginally higher. D. Publication effort made to advertise the projects to include DBE participation The Low Bidder used the following publications for his request for DBE participation for this (Exhibit ‘A’ from Low Bidder’s Good Faith Efforts documentation): Publications Dates of Advertisement Construction Update 9/15/2022; 9/22/2022 Minority Bidders Bulletin 9/12/2022; 9/19/2022; 9/26/2022 Contractors Estimate Focus 9/8/2022 to bid date Copies of the publications were provided in Low Bidder’s Good Faith Efforts documentation. E. Agencies, organizations, or groups contacted to provide assistance in contacting, recruiting and using DBEs The Low Bidder contacted twelve (12) minority organizations by email per below table (Exhibit ‘G’ from Low Bidder’s Good Faith Efforts documentation). Name of Agency / Organization Method / Date of Contact 1 American Indian Chamber of Commerce of California Email 9/8/2022 2 Asian Business Association Email 9/8/2022 3 Asian Business Association of Orange County Email 9/8/2022 4 Chinese American Construction Professionals Email 9/8/2022 5 Filipino American Society of Architects and Engineers Email 9/8/2022 6 Greater Los Angeles African American Chamber of Commerce Email 9/8/2022 7 Hispanic Chamber of Commerce of Orange County Email 9/8/2022 8 Korean Chamber of Commerce of Orange County Email 9/8/2022 9 National Association of Minority Contractors Email 9/8/2022 10 Associated General Contractors of California Email 9/8/2022 11 American Indian Chamber of Commerce Email 9/8/2022 F. Efforts to provide information about the plans, specifications, and contract requirements The Low Bidder did offer to provide information, plans and contract requirements upon request in his advertisements. A sample from his information distributed on 9/8/2022: “Plans/Specifications and Standard Subcontract Agreement are available for viewing at Ortiz – please call to arrange. You may also view and/or download plans/specifications/ Invitation to bid/Standard Subcontract Agreement at our FTP site: www.ortizplans.com username: 22-025, password: ORTIZ. Please check the site for updates. …” G. Assistance with bonding, lines of credit, insurance, equipment, supplies, materials, and/or services The Low Bidder did offer assistance with bonding, lines of credit, insurance, equipment, supplies, materials, and/or services. A sample from his information distributed on 9/8/2022: “Ortiz Enterprises Inc. estimating staff is available to assist subcontractors in obtaining bonding, Lines of credit, Insurance, necessary Equipment, Supplies, Material, or related assistance or services requested. …” H. Additional data to support a demonstration of Good Faith Effort The Low Bidder has submitted very detailed documentation of his effort towards DBE’s (communication, outreach and offer for assistance). Below summary shows that neither the 3rd nor the 4th lowest bidder reached the DBE Goal, their goals were even lower than the one from the Low Bidder. Engineer’s Estimate $16,496,244.50 DBE Goal 21.00 % #1 Ortiz Enterprises (Low Bidder) $21,635,759.60 DBE Goal 17.19 % #2 MCM Construction $22,069,640.00 DBE Goal 21.36 % #3 Griffith Company $23,450,459.50 DBE Goal 11.4 % #3 Riverside Construction $23,489,250.50 DBE Goal 9.0 % FINDING OF THE CITY OF LA QUINTA The City of La Quinta finds that the Low Bidder did demonstrate Good Faith Efforts to meet the DBE contract goal for the reasons cited in this evaluation. He achieved a reasonable balance between project cost and trying to meet the DBE goal. Submitted by: Approved by: Lorissa Gruehl, PE Bryan McKinney, P.E. (Senior Engineer) (Public Works Director / City Engineer)