Colorado River Basin Regional Water Quality Control Board
CERTIFIED MAIL: 7018 1830 0001 0265 0538
October 3, 2018
Brian McKinney
City of La Quinta
78-495 Calle Tampico
La Quinta, CA 92253
EouuxopG. ERowa Jr.
MRROR EROovROiECTIeR
SUBJECT: CLEAN WATER ACT SECTION 401 WATER QUALITY CERTIFICATION AND
ORDER FOR THE DUNE PALMS ROAD LOW WATER CROSSING
REPLACEMENT PROJECT, WDID NO. 7A333190001
Dear Mr. McKinney:
Enclosed please find a Clean Water Act Section 401 Water Quality Certification (WQC) and
Order, authorized by the Colorado River Basin Regional Water Quality Control Board. This WQC
is issued for the Dune Palms Road Low Water Crossing Replacement Project (Project).
This WQC is issued in response to an application submitted by the City of La Quinta for proposed
Project discharges to waters of the U.S., to ensure that the water quality standards for all waters
of the U.S. impacted by the Project are met. You may proceed with your Project according to the
terms and conditions of the enclosed WQC.
If you require further assistance, please contact Kai Dunn, Senior Water Resource Control
Engineer, by phone at (760) 776-8986 or by email at Kai. Dunn(5waterboards.ca.gov.
Sincerely,
� 2, J �/Z-
Paula Rasmus en
Executive Officer
Colorado River Basin
Regional Water Quality Control Board
EM/tab
NANCY WRIOHT. CHAIR I PAUTA RASMUSSEN, E%ECUTNE OFFICER
73-720 Fred Waring Drive, Suite 100. Palm Desart, CA 922M I w .weterpo&Ms.oe.gov/colomdoriver
\0 R CYCLEe vnnEs
Brian McKinney - 2 -
City of La Quinta
WDID No. 7A333190001
Enclosures:
(1) WQC Dune Palms Road Low Water Crossing Replacement Project
(2) Attachment A — Maps
(3) Attachment B — Receiving Waters, Impact, and Mitigation Information
(4) Attachment C — CEQA Findings of Facts
(5) Attachment D — Signatory Requirements
(6) Attachment E — Reporting Requirements
cc:
Melissa Scianni
U.S. Environmental Protection Agency, Region 9
Scianni.MelissaCd)epa.gov
Megan Fitzgerald
U.S. Environmental Protection Agency, Region 9
ftzgerald.megan(c epa.gov
James Mace
U.S. Army Corps of Engineers
Riverside Regulatory Field Office
James.E.Mace@usace.army.mil
October 3, 2018
Charles Land
Environmental Scientist
California Dept. of Fish and Wildlife, Eastern Sierra/Inland Deserts Region
Charles.land@wildlife.ca.gov
CWA Section 401 WQC Program
Division of Water Quality
State Water Resources Control Board
Stateboard40l@waterboards.ca.gov
Maisoon Afaneh
WSP USA
Maisoon.AfanehO-)wsp. com
Kai Dunn
Program Manager
Colorado River Regional Water Quality Control Board
Kai. Dunn@waterboards.ca.gov
........ �Wo
Water Boards
Colorado River Basin Regional Water Quality Control Board
Eovuxo G. B... Jx.
I aorsnxon
VeAxneoxrE xu a or¢cnox
CLEAN WATER ACT SECTION 401 WATER QUALITY CERTIFICATION AND ORDER
Effective Date:
October 3, 2018
Reg. Meas. ID: 422702
Place ID:
849029
Program Type:
Fill/Excavation
WDID:
7A333190001
USACOE#:
NWP 14, BLRKS-
5433 014
Project Type: Bridges, Overpasses and Crossings
Project: Dune Palms Road Low Water Crossing Replacement
Applicant: City of La Quinta
Applicant Contact: Bryan McKinney
78-495 Calle Tampico
La Quinta, CA 92253
Phone: (760) 777-7045
Email: bmckinney@la-quinta.org
Applicant's Agent: Maisoon Afaneh
862 E. Hospitality Lane, Suite 350
San Bernardino, CA 92408
Phone: (909) 915-2528
Email: Maisoon.Afaneh@wsp.com
Water Board Staff: Kai Dunn
Senior Water Resource Control Engineer
73-720 Fred Waring Drive, Suite 100
Palm Desert, CA 92260
Phone: (760) 776-8986
Email: kai.dunn@waterboards.ca.gov
NANCY WRIGHT. CHAIR I PAUL1 RASMUSSEN. EXECUTIVE OFFICER
93-720 Fred Waring Drive, Suite 100, Palm Desert, CA 92260 1 www.waterboar s.ca.gov/colamdoriver
%I a C.C,ED.A.EA
City of La Quinta — Dune Palms Road Low Water Crossing Replacement Project
Reg. Meas. ID: 422702
Place ID: 849029
WDID: 7A333190001
Water Board Contact Person:
If you have any questions, please call the Colorado River Basin Regional Water Quality
Control Board (Colorado River Basin Water Board) staff contact listed above, or (760) 346-
7491 and ask to speak with the Water Quality Certification and Wetlands Unit Program
Manager.
Attachment A
Maps
Attachment B
Receiving Waters, Impact, and Mitigation Information
Attachment C
CEQA Findings of Facts
Attachment D
Signatory Requirements
Attachment E
Reporting Requirements
Page 2 of 15
City of La Quinta — Dune Palms Road Low Water Crossing Replacement Project
Reg. Meas. ID: 422702
Place ID: 849029
WDID: 7A333190001
I. Order
This Clean Water Act (CWA) section 401 Water Quality Certification action and Order (Order)
is issued by the California Regional Water Quality Control Board, Colorado River Basin
Region (Colorado River Basin Water Board) at the request of the City of La Quinta (Permittee)
for the Dune Palms Road Low Water Crossing Replacement Project (Project). This Order is
for the purpose described in the application submitted by the Permittee. The application was
received on July 12, 2018. The application was deemed complete on August 22, 2018.
II. Public Notice
The Colorado River Basin Water Board provided public notice (07-23-2018) of the application
pursuant to California Code of Regulations, title 23, section 3858 from July 23, 2018 to August
12, 2018. The Colorado River Basin Water Board did not receive any comments during the
comment period.
III. Project Purpose
The purpose of the Project is to raise the roadway to above the current channel grade level to
ensure crossing during precipitation events. Raising the bridge will allow pedestrians, motorists,
and bicyclists to safely traverse the route year-round.
IV. Project Description
The Permittee proposes to replace the current low water crossing with a new bridge to elevate
the roadway. The new bridge will consist of: two 12-foot travel lanes, two 11-foot travel lanes,
two 8-foot shoulders, 6-foot sidewalk on both sides, and a raised median. The north and south
approaches to the new bridge will be rebuilt and raised to meet the new bridge elevation.
Concrete slope protection will be installed along the north side of the channel and replaced or
extended along the south side.
V. Project Location
The Project is located in the City of La Quinta in Riverside County, California. The Project is
replacing the existing bridge on Dune Palms Road between the intersections of Highway 111
and Blackhawk Way/Westward Ho Drive. Township/Range: T05S E07E (Latitude N 330 42'
39", Longitude W 116* 16' 40"). Maps showing the Project location are found in Attachment A
of this Order.
VI. Project Impact and Receiving Waters Information
The Project is located within the jurisdiction of Colorado River Basin Water Board. Receiving
waters and groundwater potentially impacted by this Project are protected in accordance with
the applicable water quality control plan (Basin Plan) for the region and other plans and
policies, accessible online at: http://www.waterboards.ca.gov/plans policies/.
The Basin Plan includes water quality standards, which consist of existing and potential
beneficial uses of waters of the U.S./state, water quality objectives to protect those uses, and
the state and federal antidegradation policies.
Project impact and receiving waters information can be found in Attachment B.
The Coachella Valley Stormwater Channel is the receiving water.
Page 3 of 15
City of La Quinta — Dune Palms Road Low Water Crossing Replacement Project
Reg. Meas. ID: 422702
Place ID: 84902£
WDID: 7A333190001
Table 1 of Attachment B shows the receiving waters and beneficial uses of waters of the U.S.
impacted by the Project. Individual impact location and quantity is shown in Table 2 of
Attachment B.
VII. Description of Direct Impacts to Waters of the U.S.
The Project will be constructed within the Coachella Valley Stormwater Channel. Impacts to the
area will include installation of concrete slope protection, bridge piers, and a temporary bypass
road. The area around the removed low water crossing will be excavated and graded to return
the channel profile to a natural condition.
Runoff from the Project location will drain into the Coachella Valley Stormwater Channel.
Total Project fill/excavation quantities for all impacts are summarized in Table 1. Permanent
impacts are categorized as those resulting in a physical loss in area and also those degrading
ecological condition only.
Table 1: Total Project Fill/Excavation tity
Aquatic
Resource Type
Temporary Impact'
Permanent Impact
oss orea
physical Lf A
Degradation of Ecological
Condition Onl
Acres
CYz
LF
Acres
CY
LF
Acres
CY
LF
Lake
Ocean/bay/
estuary
Riparian Zone
Stream Channel
0.72
238
0.02
20
Vernal Pool
Wetland
0.01
53
Vill. Compensatory Mitigation
The Project is replacing an existing structure in a disturbed, urban area and the permanent
impacts will be negligible. This Project does not require compensatory mitigation.
The Permittee proposes to recontour the area to pre -Project or natural conditions where
possible. Removal of the low water crossing will restore the natural channel sediment
redistribution.
IX. California Environmental Quality Act (CEQA)
On February 14, 2018, the Permittee, as lead agency, adopted an initial study/mitigated
negative declaration (IS/MND) for the Project and filed a Notice of Determination (NOD) with
the Riverside County Clerk (E-201800056) on January 23, 2018.
' Includes only temporary direct impacts to waters of the U.S. and does not include upland areas of temporary
disturbance which could result in a discharge to waters of the U.S.
2 Cubic Yards (CY); Linear Feet (LF)
Page 4 of 15
City of La Quinta — Dune Palms Road Low Water Crossing Replacement Project
Reg. Meas. ID: 422702
Place ID: 849029
WDID: 7A333190001
The Colorado River Basin Water Board has determined that the Project will not result in any
significant adverse water resource impacts. (Cal. Code Regs., tit. 14, § 15096, subd (h).)
Pursuant to CEQA, the Colorado River Basin Water Board has made Findings of Facts
(Findings) which support the issuance of this Order and are included in Attachment C.
X. Petitions for Reconsideration
Any person aggrieved by this action may petition the State Water Resources Control Board
(State Water Board) to reconsider this Order in accordance with California Code of
Regulations, title 23, section 3867. A petition for reconsideration must be submitted in writing
and received within 30 calendar days of the issuance of this Order.
XI. Fees Received
A portion of the application/Project fee of $1,500 was received on May 25, 2018. The total fee
amount of $9,951 was determined as required by California Code of Regulations, title 23,
sections 3833(b)(3) and 2200(a)(3), and was calculated as Category A - Fill & Excavation
Discharges (fee code 84) with the dredge and fill fee calculator.
The remaining $8,451 was received August 29, 2018.
XII. Conditions
The Colorado River Basin Water Board has independently reviewed the record of the Project
to analyze impacts to water quality and designated beneficial uses within the watershed of the
Project. In accordance with this Order, the Permittee may proceed with the Project under the
following terms and conditions:
A. Authorization
1. Impacts to waters of the U.S. shall not exceed quantities shown in Table 1.
2. Work shall be performed under "no flow" conditions in the washes to preclude potential
impacts to water quality.
B. Reporting and Notification Requirements
The following section details the reporting and notification types and timing of submittals.
Requirements for the content of these reporting and notification types are detailed in
Attachment E, including specifications for photo and map documentation during the
Project. Written reports and notifications must be submitted using the Reporting and
Notification Cover Sheet located in Attachment E, which must be signed by the Permittee
or an authorized representative.
1. Project Reporting
a. Monthly Reporting: The Permittee must submit a Monthly Report to the Colorado
River Basin Water Board on the 15t" day of each month for the duration of the
construction phase (approximately 16 months). Monthly reporting shall continue until
the Colorado River Basin Water Board issues a Notice of Project Complete Letter to
Page 5 of 15
City of La Quinta — Dune Palms Road Low Water Crossing Replacement Project
Reg. Meas. ID: 422702
Place ID: 849029
WDID: 7A333190001
the Permittee.
b. Annual Reporting: The Permittee must submit an Annual Report including activities
conducted for the previous fiscal year (July 1 — June 30) to the Colorado River Basin
Water Board on the 1st of September. Annual Reports must be submitted even if
Project construction has not begun. Annual reporting shall continue until a Notice of
Project Complete Letter is issued to the Permittee by the Colorado River Basin
Water Board.
c. Other Reporting: If pollutants are observed in surface water, the Permittee shall
submit a report to the Colorado River Basin Water Board within 30-days after
encountering the pollutants and describe actions taken to correct the problem and
provide photographic documentation that supports the information in the report.
If repairs are required, the Permittee shall take pictures of the area where work
needs to take place, documenting the before and after conditions of the area; and
shall maintain a daily log for each site where work is taking place pursuant to this
Order, while the Permittee conducts its repair activities. The log shall:
• Provide a general description of the repair work;
• Specify the date and daily starting and ending time for the repair work;
• Note key weather conditions (e.g., temperature, wind speed and direction,
precipitation, if any);
• Include notes from visual observations regarding the presence/absence of
construction debris/trash (e.g., discarded filter fiber) and used oil (e.g., oil that
leaks from construction equipment) in the area where the work has taken place.
Within 30 days following completion of all repair work, the Permittee shall submit
to the Colorado River Basin Water Board a summary report of the key daily log
entries. The summary report shall include the above -mentioned before and after
pictures of the conditions of the area and shall be signed by the Permittee's Project
Manager.
2. Project Status Notifications
a. Commencement of Construction: The Permittee shall submit a Commencement of
Construction Report at least seven (7) days prior to start of initial ground disturbance
activities.
b. Request for Notice of Completion of Discharges Letter: The Permittee shall
submit a Request for Notice of Completion of Discharges Letter following completion
of active Project construction activities, including any required restoration and
permittee-responsible mitigation. This request shall be submitted to the Colorado
River Basin Water Board staff within thirty (30) days following completion of all
Project construction activities. Upon acceptance of the request, Colorado River Basin
Water Board staff shall issue a Notice of Completion of Discharges Letter to the
Permittee, which will end the active discharge period and associated annual fees.
Page 6 of 15
City of La Quinta — Dune Palms Road Low Water Crossing Replacement Project
Reg. Meas. ID: 422702
Place ID: 849029
WDID:7A333190001
c. Request for Notice of Project Complete Letter: The Permittee shall submit a
Request for Notice of Project Complete Letter when construction and/or any post -
construction monitoring is complete,3 and no further Project activities will occur. This
request shall be submitted to Colorado River Basin Water Board staff within thirty
(30) days following completion of all Project activities. Upon approval of the request,
the Colorado River Basin Water Board staff shall issue a Notice of Project Complete
Letter to the Permittee which will end the post discharge monitoring period and
associated annual fees.
3. Conditional Notifications and Reports: The following notifications and reports are
required as appropriate.
a. Accidental Discharges of Hazardous Materials:4 Following an accidental
discharge of a reportable quantity of a hazardous material, sewage, or an unknown
material, the following applies (Wat. Code, § 13271):
As soon as (A) Permittee has knowledge of the discharge or noncompliance,
(B) notification is possible, and (C) notification can be provided without
substantially impeding cleanup or other emergency measures then:
• first call — 911 (to notify local response agency)
• then call — Office of Emergency Services (OES) State Warning Center at:
(800) 852-7550 or (916) 845-8911
• Lastly follow the required OES procedures as set forth in:
hftp://www.caloes.ca.gov/FireRescueSite/Documents/CalOES-
Spill Booklet Feb2014 FINAL BW Acc.pdf
ii. Following notification to OES, the Permittee shall notify the Colorado River
Basin Water Board, as soon as practicable (ideally within 24 hours).
Notification may be via telephone, e-mail, delivered written notice, or other
verifiable means.
iii. Within five (5) working days of notification to the Colorado River Basin Water
Board, the Permittee must submit an Accidental Discharge of Hazardous
Material Report.
b. Violation of Compliance with Water Quality Standards: The Permittee shall notify
the Colorado River Basin Water Board of any event causing a violation of
compliance with water quality standards. Notification may be via telephone, e-mail,
delivered written notice, or other verifiable means.
3 Completion of post -construction monitoring shall be determined by Colorado River Basin Water Board staff and
shall be contingent on successful attainment of restoration and mitigation performance criteria.
4 "Hazardous material' means any material that, because of its quantity, concentration, or physical or chemical
characteristics, poses a significant present or potential hazard to human health and safety or to the environment if
released into the workplace or the environment. "Hazardous materials" include, but are not limited to, hazardous
substances, hazardous waste, and any material that a handler or the administering agency has a reasonable basis
for believing that it would be injurious to the health and safety of persons or harmful to the environment if released
into the workplace or the environment. (Health & Saf. Code, § 25501.)
Page 7 of 15
City of La Quinta — Dune Palms Road Low Water Crossing Replacement Project
Reg. Meas. ID: 422702
Place ID: 849029
WDID: 7A333190001
i. Examples of noncompliance events include: lack of storm water treatment
following a rain event, discharges causing a visible plume in a water of the
state, and water contact with uncured concrete.
ii. This notification must be followed within three (3) working days by submission
of a Violation of Compliance with Water Quality Standards Report.
c. In -Water Work:
i. The Permittee shall notify the Colorado River Basin Water Board at least
forty-eight (48) hours prior to initiating work in water or stream diversions.
Notification may be via telephone, e-mail, delivered written notice, or other
verifiable means.
ii. Within three (3) working days following completion of work in water or stream
diversions, an In -Water Work/Diversions Water Quality Monitoring Report
must be submitted to Colorado River Basin Water Board staff.
d. Modifications to Project: Project modifications may require an amendment of this
Order. The Permittee shall give advance notice to Colorado River Basin Water Board
staff if Project implementation as described in the application materials is altered in
any way or by the imposition of subsequent permit conditions by any local, state or
federal regulatory authority by submitting a Modifications to Project Report. The
Permittee shall inform Colorado River Basin Water Board staff of any Project
modifications that will interfere with the Permittee's compliance with this Order.
e. Transfer of Property Ownership: This Order is not transferable in its entirety or in
part to any person or organization except after notice to the Colorado River Basin
Water Board in accordance with the following terms:
i. The Permittee must notify the Colorado River Basin Water Board of any
change in ownership or interest in ownership of the Project area by
submitting a Transfer of Property Ownership Report. The Permittee and
purchaser must sign and date the notification and provide such notification to
the Colorado River Basin Water Board at least 10 days prior to the transfer of
ownership
ii. Until such time as this Order has been modified to name the purchaser as the
permittee, the Permittee shall continue to be responsible for all requirements
set forth in this Order.
f. Transfer of Long -Term BMP Maintenance: If maintenance responsibility for post -
construction BMPs is legally transferred, the Permittee must submit to the Colorado
River Basin Water Board a copy of such documentation and must provide the
transferee with a copy of a long-term BMP maintenance plan that complies with
manufacturer or designer specifications. The Permittee must provide such
notification to the Colorado River Basin Water Board with a Transfer of Long -Term
BMP Maintenance Report at least 10 days prior to the transfer of BMP maintenance
responsibility.
Page 8 of 15
City of La Quinta — Dune Palms Road Low Water Crossing Replacement Project
Reg. Meas. ID: 422702
Place ID: 849029
WDID:7A333190001
C. Water Quality Monitoring
1. General: If surface water is present, continuous visual surface water monitoring shall be
conducted to detect accidental discharge of construction related pollutants (e.g. oil and
grease, turbidity plume, or uncured concrete).
2. Accidental Discharges/Noncompliance: Upon occurrence of an accidental discharge
of hazardous materials or a violation of compliance with a water quality standard,
Colorado River Basin Water Board staff may require water quality monitoring based on
the discharge constituents and/or related water quality objectives and beneficial uses.
3. In -Water Work or Diversions: For projects involving planned work in water or stream
diversions, a water quality monitoring plan shall be submitted to Colorado River Basin
Water Board staff for acceptance at least 30 days in advance of any discharge to the
affected water body. Water quality monitoring shall be conducted in accordance with the
approved plan.
Sampling shall be conducted in accordance with Table 2 sampling parameters.5
Table 2: Sample Type and FrequencyRe uirements
Parameter
Unit of
Measurement
Type of Sample
Minimum Frequency
Oil and Grease
N/A
Visual
Continuous
Dissolved
Oxvcien
mg/L & % saturation
Grab
Every 4 hours
H
Standard Units
Grab
Every 4 hours
Turbidity
NTU
Grab
Every 4 hours
Temperature
OF or as °C
Grab
Every 4 hours
4. Post -Construction: The Permittee shall visually inspect the Project site during the rainy
season for five (5) years to ensure excessive erosion, stream instability, or other water
quality pollution is not occurring in or downstream of the Project site. If water quality
pollution is occurring, the Permittee shall contact the Colorado River Basin Water Board
staff member overseeing the Project within three (3) working days. The Colorado River
Basin Water Board may require the submission of a Violation of Compliance with Water
Quality Standards Report. Additional permits may be required to carry out any necessary
site remediation.
D. Standard
1. This Order is subject to modification or revocation upon administrative or judicial review,
including review and amendment pursuant to Water Code section 13330, and California
Code of Regulations, title 23, chapter 28, article 6 commencing with sections 3867-3869,
6 Pollutants shall be analyzed using the analytical methods described in 40 Code of Federal Regulations part 136;
where no methods are specified for a given pollutant, the method shall be approved by Colorado River Basin Water
Board staff. Grab samples shall be taken between the surface and mid -depth and not be collected at the same time
each day to get a complete representation of variations in the receiving water. A hand-held field meter may be used,
provided the meter utilizes a U.S. EPA -approved algorithm/method and is calibrated and maintained in accordance
with the manufacturers instructions. A calibration and maintenance log for each meter used for monitoring shall be
maintained onsite.
Page 9 of 15
City of La Quinta — Dune Palms Road Low Water Crossing Replacement Project
Reg. Meas. ID: 422702
Place ID: 849029
WDID: 7A333190001
inclusive. Additionally, the Colorado River Basin Water Board reserves the right to
suspend, cancel, or modify and reissue this Order, after providing notice to the
Permittee, if the Colorado River Basin Water Board determines that: the Project fails to
comply with any of the conditions of this Order; there is a change in any condition that
requires either a temporary or permanent reduction or elimination of the authorized
discharge; or, when necessary to implement any new or revised water quality standards
and implementation plans adopted or approved pursuant to the Porter -Cologne Water
Quality Control Act (Wat. Code, § 13000 et seq.) or federal Clean Water Act section 303
(33 U.S.C. § 1313).
2. This Order is not intended and shall not be construed to apply to any activity involving a
hydroelectric facility requiring a Federal Energy Regulatory Commission (FERC) license
or an amendment to a FERC license, unless the pertinent certification application was
filed pursuant to subsection 3855(b) of chapter 28, title 23 of the California Code of
Regulations, and that application specifically identified that a FERC license or
amendment to a FERC license for a hydroelectric facility was being sought.
3. This Order is conditioned upon total payment of any fee required under title 23 of the
California Code of Regulations and owed by the Permittee.
4. In the event of any violation or threatened violation of the conditions of this Order, the
violation or threatened violation shall be subject to any remedies, penalties, process, or
sanctions as provided for under state and federal law. For purposes of Clean Water Act,
section 401(d), the applicability of any state law authorizing remedies, penalties,
processes, or sanctions for the violation or threatened violation constitutes a limitation
necessary to assure compliance with the water quality standards and other pertinent
requirements incorporated into this Order.
E. General Compliance
1. Failure to comply with any condition of this Order shall constitute a violation of the
Porter -Cologne Water Quality Control Act and the Clean Water Act. The Permittee
and/or discharger may then be subject to administrative and/or civil liability pursuant to
Water Code section 13385.
2. Permitted actions must not cause a violation of any applicable water quality standards,
including impairment of designated beneficial uses for receiving waters as adopted in the
Basin Plans by any applicable Colorado River Basin Water Board or any applicable
State Water Board (collectively, Water Boards) water quality control plan or policy. The
source of any such discharge must be eliminated as soon as practicable.
3. In response to a suspected violation of any condition of this Order, the Colorado River
Basin Water Board may require the holder of this Order to furnish, under penalty of
perjury, any technical or monitoring reports the Water Boards deem appropriate,
provided that the burden, including costs, of the reports shall bear a reasonable
relationship to the need for the reports and the benefits to be obtained from the reports.
The additional monitoring requirements ensure that permitted discharges and activities
comport with any applicable effluent limitations, water quality standards, and/or other
appropriate requirement of state law.
Page 10 of 15
City of La Quinta — Dune Palms Road Low Water Crossing Replacement Project
Reg. Meas. ID: 422702
Place ID: 849029
WDID: 7A333190001
4. The Permittee must, at all times, fully comply with engineering plans, specifications, and
technical reports submitted to support this Order; and all subsequent submittals required
as part of this Order. The conditions within this Order and Attachments supersede
conflicting provisions within Permittee submittals.
5. This Order and all of its conditions contained herein continue to have full force and effect
regardless of the expiration or revocation of any federal license or permit issued for the
Project. For purposes of Clean Water Act, section 401(d), this condition constitutes a
limitation necessary to assure compliance with the water quality standards and other
pertinent requirements of state law.
6. Construction General Permit Requirement: The Permittee shall maintain compliance
with conditions described in, and required by, NPDES General Permit for Storm Water
Discharges Associated with Construction and Land Disturbance Activities (Order No.
2009-0009-DWQ; NPDES No. CAS000002).
7. The Permittee shall submit to the Colorado River Basin Water Board a signed copy of
the California Department of Fish and Wildlife's Lake and Streambed Alteration
Agreement for the Project prior to any discharge of wastes to waters of the U.S./state.
F. Administrative
1.* Signatory requirements for all document submittals required by this Order are presented
in Attachment D of this Order.
2. This Order does not authorize any act which results in the taking of a threatened,
endangered or candidate species or any act, which is now prohibited, or becomes
prohibited in the future, under either the California Endangered Species Act (Fish & G.
Code, §§ 2050-2097) or the federal Endangered Species Act (16 U.S.C. §§ 1531-1544).
If a "take" will result from any act authorized under this Order held by the Permittee, the
Permittee must obtain authorization for the take prior to any construction or operation of
the portion of the Project that may result in a take. The Permittee is responsible for
meeting all requirements of the applicable endangered species act for the Project
authorized under this Order.
3. The Permittee shall grant Colorado River Basin Water Board staff or an authorized
representative (including an authorized contractor acting as a Water Board
representative), upon presentation of credentials and other documents as may be
required by law, permission to:
a. Enter upon the Project or compensatory mitigation site(s) premises where a
regulated facility or activity is located or conducted, or where records are kept.
b. Have access to and copy any records that are kept and are relevant to the Project or
the requirements of this Order.
c. Inspect any facilities, equipment (including monitoring and control equipment),
practices, or operations regulated or required under this Order.
d. Sample or monitor for the purposes of assuring Order compliance.
Page 11 of 15
City of La Quinta — Dune Palms Road Low Water Crossing Replacement Project
Reg. Meas. ID: 422702
Place ID: 849029
WDID: 7A333190001
4. A copy of this Order shall be provided to any consultants, contractors, and
subcontractors working on the Project. Copies of this Order shall remain at the Project
site for the duration of this Order. The Permittee shall be responsible for work conducted
by its consultants, contractors, and any subcontractors.
5. A copy of this Order must be available at the Project site(s) during construction for
review by site personnel and agencies. All personnel performing work on the Project
shall be familiar with the content of this Order and its posted location at the Project site.
G. Construction
Good Site Management "Housekeeping"
1. Permittee shall follow good site management "housekeeping," and implement erosion
control, sediment control, and other construction -related best management practices
depicted in Table 3 below.
2. A qualified biological monitor shall be on site during all ground -disturbing activities (work
area preparation, grading, clearing, grubbing, trenching, construction, and
decommissioning activities) to prevent impacts to special -status species and other
biological resources, as well as document and report any construction -related
incidences.
3. The area of vegetation and soil disturbance shall be restricted to the smallest extent
possible.
4. After completing construction activities, any disturbed areas shall be restored to pre-
existing contours and conditions to the extent feasible.
Table 3: BMPs
Type of
BMP
BMP
Application
Construction
Erosion control
Implement erosion control BMPs to mitigate soil
BMPs
erosion, minimize soil loss from wind erosion, and to
reduce air pollution during construction activities for all
disturbed areas. Examples: mulch, straw, wood chips,
soil application, lot perimeter protection per county
standards, bonded fiber matrix or stabilized fiber
matrix, physical stabilization erosion control blanket.
Velocity reduction
Implement velocity reduction BMPs to reduce
water/runoff velocity. Examples: energy dissipater
outlet protection.
Sediment control
Implement sediment control BMPs to remove sediment
loads from runoff generated within the construction site
for all disturbed areas. Examples: silt fence, fiber rolls,
gravel bags, dewatering filtration.
Off -site sediment
Implement off -site sediment tracking control BMPs for
tracking control
reducing the transport of sediment on tires off, and
within, construction site. Examples: stabilized
construction entrance, construction road stabilization,
entrancelexit tire wash, entrance/exit inspection and
cleaning facility.
Page 12 of 15
City of La Quinta — Dune Palms Road Low Water Crossing Replacement Project
Reg. Meas. ID: 422702
Place ID: 849029
WDID: 7A333190001
Table
Type of
BMP
BMP
Application
General site and
Implement general site and materials management
materials
BMPs for materials and waste management.
management
Examples: material delivery and storage management,
spill prevention and control, concrete waste
management, solid waste management, sanitary waste
management, hazardous waste management.
Low Impact
Conservation of
Implement LID BMPs to conserve natural drainages.
Development
natural drainages
Examples: minimize disturbances of natural areas,
construct in least environmentally sensitive areas.
Minimize disturbances
Implement LID BMPs to minimize disturbances to
to natural drainages
natural drainages. Examples: avoid disturbing natural
swales and topographic depressions, construction
setback from creeks.
Minimize impervious
Implement LID BMPs to reduce impervious surfaces
surfaces
through efficient site design. Examples: preserve
existing vegetation, permeable roads with minimum
widths.
Minimize soil
Implement LID BMPs to minimize soil compaction.
compaction
Examples: protect native soil and vegetation from
construction equipment.
Drain runoff from
Implement LID BMPs to drain runoff from impervious
impervious surfaces to
surfaces to pervious areas.
pervious areas
Hydrologic design
Implement LID BMPs for optimizing hydrologic design.
Examples: infiltration tranches or basins, depression
areas for infiltration, bio-filters such as vegetated or
rock swales.
Permeable pavement
Implement LID BMPs using permeable pavement
design
design. Examples: pervious concrete, permeable
asphalt concrete/pavers, granular material.
LID road design
Implement LID BMPs for road design. Examples:
permeable roads, reduction of overall road coverage,
direct runoff to vegetated swales.
Post-
Protection of channel
Implement channel protection BMPs to protect banks of
Construction
banks/manufactured
the channels as well as the slopes.
BMPs
slopes
Outlet protection
Implement outlet protection BMPs to reduce
discharge/water velocity. Examples: energy dissipater
outlet protection, velocity dissipation devices.
Hazardous Materials
5. No toxic and/or hazardous materials shall be stored near or within wash/drainage areas.
To the extent practicable, these materials shall be stored offsite and placed in
appropriate secondary containment.
Page 13 of 15
City of La Quinta — Dune Palms Road Low Water Crossing Replacement Project
Reg. Meas. ID: 422702
Place ID: 849029
WDID: 7A333190001
6. Spoil sites shall not be located where spoil could be washed back into the stream
channel or where spoil covers aquatic or riparian vegetation. Any materials placed in
seasonally dry portions of the drainage areas that could be washed downstream or could
be harmful to aquatic life shall be removed from the streambed prior to inundation by
high flows.
7. No fueling or maintenance of equipment or vehicles shall occur adjacent to or within the
wash/drainage areas.
Stormwater Management
8. Work shall not be conducted during rain events.
9. Permittee shall develop and implement a Stormwater Pollution Prevention Plan
(SWPPP) that complies with the requirements of the State Water Board's Construction
General Permit.
Roads
10. Work and staging areas and temporary access routes shall be sized, located, and
flagged to limit potential impacts to natural areas. Previously -disturbed areas shall be
used to the extent feasible.
H. Mitigation for Temporary Impacts
The Permittee shall restore all areas of temporary impacts to waters of the U.S. and all
Project site upland areas of temporary disturbance which could result in a discharge of
waters of the U.S.
Page 14 of 15
City of La Quinta — Dune Palms Road Low Water Crossing Replacement Project
Reg. Meas. ID: 422702
Place ID: 849029
WDID: 7A333190001
XIII. Water Quality Certification
I hereby issue the Order for the City of La Quinta — Dune Palms Road Low Water Crossing
Replacement Project, WDID No. 7A333190001, certifying that as long as all of the conditions
listed in this Order are met, any discharge from the referenced Project will comply with the
applicable provisions of Clean Water Act sections 301 (Effluent Limitations), 302 (Water
Quality Related Effluent Limitations), 303 (Water Quality Standards and Implementation
Plans), 306 (National Standards of Performance), and 307 (Toxic and Pretreatment Effluent
Standards).
Except insofar as may be modified by any preceding conditions, all Order actions are
contingent on: (a) the discharge being limited and all proposed mitigation being completed in
strict compliance with the conditions of this Order and the attachments to this Order; and, (b)
compliance with all applicable requirements of statewide water quality control plans and
policies and the Colorado River Basin Water Board's water quality control plan and policies.
Paula Rasm sen
Acting Executive Officer
Colorado River Basin
Water Quality Control Board
Date
Attachment A
Maps
Attachment B
Receiving Waters, Impact, and Mitigation Information
Attachment C
CEQA Findings of Facts
Attachment D
Signatory Requirements
Attachment E
Reporting Requirements
Page 15 of 15
Attachment.A
Project Maps
J
(This page intentionally left blank)
11
Initial Study/Mitigated Negative Declaration
Figure 1. Project Vicinity Map
i
Pal Deaerl.
/ m �
ject /
iti0n _ chell6
G6 _
' Le
�I Ytf.
i
RIVERSIDE COUNTY
M'.
w
Dune Palms Road Low -Water Crossing Replacement Project 4
Initial Study/Mitigated Negative Declaration
Figure 2. Project Location
y
o.m c��
..uimmm
'yam
ry rvo0�
Y i
lw.m
unrn ouuryu
X0
{
S.d..0
�" •'4.
3 �
�
X�
=
Ser.rn sl'
awn 4
s
.� -
i
a..m Xm•e,
fi
n...XA•a nr
m
1NI.I C1 flora iT
iX PYod•�P
L 5•
•
Y.
h
•rr
fu.a a Ir
..
u
V;O
e�
i s
d
^G
`«mn r.un A...
a
y<
wurwde n. r.
nI
S.m..p
sr.imm.Aa
Prol%Ilocetlon
_
odder crr
1
.
am i o.p
Ia.mn
E
�
now l.am e
dIY
Y
.J .. n.v. 4..
oao
>Y'r
L
•5.
tlm•0.. Pv mue ti
47
IY.YAnu
Yi�m�W.Ar
.✓i Ar.
r.
CmYcn IX
r L..Sr
•xP.rl Sim Or
T
n..
`n
Ya'nr..n
£i
r•i51 6
Seatvr
n.
C]IY�Av.
a ha I��..r.
SA, n..lii
n
Il .rrrmM<. 1G
{6
l..na.4'
Pon•p
Avwwl.4 •a••ia 91
••ri.
4nu.Y
aeaa In
,d/. R
to Y.nl.Or
Y
J.
LA`i
GdMn C.YPr
w,•...,
iIle,
_C
rd
Mu[erwaPvr
H
{rgf
0 O.It6 Q3
pm,�11n6 03
.
a
i 4 1
Dune Palms Road Low -Water Crossing Replacement Project 5
Photo Source: Esd Exhibit 4.1
Jurisdictional Delineation
2014-173 La Qulnta Dune Palms
)d
r
U
b
_
� n
v$UU
�i< 6
—
f
OaZij 6
c�
m y,0 a
30
_
0
U
1�j�����+�yy0¢ 0
Dune Palms Road — Southern Side of Existing Low Flow Crossing
Dune Palms Road — Northern Side of Existing Low Flow Crossing
Dune Palms Road — Eastern Side of Existing Low Flow Crossing
Dune Palms Road — Western Side of Existing Low Flow Crossing
I Pt
k; F rr 1
Disturbed Habitat
Attachment B
Receiving Waters and Impact
(This, page intentionally .left..blank)
City of La Quinta — Dune Palms Road Low Water Crossing Replacement Project
Attachment B
Receiving Waters
The following table shows the receiving waters associated with each impact site.
WDID: 7A333190001
Reg. Meas. ID: 422702
Place ID: 849029
Table 1: Receiving Waters
Information
Non -Federal
Impact Site ID
Waterbody Name
Impacted
Water
Receiving
Receiving
303d
eCRAM
Waters
Aquatic
Board
Waters
Waters
Listing
ID'
Resource Type
Hydrologic
Beneficial
Pollutant
Units
Uses
❑
Coachella Valley
Unvegetated
MUN, AGR,
Stormwater Channel
tributary
REC 1, REC Il,
WARM,
COLD, WILD,
POW
Individual Direct Impact Locations
The following table shows individual impact locations. Table 2: Individual Direct Impact Information
Impact Site ID
Latitude
Longitude
Indirect Impact
Direct
Dredge
Fill/Excavation
Requiring
Impact
Miti tion
Duration
Yes
No
Acres
Cubic
Linear
Acres
Cubic
Linear
Yards
Feet
Yards
Feet
Coachella Valley Stormwater
Channel
33° 42' 39"
N
116° 16' 40"
W
❑
Temporary
0.73
291
Permanent
0.02
20
California Rapid Assessment Method (CRAM) score of impacted sites provided by the Permittee
Page 1 of 1
Attachment C
CEQA Findings of Facts
J
(This page intentionally left blank.)
City of La Quinta — Dune Palms Road Low Water Crossing Replacement Project
WDID 7A33319001 Reg. Meas. ID: 422702
Attachment C Place ID: 849029
A. Environmental Review
On February 14, 2018, the City of La Quinta (Permittee), as lead agency, adopted an initial
study/mitigated negative declaration (IS/MND) for the Project and filed a Notice of
Determination (NOD) with the Riverside County Clerk on January 23, 2018 (E-201800056).
The Colorado River Basin Water Board is a responsible agency under CEQA (Pub.
Resources Code, § 21069) and in making its determinations and findings, must presume that
the Permittee's adopted environmental document comports with the requirements of CEQA
and is valid. (Pub. Resources Code, § 21167.3.) The Colorado River Basin Water Board has
reviewed and considered the environmental document and finds that the environmental
document prepared by the Permittee adequately addresses the Project's water resource
impacts. (Cal. Code Regs., tit. 14, § 15096, subd. (f).) The environmental document includes
the mitigation monitoring and reporting program (MMRP) developed by the Permittee for all
mitigation measures that have been adopted for the Project to reduce potential significant
impacts. (Pub. Resources Code, § 21081.6, subd. (a)(1); Cal. Code Regs., tit. 14, § 15074,
subd. (d).)
B. Incorporation by Reference
Pursuant to CEQA, these Findings of Facts (Findings) support the issuance of this Order
based on the IS/MND, the application for this Order, and other supplemental documentation.
All CEQA project impacts are analyzed in detail in the IS/MND, which is incorporated herein
by reference. The IS/MND is available at: 2724 Gateway Drive, Riverside, CA, 92507.
Requirements under the purview of the Colorado River Basin Water Board in the MMRP are
incorporated herein by reference.
The Permittee's application for this Order, including all supplemental information provided, is
incorporated herein by reference.
C. Findings
The IS/MND describes the potential significant environmental effects to water resources that
were mitigated in the IS/MND. Having considered the whole of the record, the Colorado River
Basin Water Board has determined that there is no substantial evidence that the Project or
any of its aspects could result in significant adverse impacts to water resources. (Cal. Code
Regs., tit. 14, § 15096, subd. (h).)
D. Determination
The Colorado River Basin Water Board has determined that the Project, when implemented in
accordance with the MMRP and the conditions in this Order, will not result in any significant
adverse water resource impacts. (Cal. Code Regs., tit. 14, § 15096, subd. (h).) The Colorado
River Basin Water Board will file a NOD with the State Clearinghouse within five (5) working
days from the issuance of this Order. (Cal. Code Regs., tit. 14, § 15096, subd. (i).)
Page 1 of 1
Attachment D
Signatory Requirements
r
(This page intentionally left blank)
City of La Quinta — Dune Palms Road Low Water Crossing Replacement Project
Reg. Meas. ID: 422702
Attachment D Place ID: 849029
WDID NO. 7A333190001
SIGNATORY REQUIREMENTS
All Documents Submitted In Compliance With This Order
Shall Meet The Following Signatory Requirements:
1. All applications, reports, or information submitted to the Colorado River Basin Water
Quality Control Board (Colorado River Basin Water Board) must be signed and certified as
follows:
a) For a corporation, by a responsible corporate officer of at least the level of
vice-president.
b) For a partnership or sole proprietorship, by a general partner or proprietor,
respectively.
c) For a municipality, or a state, federal, or other public agency, by either a
principal executive officer or ranking elected official.
2. A duly authorized representative of a person designated in items 1.a through 1.c
above may sign documents if:
a) The authorization is made in writing by a person described in items 1.a
through 1.c above.
b) The authorization specifies either an individual or position having
responsibility for the overall operation of the regulated activity.
c) The written authorization is submitted to the State Water Board Staff Contact prior to
submitting any documents listed in item 1 above.
3. Any person signing a document under this section shall make the following
certification:
"I certify under penalty of law that I have personally examined and am familiar
with the information submitted in this document and all attachments and that,
based on my inquiry of those individuals immediately responsible for obtaining
the information, I believe that the information is true, accurate, and complete. I
am aware that there are significant penalties for submitting false information,
including the possibility of fine and imprisonment."
Page 1 of 1
Attachment E
Report and Notification Requirements
(This page intentionally left blank)
City of La Quinta — Dune Palms Road Low Water Crossing Replacement Project
Reg. Meas. ID: 422702
Place ID: 849029
Attachment E WDID: 7A333190001
Copies of this Form
In order to identify your project, it is necessary to include a copy of the Project specific Cover Sheet below
with your report: please retain for your records. If you need to obtain a copy of the Cover Sheet you may
download a copy of this Order as follows:
1. Go to: http://www.waterboards.ca.gov/water issues/programs/cwa401/certifications.shtmI
2. Find your Order in the table based on Applicant, Date, and Subject headers.
III Report Submittal Instructions III
Check the box on the Report and Notification Cover Sheet next to the report or notification you are
submitting.
• Part A (Annual Report): This report will be submitted annually from the anniversary of the Project
effective date until a Notice of Project Complete Letter is issued.
• Part B (Project Status Notifications): Used to notify the Colorado River Basin Water Board of the
status of the Project schedule that may affect Project billing.
• Part C (Conditional Notifications and Reports): Required on a case by case basis for accidental
discharges of hazardous materials, violation of compliance with water quality standards,
notification of in -water work, or other reports.
2. Sign the Report and Notification Cover Sheet and attach all information requested for the Report Type.
3. Electronic Report Submittal Instructions:
• Submit signed Report and Notification Cover Sheet and required information via email to: RB7-
coloradoriver@waterboards.ca.gov and cc: kai.dunn@waterboards.ca.gov
• Include in the subject line of the email:
Subiect: ATTN: Kai Dunn: Reg. Measure ID: 422702 Report
Definition of Reporting Terms
1. Active Discharge Period: The active discharge period begins with the effective date of this Order
and ends on the date that the Permittee receives a Notice of Completion of Discharges Letter or, if no
post -construction monitoring is required, a Notice of Project Complete Letter. The Active Discharge
Period includes all elements of the Project including site construction and restoration, and any
Permittee responsible compensatory mitigation construction.
2. Request for Notice of Completion of Discharges Letter: This request by the Permittee to the
Colorado River Basin Water Board staff pertains to projects that have post construction monitoring
requirements, e.g. if site restoration was required to be monitored for 5 years following construction.
Colorado River Basin Water Board staff will review the request and send a Completion of Discharges
Page 1 of 11
City of La Quinta — Dune Palms Road Low Water Crossing Replacement Project
Reg. Meas. ID: 422702
Place ID: 849029
Attachment E WDID: 7A333190001
Letter to the Permittee upon approval. This letter will initiate the post -discharge monitoring period and
a change in fees from the annual active discharge fee to the annual post -discharge monitoring fee.
3. Request for Notice of Project Complete Letter: This request by the Permittee to the Colorado River
Basin Water Board staff pertains to projects that either have completed post -construction monitoring
and achieved performance standards or have no post -construction monitoring requirements, and no
further Project activities are planned. Colorado River Basin Water Board staff will review the request
and send a Project Complete Letter to the Permittee upon approval. Termination of annual invoicing of
fees will correspond with the date of this letter.
5.
Post -Discharge Monitorina Period: The post -discharge monitoring period begins on the date of the
Notice of Completion of Discharges Letter and ends on the date of the Notice of Project Complete
Letter issued by the Colorado River Basin Water Board staff. The Post -Discharge Monitoring Period
includes continued water quality monitoring or compensatory mitigation monitoring.
October 3. 2018.
III Map/Photo Documentation Information III
When submitting maps or photos, please use the following formats.
-------------------------------------------------------------------------------------------------------------------------------------
1. Map Format Information:
Preferred map formats of at least 1:24000 (1" = 2000') detail (listed in order of preference):
• GIS shapefiles: The shapefiles must depict the boundaries of all project areas and extent of
aquatic resources impacted. Each shape should be attributed with the extent/type of aquatic
resources impacted. Features and boundaries should be accurate to within 33 feet (10 meters).
Identify datum/projection used and if possible, provide map with a North American Datum of 1983
(NAD38) in the California Teale Albers projection in feet.
• Google KML files saved from Google Maps: My Maps or Google Earth Pro. Maps must show the
boundaries of all project areas and extent/type of aquatic resources impacted. Include URL(s) of
maps. If this format is used include a spreadsheet with the object ID and attributed with the
extent/type of aquatic resources impacted.
• Other electronic format (CAD or illustration format) that provides a context for location (inclusion
of landmarks, known structures, geographic coordinates, or USGS DRG or DOQQ). Maps must
show the boundaries of all project areas and extent/type of aquatic resources impacted. If this
format is used include a spreadsheet with the object ID and attributed with the extent/type of
aquatic resources impacted.
• Aquatic resource maps marked on paper USGS 7.5 minute topographic maps or Digital
Orthophoto Quarter Quads (DOQQ) printouts. Maps must show the boundaries of all project
areas and extent/type of aquatic resources impacted. If this format is used include a spreadsheet
with the object ID and attributed with the extent/type of aquatic resources impacted.
2. Photo -Documentation: Include a unique identifier, date stamp, written description of photo details,
and latitude/longitude (in decimal degrees) or map indicating location of photo. Successive photos
should be taken from the same vantage point to compare pre/post construction conditions.
Page 2 of 11
Southern California Gas Company — L3000, Park Moabi Exposure Repair Project
Reg. Meas. ID: 422639
Place ID: 848952
Attachment E WDID: 76363042001
REPORT AND NOTIFICATION COVER SHEET
Project: City of La Quinta Dune Palms Road Low Water Crossing Replacement Project
WDID 713363042001
Permittee: City of La Quinta
Reg. Meas. ID: 422639 Place ID: 848952
Order Effective Date: October 3, 2018
Report Type Submitted
..
ReportType 1
❑
Monthly Report
-------------------------------------------------
Report Type 2
❑Annual
Re ort
Project
Report
----------Type--------3 ------------------------------ommencement--------------o
❑Cf
Const ru
ction---------------------------------------------------------------------
Report Type 4
------------------•--------------------------------------------------------------------------------------------------
❑
---------
Request for Notice of Completion of Discharges Letter-
Report Type 5
❑Request
for Notice of Project Complete Letter
-rt C - Conditional N• • . ' - e s
Report Type 6
❑
Accidental Discharge of Hazardous Material Report
---- ----
Report Type 7
❑
------------------------- ------ ------------------------------------------------------------------
Violation -of-Corn plience with Water Quality Standards Report
Report Type 8
❑
-❑----Mo--d-if--c--at-o--n--s-
In -Water Work/Diversions Water Quality tyMonitonn Reportort
------------------------------------------
ReortType9
----------------------------------------------------------------------------------------------------------------------------------------
to--P-r-oje--ct-R--ep-ort---------
Report Type 10
-❑
Transfer of Property Ownership Report
----------- - ----• ----- --- ---- - -- ------ ---- -- ------ -
Report Type 11
❑
Transfer of Long -Term BM Maintenance Report
Page 3 of 11
Southern California Gas Company — 1-3000, Park Moabi Exposure Repair Project
Reg. Meas. ID: 422639
Attachment E
Place ID: 848952
WDID: 713363042001
"I certify under penalty of law that I have personally examined and am familiar with the information
submitted in this document and all attachments and that, based on my inquiry of those individuals
immediately responsible for obtaining the information, I believe that the information is true, accurate, and
complete. I am aware that there are significant penalties for submitting false information, including the
possibility of fine and imprisonment."
Print Name' Affiliation and Job
Signature Date
'STATEMENT OF AUTHORIZATION (include if authorization has changed since
application was submitted)
I hereby authorize
submittal of this report, and to furnish
submittal.
Permittee's Signature
to act in my behalf as my representative in the
upon request, supplemental information in support of this
Date
*This Report and Notification Cover Sheet must be signed by the Permittee or a duly authorized
representative and included with all written submittals.
Page 4 of 11
City of La Quinta — Dune Palms Road Low Water Crossing Replacement Project
Reg. Meas. ID: 422702
Place ID: 849029
Attachment E WDID: 7A333190001
11 Part A — Project Reporting 11
Report Type 1
Monthly Report
Report Purpose
Notifies Colorado River Basin Water Board staff of the Project status and
environmental compliance activities on a monthly basis.
When to Submit
On the 15th day of each month until a Notice of Project Complete Letter is
issued to the Permittee.
Report Contents
1. Construction Summary
Describe Project progress and schedule including initial ground
disturbance, site clearing and grubbing, road construction, site
construction, and the implementation status of construction storm water
Best Management Practices (BMPs'). If construction has not started,
provide estimated start date.
2. Event Summary
Describe distinct Project activities and occurrences, including
environmental monitoring, surveys, and inspections.
3. Photo Summary
Provide photos of Project activities. For each photo, include a unique site
identifier, date stamp, written description of photo details, and
latitude/longitude (in decimal degrees) or map indicating location of photo.
Successive photos should be taken from the same vantage point to
compare pre/post construction conditions.
4. Compliance Summary
a) List name and organization of environmental surveyors, monitors, and
inspectors involved with monitoring environmental compliance for the
reporting period.
b) List associated monitoring reports for the reporting period.
c) Summarize observed incidences of non-compliance, compliance
issues, minor problems, or occurrences.
d) Describe each observed incidence in detail. List monitor name and
organization, date, location, type of incident, corrective action taken (if
any), status, and resolution.
' Best Management Practices (BMPs) is a term used to describe a type of water pollution or
environmental control.
Page 5 of 11
City of La Quinta — Dune Palms Road Low Water Crossing Replacement Project
Attachment E
Reg. Meas. ID: 422702
Place ID: 849029
WDID: 7A333190001
Report Type 2
Annual Report
Report Purpose
Notify the Colorado River Basin Water Board staff of Project status during
both the active discharge and post -discharge monitoring periods.
When to Submit
Annual reports shall be submitted each year on the 1 st day of September.
Annual reports shall continue until a Notice of Project Complete Letter is
issued to the Permittee.
Report Contents
The contents of the annual report shall include the topics indicated below for
each project period. Report contents are outlined in Annual Report Topics
below.
During the Active Discharge Period
• Topic 1: Construction Summary
• Topic 2: Mitigation for Temporary Impacts Status
• Topic 3: Compensatory Mitigation for Permanent Impacts Status
During the Post -Discharge Monitoring Period
• Topic 2: Mitigation for Temporary Impacts Status
• Topic 3: Compensatory Mitigation for Permanent Impacts Status
j.
Annual Report Topic 1
Construction Summary
When to Submit
With the annual report during the Active Discharge Period.
Report Contents
1. Project progress and schedule including initial ground disturbance, site
clearing and grubbing, road construction, site construction, and the
implementation status of construction storm water best management
practices (BMPs). If construction has not started, provide estimated start
date and reasons for delay.
2. Map showing general Project progress.
3. If applicable:
a. Summary of Conditional Notification and Report Types 6 and 7 (Part C
below).
b. Summary of Certification Deviations. See Certification Deviation
Attachment for further information.
Annual Report Topic 2
Mitigation for Temporary Impacts Status
When to Submit
With the annual report during both the Active Discharge Period and Post -
Discharge Monitoring Period.
Page 6 of 11
City of La Quinta — Dune Palms Road Low Water Crossing Replacement Project
Attachment E
Reg. Meas. ID: 422702
Place ID: 849029
WDID: 7A333190001
Report Contents
1. Planned date of initiation and map showing locations of mitigation for
temporary impacts to waters of the state and all upland areas of temporary
disturbance which could result in a discharge to waters of the state.
2. If mitigation for temporary impacts has already commenced, provide a
map and information concerning attainment of performance standards
contained in the restoration plan.
Annual Report Topic 3
Compensatory Mitigation for Permanent Impacts Status
When to Submit
With the annual report during both the Active Discharge Period and Post -
Discharge Monitoring Period.
Report Contents
*If not applicable report N/A.
Part A. Permittee Responsible
1. Planned date of initiation of compensatory mitigation site installation.
2. If installation is in progress, a map of what has been completed to date.
3. If the compensatory mitigation site has been installed, provide a final map
and information concerning attainment of performance standards
contained in the compensatory mitigation plan.
Part B. Mitigation Bank or In -Lieu Fee
1. Status or proof of purchase of credit types and quantities.
2. Include the name of bank/ILF Program and contact information.
3. If ILF, location of project and type if known.
Page 7 of 11
City of La Quinta — Dune Palms Road Low Water Crossing Replacement Project
Reg. Meas. ID: 422702
Place ID: 849029
Attachment E WDID: 7A333190001
11 Part B — Project Status Notifications 11
Report Type 3
Commencement of Construction
Report Purpose
Notify Colorado River Basin Water Board staff prior to the start of
construction.
When to Submit
Must be received at least seven (7) days prior to start of initial ground
disturbance activities.
Report Contents
1. Date of commencement of construction.
2. Anticipated date when discharges to waters of the state will occur.
3. Project schedule milestones including a schedule for onsite compensatory
mitigation, if applicable
Report Type 4
Request for Notice of Completion of Discharges Letter
Report Purpose
Notify Colorado River Basin Water Board staff that post -construction
monitoring is required and that active Project construction, including any
mitigation and permittee responsible compensatory mitigation, is complete.
When to Submit
Must be received by Colorado River Basin Water Board staff within thirty (30)
days following completion of all Project construction activities.
Report Contents
1. Status of storm water Notice of Termination(s), if applicable.
2. Status of post -construction storm water BMP installation.
3. Pre- and post -photo documentation of all Project activity sites where the
discharge of dredge and/or fill/excavation was authorized.
4. Summary of Certification Deviation discharge quantities compared to
initial authorized impacts to waters of the state, if applicable.
5. An updated monitoring schedule for mitigation for temporary impacts to
waters of the state and permittee responsible compensatory mitigation
during thepost-discharge_ monitoringperiod, if applicable.
Report Type 5
Request for Notice of Project Complete Letter
Report Purpose
Notify Colorado River Basin Water Board staff that construction and/or any
post -construction monitoring is complete, or is not required, and no further
Project activity is planned.
When to Submit
Must be received by Colorado River Basin Water Board staff within thirty (30)
days following completion of all Project activities.
Report Contents
Part A: Mitigation for Temporary Impacts
1. A report establishing that the performance standards outlined in the
restoration plan have been met for Project site upland areas of temporary
disturbance which could result in a discharge to waters of the state.
2. A report establishing that the performance standards outlined in the
restoration plan have been met for restored areas of temporary impacts to
Page 8 of 11
City of La Quinta — Dune Palms Road Low Water Crossing Replacement Project
Reg. Meas. ID: 422702
Place ID: 849029
Attachment E WDID: 7A333190001
waters of the state. Pre- and post -photo documentation of all restoration
sites.
Part B: Permittee Responsible Compensatory Mitigation
3. A report establishing that the performance standards outlined in the
compensatory mitigation plan have been met.
4. Status on the implementation of the long-term maintenance and
management plan and funding of endowment.
5. Pre- and post -photo documentation of all compensatory mitigation sites.
6. Final maps of all compensatory mitigation areas (including buffers).
Part C: Post -Construction Storm Water BMPs
7. Date of storm water Notice of Termination(s), if applicable.
8. Report status and functionality of all post -construction BMPs.
Page 9 of 11
City of La Quinta - Dune Palms Road Low Water Crossing Replacement Project
Attachment E
Part C - Conditional Notifications and Reports
Reg. Meas. ID: 422702
Place ID: 849029
WDID: 7A333190001
Report Type 6
Accidental Discharge of Hazardous Material Report
Report Purpose
Notifies Colorado River Basin Water Board staff that an accidental discharge
of hazardous material has occurred.
When to Submit
Within five (5) working days following the date of an accidental discharge.
Continue reporting as required by Colorado River Basin Water Board staff.
Report Contents
1. The report shall include the OES Incident/Assessment Form, a full
description and map of the accidental discharge incident (i.e. location,
time and date, source, discharge constituent and quantity, aerial extent,
and photo documentation). If applicable, the OES Written Follow -Up
Report may be substituted.
2. If applicable, any required sampling data, a full description of the sampling
methods including frequency/dates and times of sampling, equipment,
locations of sampling sites.
3. Locations and construction specifications of any barriers, including silt
curtains or diverting structures, and any associated trenching or
anchoring.
Report Type 7
Violation of Compliance with Water Quality Standards Report
Report Purpose
Notifies Colorado River Basin Water Board staff that a violation of compliance
with water quality standards has occurred.
When to Submit
The Permittee shall report any event that causes a violation of water quality
standards within three (3) working days of the noncompliance event
notification to Colorado River Basin Water Board staff.
Report Contents
The report shall include: the cause; the location shown on a map; and the
period of the noncompliance including exact dates and times. If the
noncompliance has not been corrected, include: the anticipated time it is
expected to continue; the steps taken or planned to reduce, eliminate, and
prevent reoccurrence of the noncompliance; and any monitoring results if
required by Colorado River Basin Water Board staff.
Report Type 8 Modifications to Project Report
Report Purpose Notifies Colorado River Basin Water Board staff if the Project, as described in
the application materials, is altered in any way or by the imposition of
subsequent permit conditions by any local, state or federal regulatory
When to Submit If Project implementation as described in the application materials is alteredin
any way or by the imposition of subsequent permit conditions by any local,
state or federal regulatory authority.
Page 10 of 11
City of La Quinta — Dune Palms Road Low Water Crossing Replacement Project
Reg. Meas. ID: 422702
Place ID: 849029
Attachment E WDID: 7A333190001
Report Contents A description and location of any alterations to Project implementation.
Identification of any Project modifications that will interfere with the
Permittee's compliance with the Order.
Report Type 9
Transfer of Property Ownership Report
Report Purpose
Notifies Colorado River Basin Water Board staff of change in ownership of the
Project or Permittee-responsible mitigation area.
When to Submit
At least 10 working days prior to the transfer of ownership.
Report Contents
1. A statement that the Permittee has provided the purchaser with a copy of
this Order and that the purchaser understands and accepts:
a. the Order's requirements and the obligation to implement them or
be subject to administrative and/or civil liability for failure to do so;
and
b. responsibility for compliance with any long-term BMPz
maintenance plan requirements in this Order.
2. A statement that the Permittee has informed the purchaser to submit a
written request to the Colorado River Basin Water Board to be named as
the permittee in a revised order.
Report Type 10
Transfer of Long -Tenn BMP Maintenance Report
Report Purpose
Notifies Colorado River Basin Water Board staff of transfer of long-term BMP
maintenance responsibility.
When to Submit
At least 10 working days prior to the transfer of BMP maintenance
responsibility.
Report Contents
A copy of the legal document transferring maintenance responsibility of post -
construction BMPs.
2 Best Management Practices (BMPs) is a term used to describe a type of water pollution or
environmental control.
Page 11 of 11