Loading...
HomeMy WebLinkAboutLa Quinta_Ave 502020/21-2025/26 Highway Bridge Program District:County: Responsible Agency 08 Riverside Total CAUTION -- This is NOT the FTIP/FSTIP. See the appropriate FTIP/FSTIP for current funding commitments. This report includes projects that should be line item projects in the FTIP/FSTIP. Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond La Quinta BRIDGE NO. 00L0091, AVENUE 50 OVER LA QUINTA EVACUATION CHANNEL. Replace 3-lane low water crossing with 4-lane bridge. Fund Source Summary: PE R/W Total CON Total 10,800,000 600,000 1,300,000 1,900,000 1,320,000 600,000 1,300,000 14,020,000 10,800,000 1,320,000 12,120,000 Phase Summary: Fed $ Local AC Local Match Total LSSRP Bond Total 480,000 1,040,000 11,216,000 120,000 260,000 2,804,000 600,000 1,300,000 14,020,000 9,696,000 2,424,000 12,120,000 Fed Proj: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond PE Summary: Proj id Funds Src TotalPhase Phase Funding Details: Fed $ Local AC Local Match Total LSSRP Bond Total 480,000 1,040,000 1,520,000 120,000 260,000 380,000 600,000 1,300,000 1,900,000 Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond 4370 HBP PE -1,040,000 1,040,000 Local Match -260,000 260,000 Total:Fed. Reimb. Rate:80.00% New! 10/8/2022 DLA-Admin: Not ready to ad within 6 months. PE funds moved from FFY 24/25 to 25/26. Project has not received authorization to proceed. Move funding out. 4370 HBP PE -1,040,000 1,040,000 Local Match -260,000 260,000 Total:Fed. Reimb. Rate:80.00%10/28/2021 DLA-Admin: Not ready to ad within 6 months. PE funds moved from FFY 23/24 to 24/25. Action taken to financially constrain the FTIP (PUSH). Attempt will be made to program this project in year shown. 4370 HBP -1,040,000PE 1,040,000 Local Match -260,000 260,000 Total:Fed. Reimb. Rate:80.00%10/25/2021 DLA-Admin: Revised PE funds to provide what is needed to clear NEPA. 4370 HBP 1,520,000 1,520,000PE Local Match 380,000 380,000 Total:1,900,000Fed. Reimb. Rate:80.00%8/15/2021 DLA-Admin: Revise PE reimbursement rate from 88.53% to 80.00% for on system project, local agency wants to keep programmed for PE not yet authorized Caltrans, Division of Local Assistance Page 2110/25/2022, 8:37 AM Det2 FL4 SmlTxt 2020/21-2025/26 Highway Bridge Program District:County: Responsible Agency 08 Riverside Total CAUTION -- This is NOT the FTIP/FSTIP. See the appropriate FTIP/FSTIP for current funding commitments. This report includes projects that should be line item projects in the FTIP/FSTIP. Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond 4370 HBP -1,682,070 -1,682,070PE Local Match -217,930 -217,930 Total:-1,900,000Fed. Reimb. Rate:88.53%8/15/2021 DLA-Admin: Revise PE reimbursement rate from 88.53% to 80.00% for on system project, local agency wants to keep programmed for PE not yet authorized 4370 HBP -1,682,070 1,682,070PE Local Match -217,930 217,930 Total:Fed. Reimb. Rate:88.53%10/27/2020 DLA-Admin: Not ready to ad within 6 months. PE funds moved from FFY 20/21 to 22/23. Funding pushed due to project prioritization. 4370 HBP 1,682,070PE-442,650 Local Match 217,930-57,350 Total:Fed. Reimb. Rate:88.53%10/18/2020 DLA Admin: Remove AC from PE. 9/22/2020 Eduardo Moreno-Castaneda: Moved PE funds from FFY 19/20 to 20/21 as requested in 2020 September Survey. -1,239,420 -160,580 4370 Local AC (HBP)PE -1,239,420 Local Match -160,580 Total:Fed. Reimb. Rate:88.53%9/22/2020 Eduardo Moreno-Castaneda: Moved PE AC funds from FFY 19/20 to 20/21 as requested in 2020 September Survey. 1,239,420 160,580 4370 Local AC (HBP)PE 1,239,420 Local Match 160,580 Total:Fed. Reimb. Rate:88.53%10/31/2019 DLA-Admin: PE Funding moved from 21/22 to Beyond, AC PE Funding. Action taken to financially constrain the FTIP (PUSH). -1,239,420 -160,580 4370 HBP PE -1,239,420 Local Match -160,580 Total:Fed. Reimb. Rate:88.53%10/30/2019 DLA-Admin: PE funds moved from 19/20 to 21/22. Action taken to financially constrain the FTIP(PUSH). 1,239,420 160,580 4370 HBP -1,682,070PE1,682,070 Local Match -217,930217,930 Total:Fed. Reimb. Rate:88.53%9/25/2018 Matt Sapp: Not ready to ad within 6 months. PE funds moved from FFY 20/21 to 19/20. 4370 HBP 1,682,070 1,682,070PE Local Match 217,930 217,930 Total:1,900,000Fed. Reimb. Rate:88.53%2/12/2018 Eileen Crawford: New Project per 6A dated 6/10/2015 Caltrans, Division of Local Assistance Page 2210/25/2022, 8:37 AM Det2 FL4 SmlTxt 2020/21-2025/26 Highway Bridge Program District:County: Responsible Agency 08 Riverside Total CAUTION -- This is NOT the FTIP/FSTIP. See the appropriate FTIP/FSTIP for current funding commitments. This report includes projects that should be line item projects in the FTIP/FSTIP. Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond R/W Summary: Proj id Funds Src TotalPhase Phase Funding Details: Fed $ Local AC Local Match Total LSSRP Bond Total 1,056,000 264,000 1,320,000 1,056,000 264,000 1,320,000 Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond 4370 HBP 1,056,000R/W Local Match 264,000 Total:1,320,000Fed. Reimb. Rate:80.00%8/15/2021 DLA-Admin: Revise RW reimbursement rate from 88.53% to 80.00% for on system project, local agency wants to keep programmed for PE not yet authorized 1,056,000 264,000 4370 HBP -1,168,596R/W Local Match -151,404 Total:-1,320,000Fed. Reimb. Rate:88.53%8/15/2021 DLA-Admin: Revise RW reimbursement rate from 88.53% to 80.00% for on system project, local agency wants to keep programmed for PE not yet authorized -1,168,596 -151,404 4370 HBP R/W -1,168,596 Local Match -151,404 Total:Fed. Reimb. Rate:88.53%10/27/2020 DLA-Admin: Not ready to ad within 6 months. RW funds moved from FFY 23/24 to Beyond. Funding pushed due to project prioritization. 1,168,596 151,404 4370 HBP -1,168,596R/W 1,168,596 Local Match -151,404 151,404 Total:Fed. Reimb. Rate:88.53%10/18/2020 DLA-Admin: Not ready to ad within 6 months. funds moved from FFY 22/23 to 23/24. Project has not received authorization to proceed. Move funding out. 4370 HBP 1,168,596R/W Local Match 151,404 Total:Fed. Reimb. Rate:88.53%9/22/2020 Eduardo Moreno-Castaneda: Moved RW funds from Beyond to FFY 22/23 as requested in 2020 September Survey. -1,168,596 -151,404 4370 HBP 1,168,596R/W Local Match 151,404 Total:1,320,000Fed. Reimb. Rate:88.53%2/13/2018 Eileen Crawford: New Project per 6A dated 6/10/2015 1,168,596 151,404 Caltrans, Division of Local Assistance Page 2310/25/2022, 8:37 AM Det2 FL4 SmlTxt 2020/21-2025/26 Highway Bridge Program District:County: Responsible Agency 08 Riverside Total CAUTION -- This is NOT the FTIP/FSTIP. See the appropriate FTIP/FSTIP for current funding commitments. This report includes projects that should be line item projects in the FTIP/FSTIP. Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond CON Summary: Proj id Funds Src TotalPhase Phase Funding Details: Fed $ Local AC Local Match Total LSSRP Bond Total 8,640,000 2,160,000 10,800,000 8,640,000 2,160,000 10,800,000 Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond 4370 HBP 8,640,000CON Local Match 2,160,000 Total:10,800,000Fed. Reimb. Rate:80.00%8/15/2021 DLA-Admin: Revise Con reimbursement rate from 88.53% to 80.00% for on system project, local agency wants to keep programmed for PE not yet authorized 8,640,000 2,160,000 4370 HBP -9,561,240CON Local Match -1,238,760 Total:-10,800,000Fed. Reimb. Rate: 88.53%8/15/2021 DLA-Admin: Revise Con reimbursement rate from 88.53% to 80.00% for on system project, local agency wants to keep programmed for PE not yet authorized -9,561,240 -1,238,760 4370 HBP 9,561,240CON Local Match 1,238,760 Total:10,800,000Fed. Reimb. Rate:88.53%2/13/2018 Eileen Crawford: New Project per 6A dated 6/10/2015 9,561,240 1,238,760 Caltrans, Division of Local Assistance Page 2410/25/2022, 8:37 AM Det2 FL4 SmlTxt