HomeMy WebLinkAboutNBIL(537)_3-A_RFA CON(AC Conv.)_22-12-00STATE OF CALIFORNIA • DEPARTMENT OF TRANSPORTATION PROJECT AUTHORIZATION/ADJUSTMENT REQUEST
LAPM 3-A (REV 01/2022)
Local Assistance Procedures Manual
Page 1 of 2
Print Request Instructions Reset Form
ADA Notice For individuals with sensory disabilities, this document is available in alternate formats. For alternate format information, contact the Forms
Management Unit at (916) 445-1233, TTY 711, or write to Records and Forms Management, 1120 N Street, MS-89, Sacramento, CA 95814.
Date
12/14/2022
Federal Project Number
BR-NBIL(537)
Agency
City of La Quinta
Caltrans
District 08 Congressional
District 36
Project Contact
Bryan McKinney, P.E.
Title
Public Works Director / Engineer
Email
bmckinney@laquintaca.gov
Phone
(760) 777-7045
Project Title
Dune Palms Road Bridge / Dune Palms Road over Coachella Valley Stormwater Channel - CP# 2011-05 HBP
Project Location
Dune Palms Road Spanning the Coachella Valley Stormwater Channel from Corporate Center to South of Blachhawk Way/Westward Ho.
Bridge Number(s)
00L0070
Description of Work
Bridge construction and road widening. Replace low-water crossing with an all-weather crossing including road approaches and necessary
bank concrete slope scour countermeasures.
Functional Classification
Major Collector Located
on SHS
CRS Map No.
17W13
ITS Risk
N/A
Project Oversight
Locally Administered
Estimated Phase Completion Date
12/31/2024
PED
12/31/2025
Authorization
Adjustment
PE R/W CON CE NI
PE R/W CON CE NI
Advance
Construction
CTC Allocation
Required
Federal Amount
Requested $10,000,000.00
Invoking Section 1440 of the FAST ACT?
(aka At-Risk PE)?No
PROJECT FUNDING
Previously Authorized Phase(s)PE R/W CON CE NI
Federal Fund Type Project Cost Federal
Participating Cost Federal Funds State Match
Funds
Local Match
Funds Other Funds Reimb.
Rate P/L
R/W
TC
1,548,409.00 1,318,000.00 1,166,826.00 381,583.00 88.54 +
-
PREV AUTH
R/W subtotals 1,548,409.00 1,318,000.00 1,166,826.00 0.00 381,583.00 0.00
CON
TC
FA
18,927,386.00 15,794,104.00 4,944,866.00 13,982,520.00 N/A +PREV AUTH
HBP 0.00 8,077,220.00 0.00 (8,077,220.00)N/A L +
CON subtotals 18,927,386.00 15,794,104.00 8,077,220.00 0.00 4,944,866.00 5,905,300.00
CE
TC
SF
2,171,896.00 2,171,896.00 249,116.00 1,922,780.00 N/A +PREV AUTH
HBP 0.00 0.00 1,922,780.00 0.00 (1,922,780.00)N/A L +
CE subtotals 2,171,896.00 2,171,896.00 1,922,780.00 0.00 249,116.00 0.00
Total Project Cost 22,647,691.00 19,284,000.00 11,166,826.00 0.00 5,575,565.00 5,905,300.00
COST ESTIMATE
Detail your project costs with the cost estimate template(s) created on the following pages (applicable templates are created based on the
phases selected for authorization and/or adjustment).
If the cost estimate template(s) created cannot be used or a different format is preferred (e.g., Excel spreadsheet), indicate which phase(s)
other documentation will be submitted to support your authorization and/or adjustment request:
Any existing inputs and calculations on cost estimate templates will be cleared when selected.
Construction/Construction Engineering
STATE OF CALIFORNIA • DEPARTMENT OF TRANSPORTATION PROJECT AUTHORIZATION/ADJUSTMENT REQUEST
LAPM 3-A (REV 01/2022)
Print Request Instructions Reset Form
Date
12/14/2022
Federal Project Number
BR-NBIL(537)
Page 2 of 2
ADA Notice For individuals with sensory disabilities, this document is available in alternate formats. For alternate format information, contact the Forms
Management Unit at (916) 445-1233, TTY 711, or write to Records and Forms Management, 1120 N Street, MS-89, Sacramento, CA 95814.
REQUIRED SUPPORTING DOCUMENTS
Include the following items with this form [(P= required, ● = required if applicable)]. This list does not represent all documents required to be in the agency's
project files. The District Local Assistance Engineer may request additional documents for authorization/adjustment.
Project Document
FTIP Document (Include CMAQ Emissions Benefits Calculations, Back-up List and EPSP
Approval if applicable)
NEPA Approval Document (LAPM Exhibit 6-F / 6-G)
Right of Way Certification (LAPM Exhibit 13-A / 13-B)
FHWA Specific Authorization to Relocate Utilities (LAPM Exhibit 14-C)
Cost-Effectiveness/Public Interest Finding (LAPM Exhibit 12-F)
Detail Cost Estimate
CON/CE
ADJ
●
●
●
●
●
✔
RESPONSIBLE CHARGE CERTIFICATION
I certify that the information provided in this request is accurate and correct. Any changes to the project scope, cost, or schedule will be communicated to the
District Local Assistance Engineer. This Agency agrees to comply with the applicable terms and conditions set forth in Title 23, U.S. Code, Highways, and the
policies and procedures promulgated by the Federal Highway Administration (FHWA) and California Department of Transportation relative to the above-
designated project.
I understand that this Agency is responsible for all costs incurred prior to receiving authorization to proceed. In addition, this Agency will be responsible for all
costs in excess of the federal and/or state funds encumbered to complete the above-designated project.
Signature of Full-Time Public Employee in Responsible Charge Date
12/14/2022
Print Name
Bryan McKinney, P.E.
Title
Public Works Director / City Engineer
REMARKS