HomeMy WebLinkAboutTYLI_Fee_La Quinta Dune Palms_Exhibit B signedLABOR
TYLI
PM/RE
Joseph Smith
TYLI
Deputy RE/SR
John Buckley
TYLI
Office Engineer
Cathleen Ma FT
Falcon
Inspector
FT (PW)
Falcon
SWPPP Insp
Dion Castro
Labor
Compliance
Officer
Chia-Chi Wang
(DESI)
TYLI
Schedule
Reviews -
Wade Durant
Task No.Task Name Start Finish $280.88 $225.32 $168.43 $205.62 $204.26 $177.70 $220.06 Hours Costs
1.00 Project Management Mar-22 Mar-24
1.20 Monthly Progress Reports -$
Subtotals (Hours) =-$
Subtotals (Costs) = -$ -$ -$ -$ -$ -$ -$ -$
2.00 Pre-Construction Services Mar-22 Apr-22
2.1 Constructability Review 16 16 8 40 8,655.52$
2.2 Pre-Bid Package Review 4 4 673.72$
2.3 Pre-Bid Meeting 4 4 8 1,723.76$
2.4 Bid-Openeing Meeting 4 4 901.28$
2.5 Bid Analysis 1 2 2 2 7 1,328.82$
2.6 Award Package 1 1 225.32$
2.7 Project Walkthrough 1 1 225.32$
2.8 Project Kick-Off Meeting 1 1 225.32$
2.9 Pre-Construction Meeting 3 2 2 2 9 1,779.46$
2.10 Pre-Construction Photo Documentation 1 1 225.32$
2.11 Review Project Permits 4 4 822.48$
Subtotals (Hours) = 32 8 28 4 8 80 16,786.32$
Subtotals (Costs) = -$ 7,210.24$ 1,347.44$ 5,757.36$ -$ 710.80$ 1,760.48$ 80 16,786.32$ 0.6%0.6%
3.00 Construction Services Apr-19 Jan-24
3.10 Const. Mnmgt, Insp., Admin.
3750 1900 3450 250 188 110 9648 1,983,035.20$
Subtotals (Hours) = 3750 1900 3450 250 188 110 9,648 1,983,035.20$
Subtotals (Costs) = -$ 844,950.00$ 320,017.00$ 709,389.00$ 51,065.00$ 33,407.60$ 24,206.60$ 9,648 1,983,035.20$ 69.5%71.7%
4.00 Post-Construction Services Feb-24 Mar-24
4.1 Item Close-Out 2 8 2 12 2,209.32$
4.2 Claims Report 4 8 8 20 3,893.68$
4.3 Proposed Final Estimate 4 4 8 16 2,996.60$
4.4 Project Reimbursement 2 2 411.24$
4.5 Project Report 2 4 6 1,124.36$
4.6 Record Drawings
8 4 8 20 4,121.24$
Subtotals (Hours) = 20 28 20 8 76 14,756.44$
Subtotals (Costs) = -$ 4,506.40$ 4,716.04$ 4,112.40$ -$ 1,421.60$ -$ 76 14,756.44$ 0.5%0.5%
5.00 Survey Services 154,674.53$
CL Surveing Subtotals (Hours) =1058 154,674.53$
Subtotals (Costs) =154,674.53$ -$ -$ -$ -$ -$ 1,058 154,674.53$ 7.6%5.6%
6.00 Materials Testing and Inspection 156,358.65$
AESCO Subtotals (Hours) =540 156,358.65$
Subtotals (Costs) =156,358.65$ -$ -$ -$ -$ -$ 540 156,358.65$ 3.9%5.7%
7.00 Biological and Cultural Monitoring 84,799.98$
ECORP Subtotals (Hours) =771 84,799.98$
Subtotals (Costs) =84,799.98$ -$ -$ -$ -$ -$ 771 84,799.98$ 5.6%3.1%
8.00 Public Outreach 123,414.10$
Connect and Company Subtotals (Hours) =1145 123,414.10$
Subtotals (Costs) =123,414.10$ -$ -$ -$ -$ -$ 1,145 123,414.10$ 8.3%4.5%
9.00 CIDH Pile Acceptance (ODC)-$
Earthspectives- (As needed) Subtotals (Hours) =-$
Costs listed as ODC below Subtotals (Costs) =-$ -$ -$ -$ -$ -$
City of La Quinta
Construction Management and Inspection Services for Dune Palms Road and Bridge Project
Cost Proposal
Total Hours Totals
Percent of Total
City of La Quinta
Construction Management and Inspection Services for Dune Palms Road and Bridge Project
Cost Proposal
10.00 Electrical Inspection 59,923.73$
DESI (John Kannor)Subtotals (Hours) =360 59,923.73$
Subtotals (Costs) =59,923.73$ -$ -$ -$ -$ -$ 360 59,923.73$ 2.6%2.2%
11.00 Source Inspection Quallity Management 35,443.41$
ZTC Consulting Group Subtotals (Hours) =200 35,443.41$
Subtotals (Costs) =35,443.41$ -$ -$ -$ -$ -$ 200 35,443.41$ 1.4%1.3%
Total (Hours) =3802 1936 3498 250 200 118
Total (Costs) =-$ 856,666.64$ 326,080.48$ 719,258.76$ 51,065.00$ 35,540.00$ 25,967.08$ 13,878 2,629,192.36$
Percentage of Total (Hours) =27.4%14.0%25.2%1.8%1.4%0.9%70.6%
Percentage of Total (Costs) =31.0%11.8%26.0%1.8%1.3%0.9%72.9%
T.Y. Lin International TOTAL PROPOSED COST
Cost/Month Unit Total Labor =2,629,192.36$
1,250.00$ 44.00 55,000.00$ 2022 Escalation =6,236.69$ 4%
-$ 2023 Escalation =10,394.48$ 4%
55,000.00$ 2024 Escalation =4,157.79$ 4%
Sub Escalation 28,669.36$ 3.1%
Unit Cost Unit Total ODCs =86,000.00$ 110.2%
25,000.00$ 1 25,000.00$ Total =2,764,650.68$
25,000.00$
Unit Cost Unit Total DBE Total $ 529,911.01$
6,000.00$ 1 6,000.00$ DBE% 19.17%
6,000.00$
ODCs TOTAL =86,000.00$
OTHER DIRECT COSTS
Item
Profilograph Bridge Deck
Item
CIDH Pile QA- Earthspectives
Item
Vehicle (Miles)
Local Assistance Procedures Manual
Note: Mark-ups are Not Allowed X
a) Subtotal Direct Labor Costs
b) Anticipated Salary Increases (see page 2 for calculation)
d) )
f) )
h)
NOTES:
1.
2.
3.
January 2020
FIXED FEE
Subconsultant 1:
Subconsultant 2:
Subconsultant 3:
Subconsultant 4:
DIRECT LABOR
Classification/Title Actual Hourly Rate
51.28$
Unit Cost Total
-$
k) TOTAL FIXED FEE [(c) + (j)] x fixed fee 10.0
l)CONSULTANT'S OTHER DIRECT COSTS (ODC) - ITEMIZE (Add additional pages if necessary)
83,067.39$
14,061.32$
Fringe Benefits (Rate:
EXHIBIT 10-H1
Cost Proposal
m) SUBCONSULTANTS' COSTS (Add additional pages if necessary)
-$
-$
QuantityDescription of Item Unit
57,545.82$
c) TOTAL DIRECT LABOR COSTS [(a) + (b)]
46,042.41$ e) Total Fringe Benefits [(c) x (d)]
Chainman
Total
Survey Project Manager 78.25$ 5,477.50$
Date
Consultant
Contract No.City Project No. 2011-05
j) TOTAL INDIRECT COSTS [(e) + (g) + (i)]
CL Surveying and Mapping, Inc.
12/6/2021Project No.
i) Gen & Admin [(c) x (h)] 18,512.49$
32.170%
57,545.82$
EXHIBIT 10-H1 COST PROPOSAL Page 1 of 3
COST-PLUS-FIXED FEE OR LUMP SUM OR FIRM FIXED PRICE CONTRACTS
(DESIGN, ENGINEERING AND ENVIRONMENTAL STUDIES)
Prime Consultant Subconsultant
20,922.24$
2nd Tier Subconsultant
LABOR COSTS
Survey Tech
Party Chief
Name
-$
-$
%]
INDIRECT COSTS
g) Overhead [(c) x (f)] 18,512.49$
)(Rate: 32.170%
Overhead (Rate:
80.010%
Plan Sheets
Test
Joseph Deal
TBD
70
408
Hours
Bernardo Padilla
TBD
172
408
Page 1 of 9
m) TOTAL SUBCONSULTANTS' COSTS
n) TOTAL OTHER DIRECT COSTS INCLUDING SUBCONSULTANTS [(l) + (m)]
General and Adminstrative
with two asterisks (**). All costs must comply with the Federal cost principles. Subconsultants will provide their own cost proposals.
The cost proposal format shall not be amended. Indirect cost rates shall be updated on an annual basis in accordance with the
consultant’s annual accounting period and established by a cognizant agency or accepted by Caltrans.
Anticipated salary increases calculation (page 2) must accompany.
154,674.53$ TOTAL COST [(c) + (j) + (k) + (n)]
-$
-$
-$
Key personnel must be marked with an asterisk (*) and employees that are subject to prevailing wage requirements must be marked
-$ l) TOTAL OTHER DIRECT COSTS
-$
Mileage Costs
Equipment Rental and Supplies
Permit Fees
50.00$
55.26$
8,600.00$
22,546.08$
-$
-$
-$
-$
-$
-$
-$
Local Assistance Procedures Manual
+=
+=
+=
+=
+=
*=
*=
*=
*=
*=
=
*=
*=
*=
*=
*=
=
=
=
NOTES:
183,846.79$
Page 2 of 9
January 2020
$157.94
Year 1
Year 2
EXHIBIT 10-H1 COST PROPOSAL Page 2 of 3
COST-PLUS-FIXED FEE OR LUMP SUM OR FIRM FIXED PRICE CONTRACTS
(CALCULATIONS FOR ANTICIPATED SALARY INCREASES)
Avg Hourly Rate
=
1. This is not the only way to estimate salary increases. Other methods will be accepted if they clearly indicate the %
4. Calculate Total Costs including Escalation (Multiply Average Hourly Rate by the number of hours)
20.0%
20.0%
20.0%
20.0%
20.0%
100.0%
Estimated Hours Year 3
Estimated Hours Year 4
Estimated Hours Year 5
Transfer to Page 1
Total Direct Labor Cost with Escalation
Direct Labor Subtotal before Escalation
$39,800.34
191,349.22$
Cost Proposal
252
252
Year 2 Avg Houly Rate
Year 3 Avg Houly Rate
Year 4 Avg Houly Rate
Year 5 Avg Houly Rate
Estimated Hours Year 1
Estimated Hours Year 2
1. Calculate Average Hourly Rate for 1st year of the contract (Direct Labor Subtotal divided by total hours)
Year 3
Year 4
252
252
252
1260
Estimated Hours Year 3
Estimated Hours Year 4
Estimated Hours Year 5
Total
EXHIBIT 10-H1
2. An estimation that is based on direct labor multiplied by salary increase % multiplied by the # of years is not acceptable.
(i.e. $250,000 x 2% x 5 yrs = $25,000 is not an acceptable methodology)
3. This assumes that one year will be worked at the rate on the cost proposal before salary increases are granted.
4. Calculations for anticipated salary escalation must be provided.
increase, the # of years of the contract, and a breakdown of the labor to be performed each year.
252
252
252
252
252
$37,504.75
$38,254.84
$39,019.94
Estimate hours
(calculated above)
Cost per
Year
$36,769.36 Estimated Hours Year 1
Estimated Hours Year 2
Year 5
Avg Hourly Rate
(calculated above)
$ 7,502.43
1260
1260
1260
1260
1260
Total
$145.91
$148.83
$151.80
$154.84
$145.91
Total Hours per Cost
Proposal
$148.83
$151.80
$154.84
$157.94
Proposed Escalation
Total Hours per
Year
Total Hours per
Cost Proposal
2. Calculate hourly rate for all years (Increase the Average Hourly Rate for a year by proposed escalation %)
5 Year
Contract
Duration
Year 5 $157.94 2%$161.10 Year 6 Avg Houly Rate
Year 1 Avg
Hourly Rate
Estimated total of Direct Labor Salary Increase
Year 1
Year 2
Year 3
Year 4
Year 5
3. Calculate estimated hours per year (Multiply estimate % each year by total hours)
Direct Labor
Subtotal per Cost
Proposal
$183,846.79
Year 1
Year 2
Year 3
Year 4
Estimated % Completed
Each Year
1260
$145.91
$151.80
$154.84
2%
2%
2%
2%
$148.83
Avg
Hourly
Rate
Local Assistance Procedures Manual
EXHIBIT 10-H1 COST PROPOSAL Page 3 of 3
Certification of Direct Costs:
I, the undersigned, certify to the best of my knowledge and belief that all direct costs identified on the
cost proposal(s) in this contract are actual, reasonable, allowable, and allocable to the contract in
accordance with the contract terms and the following requirements:
1. Generally Accepted Accounting Principles (GAAP)
2. Terms and conditions of the contract
3. Title 23 United States Code Section 112 - Letting of Contracts
4. 48 Code of Federal Regulations Part 31 - Contract Cost Principles and Procedures
5. 23 Code of Federal Regulations Part 172 - Procurement, Management, and
Administration of Engineering and Design Related Service
6. 48 Code of Federal Regulations Part 9904 - Cost Accounting Standards Board (when applicable)
All costs must be applied consistently and fairly to all contracts. All documentation of compliance must
be retained in the project files and be in compliance with applicable federal and state requirements.
Costs that are noncompliant with the federal and state requirements are not eligible for reimbursement.
Local governments are responsible for applying only cognizant agency approved or Caltrans accepted
Indirect Cost Rate(s).
Prime Consultant or Subconsultant Certifying:
Name:Title*:
Signature:
Email:Phone Number:
Address: 400 East Rincon Street, Suite 202, Corona, CA 92879
List services the consultant is providing under the proposed contract:
Land Surveying
*An individual executive or financial officer of the consultant’s or subconsultant’s organization at
a level no lower than a Vice President or a Chief Financial Officer, or equivalent, who has
authority to represent the financial information utilized to establish the cost proposal for the
contract.
Lam Le
Lam@cl-survey.com (909) 484-4200
EXHIBIT 10-H1
Cost Proposal
President
Date of Certification (mm/dd/yyyy): 1/28/2022
Local Assistance Procedures Manual
Note: Mark-ups are Not Allowed X
a) Subtotal Direct Labor Costs
b) Anticipated Salary Increases (see page 2 for calculation)
d) )
f) )
h)
NOTES:
1.
2.
3.
39.00$
52.50$
18,135.00$
4,725.00$
5,350.00$
-$
5,000.00$
350.00$
-$
-$
-$
Christine Feldman
465
90
Page 1 of 9
m) TOTAL SUBCONSULTANTS' COSTS
n) TOTAL OTHER DIRECT COSTS INCLUDING SUBCONSULTANTS [(l) + (m)]
General and Adminstrative
with two asterisks (**). All costs must comply with the Federal cost principles. Subconsultants will provide their own cost proposals.
The cost proposal format shall not be amended. Indirect cost rates shall be updated on an annual basis in accordance with the
consultant’s annual accounting period and established by a cognizant agency or accepted by Caltrans.
Anticipated salary increases calculation (page 2) must accompany.
123,414.10$ TOTAL COST [(c) + (j) + (k) + (n)]
-$
-$
-$
Key personnel must be marked with an asterisk (*) and employees that are subject to prevailing wage requirements must be marked
5,350.00$ l) TOTAL OTHER DIRECT COSTS
-$
-$
-$
%]
INDIRECT COSTS
g) Overhead [(c) x (f)] 56,221.00$
)(Rate: 0.000%
Overhead (Rate:
0.000%
Plan Sheets
18000
Test
Mileage Costs
Equipment Rental and Supplies
Permit Fees
12/6/2021Project No.
i) Gen & Admin [(c) x (h)] -$
110.000%
51,110.00$
EXHIBIT 10-H1 COST PROPOSAL Page 1 of 3
COST-PLUS-FIXED FEE OR LUMP SUM OR FIRM FIXED PRICE CONTRACTS
(DESIGN, ENGINEERING AND ENVIRONMENTAL STUDIES)
Prime Consultant Subconsultant
8,500.00$
2nd Tier Subconsultant
LABOR COSTS
Sr. Community
Outreach
Art Diretor/Graphic
Designer
Name
Andrea Suarez
Jenessa Sanchez
250
340
Hours
Jessica Sanchez
EXHIBIT 10-H1
Cost Proposal
m) SUBCONSULTANTS' COSTS (Add additional pages if necessary)
-$
350.00$
QuantityDescription of Item Unit
51,110.00$
c) TOTAL DIRECT LABOR COSTS [(a) + (b)]
-$ e) Total Fringe Benefits [(c) x (d)]
Outreach Support
Total
Outreach Director 79.00$ 19,750.00$
Date
Consultant
Contract No.City Project No. 2011-05
j) TOTAL INDIRECT COSTS [(e) + (g) + (i)]
Connect & Company, LLC
January 2020
FIXED FEE
Subconsultant 1:
Subconsultant 2:
Subconsultant 3:
Subconsultant 4:
DIRECT LABOR
Classification/Title Actual Hourly Rate
25.00$
Unit Cost Total
0.56$
1
k) TOTAL FIXED FEE [(c) + (j)] x fixed fee 10.0
l)CONSULTANT'S OTHER DIRECT COSTS (ODC) - ITEMIZE (Add additional pages if necessary)
56,221.00$
10,733.10$
Fringe Benefits (Rate:
Local Assistance Procedures Manual
+=
+=
+=
+=
+=
*=
*=
*=
*=
*=
=
*=
*=
*=
*=
*=
=
=
=
NOTES:
Estimated total of Direct Labor Salary Increase
Year 1
Year 2
Year 3
Year 4
Year 5
3. Calculate estimated hours per year (Multiply estimate % each year by total hours)
Direct Labor
Subtotal per Cost
Proposal
$250,000.00
Year 1
Year 2
Year 3
Year 4
Estimated % Completed
Each Year
5000
$50.00
$52.02
$53.06
2%
2%
2%
2%
$51.00
Avg
Hourly
Rate
Total Hours per
Cost Proposal
2. Calculate hourly rate for all years (Increase the Average Hourly Rate for a year by proposed escalation %)
5 Year
Contract
Duration
Year 5 $54.12 2%$55.20 Year 6 Avg Houly Rate
Year 1 Avg
Hourly Rate
5000
5000
5000
Total
$50.00
$51.00
$52.02
$53.06
$50.00
Total Hours per Cost
Proposal
$51.00
$52.02
$53.06
$54.12
Proposed Escalation
Total Hours per
Year
EXHIBIT 10-H1
2. An estimation that is based on direct labor multiplied by salary increase % multiplied by the # of years is not acceptable.
(i.e. $250,000 x 2% x 5 yrs = $25,000 is not an acceptable methodology)
3. This assumes that one year will be worked at the rate on the cost proposal before salary increases are granted.
4. Calculations for anticipated salary escalation must be provided.
increase, the # of years of the contract, and a breakdown of the labor to be performed each year.
1000
1000
1000
1000
1000
$51,000.00
$52,020.00
$53,060.40
Estimate hours
(calculated above)
Cost per
Year
$50,000.00 Estimated Hours Year 1
Estimated Hours Year 2
Year 5
Avg Hourly Rate
(calculated above)
$ 10,202.01
5000
5000
Direct Labor Subtotal before Escalation
$54,121.61
260,202.01$
Cost Proposal
1000
1000
Year 2 Avg Houly Rate
Year 3 Avg Houly Rate
Year 4 Avg Houly Rate
Year 5 Avg Houly Rate
Estimated Hours Year 1
Estimated Hours Year 2
1. Calculate Average Hourly Rate for 1st year of the contract (Direct Labor Subtotal divided by total hours)
Year 3
Year 4
1000
1000
1000
5000
Estimated Hours Year 3
Estimated Hours Year 4
Estimated Hours Year 5
Total
250,000.00$
Page 2 of 9
January 2020
$54.12
Year 1
Year 2
EXHIBIT 10-H1 COST PROPOSAL Page 2 of 3
COST-PLUS-FIXED FEE OR LUMP SUM OR FIRM FIXED PRICE CONTRACTS
(CALCULATIONS FOR ANTICIPATED SALARY INCREASES)
Avg Hourly Rate
=
1. This is not the only way to estimate salary increases. Other methods will be accepted if they clearly indicate the %
4. Calculate Total Costs including Escalation (Multiply Average Hourly Rate by the number of hours)
20.0%
20.0%
20.0%
20.0%
20.0%
100.0%
Estimated Hours Year 3
Estimated Hours Year 4
Estimated Hours Year 5
Transfer to Page 1
Total Direct Labor Cost with Escalation
Local Assistance Procedures Manual
EXHIBIT 10-H1 COST PROPOSAL Page 3 of 3
Certification of Direct Costs:
I, the undersigned, certify to the best of my knowledge and belief that all direct costs identified on the
cost proposal(s) in this contract are actual, reasonable, allowable, and allocable to the contract in
accordance with the contract terms and the following requirements:
1. Generally Accepted Accounting Principles (GAAP)
2. Terms and conditions of the contract
3. Title 23 United States Code Section 112 - Letting of Contracts
4. 48 Code of Federal Regulations Part 31 - Contract Cost Principles and Procedures
5. 23 Code of Federal Regulations Part 172 - Procurement, Management, and
Administration of Engineering and Design Related Service
6. 48 Code of Federal Regulations Part 9904 - Cost Accounting Standards Board (when applicable)
All costs must be applied consistently and fairly to all contracts. All documentation of compliance must
be retained in the project files and be in compliance with applicable federal and state requirements.
Costs that are noncompliant with the federal and state requirements are not eligible for reimbursement.
Local governments are responsible for applying only cognizant agency approved or Caltrans accepted
Indirect Cost Rate(s).
Prime Consultant or Subconsultant Certifying:
Name:Title*:
Signature:
Email:Phone Number:
Address: 690 Carlsbad Village Drive, Ste. 204, Carlsbad CA 92008
List services the consultant is providing under the proposed contract:
Page 3 of 9
January 2020
EXHIBIT 10-H1
Cost Proposal
President
Date of Certification (mm/dd/yyyy): 11/29/2021
*An individual executive or financial officer of the consultant’s or subconsultant’s organization at
a level no lower than a Vice President or a Chief Financial Officer, or equivalent, who has
authority to represent the financial information utilized to establish the cost proposal for the
contract.
Andrea Suarez
AWS
andrea@connectcopr.com 760-889-6949
Local Assistance Procedures Manual
Note: Mark-ups are Not Allowed X
a)Subtotal Direct Labor Costs
b)Anticipated Salary Increases (see page 2 for calculation)
d))
f))
h)
NOTES:
1.
2.
3.
January 2020
FIXED FEE
Subconsultant 1:
Subconsultant 2:
Subconsultant 3:
Subconsultant 4:
DIRECT LABOR
Classification/Title Actual Hourly Rate
-$
Unit Cost Total
0.56$
k) TOTAL FIXED FEE [(c) + (j)] x fixed fee 10.0
l)CONSULTANT'S OTHER DIRECT COSTS (ODC) - ITEMIZE (Add additional pages if necessary)
46,281.34$
8,345.81$
Fringe Benefits (Rate:
EXHIBIT 10-H1
Cost Proposal
m) SUBCONSULTANTS' COSTS (Add additional pages if necessary)
-$
-$
QuantityDescription of Item Unit
36,900.00$
276.75$
c) TOTAL DIRECT LABOR COSTS [(a) + (b)]
12,866.87$ e) Total Fringe Benefits [(c) x (d)]
Total
Labor Compliance Officer 75.00$ 13,500.00$
Date
Consultant
Contract No.City Project No. 2011-05
j) TOTAL INDIRECT COSTS [(e) + (g) + (i)]
Dynamic Engineering Services, Inc.
12/6/2021Project No.
i) Gen & Admin [(c) x (h)]-$
89.880%
37,176.75$
EXHIBIT 10-H1 COST PROPOSAL Page 1 of 3
COST-PLUS-FIXED FEE OR LUMP SUM OR FIRM FIXED PRICE CONTRACTS
(DESIGN, ENGINEERING AND ENVIRONMENTAL STUDIES)
Prime Consultant Subconsultant
-$ $ -
-$ $ -
-$
2nd Tier Subconsultant
LABOR COSTS
Electrical Inspector
Electrical Inspector
Name
-$
-$
%]
INDIRECT COSTS
g) Overhead [(c) x (f)]33,414.46$
)(Rate:0.000%
Overhead (Rate:
34.610%
Plan Sheets
8000 mile
Test
Chia-Chi Wang 180
Hours
John Kannor
Steve Brown
360
Page 1 of 9
m) TOTAL SUBCONSULTANTS' COSTS
n) TOTAL OTHER DIRECT COSTS INCLUDING SUBCONSULTANTS [(l) + (m)]
General and Adminstrative
with two asterisks (**). All costs must comply with the Federal cost principles. Subconsultants will provide their own cost proposals.
The cost proposal format shall not be amended. Indirect cost rates shall be updated on an annual basis in accordance with the
consultant’s annual accounting period and established by a cognizant agency or accepted by Caltrans.
Anticipated salary increases calculation (page 2) must accompany.
96,283.89$ TOTAL COST [(c) + (j) + (k) + (n)]
-$
-$
-$
Key personnel must be marked with an asterisk (*) and employees that are subject to prevailing wage requirements must be marked
4,480.00$ l) TOTAL OTHER DIRECT COSTS
-$
Mileage Costs
Equipment Rental and Supplies
Permit Fees
65.00$
62.50$
23,400.00$
-$
4,480.00$
-$
4,480.00$
-$
-$
-$
-$
Local Assistance Procedures Manual
+=
+=
+=
+=
+=
*=
*=
*=
*=
*=
=
*=
*=
*=
*=
*=
=
=
=
NOTES:
36,900.00$
Page 2 of 9
January 2020
$74.67
Year 1
Year 2
EXHIBIT 10-H1 COST PROPOSAL Page 2 of 3
COST-PLUS-FIXED FEE OR LUMP SUM OR FIRM FIXED PRICE CONTRACTS
(CALCULATIONS FOR ANTICIPATED SALARY INCREASES)
Avg Hourly Rate
=
1. This is not the only way to estimate salary increases. Other methods will be accepted if they clearly indicate the %
4. Calculate Total Costs including Escalation (Multiply Average Hourly Rate by the number of hours)
25.0%
50.0%
25.0%
0.0%
0.0%
0.0%
Estimated Hours Year 3
Estimated Hours Year 4
Estimated Hours Year 5
Transfer to Page 1
Total Direct Labor Cost with Escalation
Direct Labor Subtotal before Escalation
$0.00
37,176.75$
Cost Proposal
135
270
Year 2 Avg Houly Rate
Year 3 Avg Houly Rate
Year 4 Avg Houly Rate
Year 5 Avg Houly Rate
Estimated Hours Year 1
Estimated Hours Year 2
1. Calculate Average Hourly Rate for 1st year of the contract (Direct Labor Subtotal divided by total hours)
Year 3
Year 4
135
0
0
540
Estimated Hours Year 3
Estimated Hours Year 4
Estimated Hours Year 5
Total
EXHIBIT 10-H1
2. An estimation that is based on direct labor multiplied by salary increase % multiplied by the # of years is not acceptable.
(i.e. $250,000 x 2% x 5 yrs = $25,000 is not an acceptable methodology)
3. This assumes that one year will be worked at the rate on the cost proposal before salary increases are granted.
4. Calculations for anticipated salary escalation must be provided.
increase, the # of years of the contract, and a breakdown of the labor to be performed each year.
135
270
135
0
0
$18,450.00
$9,501.75
$0.00
Estimate hours
(calculated above)
Cost per
Year
$9,225.00 Estimated Hours Year 1
Estimated Hours Year 2
Year 5
Avg Hourly Rate
(calculated above)
$ 276.75
540
540
540
540
540
Total
$68.33
$68.33
$70.38
$72.49
$68.33
Total Hours per Cost
Proposal
$68.33
$70.38
$72.49
$74.67
Proposed Escalation
Total Hours per
Year
Total Hours per
Cost Proposal
2. Calculate hourly rate for all years (Increase the Average Hourly Rate for a year by proposed escalation %)
5 Year
Contract
Duration
Year 5 $74.67 3%$76.91 Year 6 Avg Houly Rate
Year 1 Avg
Hourly Rate
Estimated total of Direct Labor Salary Increase
Year 1
Year 2
Year 3
Year 4
Year 5
3. Calculate estimated hours per year (Multiply estimate % each year by total hours)
Direct Labor
Subtotal per Cost
Proposal
$36,900.00
Year 1
Year 2
Year 3
Year 4
Estimated % Completed
Each Year
540
$68.33
$70.38
$72.49
0%
3%
3%
3%
$68.33
Avg
Hourly
Rate
Local Assistance Procedures Manual
EXHIBIT 10-H1 COST PROPOSAL Page 3 of 3
Certification of Direct Costs:
I, the undersigned, certify to the best of my knowledge and belief that all direct costs identified on the
cost proposal(s) in this contract are actual, reasonable, allowable, and allocable to the contract in
accordance with the contract terms and the following requirements:
1. Generally Accepted Accounting Principles (GAAP)
2. Terms and conditions of the contract
3. Title 23 United States Code Section 112 - Letting of Contracts
4. 48 Code of Federal Regulations Part 31 - Contract Cost Principles and Procedures
5. 23 Code of Federal Regulations Part 172 - Procurement, Management, and
Administration of Engineering and Design Related Service
6. 48 Code of Federal Regulations Part 9904 - Cost Accounting Standards Board (when applicable)
All costs must be applied consistently and fairly to all contracts. All documentation of compliance must
be retained in the project files and be in compliance with applicable federal and state requirements.
Costs that are noncompliant with the federal and state requirements are not eligible for reimbursement.
Local governments are responsible for applying only cognizant agency approved or Caltrans accepted
Indirect Cost Rate(s).
Prime Consultant or Subconsultant Certifying:
Name:Title*:
Signature:
Email:Phone Number:
Address:27395 Echo Canyon Court, Corona, CA 92883
List services the consultant is providing under the proposed contract:Labor Compliance Monitoring
Electrical Inspection
*An individual executive or financial officer of the consultant’s or subconsultant’s organization at
a level no lower than a Vice President or a Chief Financial Officer, or equivalent, who has
authority to represent the financial information utilized to establish the cost proposal for the
contract.
chia-Chi Wang
ccwang@dynamicsi.com 951-892-1420
EXHIBIT 10-H1
Cost Proposal
Project Manager
Date of Certification (mm/dd/yyyy):12/1/2021
Local Assistance Procedures Manual
Note: Mark-ups are Not Allowed X
a)Subtotal Direct Labor Costs
b)Anticipated Salary Increases (see page 2 for calculation)
d))
f))
h)
Project Accountant Jackie McComas 24.0 $ 31.00 744.00$
Publications Laura Hesse 13.0 $ 26.56 345.28$
Project Controls Candy Coons 7.5 $ 30.05 225.38$
26.00$ 3,666.00$
Sr. Bio. Oversight Wendy Turner*21.0 $ 36.06 757.26$
Biologist Christina Torres 48.0 $ 25.00 1,200.00$
Sr. Bio. Oversight Margaret Bornyasz 11.0 $ 58.44 642.84$
14.00$
Biologist Corrina Tapia 0.5 $ 23.50 11.75$
QA/QC Lisa Westwood, RPA 4.0 73.20$ 292.80$
PI Task Manager John O'Connor, Ph.D., RPA*9.0 41.64$ 374.76$
Staff Archaeologist Robert Cunningham 395.0 30.00$ 11,850.00$
Project Manager Caroline Garcia*141.0
Biologist Bryce "Adam" Schroeder 0.5 $ 33.72 16.86$
Biologist Jessie Beckman 10.0 32.50$ 325.00$
Biologist Alden Lovaas 30.0 20.72$ 621.60$
Biologist Alexandra "Lexi" Dorough 32.0 18.50$ 592.00$
Biologist Chelsie Brown 0.5 $ 28.00
Biologist Max Murray 0.5 25.85$ 12.93$
Biologist Joshua Harris 6.5 $ 18.50 120.25$
24.20$ 12.10$
Biologist Lauren Simpson 0.5 34.25$ 17.13$
Biologist Carley Lancaster 0.5 33.75$ 16.88$
FIXED FEE
DIRECT LABOR
Classification/Title Actual Hourly Rate
23.54$
Unit Cost Total
0.56$
36 Day
k) TOTAL FIXED FEE [(c) + (j)] x fixed fee 5.0
l)CONSULTANT'S OTHER DIRECT COSTS (ODC) - ITEMIZE (Add additional pages if necessary)
45,240.99$
3,427.69$
Fringe Benefits (Rate:
EXHIBIT 10-H1
Cost Proposal
100.00$
QuantityDescription of Item Unit
22,398.84$
914.05$
c) TOTAL DIRECT LABOR COSTS [(a) + (b)]
16,165.16$ e) Total Fringe Benefits [(c) x (d)]
GIS Support
Total
Biologist 41.60$ 20.80$
Date
Consultant
Contract No.City Project No. 2011-05
j) TOTAL INDIRECT COSTS [(e) + (g) + (i)]
1/28/2022Project No.
i) Gen & Admin [(c) x (h)]19,958.17$
39.11%
23,312.89$
EXHIBIT 10-H1 COST PROPOSAL Page 1 of 3
COST-PLUS-FIXED FEE OR LUMP SUM OR FIRM FIXED PRICE CONTRACTS
(DESIGN, ENGINEERING AND ENVIRONMENTAL STUDIES)
Prime Consultant Subconsultant
378.00$ $ 42.00 Sr. GIS Support
-$
141.24$
2nd Tier Subconsultant
LABOR COSTS
Name
Biologist Taylor Dee
%]
INDIRECT COSTS
g) Overhead [(c) x (f)]9,117.67$
)(Rate:85.61%
Overhead (Rate:
69.34%
Josh Corona-Bennett
Torrey Rotellini
Marc Guidry, GISP
0.5
6.0
9.0
Hours
0.5
General and Adminstrative
Mileage Costs
Vehicle Rental
2,878.40$
3,600.00$
5,140 Mile
NOTES:
1.
2.
3.
January 2020
Subconsultant 1:
Subconsultant 2:
Subconsultant 3:
Subconsultant 4:
35
35
Night
m) SUBCONSULTANTS' COSTS (Add additional pages if necessary)
125.00$
with two asterisks (**). All costs must comply with the Federal cost principles. Subconsultants will provide their own cost proposals.
The cost proposal format shall not be amended. Indirect cost rates shall be updated on an annual basis in accordance with the
consultant’s annual accounting period and established by a cognizant agency or accepted by Caltrans.
Anticipated salary increases calculation (page 2) must accompany.
84,799.98$ TOTAL COST [(c) + (j) + (k) + (n)]
-$
-$
-$
Key personnel must be marked with an asterisk (*) and employees that are subject to prevailing wage requirements must be marked
12,818.40$ l) TOTAL OTHER DIRECT COSTS
-$
Lodging
ea 530.00$
Day
12,818.40$
-$
4,375.00$
1,435.00$
530.00$
Page 1 of 9
m) TOTAL SUBCONSULTANTS' COSTS
n) TOTAL OTHER DIRECT COSTS INCLUDING SUBCONSULTANTS [(l) + (m)]
41.00$ Per diem/Meals
Exclusion Supplies 1
Local Assistance Procedures Manual
+=
+=
+=
+=
+=
*=
*=
*=
*=
*=
=
*=
*=
*=
*=
*=
=
=
=
NOTES:
22,398.84$
Page 2 of 9
January 2020
$31.45
Year 1
Year 2
EXHIBIT 10-H1 COST PROPOSAL Page 2 of 3
COST-PLUS-FIXED FEE OR LUMP SUM OR FIRM FIXED PRICE CONTRACTS
(CALCULATIONS FOR ANTICIPATED SALARY INCREASES)
Avg Hourly Rate
=
1. This is not the only way to estimate salary increases. Other methods will be accepted if they clearly indicate the %
4. Calculate Total Costs including Escalation (Multiply Average Hourly Rate by the number of hours)
20.0%
20.0%
20.0%
20.0%
20.0%
100.0%
Estimated Hours Year 3
Estimated Hours Year 4
Estimated Hours Year 5
Transfer to Page 1
Total Direct Labor Cost with Escalation
Direct Labor Subtotal before Escalation
$4,849.04
23,312.89$
Cost Proposal
154.2
154.2
Year 2 Avg Houly Rate
Year 3 Avg Houly Rate
Year 4 Avg Houly Rate
Year 5 Avg Houly Rate
Estimated Hours Year 1
Estimated Hours Year 2
1. Calculate Average Hourly Rate for 1st year of the contract (Direct Labor Subtotal divided by total hours)
Year 3
Year 4
154.2
154.2
154.2
771
Estimated Hours Year 3
Estimated Hours Year 4
Estimated Hours Year 5
Total
EXHIBIT 10-H1
2. An estimation that is based on direct labor multiplied by salary increase % multiplied by the # of years is not acceptable.
(i.e. $250,000 x 2% x 5 yrs = $25,000 is not an acceptable methodology)
3. This assumes that one year will be worked at the rate on the cost proposal before salary increases are granted.
4. Calculations for anticipated salary escalation must be provided.
increase, the # of years of the contract, and a breakdown of the labor to be performed each year.
154
154
154
154
154
$4,569.36
$4,660.75
$4,753.97
Estimate hours
(calculated above)
Cost per
Year
$4,479.77 Estimated Hours Year 1
Estimated Hours Year 2
Year 5
Avg Hourly Rate
(calculated above)
$ 914.05
771
771
771
771
771
Total
$29.05
$29.63
$30.23
$30.83
$29.05
Total Hours per Cost
Proposal
$29.63
$30.23
$30.83
$31.45
Proposed Escalation
Total Hours per
Year
Total Hours per
Cost Proposal
2. Calculate hourly rate for all years (Increase the Average Hourly Rate for a year by proposed escalation %)
5 Year
Contract
Duration
Year 5 $31.45 2%$32.08 Year 6 Avg Houly Rate
Year 1 Avg
Hourly Rate
Estimated total of Direct Labor Salary Increase
Year 1
Year 2
Year 3
Year 4
Year 5
3. Calculate estimated hours per year (Multiply estimate % each year by total hours)
Direct Labor
Subtotal per Cost
Proposal
$22,398.84
Year 1
Year 2
Year 3
Year 4
Estimated % Completed
Each Year
771
$29.05
$30.23
$30.83
2%
2%
2%
2%
$29.63
Avg
Hourly
Rate
Local Assistance Procedures Manual Exhibit 10-H1
Certification of Direct Costs:
2. Terms and conditions of the contract
3.Title 23 United States Code Section 112 - Letting of Contracts
4.48 Code of Federal Regulations Part 31 - Contract Cost Principles and Procedures
6.48 Code of Federal Regulations Part 9904 - Cost Accounting Standards Board (when applicable)
Local governments are responsible for applying only cognizant agency approved or Caltrans accepted Indirect Cost Rate(s).
Prime Consultant or Subconsultant Certifying:
List services the consultant is providing under the proposed contract:
Name: Brant Brechbiel Title *: Vice President/CCO
EXHIBIT 10-H1 COST PROPOSAL Page 4 of 4
Phone Number: (714) 648-0630
Environmental Compliance Services
Address: 2861 Pullman Street, Santa Ana, CA 92705
Email:
bbrechbiel@ecorpconsulting.com
I, the undersigned, certify to the best of my knowledge and belief that all direct costs identified on the cost proposal(s) in this contract are actual,
reasonable, allowable, and allocable to the contract in accordance with the contract terms and the following requirements:
All costs must be applied consistently and fairly to all contracts. All documentation of compliance must be retained in the project files and be in
compliance with applicable federal and state requirements. Costs that are noncompliant with the federal and state requirements are not eligible for
reimbursement.
*An individual executive or financial officer of the consultant’s or subconsultant’s organization at a level no lower than a Vice President or a Chief
Financial Officer, or equivalent, who has authority to represent the financial information utilized to establish the cost proposal for the contract.
5.23 Code of Federal Regulations Part 172 - Procurement, Management, and Administration of Engineering and Design Related Service
1. Generally Accepted Accounting Principles (GAAP)
Signature : Date of Certification (mm/dd/yyyy): 11/01/2021
LPP 15-01 January 14, 2015
Local Assistance Procedures Manual EXHIBIT 10-H
Cost Proposal
Note: Mark-ups are Not Allowed o Prime x Subconsultant o 2nd Tier Subconsultant
Consultant
Project No. City Project No. 2011-05 Contract No. _____________Date 12/6/2021
DIRECT LABOR
Hours
3498
250
LABOR COSTS
a) Subtotal Direct Labor Costs
b) Anticipated Salary Increases (see page 2 for sample)
c) TOTAL DIRECT LABOR COSTS [(a) + (b)]
FRINGE BENEFITS
d) Fringe Benefits Rate: 0.00%
e) TOTAL FRINGE BENEFITS [(c) x (d)]
INDIRECT COSTS
f) Overhead Rate: 147.59%g) Overhead [(c) x (f)]
h) General & Administrative Rate: 0.00%i) General & Administrative [(c) x (h)]
j) TOTAL INDIRECT COSTS [(e) + (g) + (i)]
FEE (Profit)
q) Rate:10.00%k) TOTAL FIXED PROFIT [(c) + (j)] x (q)]
l) CONSULTANT OTHER DIRECT COSTS (ODC) ITEMIZE
Unit(s)Unit Cost
m) SUBCONSULTANT'S COST (Add additional pages if necessary)
NOTES:
3. Anticipated salary increases calculation (page 2) must accompany.
January 2020
1. Key personnel must be marked with an asterisk (*) and employees that are subject to prevailing wage requirements must be marked with two asterisks
(**). All costs must comply with the Federal cost principles. Subconsultants will provide their own cost proposals.
2. The cost proposal format shall not be amended. Indirect cost rates shall be updated on an annual basis in accordance with the consultant’s annual
accounting period and established by a cognizant agency or accepted by Caltrans.
LPP 15-01
TOTAL COST [(c) + (j) + (k) + (n)]$770,336.42
Subconsultant 2:
Subconsultant 3:
m) TOTAL SUBCONSULTANTS' COSTS $0.00
n) TOTAL OTHER DIRECT COSTS INCLUDING SUBCONSULTANTS [(l)+(m)]$0.00
l) TOTAL OTHER DIRECT COSTS Included in OH
Subconsultant 1:
Description Total
70,030.58
SWPPP Dion Castro $75.00 $18,750.00
$282,849.00
$282,849.00
$0.00
$417,456.84
$0.00
$417,456.84
Roadway/Bridge Inspector Syed Afzal Biyabani $75.50 $264,099.00
EXHIBIT 10-H1 COST PROPOSAL Page 1 of 2
ACTUAL COST-PLUS-FIXED FEE OR LUMP SUM (FIRM FIXED PRICE) CONTRACTS
(DESIGN, ENGINEERING AND ENVIRONMENTAL STUDIES)
FALCON Engineering Services, Inc.
Classification/Title Name Actual Hourly Rate Total
EXHIBIT 10-H1 COST PROPOSAL Page 3 of 3
Certification of Direct Costs:
Prime Consultant or Subconsultant Certifying:
Name:
Signature:
Email:
Address:
List of services the consultant is providing under the proposed contract.
Structures Representative, Construction Inspection, Roadway, Electrical, Signal, SWPPP
wfaqih@falcon-ca.com Phone Number:(951) 264-2350
341 Corporate Terrace Circle, Suite 101
Corona, CA 92879
*An individual executive or financial officer of the consultant’s or subconsultant’s organization at a level no lower than a
Vice President or a Chief Financial Officer, or equivalent, who has authority to represent the financial information utilized to
establish the cost proposal for the contract.
Local governments are responsible for applying only cognizant agency approved or Caltrans accepted Indirect Cost Rate(s).
Wael Faqih, PE Title*:Senior Vice President
Date of Certification: February 1, 2022
All costs must be applied consistently and fairly to all contracts. All documentation of compliance must be retained in the
project files and be in compliance with applicable federal and state requirements. Costs that are noncompliant with the federal
and state requirements are not eligible for reimbursement.
I, the undersigned, certify to the best of my knowledge and belief that all direct costs identified on the cost proposal(s) in this
contract are actual, reasonable, allowable, and allocable to the contract in accordance with the contract terms and the
following requirements:
1. Generally Accepted Accounting Principles (GAAP)
2. Terms and conditions of the contract
3. Title 23 United States Code Section 112 - Letting of Contracts
4. 48 Code of Federal Regulations Part 31 - Contract Cost Principles and Procedures
5. 23 Code of Federal Regulations Part 172 - Procurement, Management, and Administration of Engineering and Design
Related Services
6. 48 Code of Federal Regulations Part 9904 - Cost Accounting Standards Board (when applicable)
Local Assitance Procedures Manual Exhibit 10-H1
Cost Proposal
Note: Mark-ups are Not Allowed ☐ Prime Consultant ☒Subconsultant ☐ 2nd Tier Subconsultant
Consultant Contract No. BRKLS-5433(014) Date 1/27/2022
DIRECT LABOR Dune Palms Road Bridge Project
hours Actual Hourly Rate Total
44 $82.50 $3,630.00
80 $54.50 $4,360.00
32 $45.00 $1,440.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
LABOR COSTS
a) Subtotal Direct Labor Costs $9,430.00
b) Anticipated Salary Increases (see page 2 for sample)$0.00
c) TOTAL DIRECT LABOR COSTS [(a) + (b)]$9,430.00
FRINGE BENEFITS
d) Fringe Benefits (Rate 0.00%)e) Total Fringe Benefits
[(c) x (d)]$0.00
INDIRECT COSTS
f) Overhead (Rate:104.66%) g) Overhead [(c) x (f)]$9,869.44
h) General and Administrative (Rate:0.00%) i) Gen & Admin [(c) x (h)]$0.00
j) Total Indirect Costs [(e) + (g) + (i)]$9,869.44
FEE (Profit)
q) (Rate: 10.00%)k) TOTAL FIXED PROFIT [(c) + (j)] x (q)]$1,929.94
OTHER DIRECT COSTS (ODC)
Description Unit(s) Unit Cost Total
l)Travel (Per Caltrans Policies)4 $600.00 $2,400.00
m)Mileage (per IRS rate)893 $0.56 $500.00
n)Material Testing (see attached)1 $11,260.00 $11,260.00
o)Subconsultant Costs
p) Total Other Direct Costs [(l) + (m) + (n) + (o)]$14,160.00
TOTAL COST [(c) + (j) + (k) + (p)]$35,389.38
NOTES:
Page 1 of 4
Janaury 2018
EXHIBIT 10-H1 COST PROPOSAL Page 1 of 4
ACTUAL COST-PLUS-FIXED FEE OR LUMP SUM (FIRM FIXED PRICE) CONTRACTS
(DESIGN, ENGINEERING AND ENVIRONMENTAL STUDIES)
ZT Consulting Group, Inc.
Classification/Title Name
Structural Manterial Rep.*Farzad Tasbihgoo, PE
QA Inspector Andrew Soria, CWI, PCI III, NACE 2
QA Inspector David Ramirez, ACI I, PCI II
1. Key personnel must be marked with an asterisk (*) and employees that are subject to prevailing wage requirements must be marked with two asterisks (**). All costs must comply with the
Federal cost principles. Subconsultants will provide their own cost proposals.
2. The cost proposal format shall not be amended. Indirect cost rates shall be updated on an annual basis in accordance with the consultant’s annual accounting period and established by a
cognizant agency or accepted by Caltrans.
3. Anticipated salary increases calculation (page 2) must accompany.
Local Assitance Procedures Manual Exhibit 10-H1
Cost Proposal
Consultant Contract No. BRKLS-5433(014) Date 1/27/2022
Dune Palms Road Bridge Project
1. Calculate Average Hourly Rate for 1st year of the contract (Direct Labor Subtotal divided by total hours)44588
Avg Hourly 5 Year Contract
Rate Duration
$9,430.00 =$60.45 Year 1 Avg Hourly Rate
Avg Hourly Rate
Year 1 $60.45 +=$60.45 Year 2 Avg Hourly Rate
Year 2 $60.45 +=$60.45 Year 3 Avg Hourly Rate
Year 3 $60.45 +=$60.45 Year 4 Avg Hourly Rate
Year 4 $60.45 +=$60.45 Year 5 Avg Hourly Rate
Year 5 $60.45 +=$60.45 Year 5 Avg Hourly Rate
Total Hours
per Year
Year 1 60.00%*=93.6 Estimated Hours Year 1
Year 2 40.00%*=62.4 Estimated Hours Year 2
Year 3 0.00%*=0.0 Estimated Hours Year 3
Year 4 0.00%*=0.0 Estimated Hours Year 4
Year 5 0.00%*=0.0 Estimated Hours Year 5
Total 100% =156.0
$9,430.00
Year 1 $60.45 *=$5,658.00 Estimated Hours Year 1
Year 2 $60.45 *=$3,772.00 Estimated Hours Year 2
Year 3 $60.45 *=$0.00 Estimated Hours Year 3
Year 4 $60.45 *=$0.00 Estimated Hours Year 4
Year 5 $60.45 *=$0.00 Estimated Hours Year 5
=$9,430.00
=$9,430.00
=$0.00 Transfer to Page 1
NOTES:
• This is not the only way to estimate salary increases. Other methods will be accepted if they clearly indicate the % increase,
the # of years of the contract, and a breakdown of the labor to be performed each year.
• An estimation that is based on direct labor multiplied by salary increase % multiplied by the # of years is not acceptable.
(i.e. $250,000 x 2% x 5 yrs = $25,000 is not an acceptable methodology)
• This assumes that one year will be worked at the rate on the cost proposal before salary increases are granted.
Page 2 of 4
Janaury 2018
156.0
156.0
Total
156.0
Estimated hours Cost per Year
Total Direct Labor Cost with Escalation
Direct Labor Subtotal before Escalation
Estimated total of Direct Labor Salary Increase
0
0
0
(calculated above)
Avg Hourly Rate
(calculated above)
94
62
per Cost ProposalCompleted Each Year
Estimated %
156.0
156.0
4. Calculate Total Costs including Escalation (Multiply Average Hourly Rate by the number of hours)
Total Hours
2. Calculate hourly rate for all years (Increase the Average Hourly Rate for a year by proposed escalation %)
0%
EXHIBIT 10-H1 COST PROPOSAL (EXAMPLE #1) PAGE 2 OF 2
ACTUAL COST-PLUS-FIXED FEE OR LUMP SUM (FIRM FIXED PRICE) CONTRACTS
(SAMPLE CALCULATIONS FOR ANTICIPATED SALARY INCREASES)
ZT Consulting Group, Inc.
Total Hours
156
Proposed Escalation
0%
0%
0%
0%
Direct Labor Subtotal
per Cost Proposal per Cost Proposal
3. Calculate estimated hours per year (Multiply estimate % each year by total hours)
Local Assitance Procedures Manual Exhibit 10-H1
Cost Proposal
Consultant Contract No. BRKLS-5433(014) Date 1/27/2022
Dune Palms Road Bridge Project
Units Cost per Unit Cost
1)0 100.00$ $0.00
2)0 1,200.00$ $0.00
3)32 180.00$ $5,760.00
4)2 625.00$ $1,250.00
5)0 250.00$ $0.00
6)0 250.00$ $0.00
7)25 150.00$ $3,750.00
8)2 250.00$ $500.00
$11,260.00
Units Cost per Unit Cost
1)4 600.00$ $2,400.00
2)893 0.56$ $500.00
$2,900.00
Total ODC $14,160.00
Notes
Page 3 of 4
Janaury 2018
Travel per Note 1 - Per Trip
1. Pre-approved travel and Per Diem will be reimbursed in accordance with the current Caltrans Travel Guide for consultants, and detailed in executed Task Order Cost
Estimates. No charge will be invoiced for employee relocation costs.
Mileage Per IRS
Structural Fasteners - High Strength Bolts
Strands
PT Anchorage
Material Testing Summary of Cost
Travel Cost - Per Caltrans Policies (Note 1)
Epoxy Coated Bars
Elastomer Seal
Splices - Mechanical or Hoops or Headed Bars
Bearing Pads
Structural Fasteners - Anchor Rods
EXHIBIT 10-H1 COST PROPOSAL (EXAMPLE #1) PAGE 3 OF 4
ACTUAL COST-PLUS-FIXED FEE OR LUMP SUM (FIRM FIXED PRICE) CONTRACTS
(SAMPLE CALCULATIONS FOR ANTICIPATED SALARY INCREASES)
ZT Consulting Group, Inc.
Estiamte of Other Direct Cost (ODC)
Consultant Contract No. BRKLS-5433(014) Date 1/27/2022
Dune Palms Road Bridge Project
Page 4 of 4
Janaury 2018
List services the consultant is providing under the proposed contract:
*An individual executive or financial officer of the consultant’s or subconsultant’s organization at a level no lower than a Vice President or a Chief Financial Officer, or
equivalent, who has authority to represent the financial information utilized to establish the cost proposal for the contract.
Source Inspection, Fabrication Visit, Construction Material Sampling at Shop, Travel to Shops for inspection and testing
I, the undersigned, certify to the best of my knowledge and belief that all direct costs identified on the cost proposal(s) in this contract are actual, reasonable, allowable, and
allocable to the contract in accordance with the contract terms and the following requirements:
Certification of Direct Costs:
1. Generally Accepted Accounting Principles (GAAP)
2. Terms and conditions of the contract
3. Title 23 United States Code Section 112 - Letting of Contracts
4. 48 Code of Federal Regulations Part 31 - Contract Cost Principles and Procedures
5. 23 Code of Federal Regulations Part 172 - Procurement, Management, and Administration of Engineering and Design Related Service
6. 48 Code of Federal Regulations Part 9904 - Cost Accounting Standards Board (when applicable)
Address: ____________________________________________________________________________________________________________________
All costs must be applied consistently and fairly to all contracts. All documentation of compliance must be retained in the project files and be in compliance with applicable
federal and state requirements. Costs that are noncompliant with the federal and state requirements are not eligible for reimbursement. Local governments are responsible
for applying only cognizant agency approved or Caltrans accepted Indirect Cost Rate(s).
Prime Consultant or Subconsultant Certifying:
Name: _______________________________________________________________
Signature :___________________________________________________________________
Email: _____________________________________________________________________Phone Number:_____________________________
Date of Certification: _________________________
Title *:____________________________________
EXHIBIT 10-H1 COST PROPOSAL (EXAMPLE #1) PAGE 3 OF 4
ACTUAL COST-PLUS-FIXED FEE OR LUMP SUM (FIRM FIXED PRICE) CONTRACTS
(SAMPLE CALCULATIONS FOR ANTICIPATED SALARY INCREASES)
ZT Consulting Group, Inc.
Farzad Tasbihgoo Principal
01/27/22
farzad@ztcgrp.com 818-929-8162
1041 E Green St., Suite 204, Pasadena, CA 91106