HomeMy WebLinkAboutBR-NBIL(537) - City of La Quinta - Dune Palms R..._Page_1From: Joshua Nickerson
TO: Conformance Reylew(d)DOT; Brvan McKinney
Cc: Julie Mianoana; Nick Nickerson (Email); Lorissa Gruehl; Erika Sinohuiz
Subject: BR-NBIL(537) - City of La Quinta - Dune Palms Road Bridge Construction Management
Date: Wednesday, March 16, 2022 2:16:47 PM
Attachments: l0A TY LIN Sianed.odf
EXTERNAL: This message originated outside of the City of La Quinta. Please use properjudgement and caution
when opening attachments, clicking links or responding to requests for information.
Hello,
The City of La Quinta respectfully requests an A&E Consultant Financial Document Review Request
for Federal Project No. BR-NBIL(537) — Dune Palms Road Bridge. See attached for the signed 10A
and information below related to the contract.
ContractAmount- $2,760,328.58
Prime Consultant—T.Y. Lin International —Joseph Smith (ioseph.smith(@tylin.com)
In the link below please find:
1. 10A—Audit Review Request
a. T.Y. Lin International : 10H, Prevailing Wage Policy, Acceptance ID: D2021-0812
b. AESCO Inc.: 10H, Prevailing Wage Policy, Acceptance ID: L2021-0834
c. CLSurveying and Mapping, Inc.: 10H, Prevailing Wage Policy, Acceptance ID: 1-2021-
1470
d. Connect and Company: 10H, SHR Forms, Do not perform prevailing wage services
e. Dynamic Engineering Services: 10H, Prevailing Wage Policy, Acceptance ID: L2021-1384
f. Ecorp Consulting: 10H, Prevailing Wage Policy, Acceptance ID: 12021-1385
g. Falcon Engineering Services, Inc.: 10H, Prevailing Wage Policy, Acceptance ID: 1-2020-
1212
h. ZT Consulting Group, Inc.: 10H, Prevailing Wage Policy, Acceptance ID: 2022-1493
2. RFP Solicitation — Advertised on 11/05/2021.
a. Method of Payment will be based on Actual Cost Plus Fixed Fee.
Link: https://naiconsulting.sharefile.com/d-se9ef0766b3454eOd8b1b8f440ab73bd3
Please review and let me know if you have any questions or comments.
Thanks!
Josh Nickerson, PE
Senior Engineer
NAI Consulting
e: inickerson(@naiconsulting.com
p: (760) 323-5344
d: (760) 318-0184