Loading...
HomeMy WebLinkAboutCopy of 2011-05_9D_DBE Goal for CMExhibit 9-D Instructions I. Policy: Exhibit 9-D shall be submitted in Excel to the District Local Assistance Engineer (DLAE) PRIOR to advertisement on all federal-aid contracts. Please complete the "DBE Goal Template - A&E" along with the Exhibit 10-C, "Consultant Contract Reviewer's Checklist" database entry for A&E projects or the "DBE Goal Template - CON" along with the Exhibit 12-D, "PS&E Checklist" for construction projects. II. Procedure for Calculating DBE Contract Goal: (1)    Federal Aid Number: List the federal aid number if available. If not, list the number in the Federal State Transportation Improvement Program (FSTIP) or the Federal Transportation Improvement Program (FTIP). (2)    Local Agency: List your local agency's name. (3)    Project Title: List the project title. Refer to FSTIP and FTIP as appropriate. (4) Project Description: Enter a brief project description such as location and limits, proposed facilities, etc. Avoid vague project descriptions such as provide engineering design, environmental services, or professional services. (5) Phase: Identify the phase of work as Preliminary Engineering (PE), Construction Engineering (CE), a combination of PE and CE, or Construction (CON). (6) Contract type: Select one from On-Call, Multi-Phase, or Project Specific (this type also includes bundled construction projects under one contract). (7) Item No.: List tasks in numerical order, which should match to the Engineer's Estimate or Independent Cost Estimate. (8) Approx. Quant.: List the approximate quantity of units estimated for each item of work. (9) Meas. Unit.: List measuring units such as cubic yard (CY), each (EA), hour (HR), linear feet (LF), lump sum (LS), square feet (SF), and tons (TON). (10) Item Description: List the items or tasks necessary to accomplish the contracted work. (11) Unit Price: Cost per individual unit in (10). (12) Total: This field will auto-calculate by multiplying the Approx. Quant. (8) times Unit Price (11). (13) Likely to be performed by Sub-contractor: Determine the work items that will (typically) be performed by the prime contractor and what work items can be subcontracted out. Type "Y" for these items. This does not mean that if the prime contractor is capable of performing all the work items, then no work can or will be subcontracted out. The Agency should make Good Faith Efforts to identify work items that may be subcontracted to attain DBE participation. For example, in an Asphalt-Concrete overlay project: traffic control, striping, pavement marking, and storm water preparation are typically subcontracted out. In a bridge design project, geotechnical, computer aided drafting, and surveying can be subcontracted out. Since each project can be unique, care should be exercised to identify work items that can be subcontracted out. (14) Trucking or Supply of Material Involved: Determine if the item requires Supply or Trucking. If so, list "Y". (15) Work Category Code: For the work items that can be subcontracted in number (13), identify the Work Category Codes from the California Unified Certification Program (CUCP) DBE database: https://dot.ca.gov/programs/civil-rights/dbe-search (16) Number of Available DBEs: From number (15), determine the number of DBE subcontractors or subconsultants by conducting a search in the CUCP database by Caltrans District only. (17) DBE Work Factor: Determine the “DBE Work Factor” for each item of work. The DBE Work Factor is the percentage of work that can be performed by a DBE subcontractor for each item of work: If the number of available DBE subcontractors or subconsultants is 7 or more, a 100 percent DBE Work Factor is applied to that item of work. If there are less than 7 DBEs available to perform the item of work, then determine whether or not there is a component of trucking or material supply, and apply a 10 or 12 percent DBE Work Factor to those items of work as demonstrated in the table above. For task items not typically subcontracted, determine whether or not there is an element of trucking or material supply and apply a 10 or 12 percent DBE Work Factor to those items of work as demonstrated in the table above. (18) DBE Work Amount: This field will auto-calculate by multiplying the Total (12) times the DBE Work Factor (17). (19) Comment: Provide additional comments if necessary. (20) Work Item Total: This field will auto-calculate by summing the amounts in the Total (12) column. (21) Total DBE Work Amount: This field will auto-calculate by summing the amounts in the DBE Work Amount (18) column. (22) X 80% Work Factor: The Exhibit 9-D factors the Total DBE Work Amount (21) by 80% to get the DBE Contract Goal Amount. The “80%” reflects the amount of ready, willing, and available DBEs to participate on this contract. (23) DBE Contract Goal Amount: This field will auto-calculate by multiplying the Total DBE Work Amount (21) times the 80% Work Factor (22). (24) DBE Goal Percentage: This field will auto-calculate by dividing the DBE Contract Goal Amount (23) by the Work Item Total (20). (25) Work Code: The code from the CUCP database that corresponds to the type of work. For example, C0651 is the Work Category Code for a Concrete and Cement Supplier. (26) Category: The description of the work category from the CUCP database. For example, C0651 has a work category of Concrete and Cement Supplier. (27) Local Agency Contact E-mail: Enter the local agency contact's e-mail address. (28) Date: Local agency contact enters the date when the Exhibit 9-D was submitted to the District. (29) District Received by: Enter District staff name that received the Exhibit 9-D. (30) Date: District staff enters the date received by the District. DBE Work Factor % 1 0.12 0.1 Description DBE performs, manages and supervises the work item. DBE provides the material or supplies for work item. DBE provides the trucking operation for a work item. (7) Item No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 (4) Project Description: (8) Approx. Quant. 1 1 1 362 1 2050 2570 82 1500 5 1 1 470 700 64 1330 1 1 220 1 1 1 1 1 (1) Federal Aid Number: (2) Local Agency: (3) Project Title: (9) Meas. Unit LS LS LS CY EA TON CY CY SF LS EA EA LF LF LF SF EA EA LF EA LS LS LS LS (27) Local Agency Contact E-mail: (29) District Received by: 5002(123) City of Sacramento Downtown Bike Plan, Phase II Create traffic-protected bike lane on P St. from 11th St to 12th St. (10) Item Description Mobilization Traffic Control Storm Water Pollution Prevention Plan Roadway Excavation Relocate Bus Bench Construct Hot Mix Asphalt Construct Aggregate Base Class II Concrete Bus Pad, including Monolithic Curb, Lean Concrete Base and Sub-base Construct 4" thick PCC Sidewalk Traffic Detectors Construct ADA Curb Ramp, Case A Construct ADA Curb Ramp, Case C (Mod) Construct Type A2-6 curb (Caltrans std plan A87A) Construct Type B3-6 curb (Caltrans std plan A87A) at Median Island Construct Retaining Curb Type A1-12 (Caltrans std plan A87A Mod) Construct 6-inch thick PCC at Median island Construct Parkway Drain (at Sta 450+41) Construct Parkway Drain (at Sta 439+39) Construct Reinforced Concrete Box Culvert Construct Curb Opening Inlet (Type OL-7) Caltrans std plan D72 including corner connection junction structure and local depression Clearing and Grubbing Signing and Striping Record of Construction Changes Traffic Signal Modifications (11) Unit Price 55000 50000 20560 75 200 125 40 250 4 5000 1900 3000 30 10 40 6 1500 2500 200 2000 75000 140000 6999 50000 (20) WORK ITEM TOTAL (25) Work Code C0651 C0671 C0686 C0800 C1201 C1601 C8608 C8713 C8722 C9602 C9607 (12) Total 55000 50000 20560 27150 200 256250 102800 20500 6000 25000 1900 3000 14100 7000 2560 7980 1500 2500 44000 2000 75000 140000 6999 50000 921999 (26) CONCRETE AND CEMENT SUPPLIER DRAINING SYSTEMS SUPPLIER ELECTRICAL & SIGNALS SUPPLIER TRAFFIC STRIPING, MARKING AND TRAFFIC CONTROL MATERIALS SUPPLIER TRAFFIC CONTROL SYSTEM CLEARING & GRUBBING DETECTOR CONSULTANT, ENVIRONMENTAL ENVIRONMENTAL ENGINEER BOTTOM DUMP TRUCKING END DUMP TRUCK (28) Date: (30) Date: (13) Likely to be Performed by Sub-contractor (Y=Yes)? Y Y Y Y (14) Trucking or Supply of Material Involved (Y=Yes)? Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Category (15) Work Category Code (enter a code if corresponding cell in either Column G or H is "Y") C1201 C8713, C8722 C9607 C9602 C9602 C0651 C0651 C8609 C0651 C0651 C0651 C0651 C0651 C0651 C0671 C0671 C0651 C0651 C1601 C0800 C0686 (5) Phase (Please mark below) PE CE PE and CE CON (16) Number of Available DBEs 25 192 7 50 X (17) DBE Work Factor (100% if DBEs ≥ 7 12% if supply component 10% if trucking component) 1 1 0.1 0.1 0.1 0.12 0.12 1 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 1 0.12 0.12 (21) TOTAL DBE WORK AMOUNT (22) X 80% Factor (23) DBE CONTRACT GOAL AMOUNT (24) DBE Goal Percentage (6) Contract Type (please mark below) On-Call Multi-phase Project Specific (18) DBE Work Amount 0 50000 20560 2715 0 25625 10280 2460 720 25000 228 360 1692 840 307.2 957.6 180 300 5280 240 75000 16800 0 6000 245544.8 X 80% 196435.84 0.213054287477535 X (19) Comment ≥ 7 DBEs in District ≥ 7 DBEs in District Trucking Trucking Trucking Supplies Supplies ≥ 7 DBEs in District Supplies Supplies Supplies Supplies Supplies Supplies Supplies Supplies Supplies Supplies ≥ 7 DBEs in District Supplies Supplies (7) Item No. 1 2 3 4 5 6 7 8 9 (4) Project Description: (8) Approx. Quant. 122 882 4264 3977 285 959 1 1 1 (1) Federal Aid Number: (2) Local Agency: (3) Project Title: (9) Meas. Unit HR HR HR HR HR HR LS LS LS (27) Local Agency Contact E-mail: (29) District Received by: BRKLS-5433(014) City of La Quinta Dune Palms Road Bridge (2011-05) Replace low-water crossing with an all-weather crossing including road approaches and necessary bank concrete slope scour countermeasures. (10) Item Description Principal Project Manager Assistant RE / Structures Representative Civil Inspector Environmental Monitoring Office Engineer Material Testing Surveying ODC Joshua Nickerson / jnickerson@naiconsulting.com (11) Unit Price 275 250 200 175 90 100 155000 82000 10521 (20) WORK ITEM TOTAL (25) Work Code C8722 C8723 C8733 C8760 C9826 C8736 C8737 C8738 C8739 C8740 C8741 C9982 (12) Total 33550 220500 852800 695975 25650 95900 155000 82000 10521 2171896 (26) ENVIRONMENTAL ENGINEER MATERIAL TESTING SERVICES CONSTRUCTION ENGINEERING & INSPECTION SERVICES LAND SURVEYOR LAND SURVEYING CONSTRUCTION STAKING (SURVEYING) (28) Date: (30) Date: (13) Likely to be Performed by Sub-contractor (Y=Yes)? Y Y Y Y 9/14/2021 (14) Trucking or Supply of Material Involved (Y=Yes)? Category (15) Work Category Code (enter a code if corresponding cell in either Column (13) or Column (14) is "Y") C8722 C8733 C8723 C9826 (5) Phase (Please mark below) PE CE PE and CE CON (16) Number of Available DBEs 26 26 21 18 35 21 26 28 18 5 X (17) DBE Work Factor (100% if DBEs ≥ 7 12% if supply component 10% if trucking component) 1 1 1 1 (21) TOTAL DBE WORK AMOUNT (22) X 80% Factor (23) DBE CONTRACT GOAL AMOUNT (24) DBE Goal Percentage (6) Contract Type (please mark below) On-Call Multi-phase Project Specific (18) DBE Work Amount 0 0 0 0 25650 95900 155000 82000 0 358550 X 100% 358550 0.165086173555272 X (19) Comment (7) Item No. 1 2 3 4 5 6 (4) Project Description: (8) Approx. Quant. 35 205 1209 245 1 1 (1) Federal Aid Number: (2) Local Agency: (3) Project Title: (9) Meas. Unit HR HR HR HR LS LS (27) Local Agency Contact E-mail: (29) District Received by: HSIPL-5282(048) City of Palm Springs Traffic Signal Improvement - HSIP 8 Modify Traffic Signal for improved visibility, install Advanced Dilemma Zone Detection, and add Protected Left-Turn Phasing at fourteen (14) intersections throughout the City of Palm Springs (10) Item Description Principal Project Manager Civil Inspector Office Engineer Material Testing ODC (11) Unit Price 250 200 175 90 28500 5000 (20) WORK ITEM TOTAL (25) Work Code C8723 (12) Total 8750 41000 211575 22050 28500 5000 316875 (26) MATERIAL TESTING SERVICES (28) Date: (30) Date: (13) Likely to be Performed by Sub-contractor (Y=Yes)? Y (14) Trucking or Supply of Material Involved (Y=Yes)? Category (15) Work Category Code (enter a code if corresponding cell in either Column (13) or Column (14) is "Y") C8723 (5) Phase (Please mark below) PE CE PE and CE CON (16) Number of Available DBEs 21 21 X (17) DBE Work Factor (100% if DBEs ≥ 7 12% if supply component 10% if trucking component) 1 (21) TOTAL DBE WORK AMOUNT (22) X 80% Factor (23) DBE CONTRACT GOAL AMOUNT (24) DBE Goal Percentage (6) Contract Type (please mark below) On-Call Multi-phase Project Specific (18) DBE Work Amount 0 0 0 0 28500 0 28500 X 80% 22800 7.19526627218935E-02 X (19) Comment