HomeMy WebLinkAbout03_Dune Palms 3-3-14ID Task Name Duration
1 Dune Palms Road Low Water Crossing Replacement 1198 days
2 Project Start 0 days
3 Kick-off Meeting 1 day
4 Phase 1 - Project Approval and Environmental Documents (PA&ED)375 days
5 Project Management 375 days
6 Environmental Review (CEQA/NEPA Report Technical Studies)375 days
7 Project Kick-off and Project Description 20 days
8 Research and Investigation 28 days
9 Preliminary Environmental Study (PES)45 days
10 Technical Studies 115 days
28 Environmental Assessment/Initial Study 187 days
35 Utility Coordination 355 days
40 Topographic Base Mapping 38 days
43 Preliminary Geotechnical Investigation 71 days
50 Location Hydraulic Study 70 days
51 Channel Hydrology and Hydraulic Study 150 days
52 General Plan and Bridge Type Selection Report 120 days
53 Preliminary Design Plans 60 days
54 Preliminary Engineer's Estimate 30 days
55 Preliminary Right of Way Cost Study 45 days
56 Legals & Exhibits 30 days
57 Bridge Railing Aesthetic Study 28 days
58 Phase 2 - Final Design 399 days
59 Project Management 393 days
60 Environmental Permitting 150 days
65 Right of Way 247 days
71 Roadway and Bridge Plans Bid Documents 130 days
86 Final Design Utility Coordination 143 days
91 Final Bid Package and RE File 142 days
103 CVWD Encroachment Permit 35 days
104 Construction Auhtorization (E-76)1 day
105 Contract Bidding and Award Assistance 30 days
106 Construction 422 edays
12/4
6/2 Kick-off Meeting
Phase 1 - Project Approval and Environmental Documents (PA&ED)
6/2 11/6
6/2 11/6
6/2 6/27
6/2 7/9
7/10 9/10
6/30 11/6
8/18 10/8
6/30 10/6
10/9 1/14
10/9 5/6
1/15 7/1
10/9 12/31
2/16 3/27
2/2 4/3
1/1 2/11
1/5 2/11
Phase 2 - Final Design
11/9 5/10
11/9 6/3
11/9 10/18
10/30 4/28
Final Bid Package and RE File
4/29 6/16
10/19
10/20 11/30
5/10 7/6
Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4
013 2014 2015 2016 2017 2018
Schedule for the Dune Palms Road
Low Water Crossing Replacement
Mon 3/3/14 City Project No. 2011-05
Federal Aid Project No. BRLKS-5433(014)