Loading...
HomeMy WebLinkAbout03_Dune Palms 3-3-14ID Task Name Duration 1 Dune Palms Road Low Water Crossing Replacement 1198 days 2 Project Start 0 days 3 Kick-off Meeting 1 day 4 Phase 1 - Project Approval and Environmental Documents (PA&ED)375 days 5 Project Management 375 days 6 Environmental Review (CEQA/NEPA Report Technical Studies)375 days 7 Project Kick-off and Project Description 20 days 8 Research and Investigation 28 days 9 Preliminary Environmental Study (PES)45 days 10 Technical Studies 115 days 28 Environmental Assessment/Initial Study 187 days 35 Utility Coordination 355 days 40 Topographic Base Mapping 38 days 43 Preliminary Geotechnical Investigation 71 days 50 Location Hydraulic Study 70 days 51 Channel Hydrology and Hydraulic Study 150 days 52 General Plan and Bridge Type Selection Report 120 days 53 Preliminary Design Plans 60 days 54 Preliminary Engineer's Estimate 30 days 55 Preliminary Right of Way Cost Study 45 days 56 Legals & Exhibits 30 days 57 Bridge Railing Aesthetic Study 28 days 58 Phase 2 - Final Design 399 days 59 Project Management 393 days 60 Environmental Permitting 150 days 65 Right of Way 247 days 71 Roadway and Bridge Plans Bid Documents 130 days 86 Final Design Utility Coordination 143 days 91 Final Bid Package and RE File 142 days 103 CVWD Encroachment Permit 35 days 104 Construction Auhtorization (E-76)1 day 105 Contract Bidding and Award Assistance 30 days 106 Construction 422 edays 12/4 6/2 Kick-off Meeting Phase 1 - Project Approval and Environmental Documents (PA&ED) 6/2 11/6 6/2 11/6 6/2 6/27 6/2 7/9 7/10 9/10 6/30 11/6 8/18 10/8 6/30 10/6 10/9 1/14 10/9 5/6 1/15 7/1 10/9 12/31 2/16 3/27 2/2 4/3 1/1 2/11 1/5 2/11 Phase 2 - Final Design 11/9 5/10 11/9 6/3 11/9 10/18 10/30 4/28 Final Bid Package and RE File 4/29 6/16 10/19 10/20 11/30 5/10 7/6 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 013 2014 2015 2016 2017 2018 Schedule for the Dune Palms Road Low Water Crossing Replacement Mon 3/3/14 City Project No. 2011-05 Federal Aid Project No. BRLKS-5433(014)