HomeMy WebLinkAboutAddendum 1 Dune Palms BridgeAddendum No. 1 Page 1
DATE: October 22, 2013
TO: All Prospective Design Consultants
RE: Dune Palms Road Low Water Crossing Replacement, City Project 2011-05
ADDENDUM NUMBER 1
The following shall be considered as incorporated into the Request for Proposal (RFP) for the above
referenced project. Portions of RFP not specifically mentioned in this Addendum remain in force.
RFP
Page 4 – Section: Proposal Format, Paragraph: 2 (Replace Paragraph with the Following)
Original Paragraph: Proposal packages are to be submitted to the City on/or before Monday,
November 4, 2013 at/or before 5:00 p.m. Proposals received after the stated
deadline shall not be accepted. Any questions must be submitted by 2:00 p.m.
on Monday, October 28, 2013. Proposal packages are to be delivered to:
Revised Paragraph: Proposal packages are to be submitted to the City on/or before Monday,
November 25, 2013 at/or before 5:00 p.m. Proposals received after the stated
deadline shall not be accepted. Any questions must be submitted by 2:00 p.m.
on Monday, November 18, 2013. Proposal packages are to be delivered to:
Page 6 – Section: Proposer’s Conference, Paragraph: 1 (Replace Paragraph with the Following)
Original Paragraph: A proposer's conference will be held at the City of La Quinta on Monday,
October 14, at 10:00 AM. Attendance is not mandatory and proposers may
receive the meeting minutes upon request.
Revised Paragraph: A proposer's conference will be held at the City of La Quinta on Tuesday,
November 12, at 10:30 AM. Attendance is not mandatory and proposers may
receive the meeting minutes upon request.
The Contractor is hereby notified; Addendum No. 1 must be acknowledged and submitted as part of the
RFP. Failure to do so shall result in the City designating said RFP as "Non-Responsive."
APPROVED:
Bryan McKinney, P.E.
Principal Engineer
END OF ADDENDUM NUMBER 1