Loading...
HomeMy WebLinkAboutAttachment 02 - Wage Rates"General Decision Number: CA20220025 09/02/2022 Superseded General Decision Number: CA20210025 State: California Construction Types: Building, Heavy (Heavy and Dredging) and  Highway County: Riverside County in California. BUILDING CONSTRUCTION PROJECTS; DREDGING PROJECTS (does not include hopper dredge work); HEAVY CONSTRUCTION PROJECTS (does not include water well drilling); HIGHWAY CONSTRUCTION PROJECTS Note: Contracts subject to the Davis‐Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658. Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis‐Bacon Act itself, but do not apply to contracts subject only to the Davis‐Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)‐(60). ______________________________________________________________ |If the contract is entered    |. Executive Order 14026      | |into on or after January 30,  |  generally applies to the   | |2022, or the contract is      |  contract.                  | |renewed or extended (e.g., an |. The contractor must pay    | |option is exercised) on or    |  all covered workers at     | |after January 30, 2022:       |  least $15.00 per hour (or  | |                              |  the applicable wage rate   | |                              |  listed on this wage        | |                              |  determination, if it is    | |                              |  higher) for all hours      | |                              |  spent performing on the    | |                              |  contract in 2022.          | |______________________________|_____________________________| |If the contract was awarded on|. Executive Order 13658      | |or between January 1, 2015 and|  generally applies to the   | |January 29, 2022, and the     |  contract.                  | |contract is not renewed or    |. The contractor must pay all| |extended on or after January  |  covered workers at least   | |30, 2022:                     |  $11.25 per hour (or the    | |                              |  applicable wage rate listed| |                              |  on this wage determination,| |                              |  if it is higher) for all   | |                              |  hours spent performing on  | |                              |  that contract in 2022.     | |______________________________|_____________________________| The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request. Additional information on contractor requirements and worker protections under the Executive Orders is available at https://www.dol.gov/agencies/whd/government‐contracts. Modification Number     Publication Date           0              01/07/2022           1              01/14/2022           2              01/21/2022           3              02/11/2022           4              02/18/2022           5              02/25/2022           6              04/29/2022           7              08/05/2022           8              08/12/2022           9              08/19/2022           10             09/02/2022  ASBE0005‐002 09/01/2021                                   Rates          Fringes Asbestos Workers/Insulator    (Includes the application of    all insulating materials,    protective coverings,    coatings, and finishes to all    types of mechanical systems).....$ 47.25            24.45 Fire Stop Technician    (Application of Firestopping    Materials for wall openings    and penetrations in walls,    floors, ceilings and curtain    walls)...........................$ 32.09            19.66 ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐  ASBE0005‐004 07/05/2021                                   Rates          Fringes Asbestos Removal    worker/hazardous material    handler (Includes    preparation, wetting,    stripping, removal,    scrapping, vacuuming, bagging    and disposing of all    insulation materials from     mechanical systems, whether    they contain asbestos or not)....$ 22.40            13.07 ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐  BOIL0092‐003 01/01/2021                                   Rates          Fringes BOILERMAKER......................$ 46.03            38.81 ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ * BRCA0004‐011 05/01/2020                                   Rates          Fringes BRICKLAYER; MARBLE SETTER........$ 41.48            18.63   *The wage scale for prevailing wage projects performed in   Blythe, China lake, Death Valley, Fort Irwin, Twenty‐Nine   Palms, Needles and 1‐15 corridor (Barstow to the Nevada   State Line) will be Three Dollars ($3.00) above the   standard San Bernardino/Riverside County hourly wage rate ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐  BRCA0018‐004 06/01/2021                                   Rates          Fringes MARBLE FINISHER..................$ 35.90            14.11 TILE FINISHER....................$ 30.47            12.52 TILE LAYER.......................$ 43.09            18.31 ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐  BRCA0018‐010 09/01/2021                                   Rates          Fringes TERRAZZO FINISHER................$ 35.43            14.10 TERRAZZO WORKER/SETTER...........$ 43.61            14.63 ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐  CARP0213‐001 07/01/2021                                   Rates          Fringes CARPENTER        (1) Carpenter, Cabinet       Installer, Insulation       Installer, Hardwood Floor       Worker and acoustical       installer...................$ 51.60            16.28      (2) Millwright..............$ 52.10            16.48      (3) Piledrivermen/Derrick       Bargeman, Bridge or Dock       Carpenter, Heavy Framer,        Rock Bargeman or Scowman,       Rockslinger, Shingler       (Commercial)................$ 51.73            16.28      (4) Pneumatic Nailer,       Power Stapler...............$ 51.85            16.28      (5)  Sawfiler...............$ 51.69            16.28      (6)  Scaffold Builder.......$ 42.80            16.28      (7)  Table Power Saw       Operator....................$ 51.70            16.28   FOOTNOTE: Work of forming in the construction of open cut   sewers or storm drains, on operations in which horizontal   lagging is used in conjunction with steel H‐Beams driven or   placed in pre‐ drilled holes, for that portion of a lagged   trench against which concrete is poured, namely, as a   substitute for back forms (which work is performed by   piledrivers): $0.13 per hour additional. ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐  CARP0213‐002 07/01/2021                                   Rates          Fringes Diver        (1) Wet.....................$ 834.40           16.28      (2) Standby.................$ 445.84           16.28      (3) Tender..................$ 437.84           16.28      (4) Assistant Tender........$ 413.84           16.28 Amounts in ""Rates' column are per day ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐  CARP0213‐004 07/01/2021                                   Rates          Fringes Drywall        DRYWALL INSTALLER/LATHER....$ 51.60            16.28      STOCKER/SCRAPPER............$ 22.16             8.62 ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐  CARP0721‐001 07/01/2021                                   Rates          Fringes Modular Furniture Installer......$ 21.85             7.15 ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐  ELEC0440‐001 12/27/2021                                   Rates          Fringes ELECTRICIAN        INSIDE ELECTRICIAN..........$ 49.73         3%+24.44      INTELLIGENT TRANSPORTATION       SYSTEMS       Electrician................$ 36.99         3%+23.18       Technician.................$ 27.75         3%+23.18   ZONE PAY: Zone A: Free travel zone for all contractors   performing work in Zone A.   Zone B:Any work performed in Zone (B) shall add $12.00 per   hour to the current wage scale.  Zone (B) shall be the area   from the eastern perimeter of Zone (A) to a line which runs   north and south begininng at Little Morongo Canyon (San   Bernardino/Riverside County Line), Southeast along the   Coachella Tunnels, Colorado River Aqueduct and Mecca   Tunnels to Pinkham Wash then South to Box Canyon Road, then   southwest along Box Canyon Road to Highway 195 west onto   195 south to Highway 86 to Riverside/Imperial County Line. ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐  ELEC1245‐001 06/01/2022                                   Rates          Fringes LINE CONSTRUCTION        (1) Lineman; Cable splicer..$ 64.40            22.58      (2) Equipment specialist       (operates crawler       tractors, commercial motor       vehicles, backhoes,       trenchers, cranes (50 tons       and below), overhead &       underground distribution       line equipment).............$ 50.00            21.30      (3) Groundman...............$ 38.23            20.89      (4) Powderman...............$ 51.87            18.79   HOLIDAYS: New Year's Day, M.L. King Day, Memorial Day,   Independence Day, Labor Day, Veterans Day, Thanksgiving Day   and day after Thanksgiving, Christmas Day ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐  ELEV0018‐001 01/01/2022                                   Rates          Fringes ELEVATOR MECHANIC................$ 61.34       36.885+a+b FOOTNOTE:   a. PAID VACATION:  Employer contributes 8% of regular hourly   rate as vacation pay credit for employees with more than 5   years of service, and 6% for 6 months to 5 years of service.   b. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence   Day, Labor Day, Veterans' Day, Thanksgiving Day, Friday   after Thanksgiving, and Christmas Day. ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐  ENGI0012‐003 07/01/2020                                   Rates          Fringes OPERATOR:  Power Equipment    (All Other Work)        GROUP  1....................$ 48.25            27.20      GROUP  2....................$ 49.03            27.20      GROUP  3....................$ 49.32            27.20      GROUP  4....................$ 50.81            27.20      GROUP  5....................$ 48.96            25.25      GROUP  6....................$ 51.03            27.20      GROUP  8....................$ 51.14            27.20      GROUP  9....................$ 49.29            25.25      GROUP 10....................$ 51.26            27.20      GROUP 11....................$ 49.41            25.25      GROUP 12....................$ 51.43            27.20      GROUP 13....................$ 51.53            27.20      GROUP 14....................$ 51.56            27.20      GROUP 15....................$ 51.64            27.20      GROUP 16....................$ 51.76            27.20      GROUP 17....................$ 51.93            27.20      GROUP 18....................$ 52.03            27.20      GROUP 19....................$ 52.14            27.20      GROUP 20....................$ 52.26            27.20      GROUP 21....................$ 52.43            27.20      GROUP 22....................$ 52.53            27.20      GROUP 23....................$ 52.64            27.20      GROUP 24....................$ 52.76            27.20      GROUP 25....................$ 52.93            27.20 OPERATOR:  Power Equipment    (Cranes, Piledriving &    Hoisting)        GROUP  1....................$ 49.60            27.20      GROUP  2....................$ 50.38            27.20      GROUP  3....................$ 50.67            27.20      GROUP  4....................$ 50.81            27.20      GROUP  5....................$ 51.03            27.20      GROUP  6....................$ 51.14            27.20      GROUP  7....................$ 51.26            27.20      GROUP  8....................$ 51.43            27.20      GROUP  9....................$ 51.60            27.20      GROUP 10....................$ 52.60            27.20      GROUP 11....................$ 53.60            27.20      GROUP 12....................$ 54.60            27.20      GROUP 13....................$ 55.60            27.20 OPERATOR:  Power Equipment    (Tunnel Work)        GROUP  1....................$ 50.10            27.20      GROUP  2....................$ 50.88            27.20      GROUP  3....................$ 51.17            27.20      GROUP  4....................$ 51.31            27.20      GROUP  5....................$ 51.53            27.20      GROUP  6....................$ 51.64            27.20      GROUP  7....................$ 51.76            27.20 PREMIUM PAY:   $3.75 per hour shall be paid on all Power Equipment Operator   work on the followng Military Bases: China Lake Naval   Reserve, Vandenberg AFB, Point Arguello, Seely Naval Base,   Fort Irwin, Nebo Annex Marine Base, Marine Corp Logistics   Base Yermo, Edwards AFB, 29 Palms Marine Base and Camp   Pendleton   Workers required to suit up and work in a hazardous material   environment: $2.00 per hour additional.  Combination mixer   and compressor operator on gunite work shall be classified   as a concrete mobile mixer operator. SEE ZONE DEFINITIONS AFTER CLASSIFICATIONS POWER EQUIPMENT OPERATORS CLASSIFICATIONS    GROUP 1: Bargeman; Brakeman; Compressor operator; Ditch   Witch, with seat or similar type equipment; Elevator   operator‐inside; Engineer Oiler; Forklift operator   (includes loed, lull or similar types under 5 tons;   Generator operator; Generator, pump or compressor plant   operator; Pump operator; Signalman; Switchman   GROUP 2: Asphalt‐rubber plant operator (nurse tank operator);   Concrete mixer operator‐skip type; Conveyor operator;   Fireman; Forklift operator (includes loed, lull or similar   types over 5 tons; Hydrostatic pump operator; oiler crusher   (asphalt or concrete plant); Petromat laydown machine; PJU   side dum jack; Screening and conveyor machine operator (or   similar types); Skiploader (wheel type up to 3/4 yd.   without attachment); Tar pot fireman; Temporary heating   plant operator; Trenching machine oiler   GROUP 3: Asphalt‐rubber blend operator; Bobcat or similar   type (Skid steer); Equipment greaser (rack); Ford Ferguson   (with dragtype attachments); Helicopter radioman (ground);   Stationary pipe wrapping and cleaning machine operator   GROUP 4: Asphalt plant fireman; Backhoe operator (mini‐max or   similar type); Boring machine operator; Boxman or mixerman   (asphalt or concrete); Chip spreading machine operator;   Concrete cleaning decontamination machine operator;   Concrete Pump Operator (small portable); Drilling machine   operator, small auger types (Texoma super economatic or   similar types ‐ Hughes 100 or 200 or similar types ‐   drilling depth of 30' maximum); Equipment greaser (grease   truck); Guard rail post driver operator; Highline cableway   signalman; Hydra‐hammer‐aero stomper; Micro Tunneling   (above ground tunnel); Power concrete curing machine   operator; Power concrete saw operator; Power‐driven jumbo   form setter operator; Power sweeper operator; Rock Wheel   Saw/Trencher; Roller operator (compacting); Screed operator   (asphalt or concrete); Trenching machine operator (up to 6   ft.); Vacuum or much truck   GROUP 5: Equipment Greaser (Grease Truck/Multi Shift).    GROUP 6: Articulating material hauler; Asphalt plant   engineer; Batch plant operator; Bit sharpener; Concrete   joint machine operator (canal and similar type); Concrete   planer operator; Dandy digger; Deck engine operator;   Derrickman (oilfield type); Drilling machine operator,   bucket or auger types (Calweld 100 bucket or similar types   ‐ Watson 1000 auger or similar types ‐ Texoma 330, 500 or   600 auger or similar types ‐ drilling depth of 45'   maximum); Drilling machine operator; Hydrographic seeder   machine operator (straw, pulp or seed), Jackson track   maintainer, or similar type; Kalamazoo Switch tamper, or   similar type; Machine tool operator; Maginnis internal full   slab vibrator, Mechanical berm, curb or gutter(concrete or   asphalt); Mechanical finisher operator (concrete,   Clary‐Johnson‐Bidwell or similar); Micro tunnel system   (below ground); Pavement breaker operator (truck mounted);   Road oil mixing machine operator; Roller operator (asphalt   or finish), rubber‐tired earth moving equipment (single   engine, up to and including 25 yds. struck); Self‐propelled   tar pipelining machine operator; Skiploader operator   (crawler and wheel type, over 3/4 yd. and up to and   including 1‐1/2 yds.); Slip form pump operator (power   driven hydraulic lifting device for concrete forms);   Tractor operator‐bulldozer, tamper‐scraper (single engine,   up to 100 h.p. flywheel and similar types, up to and   including D‐5 and similar types); Tugger hoist operator (1   drum); Ultra high pressure waterjet cutting tool system   operator; Vacuum blasting machine operator   GROUP 8: Asphalt or concrete spreading operator (tamping or   finishing); Asphalt paving machine operator (Barber Greene   or similar type); Asphalt‐rubber distribution operator;   Backhoe operator (up to and including 3/4 yd.), small ford,   Case or similar; Cast‐in‐place pipe laying machine   operator; Combination mixer and compressor operator (gunite   work); Compactor operator (self‐propelled); Concrete mixer   operator (paving); Crushing plant operator; Drill Doctor;   Drilling machine operator, Bucket or auger types (Calweld   150 bucket or similar types ‐ Watson 1500, 2000 2500 auger   or similar types ‐ Texoma 700, 800 auger or similar types ‐   drilling depth of 60' maximum); Elevating grader operator;   Grade checker; Gradall operator; Grouting machine operator;   Heavy‐duty repairman; Heavy equipment robotics operator;   Kalamazoo balliste regulator or similar type; Kolman belt   loader and similar type; Le Tourneau blob compactor or   similar type; Loader operator (Athey, Euclid, Sierra and   similar types); Mobark Chipper or similar; Ozzie padder or   similar types; P.C. slot saw; Pneumatic concrete placing   machine operator (Hackley‐Presswell or similar type);   Pumpcrete gun operator; Rock Drill or similar types; Rotary   drill operator (excluding caisson type); Rubber‐tired   earth‐moving equipment operator (single engine,   caterpillar, Euclid, Athey Wagon and similar types with any   and all attachments over 25 yds. up to and including 50 cu.   yds. struck); Rubber‐tired earth‐moving equipment operator   (multiple engine up to and including 25 yds. struck);   Rubber‐tired scraper operator (self‐loading paddle wheel   type‐John Deere, 1040 and similar single unit); Self‐   propelled curb and gutter machine operator; Shuttle buggy;   Skiploader operator (crawler and wheel type over 1‐1/2 yds.   up to and including 6‐1/2 yds.); Soil remediation plant   operator; Surface heaters and planer operator; Tractor   compressor drill combination operator; Tractor operator   (any type larger than D‐5 ‐ 100 flywheel h.p. and over, or   similar‐bulldozer, tamper, scraper and push tractor single   engine); Tractor operator (boom attachments), Traveling   pipe wrapping, cleaning and bendng machine operator;   Trenching machine operator (over 6 ft. depth capacity,   manufacturer's rating); trenching Machine with Road Miner   attachment (over 6 ft depth capacity): Ultra high pressure   waterjet cutting tool system mechanic; Water pull   (compaction) operator GROUP 9: Heavy Duty Repairman   GROUP 10: Drilling machine operator, Bucket or auger types   (Calweld 200 B bucket or similar types‐Watson 3000 or 5000   auger or similar types‐Texoma 900 auger or similar   types‐drilling depth of 105' maximum); Dual drum mixer,   dynamic compactor LDC350 (or similar types); Monorail   locomotive operator (diesel, gas or electric); Motor   patrol‐blade operator (single engine); Multiple engine   tractor operator (Euclid and similar type‐except Quad 9   cat.); Rubber‐tired earth‐moving equipment operator (single   engine, over 50 yds. struck); Pneumatic pipe ramming tool   and similar types; Prestressed wrapping machine operator;   Rubber‐tired earth‐moving equipment operator (single   engine, over 50 yds. struck); Rubber tired earth moving   equipment operator (multiple engine, Euclid, caterpillar   and similar over 25 yds. and up to 50 yds. struck), Tower   crane repairman; Tractor loader operator (crawler and wheel   type over 6‐1/2 yds.); Woods mixer operator (and similar   Pugmill equipment)   GROUP 11: Heavy Duty Repairman ‐ Welder Combination, Welder ‐   Certified.   GROUP 12: Auto grader operator; Automatic slip form operator;   Drilling machine operator, bucket or auger types (Calweld,   auger 200 CA or similar types ‐ Watson, auger 6000 or   similar types ‐ Hughes Super Duty, auger 200 or similar   types ‐ drilling depth of 175' maximum); Hoe ram or similar   with compressor; Mass excavator operator less tha 750 cu.   yards; Mechanical finishing machine operator; Mobile form   traveler operator; Motor patrol operator (multi‐engine);   Pipe mobile machine operator; Rubber‐tired earth‐ moving   equipment operator (multiple engine, Euclid, Caterpillar   and similar type, over 50 cu. yds. struck); Rubber‐tired   self‐ loading scraper operator (paddle‐wheel‐auger type   self‐loading ‐ two (2) or more units)   GROUP 13: Rubber‐tired earth‐moving equipment operator   operating equipment with push‐pull system (single engine,   up to and including 25 yds. struck)   GROUP 14: Canal liner operator; Canal trimmer operator;   Remote‐ control earth‐moving equipment operator (operating   a second piece of equipment: $1.00 per hour additional);   Wheel excavator operator (over 750 cu. yds.)   GROUP 15: Rubber‐tired earth‐moving equipment operator,   operating equipment with push‐pull system (single engine,   Caterpillar, Euclid, Athey Wagon and similar types with any   and all attachments over 25 yds. and up to and including 50   yds. struck); Rubber‐tired earth‐moving equipment operator,   operating equipment with push‐pull system (multiple   engine‐up to and including 25 yds. struck)   GROUP 16: Rubber‐tired earth‐moving equipment operator,   operating equipment with push‐pull system (single engine,   over 50 yds. struck); Rubber‐tired earth‐moving equipment   operator, operating equipment with push‐pull system   (multiple engine, Euclid, Caterpillar and similar, over 25   yds. and up to 50 yds. struck)   GROUP 17: Rubber‐tired earth‐moving equipment operator,   operating equipment with push‐pull system (multiple engine,   Euclid, Caterpillar and similar, over 50 cu. yds. struck);   Tandem tractor operator (operating crawler type tractors in   tandem ‐ Quad 9 and similar type)   GROUP 18: Rubber‐tired earth‐moving equipment operator,   operating in tandem (scrapers, belly dumps and similar   types in any combination, excluding compaction units ‐   single engine, up to and including 25 yds. struck)   GROUP 19: Rotex concrete belt operator (or similar types);   Rubber‐tired earth‐moving equipment operator, operating in   tandem (scrapers, belly dumps and similar types in any   combination, excluding compaction units ‐ single engine,   Caterpillar, Euclid, Athey Wagon and similar types with any   and all attachments over 25 yds.and up to and including 50   cu. yds. struck); Rubber‐tired earth‐moving equipment   operator, operating in tandem (scrapers, belly dumps and   similar types in any combination, excluding compaction   units ‐ multiple engine, up to and including 25 yds. struck)   GROUP 20: Rubber‐tired earth‐moving equipment operator,   operating in tandem (scrapers, belly dumps and similar   types in any combination, excluding compaction units ‐   single engine, over 50 yds. struck); Rubber‐tired   earth‐moving equipment operator, operating in tandem   (scrapers, belly dumps, and similar types in any   combination, excluding compaction units ‐ multiple engine,   Euclid, Caterpillar and similar, over 25 yds. and up to 50   yds. struck)   GROUP 21: Rubber‐tired earth‐moving equipment operator,   operating in tandem (scrapers, belly dumps and similar   types in any combination, excluding compaction units ‐   multiple engine, Euclid, Caterpillar and similar type, over   50 cu. yds. struck)   GROUP 22: Rubber‐tired earth‐moving equipment operator,   operating equipment with the tandem push‐pull system   (single engine, up to and including 25 yds. struck)   GROUP 23: Rubber‐tired earth‐moving equipment operator,   operating equipment with the tandem push‐pull system   (single engine, Caterpillar, Euclid, Athey Wagon and   similar types with any and all attachments over 25 yds. and   up to and including 50 yds. struck); Rubber‐tired   earth‐moving equipment operator, operating with the tandem   push‐pull system (multiple engine, up to and including 25   yds. struck)   GROUP 24: Rubber‐tired earth‐moving equipment operator,   operating equipment with the tandem push‐pull system   (single engine, over 50 yds. struck); Rubber‐tired   earth‐moving equipment operator, operating equipment with   the tandem push‐pull system (multiple engine, Euclid,   Caterpillar and similar, over 25 yds. and up to 50 yds.   struck)   GROUP 25: Concrete pump operator‐truck mounted; Rubber‐tired   earth‐moving equipment operator, operating equipment with   the tandem push‐pull system (multiple engine, Euclid,   Caterpillar and similar type, over 50 cu. yds. struck) CRANES, PILEDRIVING AND HOISTING EQUIPMENT CLASSIFICATIONS     GROUP 1: Engineer oiler; Fork lift operator (includes loed,   lull   or similar types) GROUP 2: Truck crane oiler     GROUP 3: A‐frame or winch truck operator; Ross carrier   operator (jobsite)   GROUP 4: Bridge‐type unloader and turntable operator;   Helicopter hoist operator   GROUP 5:  Hydraulic boom truck; Stinger crane (Austin‐Western   or similar type); Tugger hoist operator (1 drum)   GROUP 6: Bridge crane operator; Cretor crane operator; Hoist   operator (Chicago boom and similar type); Lift mobile   operator; Lift slab machine operator (Vagtborg and similar   types); Material hoist and/or manlift operator; Polar   gantry crane operator; Self Climbing scaffold (or similar   type); Shovel, backhoe, dragline, clamshell operator (over   3/4 yd. and up to 5 cu. yds. mrc); Tugger hoist operator   GROUP 7: Pedestal crane operator; Shovel, backhoe, dragline,   clamshell operator (over 5 cu. yds. mrc); Tower crane   repair; Tugger hoist operator (3 drum)   GROUP 8: Crane operator (up to and including 25 ton   capacity); Crawler transporter operator; Derrick barge   operator (up to and including 25 ton capacity); Hoist   operator, stiff legs, Guy derrick or similar type (up to   and including 25 ton capacity); Shovel, backhoe, dragline,   clamshell operator (over 7 cu. yds., M.R.C.)   GROUP 9: Crane operator (over 25 tons and up to and including   50 tons mrc); Derrick barge operator (over 25 tons up to   and including 50 tons mrc); Highline cableway operator;   Hoist operator, stiff legs, Guy derrick or similar type   (over 25 tons up to and including 50 tons mrc); K‐crane   operator; Polar crane operator; Self erecting tower crane   operator maximum lifting capacity ten tons   GROUP 10: Crane operator (over 50 tons and up to and   including 100 tons mrc); Derrick barge operator (over 50   tons up to and including 100 tons mrc); Hoist operator,   stiff legs, Guy derrick or similar type (over 50 tons up to   and including 100 tons mrc), Mobile tower crane operator   (over 50 tons, up to and including 100 tons M.R.C.); Tower   crane operator and tower gantry   GROUP 11: Crane operator (over 100 tons and up to and   including 200 tons mrc); Derrick barge operator (over 100   tons up to and including 200 tons mrc); Hoist operator,   stiff legs, Guy derrick or similar type (over 100 tons up   to and including 200 tons mrc); Mobile tower crane operator   (over 100 tons up to and including 200 tons mrc)   GROUP 12: Crane operator (over 200 tons up to and including   300 tons mrc); Derrick barge operator (over 200 tons up to   and including 300 tons mrc); Hoist operator, stiff legs,   Guy derrick or similar type (over 200 tons, up to and   including 300 tons mrc); Mobile tower crane operator (over   200 tons, up to and including 300 tons mrc)   GROUP 13: Crane operator (over 300 tons); Derrick barge   operator (over 300 tons); Helicopter pilot; Hoist operator,   stiff legs, Guy derrick or similar type (over 300 tons);   Mobile tower crane operator (over 300 tons) TUNNEL CLASSIFICATIONS     GROUP 1: Skiploader (wheel type up to 3/4 yd. without   attachment) GROUP 2: Power‐driven jumbo form setter operator     GROUP 3: Dinkey locomotive or motorperson (up to and   including 10 tons)   GROUP 4: Bit sharpener; Equipment greaser (grease truck);   Slip form pump operator (power‐driven hydraulic lifting   device for concrete forms); Tugger hoist operator (1 drum);   Tunnel locomotive operator (over 10 and up to and including   30 tons)   GROUP 5: Backhoe operator (up to and including 3/4 yd.);   Small Ford, Case or similar; Drill doctor; Grouting machine   operator; Heading shield operator; Heavy‐duty repairperson;   Loader operator (Athey, Euclid, Sierra and similar types);   Mucking machine operator (1/4 yd., rubber‐tired, rail or   track type); Pneumatic concrete placing machine operator   (Hackley‐Presswell or similar type); Pneumatic heading   shield (tunnel); Pumpcrete gun operator; Tractor compressor   drill combination operator; Tugger hoist operator (2 drum);   Tunnel locomotive operator (over 30 tons) GROUP 6: Heavy Duty Repairman   GROUP 7:  Tunnel mole boring machine operator ENGINEERS ZONES $1.00 additional per hour for all of IMPERIAL County and the portions of KERN, RIVERSIDE & SAN BERNARDINO Counties as defined below: That area within the following Boundary:  Begin in San Bernardino County, approximately 3 miles NE of the intersection of I‐15 and the California State line at that point which is the NW corner of Section 1, T17N,m R14E, San Bernardino Meridian.  Continue W in a straight line to that point which is the SW corner of the northwest quarter of Section 6, T27S, R42E, Mt. Diablo Meridian.  Continue North to the intersection with the Inyo County Boundary at that point which is the NE corner of the western half of the northern quarter of Section 6, T25S, R42E, MDM.  Continue W along the Inyo and San Bernardino County boundary until the intersection with Kern County, as that point which is the SE corner of Section 34, T24S, R40E, MDM.  Continue W along the Inyo and Kern County boundary until the intersection with Tulare County, at that point which is the SW corner of the SE quarter of Section 32, T24S, R37E, MDM.  Continue W along the Kern and Tulare County boundary, until that point which is the NW corner of T25S, R32E, MDM.  Continue S following R32E lines to the NW corner of T31S, R32E, MDM.  Continue W to the NW corner of T31S, R31E, MDM.  Continue S to the SW corner of T32S, R31E, MDM.  Continue W to SW corner of SE quarter of Section 34, T32S, R30E, MDM. Continue S to SW corner of T11N, R17W, SBM.  Continue E along south boundary of T11N, SBM to SW corner of T11N, R7W, SBM. Continue S to SW corner of T9N, R7W, SBM.  Continue E along south boundary of T9N, SBM to SW corner of T9N, R1E, SBM. Continue S along west boundary of R1E, SMB to Riverside County line at the SW corner of T1S, R1E, SBM.  Continue E along south boundary of T1s, SBM (Riverside County Line) to SW corner of T1S, R10E, SBM.  Continue S along west boundary of R10E, SBM to Imperial County line at the SW corner of T8S, R10E, SBM. Continue W along Imperial and Riverside county line to NW corner of T9S, R9E, SBM.  Continue S along the boundary between Imperial and San Diego Counties, along the west edge of R9E, SBM to the south boundary of Imperial County/California state line.  Follow the California state line west to Arizona state line, then north to Nevada state line, then continuing NW back to start at the point which is the NW corner of Section 1, T17N, R14E, SBM $1.00 additional per hour for portions of SAN LUIS OBISPO, KERN, SANTA BARBARA & VENTURA as defined below:   That area within the following Boundary:  Begin approximately 5 miles north of the community of Cholame, on the Monterey County and San Luis Obispo County boundary at the NW corner of T25S, R16E, Mt. Diablo Meridian.  Continue south along the west side of R16E to the SW corner of T30S, R16E, MDM.  Continue E to SW corner of T30S, R17E, MDM.  Continue S to SW corner of T31S, R17E, MDM.  Continue E to SW corner of T31S, R18E, MDM. Continue S along West side of R18E, MDM as it crosses into San Bernardino Meridian numbering area and becomes R30W.  Follow the west side of R30W, SBM to the SW corner of T9N, R30W, SBM. Continue E along the south edge of T9N, SBM to the Santa Barbara County and Ventura County boundary at that point whch is the SW corner of Section 34.T9N, R24W, SBM, continue S along the Ventura County line to that point which is the SW corner of the SE quarter of Section 32, T7N, R24W, SBM.   Continue E along the south edge of T7N, SBM to the SE corner to T7N, R21W, SBM.  Continue N along East side of R21W, SBM to Ventura County and Kern County boundary at the NE corner of T8N, R21W. Continue W along the Ventura County and Kern County boundary to the SE corner of T9N, R21W.  Continue North along the East edge of R21W, SBM to the NE corner of T12N, R21W, SBM.  Continue West along the north edge of T12N, SBM to the SE corner of T32S, R21E, MDM. [T12N SBM is a think strip between T11N SBM and T32S MDM]. Continue North along the East side of R21E, MDM to the Kings County and Kern County border at the NE corner of T25S, R21E, MDM, continue West along the Kings County and Kern County Boundary until the intersection of San Luis Obispo County.  Continue west along the Kings County and San Luis Obispo County boundary until the intersection with Monterey County.  Continue West along the Monterey County and San Luis Obispo County boundary to the beginning point at the NW corner of T25S, R16E, MDM.   $2.00 additional per hour for INYO and MONO Counties and the Northern portion of SAN BERNARDINO County as defined below: That area within the following Boundary:  Begin at the intersection of the northern boundary of Mono County and the California state line at the point which is the center of Section 17, T10N, R22E, Mt. Diablo Meridian.  Continue S then SE along the entire western boundary of Mono County, until it reaches Inyo County at the point which is the NE corner of the Western half of the NW quarter of Section 2, T8S, R29E, MDM. Continue SSE along the entire western boundary of Inyo County, until the intersection with Kern County at the point which is the SW corner of the SE 1/4 of Section 32, T24S, R37E, MDM. Continue E along the Inyo and Kern County boundary until the intersection with San Bernardino County at that point which is the SE corner of section 34, T24S, R40E, MDM.  Continue E along the Inyo and San Bernardino County boundary until the point which is the NE corner of the Western half of the NW quarter of Section 6, T25S, R42E, MDM.  Continue S to that point which is the SW corner of the NW quarter of Section 6, T27S, R42E, MDM. Continue E in a straight line to the California and Nevada state border at the point which is the NW corner of Section 1, T17N, R14E, San Bernardino Meridian.  Then continue NW along the state line to the starting point, which is the center of Section 18, T10N, R22E, MDM. REMAINING AREA NOT DEFINED ABOVE RECIEVES BASE RATE ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐  ENGI0012‐004 08/01/2020                                   Rates          Fringes OPERATOR:  Power Equipment    (DREDGING)        (1) Leverman................$ 56.40            30.00      (2) Dredge dozer............$ 50.43            30.00      (3) Deckmate................$ 50.32            30.00      (4) Winch operator (stern       winch on dredge)............$ 49.77            30.00      (5) Fireman‐Oiler,       Deckhand, Bargeman,       Leveehand...................$ 49.23            30.00      (6) Barge Mate..............$ 49.84            30.00 ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐  IRON0433‐006 07/01/2020                                   Rates          Fringes IRONWORKER        Fence Erector...............$ 34.58            24.81      Ornamental, Reinforcing       and Structural..............$ 41.00            33.45 PREMIUM PAY: $6.00 additional per hour at the following locations: China Lake Naval Test Station, Chocolate Mountains Naval Reserve‐Niland, Edwards AFB, Fort Irwin Military Station, Fort Irwin Training Center‐Goldstone, San Clemente Island, San Nicholas Island, Susanville Federal Prison, 29 Palms ‐ Marine Corps, U.S. Marine Base ‐ Barstow, U.S. Naval Air Facility ‐ Sealey, Vandenberg AFB $4.00 additional per hour at the following locations: Army Defense Language Institute ‐ Monterey, Fallon Air Base, Naval Post Graduate School ‐ Monterey, Yermo Marine Corps Logistics Center $2.00 additional per hour at the following locations: Port Hueneme, Port Mugu, U.S. Coast Guard Station ‐ Two Rock ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ * LABO0300‐005 08/01/2022                                   Rates          Fringes Asbestos Removal Laborer.........$ 39.23            23.28   SCOPE OF WORK:  Includes site mobilization, initial site   cleanup, site preparation, removal of asbestos‐containing   material and toxic waste, encapsulation, enclosure and   disposal of asbestos‐ containing materials and toxic waste   by hand or with equipment or machinery; scaffolding,   fabrication of temporary wooden barriers and assembly of   decontamination stations. ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐  LABO0345‐001 07/01/2022                                   Rates          Fringes LABORER (GUNITE)        GROUP 1.....................$ 48.50            21.37      GROUP 2.....................$ 47.55            21.37      GROUP 3.....................$ 44.01            21.37   FOOTNOTE: GUNITE PREMIUM PAY:   Workers working from a   Bosn'n's Chair or suspended from a  rope or cable shall   receive 40 cents per hour above the foregoing applicable   classification rates.   Workers doing gunite and/or   shotcrete work in a tunnel shall  receive 35 cents per hour   above the foregoing applicable classification rates, paid   on a portal‐to‐portal basis.   Any work performed on, in or   above any smoke stack, silo, storage elevator or similar   type of structure, when such  structure is in excess of   75'‐0"" above base level and which work must be performed in   whole or in part more than 75'‐0"" above base level, that   work performed above the 75'‐0"" level  shall be compensated   for at 35 cents per hour above the  applicable   classification wage rate. GUNITE LABORER CLASSIFICATIONS  GROUP 1: Rodmen, Nozzlemen  GROUP 2: Gunmen  GROUP 3: Reboundmen ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐  LABO1184‐001 07/01/2022                                   Rates          Fringes Laborers: (HORIZONTAL    DIRECTIONAL DRILLING)        (1) Drilling Crew Laborer...$ 40.69            18.25      (2) Vehicle Operator/Hauler.$ 40.86            18.25      (3) Horizontal Directional       Drill Operator..............$ 42.71            18.25      (4) Electronic Tracking       Locator.....................$ 44.71            18.25 Laborers: (STRIPING/SLURRY    SEAL)        GROUP 1.....................$ 41.90            21.32      GROUP 2.....................$ 43.20            21.32      GROUP 3.....................$ 45.21            21.32      GROUP 4.....................$ 46.95            21.32 LABORERS ‐ STRIPING CLASSIFICATIONS     GROUP 1: Protective coating, pavement sealing, including   repair and filling of cracks by any method on any surface   in parking lots, game courts and playgrounds; carstops;   operation of all related machinery and equipment; equipment   repair technician   GROUP 2: Traffic surface abrasive blaster; pot tender ‐   removal of all traffic lines and markings by any method   (sandblasting, waterblasting, grinding, etc.) and   preparation of surface for coatings.  Traffic control   person: controlling and directing traffic through both   conventional and moving lane closures; operation of all   related machinery and equipment   GROUP 3: Traffic delineating device applicator: Layout and   application of pavement markers, delineating signs, rumble   and traffic bars, adhesives, guide markers, other traffic   delineating devices including traffic control. This   category includes all traffic related surface preparation   (sandblasting, waterblasting, grinding) as part of the   application process. Traffic protective delineating system   installer: removes, relocates, installs, permanently   affixed roadside and parking delineation barricades,   fencing, cable anchor, guard rail, reference signs,   monument markers; operation of all related machinery and   equipment; power broom sweeper   GROUP 4: Striper: layout and application of traffic stripes   and markings; hot thermo plastic; tape traffic stripes and   markings, including traffic control; operation of all   related machinery and equipment ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ * LABO1184‐002 07/01/2022                                   Rates          Fringes LABORER (TUNNEL)        GROUP 1.....................$ 45.68            23.30      GROUP 2.....................$ 46.00            23.30      GROUP 3.....................$ 46.46            23.30      GROUP 4.....................$ 47.15            23.30 LABORER        GROUP 1.....................$ 36.39            21.04      GROUP 2.....................$ 36.94            21.04      GROUP 3.....................$ 37.49            21.04      GROUP 4.....................$ 39.04            21.04      GROUP 5.....................$ 39.39            21.04 LABORER CLASSIFICATIONS     GROUP 1: Cleaning and handling of panel forms; Concrete   screeding for rough strike‐off; Concrete, water curing;   Demolition laborer, the cleaning of brick if performed by a   worker performing any other phase of demolition work, and   the cleaning of lumber; Fire watcher, limber, brush loader,   piler and debris handler; Flag person; Gas, oil and/or   water pipeline laborer; Laborer, asphalt‐rubber material   loader; Laborer, general or construction; Laborer, general   clean‐up; Laborer, landscaping; Laborer, jetting; Laborer,   temporary water and air lines; Material hose operator   (walls, slabs, floors and decks); Plugging, filling of shee   bolt holes; Dry packing of concrete; Railroad maintenance,   repair track person and road beds; Streetcar and railroad   construction track laborers; Rigging and signaling; Scaler;   Slip form raiser; Tar and mortar; Tool crib or tool house   laborer; Traffic control by any method; Window cleaner;   Wire mesh pulling ‐ all concrete pouring operations   GROUP 2:  Asphalt shoveler; Cement dumper (on 1 yd. or larger   mixer and handling bulk cement); Cesspool digger and   installer; Chucktender; Chute handler, pouring concrete,   the handling of the chute from readymix trucks, such as   walls, slabs, decks, floors, foundation, footings, curbs,   gutters and sidewalks; Concrete curer, impervious membrane   and form oiler; Cutting torch operator (demolition); Fine   grader, highways and street paving, airport, runways and   similar type heavy construction; Gas, oil and/or water   pipeline wrapper ‐ pot tender and form person; Guinea   chaser; Headerboard person ‐ asphalt; Laborer, packing rod   steel and pans; Membrane vapor barrier installer; Power   broom sweeper (small); Riprap stonepaver, placing stone or   wet sacked concrete; Roto scraper and tiller; Sandblaster   (pot tender); Septic tank digger and installer(lead); Tank   scaler and cleaner; Tree climber, faller, chain saw   operator, Pittsburgh chipper and similar type brush   shredder; Underground laborer, including caisson bellower   GROUP 3: Buggymobile person; Concrete cutting torch; Concrete   pile cutter; Driller, jackhammer, 2‐1/2 ft. drill steel or   longer; Dri‐pak‐it machine; Gas, oil and/or water pipeline   wrapper, 6‐in. pipe and over, by any method, inside and   out; High scaler (including drilling of same); Hydro seeder   and similar type; Impact wrench multi‐plate; Kettle person,   pot person and workers applying asphalt, lay‐kold,   creosote, lime caustic and similar type materials   (""applying"" means applying, dipping, brushing or handling   of such materials for pipe wrapping and waterproofing);   Operator of pneumatic, gas, electric tools, vibrating   machine, pavement breaker, air blasting, come‐alongs, and   similar mechanical tools not separately classified herein;   Pipelayer's backup person, coating, grouting, making of   joints, sealing, caulking, diapering and including rubber   gasket joints, pointing and any and all other services;   Rock slinger; Rotary scarifier or multiple head concrete   chipping scarifier; Steel headerboard and guideline setter;   Tamper, Barko, Wacker and similar type; Trenching machine,   hand‐propelled   GROUP 4: Asphalt raker, lute person, ironer, asphalt dump   person, and asphalt spreader boxes (all types); Concrete   core cutter (walls, floors or ceilings), grinder or sander;   Concrete saw person, cutting walls or flat work, scoring   old or new concrete; Cribber, shorer, lagging, sheeting and   trench bracing, hand‐guided lagging hammer; Head rock   slinger; Laborer, asphalt‐ rubber distributor boot person;   Laser beam in connection with laborers' work; Oversize   concrete vibrator operator, 70 lbs. and over; Pipelayer   performing all services in the laying and installation of   pipe from the point of receiving pipe in the ditch until   completion of operation, including any and all forms of   tubular material, whether pipe, metallic or non‐metallic,   conduit and any other stationary type of tubular device   used for the conveying of any substance or element, whether   water, sewage, solid gas, air, or other product whatsoever   and without regard to the nature of material from which the   tubular material is fabricated; No‐joint pipe and stripping   of same; Prefabricated manhole installer; Sandblaster   (nozzle person), water blasting, Porta Shot‐Blast   GROUP 5: Blaster powder, all work of loading holes, placing   and blasting of all powder and explosives of whatever type,   regardless of method used for such loading and placing;   Driller: All power drills, excluding jackhammer, whether   core, diamond, wagon, track, multiple unit, and any and all   other types of mechanical drills without regard to the form   of motive power; Toxic waste removal TUNNEL LABORER CLASSIFICATIONS     GROUP 1: Batch plant laborer; Changehouse person; Dump   person; Dump person (outside); Swamper (brake person and   switch person on tunnel work); Tunnel materials handling   person; Nipper; Pot tender, using mastic or other materials   (for example, but not by way of limitation, shotcrete, etc.)   GROUP 2: Chucktender, cabletender; Loading and unloading   agitator cars; Vibrator person, jack hammer, pneumatic   tools (except driller);  Bull gang mucker, track person;   Concrete crew, including rodder and spreader   GROUP 3: Blaster, driller, powder person; Chemical grout jet   person; Cherry picker person; Grout gun person; Grout mixer   person; Grout pump person; Jackleg miner; Jumbo person;   Kemper and other pneumatic concrete placer operator; Miner,   tunnel (hand or machine); Nozzle person; Operating of   troweling and/or grouting machines; Powder person (primer   house); Primer person; Sandblaster; Shotcrete person; Steel   form raiser and setter; Timber person, retimber person,   wood or steel; Tunnel Concrete finisher GROUP 4: Diamond driller; Sandblaster; Shaft and raise work ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐  LABO1184‐004 07/01/2022                                   Rates          Fringes Brick Tender.....................$ 37.32            23.18 ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐  LABO1414‐001 08/03/2022                                   Rates          Fringes LABORER        PLASTER CLEAN‐UP LABORER....$ 38.92            23.32      PLASTER TENDER..............$ 41.47            23.32 Work on a swing stage scaffold: $1.00 per hour additional. ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐  PAIN0036‐001 07/01/2020                                   Rates          Fringes Painters: (Including Lead    Abatement)        (1) Repaint (excludes San       Diego County)...............$ 29.59            17.12      (2) All Other Work..........$ 33.12            17.24   REPAINT of any previously painted structure.  Exceptions:   work involving the aerospace industry, breweries,   commercial recreational facilities, hotels which operate   commercial establishments as part of hotel service, and   sports facilities. ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐  PAIN0036‐008 10/01/2021                                   Rates          Fringes DRYWALL FINISHER/TAPER...........$ 43.63            22.92 ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐  PAIN0036‐015 01/01/2020                                   Rates          Fringes GLAZIER..........................$ 43.45            23.39   FOOTNOTE:  Additional $1.25 per hour for work in a condor,   from the third (3rd) floor and up  Additional $1.25 per   hour for work on the outside  of the building from a swing   stage or any suspended contrivance, from the ground up ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐  PLAS0200‐009 08/03/2022                                   Rates          Fringes PLASTERER........................$ 47.37            19.64 ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐  PLAS0500‐002 07/01/2020                                   Rates          Fringes CEMENT MASON/CONCRETE FINISHER...$ 38.50            25.91 ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ * PLUM0016‐001 09/01/2022                                   Rates          Fringes PLUMBER/PIPEFITTER        Work ONLY on new additions       and remodeling of bars,       restaurant, stores and       commercial buildings not       to exceed 5,000 sq. ft. of       floor space.................$ 53.51            25.28      Work ONLY on strip malls,       light commercial, tenant       improvement and remodel       work........................$ 40.95            23.61      All other work except work       on new additions and       remodeling of bars,       restaurant, stores and       commercial buildings not       to exceed 5,000 sq. ft. of       floor space and work on       strip malls, light       commercial, tenant       improvement and remodel       work........................$ 55.18            26.26 ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ * PLUM0345‐001 09/01/2022                                   Rates          Fringes PLUMBER        Landscape/Irrigation Fitter.$ 38.20            25.65      Sewer & Storm Drain Work....$ 42.29            23.03 ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐  ROOF0036‐002 08/01/2022                                   Rates          Fringes ROOFER...........................$ 43.47            19.52   FOOTNOTE: Pitch premium: Work on which employees are exposed   to pitch fumes or required to handle pitch, pitch base or   pitch impregnated products, or any material containing coal   tar pitch, the entire roofing crew shall receive $1.75 per   hour ""pitch premium"" pay. ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐  SFCA0669‐002 01/01/2022                                   Rates          Fringes SPRINKLER FITTER.................$ 41.27            26.77 ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐  SHEE0105‐003 01/01/2022 LOS ANGELES (South of a straight line drawn between Gorman and Big Pines)and Catalina Island, INYO, KERN (Northeast part, East of Hwy 395), MONO ORANGE, RIVERSIDE, AND SAN BERNARDINO COUNTIES                                   Rates          Fringes SHEET METAL WORKER        (1) Commercial ‐ New       Construction and Remodel       work........................$ 50.23            29.60      (2) Industrial work       including air pollution       control systems, noise       abatement, hand rails,       guard rails, excluding       aritechtural sheet metal       work, excluding A‐C,       heating, ventilating       systems for human comfort...$ 48.28            29.46 ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐  TEAM0011‐002 07/01/2020                                   Rates          Fringes TRUCK DRIVER        GROUP  1....................$ 32.59            30.59      GROUP  2....................$ 32.74            30.59      GROUP  3....................$ 32.87            30.59      GROUP  4....................$ 33.06            30.59      GROUP  5....................$ 33.09            30.59      GROUP  6....................$ 33.12            30.59      GROUP  7....................$ 33.37            30.59      GROUP  8....................$ 33.62            30.59      GROUP  9....................$ 33.82            30.59      GROUP 10....................$ 34.12            30.59      GROUP 11....................$ 34.62            30.59      GROUP 12....................$ 35.05            30.59 WORK ON ALL MILITARY BASES: PREMIUM PAY:  $3.00 per hour additional.   [29 palms Marine Base, Camp Roberts, China Lake, Edwards AFB,   El Centro Naval Facility, Fort Irwin, Marine Corps   Logistics Base at Nebo & Yermo, Mountain Warfare Training   Center, Bridgeport,   Point Arguello, Point Conception,   Vandenberg AFB] TRUCK DRIVERS CLASSIFICATIONS   GROUP 1: Truck driver     GROUP 2: Driver of vehicle or combination of vehicles ‐ 2   axles; Traffic control pilot car excluding moving heavy   equipment permit load; Truck mounted broom   GROUP 3: Driver of vehicle or combination of vehicles ‐ 3   axles; Boot person; Cement mason distribution truck;  Fuel   truck driver; Water truck ‐ 2 axle; Dump truck, less than   16 yds. water level; Erosion control driver   GROUP 4: Driver of transit mix truck, under 3 yds.; Dumpcrete   truck, less than 6‐1/2 yds. water level   GROUP 5: Water truck, 3 or more axles; Truck greaser and tire   person ($0.50 additional for tire person); Pipeline and   utility working truck driver, including winch truck and   plastic fusion, limited to pipeline and utility work;   Slurry truck driver   GROUP 6: Transit mix truck, 3 yds. or more; Dumpcrete truck,   6‐1/2 yds. water level and over; Vehicle or combination of   vehicles ‐ 4 or more axles; Oil spreader truck; Dump truck,   16 yds. to 25 yds. water level   GROUP 7: A Frame, Swedish crane or similar; Forklift driver;   Ross carrier driver   GROUP 8: Dump truck, 25 yds. to 49 yds. water level; Truck   repair person; Water pull ‐ single engine; Welder   GROUP 9: Truck repair person/welder; Low bed driver, 9 axles   or over   GROUP 10: Dump truck ‐ 50 yds. or more water level; Water   pull ‐ single engine with attachment   GROUP 11: Water pull ‐ twin engine; Water pull ‐ twin engine   with attachments; Winch truck driver ‐ $1.25 additional   when operating winch or similar special attachments GROUP 12: Boom Truck 17K and above ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ WELDERS ‐ Receive rate prescribed for craft performing operation to which welding is incidental. ================================================================ Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis‐Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017.  If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year. Employees must be permitted to use paid sick leave for their own illness, injury or other health‐related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health‐related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking.  Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government‐contracts. Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate). Union Rate Identifiers A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example: PLUM0198‐005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014. Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate. Survey Rate Identifiers Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification.  As this weighted average rate includes all rates reported in the survey, it may include both union and non‐union rates. Example: SULA2012‐007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier. Survey wage rates are not updated and remain in effect until a new survey is conducted. Union Average Rate Identifiers Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG‐OH‐0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier. A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based. ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐                    WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: *  an existing published wage determination *  a survey underlying a wage determination *  a Wage and Hour Division letter setting forth a position on    a wage determination matter *  a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour National Office because National Office has responsibility for the Davis‐Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations.  Write to:             Branch of Construction Wage Determinations             Wage and Hour Division             U.S. Department of Labor             200 Constitution Avenue, N.W.             Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:             Wage and Hour Administrator             U.S. Department of Labor             200 Constitution Avenue, N.W.             Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board).  Write to:             Administrative Review Board             U.S. Department of Labor             200 Constitution Avenue, N.W.             Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. ================================================================           END OF GENERAL DECISIO"