HomeMy WebLinkAbout02-27-2023 Lane Closure Approval Letter OrtizFebruary 17, 2023 Mike Adams Ortiz Enterprises, Inc. 6 Cushing, Suite 200 Irvine, CA 92618 Dear Mr. Adams: I have received your letter on February 15, 2023, requesting permission to work outside of the construction hours established by La Quinta Municipal Code Section 6.08.050, at the Dune Palms Road Bridge, Project no. 2011-05. Exception 2 of the above-mentioned code section allows the issuance of an early work permit under certain specific conditions. It is our determination that a sufficient need exists due to the need to perform sewer improvements in the most efficient manner. Therefore, an full closure is provision of the exception, subject to the following conditions: 1.This permit is only valid for a full lane closure for sewer improvements at the Dune Palms Road Bridge Improvements project, project no. 2011-05. 2.Work hours shall be from 6:30 a.m. to 5:30 p.m. on Monday, February 27, 2023, to Monday, March 13, 2023. All lanes shall be opened no later than 6:30 a.m. on Monday, March 13, 2023. 3.This permit shall be revoked upon receipt by the Public Works Department of any citizen complaint of construction noise occurring during the extended hours granted by this early work permit, or upon violation of any condition of this early work permit. All work not specifically included in the terms of this early work permit shall be performed only during Code-established construction hours or by a separately issued early work permit. Sincerely, Jon McMillen City Manager cc: Bryan McKinney, P.E., Public Works Director / City Engineer La Quinta Police Department Fire Department February 15, 2023 Via e-mail City of La Quinta Public Works Department 78495 Calle Tampico La Quinta, Ca. 92253 Attn: Tom Nowak Re: Dune Palms Bridge Rd. Improvement City of La Quinta Project 2011-05 Ortiz Job No. 234 Log No. 001 Subject: Full Closure of Dune Palms Rd. for Sewer Improvements Dear Mr. Nowak, Per our recent discussions relating to our scheduled work for the sewer relocations, and the necessary traffic control required to complete this work, Ortiz Enterprises, Inc. understands and appreciates the City’s concerns of impact to the public. For background:  As both the 12” sewer and 18” sewer cross existing Dune Palms Road, OEI (and our subcontractor SRK Engineering) anticipated using temporary traffic control to close 1 lane in either direction of Dune Palms Road while installing this sewer work. We anticipated this work to last 5 weeks.  The City has reservations to perform the work in this manner due to the heavy traffic experienced during school hours.  Unfortunately, no other options are available to keep both lanes of Dune Palms Road open during this work. There is not enough room to build a temporary road around the work, due to existing sewer manholes, existing IID poles, and slope paving. This afternoon a concept was proposed by the City to perform this work utilizing a complete closure of Dune Palms Road for a 2 week period, beginning Monday, February 27, 2023. This closure would be in effect 24 hours per day for 2 weeks, uninterrupted. OEI has discussed this option with SRK. Both OEI and SRK are in agreement that this option would be beneficial to all parties involved. At the end of this two-week period all work in the existing Dune Palms Road will be complete. We anticipate that an additional 1 to 1 ½ weeks will remain to complete the sewer work outside of Dune Palms Road, with no traffic control required. OEI will install and maintain all necessary traffic control necessary for the closure of Dune Palms Road (signage, detour signs, etc.) during the two-week closure. Please let us know your thoughts. We have postponed beginning this work until February 27, 2023, hopefully giving the City the time required to approve this concept, and distribute all required notifications. Thank you for your cooperation. Sincerely, Mike Adams Project Manager Ortiz Enterprises, Inc. Cc: Job 234/COLQ/Corr. to file