HomeMy WebLinkAbout03-16-2023 Extended Work Hours for Pile Placement Approval Letter Ortiz - signed March 16, 2023 Mike Adams Ortiz Enterprises, Inc. 6 Cushing, Suite 200 Irvine, CA 92618 Dear Mr. Adams: I have received your letter on March 16, 2023, requesting permission to work outside of the construction hours established by La Quinta Municipal Code Section 6.08.050, at the Dune Palms Road Bridge, Project no. 2011-05. Exception 2 of the above-mentioned code section allows the issuance of an early work permit under certain specific conditions. It is our determination that a sufficient need exists due to the need to complete the pile placement plan safely. With holes excavated, rebar cages placed, and concrete filled, it leaves less days of unfilled shafts. 1. This permit is only valid for the pile placement at the Dune Palms Road Bridge Improvements project, project no. 2011-05. 2. Work hours shall be from 6:00 a.m. to 6:00 p.m. during the pile placement installation only. 3. This permit shall be revoked upon receipt by the Public Works Department of any citizen complaint of construction noise occurring during the extended hours granted by this early work permit, or upon violation of any condition of this early work permit. All work not specifically included in the terms of this early work permit shall be performed only during Code-established construction hours or by a separately issued early work permit. Sincerely, Jon McMillen City Manager cc: Bryan McKinney, P.E., Public Works Director / City Engineer La Quinta Police Department Fire Department March 16, 2023 Via e-mail City of La Quinta Public Works Department 78495 Calle Tampico La Quinta, Ca. 92253 Attn: Tom Nowak, R.E. Re: Dune Palms Bridge Rd. Improvement City of La Quinta Project 2011-05 Ortiz Job No. 234 Log No. 005 Subject: CIDH Pile Placement Plan Dear Mr. Nowak, Attached please find “Pile Placement Plan” for both the 24” and 60” CIDH Piles to be installed on this project. This plan stipulates using a “Wet Hole” method of installation (using slurry) and the use of a minimum 20’ temporary steel casing during the installation of the 60” CIDH Piles. Please reference OEI’s previously submitted RFI #5 which discusses leaving drilled excavations open overnight during the construction of these piles. Additionally, please reference OEI’s RFI #3 which discusses Working Hours during the construction of these piles. The construction of these 60” CIDH Piles (excavation, installing rebar cages, and placing concrete) are a complex and time consuming operation. Although our intentions and hopes are being able to complete the entire installation process of a single pile in a single work shift, we must anticipate working and site conditions that may not allow us to achieve this goal, being prepared to continue on a subsequent work shift. 2 requests – 1. Allow extended work shifts (6:00 am to 6:00 pm) during the construction of the 24” and 60” CIDH piles. 2. Please review the attached “Pile Placement Plan”, specifically relating to the use of slurry in conjunction with a 20’ temporary steel casing at the top of the excavation , and modifying the Contract Specifications (and Addendum #2, Question #11) which requires “No CIDH hole shall be permitted to be left open overnight”. OEI and our subcontractor, Foundation Pile, both understand that the ultimate integrity of the finished piles are contractually required, which is our intent. Safety, to our crews, city representatives, and the public are always a first priority during these operations. Sincerely, Mike Adams Project Manager Ortiz Enterprises, Inc. Cc: Job 234/COLQ/Corr. to file