HomeMy WebLinkAboutCVAG - Request 2 for Amend 2 to Reimburs Agrmt 2011-05 Dune Palms Bridge Project November 16, 2020 Tom Kirk Executive Director Coachella Valley Association of Governments 73-710 Fred Waring Drive, Suite 200 Palm Desert, CA 92260 Subject: Request for Increased Regional Arterial Program Funding for the Dune Palms Road Bridge Spanning the Whitewater River Dear Mr. Kirk, The City of La Quinta respectfully requests the Coachella Valley Association of Governments (CVAG) approve Amendment No. 2 to the Agency Reimbursement Agreement between the City of La Quinta and CVAG for the Design and Construction of a new Bridge over the Whitewater River on Dune Palms Road increasing the Regional Arterial Program Funding Contribution for the new Bridge from $1,506,750 to $5,395,230, an increase of $3,888,480. It also requests Amendment 2 extend the term of the Agency Reimbursement Agreement through December 2024. CVAG previously authorized and obligated the following: Original Reimbursement Agreement, dated 12-03-2003 $1,506,750 Amendment 1, Dune Palms Road Widening, dated 09-16-2016 $1,862,250 Total CVAG Funding Authorization to date: $3,369,000 The Dune Palms Road widening between Blackhawk Way and the new bridge approach is complete. The CVAG funding provided as part of Amendment 1 has been expended and reimbursed by CVAG. The new bridge project is partially funded with Surface Transportation Program (STP) funds through the State’s Highway Bridge Program (HBP). The HBP will now provide 88.53%, up to $17,652,222, toward “participating costs” associated with the proposed all weather bridge spanning the Whitewater River on Dune Palms Road. The following represents the estimated project budget and proposed funding shares for the new bridge: Phase Estimated Cost New Bridge Federal Funding (Caltrans-HBP) Non-Participating Plus Local Share Engineering/Design $1,750,000 $1,549,275 $200,275 Right of Way $1,570,554 $1,166,825 $403,729 Construction $16,695,276 $11,241,037 $5,454,239 Const. Engineering $2,504,292 $2,217,050 $287,242 Contingency $1,669,530 $1,478,035 $191,495 Total Costs: $24,189,652 $17,652,222 $6,537,430 Caltrans-HBP Funding Share: $17,652,222 City of La Quinta Funding Share: $1,084,100 *CVAG Funding Share: $5,395,230 CVWD Funding Share: $58,100 Total Cost: $24,189,652 *CVAG’s Funding Share includes 100% of the requested CV Link Project Components estimated at $2,142,930.00. The detailed cost estimate for the CV Link Components is attached for your reference. The costs presented were prepared using the actual bid information CVAG obtained from bidders during its recent bid advertisement and award of the CV Link. The increased project costs of the bridge are primarily due to increases in construction and right-of-way costs, along with the addition of the CVAG requested CV Link Elements. The original construction cost estimates were prepared in conjunction with the original HBP Funding Application in 2011. The original right- of-way cost did not anticipate the need for eminent domain proceedings due to an uncooperative property owner on the northeast corner. The original cost estimate did not anticipate the enhanced CV Link project elements requested by CVAG. The City of La Quinta is finalizing the right-of-way phase and anticipates having a shovel ready project by March 2021. Construction is expected to begin as early as June or July 2021. CITY OF LA QUINTAPrinted on: November 12, 2020 at 1:52 PMDune Palms Road Bridge ImprovementsEngineer's Estimate100% Mylar Screen Check Submittal - CV Link Elements OnlyITEM NO.ITEM UNITESTIMATED UNIT PRICE ESTIMATED QUANTITY AMOUNT ESTIMATED QUANTITY AMOUNT NOTES1 Sawcut & Remove Conc. Slope ProtectionSF3.50 25,600 89,600.00 15,800 55,300.002Clearing and Grubbing LS 216,600.001 216,600.001 2,500.00 18" Storm Drain Outlet, west of DPRd3 Concrete Slope ProtectionCY500.00 1,970 985,000.00899 449,500.00 Inlcudes southern full length and undercrossing4 18" Storm Drain OutletEA 14,000.001 14,000.001 14,000.00 18" Storm Drain Outlet, west of DPRd5 18" HDPE, N-12 WT Joint SD PipeLF65.0058 3,770.0058 3,770.00 18" Storm Drain Outlet, west of DPRd6 Class 2 Aggregate Base (T = 4") (Trail)SF1.00 9,585 9,585.009,585 9,585.007 Concrete Trail (T = 6")SF10.00 9,585 95,850.009,585 95,850.00 Secondary trail concrete8 Curb Ramp (Case B)EA7,500.002 15,000.002 15,000.009 Metal Railing (Trail Retaining Walls)LF750.00274 205,500.00274 205,500.0010 Metal Railing (Trail Undercrossing)LF810.00730 591,300.00730 591,300.0011 Install City Furnished In Pavement Solar LightsEA300.0018 5,400.0018 5,400.0012 Thermoplastic Banding (Undercrossing)SF43.00 1,588 68,284.001,588 68,284.0013 6" Solid White Stripe (Paint) (Trail)LF2.40210 504.00210504.00 Undercrossing trail section.14 Paint Bridge Soffit & Exterior GirderLS9,600.001 9,600.001 9,600.0015 F&I Soffit Panels w/ Eletrical ConnectionsLS 126,500.001 126,500.001 126,500.0016 3" Sch. 40 PVC Conduit (CV Link)LF15.00725 10,875.00725 10,875.0017 Pull Box No. 3.5 (PCC) EA700.004 2,800.004 2,800.0018 4" Thick Decomposed GraniteSF4.00 5,090 20,360.005,090 20,360.0019 Structure Excavation (Ret Wall)CY75.00368 27,600.00368 27,600.00 South walls for secondary trail.20 Structure Backfill (Ret Wall)CY90.00501 45,090.00501 45,090.00 South walls for secondary trail. CV LINK ELEMENTS - CVAG OVERALL TOTALS ATTACHMENT 1 ITEM NO.ITEM UNITESTIMATED UNIT PRICE ESTIMATED QUANTITY AMOUNT ESTIMATED QUANTITY AMOUNT NOTES21 Structural Concrete (Ret Wall) CY 800.00 201 160,800.00 201 160,800.00 South walls for secondary trail.22 Bar Reinforcing Steel (Ret Wall) LS 1.20 20,000 24,000.00 20,000 24,000.00 South walls for secondary trail.Subtotal CV Link Items 1,948,118.00Contingency (10%)194,810.00$ Total Cost2,142,928.00$ Prepared by:Brad Donais11/12/2020 OVERALL TOTALS CV LINK PROJECT COST PARTICIPATING