Loading...
HomeMy WebLinkAboutLetter #004 (Full Closure Extension) Response An Affirmative Action / Equal Opportunity Employer M/F/D/V 404 Camino del Rio South, Suite 700 | San Diego, California 92108 | T 619.692.1920 | F 619.692.0634 | www.tylin.com March 8, 2023 Mr. Mike Adams Project Manager Ortiz Enterprises, Inc. 6 Cushing, Suite 200 Irvine, CA 92618 Reference: Dune Palms Road Bridge Improvements Project City of La Quinta, California City Project No: 2011-05 Federal Project No. BRNBIL (537) Subject: Letter #004 (Full Closure Extension) Response Mr. Adams, The City is in receipt of your written notice, dated March 3, 2023, with the subject line reading, “Full Closure Extension”. It is agreed that your subcontractor SRK did encounter sewer line existing conditions that conflicted with the plan drawings. On February 27th, Ortiz submitted RFI No. 8 detailing the sewer line conflict. On the same day, this RFI was forwarded to designer of record Brad Donais. RFI response and revised plan drawings were submitted to CVWD and reviewed and accepted by CVWD on March 7, 2023. This information was forwarded to Ortiz the same day. In the e-mail sent, it was requested to have SRK return on site as quickly as possible. Please refer to Special Provision Specification Section 6.3.1 Notice of Delays: “The Contractor shall take immediate steps to prevent, if possible the occurrence or continuance of the delay.” It is acknowledged that SRK incurred costs due to sewer pumps and equipment delivered to the site and not utilized during this time frame. Idle equipment is being documented by our inspector. Plan revisions for the sewer line have already been sent to Ortiz; plan revisions for the storm drain modification are forthcoming. All these revisions will be included in upcoming CCO No. 002. Sincerely, Tom Nowak Resident Engineer/Structure Representative TYLin