HomeMy WebLinkAboutPages from WAYFINDING DESIGN INTENT1.ROADWAY WAYFINDINGTEXT: Font is to be Neutra Bold at 36" height,typ. The text color is to be white. Text is to becentered on the bridge deck slab soffit andaligned with the inner path edge.2.CV LINK LOGOTEXT: The CV Link logo is to be applied to thebridge piers and supports, such that the text isat least 36" in height. The text color is to besingle-toned as white and the separating dashis to be [LIGHT GREY, PMS 10102C]. Thefabricator must account for applying the logoonto bridge piers or columns with a curvedface.3.LIGHTINGSPECIFICATION: Up-lighting for street nametreatment is to be BEGA product 77 462 [WHT]. One fixture is to be placed below thecenter of the text. Where the text length exceeds the luminescence of one light, twomay be placed below the text, evenly spaced,as approved.4.COLOR SPECIFICATIONWhere sign face is to be viewed by west ornorth bound path users, color is to be [SATIN ORANGE, PMS 172C] or as approved.Where graphic is to be viewed by east or southbound path users, color is to be [SATIN BLUE,PMS 297C] or as approved. The backing paintof bridge pier and column wayfinding is tofollow this same guidelines: piers and columnsto the right of the west or northbound side ofthe trail are to be the color of [SATIN ORANGE, PMS 172C] or as approved, andpiers and columns to the right of the east orsouthbound side of the path are to be the colorof [SATIN BLUE, PMS 297C] or as approved.STREET NAME TREATMENT1NO SCALESOLID PIER TREATMENT2NO SCALE5'-0"min3'-0"min CLST NAME3'-0"WESTBOUNDST NAME3'-0"Roadway name -Right-aligned w/ edge of pathCLEASTBOUNDCOLUMN TREATMENT3NO SCALEW varies, seeUC sheets3'-0" MIN, TYP112CL
CL W varies, seeUC sheetsEQ.EQ.
EQ.EQ.4443333W varies, seeUC sheetsW varies, seeUC sheetsSlope and conditionsvaryBridge support columnSlope and conditionsvaryRoadway name -Left-aligned w/ edge of pathBRIDGE DECK SLABBridge support columnPATHPATH2Text - centered on column, facing path432BRIDGE DECK SLABBRIDGE DECK SLABSolid pierbridge supportBRIDGE DECK SLAB4Bridge support columnCV LINK logo - centeredon pier, facing pathCLCL
LC OBOBOBOBUndercrossing Treatments15CV Link WayfindingCoachella Valley Associationof Governments·These drawings are intended to illustratedesign intent only and are not forconstruction. All final engineering and siteconditions of the project are theresponsibility of the fabricator. Shopdrawings by the fabricator must besubmitted for approval, prior to proceedingwith fabrication.·The quality of fit and finish on the finalproduct must meet or exceed therequirements of these design intentdocuments. Any variations to design,materials, or fabrication methods must beapproved by the Owner or Representive.·Welds: All welds shall be ground smoothand painted.·Hardware: All exposed hardware shall betamper proof fasteners.·All exposed edges shall be painted tomatch adjacent face.·Colors shown are for reference only andare subject to the limitations of the printingprocess. Refer to referenced color systemscontained within these drawings for actualspecifications.·Scaled examples shown are for referenceonly, and do not necessarily reflect actualsite conditions. Detailed site surveys arerequired prior to fabrication and installation.·Messages shown in these drawings are forgeneral reference only. Refer to messageschedules for actual required messages.GENERAL NOTESPROJECTCLIENTSHEET NUMBERDOCUMENT ISSUESHEET TITLEAlta Planning + Design
35935 Mission Hills DriveRancho Mirage, CA 92270ph: 760.851.0050KEY NOTES