HomeMy WebLinkAboutDune Palms Road Ex Ph I Proposal final 7-6-17Extended Phase I Proposal for
P19-16950, CA-RIV-8835
Dune Palms Road Low Water Crossing Replacement Project
La Quinta, Riverside County
BLRKS – 5433(014)
Prepared by Roger D. Mason, Ph.D., RPA
Principal Investigator – Prehistoric Archaeology
Director of Cultural Resources
ECORP Consulting, Inc.
1801 Park Court Place
Building B, Suite 103
Santa Ana, California 92701
Reviewed by Steven Holm
PQS: Principal Investigator, Historical Archaeology
Archaeologist
California Department of Transportation, District 8
464 W. Fourth Street, 8th Floor, MS-825
San Bernardino, California 92401-1400
Approved by Gabriel Duff
Branch Chief, Cultural Studies
California Department of Transportation, District 8
464 W. Fourth Street, 8th Floor, MS-825
San Bernardino, California 92401-1400
July 2017
Extended Phase I Proposal 1 Dune Palms Road Low Water Crossing Replacement Project
July 2017
1.0 INTRODUCTION
Dune Palms Road Low Water Crossing Replacement Project (Project) in the City of La Quinta
(see Study Vicinity Map and Study Location Map in Section 10.0) proposes to remove the
existing low-water crossing of Dune Palms Road at the Coachella Valley Storm Water Channel
(CVSC) in the City of La Quinta, Riverside County. The crossing will be replaced with a four-
span bridge 480 feet long and 86 feet wide. The bridge typical section consists of six-foot
sidewalk on both sides of the bridge, two (2) eight-foot outside shoulders also serving as
bike/golf cart lanes, a 10 foot raised median, two (2) eleven-foot travel lanes, and two (2)
twelve-foot travel lanes (Figure Appendix D-1).
The proposed configuration will be consistent with the existing four lane roadway section to the
south, and the City’s current improvement project to the north (project number 2009-04),
which will widen Dune Palms Road from two to four lanes with a median and left turn lanes.
The proposed improvements will include a reconstruction of the north and south bridge
approaches to accommodate the significant raised profile of the roadway. In order to match the
roadway section on the south side of the bridge, the Project’s construction limits will be
extended to 239 feet of Highway 111. On the north side of the bridge, the Project construction
limits will be extended to include a vacant lot immediately north of the Project limits. The
vacant lot is owned by the City and will be offered by the City in the bidding documents to be
used for storage and construction staging by the contractor for the construction of this Project
A more detailed project description is in the ASR (Gust et al 2016).
The potential for subsurface archaeological material from the prehistoric period was identified in
the Project APE. During the archaeological survey for the Project, prehistoric archaeological site
P33-16950 was identified in the APE east of Dune Palms Road and north of Hwy 111 (APN 600-
030-018). The site occupies most of the parcel and extends into the construction limits or Area
of Direct Impact (ADI) along Dune Palms Road (see Site Map in Section 10.0). The portion of
the site outside the ADI was tested using shovel test pits (STPs), hand-excavated units, and
backhoe trenches in 2008 (Eddy et al. 2008) and subsurface archaeological material and human
remains were found. Additional units were excavated to recover all of the human remains. As a
result of the survey for the current project (Gust et al 2016), ceramic sherds and daub, along
with one flake (debitage), were identified near Dune Palms Road and the P33-16950 site
boundary was extended into the ADI. The part of the site in the ADI appeared greatly disturbed
during the 2016 survey. No subsurface testing has been conducted in the portion of the site in
the ADI.
An Extended Phase I subsurface investigation is needed to determine whether subsurface
prehistoric archaeological deposits extend horizontally into the ADI and if so, whether they can
be protected by an ESA. If subsurface deposits are present, the Extended Phase I subsurface
investigation will also determine whether the deposits are intact or too disturbed to contribute
to the eligibility of site P33-16950. The Extended Phase I program will help determine the
boundaries of the site as required by 36 CFR 800.4(b).
Extended Phase I Proposal 2 Dune Palms Road Low Water Crossing Replacement Project
July 2017
2.0 SITE CONTEXT
The prehistoric and ethnographic context for the project area is provided in the ASR (Gust, et al
2016). Site P33-16950 was previously tested using shovel test pits (STPs), hand-excavated
units, and backhoe trenches in 2008 (Eddy et al. 2008). Seven hundred and fourteen artifacts
(prehistoric ceramic sherds, daub/FAC, ground stone fragments, and rocks) were recovered
during surface collection prior to testing. Seven hundred and twelve artifacts consisting of
ceramic sherds, marine and freshwater shell, ground stone, charcoal, faunal bone and human
remains were recovered from the units. Additionally, 27 1 meter by 1 meter recovery units
(RUs) were hand excavated around the location of the human remains and an additional 1,125
artifacts and ecofacts were found. The depth of the RUs ranged from 20 to 40 centimeters (cm)
below surface. The report did not report which artifacts were identified at what depth, but the
catalog indicates that a majority of the artifacts are in the upper 40 cm of the site. Sixteen
items were found between 100 cm and 250 cm in depth. These items included 6 pieces of fire-
affected rock, 1 piece of unburned sandy clay, 5 pieces of unburned clay, 1 faunal bone
fragment, and 3 pieces of charcoal (Gust, et al 2016).
Based on the testing program, Eddy et al. (2008) concluded that the site in general had “very
limited ability to provide important new information for the study of prehistory in the
Whitewater River Delta/ Dune Complex and surrounding region, [and] in light of the low
quantity of formal artifacts it yielded… the site as a whole does not appear to qualify as a
‘historical resource’." In other words, they believed that based on the artifacts recovered, the
site is not eligible for the CRHR. However, the cremated human remains retain a high degree of
Native American traditional cultural value, so it was concluded that the portion of the site
containing the cremated remains was eligible for the CRHR under CEQA. P33-16950 has not
been evaluated for the NRHP.
Ceramics and cremations indicate that site P33-16950 was occupied during the Peninsular
Pattern of the Palomar Tradition (900 to 150 B.P.). Sites similar to P33-16950 occupied during
the Peninsular Pattern appear to be resource procurement camps for people from nearby
villages. The procured resources were likely taken back to the village for consumption or
storage. Data from such sites could be used to address research issues about the kinds of
resources procured (based on faunal bone, shell, and macrobotanical remains from flotation
samples) and the activities that took place at these sites (based on functional artifact types and
features). Issues of chronology and trade and exchange could also possibly be addressed. A
more specific period of use for the site could be determined if charcoal for radiocarbon dating is
present. Items traded in from outside the area could include marine shell beads from the coast
and obsidian from the Coso source or the Obsidian Butte source.
3.0 SCOPE OF WORK
Shovel test pits (STPs) will be excavated in the ADI along the east side of Dune Palms Road
south of the stormwater channel (CVSC), as shown on the Site Map and Site Detail Map in
Section 10.0. This is the area between the edge of Dune Palms Road and the ADI boundary to
the east. The northern part of this area is where the recently extended P33-16950 site
boundary (based on surface material) overlaps the ADI. Seventeen STPs systematically spaced
10 m apart will be excavated in this area with the STPs arranged in two north-south lines. STPs
Extended Phase I Proposal 3 Dune Palms Road Low Water Crossing Replacement Project
July 2017
will not be excavated to the north in the CVSC where there is a vertical drop of 10 to 18 feet.
There is little or no potential for archaeological material in the channel (see Site Detail Map in
Section 10.0).
The STPs will be excavated by hand with shovels in arbitrary 20-centimeter (cm) levels and will
be about 40 cm in diameter. Excavated material will be passed through 1/8th-inch mesh.
Artifacts remaining in the screen will be placed in bags labeled with the appropriate provenience
information. STPs will be excavated to a depth of 80 cm (it is not practical to excavate STPs
beyond about 80 cm below surface). If subsurface artifacts are found in the lower levels of an
STP, an auger will be used to assess whether cultural material continues below 80 cm.
If subsurface prehistoric artifacts are found in STPs, a hand-excavated unit may be necessary
to assess whether the artifacts are in a disturbed context. It is difficult to observe stratigraphy
in the sides of STPs. However, a unit can provide information about stratigraphy (whether the
archaeological material is mixed or in situ) by examining the unit sidewalls. If the unit is
necessary, the unit will measure 1 m by 1 m and will be excavated by hand in arbitrary 10 cm
levels. Excavated material will be passed through 1/8th-inch mesh. A profile of two
perpendicular sidewalls will be drawn. Artifacts remaining in the screen will be placed in bags
labeled with the appropriate provenience information. Artifacts will be identified, described,
photographed, and drawn in ECORP’s lab in Redlands.
A report will be prepared following the format required by Caltrans for an Extended Phase I
investigation. The report will contain the project description, the methods used, and will
describe the results, including any artifacts recovered. The report will contain a discussion of
whether intact subsurface archaeological deposits are present.
The Principal Investigator for the Extended Phase I Investigation will be Roger Mason who has
a Ph.D. in Anthropology from the University of Texas, Austin. He has over 30 years of
experience in southern California archaeological investigations. The Field Director will be Robert
Cunningham who has a B.A. in Anthropology from UCLA and has 9 years of experience.
4.0 DECISION THRESHOLDS
STPs will be excavated to the maximum practical depth for STPs (80 cm). However, if
archaeological material is found in a 20 cm level of an STP and the deposits appear to be
undisturbed, the remaining levels of the STP will not be excavated so as not to further disturb
intact archaeological material. However, if it cannot be determined if the archaeological material
is from a disturbed or undisturbed context, the remaining levels of the STP will be excavated.
STPs will be considered sterile if they contain no archaeological material.
If no archaeological material is found in any of the STPs, it will be concluded that there is not a
substantial subsurface deposit in the ADI. If archaeological material is present in the STPs, the
degree of disturbance will be assessed by examining the sediments and other material from the
STPs. Recent intrusive material indicating disturbance could include road gravel, chunks of
concrete or asphalt, and recent refuse (glass, metal, plastic). If such material is present, it will
be concluded that the deposit is so disturbed that it would no longer have the potential to
contribute to the eligibility of the site as a whole. If such material is not present, but the
Extended Phase I Proposal 4 Dune Palms Road Low Water Crossing Replacement Project
July 2017
sediments from the STPs appear disturbed, a unit will be excavated and the sidewall profiles will
be examined. If there is variation by depth in the type (sand, silt, loam) and color of the
sediments and it appears that sediments characteristic of the upper levels have been introduced
into the lower levels, it will be concluded that the deposit is too disturbed to have the potential
to contribute to the eligibility of the site as a whole.
If archaeological material is found in the STPs in an undisturbed context, the Extended Phase I
subsurface investigation will cease and units will be excavated as part of a Phase II program to
evaluate whether the material can contribute to the eligibility of the site as a whole. The
evaluation would take into account the results of the previous test program (Eddy et al. 2008),
along with the material found in the Phase II units in the ADI.
5.0 TIMETABLE
The fieldwork will require 6 days (if the unit is necessary) and will be scheduled upon
acceptance of this Extended Phase I Proposal and upon notification by the City that property
access has been obtained (see Section 8). Lab work (if material is found) will require two days
and report preparation will require one week. However, the total calendar time for completion
of the report may be extended to account for Native American coordination.
6.0 NATIVE AMERICAN COORDINATION
Twenty Native American groups were contacted as part of the initial Native American
coordination as part of the ASR preparation. The Agua Caliente Band of Mission Indians, the
Augustine Band of Mission Indians, and the Morongo Band of Mission Indians all requested that
a Native American monitor observe all project-related ground disturbing activities. The Torres-
Martinez Desert Cahuilla Indians stated that an MLD from their group supervised the reburial of
human remains from site P33-16950 in 2008, but they did not know where the remains were
reburied. They consider the entire area from Washington to Jefferson Streets to be part of one
large village.
A letter providing updated information about the project was sent by the City of La Quinta to
the following Native American contacts:
Luther Salgado, Chairman, Cahuilla Band of Indians
Ernest Siva, Tribal Elder, Morongo Band of Mission Indians
Karen Kupcha, Augustine Band of Cahuilla Mission Indians
Patricia Garcia, THPO, Agua Caliente Band of Cahuilla Indians
Michael Mirelez, Cultural Resources Coordinator, Torres-Martinez Desert Cahuilla Indians
William Vance, Tribal Vice Chairman of the Augustine Band of Cahuilla Mission Indians replied
that the Band is unaware of specific cultural resources that may be affected by the proposed
project. They recommended that a qualified Native American monitor be present during
construction and they wish to be notified if any cultural resources are discovered. No other
responses to the letter were received.
Extended Phase I Proposal 5 Dune Palms Road Low Water Crossing Replacement Project
July 2017
In telephone calls on May 3, 2017, Patricia Garcia, THPO, Agua Caliente Band of Cahuilla
Indians and Michael Mirelez, Cultural Resources Coordinator, Torres-Martinez Desert Cahuilla
Indians, stated that they wished to supply a Native American monitor to observe the Extended
Phase I Program. An agreement for Native American monitoring was received from Agua
Caliente, but not from Torres-Martinez. In a follow-up telephone call on June 20, Michael
Mirelez of Torres-Martinez said that they could not find a qualified monitor and that they defer
to Agua Caliente for Native American monitoring. As confirmed in a phone call with Patricia
Garcia on June 20, a Native American monitor for the Extended Phase I Program will be
supplied by the Agua Caliente Band.
If human remains are discovered in a location other than a dedicated cemetery, the provisions
and regulations of Health and Safety Code 7050.5, CEQA 15064.5(e), and Public Resources
Code 5097.98 will be followed; archaeological excavation will cease and the Field Director will
notify the ECORP Project Archaeologist who will notify the Caltrans Archaeologist, Caltrans
District 8 Native American Coordinator, and the Riverside County Coroner. The Field Director
will maintain control of the area until the Coroner arrives. If the Coroner determines the
remains are Native American and not the result of a crime, then the Coroner will notify the
NAHC, which then will designate a Native American Most Likely Descendant (MLD) for the
project. When the MLD visits the site, the Field Director will be present. The designated MLD
will have 48 hours from the time access to the property is granted to make recommendations
concerning treatment of the remains. The MLD’s recommendations will be given to the
landowner and Caltrans.
7.0 CURATION
Recovered archaeological material will be temporarily maintained at the ECORP office in
Redlands until a curation agreement with an acceptable facility is obtained. The curation
agreement and a collection agreement with the property owner will be in place by the time the
XPI field work begins. All prehistoric artifacts will be curated.
8.0 ARCHAEOLOGICAL PERMITS
Permission from the owner of the property at APN 600-030-018 will be necessary in order to
excavate the STPs. The City of La Quinta will obtain a Right to Enter access agreement with the
landowner.
Extended Phase I Proposal 6 Dune Palms Road Low Water Crossing Replacement Project
July 2017
9.0 REFERENCES CITED
Eddy, J., M. Dahdul, H. Quinn, and M. Wetherbee
2008 Final Cultural Resources Report: Archaeological Testing and Evaluation of Site CA-
RIV-8835 (33-16950), Assessor's Parcel No. 600-030-018, City of La Quinta,
Riverside County, California. Prepared by CRM Tech. Report on file at Eastern
Information Center, University of California, Riverside.
Sherri M. Gust, Desiree Martinez, Molly Valasik, and André Simmons
2016 Archaeological Survey Report for the Dune Palms Road Low-Water Crossing
Replacement Project, La Quinta City, Riverside County, California. Federal Project
No. BLRKS – 5433(014). Prepared for California Department of Transportation —
District 8, San Bernardino. Prepared by Cogstone Resource Management Inc.,
Orange.
10.0 MAPS
Study Vicinity Map
Study Location Map
Site Location Map
Study Vicinity Map (USGS 30 x 60 Minute Palm Springs, California, Quadrangle)
Dune Palms Road
Study Vicinity Map
Dune Palms Road
Low Water Crossing
Replacement Project
BLRKS-5433(014)
Area of Potential Effects
0 2
Miles I
Study Location Map (USGS 7.5 Minute La Quinta, California, Quadrangle)
Dune Palms Road
Study Location Map
Dune Palms Road
Low Water Crossing
Replacement Project
BLRKS-5433(014)
Area of Potential Effects
0 1,000
Feet I
Storm Wate
r
C
h
a
n
n
e
l
Storm Wate
r
C
h
a
n
n
e
l
Site MapP33-16950
Map Date: 1/9/2017
Photo Source: NAIP 2014
Dune Palms RoadLocation: N:\2014\2014-173.001 Dune Palms Road\MAPS\Cultural_Resources\Overview_Maps\DP_SiteMap_V1.mxd (MAG)-mguidry 1/13/2017 I
0 75
Meters
Map Contents
Area of Potential Effects
Construction Limits (ADI)
Site Boundary P33-16950
STP Locations - refer to the Site Detail Map
Site Map
Dune Palms Road
Low Water Crossing
Replacement Project
BLRKS-5433(014)
D(
D(
D(
D(
D(
D(
D(
D(
D(
D(
D(
D(
D(
D(
D(
D(
D(
Storm Wat
e
r
C
h
a
n
n
e
l
Storm Wat
e
r
C
h
a
n
n
e
l
CORPORATE CENTRE DR DUNE PALMS RDSite Detail MapP33-16950
Map Date: 1/9/2017
Photo Source: NAIP 2014
Dune Palms RoadLocation: N:\2014\2014-173.001 Dune Palms Road\MAPS\Cultural_Resources\Overview_Maps\DP_SiteMap_detail_V1.mxd (MAG)-mguidry 1/13/2017 I
0 30
Meters
Map Contents
Area of Potential Effects
Construction Limits (ADI)
Site Boundary P33-16950
D(STP
Site Detail Map
Dune Palms Road
Low Water Crossing
Replacement Project
BLRKS-5433(014)