Loading...
HomeMy WebLinkAbout2-13-23 Foundation Trial Batch IRInspector:Date:Initials: In order to comply with Engineer's Response to our Submittal 8.1 (Dune Palms) we are duly notifying the Engineer that on 2/13/2023 at Desert Redi-Mix Plant located at 72200 Vista Chino, Thousnad Palms, CA 92276 we shall be carrying out Trial Batches accordingly. Our contact person is Mr. John Seybold who could be reached at (909) 806-9788 or at jseybold@desertredimix.com INSPECTION RESULTS: Approved Approved as Noted Not Approved Plan Ref:Location: 72200 Vista Chino Thousand Palms, CA 92276 INSPECTION REQUEST: Spec Section:Requested Date and Time: By: Section 90 Trial Batches 2/13/2023, TBA Trade:Date of Request:Confirmed Time: CIDH Piles Concrete 2/9/2023 NOTIFICATION / COORDINATION From: Foundation Pile Inc. By:Confirmed Date: INSPECTION REQUEST Armando J. Barberena