Loading...
HomeMy WebLinkAbout2011-05 CVAG Inv. 16 4-22-19April 22, 2019 Coachella Valley Association of Governments 73710 Fred Waring Dr., Ste. 200 Palm Desert, CA 92260 Attention: Tom Kirk, Executive Director c4ev Qa�tra — CM moRNIA -- Progress Payment No.:. 16 City Project No.:: 2011-05 Agreement Authorization:: 12/2/2013 Funding Source:: Measure A/ TUMF Subject: Progress Payment No. 16 - Dune Palms Road Bridge Spanning the Coachella Valley Stormwater Channel, CIP 2011-05 The City of La Quinta respectfully requests the Coachella Valley Association of Governments (CVAG) provide reimbursement for the following project costs associated with the Dune Palms Road Bridge Spanning the Coachella Valley Stormwater Channel project, CIP 2011-05. Total Preliminary Engineering: $ 1,417,914.26 Construction Engineering: $ Construction: $ - Project Administration: $ - TOTAL PROJECT COST: $ 1,417,914.26 HBP Share (88.53%): $ 1,233,008.50 Eligible Project Costs Remaining: $ 184,905.76 CVAG Share (75%): $ 138,679.32 City Share (25%): $ 46,226.44 CVAG Authorized Amount: $ 1,506,750.00 Less Costs on Previous Requests: $ (114,873.54) Authorized Amount Remaining: $ 1,391,876.46 TOTAL PROGRESS PAYMENT REQUEST: 1 $ 23,805.78 Please don't hesitate to contact Nick Nickerson at (760) 323-5344 if you have questions or if additional documentation is required. Sincerely, SRMC INNEY �- City Engineer DUNE PALMS ROAD OVER THE COACHELLA VALLEY STORMWATER CHANNEL CIP 2011-05 Preliminary Engineering Vendor Invoice No. Date Amount Check No. Federal Share (88.53%) Local Share (25%) CVAG Share (75%) Bengal Engineering 3634 12/18/18 $ 55,327.80 121323 $ 48,981.70 1,586.52 $ 4,759.58 Bengal Engineering 3658 1/15/19 $ 64,747.96 121323 $ 57,321.37 1,856,65 $ 5,569.94 Ben al En ineerin 3669 2/12119 $ 23,440.26 121644 $ 20,751.66 672.15 $ 2,016.45 Bengal Engineering 3684 3/18/19 $ 34,108.60 122034 $ 30,196.34 978.06 $ 2,934.20 NAI Consulting 7 12/1/18 $ 1,995.00 120898 $ - 498.75 $ 1,496.25 NAI Consulting 8 1/1/19 $ 2,287.50 121291 $ - 571.88 $ 1,715.62 NAI Consulting 9 2/1/19 $ 4,502.50 121607 $ - 1,125.63 $ 3,376.87 NAI Consulting 1 10 3/1/19 1 $ 2,582.50 1 121895 $ - 645.63 $ 1,936.87 TOTAL COST THIS REQUEST: $ 188,992.12 1 1 $ 157,251.07 $ 7,935.27 $ 23,805.78 TOTAL PROJECT COSTS: $ 1,417,914.26 $ 1,233,008.50 $ 46,226.44 $ 138,679.32 City of La Quinta VENDOR: 07575 BENGAL ENGINEERING INC DATE ID PO # DESCRIPTION 12/18/2018 3633 1718-0070-R1 NOV 2018 - DUNE PALMS WIDENING PRJ 091004-D 12/18/2018 3634 P000000029-112 NOV 2018 - DUNE PALMS BRIDGE LOW WATER CROSSING 1/15/2019 3657 1718-0070-R1 DEC 2018 DUNE PALMS WIDENING PRJ 091004-0 1/15/2019 3658 900000002.9-112 DEC 2018 - DUNE PALMS BRIDGE LOW WATER CROSSING CHECK NO:121323 02/01/2019 GL ACCT # AMOUNT 401-0000-60185 1,241.50 401.0000.60185 55,327.80 401-0000-60185 1,909.00 401-0000-60185 64,747.96 CHECK TOTAL 123,226.26 City of La Quinta Aft WELLS FARGO CHECK NO: 121323 78-495 Calle Tampico I1-24/1230 (8) La Qulnta, CA 92253 (760) 777-7150 _ {'r 'I:r 02/01/2019 $123,226.26 Ii PAY ---One Hundred Twenty Three Thousand Two Kugdred. Twen;y Six Dollars_ -and 26/100 Cents--- �.r. THIS CHECK S.Xf, IFTA AND IS VQiD 180 DAYS FROM ISSUE DATE TO THE BENGAL ENGINEERING INC ORDER 250 BIG SUR DRIVE '� 1 T "— oRosl7rA1� - GOLETA, CA 93117- . LAOL p I p Sl HA VRL Jim 12 13 2 311' a: 1 2 1000 2484 1124 159 28 248 2110 o\ Bengal Engineering, Inc. Civil, Bridge, hydraulic. Structural, & Highway Engineers City of La Quinta C/O: Nick Nickerson NAI Consulting, Inc. 68-955 Adellna Rd Cathedral City, CA, 92234 Professional Services Rendered for: DUNE PALMS ROAD LOW WATER CROSSING REPLACEMENT CITY PROJ #. - 2011-05; FEDERAL AID PROJ. NO. BRLKS-5433(014) APPRWED FOR PAYMENT BY_� ACCOUNT NO. IIUQ2 - I-) /YQ1--=am{ r�,osi�,rr PO#. PROJ# 201 (-oS DESCRIPTION De's 250 Big S r rive j V# fl' S� Galeta,�1��� I'r�,y� SS.3�7. Phone: (805) 563-0788 Invoice: 3634 Invoice Date: 12/18/2018 Invoice Period: 11/l/18-11130/18 Task # & Name Total Fee % Complete Previously Invoiced Current Invoice Remaining Fee PHASE I: PROJ APPROVAL rL ENV. DOCS Project Management - Phase 1 Environmental Clearance iUtility Coordination 100.0% $61,350.00 $0,00 $2 741.38 $61.350.00 $228,996.00 98.8% $226,000.9_2 $11,328.80 $14,650.00 $70 700.00 $253.70 $11,330,00 $14,650.00 100.0% 100.0% 100.0% 100.3% $1.20 $0.00 Topographic Base Mapping iGeotechnical Studies _ $70 700.00 $46.380.00 _ $0.00 {Channel Hydrology & H draulics Stud Study_ $46 510.00 -$130.00 (Bridge Type Selection ;74,596,00 100.1% $74 670.00 $75.00 (Preliminary Design Plans Preliminary Engineers Estimate $13 100.00 100.0% 100.0% $13.100.061 $5,720.00 $0.00 $5,720.00 $0.00 Preliminary Right of Way Cost Stu $8,760.00 $5,900.00 100.0% 100.0% _ $8,760.00 $5,900.00 _ _ $0.00 _ .Add #1 Additional Potholing _ $0.00 � $0.00 .Add #1 Noise Modelln $6 800,00 100.0% _ $6.800.00 Add#2 Extended Cultural Field Survey $7,800.00 100.0% 100.0% $7,800.00: $31.678.00 $16.100.00 $19,900.00 $9,583.00 $92,474.72 $0.00 ,Add #3 Trfc Memo✓No/se ImplAQ Report Add #4 Allemative Grade Control Structures $31,678.00 $0.00 $0.00 $16,100.00 100.0% Add #5 Scour Analysis Add #6 Prey_ Ext Phase 1 Work Plan Add #7 tm_plmt Ext Phase 1 Work Plan ,Phase 1 Total $19,900.00 100.0% $0.00 $9,583.00 _ $96.449.00 100.0% 95.9% $0.00 $3,974.28 $729 791.00 99.1% $723,025.44 $253.70 $6,511.86 PHASE II: PLANS, SPECS AND ESTIMATES Project Management $63,250.00 Environmental Permitillre _ $21.527.00 Le al and Exhibits 5 L&E's 5,300.00 $35,107.35 $600.00 $26,167.63 58.6% 2.8% $1,975.02 $20,927.00 100.0% _ $5300.00 $42,669.50 $0.00 Roadway Improvement Plans $78,790.00 59.1% $3,874.50 $32,246.00 (Foundation Report _ $15,650.00 275,765.00 $6,250.00 29.901 80.3%1 65.0°� $0.00 S3,271.28 $18,590.31 53112.50 _ $12,378.72 aBridge Plans $202,910.84 $3,750.00 $54,263.85 $2,187.50 _ Utility Coordination Special Provisions _ Construction Cost Estimate Resident Engineers File Right of Way Acquisition Services CVWD Encroachment Permit ,Add #8., Scour, Utd., Lnsc , ROW Phase 2 Total $8,100.00 $7,800.00 58.0% $3,350.00 $1.350.00 $1,050.00 $3,400.00 $5,280.00 $12,980.00 18.8% $1.470.00 _ $12,980.00 $0.00 $82,255.00 29.2% $10 814.65 $13,164.55 $58,275.80 $3,000.00 $78.389.06 $309,495.56 _ $5.400.00 $33,000.00 $7,200.00 _ $3,000.00 $89,875.00 $0.00 12.8% 53.8% $0.00 $11,485.94 $670,542.00 $305,972.34 $55,074.10 PHASE III: BID AND CONSTRUCTM PHASE Services Du_ ring Bidding Construction Support Services _ _ Contingency Total 1rvolnl llanouna Total: _ $5,400.00 $33,000.00 $7,200.00 $1.445.933.00 74.99% $1,028,997.78. $55.327.801 $361.607.42 WHIR I.W°ri WE-") n news roUUM � Imrcmul a N r r N ro o e* o* e 6 0 0 o ee a p� 0 0 0 o c o 0 m p eoO O Nr OOO OOd M Ol O hOOWi'lq 0 r- 4 cV pp 10 pp 00 e7,O a E octioir�00000a C*0400a gf]grO tiaon�oai0 owed b PO61 O r O O P• r C] 000 Y'• r Y to Ou7N 06 In N A U r C OmO 00 MO ON00000O0 OOOD C OMN O O pp C In fD 0 h h O ' �n hm m In Lo Oo 00 0 O m 0 In 0 000 OO a E h mN 0NMN to to cc V Go cc N•01N A0 O ppp� V SO fp N ed O N M N N M 0 In M i0 M cV ar N N r r i0 C0 N C O Q1 jNjW9169N be ol.-I.W ,yq cA N•EANNNNNN NrtA �yq •EA NNN O N(� O o 0 0 0 O O O h o pp pp ,goo u] o N O cO m 0 0 0 0 0 0 0 M 0 0 0 N 0 0 N Ol O G V m OCC 000 G N Oa NO O 0 ppj C c0 P: cp n� Op CO Ms N[W0 �WMNM � ID c mN�dO��M000 fV M LO�MN CV V YN N 00 W _ F rtA •fA NNfANNNNb9 N�flp9 FA fA foA 6pp9 N44 d1 fA A NNN O 10 N 'K1 pNN � �Np Oe1 f0 N A 1� pM r Ol pO e'! IL7 pO 10 N W EO i� i10 P7 [�1 O r- f,� 'M •0C r � M N w N AQ 10,14 'pIN N N IN �r0 L a � uO1]uQi$S N ENO - no •N Y C N ppd Q n InO INLq aq Ol M 07 N Of A d C M N G pQ� N ` Z d N ilA •N N N N N QA N r 10 h KO] ED 0 00 m Z N N O N m eQ� O Ml W 0 � O to C �+ O M N N N !d M dECa � � r R C 01 IY A Ol Qc m oS`$op$�•1 In 0) e+O)Mh NM¢7 yy Nl19N oa0O o N N SOOSup lnr N N h n N N $$SOSoSa 01, �N NusM N Ndl C0a OOI rep O S fig Ndl VtoOOd TN ii7 N NN r m O NeA M7 O)�O n • TAN S' Y7 8 c7 f9 o$c$Q YO cO M9NN mop $� i'ff J H 0 9 7 in 7 rn O N O C O N E No E U N O C N O y ~c US C U a cLLlep acmes E _da1�o ac4) �n fO2. m dad LL LL -0oC E y oc EE Faco cl gqc ' roa a VQ In cU9mN2(n0 mr LLJ occWEcrPoa) 0.o �LLI cc2_cd o Lj c °1 E E E o `°; c cu V �?v on d O j_ o: p 0 f0 D N 01 N fel '� p !0 7apf C N t R Z G as wa�C7UM(Laa aaiW J�LlCa.7¢n'U�� a(o0 y o ... z o 0 0 0 0 0 0 0 0 0 0 YN neboOoogq 00O0000Oomao E IOlnoo00000S0 . N O U e cc C 000 On C O O Q d f 0 7 �otCi rncmi E �Nr cncno N O Q NN 'Al NNf NNN to S SSSS C3 cO co Go appSSo 0 cc� 00 en0. Y 01 in mn�coTON- c 0) H fA IA fA N fA N fA w �H <A E Q Bengal Engineering, Inc. 00Bridge, Hydraulic. Siructural, & Highway Engineers City of La Quinta C/O: Nick Nickerson NAI Consulting, Inc. 68-955 Adelina Rd Cathedral City, CA, 92234 Professional Services Rendered for: DUNE PALMS ROAD LOW WATER CROSSING REPLACEMENT CITY PROJ #. - 2011-05; FEDERAL AID PROD. NO. BRLKS-5433(014) 360 S. Hope Ave. Suite C-110 Santa Barbara, CA 93105 805-563-0788 Invoice: 3658 Invoice Date: 1/15/2019 Invoice Period: 12/1/18-12/31/18 Task # & Name Total Fee % Complete Previously Invoiced Current Invoice Remaining Fee (PHASE I: PROJ APPROVAL & ENV. DOCS Project Management - Phase 1 $61,350.00 $228.990.00 100.0% 98.9% $61,350.00 _ $0.00 Environmental Clearance $226,254.62 $195,00 $2.546.38 Utility, Coordination $11,330.00 $14,650.00 100.0% $11328.80 $1.20 Togo ra hic Base Mapping 100.0% 100.0% $14,650.00 $0.00 Geotechnical Studies $70 700.00 $70 700.00 $0.00 Channel Hydrology & Hydraulics Study S46 380.00 100.3% $46 510.00 4130.00 -$75.00 $0.00 $0.00 (Bridge Type Selection IPreliminairy Design Plans $74,595.00 100.1% $74,670.00 $13,100.00 100.0% 100.0% $13,100.00 $5 720.00 Preliminary Engineers Estimate $5 720.00 [Preliminary Right of Way Cost Study $8,760.00 $5,900.00 $6,800.00 100.0% 100.0% 100.0%1 $8,760.00 $5,900.00 $6,800.00 _ $0.00 $0.00 $0.00 $0.00 $0.00 Add #1 Additional Poth2LnR Add #1 Noise Modeling ,Add#2 Extended Cultural Field Survey $7,800.00 100.0% $7,800.00 $31,678.00 ,Add 93 Trfc Memo/Noise ImplAQ Report $31,678.00 100.0%-- Add #4 Attemative Grade Control Structures Add #5 ScourAnal sis $16,100.00 100.0% $16 100.00 $0.00 S19,900.00 100.0% $19 900.00 $0.00 .Add #6 Pneep. ExL Phew 1 Work Plan .Add #7Im lmt. Ext. Phase 1 Work Plan (Phase 1 Total $9,583.00 $96.449.00 $729.791.00 100.0% 95.9%° $9,583.00 $92,474.72 $0.0_0 $3,974.28 99.1% $723 79.14 $195.00 $6.316.86 PHASE II: PLANS SPECS AND ESTIMATES Project Management $63,250.00 (Environmental Permitting $21,527.00 !Legal and Exhibits_ 5( L&E's)_ $5,300.00 $22,966.33 $20,927.00 63.7% $37 082.37 $3,201.30 2.8% $600.00 �100.0% $5,300.00 $0.00 Roadmy Improvement Plans $78,790.00 59.1% 84.5% $46,544.00 $3 271.28 $9,946.34 $32,246.00 $2,432.38 (Foundation Report S1500.00 Brio a Plans $275L765.00 93.1% $221,501.15 $35,222.16 $19,041.69 Fdi Utili CDOnf.o __._.--._-._a-. --.n-- -- Special Provisions Construction Cost Estimate _ $8,250.00 $8,100,00 $7,800.00 65.0% $4 062.50 ✓ $2,187.50 $3,175.00 60.6% $4,700.00 $225.00 32.3% $2,520.00 $210.00 $5,070.00 Resident Engineers File $12,980.00 Right of Way Acquisition Services $82,255.00 46.7% CVWD Encroachment Permit $3,000.00 Add #8: Scour t/fll., Lnscp,_ ROW $89,875.00 14.3% Phase 2 Total $670,542.00 63.5% PHASE III: BID AND CONSTRUCTION PHASE Services During Bidding _ $5,400.00 Construction Support Services _ $33.000.00 _ Contingency.Total $7,200.00I $0.00 $23,979.20 $12,980.00 $43,857.64 $3,000.00 S77,059.06 $244,942.60 $14,418.16 _ $0.00 $11,485.94 $1,330 00 $361.046.44 $64,552.96 _ $_5.400.00 $3_3,000.00 $7,200.00 Total: $1,445.933.00 79.47% $1,084,325.58 $64,747.961 $296.859.46 V C 6V-m.,D►J✓ G 0 d r d m O O a H E o0 d a g4 z° � E A } d N O F o t� o a �po e-o F ao a'aa°a'a"o 0 o ao aa•a� d 0Mm0a00 b$�� a]0)0rmm0000mo oo.M O. Eo O OOO o m 07 MoOOO�Oo m m000 o ON r 00 c0 r7 r OOP N cg 00co ri Lo o vi o(Do a 00'W 00 o ao cc 0Wn aOCD tD w cq R no 0 01 O m O p O SO M O O m m O O O O O O O N C OMN MO OlicDwOOOc�,O OOr OCOr ' ' 0MaarDti Cr 'A c0ti wN w00 SON E 0701 N er •Orr 003 mO OOtD •IO d N Ncv c 0 u7 [�C cq lD N mN-V •i N C 7 O w w w Wl N 'U3 w w WA w w Wi a7 Wi v1 'N F9 w N w y9 to w ,yq N O N 0 0 0 0 0 0 0 0 r 0 0 0 N 0 0 0 m N d O> O W co O f W MOM 09 0 0 0 0 0 c) O 0 0 O 0 m M m00 0 00. O O m n (� 1 in M N O O W D O M • ti N �N�nOrrONWD r r NWDM Nr NmNM O Of r m M N O e o 0� in ao M ui c� ci �v v N M r N F W WI -WI www w•w 69.69 1 ww 69 QA www V3 N N 6009 1 ww N ri OI WO � M 'Al I I I I Iol I N •N N N N N {{yy W0 r0 O op N;; SS � W p� W W �n LL07 OWJ SO WO Is CNO. 0 9 � O �N'Li COM 0 ri •00 N) M C V a T a A a w .y w 69,69 to w 'w w N N LO V 0 W c7 S OWn a O N ONO yyyN C O ri c�Vp V O N pO o O t: y Co O in co Of M Of N 0) en a E c SW, d '0 w da w N. 9 N w W► CE 'CA WcV d ch c C d m 8888888800 WnOM M wMuq c7cDn W r r cV c O 'Mwwwwww m 0) ci9rr oo oo 04 M LL'7 W 0000 OO0000aO0C?cig669Ori &N fMO iN Apppp0pQQn MrcD N b iN w69w OOOo M W r r NrOR n m N Nwwrq o 0 W r aCo N coCOW Wl w'u3 o O 0000 wryyN 000 O M V YI J f O U N N U W o c c c w v E C a o cw ?ca a c�� d ca. M N oa Od ypLnW7 N W d IL C g OO p O C C O N C y -, v BE m E V m�� o N' v a) - •° 0 0 a) �worc�-=�Z Z cacilt79 a c: �yyo E U L N H C C cc C N' d a j C W U udW .E +OpCQ.9.9.9 _C w= Vl E- cd �iLO L Q C :� O N L C L E C O O _au,.14y2) c" G O W t y� O aalwMF-C7Umb d Qd W J2u_�CO�wQ �Ci QN'Ci aEi z �oa c aoo�.o0 OogooaoO•mm WO Ooaao•oory o E E M000•oo0goLnv Ln o 000 o•m 0 W C SS o 0W0 c o0o corn 00 Ln E N Or10 d k N r C 7 O E Q WWnWiwwwWtpo'W o S S O Coco p0 o a0 O fri icl cCi rn acg cq •�$W°�am C _ O co r c7 co 0W r of N cn cV r (0 F- w'Wnwwwrq'WnwwWaN �N 0�1 Ln w W ri 00 N C e E 0 C O E a QU z City of La Quirft CHECK NO:121644 VENDOR: 07575 BENGAL ENGINEERING INC 03/01/2019 DATE ID PO# DESCRIPTION GLACCT# AMOUNT 2/12/2019 3668 1718-0070-R1 JAN 2019 DUNE PALMS WIDENING PRJ 091004-D 401-0000-60185 3,755.00 2/12/2019 3669 P000000029-R2 JAN 2019 DUNE PALMS BRIDGE LOW WATER CROSSING 401-0000-60185 23,440.26 City of La Quinta WELLS FARGO 78-495 Calle Tampico 11-24/1210 (8) La Quinta, CA 92253 (760) 777-7150 PAY ---Twenty Seven Thousand One Hundred Ninety Five Dollars and 26/100 Cents --- TO THE BENGAL ENGINEERING INC ORDER 250 BIG SUR DRIVE OF GOLETA, CA 93117- CHECK TOTAL 27,195.26 CHECK NO:121644 03/01/2019 $27,195.26 AUTHORIZED SIGNATURE AUTHORIZED SIGNATURE I'm L2L6441,' 1:1,210002481: Il'4L5928248211" City of La Quinta C/O: Nick Nickerson NAI Consulting, Inc. 68-965 Adeline Rd Cathedral City, CA, 92234 Professional Services Rendered for: DUNE PALMS ROAD LOW WATER CROSSING REPLACEMENT CITY PROJ #. - 2011-05; FEDERAL AID PROJ. NO. BRLKS-5433(014) AP FOR PAYMENT BY�.- ACCOUNT NO. PO# _. -_ PROJ# 21QI1-0am 360 S. Hoe elr RIPTION - Suite C-11AMT. TO PAY` 12 3,µV#� Santa Barbara, CA 93105 805-663.0788 Invoice: 3669 Invoice Date: 2/12/2019 Invoice Period. 1/1/19-1/31/19 Task # & Name Total Fee % Complete Previously Invoiced Current Invoice Remaining Fee PHASE I: PROJ APPROVAL & ENV. DOCS Protect Management - Phase 1 Environmental Clearance (Utility Coordination To ogre hic Base Mapping +Geotechnical Studies $61,350.00 100.0% 98.9% $61,350.00 $226,449.62 _ $0.00 $228,996.00 $11 330.00 $2.546.38 100.0% $1.20 $0.00 $0.00 $14 650.00 100.0% _$11,328.80 $14,650.00 $70 700.00 $70,700.00 100.0% (Channel Hydrology & Hydraulics Stugy $46 380.00 _ 100.3% 100.1% 100.0% $46,510.00 -$130.00 -$75.00 $0.00 $0.00 $0.00 Bridge Type Selection $74,595.00 $74,670.00 IPrelimina Design Plans $13 100.00 $13100.00 Preliminary Engineers Estimate Preliminary Right of Way Cost Study $5,720.00 $8,760.00 100.0% $5,720.00 100.0% $8.760.00 ,Add #1 Additional Potholing $5,900.00 100.0% $5,900.00 $0.00 ,Add#1 Noise Modeling ,Add#2 Extended Cultural Field Survey Add #3 Trfc MemaMoise Imp/AQ Report $6,800.00. 7 800.00 100.0% $6,800.00 _ $0.00 $0.00 $0.00 $0.00 100.0%1 $7,800.00 $31.678.00 $16,100.00 $31,678.00 100.0% ,Add #4 Alternative Grade Control Structures $16 100.00 100.0% Add #5 Scour Ana sis ,Add #6 Prep. Ext Phase 1 Work Plan Add #7 Implmt. Ext Phase 1 Work Plan $19 900.00 100.0% 100.0% 95.9% $19,900.00 $9,583.00 $92,474.72 _ $0.00 $0.00 $3 974.28 $9,583.00 $96,449.00 Phase 1 Total $729,791.00 99.1% _ $723,474.14 $0.00 $fi 316.86 PHASE It: PLANS, SPECS AND ESTIMATES (Project Management $63,260.00 68.5%1 $40,283.67 $3,032.07 $1%934.26 (Environmental Permitting _ $21,527.00 2.8% $600.00 $20,927.00 Legal 8rld E*lbb 5_L&E,$)_ (Roadway Improvement Plans $5,300.00 $78,790.00 100.0% 64.0% $5,300.00 $46.544.00 $3,874.50 _ _ $0.00 $28,371.50 Foundation Report _ Bridge Plans $15,650.00 84.5% 93.1%° $13,217,62 $256.723.31 $2,432.38 $19,041.69 $275 765.00 Utility Coordination _ $6 250.00 65.0% $4,062.50 $2187.50 Special Provisions $8,100.00 60.8% $4,925.00 $3,175.00 Construction Cost Estimate (Resident Engineers File $7,800.00 $12,980.00 35.0% 47.8% _ i _ 31.7% 67.0% _ $_2,730.00 $0.00 $38,397.36 $0.00- $12,815.94 $425,599.40 $900.00 $15,633.69 $23.440.26 $5,070.00 $12,980.00 $42,957.64 $3,000.00 _ $61,425.37 $221,502.34 iRi ht of Way Acquisition Services CVWD Encroachment Permit $82,255.00 $3.000.00 $89.875.00 $670,542.00 ,Add #8: Scour, Uhl., Lnscp, ROW (Phase 2 Total !PHASE III: BID AND CONSTRUCTION PHASE .Services During Bidding $5.400.00 _ _ $5,400.00 $33,000.00 Construction Su ort Services $33.000.00 $7.200.00 Contingency Total llsoint lranpunr, Total: $7,200.00 $1,445.933.001 81.09% $1.149.073.54 $23.440.261 $273.419.20 ►mnu rnoo, o, rnrmmr`C1 ' o mxm}Wun.c.rroim ro Jg°it/II�StL_Icons�tltlnu i7�m nr O 0 Q 4 g O z c 0 u Q o 0rnrnoom0000 0 0 0 0 0 0 0 o u o o o ao ,o o ago ,o �o 000 ae at a •O m010 o Nro00 mrn�orn V'r 0 O1 o�000omo 0O mO0 r 0 O•O fD E •omm o rn rn o 00oo0 o a 0 0 0 0 o o M m N'O:MV O m m fM LO:o 0) m col m co 1. v �o 0 oN oo 11 of omo 0o m0 Om•m000R8ya 00ff� C OMN 00 �N O m M'm �m O 0.O t00 �00 Yf G S O r p� • r N 11. ono tY O '0 0 01 Mh ' �rnrn N r M'•f My 70� r•m 0.m0)0 M0 Oo- VOCo E M O R' N iW N N N Of 'N '� NV fh M N C 7 0 Qw m 'fA 49 A 69 0 69 .6 'f9 ce N N fA Vl �f9 w m 'fA �» f9 fri �t9 w w O N 0 0 0 0 0 0 00 V O O O N O O O w Y1 O m m 0 0 0 O 0 0 0 r O O m m M m 0 0 M V GI 1o�7 m manor o 00 uiopp ad I.- HCMLn o f- CD M 14 M fmO Or La froOh� f7 pOp f0M V NroM rh N CND 0 m 0V f']m06 f7 nOMf0V V N o f7 C m N r r r V r r 'a m N M CfV H f9 U1 fA fA fA V! F9 fA - w w fA N eAR fA fA :A .M f9 ffi w to fA N !Q 3 O R S 4 m r O g C a f<f fi f9 n en w aa tali O Ci M 0 0 Ow1 M1 p CD Or ui O t�pp (NN o O m P XCf z 0 N cm N •N N M 01 O M j m M m EC a S. m d w 69 fA 0 y) CA fA H Or M N fwen pp m ,,CV M LL0700O m ci z 0 vi M N r- U) nrrnNU)uOi m N m co M 0 tV0 a m pf O M C M M o0 M CD P) a a` r= m d •FA fJ3 fir e9 69 •f9 f» 60 •fA rn c •� y C C W _ m ch IV o000000000 o000000000 o f00000 4MMU)C M0)Mcpr Rir'Vom-Tf7 m N N FA fA r r fA fA W Mm r V fri If} o 0 MF r r [A •fA o0 NO rr LOGO •FA fA 0oo00oo00000 00o000000000 mN NmMrm M f0 N fii f» OM Ill fD r fR fA mm r vg LO r r N FA N m O N ffl 00 f9 FA O m m0)NO r N r fH f9 mO N M m fA (» •000 000 oo OO 1403 'n f7aa M iFA fA N r w J F O Vj 7 ca m ar V) Nru Cyr o y L E C.) cc Z a a V 4 f] G W �' m a M {y a 0 �+ �aci cEaaN� �?o �u�im ar 9 E c ty } E EU�2o�igycL m [C m U% Q N G E�ajOn O- O y coafg I C3 fLr Q m cS C fq pro ,- ,X m� Ec��Qa�m� _N -_ �o m�� Q 2 m 8 A 0 0 m Uo$c Lf,� F C fp C C = :� �° a a a L] It1 ap = y i�N E E wa`�iQmfic o� �ti t Q C'a O c t y Q C ��o N O C ar�wr 0 m 2 c Q 0 aiaW �Fc7umIL all •ddW CZ ca U310a'[CU I 11 V]U �zo d y . o 00 0 0 cc 0 'bg o $g o o ,e, a E 'm00oo0Oaam'� nOO000000rnfv Q c coop Om rr�Lij C o 0 pop 0 m O O N Cr N a N V N r co ¢0 d' m C 0 E Q f9 to m fA •fy Vi u3 w fA O O O O O O C N M 0 O O O O O O O f 0 opo 00o0 L00i p ao 01 W m fcp CD pm ffl fO r C MofA N F fA fR Vi •[A w f9 E9 fA FA fA fA m w 0 O M vn a Ld f9 City of La Quints CHECK NO:122034 VENDOR: 07575 BENGAL ENGINEERING INC 04/05/2019 DATE ID PO# DESCRIPTION GLACCT# AMOUNT 3/18/2019 3683 1718-0070-R1 FEB 2019 DUNE PALMS WIDENING PRJ 091004-D 401-0000-60185 4,609.50 3/18/2019F 3684 P000000029-R2 FEB 2019 DUNE PALMS BRIDGE LOW WATER CROSSING PRJ 401-0000-60185 34,108.60 City of La Quinta WELLS FARGO 79-495 Calle Tampico '11-24/2210 (8) La Quinta, CA 92253 (760) 777-7150 PAY —Thirty Eight Thousand Seven Hundred Eighteen Dollars and 10/100 Cents --- TO THE BENGAL ENGINEERING INC ORDER 250 BIG SUR DRIVE OF GOLETA, CA 93117- CHECK TOTAL 38,718.10 CHECK NO:122034 04/05/2019 $38,718.10 AUTHORIZED SIGNATURE AUTHORIZED SIGNATURE II■1,2203411' i:i21,00024114 0 Le 1, S 9 2 El 2 4 El 2 ir ENGAL ' -•iI.tc ,l hl!• F Ii.IN[. I1.11 City of La Quints CIO: Nick Nickerson NAI Consulting, Inc. 68-955 Adellna Rd Cathedral City, CA, 92234 Professional Services Rendered for: DUNE PALMS ROAD LOW WATER CROSSING REPLACEMENT CITY PROJ #. - 2011-05; FEDERAL AID PROJ. NO. BRLKS-5433(014) APPfRQVED FOR PAYMENT sr. ACCOUNT NO. - 4 :Sc kIE PO# PROJ#._2G! r-05_ 360 S. Hop CRIPTION Des" v - suite C-119kMT. TO PA a4ddat:6 V#_ - Santa Barbara, CA 93105 805-553-0788 Invoice: 3684 Invoice Date: 3/18/2019 Invoice Period: 2/l/19-2/28/19 Task # 3 Name Total Fee % Complete Previously Invoiced Current Invoice Remaining Fee (PHASE I: PROJ APPROVAL S ENV. DOCS ro e_ Pct Mana ement - Phase 1 (Environmental Clearance $61,350-00 100.0% 100.0% $61.,350.00 $0.00 $228,996.00 $226.449.62 $2,546.38 $1.20 $0.00 'Utility,Coordination $11.330-00 100.0% 100.09/6 $11,328.80 $0,00 'Topographic Base Mapping {Geotechnical Studies Channel Hydro ogy & Hydraulics Study ]Bridge Type Selection (Preliminary Design Plans $14 650.00 $14,650.00 $70,700.00 _ $0.00 $70,700.00 100.00/6 $0.00 $0.00 $46.380.00 100.0°k $46,510.00 -$130.00 $74.595.00 100.0% $74.6_70,00 $13,100.00 -$75.00 $0.00 $13,100.00 $5 720.00 100.0% 100.0% $0.00 (Preliminary Engineers Estimate (Preliminary Right of Way Cost Study $5,720.00 $0.00 $8,760.00 100.0% $8,760.00 $0.00 Add #1 Addldonal Potholing _ Add #1 Noise Modeling _ Add#2 Extended Cultural Field Survey .Add #3 Trtc Mema✓Noiss ImplAQ Report Add #4 Alternative Grade Control Structures .Add #5 Scour Ana sis Add #6 Prep. Ext. Phase 1 Work Plan .Add #7 Implmt Ext. Phase 1 Work Plan Phase 1 Total $5,900.00 100.0% 100.0%1 $5,900.00 $6,800.00 $0.00 $0,00 $0.00 $0.00 $6 800.00 $7 800.00 100.0% 100.0% 100.00/a $7,800.00 $31,678.00 $16.100.00 $19.900.00 $9,583.00 $92,475.02 $723 474.44 $31,678.00 _ $16,100.00 $0.00 $0.00 $19,900.00 100.0% 100.0% 100.00% 100.0% $3,973.98 $9,583.00 $96 449.00 $0.00 _$_0.00 $0.00 $729 791.00 $6.316.56 PHASE II: PLANS, SPECS AND ESTIMATES _ (Project Management $63,250.00 Environmental Permitting $21,527.00 Legal and Exhibits (5 L&E s) $5.300.00 Roadway Improvement Plans $78,790.00 71.2% 100.0% 100.0% $43.315.74 $1 720.00 $18,214.26 $600.00 $20,927.00 $0.00 $0.00 $5.300.00 $2,324.70 66.9% $50,418.50 $26,046.80 Foundation Report .Bridge Plans Utility Coordination $15,650.00 84.50% 93.1% 68.0% 60.8% 35.0% $13,217.62 $256,723.31 $2,432.38 $275,765.00 $6,250.00 $19,041.69 $4,062.50 $4925.00 $2,730.00 $187.50 $2,000.00 $_3,175.00 $5.070.00 Sp_eclal Provisions _ $8,100.00 Construction Cost Estimate (Resident Engineers File $7,800.00 $12,980.00 $0.00 $12,980.00 $42,275.74 Right of Way Acquisition Services $82,255.00 48.6% $39,297,36 5681.90 CVWD Encroachment Permit $3,000.00 Odd #6. Scour, UN., L nsc , ROW $89,875.00 Phase 2 Total $970,542.00 PHASE ill: BID AND CONSTRUCTION PHASIC Services During Bidding_ _ $5,400.00. Construction Sup ooJt SBFyice_S $33,000.00 Contingency Total $7,200.00 •110I0tI Hnrmuna Total: $1,445,933.00 $0.00 $3,000.00 33.8% $28.449.63 $449,039.66 $1.950.94 $27,792.04 $59,474.43 $193,710.30 $5.400.00 $33.000.00 $7,200.00 71.1 % 83.45%1 $1,172,514A0j $34,108.60 $239,310.30 wnnu rannr a/ rnrmmr Ingl,n,[�r w�r�l o,feall ❑ OTN�n Jelin/� Ir�Olrr1 ro lunnmlaziunlmnp IIS Iln _ .oln n. pmnwul City of La Quinta VENDOR: 00250 NAI CONSULTING INC DATE ID PO # 12/1/2018 7JOB 2018-02 1718-0169-R1 12/1/2018 7JOB 2018-02 1718-0169-R1 12/1/2018 7JOB 2018-02 1718-0169-R1 12/1/2018 7JOB 2018-02 1718-0169-R1 12/1/2018 7JOB 2018-02 1718-0169-R1 12/1/2018 7JOB 2018-02 1718-0169-R1 12/1/2018 7JOB 2018-02 1718-0169-R1 12/1/2018 7JOB 2018-02 1718-0169-R1 12/1/2018 7JOB 2018-02 1718-0169-R1 12/1/2018 7JOB 2018-02 1718-0169-R1 12/1/2018 7JOB 2018-02 1718-0169-R1 12/1/2018 7JOB 2018-02 1718-0169-R1 12/1/2018 7JOB 2018-02 1718-0169-R1 12/1/2018 7JOB 2018-02 1718-0169-R1 12/1/2018 7JOB 2018-02 1718-0169-R1 12/1/2018 7JOB 2018-02 1718-0169-R1 12/1/2018 7JOB 2018-02 1718-0169-R1 12/1/2018 7JOB 2018-02 1718-0169-R1 12/1/2018 7JOB 2018-02 1718-0169-R1 12/1/2018 7JOB 2018-02 1718-0169-R1 12/1/2018 7JOB 2018-02 1718-0169-R1 12/1/2018 710E 2018-02 1718-0169-R1 12/1/2018 7JOB 2018-02 1718-0169-R1 DESCRIPTION EISENHOWER RETENTION BASIN LANDSCAPE IMP FRITZ BURNS PARK -SIDEWALK & PARKING N LQ PARKWAY TURF CONVERSION SILVERROCK INFRASTRUCTURE IMPROVEMENTS WASHINGTON DRAINAGE IMPROVEMENTS SB821 LQ HIGH SCHOOL ADA CC CAMPUS LAKE/IRRIG CONVERSION IMPROVEMENS EISENHOWER DRAINAGE CIP DEV/MEASURE A 5YR CIP FRONTIER PROPERTY WALL COVE PUBLIC RESTROOM CALLE TAMPICO DRAINAGE WASHINGTON ST AT FRED WARING DR UUIVt rHLIVIJ JI I IV11'RUVtIVItIV IJ 1VVVVK I VVt�I VVAKU Nrn HSIP INTERSECTION IMPROVEMENTS MADISON (AVE 50-AVE52) DUNE PALMS BRIDGE IMPROVEMENT LQ VILLAGE -A ROAD DIET PROJECT SSAR SYS SAFETY ANALYSIS REPORT RETENTION BASIN (DPLM AT WWHO) rIJUr I KAM NUIVHL 1141 tm-UIVIMM I Nt I VVUMr% I IPrRAnF PAVEMENT MGMT PLAN ST IMPROVEMENT CITYWIDE SIDEWALK IMPROVEMENTS City of La Quinta WELLS FARGO 78-495 Calle Tampico 11-24/1210 (8) La Quinta, CA 92253 (760)777-7150 D PAY ---Thirty Six Thousand Three Hundred Fifteen Dollars and 00/100 Cents --- GL ACCT # 401-0000-60103 201-7003-60103 401-0000-60103 401-0000-60103 401-0000-60103 401-0000-60103 401-0000-60103 401-0000-60103 101-7006-60104 217-0000-74010 401-0000-60103 401-0000-60103 401-0000-60103 401-0000-60103 401-0000-60103 401-0000-60103 401-0000-60103 401-0000-60103 401-0000-60103 401-0000-60103 401-0000-60103 401-0000-60103 401-0000-60103 CHECK TOTAL CHECK NO: 120898 12/14/2018 AMOUNT 145.00 145.00 2,982.50 725.00 1,080.00 422.50 65.00 580.00 7,995.00 145.00 145.00 452.50 145.00 1,515.00 1,085.00 725.00 1,995.00 7,277.50 1,395.00 1,450.00 250.00 3,420.00 2,175.00 36,315.00 CHECK NO: 120898 12/14/2018 $36,315.00 THIS CHECK EXPIRE AND IS VOID 180 DAYS FROM ISSUE DATE TO THE NAI CONSULTING INC ORDER 68955 ADELINA ROAD "— U ORI ED WMA►UM Of CATHEDRAL CITY, CA 92253 I A II IZED 51GNA713RE II' 1 20896110 1: 12 1000 2481: III 4 L 59 28 248 21l' �.�. _ ,� . ., .. ..,.or 4R x,d.. ,... tY .. �...+ r i► ,,Y r s. r z -, r rx .r�ira.rsrrra• .. . rTx.T f NAI Consulting, Inc. Civil Engineering Project Management Contract Administration 68-955 Adelina Road Cathedral City, CA 92234 Phone: (760) 323-5344 INVOICE TO: City of La Quinta Date: December 1, 2018 Public Works Department Job Number: 2018-02 P.O. Box 1504 Progress Payment: 7 La Quinta, California 92253 Attention: Bryan McKinney City Engineer PROJECT: PROJECT MANAGEMENT AND CONTRACT ADMINISTRATIVE SUPPORT SERVICES Reference: Agreement for Contract Services Dated: May 1, 2018 Professional services rendered pursuant to City of La Quinta Contract, dated May 1, 2018 to provide Project Management, Contract Management and Administrative Support Services to the City of La Quinta. Professional Fees Earned: November 1, 2018 through November 30, 2018 BASE CONTRACT AMOUNT: $ LESS PREVIOUS AMOUNT BILLED: TOTAL CONTRACT AMOUNT REMAINING: 487,455.00 ($279,559.43) 207,895.57 Description Hours Rate Total Project Manager 96 $ 145.00 $ 13,920.00 Senior Civil Engineer 118 $ 145.00 $ 17,110.00 Senior Engineer 22 $ 125.00 $ 2,750.00 Assistant Engineer $ 85.00 $ - Administrative Support 39 $ 65.00 $ 2,535.00 TOTAL FEES EARNED THIS PERIOD: $ 36,315.00 REIMBURSABLE EXPENSE SUBTOTAL: TOTAL AMOUNT DUE THIS INVOICE See attached for description of work performed. INVOICE DUE WHEN RENDERED $0.00 $ 36,315.00 CITY OF LA QUINTA SUMMARY OF ALL POSITIONS Hourly Cost Reimburseables Total GL Account No. Project Account No. 18/19PMP FY 18110 Pavement Managemenl Plan Street lm provern ents $ 3.420.00 $ 3.420.00 401-0000-60103 1819PMP-P 18/19STI FY 18119 Ci 'de Sidewalk Improvements $ 2,175.00 $ 2,175.00 401-0000-60103 1819STI-P 2009-02 Madison Street Ave. 50 To Ave. 52 $ 725.00 $ 725"00 401-0000-60185 091002-P 2009-04 Dune Palms Road Street Improvements WWR to Westward Ho $ 1.515"00 $ 1.515.00 401-0000-60185 091004-P 2011-06 Oune Palm s.Bridge Irn rovemeM $ 1.995.00 $ 1,995.00 401-0000-60103 111205-P 2014-17 SilverRock Resort Infrastructure $ 725.00 $ 725,00 401-0000-60103 141517-P 2015-03 ILa Quinta Village Complete Streets - A Road Diet Project $ 7,277.50 $ 7.277"50 401-0000-60103 151603-P 2015-12A Wash ln ton Drai nagelm provernents $ 1.080.00 $ 1,080.00 401-0000-60103 151612-P 2015-12B Eisenhower Drains e $ 580.00 $ 580.00 401-0000-60103 151612-P 2015-12C Calle Tampico Drainage $ 452.50 $ 452.50 401-0000-60103 151612-P 2015-12D Retention Basin DPLM at WWHO $ 1.450,00 $ 1,450.00 401-0000-60103 151612-P 2016-01 HSIP Intersection Im avements $ 1,085.00 $ 1.085.00 401-0000-60103 201601-P 2016-02 HSIP Traffic Signal Interconnect Network Upgrade $ 250.00 $ 250.00 401-0000-60103 201602-P 2016-03 North La Quinta Parkway Turf Conversion $ 2,982,50 $ 2,982.50 401-0000-60103 201603-P 2016-06 Civic Center Campus Lake/irrigation Conversion Im rovements $ 65.00 $ 65.00 401-0000-60103 201606-P 2017-01 Washington Street at Fred Waring Drive $ 145.00 $ 145.00 401-0000-60103 201701-P 2017-04 Eisenhower Retention Basin Landscape Improvements $ 145.00 $ 145.00 401-0000-60103 201704-P 2017-05 SB821 La Quinta High School ADA $ 422.50 $ 422.50 401-0000-60103 201705-P 2017-08 SSAR-Systemic Safel Analysis R $ 1.395.00 $ 1.395.00 201-7003-60103 201708-P 2017-22 Fritz Bums Park - Sidewalk & Parkin2 $ 145.00 $ 145,00 201-7003-60103 201722-E 2018-01 Cove Public Restroom $ 145.00 $ 145.00 401-0000-60103 201801-P Other assigned duties: Misc.7006 DIF - Transportation Infrastructure Report $ 7,995.00 $ 7,995.00 101-7006-60104 Misc. 0000 Frontier P[%edy Wall $ 145.00 $ 145.00 217-0000-74010 Professional srvs GRAND TOTAL: $ 36,315.001 1 $ 36 315.00 City of La Quinta VENDOR:00250 NAI CONSULTING INC DATE ID PO # 1/1/2019 8JOB 2018-02 1718-0169-R1 1/1/2019 8 JOB 2018-02 1718-0169-R1 1/1/2019 8JOB 2018-02 1718-0169-R1 1/1/2019 8 JOB 2018-02 1718-0169-R1 1/1/2019 8JOB 2018-02 1718-0169-R1 1/1/2019 8 JOB 2018-02 1718-0169-R1 1/1/2019 8JOB 2018-02 1718-0169-R1 1/1/2019 8JOB 2018-02 1718-0169-R1 1/1/2019 8JOB 2018-02 1718-0169-R1 1/1/2019 8JOB 2018-02 1718-0169-RS 1/1/2019 810E 2018-02 1718-0169-R1 1/1/2019 8 JOB 2018-02 1718-0169-R1 1/1/2019 8 JOB 2018-02 1718-0169-R1 1/1/2019 8 JOB 2018-02 1718-0169-R1 1/1/2019 8JOB 2018-02 1718-0169-R1 1/1/2019 8 JOB 2018-02 1718-0169-R1 1/1/2019 8 JOB 2018-02 1718-0169-R1 1/1/2019 8JOB 2018-02 1718-0169-R1 1/1/2019 8 JOB 2018-02 1718-0169-R1 1/1/2019 8 JOB 2018-02 1718-0169-R1 CHECK NO: 121291 01/25/2019 DESCRIPTION GL ACCT # AMOUNT SB821 LQ HIGH SCHOOL ADA 401-0000-60103 162.50 MbUr I KArr JIUIVAL 1141 r.KLUIVIVt\.I 14t I VVUMrl 401-0000-60103 195.00 1IPGRAnF EISENHOWER DRAINAGE 401-0000-60103 1,917.50 JEFFERSON-AVE 53 ROUNDABOUT 401-0000-60103 32.50 LQ VILLAGE -A ROAD DIET PROJECT 401-0000-60103 6,379.32 RETENTION BASIN (DPLM AT WWHO) 401-0000-60103 435.00 HSIP INTERSECTION IMPROVEMENTS 401-0000-60103 703.21 FRONTIER PROPERTY WALL 217-0000-74010 2,770.00 EISENHOWER RETENTION BASIN LANDSCAPE IMP 401-0000-60103 790.00 COVE PUBLIC RESTROOM 401-0000-60103 435.00 AVENIDA BERMUDAS ADA IMPROVEMENTS 401-0000-60103 4,915.00 MADISON (AVE 50-AVE52) 401-0000-60103 435.00 N LQ PARKWAY TURF CONVERSION 401-0000-60103 2,450.00 CALLE TAMPICO DRAINAGE 401-0000-60103 145.00 WASHINGTON DRAINAGE IMPROVEMENTS 401-0000-60103 580.00 SILVERROCK INFRASTRUCTURE IMPROVEMENTS 401-0000-60103 322.50 PAVEMENT MGMT PLAN ST IMPROVEMENT 401-0000-60103 705.00 DUNE PALMS BRIDGE IMPROVEMENT 401-0000-60103 2,287.50 CIP DEV/MEASURE A 5YR CIP 101-7006-60104 4,582.50 UUNt rALIVIJJI 11V1t-MUV LIVICIV IJ tVVVVK IU VVt�I VVAnU 401-0000-60103 4,240.00 Hn1 City of La Quinta WELLS FARGO 78-495 Calle Tampico 11-24/1210 (8) [' La Quinta, CA 92253 (760) 777-7150 PAY ---Thirty Four Thousand Four Hundred Eighty Two Dollars and 53/100 Cents --- TO THE NAI CONSULTING INC ORDER 68955 ADELINA ROAD O� CATHEDRAL CITY, CA 92253 CHECK TOTAL 34,482.53 �'_Y71�71;1:0?(#$,S:f�lii�r�rr[•i.]:stele:tiniclr:�;U;r:�.;.I;11•fL-�'�'- ^' CHECK NO: 121291 rCw C± 01/25/2019 $34,482.53 THIS CH CK EXPIIIES AND IS VOID 180 DAYS FROM ISSUE DATE �I I - All HORIiiD SIGNATURE . q HD UD SIGNATURE 0"L2L29111" 1:L210002481: 1114L592821,13 211a _._. � .-_ . -- -- - - -- _ ARIN�­ •- -- - ---- _.A_ . NAI Consulting, Inc. Civil Engineering Project Management Contract Administration 68-955 Adelina Road Cathedral City, CA 92234 Phone: (760) 323-5344 TO: City of La Quinta Date: Public Works Department Job Number: P.O. Box 1504 Progress Payment: La Quinta, California 92253 Attention: Bryan McKinney City Engineer 1.1913101 Leto January 1, 2019 2018-02 8 PROJECT: PROJECT MANAGEMENT AND CONTRACT ADMINISTRATIVE SUPPORT SERVICES Reference: Agreement for Contract Services Dated: May 1, 2018 Professional services rendered pursuant to City of La Quinta Contract, dated May 1, 2018 to provide Project Management, Contract Management and Administrative Support Services to the City of La Quinta. Professional Fees Earned: December 1, 2018 through December 31, 2018 BASE CONTRACT AMOUNT: $ LESS PREVIOUS AMOUNT BILLED: TOTAL CONTRACT AMOUNT REMAINING: 487,455.00 ($315,874.43) 171,580.57 Description Hours Rate Total Project Manager 81 $ 145.00 $ 11,745.00 Senior Civil Engineer 109 $ 145.00 $ 15,805.00 Senior Engineer 34 $ 125.00 $ 4,250.00 Assistant Engineer $ 85.00 $ - Administrative Support 41 $ 65.00 $ 1 2,665.00 TOTAL FEES EARNED THIS PERIOD: $ 34,465.00 REIMBURSABLE EXPENSE SUBTOTAL: TOTAL AMOUNT DUE THIS INVOICE See attached for description of work performed. INVOICE DUE WHEN RENDERED $17.53 $ 34,482.53 Project # Description of Reimbursable 2015-03 Golden State Overnight $9.32 2016-01 Golden State Ovemi ht $8.21 Total Reimbursable: $17.53 CITY OF LA QUINTA SUMMARY OF ALL POSITIONS Hourly Cost Reimburseables Total GL Account No. Project Account No 18119PMP FY 18119 Pavement Management Plan Street Improvements $ 705,00 $ 705.00 401-0000-60103 1819PMP-P 2009-02 Madison Street Ave. 50 To Ave. 52 $ 435.00 $ 435.00 401-0000-60103 091002-P 2009-04 Dune Palms Road Street Improvements (WWR to Westward Ho) $ 4.240.00 $ 4,240.00 401-0000-60103 091004-P 2011-05 Dune Palms Grid a I p rovement $ 2,287.50 $ 2,287.50 401-0000-60103 111205-P 2014-17 SilverRock Resort Infrastructure $ 322,50 $ 322.50 401-0000-60103 141517-P 2015-03 La Quinta VilTageComplele Streets - A Road Diet Pro ect $ 6.370.00 $ 9.32 $ 6.379, 32 401-0000-60103 151603-P 2015-12A Washington Drainage Improvements $ 580.00 $ 680.00 401-0000-60103 151612-P 2015-12B Eisenhower Drainage $ 1,917.50 $ 1,917.50 401-0000-60103 151612-P 2015-12C Calle Tampico Drainage $ 145.00 $ 145.00 401-0000-60103 151612-P 2015-12D Retention Basin DPLM at WWHO $ 435.00 $ 435.00 401-0000-60103 151612-P 2016-01 HSIP Intersection Improvements $ 695,00 $ 8.21 $ 703.21 401-0000-60103 201601-P 2016-02 HSiP Traffic Si nai Interconnect Network Upgrade $ 195.00 $ 195.00 401-0000-60103 201602-P 2016-03 North La Quinta Parkway Turf Conversion $ 2.450.00 $ 2,450.00 401-0000-60103 201603-P 2017-04 Eisenhower Retention Basin Landscape Improvements $ 790.00 $ 790.00 401-0000-60103 201704-P 2017-05 S0821 La Quinta Hi h Schad ADA $ 162.50 $ 162.50 401-0000-60103 201705-P 2017-09 Jefferson Street at Avenue 53 Roundabout $ 32.50 $ 32.50 401-0000-60103 201709-P 2018-01 Cove Public Restroom $ 435.00 $ 435.00 401-0000-60103 201801-P 2018-02 Avenida Bermudas ADA I provements $ 4.915.00 $ 4,915.00 401-0000-60103 201802-P Other assigned duties: Misc.7006 IDIF - Transportation Infrastructure Report $ 4,582.50 $ 4,582.50 101-7006-60104 Misc.0000 1 Frontier Property Will $ 2770.00 $ 2,770,00 217-0000-74010 Professional Srvs GRAND TOTAL: $ 34,466.00 S 34,482.63 E: I City of La Quinta VENDOR; 00250 NAI CONSULTING INC DATE ID PO # 2/1/2019 9JOB 2018-02 1718-0169-R1 2/1/2019 9JOB 2018-02 1718-0169-R1 2/1/2019 9JOB 2018-02 1718-0169-R1 2/1/2019 9 JOB 2018-02 1718-0169-R1 2/1/2019 9JOB 2018-02 1718-0169-R1 2/1/2019 9JOB 2018-02 1718-0169-R1 2/1/2019 9JOB 2018-02 1718-0169-R1 2/1/2019 9JOB 2018-02 1718-0169-R1 2/1/2019 9JOB 2018-02 1718-0169-R1 2/1/2019 910E 2018-02 1718-0169-R1 2/1/2019 9JOB 2018-02 1718-0169-R1 2/1/2019 9JOB 2018-02 1718-0169-R1 2/1/2019 9JOB 2018-02 1718-0169-R1 2/1/2019 9 JOB 2018-02 1718-0169-R1 2/1/2019 9JOB 2018-02 1718-0169-R1 2/1/2019 9JOB 2018-02 1718-0169-R1 2/1/2019 9JOB 2018-02 1718-0169-R1 2/1/2019 9JOB 2018-02 1718-0169-R1 2/1/2019 9JOB 2018-02 1718-0169-R1 2/1/2019 9JOB 2018-02 1718-0169-R1 2/1/2019 9JOB 2018-02 1718-0169-R1 2/1/2019 9JOB 2018-02 1718-0169-R1 DESCRIPTION MADISON (AVE 50-AVE52) CIP DEV/MEASURE A 5YR CIP JEFFERSON-AVE 53 ROUNDABOUT rt�Ur I KArr WUIVAL IIV 1 tKULANIVtI.I IVt I WUKM1 I Ivr,RAnF SSAR SYS SAFETY ANALYSIS REPORT CALLE TAMPICO DRAINAGE WASHINGTON DRAINAGE IMPROVEMENTS EISENHOWER DRAINAGE LQ VILLAGE -A ROAD DIET PROJECT DUNE PALMS BRIDGE IMPROVEMENT HSIP INTERSECTION IMPROVEMENTS UUIVC rAL.IVID �I IIVIrKUVtIVItIV I tVVVVM I WtJI VVAKU Hrn AVENIDA BERMUDAS ADA IMPROVEMENTS SILVERROCK INFRASTRUCTURE IMPROVEMENTS COVE PUBLIC RESTROOM SILVERROCK EVENT SITE RETENTION BASIN (DPLM AT WWHO) N LQ PARKWAY TURF CONVERSION WASHINGTON ST AT FRED WARING DR HIGHWAY 111 SIDEWALK IMPROVEMENTS EISENHOWER RETENTION BASIN LANDSCAPE IMP PAVEMENT MGMT PLAN ST IMPROVEMENT City of La Quinta WELLS FARGO 78-495 Calle Tampico 11-24/1210 (8) La Quinta, CA 92253 (760)777-7150 PAY ---Forty Four Thousand Six Hundred Forty Six Dollars and 10/10U Cents --- TO THE ORDER OF NAI CONSULTING INC 68955 ADELINA ROAD CATHEDRAL CITY, CA 92253 GL ACCT # 401-0000-60103 101-7006-60104 401-0000-60103 401-0000-60103 401-0000-60103 401-0000-60103 401-0000-60103 401-0000-60103 401-0000-60103 401-0000-60103 401-0000-60103 401-0000-60103 401-0000-60103 401-0000-60103 401-0000-60103 401-0000-60103 401-0000-60103 401-0000-60103 401-0000-60103 401-0000-60103 401-0000-60103 401-0000-60103 FEB S 7 2019 CHECK TOTAL CHECK NO:121607 02/22/2019 AMOUNT 1,885.00 5,462.50 322.50 985.00 1,290.00 1,080.00 1,547.50 2,207.50 6,623.60 4,502.50 145.00 3,755.00 1,160.00 435.00 725.00 3,045.00 1,225.00 1,950.00 145.00 2,030.00 1,950.00 2,175.00 44,646.10 CHECK NO: 121607 dry` LIMIIIE 02/22/2019 $44,646 10 THIS CH FCK EXPIRES AND IS VOID 180 DAYS FROM ISSUE DATE ��r DRl�fO SIGNAYLIRE HOWEO S, GHATURE II■ 12 160 ?Ilm 1: 12 1000 248D: II'4 IS 9 28 248 2V .v�-y01-.1,..�:..rr.rw►rv'N'71trTrafxmv,,x!VRPT•zffl!v.'lT:r-x# NAI Consulting, Inc. Civil Engineering Project Management Contract Administration 68-955 Adelina Road Cathedral City, CA 92234 Phone: (760) 323-5344 INVOICE TO: City of La Quinta Date: February 1, 2019 Public Works Department Job Number: 2018-02 P.O. Box 1504 Progress Payment: 9 La Quinta, California 92253 Attention: Bryan McKinney PROJECT: PROJECT MANAGEMENT AND CONTRACT ADMINISTRATIVE SUPPORT SERVICES Reference: Agreement for Contract Services Dated: May 1, 2018 Professional services rendered pursuant to City of La Quinta Contract, dated May 1, 2018 to provide Project Management, Contract Management and Administrative Support Services to the City of La Quinta. Professional Fees Earned: January 1, 2019 through January 31, 2019 BASE CONTRACT AMOUNT: $ 487,455.00 LESS PREVIOUS AMOUNT BILLED: ($350,356.96) TOTAL CONTRACT AMOUNT REMAINING: $ 137,098.04 Description Hours Rate Total Project Manager 125 $ 145.00 $ 18,125.00 Senior Civil Engineer 147 $ 145.00 $ 21,315.00 Senior Engineer 28 $ 125.00 $ 3,500.00 Assistant Engineer $ 85.00 $ - Administrative Support 26 $ 65.00 $ 1 1,690.00 TOTAL FEES EARNED THIS PERIOD: $ 44,630.00 REIMBURSABLE EXPENSE SUBTOTAL: TOTAL AMOUNT DUE THIS INVOICE See attached for description of work performed. INVOICE DUE WHEN RENDERED $16.10 $ 44,646.10 CITY OF LA QUINTA SUMMARY OF ALL POSITIONS HoUrIX Cost Reimburseables Total GL Account No. Project Account No. 18/19PMP FY 18/19 Pavement Management Plan Street Improvements $ 2,175.00 $ 2 175.00 401-0000-601D3 1819PMP-P 2009-02 Madison Street Ave. 50 To Ave. 52 $ 1.885.00 $ 1,085.00 401-0000-60103 091002-P .2009-04 Dune Palms Road Street improvements (WWR to Westward Ho) $ 3.755.00 $ 3.755.00 401-0000.60103 091004-P 2011-06 Dune Palms Bridge Improvement S 4,502.50 4,502,60 401-ODOMO103 111206•P :2014-17 SilverRock Resort Infrastructure $ 435.00 5 435.00 401-0000-60103 141517-P .2015-03 La Quinta Village Complete Streets - A Road Diet Project $ 6.607.50 $ 16.10 $ 6,623.60 401-0000-601 D3 151603-P 2015-12A Washington Drainage Improvements $ 1.547.50 $ 1,547.50 401-0000-60103 151612-P :2015-128 Eisenhower Drainage $ 2,207.50 $ 2,207.50 401-0000-601D3 151612-P 2015-12C Calle Tampico Drainage $ 1,080.00 $ 1,080.00 401-0000-60103 151612-P 2015-12D Retention Basin DPLM at WWHp $ 1,225-00 S 1,225.00 401-0000-60103 151612-P 2016-01 HSIP Intersection Improvements $ 145.00 $ 145.00 401-0000-60103 201601-P 2016-02 IHSIP Traffic Signal Interconnect Network Upgrade $ 906.00 5 986.00 401-0000-60103 201602-P 2016-03 INorth La Quinta Parkway Turf Conversion $ 1.950.00 $ 1,950.00 401-0000-60103 201603-P 2016-08 SilverRock Venue Site $ 3,045.00 $ 3,045.00 401-0000-60103 201608•P 2017-01 'Washington Street at Fred Waring Drive $ 145.00 $ 145.00 401-0000-60103 201701-P 2017-04 (Eisenhower Retention Basin Landscape Improvements $ 1,950.00 f; 1,950.00 401-0000-60103 201704-P 2017-08 SSAR - Systemic Safety Analysis Report $ 1.290.00 $ 1,290.00 401-0000-60103 201708-P 2017-09 Jefferson Street at Avenue 53 Roundabout $ 322.50 $ 322.50 401-0000-60103 201709-P 2018-01 (Cove Public Restroom $ 725.00 $ 725.00 401-0000-60103 201801-P 2018 02 Avenida Bermudas ADA Im rovements $ 1 1UM $ 1 160.00 401-GOOD-60103 201802-P 2018-03 Hi hwa 111 Sidewalk Improvements 2,030.00 $ 2,030.00 401-0000-60103 201803-P Othara5slgned duties: Misc.7008 Capital improvement Plan Misc.7006 TUMF Analysis) MAF Coordination Misc.7005 IDIF - Trap ortationInfrastructureReport $ 5,462.50 $ 5,462.50 101-7006-60104 GRAND TOTAL: $ 44 630.00 $ 44,646.10 i Y City of La Quinta VENDOR: 00250 NAI CONSULTING INC DATE ID PO # 3/1/2019 10 JOB 2018-02 1718-0169-R1 3/1/2019 10 JOB 2018-02 1718-0169-R1 3/1/2019 10 JOB 2018-02 1718-0169-R1 3/1/2019 10 JOB 2018-02 1718-0169-R1 3/1/2019 10 JOB 2018-02 1718-0169-R1 3/1/2019 10 JOB 2018-02 1718-0169-R1 3/1/2019 10 JOB 2018-02 1718-0169-R1 3/1/2019 10 JOB 2018-02 1718-0169-R1 3/1/2019 10 JOB 2018-02 1718-0169-R1 3/1/2019 10 JOB 2018-02 1718-0169-R1 3/1/2019 10 JOB 2018-02 1718-0169-R1 3/1/2019 10 JOB 2018-02 1718-0169-R1 3/1/2019 10 JOB 2018-02 1718-0169-R1 3/1/2019 10 JOB 2018-02 1718-0169-R1 3/1/2019 10 JOB 2018-02 1718-0169-R1 3/1/2019 10 JOB 2018-02 1718-0169-R1 3/1/2019 10 JOB 2018-02 1718-0169-R1 3/1/2019 10 JOB 2018-02 1718-0169-R1 3/1/2019 10 JOB 2018-02 1718-0169-R1 3/1/2019 10 JOB 2018-02 1718-0169-R3 3/1/2019 10 JOB 2018-02 1718-0169-R1 3/1/2019 10 JOB 2018-02 1718-0169-R1 3/1/2019 10 JOB 2018-02 1718-0169-R1 3/1/2019 10 JOB 2018-02 1718-0169-R1 CHECK NO:121895 03/22/2019 DESCRIPTION GL ACCT # AMOUNT 02/2019 HSIP INTERSECTION IMPROVEMENTS 401-0000-60103 1,475.00 02/2019 COVE PUBLIC RESTROOM 401-0000-60103 580.00 02/2019 SILVERROCK EVENT SITE 401-0000-60103 1,305.00 u/_/zuiV mwr E KHrr DIUNAE- NN 1 tnwrvrvtu Evt E VVn 401-0000-60103 2,455.98 1 IPGR 02/2019 RETENTION BASIN (DPLM AT WWHO) 401-0000-60103 870.00 02/2019 HIGHWAY 111 SIDEWALK IMPROVEMENTS 401-0000-60103 1,692.50 02/2019 DUNE PALMS BRIDGE IMPROVEMENT 401-0000-60103 2,582.50 Ut/LUIV tEJtN1lUVVtK Kt i M E wEv nHauv LHrvw4J+rt 401-0000-60103 757.50 IMP 02/2019 WASHINGTON DRAINAGE IMPROVEMENTS 401-0000-60103 177.50 02/2019 PAVEMENT MGMT PLAN STREET IMPROVE 401-0000-60103 4,930.00 02/2019 AVENIDA BERMUDAS ADA IMPROVEMENTS 401-0000-60103 580.00 02/2019 EISENHOWER DRAINAGE 401-0000-60103 1,225.00 02/2019 SB821 JEFFERSON ST SIDEWALK GAP CLOSURE 401-0000-60103 125.00 02/2019 WASHINGTON ST AT FRED WARING DR 401-0000-60103 290.00 02/2019 JEFFERSON-AVE 53 ROUNDABOUT 401-0000-60103 580.00 02/2019 PROF ENG SVCS MADISON (AVE 50-AVE52) 401-0000-60103 1,192.50 02/2019 N LQ PARKWAY TURF CONVERSION 401-0000-60103 902.50 02/2019 CALLE TAMPICO DRAINAGE 401-0000-60103 177.50 02/2019 FRITZ BURNS PARK -SIDEWALK & PARKING 201-7003-60103 290.00 02/2019 SSAR SYS SAFETY ANALYSIS REPORT 401-0000-60103 565.00 02/2019 LQ VILLAGE -A ROAD DIET PROJECT 401-0000-60103 4,215.00 02/2019 CIP DEV/MEASURE A 5YR CIP 101-7006-60104 10,387,50 02/2019 SILVERROCK INFRASTRUCTURE IMPROVEMENTS 401-0000-60103 1,595.00 UZIZUiy UUNt VALIVlb 3E irvirnuvt jVVVVK I 401-0000 60103 2,210.00 U/FtTWARn N01 City of La Quinta WELLS FARGO 78-495 Calle Tampico 11-24/1210 (8) F , La Quinta, CA 92253 kk (760)777-7150 PAY ---Forty One Thousand One Hundred Sixty Dollars and 98/100. Cents• -- TO THE NAI CONSULTING INC ORDER 68955 ADELINA ROAD OF CATHEDRAL CITY, CA 92253 MAR 2 8 2019 CHECK TOTAL 41,160.98 CHECK NO: 121895 03/22/2019 $41,160.98 THIS CHECK EXPIRES AND IS VOID 180 DAYS FROM ISSUE DATE AU NMUO SIGNATEIRE HOW Z ED SIGNATURE 4 � 11°L2L89511' 1:L2L0002481: 1I'4L5928248 2110 .,.�ei+'��r.�.rrr_rw-�:r �r_r�mtrs..-rv:r, �v�^r:.r i�rm r��.:rvvw�,�,a*r:r.•cira.�rr�r-�•+� NAI Consulting, Inc. Civil Engineering Project Management Contract Administration 68-955 Adelina Road Cathedral City, CA 92234 Phone: (760) 323-5344 INVOICE TO: City of La Quinta Date: March 1, 2019 Public Works Department Job Number: 2018-02 P.O. Box 1504 Progress Payment: 10 La Quinta, California 92253 Attention: Bryan McKinney PROJECT: PROJECT MANAGEMENT AND CONTRACT ADMINISTRATIVE SUPPORT SERVICES Reference: Agreement for Contract Services Dated: May 1, 2018 Professional services rendered pursuant to City of La Quinta Contract, dated May 1, 2018 to provide Project Management, Contract Management and Administrative Support Services to the City of La Quinta. Professional Fees Earned: February 1, 2019 through February 28, 2019 BASE CONTRACT AMOUNT: $ 487,455.00 LESS PREVIOUS AMOUNT BILLED: ($395,003.06) TOTAL CONTRACT AMOUNT REMAINING: $ 92,451.94 Description Hours Rate Total Project Manager 116 $ 145.00 $ 16,820.00 Senior Civil Engineer 115 $ 145.00 $ 16,675.00 Senior Engineer 41.5 $ 125.00 $ 5,187.50 Assistant Engineer $ 85.00 $ - Administrative Support 38 $ 65.00 $ 2,470.00 TOTAL FEES EARNED THIS PERIOD: $ 41,152.50 REIMBURSABLE EXPENSE SUBTOTAL: TOTAL AMOUNT DUE THIS INVOICE See attached for description of work performed. INVOICE DUE WHEN RENDERED $8.48 $ 41,160.98 iProject # Description of Reimbursable 2016-02 Golden State Overnight $8.48 Total Reimbursable: $8.48 CITY OF LA QUINTA SUMMARY OF ALL POSITIONS Hourly Cost Reimburseables Total GL Account No. Project Account No. 18/19PMP FY 18/19 Pavement Management Plan Street Improvements $ 4 930.00 $ 4,930.00 401-0000-60103 1819PMP-P 2009-02 Madison Street Ave. 50 To Ave. 52 $ 1.192.50 $ 1,192.50 401-DODO-60103 091002-P 2009-04 Dune Palms Road Street Improvements WWR to Westward Ho $ 2.210.00 $ 2,210.00 401-0000-60103 091004-P 2011-05 Dune Palms Bridge ImprpVarnant $ 2.582.50 $ 2.582.50 401-0000-60103 111205-P 2014-17 SilverRock Resort Infrastructure $ 1,596.00 $ 1,695.00 401-0000-60103 141517-P 2015-03 La Quinta Village Complete Streets - A Road Diet Project $ 4.215.00 $ 4.215.00 401-0000-60103 151603-P 2015-12A Washington Drainage Im rovements $ 177.50 $ 177.50 401-0000-60103 151612-P 2015-12B Eisenhower Drainage $ 1.225.00 $ 1,225.00 401-0000-60103 151612-P 2015-12C Calle Tampico Drainage $' 177.50 $ 177,50 401-0000-60103 151612-P 2015-12D Retention Basin DPLM at WWHO $ 870.00 $ 870.00 401-0000-60103 151612-P 2016-01 HSiP Intersection Improvements $ 1.475.00 $ 1.475.00 401-0000-60103 201601-P 2016-02 HSIP Traffic Signal Interconnect Network Up2rade $ 2,447.50 $ 8.48 $ 2 455.98 401-0000-60103 201602-P .2016-03 North La Quinta Parkway Turf Conversion $ 902.50 $ 902.50 401-0000-60103 201603-P .2016-08 SilverRock Venue Site $ 1.305.00 $ 1.305.00 401-0000-60103 201608-P 2017-01 Washington Street at Fred Wadn_q Drive $ 290.00 $ 290.00 401-0000-60103 201701-P 2017-04 Eisenhower Retention Basin Landscape Improvements $ 757.50 $ 757.50 401-0000-60103 201704-P 2017-06 SB821 Jefferson Street Sidewalk Gap Closure $ 125.00 $ 125.00 401-0000-60103 201706-P 2017-08 SSAR - Systemic Safety Analysis Report $ 565.00 $ 565.00 401-0000-60103 201708-P 2017-09 Jefferson Street at Avenue 53 Raundaboul $ 580,00 $ 580.00 401-0000-60103 201709-P 2017-22 Fritz Bums Park - Sidewalk & Parking $ 290.00 $ 290.00 201-7003-60103 201722-E 2018-01 Cove Public Restroom $ 580.00 $ 580.00 401-0000-60103 201801-P 2018-02 .Avenida Bermudas ADA Improvements $ 580.00 $ 580.00 401-0000-60103 201802-P 2018-03 Hi hwa 111 Sidewalk Improvements $ 1,692,50 $ 1,692.50 401-0000-60103 201803-P Other assigned duties: Misc.7006 Capital Improvement Plan Development Misc.7006 Measure A 5 Year Capital Improvement Plan Misc.7006 DI - Update $ 10,387.50 $ 10,387.50 101-7006-60104 GRAND TOTAUi $ 41 152.50 S 41,160.98 'D o 00 O �OaoO D o 0 0 o 0 0 0 0 0 0 00000Oo•o 0 o O o oo �Fa10 it7 t77 VI lu"i N N N � O�- O A Vl O N A O O W V) N t� OO mm O M m•m IF f7 iV3 E9 F9 iVf fA fA V) f9 fA (A fA fA t9 M fA 'tA fA 'FA D O 00 N 'In O O 1!] �[] 0 0 o 0 •N � 0 0 0 0 'N 'u1 0 0 0 0 N N 0 0 N 0 0 •N 0I0 N o O N �rv,��a fA •IA fA N �� Hi iA v v Yi fA v � F9 19 In � � U3 Ui l° v vv•avv fA fA In 19 'V3 VI f9 f9 J ~ O� [F] T •N T VIA B A N M W tll N 1y M N V Q � W �LV NN V ooN�D� o o 0 '0 p p0'oo00� pw S�CI �g04 I. NNO w N .-aDa oa o 0 0 0'0 0'0 Opggo 'C � W v o v o o •0 0 0 0 0 0 0 o O 'o a �o 0 IH t� 0 0 o 0 01,11 O g o q W j� Iti N00000 ['1 O O N O 0 00tlp O'N C m �� 0 •o o v O o 0 0 0 0 0 0 0 0 6 p 0 iD z Wa o�ooOpO o o g p o O .0-0 0 tv ;�wppoNoo F- 000 � 0 Ooo�oO In0 OO 0-0N 0 OpoOpoN 3 ,a TIC N F o•0O Ovo O m—ulgq0o0oO c .- 0 mic 0 O rin v N o 'o o '0 �+ U- O d N 0 0 0 O O 0 0 - 0.0 N •�[7 pf�lO0 D O O N O r r OgO0 N 1- O .17 O r r O C ��m�oroNoO - o o � o O OOG�D t N W 0 'D O L 0 0 0 0 0 0 .- •0 O N U N �/I d � o c E m 0 Q E2 n c 2 c m w° a m y3V d U c a > E ° E U IH E` 'd In 2 N m c w�i m� �E O EIs N m>~ v E eII(I E E a3 a?LL_mc> EOx w >�d`ci '¢ dEmN °maw°a3 7.'tm°.c-Ct m E E a Y � a5"'� Q 0 ct 3 y a m �w•a di'avm d w�ev rzZi 3'w uu<r a 'Vloid" Nry rN�g44'e i211] f 44���4� mAA_�miNN epil Nry N {pi{{vy v ryGNN 0 N