HomeMy WebLinkAbout2026-06-18 CUP2025-0004 Completeness Determination June 18, 2026 Nicole Vann MSA Consulting 34200 Bob Hope Drive Rancho Mirage, CA 92270 SUBJECT: COMPLETENESS DETERMINATION - LA QUINTA RESORT RENOVATION OF THE EXISTING FAMILY SWIMMING POOL CUP 2025- 0004 Dear Ms. Vann: On May 21, 2-026, the City of La Quinta Design and Development Department received second resubmittal materials for the above-referenced application for a family swimming pool renovation at the La Quinta Resort property located at 49499 Eisenhower Drive. After reviewing all submitted information, your application has been found complete. Additional information is, however, required. Specifically, Public Works requires that you submit a hydrology memo which explains drainage design for the site. Please prepare that and submit it to the application file on the Hub. We have also reviewed the CEQA documentation you provided, and have determined that it does not support an exemption. The documentation does not provide substantial evidence that the project will not have an impact on the environment. Please note that the characterization of the project as being ancillary and no expansion of use is not supported. The facilities substantially expand both the capacity of the pool as a whole simply due to its size, and the attraction to guests because of the addition of slides and the kid’s play structure. The City will require the preparation of an Initial Study for the project. The noise study submitted with the exemption documents is insufficient and inadequate. Comments have been provided and are attached. The historic resource analysis must be modified to eliminate references to exemption, and provide sufficient information for an Initial Study. The Initial Study must also include an air quality/GHG analysis with a focus on construction emissions and Locally Significant Thresholds (LST). Your application will now move to the second step in the City’s application review process, the distribution to appropriate City departments and other reviewing agencies for review and comment. This second step typically takes three to four weeks. Please note that additional materials may be required as your application is reviewed. We have also received the follow comments, which can be incorporated into your plans now, or held until the design review is complete and added to your next submittal: 1. From Public Works: Show the lot lines to be adjusted on the grading plan. 2. From the Fire Department: On a site plan, show the fire access walkways to the Slide Tower from the fire apparatus access road. If the fire access walkway exceeds the maximum standard length of 150 feet, then the structure may need to be relocated or mitigation measures can be proposed to the Fire Department for review and approval. We recommend that you contact Chris Cox, our Fire Marshal, directly to address this. We also understand that you are undertaking a Lot Line Adjustment or similar mechanisms to modify the site boundaries. We can either condition the project to complete the lot modifications prior to any permit issuance, or process it in parallel with this application. Please let us know which option you intend to pursue. As you know, I work remotely from City Hall. If you have any questions about the requirements above, please feel free to contact me at 760-341-4800 or consultingplanner@laquintaca.gov Sincerely, Nicole Sauviat Criste Consulting Planner Design and Development Department