HomeMy WebLinkAboutRFP YMCA Fence & Trash Enclosure 2025-10 / Civic Center Bridge 2026-07 Addendum 2 Page 1 of 3 ADDENDUM NO. 2 TO REQUEST FOR PROPOSALS (RFP) Date: July 29, 2026 To:All prospective proposers RFP: YMCA FENCE AND TRASH ENCLOSURE PROJECT NO. 2025-10 & CIVIC CENTER BRIDGE IMPROVEMENTS PROJECT NO. 2026-07 The following provisions are hereby incorporated into the RFP for the above-referenced consulting services, originally published on July 09, 2026. The following is a response letter for all questions received as part of this RFP 1. Question: "Present the proposals in a format and order that corresponds to the numbering and lettering contained herein", but one of the Evaluation Criteria is "Project Understanding and Approach" and it does not have a corresponding number. Under what number should our U&A go? Answer: The following shall be included under Section IV. Proposal Format between Sections 5. And Sections 6. 5.1 Project Understanding and Approach A description of the firm’s project understanding and how the consultant team will approach the project. 5.2 Scope of Services A description of the tasks, sub-tasks, and deliverables that will be provided. The Scope of Work should be presented in a logical format that can be easily attached to the Agreement for Contract Services. 5.3 Project Schedule A comprehensive Gantt Chart schedule describing the nature and scheduling of proposed tasks. 2. Question: Do subcontractors also need to fill out Attachments 2 and 3? Answer: No, only the Prime Consultant. 3. Question: Are consultants expected to provide cost estimating? Answer: Yes, consultants shall provide a cost estimate at the 1st, 2nd, and 3rd reviews (at a minimum) as described in the PROJECT DEVELOPMENT PROCESS section of the RFP. Page 2 of 3 4.Question: Are original bridge design drawings, shop drawings, fabrication drawings, or previous inspection reports available? Answer: They are unavailable. It is suspected the bridge manufacturer is a part of the company Contech Engineering Solutions. 5. Question: Can the City confirm whether the bridge structural steel is painted galvanized or mild steel, or another material? If known, are previous coating specifications available? Answer: The city cannot confirm the bridge material nor the current coating material or previous specifications. 6. Question: Is the consultant expected to retain and manage any specialty testing subconsultants (e.g., NDE, GPR, concrete testing), or is intent to do initial assessment and then consultant can provide recommendations if any of those services are warranted and potentially have those procured directly by the City if needed? Answer: The prime consultant shall determine which sub-consultants are needed to complete the work as described in the RFP. It is not expected to retain and manage any additional specialty testing subconsultants if unneeded. If after the initial assessment it is determined a specific specialty testing is needed that is not included in the proposal, the city may request to add the additional services via amendment to the contract. The consultant may include an optional task if it is suspected specific specialty testing will be needed based on judgement or past practice. 7. Question: May we assume hazardous materials testing (e.g., lead-based paint, etc.) is excluded from the consultant's scope? Answer: Hazardous materials testing for construction demolition may be excluded from the consultant’s scope. However, demolition plans and specifications must address any lead and/or asbestos if found during investigation. 8. Question: Will the City provide a current topographic survey and utility information for the trash enclosure? May we assume no civil engineering scope (grading, drainage, utility relocation, paving, ADA improvements, etc.) is required? Answer: The City will not provide a current topographic survey due to the small nature of each project. Minimum Civil Engineering Scope relevant to the construction of the trash enclosure such as subgrade preparation, concrete design, etc. should be included in the plans and specifications. Specific Grading, Specific Drainage, Utility Relocation, Paving, ADA improvements (outside the trash enclosure area) as mentioned in the question can be omitted. 9. Question: May we assume a geotechnical investigation is not required for the trash enclosure, and that foundation design may be based on code-presumptive values or available geotechnical information provided by the City? Page 3 of 3 Answer: The consultant may utilize code-presumptive values for the foundation design. 10.Question: Has the City established a target construction budget for either project? Answer: The City has not established a target construction budget for either project at this moment. It is suspected a targeted construction budget will be determined after the concept review (1st Review). 11.Question: Please clarify the anticipated level of bidding and construction support. Should consultants assume responses to RFIs and limited submittal review only, or are construction site visits, structural observation, and construction meetings expected? Answer: Consultants should include responses to RFI and submittal reviews for bidding and construction support. Construction Site Visits and Structural Observation may be included as an optional task for the Civic Center Bridge Improvements for RFI questions during construction. Construction meeting attendance is not expected. 12.Question: Can [the] waterfall be turned off temporarily to facilitate observations? Can we assume we can enter the water with waders to do initial observations? Answer: Yes to both questions. 13.Question:Is the consultant expected to perform a complete structural analysis of the existing bridges, or is the intent to evaluate and design localized repairs based on observed deterioration? Answer: The intent is to evaluate, and design localized repairs based on observed deterioration as well as protective measures against further deterioration. In all other respects the original RFP shall remain in effect. ******************************************************* End of Addendum No. 2 Published July 29, 2026 ________________________ Felix De Leon, Senior Civil/Managing Engineer City of La Quinta