PROJECT INFORMATION
GROUND
LEVEL
PROJECT NAME: BELLASENO
STREET ADDRESS: SOUTHEAST CORNER MONROE STREET AND AVENUE 60
TRACT/PARCEL NUMBER: 31732, AMENDMENT NO. 2
TOTAL PROJECT ACREAGE: 43.8 (DISTURBED AREA)
LOCATION OF WATER SOURCE AND FLOW RATE: EX. FDC, CVWD WATER (1500 GPM, MIN.)
LOCATION OF BACKUP SOURCE AND FLOW: CVWD WATER MANN (1500 GPM, MW.)
MAX CUBIC YARDS OF EARTH MOVEMENT: 62,800 C.Y. MASS EXCAVATION
AMOUNT OF EXPORT: 0 CY
DISPOSAL S/TE/S: N/A
ON SITE STORAGE PILES: TBD BY C/TY/CONTRACTOR (NOTE: NO STOCKPILING WITHOUT CITY ENG/NEER APPROVAL.
PRIMARY SOIL TYPE: SILTY SANDS & SANDY SILTS
CONTROL BUDGET: $100,000
OWNER REPRESENTATIVE INFORMATION
OWNERS REPRESENTATIVE NAME: DAVE LIPPERT
OWNERS REPRESENTATIVE ADDRESS:: P.O. BOX 5477
L4 QUINTA, CA 92248
CONTACT PHONE NUMBER (24 HOURS): 760-601-7437
OWNER'S REPRESENTATIVE'S AQMD CERTIF/CATICt'&NUMBER: CV1601-003011-3095
OWNERS REPRESENTATIVE SIGNATURE AND DATE:
PHASING OF GRADING ACTIVITIES
THE AMOUNT OF ACTIVE DISTURBED AREA MUST BE LIMITED TO WHAT CAN BE EFFECTIVELY WATERED 4 TIMES PER
DAY BY EITHER SPRINKLERS OR WATER TRUCKS. TYPICAL 2000 GALLON WATER TRUCKS CAN EFFECTIVELY WATER
ABOUT 4 ACRES PER HOUR. THEREFORE AN 8 HR. WORKDAY DIVIDED BY 4 WATER/NGS PER DAY T/MES 4 AC./HR.
= 8 ACRES PER TRUCK. SINCE WATER TRUCKS ARE ALLOWED TO WORK 7 DAYS A WEEK, 24 HOURS A DAY, IN
SOME LOCATIONS, UP TO 24 AC. PER TRUCK MAY BE ACHIEVED THAT WAY, WITH SPECIAL PERMISSION. LARGER
PROJECTS MUST HAVE MORE TRUCKS, MORE HOURS, MORE SPRINKLERS, OR LESS DISTURBED AREA AT ANY ONE
TIME. AREAS ALREADY GRADED OR STOCKPILED MUST BE STABILIZED W/TH CHEMICALS, HYDROMULCH, 0!d
VEGETATION, BEFORE ADDITIONAL AREAS CAN BE STRIPPED FOR GRADING. THE PHASING PATTERN BELOW SHALL BE
SHOWN IN THE REFERENCE MAP ON THIS SHEET AT UPPER RIGHT. DRIVING ROUTES THROUGH A PROJECT MUST BE
COUNTED IN ALL PHASES WHERE THEY ARE ONLY TREATED WITH WATER. IT /S BETTER TO TREAT THEM WITH AN
APPROVED "O/L" (LIKE ENV/ROKLEEN) OR SIMILAR NON -CRUSTING DUST PALLIATIVE, TO SAVE WATER.
ASSUME 1 2000 GALLON WATER TRUCK CAN EFFECTIVELY WATER 8 ACRES PER DAY ON NON HIGH WIND DAYS.
DURING HIGH W/ND DAYS, THE NUMBER OF TRUCKS MAY INCREASE DEPENDING ON THE SITUATION.
THE UTILITY TRENCHING PHASE AND STREET IMPROVEMENT PHASE WILL OBTAIN ITS OWN WATER TRUCK.
PHASE A CLEAR AND GRUB
START DATE END DATE DISTURBED ACREAGE
7/1/16 7/15/16 43.8
PHASE B
START DATE
7/16/16
PHASE C
START DATE
11/1/16
PHASE D
START DATE
4/1/17
STABIL/ZED ACRES
0.0
ROUGH GRADING
END DATE DISTURBED ACREAGE STABIL/ZED ACRES
10/30/16 43.8 0.0
UTILITY TRENCHING AND STREET IMPROVEMENTS
END DATE DISTURBED ACREAGE STABIL/ZED ACRES
6/30/17 10.0 33.8
BUILDING AND LANDSCAPING
END DATE DISTURBED ACREAGE STABIL/ZED ACRES
UNKNOWN 5.0 38.8
FUGITIVE PM 10 DUST CONTROL MEASURES
SPR/NKLER ACRES
0
SPR/NKLER ACRES
0
SPRINKLER ACRES
0
SPRINKLER ACRES
0
2,000 GAL
WATER TRUCKS
0
2,000 GAL
WATER TRUCKS
0
2,000 GAL
WATER TRUCKS
2
2,000 GAL
WATER TRUCKS
1
4,000 GAL
WATER TRUCKS
3
4,000 GAL
WATER TRUCKS
3
4,000 GAL
WATER TRUCKS
0
4,000 GAL
WATER TRUCKS
0
HERE IS THE SUMMARIZED MATRIX OF REQUIRED DUST MITIGATION MEASURES IDENTIFIED BY PHASE:
A B C
D
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
PRE -GRADING SITE WATERING (IRRIGATION SYSTEM FOR MIN. 72 HRS. )
SIGNS POSTED ON SITE WITH 24 HR. PHONE NUMBER(S) FOR DUST CONTROLLER
SAND FENCING (ON ALL SIDES OF PROJECT LACKING EXISTING MASONRY WALLS
OR W/ND BLOCK.)
SITE WATERING 7 DAYS A WEEK (IRRIGATION SYSTEM, MW. 4 TIMES PER 24 HRS.,
0R BY WATER TRUCKS, MIN. 4 TIMES PER 24 HRS., 1 TRUCK / 8 ACRES)
PER/METER SPRINKLER SYSTEM (ALL SIDES, CONTINUOUS NIGHT WATERING WHEN WINDY)
GRAVEL (MIN. 1.5" DIAM. X 4" DEEP AT OFF-STREET STORAGE AND PARKING AREAS)
WHEEL CLEANING AT TRUCK EXITS, ("RUMBLE STRIPS", DRIVE-THROUGH PONDS,
GRAVEL AREAS, ETC. DETAIL METHOD ON REFERENCE MAP AT AT R/GHT)
INACTIVE AREA SOIL STABILIZERS (POLYMER, HYDROMULCH, APPROVED OIL, 01 PLANTS)
ACTIVE AREA SOIL STABILIZERS (ENV/ROKLEEN "0/L", OR SIMILAR WETTING AGENTS)
STOP ALL VEHICLE ACTIVITY EXCEPT WATER TRUCKS WHEN WIND > 25 MPH
STREET SWEEPING WHENEVER NEEDED
PERMANENT VEGETATION / LANDSCAPING
BLOCK WALLS
ROAD PAVING
NOTE: THESE CONTROL METHODS ARE DISCUSSED IN DETAIL IN THE "DUST CONTROL PLAN REVIEW
GUIDANCE FOR LOCAL GOVERNMENT' FROM THE SOUTH COAST A/R QUALITY MANAGEMENT DISTRICT,
(S.C.A.Q.M.D). AND AVAILABLE FROM THE CITY OF L4 QUINTA PUBLIC WORKS/ENGINEERING DEPARTMENT.
PROJECT RECORDKEEP/NG/REPORT.• RECORD ALL ACTIVITIES, CONTRACTS AND MATERIALS PURCHASES
ASSOCIATED WITH BLOWSAND/FUGIT/VE DUST PROGRAM. WEEKLY REPORTS SHOULD BE SUBMITTED TO
THE CITY OF LA QUINTA, PUBLIC WORKS DEPARTMENT F01 REVIEW. THIS "FEEDBACK' WILL EVENTUALLY
HELP THE CITY TO DETERMINE WHAT METHODS OF DUST CONTROL ARE MOST COST EFFECTIVE IN
W BOTH SHORT TERM AND LONG TERM SITUATIONS. SEE THE REPORT FORM THAT'S AVAILABLE FROM
THE C/TY OR /N THE AFORESAID DOCUMENT
FUGITIVE PM 10 DUST CONTROL PROGRAM DETAILS
EACH MITIGATION MEASURE 01 CONTROL PROGRAM SHALL BE DESCRIBED IN DETAIL BELOW AND ON
ADDITIONAL SHEETS AS NECESSARY. PLEASE USE THE REQUIRED DUST CONTROL PLAN EXHIBIT (AT RIGHT
OR ATTACHED) TO INDICATE THE LOCATION OF ON-SITE WATER AVAILABILITY, STAGING AREAS TEMPORARY
IRRIGATION LINES, TRUCK/WHEEL WASHERS, TEMPORARY SAND FENCING, CONSTRUCT/ON PHASING, WORKER'S
PARKING AREAS, GRAVELED ENTRANCE/EXIT, AND OTHER THINGS AS NEEDED.
PHASE "A": CLEARING AND GRUBBING (SITE PREP. & MOBILIZATION)
SPECIFIC PROCEDURES
1. PREWATERING METHODS: SPR/NKLER ENT/RE SITE TO AT LEAST 12X MINIMUM MOISTURE CONTENT OR WITHIN
70X OPTIMUM IF THE OPTIMUM MOISTURE CONTENT /S LESS THAN 129, TO OVEREXCAVATION DEPTH.
VALUES BASED ON ASTM TEST METHODS D2216 AND 01557.
2. GRADING/EXCAVAT/NG DUST CONTROL METHOD: WATER WITH 4,000 GAL WATER TRUCKS (TOTAL = 3).
3. OFFSITE WORK PERMISSION NEEDED: NA
4. PERIMETER DUST MITIGATION METHOD AND ACCESS CONTROL: CHAINLINK AND SAND FENC/NG AROUND
PER/METER OF PROJECT WITH ACCESS GATES LOCATED AT WEST AND SOUTH SIDES OF PROJECT.
5. INITIAL STAGING AREA: SEE PLAN
6. WHEEL WASHING PROVISIONS: SEE PLAN
7. WEEKEND DUST CONTROL MITIGATION: WATER W/TH 4,000 GAL WATER TRUCK MINIMUM OF 4 PASSES
PER DAY OR AS NEEDED.
8. UNPAVED ROAD DUST CONTROL MITIGATION METHOD: WATER MINIMUM OF 4 PASSES OR AS NEEDED.
RESTRICT TRAVELING SPEEDS TO 15 MPH MAX/MUM. LOCATIONS OF SPEED LIMIT SIGNS PER SHT. 2.
9. STORAGE AND STOCKPILE DUST CONTROL MITIGATION METHOD: WATER W/TH 2,000 GAL WATER TRUCKS (TOTAL = 1).
10. WITHIN 10 DAYS OF CEASING ACTIVITY, AN OPERATOR SHALL IMPLEMENT AT LEAST ONE OF THE FOLLOWING LONG-
TERM STABILIZATION TECHNIQUES FOR ANY DISTURBED SURFACE AREA WHERE CONSTRUCTION ACTIVITIES ARE NOT
SCHEDULED TO OCCUR FOR AT LEAST 30 DAYS:
A. REVEGETATION THAT RESULTS W 75 PERCENT GROUND COVERAGE PROV/DED THAT AN ACTIVE WATERING SYSTEM
IS IN PLACE AT ALL TIMES; OR
B. ESTABLISHMENT OF A STABILIZED SURFACE THROUGH WATERING WITH PHYSICAL ACCESS RESTRICTION
SURROUNDING THE AREA; OR
C. USE OF CHEMICAL STABILIZERS TO ESTABLISH A STABILIZED SURFACE WITH PHYS/CAL ACCESS RESTRICT/ON
SURROUNDING THE AREA.
SITE SPECIFIC DETAILS:
(PLEASE DESCRIBE ANY SPECIFIC OR ADDITIONAL CONTROL MEASURE PROPOSED.)
1. PRE -WATERING METHOD (AS SHOWN IN 1. OR AS DETAILED HERE). _SPRINKLER_
WATER AVAILABILITY, INITIAL STAGE EXISTING CVWD FIRE DETECTOR CHECK (FDC) LOCATED AT NW CORNER OF
SITE, MINIMUM k500 GPM
2. OFF-SITE WORK PERMISSION NEEDED: NONE -
3. ACCESS WILL BE CONTROLLED BY: GATES AT CONSTRUCTION ENTRANCE
PHASE "A": ROUGH GRADING (SITE PREP. & MOBILIZATION) CONTINUED
SITE SPECIFIC DETAILS:
4. IN/TIAL STAGING AREA: AS SHOWN ON SHEET 2
EQUIPMENT STORAGE
_A.S, _SHOWN ON SHED 2.
TEMPORARY OFFICE AS SHOWN ON SHEET 2
EMPLOYEE PARKING AS SHOWN ON SHEET 2
5. WHEEL WASHING PROVISIONS -GRAVEL PAD AT CONSTRUCTION -_ENTRANCES _SEE SWPPP
IN THE CITY OF LA QUINTA, COUNTY OF RIVERSIDE, STATE OF CALIFORNIA
AMENDMENT NO. 2, TRACT NO. 31732, BELLASENO
PERMIT NO.
FUGITIVE DUST (PM -10) MITIGATION PLAN
6. SPEED RESTRICTION SIGN LOCATION. POSTED AT CONSTRUCTION ENTRANCES
7. NUMBER OF POSTED "DUST CONTROL SIGNS" TWO (2) SIGNS INSTALLED
(TYP. AT CONSTRUCTION ENTRANCE OFF FRONTING ROAD)
8. OTHER PRELIMINARY WORK:
TO REDUCE JOB -SITE TRACK -OUT, INSTALL "TRACKCLEAN" OR SIMILAR TYPE RUMBLE STRIPS
BEFORE INITIATING ANY ONSITE ACTIVITY RELATED TO GRADING., SEE SWPPP
PHASE "B": ROUGH GRADING (MASS GRADING, PERIMETER WALLS)
SPECIFIC PROCEDURES
1. HAUL/NG PROCEDURES: SEE NOTES SHT. NO. 2
2. GRADING/EXCAVATING DUST CONTROL METHOD: WATER W/TH 4,000 GAL WATER TRUCKS, 2,800 CY PER TRUCK
(TOTAL = 3) (MINIMUM 4 TIMES PER 24 HRS.). APPLY CONTINOUSLY.
3. INACTIVE DISTURBED AREA DUST CONTROL MITIGATION METHOD: WATER MINIMUM OF 2 TIMES DAILY OR AS
NEEDED. MAY USE AN APPROVED AQMD SOIL STABILIZER AS NECESSARY.
4. PERIMETER DUST MITIGATION METHOD AND ACCESS CONTROL: CHA/NLINK AND SAND FENCING
AT PROJECT BOUNDARY.
5. INITIAL STAG/NG AREA: SEE SHT. NO. 2
6. WHEEL WASH/NG PROVISIONS: "TRACK OUT", SEE DETAIL NO. 4, SHT. NO. 2
7. WEEKEND DUST CONTROL MITIGATION: WATER WITH 4,000 GAL WATER TRUCKS MINIMUM OF 4 PASSES PER DAY
OR AS NEEDED.
8. UNPAVED ROAD DUST CONTROL MITIGATION METHOD: WATER MINIMUM OF 4 PASSES 01 AS NEEDED. RESTRICT
TRAVELING SPEEDS TO 15 MPH. STOP WORK AND INCREASE WATERING AS NEEDED IF MIN/MUM DUST CONTROL
WATERING /S FOUND TO BE INADEQUATE.
9. STORAGE AND STOCKPILE DUST CONTROL MITIGATION METHOD: NO STOCK PILES ON SITE.
10. WITHIN 10 DAYS OF CEASING ACTIVITY, AN OPERATOR SHALL IMPLEMENT AT LEAST ON OF THE FOLLOW/NG LONG-
TERM STABILIZATION TECHNIQUES F01 ANY DISTURBED SURFACE AREA WHERE CONSTRUCT/ON ACTIVITIES ARE NOT
SCHEDULED TO OCCUR FOR AT LEAST 30 DAYS:
A. REVEGETATION THAT RESULTS IN 75 PERCENT GROUND COVERAGE PROVIDED THAT AN ACTIVE WATERING SYSTEM
IS /N PLACE AT ALL TIMES; OR
B. ESTABLISHMENT OF A STABILIZED SURFACE THROUGH WATERING WITH PHYSICAL ACCESS RESTRICTION
SURROUNDING THE AREA; 0R
C. USE OF CHEMICAL STABILIZERS TO ESTABLISH A STABIL/ZED SURFACE W/TH PHYSICAL ACCESS RESTRICTION
SURROUNDING THE AREA. (CHEMICAL STABILIZERS SHALL BE PROVIDED WITH GREEN COLORANTS)
SITE SPECIFIC DETAILS:
(PLEASE DESCRIBE ANY SPECIFIC OR ADDITIONAL CONTROL MEASURE PROPOSED.)
1. HAUL ROUTE:
EXPORT HAUL ROUTE TBD BY DEVERLOPER/CONTRACTOR, WITH APPROVAL FROM CITY.
2. SOIL STAB/LIZATTON METHODS:
ACTIVE AREA WATER SCHEDULE:: (MIN. 4 TIMES PER 24 HRS.)
THREE (3) 4,000 GAL WATER TRUCK 4 TIMES/24 HRS.
WEEKEND WATERING SCHEDULE.: (MIN. 4 TIMES PER 24 HRS. )
THREE (3) 4,000 GAL WATER TRUCKS 4 TIMES/24 HRS.
INACTIVE AREA STABILIZATION METHOD(S):
(ACRYLIC POLYMER, HYDROMULCH, PLANTINGS, BIODEGRADABLE "OIL", OR AS DESCRIBED HERE)
3. PERIMETER BLOCK WALL SCHEDULE: WEST AND SOUTH WALL TO BE BUILT AS SOON AS
SUFFICIENT GRADING HAS BEEN COMPLETED
4. OTHER:
A) INSTALL SECURITY BARRIER TO PREVENT DISTURBANCE OF NEWLY GRADED BUILDING PADS
IMMEDIATELY UPON INITIATION OF THIS PHASE OF GRADING.
B) TO REDUCE JOB -SITE TRACK -OUT, INSTALL "TRACKCLEAN" OR SIMILAR TYPE RUMBLE STRIPS
BEFORE INITIATING ANY ONSITE ACTIVITY RELATED TO GRADING.
PHASE "C": FINISH GRADING (UTILITY & STREET CONST)
SPECIFIC PROCEDURES
1. HAULING PROCEDURES: SEE NOTES ON SHEET 2
2 GRADING/EXCAVATING DUST CONTROL METHOD: WATER WITH 2,000 GAL WATER TRUCK (TOTAL = 2).
3. INACTIVE DISTURBED AREA DUST CONTROL MITIGATION METHOD: WATER MINIMUM OF 2 TIMES DAILY 0R AS
NEEDED. MAY USE AN APPROVED AQMD SOIL STABILIZER AS NECESSARY
4. PERIMLILR DUST MITIGATION METHOD AND ACCESS CONTROL: CHA/NLINK AND SAND FENCING ON NORTH AND
EAST PROPERTY LINE.
5. STAG/NG AREA: SEE SHT. NO. 2
6. WHEEL WASH/NG PROV/S/ONS: "TRACK OUT", SEE DETAIL NO. 4, SHT. NO 2
7. WEEKEND DUST CONTROL MITIGATION: WATER WITH 2,000 GAL WATER TRUCKS MIN/MUM OF 2 PASSES PER
DAY 0R AS NEEDED.
8. UNPAVED ROAD DUST CONTROL MITIGATION METHOD: WATER MIN/MUM OF 4 PASSES OR AS NEEDED.
RESTRICT TRAVELING SPEEDS TO 15 MPH.
9. STORAGE, STOCKPILE, 0R TRENCHING DUST CONTROL MITIGATION METHOD: ONE 2,000 GAL WATER TRUCK
MINIMUM 4 TIMES PER 24 HRS.
10. WITHIN 10 DAYS OF CEASING ACTNITY, AN OPERATOR SHALL IMPLEMENT AT LEAST ON OF THE FOLLOWING LONG-
TERM STABILIZATION TECHNIQUES FOR ANY DISTURBED SURFACE AREA WHERE CONSTRUCT/ON ACTIVITIES ARE NOT
SCHEDULED TO OCCUR FOR AT LEAST 30 DAYS:
A. REVEGETAT/ON THAT RESULTS /N 75 PERCENT GROUND COVERAGE PROVIDED THAT AN ACTIVE WATERING SYSTEM
IS /N PLACE AT ALL TIMES; OR
B. ESTABLISHMENT OF A STABILIZED SURFACE THROUGH WATER/NG WITH PHYSICAL ACCESS RESTRICTION
SURROUND/NG THE AREA; OR
C. USE OF CHEMICAL STABIL/ZERS TO ESTABLISH A STABILIZED SURFACE WITH PHYSICAL ACCESS RESTRICTION
SURROUNDING THE AREA. (CHEMICAL STAB/LIZERS SHALL BE PROVIDED WITH GREEN COLORANTS)
SITE SPECIFIC DETAILS:
(PLEASE DESCRIBE ANY SPEC/FIC 01 ADDITIONAL CONTROL MEASURE PROPOSED.)
1. TRENCH STOCKPILE TREATMENT.
WATER AS NECESSARY
2. INACTIVE AREA TREATMENT
(ACRYLIC POLYMER, HYDROMULCH, PL
ANT/NGS BIODEGRADABLE "0/LOR AS DESCRIBED
HERE)
3. STREET PAVING SCHEDULE: TBD BY DEVELOPER/CONTRACTOR
4. STAGING AREA MOVEMENT SCHEDULE.:
TBD BY DEVELOPER/CONTRACTOR
5. OTHER: A) MAINTAIN SECURITY BARRIER TO PREVENT DISTURBANCE OF NEWLY GRADED BUILDING PADS
8) TO REDUCE JOB -SITE TRACK -OUT, MAINTAIN "TRACKCLEAN" OR SIMILAR TYPE RUMBLE STRIPS
C) MAINTAIN THREE (3) 2,000 GALLON WATER TRUCKS WATERING AS NEEDED
PHASE "D": FINISH GRADING (BLDG. UTIL., BLDG. CONST, LANDSCAPING)
SITE SPECIFIC DETAILS:
1. HAULING PROCEDURES: SEE NOTES ON SHEET 2
2. DISTURBED AREA DUST CONTROL METHOD: (TOTAL 1 TRUCK REQUIRED)
WATER WITH 2,000 GAL WATER TRUCK MINIMUM OF 2 PASSES 0R AS NEEDED.
3. INACTIVE DISTURBED AREA DUST CONTROL MITIGATION METHOD: PERMANENTLY STABILIZED.
4. PERIMETER DUST MITIGATION METHOD AND ACCESS CONTROL: REPLACE WITH WALL WHERE PROPOSED.
5. STAGING AREA: SEE SHT. NO, 2
6. WHEEL WASHING PROVISIONS: "TRACK OUT", SEE DETAIL NO. 4, SHT. N0. 2
7. WEEKEND DUST CONTROL MITIGATION:
WATER W/TH 2,000 GAL WATER TRUCKS MINIMUM OF 2 PASSES PER DAY 01? AS NEEDED.
8. UNPAVED ROAD DUST CONTROL MITIGATION METHOD: ALL ROADWAYS PAVED.
9. STORAGE, STOCKPILE, OR TRENCHING DUST CONTROL MITIGATION METHOD: COMPLETED
10. WITHIN 10 DAYS OF CEASING ACTIVITY, AN OPERATOR SHALL IMPLEMENT AT LEAST ON OF THE FOLLOWING LONG-
TERM STABILIZATION TECHNIQUES FOR ANY DISTURBED SURFACE AREA WHERE CONSTRUCT/ON ACTIVITIES ARE NOT
SCHEDULED TO OCCUR FOR AT LEAST 30 DAYS:
A. REVEGETATION THAT RESULTS IN 75 PERCENT GROUND COVERAGE PROVIDED THAT AN ACT/VE WATERING SYSTEM
IS /N PLACE AT ALL TIMES OR
B. ESTABLISHMENT OF A STABILIZED SURFACE THROUGH WATERING W/TH PHYSICAL ACCESS RESTRICTION
SURROUNDING THE AREA; 01?
C. USE OF CHEMICAL STABILIZERS TO ESTABLISH A STABIL/ZED SURFACE WITH PHYSICAL ACCESS RESTR/CTION
SURROUNDING THE AREA. (CHEMICAL STABILIZERS SHALL BE PROVIDED WITH GREEN COLORANTS)
SIZE SPECIFIC DETAILS
(PLEASE DESCRIBE ANY SPECIFIC OR ADDITIONAL CONTROL MEASURE PROPOSED.)
1, BUILDING PAD WATERING
HAND WATERING
2. FORMWORK AND TRENCH WATERING
HAND WATERING
3. PERIMETER LANDSCAPE SCHEDULE: (AS SOON AS POSSIBLE)
4. OTHER: A) MAINTAIN SECURITY BARRIER TO PREVENT DISTURBANCE OF NEWLY GRADED BUILDING PADS
B) TO REDUCE JOB -SITE C) MAINTAIN F/VE (5) 2,000
TRACK -OUT, MAINTAIN GALLON WATER TRUCKS
"TRACKCLEAN" OR SIMILAR WATER/NG AS NEEDED
TYPE RUMBLE STRIPS
LOTS 1 THROUGH 196, INCLUSIVE, AND LETTERED LOTS A THROUGH ZZ, INCLUSIVE,
OF AMENDED TRACT NO. 31732, IN THE CITY OF LA QUINTA, COUNTY OF RIVERSIDE,
STATE OF CALIFORNIA, AS PER MAP RECORDED IN BOOK 423 PAGES 48 THROUGH 60,
INCLUSIVE, OF MAPS, IN THE OFFICE OF THE COUNTY RECORDER OF SAID COUNTY.
PHASE "E" FINISH GRADING (DRAINAGE SWALES AND SITE LANDSCAPING)
SPECIFIC PROCEDURES
1. HAUL/NG PROCEDURES: SEE NOTES SHT. NO. 2
2. DISTURBED AREA DUST CONTROL METHOD: WATER WITH 2,000 GAL WATER TRUCK MIN/MUM OF 4 PASSES
OR AS NEEDED. (TOTAL 2 TRUCK REQUIRED)
3. INACTIVE DISTURBED AREA DUST CONTROL MITIGATION METHOD: PERMANENTLY STABILIZED.
4, PERIMETER DUST MITIGATION METHOD AND ACCESS CONTROL: REPLACE WITH WALL WHERE PROPOSED.
5 STAGING AREA: SEE SHT. NO. 2
6. WHEEL WASHING PROVISIONS: REMOVED
7. WEEKEND DUST CONTROL MITIGATION: WATER W/TH 2,000 GAL WATER TRUCKS MINIMUM OF 4 PASSES PER DAY
OR AS NEEDED.
8. UNPAVED ROAD DUST CONTROL MITIGATION METHOD: ALL ROADWAYS PAVED.
9. STORAGE, STOCKPILE, OR TRENCHING DUST CONTROL MITIGATION METHOD: COMPLETED
10. WITHIN 10 DAYS OF CEASING ACTIVITY, AN OPERATOR SHALL IMPLEMENT AT LEAST ON OF THE FOLLOWING LONG-
TERM STABILIZATION TECHNIQUES F01 ANY DISTURBED SURFACE AREA WHERE CONSTRUCTION ACTII4T/ES ARE NOT
SCHEDULED TO OCCUR F01 AT LEAST 30 DAYS:
A. REVEGETAT/ON THAT RESULTS W 75 PERCENT GROUND COVERAGE PROVIDED THAT AN ACTIVE WATERING SYSTEM
IS /N PLACE AT ALL TIMES; OR
B. ESTABLISHMENT OF A STABILIZED SURFACE THROUGH WATERING WITH PHYSICAL ACCESS RESTRICTION
SURROUND/NG THE AREA; OR
C. USE OF CHEMICAL STABILIZERS TO ESTABLISH A STABIL/ZED SURFACE WITH PHYSICAL ACCESS RESTRICTION
SURROUND/NG THE AREA.
ABATEMENT OF DUST MITIGATION FAILURE
AN IRREVOCABLE LICENSE IS HEREBY GRANTED OR CAUSED TO BE GRANTED TO THE CITY OF L4 QUINTA TO PERMIT
THE ENTRY UPON THE S/TE AT ALL TIMES AND UNDER THE FOLLOWING CIRCUMSTANCES:
A. IN THE EVENT THAT WIND SPEEDS IN EXCESS OF 25 M.P.H. ARE FORECAST TO OCCUR BY THE SOUTH COAST A/R
QUALITY MANAGEMENT DISTRICT (SCAQMD) F01 A PARTICULAR DAY;
B. IN THE EVENT OF AN ON-SITE ANEMOML /tR THAT CONFORMS TO ALL SCAQMD STANDARDS REGISTERING 2 WIND
GUSTS /N EXCESS OF 25 M.P. H WITHIN CONSECUTIVE 30 MINUTE PERIODS OR
C. IN THE EVENT FUGITIVE DUST EMISSIONS ARE VISIBLE FROM ANY BOUNDARY LINE; AND
D. THE C/TY IS UNABLE, BY TELEPHONE, TO ESTABLISH A PERSONAL CONTACT WITH THE GENERAL CONTRACTOR, OR
THE RESPONSIBLE DUST CONTROL PERSON AFTER A 60 MINUTE CONSECUTIVE PER/OD WHICH SHALL COMMENCE W/TH
THE FIRST TELEPHONE CALL WHETHER ANSWERED OR NOT. THE CITY MAY THEN, WITHOUT PREJUDICE, INITIATE ONE OR
ALL OF THE BELOW LISTED ACTIONS:
1. THE C/TY MAY CAUSE THE CESSATION OF ANY ON-SITE ACTIVITY, INCLUDING BUT NOT LIMITED TO EARTH MOVING,
CONSTRUCTION, DEMOLITION 0R VEHICULAR MOVEMENT AND MANEUVERING. EXISTING FUG/T/VE DUST MITIGATION
MEASURES SHALL CONTINUE.
2. IN THE EVENT THAT AN ON-SITE IRRIGATION SYSTEM IS NOT INSTALLED AND/OR OPERATIONAL, THE CITY WILL
CAUSE THE SITE TO BE WATERED. IN ANY CONTRACT BETWEEN THE GENERAL CONTRACTOR AND ANY
WATER -PROVIDING VENDOR, SUCH AS A WATERING TRUCK OPERATION OR IRRIGATION SYSTEM PROV/DER/OPERATOR,
THE CITY AND THE ENVIRONMENTAL OBSERVER SHALL BE NAMED AS AN AUTHORIZED AGENT FOR PERUPOSES OF
ORDERING OR CALLING -OUT WATER TRUCKS OR CAUSING AN IRRIGATION SYSTEM TO BE MADE OPERATION. SHOULD
THE GENERAL CONTRACTOR NOT HAVE SUCH A CONTRACT OR HAVE FAILED TO DESIGNATE THE CITY AND THE
RESPONSIBLE DUST CONTROL INDIVIDUAL AN AN AGENT OR NOT INFORMED THE CITY OF THE CONTRACTOR'S NAME,
ADDRESS AND PHONE NUMBER, OR THE CITY IS UNABLE TO CONTACT THE CONTRACTOR AFTER A REASONABLE EFFORT
ISMADE TO DO S0, THE CITY SHALL AUTHORIZE ANY OTHER VENDOR AS IT'S AGENT FOR PURPOSED OF ENTRY UPON
THE SITE TO ATTEMPT TO MIT/GATE ANY POTENT/AL DUST CONTROL PROBLEMS.
3. IN THE EVENT AN ON-SITE IRRIGATION SYSTEM IS INSTALLED, THE C/TY W/LL CAUSE THE IRR/GAT/ON SYSTEM TO
OPERATE. THE GENERAL CONTRACTOR SHALL TAKE ALL NECESSARY STEMS TO ENSURE THE THE CITY HAS THE MEANS
TO ACCESSES' THE SITE AND THE VALVES OF THE IRRIGATION SYSTEM; THAT IS, THE KEYS TO ANY AND LLALOCKES
PROVIDED TO THE CITY ENGINEER BY THE END OF THE NET WORK DAY FOLLOWING THE INSTALLATION OF ANY SUCH
LOCK. EACH KEY SHALL BE PLAINLY AND CLEARLY MARKED WITH THE PROJECT NAME AND CORRESPONDING LOCK
(MAIN GATE, SO THE IRRIGATION SYSTEM, ETC).
E. IF, 1N THE OPINION OF THE C/T'Y ENGINEER OR HIS DESIGNEE, THE INTENS/TY, FREQUENCY OR DURATION OF FUGITIVE
DUST EMISSIONS FROM THE SITE CONSTITUTES A HAZARD TO THE SAFETY OF THE PUBLIC, BY INTRUSION BEYOND
THE PROJECT BOUNDARY, THE CITY ENGINEER 0R HIS DESIGNEE 01 AGENT MAY IMMEDIATELY ENTER UPON THE SITE
OR IMMEDIATELY TAKE OTHER SUCH ACT/ON AS MAY BE NECESSARY TO REMEDY THE HAZARD, SUCH AS, BUT NOT
LIMITED TO COMMENCING WATERING ON THE SITE OR ORDER/NG THE CESATION OF ANY EMISSION -GENERATING ACTIVITY
OCCURRING ON-SITE.
F. ANY OF THE ABOVE ACTIONS SHALL BE CONSTRUED AS AN ABATEMENT FOR WH/CH THE C/TY WILL "BACK CHARGE'
THE GENERAL CONTRACTOR, DEVELOPER, AND/OR THE OWNER AS THE C/TY SHALL DEEM APPROPRIATE.
PROJ
AMEND. NO. 2, TRA
CT SITE
CT 31732
AIRPORT BOULEVARD
a\ AVENUE 60
vs,
AVENUE 61
AVENUE 62
HAR
VICINITY MAP
NOT TO SCALE
MARK
REVISIONS
APPR.
DATE
DESIGNED BY: BJB
90 ESS /p
tiQpN
3 " No. 20596 r" z
Exp. 9-30-17 7
*U'l• CIVIL Ril'e OP COW
-
DRAWN BY: BJB
CHECKED BY: SCM
PREPAREUNDER THE DIRECTION OF: '/
ATE: ‘„,est
TANLEY C. MOR
R.C.E. 20596
E P.DATE 9/30/17
PM -10 DUST
CONTROL SECURITY
PM -10 DUST CONTROL SECURITY /S $65,700
BOND WITH $21,900 CASH 01 ALL CASH AT
$87,600.
APPROVED BY:
OTHY R. J
CITY ENGINE
DATE: 7/Z b'I L.
N EXP. DATE 12/31/16
R.C.E. 45843
CONSULTING
PLANNERS
APPLICATION CONSENT
UNDERGROUND SERVICE ALERT
CALL TOLL FREE:
811
TWO WORKNG DAYS
BEFORE YOU DIG
(CLEARING AND GRUB/NG CONTRACTOR)
I HAVE READ THE COND/TIONS OF THE FUGITIVE
DUST CONTROL PLAN AND THE OWNER HAS
AUTHORIZED THE IMPLEMENTATION OF ALL ITS
PROVISIONS THROUGHOUT PROJECT BUILDOUT
NAME:
COMPANY NAME:
TRADE CLEAR/NG A GRUBBING
LICENS CLASS: /4
0.:
DAVE LIPPERT
LIPPERT CONSTRUCTION, INC.
760-863-5700
DATE.. 1 fro/ 60
(GRADING CONTRACTOR)
I HAVE READ THE CONDITIONS OF THE FUGITIVE
DUST CONTROL PLAN AND THE OWNER HAS
AUTHORIZED THE IMPLEMENTATION OF AL ITS
PROVISIONS THROUGHOUT PROJECT BUILDOUT.
NAME:
COMPANY NAME:
TRADE GRAD/NG
ICENSF, CZASS
SCNATU
`I'l
DjQ 7VUM:
rev
DAVE LIPPERT
LIPPERT CONSTRUCT/ON, INC.
760-863-5700
DATE- 1120(ru
(WATER TRENCH CONTRACTOR)
I HAVE READ THE CONDITIONS OF THE FUGITIVE
DUST CONTROL PLAN AND THE OWNER HAS
AUTHOR/ZED THE /MPLEMENTAT/ON OF AL ITS
PROVISIONS THROUGHOUT PROJECT BUILDOUT.
NAME:
COMPANY NAME:
TRADE
LICENSE CLASS:
NO.:
CONTACT PHONE NUMBER:
(SEWER TRENCH CONTRACTOR)
I HAVE READ THE CONDITIONS OF THE FUGITIVE
DUST CONTROL PLAN AND THE OWNER HAS
AUTHOR/ZED THE IMPLEMENTATION OF AL ITS
PROV/S/ONS THROUGHOUT PROJECT BUILDOUT.
NAME:
COMPANY NAME:
TRADE:
LICENSE CLASS:
NO.:
CONTACT PHONE NUMBER:
SIGNATURE.:
DATE::
(STORM DRAIN TRENCH CONTRACTOR)
I HAVE READ THE CONDITIONS OF THE FUGITIVE
DUST CONTROL PLAN AND THE OWNER HAS
AUTHORIZED THE IMPLEMENTATION OF AL ITS
PROVISIONS THROUGHOUT PROJECT BUILDOUT.
NAME:
COMPANY NAME:
TRADE:
LICENSE CLASS:
NO.:
CONTACT PHONE NUMBER
SIGNATURE:
DATE:
(PAVING CONTRACTOR)
I HAVE READ THE CONDITIONS OF THE FUGIT/VE
DUST CONTROL PLAN AND THE OWNER HAS
AUTHORIZED THE IMPLEMENTATION OF AL ITS
PROVISIONS THROUGHOUT PROJECT BUILDOUT
NAME:
COMPANY NAME:
TRADE:
LICENSE CLASS:
NO.:
CONTACT PHONE NUMBER:
DATE. DATE:
SIGNATURE:: SIGNATURE.:
OWNER'S CERTIFICATION
TO INSURE IMPLEMENTATION OF THE DUST CONTROL MITIGATION MEASURES, A FINANCIAL SECURITY OF $2000/PROJECT
ACREAGE SHALL BE REQUIRED PRIOR TO THE ISSUANCE OF ANY PERM/T. ANY FINANCIAL SECURITIES COLLECTED UNDER THE
PROVISIONS OF THIS REQUIREMENT SHALL BE HELD BY THE CITY OF L4 QUINTA FOR POTENT/AL USE IN MITIGATING SOURCES
OF FUGITIVE DUST NOT ADEQUATELY MITIGATED BY THE PROPERTY OWNER/S OR RESPONSIBLE DUST CONTROL PERSON. ALL
UNUSED SECURITY SHALL BE RETURNED TO THE PROPERTY OWNER ONCE THE C/TY HAS ACCEPTED THE FINAL IMPROVEMENT
AND ISSUED CERTIFICATES OF OCCUPANCY.
I CERTIFY THAT l HAVE READ THIS FUGITIVE DUST CONTROL PLAN AND UNDERSTAND THAT / AM RESPONSIBLE FOR THE
COMPLIANCE OF THIS PROJECT TO THE DUST CONTROL PROVISIONS NOTED OR REFERENCED HEREIN. I UNDERSTAND THAT THE
DUST CONTROL SECURITY THAT I'VE POSTED W/TH THE CITY OF LA QUINTA MAY BE USED BY THE CITY, AND ADDITONAL
CHARGES, /F NEEDED, TO MITIGATE ANY VISIBLE EMISSIONS OR FUGITIVE DUST, IF l FAIL TO KEEP THE DUST UNDER CONTROL.
I UNDERSTAND THAT DUST CONTRTOL /S REQUIRED 24 HOURS PER DAY, 7 DAYS PER WEEK FROM THE INITIAL DATE THAT THIS
SITE IS DISTURBED /N ANY WAY FROM THE NATURAL VEGETATED CONDITION, AND SHALL CONTINUE UNTIL THE TIME THAT THE
PROJECT SITE AND ALL IMPROVEMENTS ARE COMPLETED AND THE PROJECT SITE IS ACCEPTABLY RE -VEGETATED AND PAVED.
RESPONSIBILITY FRO THE DUST CONTROL ON THE SITE CAN NOT BE TRANSFERRED SOLELY BY TRANSFERRING ALL OR A
PORTION OF THIS PROPERTY TO OTHER CONTRACTORS, BUILDERS, 0R OWNERS. A REPLACEMENT PM -10 PLAN AND DUST
CONTROL SECURITY SHALL BE SUBMITTED FOR ANY TRANSFERRED PORTION OF THE PROJECT.
1 CERT/FY THAT l HAVE READ TH/S APPLICATION AND THAT THE INFORMATION CONTAINED HEREIN /S TRUE AND CORRECT. I
AGREE TO COMPLY W/TH THE CITY FUGITIVE DUST ORDINANCE, AQMD RULE 403, 403.1 AND THE FINAL COACHELLA VALLEY S.LP.
AND ALL LAWS RELATING TO CLEARING, GRADING, UTILITIES, LANDSCAPING, AND BUILDING OPERATIONS. l AUTHORIZE
REPRESENTATIVES OF THE C/TY OF LA QUINTA TO ENTER UPON THE ABOVE MENTIONED PROPERTY FOR INSPECTION AND/OR
ABATEMENT PURPOSES, AND l AGREE TO HOLD HARMLESS THE C/TY OF LA QUINTA AND ITS REPRESENTATIVES FROM LIABILITY
F01 ANY ACTIONS RELATED TO THIS PERMIT.
OWNER'S REPRESENTATIVE NAME SUSAN LINDQUIST, SR. DIRECTOR OF COMMUNITY DEVELOPMENT
OWNER'S ADDRESS: 23 CORPORATE PLAZA, SUITE 150
NEWPORT BEACH, CA 92660
CONTACT PHONE NU ER (24 HOURS): (949) 629-2480
SIGNATURE:
DATE: Il
RESPONSIBLE DUST CONTROL PERSON
I CERTIFY THAT l HAVE READ TH/S FUGITIVE DUST CONTROL PLAN AND UNDERSTAND THAT I AM RESPONSIBLE FOR THE
COMPLIANCE OF THIS PROJECT TO THE DUST CONTROL PROVISIONS NOTED OR REFERENCED HERE/N. AS THE AUTHOR/ZED
RESPONSIBLE PERSON FOR THIS PROJECT 1 WILL LIST MY PHONE NUMBER ON THE REQU/RED SITE S/GNS, AND / WILL
RESPOND TO DUST COMPLAINTS WITHIN THE 1 HOUR LIMIT. 1 UNDERSTAND THAT DUST CONTROL IS REQUIRED 24 HOURS PER
DAY 7 DAYS PER WEEK, FROM THE DATE THAT THE PROJECT /S FIRST DISTURBED IN ANY WAY FROM THE NATURAL VEGETATED
CONDITION, AND CONTINUE UNTIL THE TIME THAT THE PROJECT S/TE AND ALL IMPROVEMENTS ARE COMPLETED AND THE
PROJECT SITE /S ACCEPTABLY RE -VEGETATED AND PAVED, I ALSO CERT/FY THAT 1 HAVE ATTENDED AN AQMO SEMINAR ON
FUGITIVE DUST CONTROL.
NAME:
COMPANY NAME:
ADDRESS:
DAVE LIPPERT
LIPPERT CONSTRUCTION, INC.
P.O. BOX 5477
LA QUINTA, CA 92248
ONTACT PHONE NUMBER: 760-863-5700
:AT70N NUMBER: CV 1601-003011-3095/
DATE: 161 4-0
SIGNATURE::
PROJECT DATA
(SEE ATTACHED PLAN ALSO)
MORSE
DATE 6-17-2016 PROJECT NAME. BELLASENO
STREET ADDRESS / SITE LOCATION. SOUTHEAST CORNER OF MONROE AND AVENUE 60
ADJOIN/NG PROPERTY INFO. (FOR SENSITIVITY, TYP. WINDS BLOW N.W. TO S.E.)
EASTERLY AGRICULTURE
SOUTHEASTERLY AGRLCULTURE
SOUTHERLY RESIDENTIAL (VACANT)
SOUTHWESTERLY VACANT
WESTERLY _RESIDENTIAL
NORTHWESTERLY RESIDENT/ VACANT/
NORTHERLY VACANT
NORTHEASTERLY VACANT
CURRENT LAND USAGE VACANT
PROPOSED LAND USAGE RESIDENTIAL
LOT. 1-196 TRACT. 31732, AMENDMENT NO. 2 PERMIT NO •
A.P.N. 764-720-001 THROUGH 076 PARCEL SIZE:: 43.8 ACRES (DISTURBED AREA)
7764_730-Q01 THROUGH _1282_
784,- 740-00_ THROUGH 080
WATER AVAILABILITY, INITIAL STAGE EXISTING CVWD FDC
SCHULTZ
41865 Boardwalk
Suite 218
Palm Desert, CA 92211
Voice: 760-674-5776
cbergh@mdsconsulting.net
ENGINEERS SURVEYORS
SCALE: SEE ABOVE
DATE: JUNE, 2016
BENCH M A R K; PD -109-70 ELEV. ELEV. 27. 941
109-70 CHISELED SQUARE ON CANAL BRIDGE SOUTHEAST
WING WALL, 2.0 MILES SOUTH ALONG JACKSON ST. FROM HWY.111, THEN 2.0 MILES
WEST ALONG AVENUE 50, 45 FT. WEST OF MADISON ST. AND 18' SOUTH OF AVENUE 50.
WDID # 7 33C375613
IN THE CITY OF LA QUINTA, STATE OF CALIFORNIA
AMENDMENT NO. 2,
TRACT NO. 31732 - BELLASENO
FUGITIVE DUST EMISSION
CONTROL PLAN, (PM10)
A PORTION OF SW 1/4 OF THE THE NW 1/4
OF SECTION 35, T 6 S, R 7 E, S.B.B. & M.
SHT. 1
OF 2 SHTS.
FOR: VTL PALIZADA, LLC
W.0 NO:
-p (Lc( (a. -- 1 o I:\87502\31732\RG\PM10-
6/17/16
0
W
co
Q
J
-J
LU
1m
M
M
O
z
1-
sV
LL
N
O
z
2
0 1"
z
W
z
2
O
r
a