CC Resolution 1998-041^"RM RESOLUTION NO.98-41
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
LA QUINTA ADOPTING THE FISCAL YEAR 1998-99
THROUGH 2002-03 CAPITAL IMPROVEMENT PLAN
WHEREAS, pursuant to Government Code Section 66002, the City of La Quinta
the City") is required to review and adopt a Capital Improvement Plan the Plan");
and
WHEREAS, the City is required to conduct a noticed public hearing for
consideration of adoption of the Plan; and
WHEREAS, notice of the public hearing has been given pursuant to Government
Code Section 65090; and
WHEREAS, the Capital Improvement Program CIP) is a five 5) year planning
instrument used by the City to identify capital improvement needs and to coordinate
financing and timing of those needs in a manner that maximizes the return to the
public; and
WHEREAS, the CIP is a statement of the City's goals, objectives and priorities
for a five 5) year CIP and the financial commitments required to accomplish those
objectives; and
WHEREAS, the Fiscal Year 1 998-99 CIP proposes approximately $1 4,01 9,1 52
in improvement projects and $25,000,953 of unfunded, deferred improvement
projects over the five 5) year period, commencing on July 1, 1 998 and ending June
30, 2003; and
WHEREAS, the first year of the CIP, called the capital budget, proposes
$1 2,067,896 in improvements, as shown in Exhibit 1, heretofore made a part of this
Resolution.
NOW THEREFORE, the City Council for the City of La Quinta does hereby
approve the capital budget, including the appropriation of funds, as shown in Exhibit
1, heretofore made a part of this Resolution; and
BE IT FURTHER RESOLVED, the City Council for the City of La Quinta authorizes
the inclusion of said capital budget into the Fiscal Year 1 998-99 operating budget,
which appropriates funds for specific facilities, equipment and improvements.
PASSED, APPROVED and ADOPTED this 1 9th day of May, 1 998 by the
following vote:
BIB]
09-16-1998-U01
03:16:23PM-U01
ADMIN-U01
CCRES-U02
98-U02
41-U02
^"RM I
Resolution No, 98-41
Page 2
AYES: Council Members Adolph* Henderson, Perkins, Sniff, Mayor Pena
NOES: None
ABSENT: None
ABSTAIN: None
City of La Quinta, California
ATTEST:
City of La Quinta, California
APPROVED AS TO FORM:
DAWN C. HONEYWELL,'City Attorney
City of La Quinta, California
BIB]
09-16-1998-U01
03:16:23PM-U01
ADMIN-U01
CCRES-U02
98-U02
41-U02
^"RM La Quinta
GEM OF THE DESERT
FIVE-YEAR
CAPITAL IMPROVEMENT PROGRAM
Fiscal Years
1998-99 through 2002-03
BIB]
09-16-1998-U01
03:16:23PM-U01
ADMIN-U01
CCRES-U02
98-U02
41-U02
^"RM 1998-99 CAPITAL IMPROVEMENT PROGRAM
BACKGROUND AND OVERVIEW:
Provided for your consideration, is the City's Capital Improvement Program commencing in the 1998-
99 Fiscal Year. The document is a statement of the City's goals, objectives and priorities for a five
5) year Capital Improvement Program and the financial commitments required to accomplish those
objeccives. The preparation of this document has been ajoint effort of the Public Works Department,
the Finance Department, and the City's Redevelopment/Financial Consultant.
The purpose of the Capital Improvement Program is to provide the City of La Quinta with a long-
range program for major municipal capital construction projects based on the systematic development
of an advanced financial plan. The Capital Improvement Program CIP) is a five 5) year planning
instrument used by the City to identi* capital improvement needs and to coordinate financing and
timing of those needs in a manner that maximizes the return to the public. As each annual budget is
prepared, additional projects and priority needs are developed and added to the program to maintain
a total five-year plan.
The first year of the CIP is called the capital budget and is based on existing flind balances and
revenues. The capital budget is incorporated into the annual City **operating" budget. which
appropriates fbnds for specific facilities, equipment and improvements. Projects slated for subsequent
years in the program are approved on a planning basis only and do not receive ultimate expenditure
authority until they are eventually incorporated into the capital budget The CIP will be updated
annually and can be amended at any time based on revenue availability and changes in project
priorities. As such, tentative City Council endorsement of the overall five-year program is desirable
for the effective implementation of overall City goals and objectives. Capital improvements are major
projects undertaken by the City that are generally not recurring on a long-term, annual basis. In this
sense they are differentiated from operating and maintenance O&M) expenditures for normal City
operation. They generally include design, inspection, testing, project administration, land and right-
of-way acquisition, construction or modification of buildings or facilities and public infrastructure
construction or modification.
The attached 1998-99 Fiscal Year CIP includes a listing of projects by fiscal year priority and type
of improvement project. Priorities as to which fiscal year a project is scheduled depend on the
availability of specific flinding sources, operation and program needs and prior City Council policy.
Projects include street, drainage, traffic signal, landscape and lighting, city facility and park
improvements. Only those projects that have identified flinding sources in the five-year period are
listed within a fiscal year.
BIB]
09-16-1998-U01
03:16:23PM-U01
ADMIN-U01
CCRES-U02
98-U02
41-U02
^"RM IL
Those projects that are designated as *additional" do not have an identified ftinding source through
the term of the fiv*year program. The identification of additional and/or alternative flinding sources
will be addressed during the annual review and approval of subsequent CIP's. Each project is
described in briddettil including a description of the project, the location of the project. a breakdown
of the project cost, the revenue sources proposed to be used to *nd the project and an estimate of
the annual operation and maintenance costs associated with the capital improvement. The completion
of any specific capital improvement project may have a direct impact on the operational and
maintenance budgets of the General Fund, Infi*cture Fund and other flinds. An estimate of these
fliture costs is necessary to assess that there is financial capacity of the operating budget to cover
these ongoing costs. All project costs included in the CIP are at current year project estimates. No
inflation fictorshave been utilized in determining costs for projects in Fiscal Year 1999-00 through
2002-03.
The 1998-99 Fiscal Year CIP idendfles $12,067,896 in improvements. Overall, the City is proposing
approximately $14,019,152 in projects over the next five(s) years. The remaining projects represent
additional" projects having a total cost of $39,020,105. The total flinding of additional projects
listed will require fliture City Council action to ensure revenue availability. The following
assumptions should be taken into account when reviewing the CIP.
The City Council has reaffirmed prior policy to maintain sufficient General Fund emergency
reserves, a General Fund reserve for cash flow purposes, and allocation of sufficient flinds to
cover current contracted and authorized capital improvement projects.
Currently, David M. Griffith *MG) and City staff are flnal*ng a Development Impact Fee
Study that addresses impact fees for community facilities required to serve fiature
development in the City. The Study has identified additional community infi*cture
required to support growth and the estimated cost, and the level of fees required to find the
completion of those projects. This study is in the final stages of development and will be
scheduled to be presented to the City Council in the near fliture. The recommendations from
this Study, subject to City Council approval, may impact the level of the Infrastructure Fund
available for filture capital improvement projects. If approved by the City Council, the
proposed Development Fee will replace the City's current Infrastructure Impact Fee.
Certain additional" projects may require the creation of Assessment Districts to provide
finding resources. The lack of assessment district authorization could flirther defer these
projects uniess alternative sources of revenue can be secured or unless the project priorities
are changed to defer other improvements.
Becuse of increases m ongoing maintenance costs, the addition of completed improvements
and the provisions of Proposition 218, the Lighting and Landscaping District may not have
sufficient finding in the filture. The current find balance and annual assessment revenues are
inadequate to cover all fliture capital and operational cost increases. The alternative would
be to continue to defer specific lighting and landscape improvements and/or reduce existing
landscape maintenance activities until such time that other revenue sources are available.
BIB]
09-16-1998-U01
03:16:23PM-U01
ADMIN-U01
CCRES-U02
98-U02
41-U02
^"RM CITY OF LA QUINTA
CAPITAL IMPROVEMENT PROGRAM
REVENUE SUMMARY
Proled W Projed IOeecrlptiOn General lnfragtmcttim PA #1 PA * other Total
1998191
199613 Washington Strmtll-1 0 Interchange Improvements 50,000 50,000
199702- Sidewalks Various Locations 25,000 25,000
199703 Handicap Access Ramp Various Locations 10,000 10,000
199704- Highway 111 Ijeftemon Vicinity Improvements 128,680 128.6180
199802 Washington St Widening: Ave. 50 to Village SC 946,466 940,466
199803 Traffic Signal: Fred WaringiDune Palms 150,000 ti* 150,000
199806- Tmf(ic Signal: Calle Tampico & Eisenhower Drive 150,000 150,000
199810 Parc La Quinta Under Grounding 243,250 125.000 2) 368,250
199811 Avenue 50 Overlay 50,000 100,000 3) 150.000
199812 OPTICOM Retr*ft 62,500 62.500
199813 Bear Creek Bike Path REST STOPS 50,000 30.000 A) 80,000
199814 Frftz Bums Park Restoration 100,000 100.000
199815- Washington St. Wkeening Fred Waring to North Umits 252,000 252.000
199815 Ph-c V* Village Commercial Area) 559,747 6281,903 5) 1.188.650
199817- Phase V-B Cove Area) 1,817,000 2,271.401 6) 4,088,401
199818 Phase V-C Westward Ho) 922.000 1.428,980 rn 2,350,980
199819 Phase V-D Saalebrush, BottleIrrush, Saguaro) 729,393 272,505 a) 1,001.899
I 99820 Calic Rondo Channel Storm Drain 130,000 135,000 9) 255,000
199821 Village IDeveiopment 500,000 500,000
199822- Cove Oasis:lLake Cahuilla Trail 200,000 200,000
FY i998Ji999 TOTAL: 128,680 1,545,960 3,356,747 1,894,643 5,141,860 12,087,890
1919100
199813 Washington StreetIl-1 0 Interchange Improvements 50,000 50,000
199702- Sidewalks Various Locations 25,000 25,000
199703 Handicap Access Ramp Various Locations 10,000 10,000
199704- Highway 11iI,1effer'son Vicinity Improvements 128,880 128,880
199802 Washington St, Widening: Ave. 50 to Village SC 946,536 946,536
FY 1999100 TOTAL: 128,680 1,031,536 1.160,216
2000101
199613 Washington Streetli-lO Interchange Improvements 50,000 50,000
199702 Sidewalks Various Locations 25,000 25,000
199703- Handicap Access Ramp Varos Locations 10,000 10,000
199704 Highway 111 Ijeftemon Vicinity Improvements 128,880 128,680
2(00001 Traffic Signal: TampicolSouth Entrance to Village SC 75,000 75,000 150,000
FY 2000101 TOTAL: 128.880 160,000 75,000 363,680
2001102
199813 Washington Streetll-lO Interchange Improvements 50.000 50,000
199702- Sidewalks Various Locations 25,000 25,000
199703 Handicap Access Ramp Various Locations 10,000 10,000
199704 Highway 11 lljefferson Vicinity Improvements 128,880 28,680
FY 2001102 TOTAL: 126,680 85,000 213,680
2002103
199813- Washington Streeel-1 0 Interchange Improvements 50,000 50,000
199702- Sidewalks Varlous Locations 25,000 25,000
199703- Handicap Access Ramp-Various Locations 10,000 10.000
199704- Highway lilijeffeison Vicinity Improvements 128,880 128,680
FY 2002103 TOTAL: 128,680 85,000 213,680
BIB]
09-16-1998-U01
03:16:23PM-U01
ADMIN-U01
CCRES-U02
98-U02
41-U02
^"RM IL
CITY OF LA QUINTA
CAPITAL IMPROVEMENT PROGRAM
REVENUE SUMMARY
PToiect W Prolect Oncrlittlon General Infrastmcture PA #1 PA #2 Other Talal
ADD*ONAL PROJECTS
ADOl Eisenhower DrivelAvenue 50 Dmin improvements 247,000 2* DO
AD02 Weehinglon Street Median Landscaping Phase 2 291,512 * 2
AD03 Dune Pairs Road Street Widening 382,000 362.000
AD04 Parking improvements in Thu village *,000) 125,000 10) 220,000
ADOS Milea Ave. Median Larlcapin*WashIflgtonIJeterIon 144,900 144,900
ADO* Fred Waring Drive Median Landscaping 144,900 144,900
AD07 Madison Street Etenejan Interim) 3,376,000 3,376,000
ADOB Tmffic Signal: Westward Ho & Dune Palms Road 75,000 75,000 11) 150,000
ADO9 Tmffic Signal: Avenue 52 & Avenida Bermudas 150,000 150,000
ADlO Traffi* Signal Calbo Tampioo and Avenka Bernudas 150,000 150,000
ADI I Historical S* Museum Acquisition 125,000 125,000
ADi 2- Aduna Street Park Phase II 200,000 200,000
ADI3 Adarni Street Widening 60.000 60,000
AD14*Wmhington Street Median Lands*ping-PH3 676,000 676,000
ADI 5 Sound Walle Various Locations 1,500,000 1,500,000
ADi 6 Childeare Faoi'l* 500,000 12) 500,000
AD17 Sinaloa Median Landscaping 93,773 93,773
AD8 Avenue 50 Median Landi*ping 199,340 199,340
A019 Caile Tampico Median Landscape 210,728 210,728
AD20- Second Min'*ark SftelCove Area 80,000 80,000
AD21- Landscaping at Oleander Relevoir Levee 150,000 150,000
AD22 Bike RenialeiSnack Shop * Bear Creek Bike Path 506,800 13) 506.800
AD23 Design 17 Acne Park Sfte at *est**rd Ho DrivelAdams 225,000 IA) 225,000
A024 Jefferoon Street lmprovement(Avenue 54 to lndio Blvd) 3,049,200 4,573,600 ti* 7,623,000
AD25 village TmiI Enhancements 300,000 200.000 13) 500,000
AD25 Construct Municipal utrarl 7,000,000 13) 7,000,000
AD27 Cammunitl Garden 20,000 20.000
A028 BikelanelSidewalk Crossing of Hwy 111 * Point Happy 75,000 13) 75.000
ADDITIONAL PROJECTS TOTAL: 1,053,841 10.465.512 200.000 13.280,600 25,( *
BIB]
09-16-1998-U01
03:16:23PM-U01
ADMIN-U01
CCRES-U02
98-U02
41-U02
^"RM CITY OF LA QUINTA
CAPITAL IMPROVEMENT PROGRAM
REVENUE SUMMARY
OThER FUNDING SOURCES:
1) County of Riverside $76,000; SLTPP 575,000
2) DeyeIoper Contribution $125,000
3) STP $100,000
4) Bike Line Account Funding $30,000
5) Proposed Aseemiwnent District $273,062: CVwO $355,841
6) Proposed Asiesenent Oistr* $866,391; CV*NO $1,193,100; CDBG $192,000
7) Proposed Amesernent Dtstnot'* $1,374,730: CV'ND $54,230
8) Proposed Aisemnent Distr*ct $272,506
9) Deycloper Contribution $135,000
10) Deye*r Contribution $125,000
11) City of Indio $37,500: RedeeeIopnent Pro* #2 $37,500
12) Unknonn $500,000
13) To Be Determined
14) QuimbV $225,000
15) CVAG 3,811,500: SLTPP $762,300
BIB]
09-16-1998-U01
03:16:23PM-U01
ADMIN-U01
CCRES-U02
98-U02
41-U02
^"RM IL
CITY OP LA QUINTA
CAPITAL IMPROVEMEWT PROGRAM
EXPENDITURE SUMMARY
Project # Project Description Administration Enpinsering Construction Inspection Other Total
199899
199613 Washington StreeUI-1Q Interchange Improvements 50,000(1) 5'
199702 SidewaI* Various Locations 1,500 1,500 20,500 1.500 2. *
199703 Handicap Access Ramp Various LocatiOns 1,000 1,000 7,000 1,000 0,000
199704 Highway 111/Jefferson Vicinity Improvements 128,680 2) 128,660
199802- Washington St. Widening: Ave. 50 to Village SC 45,000 842,491 56,975 946,466
199803 Traffic Signal: Fred Waring/Dune Palms 7,500 14,250 118,275 9,975 150,000
199**TnafficSignaI:CaIIeTamPcO&EisenhowerDrive 7,143 12,210 122,100 8,547 150,000
199810 Parc La Quinta Under Grounding 15,000 30,000 300,000 23,250 368,250
199811 Avenue 50 Ovenay 7,500 10,000 11*,000 17,500 150.000
199812 OPTICOM Retr*fit 2,500 6,000 50,000 4,000 62.500
199813 Blur Creek Bike Path REST STOPS 3,000 6,000 65,000 6,000 80.000
199814 Fritz Bums Park Restomlion 5,000 8,000 80,000 7,000 100.000
199815 Wmhington St. Widening Fred Waring to North Umits 12,600 25,200 i95,000 1*200 252,000
199816- *seV* illap Commercial Area) 59,433 118,865 918,232 92.120 1,188,650
199817 Ptsese V-B Cove Arm) 204,425 408,849 3,158,359 318,858 4,088,491
199818- Phase VC Westwarl Ho) 117,548 235,096 1,816,117 182,199 2,350,960
199819- PIsase v-li Sagebrush, Bott*brush, Saguaro) 50,095 100,190 773,987 77,847 1,001,899
199820 Calle Rondo Channel Storm Drain 6,000 22,000 220,000 17,000 285,000
199821 Village ilieveiopment 25,000 50.000 356,250 38,750 500,000
199822 Cove Oasi*Lake Cahuilla Trail 10,000 20.000 154.500 15,500 200,000
NV 1999/1199 TOTAL: 580,243 1,069,160 9,342,791 897,022 178,880 12,067,896
1999100
199813 Washington Street/I-b Interchange Improvements 50,000 1) 50,000
199702 Sidewalks Various Locations 1,500 1,500 20,500 1,500 25,000
199703 Handicap Accass Ramp Various Locations 1,000 1,000 7,000 1,000 10,000
199704 Highway 11 1/Jeffenson Vicinity Improvements 128,680 2) 128.680
199802 Washington St. Widening: Ave. 50to Viliage SC 45,071 842,491 58,974 948,536
NV 1999/00 TOTAL: 47,571 2,500 889,991 61.474 178,680 1,1ei*i6
2000101
199813 Washington Street*I-10 Interchange Improvements 50,000 1) bu,*j00
199702 Sidewalks Various Locations 1,500 1,500 20,500 1,500 25,000
199703 Handicap Access Ramp Various Locations 1,000 1,000 7,000 1,000 10,000
199704- Highway 11 1/Jeffenson Vicinity Improvements 128,680 2) 128,680
200001 Traffic Signal: TampicoiScuth Entrance to Village SC 7143 12,210 122.100 8,547 150.000
NV 2000101 TOTAL 9,643 14,710 149,600 11,047 126,880 383,680
2001102
199613 Washington StreeUl-1 0 Interchange Improvements 50,000 1) 50,000
199702- SieewaIks VarioUs Locations 1,500 1,500 20,500 1,500 25,000
199703 Handicap Access Ramp Various Locations 1,000 1,000 7,000 1,000 10,000
199704 Highway ill/Jefferson Vicinity Improvements 128,680 2) 128.680
NV 2001102 TOTAL: 2,500 2,500 27,500 2,500 178.680 213.650
2002/03
199613 Washington Street/I-iD Interchange improvements 50,000 1) 50,000
199702- Sidewalks VaTious Locations 1,500 1,500 20,500 1,500 25,000
199703 Handicap Access Ramp Various Locations 1,000 1,000 7,000 1,000 10,000
199704 Highway 111/Jefferson Vicinity Improvements 128,680 2) 128,680
NV 2002103 TOTAL: 2,500 2,500 27,500 2,500 178,680 213,680
BIB]
09-16-1998-U01
03:16:23PM-U01
ADMIN-U01
CCRES-U02
98-U02
41-U02
^"RM IL
CITY OF LA QUINTA
CAPITAL IMPROVEMENT PROGRAM
EXPENDITURE SUMMARY
Project # Project Description Administration Engineering Construction Inspection Other Total
ADDITIONAL PROJECTS
ADOl Eimnhower DriVWAvenue50 Drain Improvements 11,000 20,179 201,791 14,030 247.000
A002 VValhirgton Street Median Landscaping Phase 2 13,881 23,729 237,291 16.611 291.512
ADO3 Dune Palm. Road Str.et Widening 18,190 31,* 310,946 21,767 362,000
ADO4 Parong Improvemets in The village 10,476 17,906 179,060 12,536 220,000
ADDS MiIm Ave. Median Lanlscapin**a*inIton*Jefterson 6,900 11.795 117,949 8,256 144.900
Fred Waring Dilve Median Landscaping 6,900 11,795 117.949 8,256 144,900
ADQ7 Madison Street Etension Interim) 160,762 274,807 2,746.066 192,365 3,376,000
ADOB Trat!ic Signal. Weetward Ho & Dune Palms Road 7,143 12,210 122,100 8,547 150,000
ADQ9 Tmffic Signal: Avenue 52 & Avenids Bermudas 7,143 12,210 122,100 8,547 150,000
ADlO Traffic Signal: Calls Tamjcco and Avenida Bermudas 7,143 12,210 122,100 8,547 150,000
ADli Histoncal Society Mumum Acquiskii* 12,000 113,000 3) 125,000
AD12 AdlamsStreet Park- Pham II 9524 16280 162800 11396 200,000
AD13 Adams Street *id*ning 2,500 5,000 49,000 3.500 60,000
A014 Wamhington Street Median Landscaping PH 3 32190 550265 55026 38519 676,000
AIDiS Sound Walls Vandus Locations 71.430 122,100 1,221,000 85.470 1500,000
AD16 Childeam Facility 23,810 40,700 407,000 28.490 500,000
ADi? Sinalos Median Landscaping 4,200 83,130 6,443 93,773
ADiS Avenue 50 Median Landscaping 8,840 176,798 13,702 199.340
ADiG Calls Tampico Median Landicape 9,345 186.1898 14,465 210,728
AD20 Second Min*ark Slt*Cove Arm 4,000 8,000 61,800 6,200 80.000
Ao21- Landscaping at Oleander Rem**r Levee 7500 15000 115675 11625 150,000
Ap22 Bike RenalaiSnack Shop* Beer Creek Bike Patn 16,000 32,000 354,000 24,800 80,000 3) 506.800
AD23 Design 17 Acre Park Site at Westward Ho DrvolAidams 25,000 175,000 25,000 4) 225,000
AD24 Jefferson Street lmprovement(Avenue 54 to lndio Blvd) 7,623,000 7,623,000
AD2S village Trail Enhancements 25,000 50,000 356.250 38,750 500,000
AD26 Construct Municipsl Librarv 350,000 700,000 5,407,500 542.500 7,000.000
AD27 Community Garden 1,000 2,000 15,450 1,550 20.000
AD26 Bikeian*SidewaIk Crossing of Hwy 111 * Point Happy 3,750 7,500 57,938 5,813 75,000
ADDITIOiIAL PROJECTS TOTAL.' 855,627 2,151,783 20,642,839 1,132,705 218,000 25.000.953
REVENUE NOTES:
1) Intequnslictional Contribution
2) Sublease from Devejoper
3) Acquisition
4) Mast,rplan
BIB]
09-16-1998-U01
03:16:23PM-U01
ADMIN-U01
CCRES-U02
98-U02
41-U02
^"RM I
CITY OF LA QUINTA
CAPITAL IMPROVEMENT PROGRAM
ANNUAL OPERATING EXPENSE SUMMARY
Project # Project Descrlptlon General Fund
FY1*8*9 FY1999100 FY2000M1 FY2OOi*2 FY2002103 TI L
199613 Washington StreeUl-1 0 Interchange Improvements
199702 Sidewaliw Various Locations
199703- Handicap Acorn Ramp Various Locations
199704 Highway 111 iJelfiroon Vjcinit* Improvements
199602 Washington St Widening: Ave. 60 to Village SC
Trafk Signal: Fred WaringiDune Palms 2,600 2,500 2.600 2,600 10,000
199606- Tnaaic Signal: Calls Tampico & Eisenhower Drive 5,000 5,000 5,000 5,000 20,000
199610 Parc La Quinta Under Grounding
199611 Avenue 50 Overlay 1,000 1,000 1,000 6.000 9,000
199612 OPTICOM R**flt 000 600 600 600 2,400
199613 Bear Creek Bike Path REST STOPS 500 500 500 500 2.000
199614 Frftz Bums Park R*ut*ton 400 400 400 400 1,000
199615- Washington St Widening Fred Waring to North LImit 2,000 2.000
199618 Phase V-A Vil* Commercial Arm)
199617 Phase V-B Cove Ama) 2,000 2,000 4,000
199618- Phase V-C *e*tward NC)
199619 Phase V-D Sagebrush, Botuebwmh, Saguano)
199620 Cab Rondo Channel Storm Drain 6,000 6,000
199621 Village Development
199622 Cove OasialLake Cahuilla Trail 2,000 2,000
200001 Traffic Signal: TampicolSouth Entrance to Village SC *,000 5,000 10.000
TOTAL ANNUAL OPERATING EXPENSE: 10,000 0.000 17,000 32,000 69,000
ADIOITIONAL PROJECTS To Be DetermIned
ADOl Eisenhewer DriAvenue 50 Drain Improvements
ADO2 Washington Street Median Landscaping Phase 2
ADO3 Dune Palms Road Street Wdening
Parking Impeeveneents in The Village
ADOS Miles Ave. Median LanIcccaping*Washin*Jefferoon
AD06 Fred Waring Drive Median Landscaping
A1007 Madison Street Entension Interim)
AD06 Traffic Signal: Westward Ho & Dune Palms Road
A009 Traffic Signal: Avenue 52 & Avenida Bennudas
ADi 0 Traffic Signal: Calls Tampico and Avenida Bennudas
ADI I Historical SCcieety Museum Acquisition
ADI2 Adams Street Park- Phase II
ADi 3- Adams Street widening
ADlA Washington Street Median Landscaping PH 3 12,000 2,000
ADi 5- Sound Walls Various Locations
ADle Childoare Facijity'
AD17 Sinaloa Median Landscaping 16.640 16,640
AD18 Avenue 50 Median Landscaping 33.2160 33,280
AD19 Calls Tampioo Median Landscape 16,640 16,640
A020 Second Min*ark SitelCove Area 20,000 20,000
A021- Landscaping at Oieander Resevoir Levee 8,000 8,000
AD22 Bike RentaIaISnack Shop * Bear Creek Bike Path
AD23 Design 17 Acre Park Site at Westward Ho Drive(Adams
AD2A Jefferoon Street Improvement(Avenue 54 to India Blvd)
AD25 Village Trail Enhancements
A026 Construst Municipal Lrlrrary
AD27 Community Garderi
AD28 BikeianelSid*alk Crossing of Hwy 111 * Paint Happy
ADDITIONAL PROJECTS TOTAL: 106.580 106,590
BIB]
09-16-1998-U01
03:16:23PM-U01
ADMIN-U01
CCRES-U02
98-U02
41-U02
^"RM CITY OF LA QUINTA: CAPITAL IMPROVEMENT PROGRAM DETAIL
Project Type: Street Improvements
Project: 199813 Washington Streetil-lO Interchange Imorovements
DeUcri ion
This pr*ect includes widening of Washington Street, replacing the Washington Street Bridges aver the milmad tmcks
and Interstate, widening and realignment of Varner Road, removing and replacing westbound ramps, widening the
cx sting eastbound ramps, and signalizing the ramp termini and the Va mar Roa*NVashington Street Intemection.
R*venue Amounta
Category FY 1998109 Fy 1990,00 FY 2000101 Fy 2001102 FY 2002103 Total
General Fund 0
Infrastructure 50,000 50,000 50,000 50,000 50,000 250.000
Proiect Area 1 0
Project Area 2 0
other: 0
Other: 0
Revenue Amount Total 50,000 50,000 50,000 50,000 50,000 250,000
Expenie Amounta
Category FY 199U109 FY 1999100 FY 2000101 FY 2001102 Fv 2002103 Total
Administration 0
Engineering 0
Construction 0
Inspection 0
other: 50,000 50,000 50,000 50,000 50,000 250,000
other 0
Expense Amount Total 50,000 50.000 50.000 50.000 50.000 250.000
Operating Costs
Category FY 1998109 FY 1999100 FY 2000101 FY 2001102 FY 2002103 Total
General Fund 0
other: 0
O ratln CoatTotal 0 0 0 0 0
AddItional Commenta: This is a muftiiurisdictional project at a total cost of $15,173,430. The City is to tund
s50,000 annually for approximately 17 years. The total City assistance is $82e,311, or
5.4*% of the total cost. CVAG will finance the improvements and will be reimbursed by
affected iun.sdictions.
Printed: 0*r-98
Page 1
BIB]
09-16-1998-U01
03:16:23PM-U01
ADMIN-U01
CCRES-U02
98-U02
41-U02
^"R
MCITY OF LA QUINTA: CAPITAL IMPROVEMENT PROGRAM DETAIL
Project Type: Street improvements
Project: 199702 Sidewalks Various Locations
**crijstlon
This annual project provides for construction of sidewalks at various high prior*ty locations. These locations are
selected from a list of heavy pedesman activity and jim ited opportunity for developer installed improvements
Revenue Amounta
CaI.pory FY 1998199 FY 1999100 FY 2000101 FY 2001102 FY 2002103 Total
G*eral Fund 0
Infrastructure 25,000 25,000 25.000 25,000 25,000 125,000
Project Area 1 0
Project Area 2 0
other: 0
other: 0
Revenue Amount Total 25,000 25.000 25.000 25.000 25,000 125.000
Expense Amounts
category FY 1998199 FY 199W00 FY 2000101 FY 2001102 FY 2002103 Total
Administration 1,500 1,500 1,500 1,500 1,500 Co
Engineering 1,500 1,500 1,500 1,500 1.500 00
Construction 20.500 20.500 20,500 20,500 20,500 i**.j00
Inspection 1,500 1,500 1,500 1,500 1,500 7,500
other: 0
other 0
Expense Amount Total 25.000 25.000 25.000 25.000 25,000 125.000
Operating Costa
C 0 FY 1*9 FY 1999100 FY 2000101 FY 2001102 FY 2002103 Total
General Fund 0
other: 0
OperatInaCoutTotail 0 0 0 0 0 0
Additional Comments:
Printed: 03 r-98
Page 2
BIB]
09-16-1998-U01
03:16:23PM-U01
ADMIN-U01
CCRES-U02
98-U02
41-U02
^"RMCITY OF LA QUINTA: CAPITAL IMPROVEMENT PROGRAM DETAIL
Project Type: Street Improvements
Project: 1 9*7Q3 *andicao Access Ramo Various Locations
Dmnption
This annual project provides for construction of handicap access mmps a various locations selected from a list where there
exists a curb with no access ramp.
Revenue Amounts
Category FY 1998199 FY 999100 FY 2000101 FY 2001102 * 2002103 Total
General Fund 0
Infrastructure 10,000 10,000 10,000 10,000 10,000 50.000
Project Area 1 0
Project Area 2 0
other: 0
other: 0
Revenue Amount Total 10.000 10,000 10.000 10.000 10.000 50.000
Exp*nm Amounts
C o FY 998199 Fy 999,00 FY 2000101 FY 2001102 FY 2002103 Total
Admirnstr'aition 1.000 1,000 1,000 1,000 1,000 5,000
Engineering 1,000 1,000 1,000 1,000 1,000 5.000
Construction 7,000 7,000 7,000 7,000 7,000 35.000
inspection 1,000 1,000 1,000 1,000 1,000 5,000
other: 0
other: 0
Exnenae Amount Total 10.000 10.000 10.000 10.000 10.000 50.000
Operating Coats
Category FY 1998,.. Fy 999,00 FY 2000101 FY 2001102 FY 2002103 Total
Geneml Fund 0
other: 0
OperatIng Cnat Total 0 0 0 0 0 0
Addftional Comments:
Printed: 03*pr-98
Page 3
BIB]
09-16-1998-U01
03:16:23PM-U01
ADMIN-U01
CCRES-U02
98-U02
41-U02
^"RMCITY OF LA QUINTA: CAPITAL IMPROVEMENT PROGRAM DETAIL
Project Type: Street Improvements
Project: 199704 Highwav 1 11 & Jefferson Street Vicinity lm*rovements
Deecription
This project provides far northsIdC widening of Highway 111 and westside widening of Jefferson, including
signalization, adjacent to commercial development Home Depot).
Revenue Amounts
Cat*pory lvi' 1gg8199 lvi' 1999100 lvi' 2000101 lvi' 2001102 lvi' 2002103 Total
General Fund 128,680 128,680 128,680 128,680 128,880 643,400
Infrastructure 0
Prnject Area 1 0
Project Area 2 0
other: 0
other: 0
Revenue Amount Total 128,680 128.680 128.680 128.680 128.680 643.400
Expense Amounts
Category lvi' 1998199 lvi' 1999100 lvi' 2000101 lvi' 2001102 1"" 2002103 Total
Administration 0
Engineering 0
Canstruction 0
InspectIon 0
other: 128,680 128,680 128,680 128,680 128,680 643,400
other 0
Expense Amount Total 128.680 128.680 128.680 128,680 128,680 843.400
Operating Costs
C 0 lvi' 1998199 FY 1999100 1"" 200010 lvi' 200102 lvi' 2002103 Total
General Fund 0
other 0
OperatingCostTotal 0 0 0 0 0 0
Additional Comments: This project is an ecomonic development obligaton in which the City has agreed to pay
48% of the sales and use tax generated from the commercial development, not to
exceed $128,680 per year for a period of twelve 12) years. Funds to be provided to
developer through sublease per prior agreement.
Printed: 0* 98
Page 4
BIB]
09-16-1998-U01
03:16:23PM-U01
ADMIN-U01
CCRES-U02
98-U02
41-U02
^"RM CITY OF LA QUINTA: CAPITAL IMPROVEMENT PROGRAM DETAIL
Project Type: Street Improvements
Project: 199802 Washington Street Widening: Avenue 50 to Village SC
De*niation
Widen portion of Washington Street, from Avenue 50 to the east entrance of the Ratphs'Nillage Shopping Center,
including the box culvert of the evacuation channel.
Revenue Amounts
Category lii' 1.98199 FY 999100 FY 2000101 FY 2001102 FY 2002103 Total
General Fund 0
Infrastructure 946,466 946,538 1893.002
Project Area 1 0
Project Area 2 0
other: 0
other 0
Revenue Amount Total 946,466 946,536 0 0 0 1.893.002
Expense Amounts
Category FY 1998199 FY 1999100 FY 2000101 FY 2001102 FY 2002103 Total
Administmton 45,000 45,071 90.071
Engineering 0
Construction 842,491 842.491 I 084.982
Inspection 58,975 58,974 117,949
other: 0
other: 0
Expense Amount Total 946.466 946.536 0 0 0 1.893.002
Operating Costs
Category FY 1998199 FY 1999100 FY 2000101 FY 2001102 FY 2002103 Total
Geneml Fund 0
other 0
OperatingCostTotal 0 0 0 0 0 0
Addftlonal Comments:
Pnnte:l 0*r-98
Page 8
BIB]
09-16-1998-U01
03:16:23PM-U01
ADMIN-U01
CCRES-U02
98-U02
41-U02
^"RM I
CITY OF LA QUINTA: CAPITAL IMPROVEMENT PROGRAM DETAIL
Project Type: Traffic Sional lmpro*ments
Project: 199603 Traffic S:gnal: Fred Wann*une Patms
DelcriDtion
Construct a traffic signal at the intemechon of Fred Waring Drive and Dune Palms Road.
Revenue Amoutits
Catmpory F,,, lgg8,.9 F,,, F"' 2000101 1"" 2001102 FY 2002103 Total
Ganemi Fund 0
Infrastructure 0
PrajectArea 1 0
Project Area 2 0
Other County of Riverside 75,000 75,000
Other: SB3OO 75.000 75,000
RevenueAmountTotal 150.000 0 0 0 0 150.000
Ex*nse Amounts
Caitapory FY i*eam* F,,, ggg100 FY 2000101 FY 2001102 FY 2002103 Total1
Adminiutration 7,500
Engineering 14,250
1
Construction 116,275
Inspection 9,975 *,t;75t
Other: ol
Other: 0!
ExpenseAmountTotal 150.000 0 0 0 0 150.000.
Operating Costs
Ca*ory * lgg8,9g F,,, 1g99'oo FY 2000101 FY 2001102 FY 2002103 Total
General Fund 2,500 2,500 2,500 2,500 10,000.
Other 0
Operating Cost Total 0 2,500 2,500 2,500 2,500 10,000'
Additional Comments..
Pnnted: 03 r-98
BIB]
09-16-1998-U01
03:16:23PM-U01
ADMIN-U01
CCRES-U02
98-U02
41-U02
^"RMCITY OF LA QUINTA: CAPITAL IMPROVEMENT PROGRAM DETAIL
Project Type: Traffic Signal improvements
Project: 199806 Traffic Signal: Calie TAMPICO & Eisenhower Drive
Description
Construct a traffic signal at the intersection of CalIe Tampico and Eisenhower Drive.
Revenue Amounts
Category FY 998199 FY 1999,00 FY 2000101 FY 2001102 FY 2002103 Total
Genemi Fund 0
lnfriiistructure 150,000 150,000
Project Area 1 0
Project Area 2 0
other: 0
other: 0
Revenue Amount Total 150.000 0 0 0 0 150.000
Expense Amounts
Category FY 998199 FY 991100 FY 2000101 FY 2001102 FY 2002103 Total
Administration 7,143 7,143
Engineering 12,210 12,210
Construction 122,100 122,100
Inspection 8,547 8.547
other 0
other: 0
Expense Amount Total 150.000 0 0 0 0 150,000
Operating CoUs
Category Fy 1998199 FY 1999100 FY 2000101 FY 2001102 FY 2002103 Total
Genemi Fund 5,000 5,000 5,000 5,000 20,000
other: 0
Operating Coat Total 0 5.000 5.000 5,000 5.000 20,000
Addftlonal Comments:
Printed: 0*Apr*96
Page 7
BIB]
09-16-1998-U01
03:16:23PM-U01
ADMIN-U01
CCRES-U02
98-U02
41-U02
^"RMCITY OF LA QUINTA: CAPITAL IMPROVEMENT PROGRAM DETAIL
Project Type: Public Facilities
Project: 1g9810 Parc La Quinta Under Graundina
Descrl*lon
This project will underground the existing overhead utilities located adjacent to Washington Street in front of the
Parc La Quinta development.
7
Revenue Amoun*
Category lii, 1998,9g FY 19.9100 FY 2000101 FY 2001102 FY 2002103 Total
General Fund 0
infrastructure 0
Project Area 1 0
Project Area 2 243,250 243.250
Other: Developer 125,000 125.000
other: 0
Revenue Amount Total 368,250 0 0 0 0 368.250
Expense Amounts
Category FY 1998199 FY 1999100 FY 2000101 FY 2001102 FY 2002103 Total
Administration 15,000
Engineering 30,000 300
Construction 300,000 3**.J00
Inspection 23,250 23,250
other: 0
other: ol
Expense Amount Total 368.250 0 0 0 0 368,2501
Operating Costs
Category FY 19.8199 FY 1999100 FY 2000101 FY 2001102 FY 2002103 Total
General Fund 0
other *llD 0
Ope'etlngCostTotil 0 0 0 0 0 0
Additional Comments: *Upan completion and acceptance by imperial lrngation District lID) maintenance and
operating costs are assumed by the electric utility provider, lID.
Printed: 03 r-98
Page 8
BIB]
09-16-1998-U01
03:16:23PM-U01
ADMIN-U01
CCRES-U02
98-U02
41-U02
^"RM i
CITY OF LA QUINTA: CAPITAL IMPROVEMENT PROGRAM DETAIL
Project Type: Street Improvements
Project: 199811 Avenue 60 Overlav
Descri*lon
This project will rehabjiltate and overlay existing pavement from Park Avenue Cast to Jefferson Stree* this project
will not include any areas previously improved by developem.
Revenue Amounts
Category FY 19981.9 FY 1999100 FY 2000101 FY 2001102 FY 2002103 Total
General Fund 0
Infrastructure 50,000 50,000
Praject Area 1 0
Project Area 2 0
other: STP ISTEA) 100,000 100,000
other 0
Revenue Amount Total 150.000 0 0 0 0 150,000
Expense Amou rite
Category FY 19981.9 FY 1999100 FY 2000101 FY 2001102 FY 2002103 Total
Adminietretian 7,500 7,500
Engineenng 10,000 10,000
Construction 115,000 iis,ooo;
Inspection 17,500 17.500
other 0
other: C
Expense Amount Total 150.000 0 0 0 0 150.000
o ratin Coats
Category FY 998199 FY 1999100 FY 2000101 FY 2001102 FY 2002103 Total
General Fund 1,000 1,000 1,000 6,000 9,000
other. 0
Operating Cost Total 0 1,000 1,000 1,000 6,000 9.000
Addftlonal Comment..' The Costs presented represent typical maintenance costs, including striping and slurry seel.
Printed: 03*pr-9E
Page C
BIB]
09-16-1998-U01
03:16:23PM-U01
ADMIN-U01
CCRES-U02
98-U02
41-U02
^"RM I
CITY OF LA QUINTA: CAPITAL IMPROVEMENT PROGRAM DETAIL
Project Type: Street Improvements
Project: 199812 OPTICOM Retro-fit
Deacrilition
This project will enhance emergency services response time by allowing emergency vehicles to pre-empt traffic
signals. The following existing signals will require installation of the OPTlCO*' emergency vehicle pr*nipUon
7
device: WashingtoniAve 50, WaishingtoniAve 47, Ave SOIPark Ave, EisenhoweriAve 50, EisenliawerlCoachella,
l*y 11 liJefferson St.
Revenue Amounts
Caiegoiy Fy 1998'99 FY 1999100 FY 2000101 FY 2001102 FY 2002103 Total
Genemi Fund 0
Infrastructure 62,500 62.500
Project Area 1 0
Project Area 2 0
other: 0
other. 0
Revenue Amount Total 62.500 0 0 0 0 62,500
Expenge Amounts
Cgp.o* FY 191U199 FY 1999100 FY 2000101 FY 2001102 FY 2002103 Total
Administration 2,500 500
Engineering 6,000 00
Construction 50,000 *
Inspection 4,000 4,000
Other: 0
other: 0
Expense Amount Total 62,500 0 0 0 0 62,500
Operating Coata
Cat.poiv FY 1998199 FY 999100 FY 2000101 FY 2001102 FY 2002103 Total
General Fund 600 600 600 600 2,400
other: 0
Operating Coat Total 0 600 600 600 600 2.400
AdditIonal Comments: Staff estimate that a budget amount of $600.00 per year will be required for maintenance.
Printed: 03 r-98
Page 10
BIB]
09-16-1998-U01
03:16:23PM-U01
ADMIN-U01
CCRES-U02
98-U02
41-U02
^"RMCITY OF LA QUINTA: CAPITAL IMPROVEMENT PROGRAM DETAIL
Project Type: Public Facilities
Project: 199813 Bear Creek Bike Path REST STOPS
*Dncriptlon
Thls project will construct four 4) rnst sta PS along the Bear Creek Bike Path. Each rest stop shall include: shade
structure, bench, bike rack, drinking fountain. minor landscaping.
R.vunue Amounts I
Category FY 1998*9 FY 1*9100 FY 2000JO1 FY 2001102 FY 2002103 Total
Ganemi Fund 0
lnfaaistructure 0
Project Area 1 50.000 50,000
Project Area 2 0
other: Bike Lane Acct. 30,000 30.000
other 0
R*venue Amount Total 80.000 0 0 0 0 80,000
Expenme Amounts
Category FY 19.8199 FY 1999100 FY 2000101 FY 2001102 FY 2002103 Total I
Administmtion 3.000 3,000,
Engineering 6,000 6,0001
Construction 65,000 65,000
Inspection 6,000 6,000
other: 0
other 0
Expense Amount Total 80.000 0 0 0 0 90.000
OperatIng Costs
Category FY 1991*9 FY 1999100 FY 2000101 FY 2001102 FY 2002103 Total
General Fund 500 500 500 500 2,000
other 0
Operating Coat Total 0 500 500 500 500 2,000
Add ftional Comments: Staff estimate a budget amount of $500.00 per year for maintenance.
Printed: 0*r-9*
Page 1*
BIB]
09-16-1998-U01
03:16:23PM-U01
ADMIN-U01
CCRES-U02
98-U02
41-U02
^"RM IL
CITY OF LA QUINTA: CAPITAL IMPROVEMENT PROGRAM DETAIL
Project Type: Public Improvements
Project: 199814 Fritz Bums Park Restoration
De.cnption
This project will ConsiSt of design of appropriate chain link fencing to Support wind screen, removal and replacement
of existing chain link fence structures around tennis courts. Repair andior replacement of existing lighting system
to make all existing lights functional. install overhead *abrlc" type shade structure at play area.
Revenue Amounts
Category FY 1998199 FY 1gg9* FY 2000101 FY 2001102 FY 2002103 Total
General *und 0
Infrastructure 0
Pro*ect Area 1 100,000 100,000
Project Area 2 0
other: 0
other 0
Revenue Amount Total 100,000 0 0 0 0 100.000
Ex flee Amount:
Category FY 1998199 FY 1999100 FY 2000101 FY 2001102 FY 2002103 Total
Administration 5,000 00
Engineenng 8,000 00
Construction 80.000 *u,000
Inspection 7,000 7,000
other: 0
other. 0
Expense Amount Total 100.000 0 0 0 0 100,0001
Operating Coats
Category FY 998199 FY 1999100 FY 2000101 FY 2001102 FY 2002103 Total
General Fund 400 400 400 400
other 0,
Operating Cost Total 0 400 400 400 400 1,600
Addftlanal Comment:: Staff estimate power consumption for this proiect will be approximately 8400.00*per year.
Printed: 0* ir-98
Page 12
BIB]
09-16-1998-U01
03:16:23PM-U01
ADMIN-U01
CCRES-U02
98-U02
41-U02
^"RMCITY OF LA QUINTA: CAPITAL IMPROVEMENT PROGRAM DETAIL
Project Type: Street Improvement
Project: 199S15 WashinQton Street Widenin* *Fred Warino Dr. to North Citv Limits*
Description
Widen pavement on east side of Washington Street enough to accommodate two 2) through lanes for northbound
traffic from Fred Waring Drive to 700 feet north of Derby Road. Restripe northbound traffic lanes on Washington
Street South of Fred Waring Drive to convert exclusive rtght turn to a second through lane.
RevenUe Amounts
Category FY 1998199 * 1U9100 FY 2000101 FY 2001102 FY 2002103 T*.
General Fund
Infrastructure 252.000 252.00C
Project Area 1 0
Project Area 2 0
other.. 0
other 0
Revenue Amount Total 252.000 0 0 0 0 252.000
Expense Amounts
Cat*ory FY 1998199 FY 1999100 FY 2000101 FY 2001102 FY 2002103 Total
Administration 12,600 12,800
Engineering 25,200 25.200
Construction I gs,ooo 195.000
Inspection 19,200 19,200
other: 0
other 0
Expense Amount Total 252.000 0 0 0 0 252.000
Operating Coats
Category FY 1998199 FY 1999100 FY 2000101 FY 2001102 FY 2002103 Total
General Fund 2,000 2.000
other 0
O ratin Coat Total 0 0 0 0 2000 2.000
Additional Comments: Washington StreetiF red Waring Drive intersection is owned by three agencies: La
Quinta 50%), Palm Desert 25%), Riverside County 25%). Palm Desert and County
have requested La Quinta to participate in project to improve traffic flow through this
intersection. Project is also a needed mitigation measure for the proposed La Quinta
Auto Mall. Staff will roceed with n otiations to ac ul-re a reimbursement a reement.
Printed: 0*r-98
Page 13
BIB]
09-16-1998-U01
03:16:23PM-U01
ADMIN-U01
CCRES-U02
98-U02
41-U02
^"RMCITY OF LA QUINTA: CAPITAL IMPROVEMENT PROGRAM DETAIL
Project Type: Street Improvement
Project: 199816 Phase V-A Villaae Commercial Area*
*Dncnlstion
This phase will provide far improvements within the Downtown" Village" Commercial area; Avenida Monteruma
around the existing Frances *ack Park). Ca lie Estado, Avenida La Fonda Desert Club to Bermudas)
7
Revenue Amounts
Category FY 19.8109 FY 1999100 FY 2000IO FY 2001102 FY 2002103 Total
General Fund
Infrastructure
Project Area 1 559.747 559.747
Project Area 2
other; Proposed AD 273,062 273,062
other CVWD 355.841 355,841
Revenue Amount Total 1 188.650 1,188,650
Ex*nse Amounts
Category FY 1998109 Fy 999,00 FY 2000101 FY 2001102 FY 2002103 Total
Administmtion 59,433 133
Engineenng 118,865 1 365
Construction 918.232 9 Z32
Inspection 92.120 92,120
other:
other:
Expense Amount Total 1 188.650 1,188,650
Operating Costs
Category FY 1998199 FY 999100 FY 2000101 FY 2001102 FY 2002103 Total I
General Fund
Other:
ODorating Cost Total
Additional Comments:
Printed: 03 r-98
* 14
BIB]
09-16-1998-U01
03:16:23PM-U01
ADMIN-U01
CCRES-U02
98-U02
41-U02
^"RMCITY OF LA QUINTA: CAPITAL IMPROVEMENT PROGRAM DETAIL
Project Type: Street Improvements
Prolect: 199817 Phase V-B Cove Area*
Deacri Ion
This portion would include street, storm, water and sewer improvements within the residential area north of Calle
SINALOA. east of Eisen flower Drive, south of Calle Tamp icc and west of Wash:ngton Street.
Revenue Amounts
Category FY 1998199 FY 1999100 FY 2000101 FY' 200i102 FY 2002103
General Fund
Infrastructure
ProjectArea 1 1,817.000 I 617,000
Project Area 2
Other.. Proposed AD 886,391 885,391
Other CVWDICDBG 1,385.100 1 385,100
Revenue Amount Total 4.088,491 4,088.4911
Expenae Amount.
Category FY 1998199 FY 1199100 FY 2000101 FY 2001102 FY 2002103 Total
Administration 204,425 204,425
Enginaenng 408,849 408,849
Construction 3,158,359 3,158,359
Inspection 316,858 316.858
other:
other..
Expense Amount Total 4.088.491 4,088.491
Operating Costs
Category Fy 995,99 FY 1999100 FY 2000101 FY 2001102 FY 2002103 Total
General Fund 2,000 2,000 4,000
other
Operating Coat Total 2,000 2,000 4.000
AdditIonal Comments:
Printed: 03*pr-9*
Page IE
BIB]
09-16-1998-U01
03:16:23PM-U01
ADMIN-U01
CCRES-U02
98-U02
41-U02
^"RM IL
CITY OF LA QUINTA: CAPITAL IMPROVEMENT PROGRAM DETAIL
Project Type: Street Improvements
Pmiect: 199818 Phase V-C *Westward Ho*
Descri ion
north of the Whitewater River Channel, including the southside of Westward Ho from Roadrunner Lane east. F
This phase will provide for surface and subsurface improvements in the residential area west of Jefferson Street,
Improvements include underg rounding of existing overhead utilities, street, storm, water and sewer.
Revenue Amoun*
C a I,,,, 199B,gg I"" 1999100 FY 2000101 1"" 2001102 FY 2002103 Total
General Fund
Infrastructure
*roject Area 1
Project Area 2 922.000 922,0001
other: Proposed AD 1.374,730 1,374,7301
Other CVWD 54,230 54.230
Revenue Amount Total 2.350.960 2.350.980
Expenee Amounts
C a 1"" 19981.9 FY 1999100 FY 2000101 FY 2001102 FY 2002103 Total
Administration 117,548 1 548
Engineering 235,096 098
Construction 1,815,117 *
Inspection 182,199 182,199
Other
Other:
Expense Amount Total 2.350.960 2.350,960
Operatin* Costs
Category FY 1998," FY 1999100 FY 2000101 FY 2001102 FY 2002103 Total
General Fund
Cther
Operating Cost Total
AddItional Comments:
Printed: 03 r-OE
Page 16
BIB]
09-16-1998-U01
03:16:23PM-U01
ADMIN-U01
CCRES-U02
98-U02
41-U02
^"RMCITY OF LA QUINTA: CAPITAL IMPROVEMENT PROGRAM DETAIL
Pmject Type: Street improvement
Project: 199S19 Phase V-D Sagebrush. Bottlebrush. $aouam*
Descnption
This phase will prn'vide street, storm and sewer improvements to Sagebrush, 9ottlebrush and Saguaro.
Revenue Amounts
Category FY 1998JO9 Fy 1Og9*0 FY 2000101 FY 2001*2 FY 2002103 Total
General Fund
Infrastructure
Project Area 1
Project Arm 2 729,303 729,303
Other Proposed AD 272,506 272,506
Other
Revenue Amount Total 1*001,899 1,001.8g9
Expense Amounts
C a FY 1998,99 FY 1999100 FY 2000101 FY 2001102 FY 2002103 Total
Administraton 50,005 50,095
Engineenng 100,190 100,190
Construction 773,957 773,957
Inspection 77,647 77,647
Other
Other
Expense Amount Total 1,001.899 1.001,899
Operating Costs
Category FY 1998199 FY 1999100 FY 2000101 FY 2001102 FY 2002103 Total
Genemi Fund
Other:
Operating Cost Total
Addftional Comments:
Printed: 03*r-9*
Page li
BIB]
09-16-1998-U01
03:16:23PM-U01
ADMIN-U01
CCRES-U02
98-U02
41-U02
^"RM I
CITY OF LA QUINTA: CAPITAL IMPROVEMENT PROGRAM DETAIL
Project Type: Storm Drain
Project: 199820 Calle Rondo Channel Storm Drain
Description
Provide an alternative method of conveying nuisance water via a subterranean conduit system once it reaches the
Calle Rondo Channel, including landscaping of entire channel area
7
Revenue Amounts
Category FY 1*8199 FY i*gi00 FY 2000101 FY 2001102 FY 2002103 Total
General Fund 0
Infrastructure 0
Project Area 1 130,000 130,000
Project Area 2 0
other: D*eloper 135,000 135,000
other 0
Revenue Amount Total 265,000 0 0 0 0 265,000
Expense Amounts
Category FY 1O98IO* FY 1*9100 FY 2000101 FY 2001102 FY 2002103 Total
Administration 6,000
Engineenng 22,000 2
Construction 220,000 22 0
Inspection 17,000 1 30
other 0
other 0
Expense Amount Total 265.000 0 0 0 0 265,000
Operatin* Costs
Category FY 1998199 FY 1999100 FY 2000101 FY 2001102 FY 2002103 Total
General Fund 6,000 6,000
other: 0
OperatIng Cost Total 0 0 0 0 6,000 6,000
Addftlonal Comments:
Printed: 0* *8
P; 16
BIB]
09-16-1998-U01
03:16:23PM-U01
ADMIN-U01
CCRES-U02
98-U02
41-U02
^"RMCITY OF LA QUINTA: CAPITAL IMPROVEMENT PROGRAM DETAIL
Project Type:
Prolect: 190821 ViIIa*e Development
Deacrlption
Design and construct a Prototypical" downtown commercial street theme, including street lights, new sidewalk,
curb and gutter, street construction and restnping
Revenue Amounts
Category FY 1998190 FY 1999100 FY 2000101 FY 2001102 FY 2002103 Total
General Fund 0
Infrastructure 0
Project Area 1 500,000 500,000
Project Area 2 0
Other; 0
Other; 0
Revenue Amount Total 500.000 0 0 0 0 500,000
Expenee Amounts
Category FY 1998199 FY 1999100 FY 2000101 FY 2001102 FY 2002103 Total
Administration 25,000 25,000
Engineering 50,000 50,000
Construction 386,250 3Ba,250
Inspection 38,750 38,750
Other; 0
other: 0
Expenee Amount Totat 500,000 0 0 0 0 500,000
Operating Coats
Category FY 1998199. FY 1999100 FY 2000101 FY 2001102 FY 2002103 Total
General Fund 0
Other; TBD 5,000 5,000
Operating Coat Total 0 0 0 0 5,000 5.000
Addftlonal Comments:
Pnnted 03-Apr-98
Page 19
BIB]
09-16-1998-U01
03:16:23PM-U01
ADMIN-U01
CCRES-U02
98-U02
41-U02
^"RMCITY OF LA QUINTA: CAPITAL IMPROVEMENT PROGRAM DETAIL
Project Type:
Project: 199822 Cove CasisiLake Cahuilla Trait
Descn Ion
Develop the cave Oasis Area south of Tecate) as a future park, and create a hiking trail from the oasis area to Lake
Cahuilla
1
Revenue Amounts
C a FY 1998199 FY 199g100 FY 2000101 FY 2001102 FY 2002103 Total
General Fund 0
Infrastructure 0
Project Area 1 200,000 200,000
Project Area 2 0
Other 0
Other: 0
Revenue Amount Total 200,000 0 0 0 0 200,000
Expense Amounts
Category FY 1998199 FY 1990100 FY 2000101 FY 2001102 FY 2002103 Total
Administration 10,000 1c*
Engineering 20,000 2C 0
Construction 154,500 15' 0
Inspection 15,500
Other: 0
Other: 0
Expense Amount Total 200,000 0 0 0 0 200,000
Operatin* Costs
Category FY 199W99 FY 1999100 FY 200W01 FY 2001102 FY 2002103 Total
General Fund 2,000 2,000
Other: 0
Operating Cost Total 0 0 0 0 2,000 2,000
Additional Comments:
Pnnted: 09A *8
Pa *0
BIB]
09-16-1998-U01
03:16:23PM-U01
ADMIN-U01
CCRES-U02
98-U02
41-U02
^"R MCITY OF LA QUINTA: CAPITAL IMPROVEMENT PROGRAM DETAIL
Project Type: Street Improvements
Project: 199613 *ashington Streetli-lO Interchange Improvements
De'crl*lon
This project includes widening of Washington Street, replacing the Washington Street Bridges over the railroad tracks
and Interstate, widening and realignment of Vamer Road, removing and replacing westbound ramps, widening the
existing eastbound ramps, and signaltzing the ramp terrnini and the Varner RoadNVashington Street Intersection.
Revenue Amounts
Cat 0 FY Iggelug FY 2000101 FY 2001102 FY 2002103 Total
General Fund 0
Infrastructure 50,000 50,000 50,000 50,000 50,000 250,000
Project Area 1 0
Project Area 2 0
other: 0
other: 0
Revenue Amount Total 50,000 50,000 50,000 50,000 50,000 250,000
Expunue Amounts
cat a FY 1998*9 FY 2000101 FY 2001102 FY 2002103 Total
Administration 0
Engineering 0
Construction 0
Inspection 0
other: 50,000 50,000 50,000 50,000 50,000 250,000
other 0
Expen.. Amount Total 50,000 50,000 50,000 50,000 50,000 250,000
Operating Costs
Cat a FY 1998IIi9 FY 2000101 FY 2001102 FY 2002103 Total
General Fund 0
other: 0
Operating Coat Total 0 0 0 0 0
AddItIonal Comments: This is a multi-jurisdictional project at a total cost of $15,173,430. The City is to fund
$50,000 annually for approximately 17 years. The total City assistance is $828,311, or
5.46% of the total cost. CVAG will finance the improvements and will be reimbursed by
aflected urisdictions.
Shading represents the current Fiscal Year.
Printed: 0ll-Apr-9B
Page 1
BIB]
09-16-1998-U01
03:16:23PM-U01
ADMIN-U01
CCRES-U02
98-U02
41-U02
^"R!M I
CITY OF LA QUINTA: CAPITAL IMPROVEMENT PROGRAM DETAIL
Project Type: Street Improvements
Project: 199702 Sidewalks Various Locations
Degcrlptlon
This annual project provides for construction of sidewalks at various high priority locations. These locations are
selected from a list of heavy pedeatnan activity and limited opportunity for developer installed improvements.
Revenue Amounta
Cat 0 FY gg8* FY 2000101 FY 2001102 FY 2002103 Total
General Fund 0
Infrastructure 25,000 25,000 25,000 25,000 25,000 125,000
Project Area 1 0
Project Area 2 0
other: 0
other: 0
Revenue Amount Total 25,000 25,000 25,000 25,000 25000 125,000
Expense Amounts
Cat 0 FY 1998JD9 FY 2000101 FY 2001102 FY 2002103 Total
Administration 1,500 1,500 1,500 1,500 1,500 7*)
Engineering 1,500 1,500 1,500 1,500 1,500 7
Construction 20,500 20,500 20,500 20,500 20,500 102 3
Inspection 1,500 1,500 1,500 1,500 1,500 7,500
other: a
other: 0
Expense Amount Total 25,000 25,000 25,000 25,000 25,000 125,000
Operating Costs
Cat 0 FY 1998*9 FY 2000101 FY 2001102 FY 2002103 Total
General Fund 0
other: 0
Operating Colt Total 0 0 0 0 0 0
Additional Comments:
*Shading represents the current Fiscal Year.
Printed: 0*AI C
BIB]
09-16-1998-U01
03:16:23PM-U01
ADMIN-U01
CCRES-U02
98-U02
41-U02
^"R"MCITY OF LA QUINTA: CAPITAL IMPROVEMENT PROGRAM DETAIL
Project Type: Street Improvements
Project: 199703 Handicap Access Ramp Various Locations
*D.acrl*ion
This annual project provides for construction of handicap access mmps a various locations selected from a list where there
exists a curb with no access ramp.
ReYenue Amounts
C 0 FY 1998199 FY 2000101 FY 2001102 FY 2002103 Total
General Fund 0
Infrastructure 10,000 10,000 10,000 10,000 10,000 50.000
Project Area 1 0
Project Area 2 0
other: 0
other 0
Revenue Amount Total 10,000 10,000 10,000 10,000 10,000 50,000
Expon* Amounts
C 0 FY 1998199 FY 2000101 FY 2001102 FY 2002103 Total
Administration 1,000 1,000 1,000 1,000 1,000 5.000
Engineering 1,000 1,000 1,000 1,000 1,000 5,000
Construction 7,000 7,000 7,000 7,000 7,000 35,000
Inspection 1,000 1,000 1,000 1,000 1,000 5,000
other: 0
other: 0
Ex fl8C Amount Total 10 000 10,000 10 000 10000 10000 50,000
Operating Cost.
Cat 0 FY 19gU199 FY 2000101 FY 2001102 FY 2002103 Total
General Fund 0
other: 0
Operating Cost Total 0 0 0 0 0 0
Addftlonal Comments:
Shading represents the current Fiscal Year.
Printed: 0*Apr-98
Page 3
BIB]
09-16-1998-U01
03:16:23PM-U01
ADMIN-U01
CCRES-U02
98-U02
41-U02
^"R#MCITY OF LA QUINTA: CAPITAL IMPROVEMENT PROGRAM DETAIL
Project Type: Street Improvements
Project: 199704 Highway ill & Jeffemon Street Vicinity Improvements
Description
This project provides for northside widening of Highway 111 and westside widening of Jeflerson, including
signalization, adjacent to commercial development Home Depot).
1
Revenue Amounts
Cat 0 Fy 1.98'*g FY 2000101 FY 2001102 FY 2002103 Total
General Fund 128,680 122,680 128,680 128,680 128,680 643,400
Infrastructure 0
Project Area 1 0
ProjectArea2 0
other: 0
other 0
Revenue Amount Total 128,680 128,680 128,680 126,680 128,660 643,400
Expenue Amounts
Cat 0 FY 1998*O FY 2000101 FY 2001102 FY 2002103 Total
Administration 0
Engineering 0
Construction 0
Inspection 0
other: 128,680 128,680 128,680 128,680 128,680 643,400
other: 0
Expenue Amount Total 128,680 128,580 126,680 128,680 128.680 643,400
OperatIng Coats
Cat a FY 1998'99 FY 2000101 FY 2001102 FY 2002103 Total
General Fund 0
other: 0
o ratin Coat Total 0 0 0 0 0 0
AdditIonal Comments: This project is an ecomonic development obligation in which the City has agreed to pay
48% of the sales and use tax generated from the commercial development, not to
exceed $126,680 per yearfor a period of twelve 12) years. Funds to be provided to
developer through sublease per prior agreement.
hading represents the current Fiscal Year.
Printed: 0*A le
P*'i* 4
BIB]
09-16-1998-U01
03:16:23PM-U01
ADMIN-U01
CCRES-U02
98-U02
41-U02
^"R$M IL
CITY OF LA QUINTA: CAPITAL IMPROVEMENT PROGRAM DETAIL
Project Type: Street Improvements
Project: 199802 Washington Street Widening: Avenue 50 to Village SC
D*crlptlon
Widen portion of Washington Street, from Avenue 50 to the east entmnce of the Ralphs'Nillage Shopping Center,
including the box culvert of the evacuation channel.
Revenue Amounts
C a FY 1*98*9 FY 2000101 FY 2001102 FY 2002103 Total
General Fund 0
Infrastructure 946,466 946,536 1,893,002
Project Area 1 0
Project Area 2 0
other: 0
other: 0
Revenue Amount Total 946*466 946,536 0 0 0 1,893,002
Expense Amounts
C a FY 19g8'99 FY 2000101 FY 2001102 FY 2002103 Total
Administration 45,000 45,071 90,071
Engineering 0
Construction 842,491 842,491 1.664.982
Inspection 58,975 58,974 117,949
other: 0
other: 0
ExpenseAmountTotal 948,466 948,536 0 0 0 1,893,002
o ratin Casts
Cat a FY 19g8*9 FY 2000101 FY 2001102 FY 2002*3 Total
General Fund 0
other: 0
Operating Cost Total 0 0 0 0 0 0
Addftlonal Comments:
* Shading represents the current Fiscal Year.
Printed: 08*pr-98
Page 5
BIB]
09-16-1998-U01
03:16:23PM-U01
ADMIN-U01
CCRES-U02
98-U02
41-U02
^"R%M I
CITY OF LA QUINTA: CAPITAL IMPROVEMENT PROGRAM DETAIL
Project Type: Street Improvements
Project: 199613 Washington Streetil-lO Interchange Improvements
Desari ion
This proje* includes widening of Washington Street, replacing the Washington Street Bridges over the railroad tracks
and Interstate, widening and realignment of Varner Road, removing and replacing westbound ramps, widening the
1
existing eastbound ramps, and signalizing the ramp termini and the Varner RoadWashington Street Intersection.
Revenue Amounts
Cat 0 FY 1g.8199 FY 1999100 * FY 2001102 FY 2002103 Total
General Fund 0
Infrastructure 50,000 50,000 50,000 50,000 50,000 250,000
Project Area 1 0
Project Area 2 0
other: 0
other: 0
Revenue Amount Total 50,000 50,000 50,000 50,000 50,000 250,000
Ex flue Amounts
C 0 FY 1998199 FY 1999100 FY 2001102 FY 2002103 Total
Administration 0
Engineering 0
Construction 0
Inspection 0
other: 50,000 50,000 50,000 50,000 50,000 250,000
other: 0
Exi:ense Amount Total 50,000 50,000 50,000 50,000 50,000 250,000
Operating Costs
C a FY 1998199 *Y 1999100 FY 2001102 FY 2002103 Total
General Fund 0
other 0
Operating Cost Total 0 0 0 0 0 0
AddItional Comments: This is a multiiurisdictional project at a total cost of $15,173,430. The City is to fund
$50,000 annually for approximately 17 years. The total City assistance is $628,311, or
5.46% of the total cost. CVAG will finance the improvements and will be reimbursed by
affected urisdictions.
*.:,.: hading represents the current Fiscal Year.
Printed: 06A *8
Page 1
BIB]
09-16-1998-U01
03:16:23PM-U01
ADMIN-U01
CCRES-U02
98-U02
41-U02
^"R&MCITY OF LA QUINTA: CAPITAL IMPROVEMENT PROGRAM DETAIL
Project Type.* Street Improvements
Project: 199702 Sidewalks Various Locations
Deucri *on
This annual project provides for construction of sidewalks at various high priority locations. These locations are
selected from a list of heavy pedestrian activity and limited opportunity for developer installed improvements.
Revenue Amounts
Cat a FYi998'o9 FYi99OIOO FY2001102 FY2002103 Total
General Fund 0
Infrastructure 25,000 25,000 25,000 25,000 25,000 125,000
Project Area 1 0
Project Area 2 0
other 0
other: 0
Revenue Amount Total 25,000 25,000 25,000 25,000 25,000 125,000
Expense Amounts
Cat a FY 998199 FY 999100 FY 2001102 FY 2002103 Total
Administration 1,500 1,500 1,500 1,500 1,500 7,500
Engineering 1,500 1,500 1,500 1,500 1,500 7,500
Construction 20,500 20,500 20,500 20,500 20,500 102,500
Inspection 1,500 1,500 1,500 1,500 1,500 7,500
other 0
other: 0
Expense Amount Total 25,000 25,000 25,000 25,000 25,000 125,000
Operating Costs
Cat 0 FY 1998199 FY 1999100 FY 2001102 FY 2002103 Total
General Fund 0
other: 0
Operating Cost Totail 0 0 0 0 0 0
Addftional Comments:
Shading represents the current Fiscal Year.
Pnnted OB*pr-98
Page2
BIB]
09-16-1998-U01
03:16:23PM-U01
ADMIN-U01
CCRES-U02
98-U02
41-U02
^"R'M I
CITY OF LA QUINTA: CAPITAL IMPROVEMENT PROGRAM DETAIL
Project Type: Street Improvements
Project: 199703 Handicap Access Ramp Various Locations
Deecription
This annual project provides far construction of handicap access ramps a various locations selected from a list where there
exists a curb wfth no access ramp.
Revenue Amounts
Cat a FY 1998199 FY 1999100 FY 2001102 FY 2002103 Total
General Fund 0
Infrastructure 10,000 10,000 10,000 10,000 10,000 50,000
Project Area 1 0
Project Area 2 0
other 0
other: 0
Revenue Amount Total 10,000 10,000 10,000 10,000 10,000 50.000
Expense Amounts
Cat a FY 1998199 FY 1999100 FY 2001102 FY 2002103 Total
Administration 1,000 1,000 1,000 1,000 1,000 5
Engineering 1,000 1,000 1,000 1,000 1,000 5
Construction 7.000 7,000 7,000 7,000 7,000 35 *
Inspection 1,000 1,000 1,000 1,000 1,000 5,000
other: 0
other: 0
Expense Amount Total 10,000 10,000 10,000 10,000 10,000 50,000
o ratin Costs
Cat a FY1998199 FY1999100 FY 2001102 FY 2002103 Total
General Fund 0
other: 0
Operating Cost Total 0 0 0 0 0 0
Addftional Comments:
hading represents the current Fiscal Year
Printed: 0*A 8
Ph* 3
BIB]
09-16-1998-U01
03:16:23PM-U01
ADMIN-U01
CCRES-U02
98-U02
41-U02
^"R(M EL
CITY OF LA QUINTA: CAPITAL IMPROVEMENT PROGRAM DETAIL
Project Type: Street Improvements
Project: 199704 Highway 111 & Jefferson Street Vicinity Improvements
Description
This project provides for northside widening of Highway 111 and westside widening of Jefferson, including
signalization, adjacent to commercial development Home Depot).
Revenue Amounts
cat o FY 1.98199 FY i9*100 FY 2001*2 FY 2002193 Total
Geneml Fund 128,680 128,680 128,680 128,680 128,680 643.400
Infrastructure 0
Project Area 1 0
Project Area 2 0
other: 0
other: 0
Revenue Amount Total 128,680 128,680 128,680 128,680 128,680 643,400
Expense Amounts
Cat 0 FY 1998199 FY 1999100 FY 2001102 FY 2002103 Total
Administration 0
Engineering 0
Construction 0
inspection 0
other: 128,680 128,680 128,680 128,680 128,680 643,400
other: 0
Expense Amount Total 128,680 128,680 128,680 128,680 128,680 643,400
Operating Costs
C 0 FY 1"8* FY 1999100 1 FY 2001102 FY 2002103 Total
Genemi Fund 0
other: 0
Operating Cost Total 0 0 0 0 0 0
Add ftional Comments: This project is an ecomonic development obligation in which the City has agreed to pay
48% of the sales and use tax generated from the commercial development, not to
exceed $128,880 per year for a period of twelve 12) years. Funds to be provided to
developer through sublease per prior agreement.
hading represents the current Fiscal Year
Printed: 0*Apr-98
Page 4
BIB]
09-16-1998-U01
03:16:23PM-U01
ADMIN-U01
CCRES-U02
98-U02
41-U02
^"R)M IL
CITY OF LA QUINTA: CAPITAL IMPROVEMENT PROGRAM DETAIL
Project Type: Traffic Signal Imprnvements
Project: 200001 Traffic Signal: Calle TampicolSouth Entrance to Village SC
Description
Construct traffic signal at intersection of Calle Tam pico and the south entrance to the RalphsNillage Shopping Center. 1
Revenue Amounts
Category FY 1998,99 FY 1999100 FY 2000101 FY 2001102 FY 2002103 Total
General Fund 0
Infrastructure 75,000 75,000
Project Area 1 75,000 75,000
Project Area 2 0
other 0
other 0
Revenue Amount Total 0 0 150,000 0 0 150,000
Expense Amounts
Category FY 1998199 FY 1999100 FY 2000101 FY 2001102 FY 2002103 Total
Administration 7,143 3
Engineering 12,210 1: 0
Construction 122,100 12' 10
Inspection 8,547 8,547
other: 0
other: 0
Expense Amount Total 0 0 150,000 0 0 150,000
Operating Co8ts
Category FY 1998199 FY 19g9100 FY 2000101 FY 2001102 FY 2002103 Total
General Fund 5,000 5,000 10,000
other: 0
Operating Cost Total 0 0 0 5,000 5,000 10,000
Addftlonal Comments:
Printed: 0* 98
BIB]
09-16-1998-U01
03:16:23PM-U01
ADMIN-U01
CCRES-U02
98-U02
41-U02
^"R*M IL
CITY OF LA QUINTA: CAPITAL IMPROVEMENT PROGRAM DETAIL
Project Type: Street Improvements
Project: 199613 Washington Stre*l-10 Interchange tmprovements
Deacription
This project includes widening of Washington Street, replacing the Washington Street Bridges over the railroad tnacks
and Interstate, widening and realignment of Vamer Road, removing and replacing westbound ramps, widening the
existing eastbound ramps, and signalizing the ramp termini and the Varner RoadIWashington Street Intersection.
Revenue Amounts
Cat a FY 199819* FY 19g9*OO FY 2000101 FY 2002103 Total
General Fund 0
Infrastructure 50,000 50,000 50,000 50,000 50,000 250,000
Project Area 1 0
Project Area 2 0
other 0
other 0
Revenue Amount Total 50,000 50,000 50,000 50,000 50,000 250,000
Expen8e Amounts
Cat a FY 1998199 FY 1999100 FY 2000101 FY 2002103 Total
Administration 0
Engineering 0
Construction 0
Inspection 0
other.. 50,000 50,000 50,000 50.000 50,000 250,000
other 0
Expenee Amount Total 50,000 50,000 50,000 50,000 50,000 250,000
Operating Costs
Cat a FY 1998199 FY 19*100 FY 2000101 FY 2002103 Total
General Fund 0
other 0
Operating Cost Total 0 0 0 0 0 0
AddItional Comments: This is a multi-jurisdictional project ate total cast of $1 5,173,430. The City is to tund
$50,000 annually for approximately 17 years. Thetotal City assistance is $628,311, or
5.46% of the total cost. CVAG will finance the improvements and will be reimbursed by
affected urisdictions.
Shading represents the current Fiscal Year
Printed: OBApr-98
Page 1
BIB]
09-16-1998-U01
03:16:23PM-U01
ADMIN-U01
CCRES-U02
98-U02
41-U02
^"R+M IL
CITY OF LA QUINTA: CAPITAL IMPROVEMENT PROGRAM DETAIL
Project Type: Street Improvements
Project: I 9*702 Sidewalks Various Locations
Description
This annual project provides for construction of sidewalks at various high priority locations. These locations are
selected fram a list of heavy pedestrian activity and limited opportunity for developer installed improvements.
Revenue Amounts
Cat 0 FY Iggaleg FY 1999100 FY 2000101 FY 2002103 Total
General Fund 0
Infrastructure 25,000 25.000 25,000 25,000 25,000 125,000
ProjectArea 1 0
Project Area 2 0
other 0
other 0
Revenue Amount Total 25,000 25,000 25,000 25,000 25,000 125,000
Expense Amounts
Cat 0 FY 1998199 FY 1999100 FY 2000101 FY 2002*O3 Total
Administration 1,500 1,500 1,500 1.500 1,500 7
Engineering 1,500 1,500 1,500 1,500 1,500 7 I
Construction 20,500 20,500 20,500 20,500 20,500 102, 1
Inspection 1,500 1,500 1,500 1,500 1,500 7,500
other 0
other: 0
Expense Amount Total 25,000 25,000 25.000 25,000 25,000 125,000
Operating Co*
Cat 0 FY 1998199 FY 19.9100 FY 2000101 FY 2002103 Total
General Fund 0
other: 0
O ratin Cost Total 0 0 0 0 0 0
Additional Comments:
Shading represents the current Fiscal Year.
Printed: 08* B
Pa** 2
BIB]
09-16-1998-U01
03:16:23PM-U01
ADMIN-U01
CCRES-U02
98-U02
41-U02
^"R,M CITY OF LA QUINTA: CAPITAL IMPROVEMENT PROGRAM DETAIL
Project Type: Street Improvements
Project: 199703 Handicap Access Ramp Various Locations
Descrilation
This annual project provides for construction of handicap access mmps a various locations selected from a list where there
exists a curb with no access ramp
Revenue Amounts
Cat 0 FY 1998199 FY 1999100 FY 2000101 ** FY 2002103 Total
General Fund 0
Infrastructure 10,000 10.000 10,000 10,000 10,000 50,000
ProjectAreal 0
Project Area 2 0
other 0
other 0
Revenue Amount Total 10,000 10,000 10,000 10,000 10,000 50,000
Expense Amounts
Cat 0 FY 1998199 FY 1999100 FY 2000101 FY 2002103 Total
* Administration 1,000 1,000 1,000 1,000 1,000 5,000
Engineering 1,000 1,000 1,000 1,000 1,000 5,000
Construction 7,000 7,000 7,000 7,000 7,000 35.000
Inspection 1,000 1,000 1,000 1,000 1,000 5,000
other: 0
other: 0
Expense Amount Total 10,000 10,000 10,000 10,000 10,000 50,000
Operating Costs
Cat 0 FY 1998199 FY 1999*00 FY 2000101 FY 2002103 Total
General Fund 0
other: 0
OpeTating Cost Total 0 0 0 0 0 0
Addftlonal Comments:
Shading represents the current Fiscal Year.
Printed: 0i-Apr-98
Page3
BIB]
09-16-1998-U01
03:16:23PM-U01
ADMIN-U01
CCRES-U02
98-U02
41-U02
^"R-M IL
CITY OF LA QUINTA: CAPITAL IMPROVEMENT PROGRAM DETAIL
Project Type: Street Improvements
Project: 199704 Highway 111 & Jefferson Street Vicinity Improvements
D..crlpllon
project provides for northside widening of Highway 111 and westside widening of Jeflerson, including
adjacent to commercial development Home Depot).
1
Revenue Amounts
C 0 FY 1008199 FY 1999100 FY 2000101 FY 2002103 Total
General Fund 128,680 128,680 128,680 128,680 128,660 643,400
Infrastructure 0
Project Area 1 0
Project Area 2 0
other: 0
other 0
Revenue Amount Total 128,680 126,680 128,680 128,680 128,680 643,400
Ex nse Amounts
C a FY 1998199 FY 1999100 FY 2000101 FY 2002103 Total
Administration
Engineering
Construction
Inspection 0
other: 128,880 128,680 128,680 128,680 128,680 643,400
other: 0
Ex nieAmountTotal 128880 128,880 128680 128680 128680 643400
o ratln Costs
C a FY 1998199 FY 1999100 FY 2000101 i FY 2002103 Total
General Fund U
other: 0
o ratin Ca5t Total 0 0 0 0 0 0
Addftional Comments: This project is an ecomonic development obligation in which the City has agreed to pay
48% of the sales and use tax generated from the commercial development, not to
exceed $128,680 per yearfora period oftwelve 12) years. Funds to be provided to
developer through sublease per prior agreement.
hading represents the current Fiscal Year.
Printed: 0*A *
Page 4
BIB]
09-16-1998-U01
03:16:23PM-U01
ADMIN-U01
CCRES-U02
98-U02
41-U02
^"R.M II
CITY OF LA QUINTA: CAPITAL IMPROVEMENT PROGRAM DETAIL
Project Type: Street Improvements
Project: 199613 Washington Street(I-10 Interchange Improvements
Descri ion
This project includes widening of Washington Street, replacing the Washington Street Bridges aver the railroad tracks
and Interstate, widening and realignment of Vs mer Road, removing and replacing westbound ramps, widening the
existing eastbound ramps, and signalizing the ramp termini and the Vamer RoadNVashington Street Intersection.
Revenue Amounts
C a FY 1998199 FY 1999100 FY 2000101 FY 2001102 Total
General *und 0
Infrastructure 60,000 50,000 50,000 50,000 50,000 250,000
Project Area 1 0
Project Area 2 0
other: 0
other; 0
Revenue Amount Total 50,000 50,000 60,000 50,000 50,000 250,000
Expenee Amounts
Cat a FY 1998199 FY 199W00 FY 200W01 FY 2001102 Total
Administration 0
Engineering 0
Construction 0
Inspection 0
other: 50,000 50,000 50,000 50,000 50,000 250,000
other 0
Expenee Amount Total 50,000 50,000 50,000 50,000 50,000 250,000
o ratin Coat.
Cat a FY 1998199 FY 1999100 FY 2000101 FY 2001102 Total
General Fund 0
other: 0
o atm CostTotal 0 0 0 0 0 0
AddItIonal Comments: This is a multi-jurisdictional project at a total cost of $15,173,430. The City is to lund
$50,000 annually for approximately 17 years. The total City assistance is $826,311, or
5.4*% of the total cost. CVAG will finance the improvements and will be reimbursed by
aflected urisdictions.
Shading represents the current Fiscal Year.
Printed: 06-Apr-96
Page 1
BIB]
09-16-1998-U01
03:16:23PM-U01
ADMIN-U01
CCRES-U02
98-U02
41-U02
^"R/MCITY OF LA QUINTA: CAPITAL IMPROVEMENT PROGRAM DETAIL
Project Type: Street Improvements
Project: 199702 Sidewalks Various Locations
Description
t This annual project provides for construction of sidewalks at various hi*h priority locations. These locations are
selected from a list of heavy pedestrian_actMty and limited opportunity for developer installed improvements. 1
Revenue Amounts
C 0 FY 1998199 FY 1999100 FY 2000101 FY 2001102 Total
General Fund 0
Infrastructure 25,000 25,000 25,000 25,000 25,000 125,000
ProjectArea 1 0
Project Area 2 0
other: 0
other: 0
Revenue Amount Total 25,000 25,000 25,000 25,000 25,000 125,000
Ex nac Amounts
Ca a FY 1998199 FY 1999100 FY 2000101 FY 2001102 Total
Administration 1,500 1,500 1,500 1,500 1,500
Engineering 1,500 1,500 1,500 1,500 1,500 0
Construction 20,500 20,500 20,500 20,500 20,500 10 0
Inspection 1,500 1,500 1,500 1,500 1,500 7,500
other: 0
other: 0
Expense Amount Total 25,000 25,000 25,000 25,000 25,000 125,000
Operating Colts
Cat a FY 1998199 FY 1999100 FY 2000101 FY 2001102 Total
General Fund 0
other: 0
Operating Cost Total 0 0 0 0 0 0
Addftional Comments:
Shading represents the current Fiscal Year.
Printed: 084 96
BIB]
09-16-1998-U01
03:16:23PM-U01
ADMIN-U01
CCRES-U02
98-U02
41-U02
^"R0M CITY OF LA QUINTA: CAPITAL IMPROVEMENT PROGRAM DETAIL
Project Type: Street irnprovements
Project: 199703 Handicap Access Ramp Various Locations
Deacrl*ion
This annual project provides for construction of handicap access mmps a various locations selected from a list where there
exists a curb with no access ramp.
Revenue Amounts
C 0 FY 1998199 FY 1990100 FY 2000101 FY 2001102 Total
General Fund 0
Infrastructure 10,000 10,000 10,000 10,000 10,000 50,000
Project Area 1 0
Project Area 2 0
other: 0
other: 0
Revenue Amount Total 10,000 10*000 10,000 10,000 10,000 50,000
Ex nec Amounts
Cat 0 FY 1908100 FY 1999100 FY 2000101 FY 2001102 Total
Administration 1,000 1,000 1.000 1,000 1,000 5,000
Engineering 1,000 1,000 1,000 1,000 1,000 5,000
Construction 7,000 7,000 7,000 7,000 7,000 35,000
Inspection 1,000 1,000 1,000 1,000 1,000 5,000
other: 0
other: 0
Expense Amount Total 10,000 10,000 10,000 10,000 10,000 50,000
OperatIng Coats
Cat a FY 1998109 FY 1999100 FY 2000101 FY 2001102 Total
General Fund 0
other: 0
Operating Cost Total 0 0 0 0 0 0
Addftlonal Comments:
Shading represents the current Fiscal Year.
Printed: 0*Apr-98
Page 3
BIB]
09-16-1998-U01
03:16:23PM-U01
ADMIN-U01
CCRES-U02
98-U02
41-U02
^"R1M I
CITY OF LA QUINTA: CAPITAL IMPROVEMENT PROGRAM DETAIL
Project Type: Street Improvements
Project: 199704 Highway 111 & Jefferson Street Vicinity Improvements
Description
This project provides far northside widening of Highway 111 and westside widening of Jefferson, including
signalization, adjacent to commercial development Home Depot).
Revenue Amounts
C 0 FY 1098100 FY 1090100 FY 2000101 FY 2001102 Total
Geneml Fund 128,660 126,660 128,660 126,680 128,680 643,400
Infrastructure 0
Project Area 1 0
Project Area 2 0
other 0
other 0
Revenue Amount Total 128,660 128,680 128,680 128,680 128,660 643,400
Ex nac Amounts
Cat a FY 1998100 FY 1999100 FY 2000101 FY 2001102 Total
Administration
Engineering
Construction
Inspection 0
other: 126,680 128,660 128,660 128.680 128,680 643,400
other: 0
Expense Amount Tatal 126,680 126,680 128,680 126,660 128,680 643,*00
o ratin Costs
C a FY 1098109 FY 1990100 FY 2000101 FY 2001102 Total
General Fund 0
other: 0
OperatingcostTotal 0 0 0 0 0 0
Addftlonal Comments: This project is an ecomonic development obligation in which the CIty has agreed to pay
48% of the sales and use tax generated from the commercial development, not to
exceed $128,680 per year for a period of twelve 12) years. Funds to be provided to
developer through sublease per prior agreement
Shading represents the current Fiscal Year.
Printed: OBA, 8
Page 4
BIB]
09-16-1998-U01
03:16:23PM-U01
ADMIN-U01
CCRES-U02
98-U02
41-U02
^"R2MCITY OF LA QUINTA: CAPITAL IMPROVEMENT PROGRAM DETAIL
Pr*ect Type: Drainage Improvement
Prnlect: ADOl Eisenhowef DrivelAvenue 50 Drain Improvements
*DescnDUon
Construct sump pump and supporting storm drain system to evacuation channel to remove flood water from this
area.
R.venue Amounts
Category To Be Detemilned Total
General Fund 0
lnfr..trucwre 247,000 247,000
Project Area 1 0
Project Area 2 0
Other: 0
Other 0
Reyenue Amount Total 0 0 0 0 247,000 247,000
Expense Amounts
Catego* To Be Delemimed Total
Administration 11,000 11,000
Engin*ring
20,179 20,179
COr-uction 201,791 201,791
InupeaDon 14,030 14,030
Other: 0
Other: 0
Expense Amount Total 0 0 0 0 247.000 247,000
Operati*np Costs
Category To Be Detenmined Total
General Fund 0
Other 0
QpemtinpCostTotal 0 0 0 0 0 0
MdftIonal Comments:
Pnntad 03*r-98
Page 1
BIB]
09-16-1998-U01
03:16:23PM-U01
ADMIN-U01
CCRES-U02
98-U02
41-U02
^"R3M IL
CIT"' OF LA OUINTA: CAPITAL IMPROVEMENT PROGRAM DETAIL
Project Type: Median Landscape Improvements
Prw'ect: ADO2 Washin*on Street Median Landscapin* Phase 2
D.'cnption
Design and construct median landscaping on Washington Street' from Avenue 48 to Eisenhower Drive
Revenue Amounts
Category To Be Determined Total
General Fund 0
lnfrestrucwre 291,512 291,512
Project Area 1 0
Project Area 2 0
Other: 0
Other: 0
RevenueAmountTotal 0 0 0 0 291.512 291,512
Expense Amounts
Category To Be Determined Total
Administration 13,881 13,881
Engineering 23,729
Construction 237,291 2: gi
Inspection io,eii 11
Other: 0
Other: 0
ExpenseAmountTotal 0 0 0 0 291,512 291.512
Operating Costs
Category To S. Determined Total
General Fund 0
Other: 0
Operating Cost Total 0 0 0 0 0 0
Additional Comments:
Printed: 0**-98
e2
BIB]
09-16-1998-U01
03:16:23PM-U01
ADMIN-U01
CCRES-U02
98-U02
41-U02
^"R4M I
CITY OF LA QUINTA: CAPITAL IMPROVEMENT PROGRAM OETAIL
Project Type: Street Improvements
prolect AD03 Dune Palms Road Street Widening
*Descrlptlon
This project will w*den Dune Palms Road, from Whftewater River Channel crossing to Westward Ho
ReYcriuc Amounts
Category To B. Dutermined Total
General Fund 0
Infrastructure 382.000 382,000
Project Area 1 0
ProjectArea2 0
Other 0
Ctner 0
Revenue Amount Total 0 0 0 0 382,000 362,000
Expense Amounts
C-, tegory ToBeDetarmined Total
Administraton 18.190 18,190
Engineering 31,095 31,095
Conatruction 310,046 310,048
Inspection 21,767 21,767
Other: 0
Other 0
Expense Amount Total 0 0 0 0 382,000 362.000
Opemtlnp Costs
Category To B. Dem*miined Total
General Fund 0
Other: 0
OpeiptinacoitTotal 0 0 0 0 0 0
Additional Comments:
Printed 03**983
BIB]
09-16-1998-U01
03:16:23PM-U01
ADMIN-U01
CCRES-U02
98-U02
41-U02
^"R5M I
CITY OF LA QUINTA: CAPITAL IMPROVEMENT PROGRAM DETAIL
Prolect Type: Public Facilites
Project: ADOA *arkinq Improvements in The Village
DescripUon
Design of parking areas near Downtown. The project will create a Downtown Parking Di*tnct. per State Law and
wiu acquire, develop and maintain Downtown Parking Lots.
7
Revenue Amounts
calepofy To Be *r'mined Total
General Fund 0
lnfrastwcwre 95,000 95,000
Pmject Area 1 0
Project Area 2 0
Cther: Developer 125,000 125.000
Other: 0
Revenue Amount Total 0 0 0 0 220,000 220.000
Expense Amounts
Cutapory To Be IOetirmined Total
Admin:straton 10,476 i*6
Engineering 17,908 1 8
Construction 179,080 17 30
Inspection 12.530 i 3a
Other: 0
Other: 0
Expense Amount Total a o o 0 220,000 220.000
Operntinp Costs
Caitapory To Be De**r'min*d Total
General Fund 0
Other: 0
o *n CoitTotal 0 0 0 0 0 0
Additional Comments:
Prlnted: 03 r-98
BIB]
09-16-1998-U01
03:16:23PM-U01
ADMIN-U01
CCRES-U02
98-U02
41-U02
^"R6M IL'
CITY OF LA QUINTA: CAPITAL IMPROVEMENT PROGRAM DETAIL
Project Type: Median Landscape Improvements
Proiect: ADOS Miles Avenue Median Landscapinp-Washin*onIJeffersan
DescriDUon
Landscape improvements to medians on Miles Avenue, from Washington Street to Jeffemon Street Only includes
landscape improvements. Approx. 80,000 sq.ft)
Revenue Amounts
C 0 To Be Determined Total
General Fund 0
Infrastructure 144,900 144,900
Project Area 1 0
Project Area 2 0
other. 0
Other. 0
Revenue Amount Total 0 0 0 0 144,900 144,900
Expense Amounts
Ca a To Be DetermIned Total
Administration 6.900 6,900
Engineering 11,795 11*,795
Construction 117,949 117,949
Inspection 6,256 8,256
other: 0
other 0
Expense Amount Total 0 0 0 0 144,900 144.900
Opemtinp Costs
Category To Be Determined Total
General Fund 0
Other: 0
OpemtinpcostTotal 0 0 0 0 C 0
Add Wonal Comments:
Printed: 0*Apr-98
Page 5
BIB]
09-16-1998-U01
03:16:23PM-U01
ADMIN-U01
CCRES-U02
98-U02
41-U02
^"R7M I
CITY OF LA QUINTA: CAPITAL IMPROVEMENT PROGRAM DETAIL
Project Type: Median Lands*ape Improvements
AD06 Fred WarinQ Drive Median Landscaping*
*D.*criDtion
Landscape improvementa to medians between Wmhin*n Street and J*emcn Street Does nat include curbs,
which will be constructed lyfuture development Approx. 80,000 sqIt)
Revenue Amounts
Category To Be Determined Total
General Fund 0
infrastructure 144,900 144,000
Project Area 1 0
Project Area 2 0
Other 0
Other 0
Revenue Amount Total 0 0 0 0 144900 144900
Expense Amounts
Ca a To Be Determined Total
Administration 6,900 6,900
Engineering 11,795
Constru*on 117,949 117 *
Inspection 8,256 5
other:
Other: 0
ExpenseAmountTotal 0 0 0 0 144,900 144,900
Operating Costs
Categorv To Be Determined Total
General Fund 0
Other: 0
O mUn CostTotal 0 0 0 0 0 0
Add ftional Comments:
Printed:
P *
BIB]
09-16-1998-U01
03:16:23PM-U01
ADMIN-U01
CCRES-U02
98-U02
41-U02
^"R8M IL
CITY OF LA QUINTA: CAPITAL IMPROVEMENT PROGRAM DETAIL
Project Type: Street improvements
Poe:: AD07 Madison Street Extension liner*
*Descnption
E*enmon of Madison Street to interim improvement standards.from Avenue 54 to Avenue 52. improvements include
construction of landscaped medians. backup landscaping, and tmrflc signais at bath Madison Street and Avenue
54, and Madison Street and Avenue 52.
Revenue Amounts
Ca*oiy To Be Detmimined Total
Genera' Fund 0
Infrntructtire 3,376,000 3,370,000
Project Area 1 0
Project Area 2 0
Other 0
Other 0
RevenueAmountTotal 0 0 0 0 3,370,000 3,370,000
Expense Amounts
Cutepory To Be Detemlne:l Total
Administraton i60,762 160,762
Engineering 274,807 274,807
Constructon 2,748,060 2,748,066
Inspection i92,365 192,365
Other: 0
Other 0
Expense Amount Total 0 0 0 0 3.370,000 3,376.000
Opemtinp Costs
Cat.poiy To Be Detemiui:e:l Total
General Fund 0
Other: 0
OpemtlnpcostTotal 0 0 0 0 0 0
Additional Comments:
Printed: 03,Ajir-98
Page 7
BIB]
09-16-1998-U01
03:16:23PM-U01
ADMIN-U01
CCRES-U02
98-U02
41-U02
^"R9M I
CITY OF LA QUINTA: CAPITAL IMPROVEMENT PROGRAM DIETAIL
PTOIect Type: Traffic Signal Improvement
P*ect: ADO8 Traffic Sianat: Westward ho & Dune Palms Road
Descri*tlon
Construct traffic signal at the intemect*on of VVestward ho Drive and Dune Palms Roa* 7
Revenue Amounts
Category To Be Deft'amiined Total
General Fund 0
Infrastructure 75.000 75,000
ProjectArea 1 0
Project Area 2 0
Otner.CItv of lndio 37,500 37,500
Other:Redev Pro #2 37,500 37.500
Revenue Amount Total 0 0 0 0 150,000 150,000
Expense Amounts
Category To Be Deeerm*ne:l Total
Administra ton 7,143
Engineenng 12,210 1 0
Conutnichon 122,100 12 *0
Inspection 8,547
Other 0
Other 0
Expense Amount Total 0 0 0 0 150,000 150,000
Operating Colts
Category To Be Delermine:l Total
Gen*al Fund 0
Other: 0
OperatingcostTotal 0 0 0 0 0 0
AddItional Comments:
Pn'nted: 0* **8
pe8
BIB]
09-16-1998-U01
03:16:23PM-U01
ADMIN-U01
CCRES-U02
98-U02
41-U02
^"R:M IL
CITY OF LA QUINTA: CAPITAL IMPROVEMENT PROGRAM DETAIL
Prolect Type: Traffic Signal improvements
Protect: A009 Traffic Sign at: Avenue 52 & Avenida Bermudas
Deicription
Construct traffic signal at the intemection of Avenue 52 and Avenida Berm udas
Ruvenue Amounts
Categiory To Be Determined Total
Generat Fund 0
Infrastructure 150,000 150.000
Project Area 1 0
Project Area 2 0
Cther: 0
other 0
Revenue Amount Total 0 0 0 0 150,000 1 50*000
Expense Amounts
Category To Be Determined Total
Adminigtration 7,143 7,143
Engineenna 12,210 12,210
Construction 122.100 22,100
ln.p*c*on 8.547 a.547
Other: 0
Other 0
Ex nseAmountTotal 0 0 0 0 150000 150000
Operating Costs
Categiory To Be Determined Total
General Fund 0
Other: 0
Operativ'gCostTollaI 0 0 0 0 0 0
AddItional Comments:
Pnnted: 03*r-98
Page 9
BIB]
09-16-1998-U01
03:16:23PM-U01
ADMIN-U01
CCRES-U02
98-U02
41-U02
^"R;M i
CITY OF LA QUINTA: CAPITAL IMPROVEMENT PROGRAM OETAIL
Pr*ect Type: Traffic Signal Improvements
Prnlect: ADi C Traffic Signal Calle Tam*co and Avenida *ermudas
Description
Construct traffic signal at the intersection of Cale Tampica and Avenida Eernudas
Revenue Amounts
Category ToBeDe*mrminetl Totalj
General Fund 0
Infrastructure 150.000 150,000
Project Area 1 0*
Project Area 2 0
Other: 0
Other: 0
Revenue Amount Total 0 0 0 0 150 000 150000
Expense Amounts
Category To Be Detenninud Total
Administration 7,143
Engineenng i2,2i0
construction 122.100 1 l00
Inspection 8,547 547
Other: 0
Other. 0
Expense Amount Total 0 0 0 0 150,000 150.000
Operating Costs
Ca 0 To Be Oeterminetl Total
General Fund 0
Other: 0
OpemtlngCostTotal 0 0 0 0 0 0
Additional Comments:
Pnnted: 0 *-9*
BIB]
09-16-1998-U01
03:16:23PM-U01
ADMIN-U01
CCRES-U02
98-U02
41-U02
^"R<M I,
CITY OF LA QUINTA: CAPITAL IMPROVEMENT PROGRAM DETAIL
Project Type: Public Facilities
Project: ADi I Historical Societ* Museum Acquisition
Descri*ion
This project involves the acquisition of an existing building located on the corner of Avenida Montezuma and Aven ida
Mendoza for the purpose of converting it to a permanent community' museum facility.
Revenue Amounts
Category To Be Determined Total
General Fund 0
Infrastructure 125,000 125,000
Project Area 1 0
Project Area 2 0
Other: 0
Other: 0
Revenue Amount Total 0 0 0 0 125.000 125,000
Expense Amounts
Ca 0 To Be Determined Total
Administration 12,000 12,000
Engineenng 0
Construction 0
Inspection 0
Other: Acquisition 113,000 113,000
Other: 0
ExpenseAmountTotal 0 0 0 0 125,000 125,000
Operating Costs
Category To Be Determined Total
General Fund 0
Other: 0
Operating Cost Total 0 0 0 C 0 0
Additional Comments:
Printed: 1*Apr-98
Page 11
BIB]
09-16-1998-U01
03:16:23PM-U01
ADMIN-U01
CCRES-U02
98-U02
41-U02
^"R=M I
CITY OF LA QUINTA: CAPITAL IMPROVEMENT PROGRAM DETAIL
Project Type: Park Improvements
Project: AD12 Adams Street Park Phase Ii
Illescription
This project will construct a jagging area, landscape impravements, picnic facilities, a water feature and other minor amenities 1
Revenue Amounts
Cat 0 To Be DetermIned Total
General Fund 0
Infrastructure 0
Project Araa 1 0
Project Area 2 200,000 200,000
other 0
other 0
Revenue Amount Total 0 0 0 0 200,000 200,000
Ex nac Amounts
C a To Be Determined Total
Administration 9,524 E 4
Engineering 16,280 If C
Construction 162,800 16* 0
Inspection 11,396 11,396
other: 0
other: 0
Expense Amount Total 0 0 0 0 200,000 200,000
Operating Costs
Category To Be DetermIned Total
General Fund 0
other 0
Operating Coat Total 0 0 0 0 0 0
Additional Comments: This project will occur an an existing developed site. Its improvements may decrease
the area subject to maintenance, possibly resulting in decreased operating costs. As of
this Fiscal Year, Quimby Funds are not generated in sufficient quantities to support this
project estimate. Therefore, Staff is recommending a loan from the General Fund to
accelerate this project.
Printed: 08-* *
Page 12
BIB]
09-16-1998-U01
03:16:23PM-U01
ADMIN-U01
CCRES-U02
98-U02
41-U02
^"R>M I
CITY OF LA QUINTA: CAPITAL IMPROVEMENT PROGRAM DETAIL
Prq'ect Type: Street improvements
Pmiect: ADI3 Adams Street Widen*nQ
Description
This project includes construction of pavement, curb and gutter, sidewalk. and retaining wail an the west side of
Adams Street adjacent tO existing CWVD well site and other unimproved land in the first 500 feet immediately
south of Adams Park.
Revenue Amounts
Category To Be De**reirned Total
General Fund 0
Infrastructure 60000 60,000
Project Area 1 0
Project Area 2 0
Other 0
Other 0
Revenue Amount Total 0 0 0 0 60,000 60*000
Expense Amounts
Category To Be Deeermined Total
Administration 2.500 2,500
Engine*nng 5.000 5.000
Construct*on 49,000 49.000
Inspection 3,500 3,500
Other 0
Other 0
Expense Amount Total 0 0 0 0 60,000 60,000
Operntinp Costs
Category To Be Determined Total
Genenai Fund 0
Other: 0
OpemtinpcostTotal 0 0 0 0 0 0
Additional Comments:
Printed: 0*Apr-98
Page*3
BIB]
09-16-1998-U01
03:16:23PM-U01
ADMIN-U01
CCRES-U02
98-U02
41-U02
^"R?M IL
CITY OF LA QUINTA: CAPITAL IMPROVEMENT PROGRAM DETAIL
Project Type: Median Landscape Improvements
Project: AD14 Washington Street Median Landscaping PH 3
Illeacriptlon
Design and construct median landscaping improvements from Avenue 48 to Avenue 50, including minor widening on
east side to accamodate median.
I
Revenue Amounts
Cat 0 To Be Determined Total
General *und 0
Infrastructure 676,000 676,000
Proiect Area 1 0
Project Area 2 0
other 0
other: 0
Revenue Amount Total 0 0 0 0 676,000 676.000
Expense Amounts
Category To Be Determined Total
Administration 32.190 32*
Engineering 550,265 550 *
Construction 55,026 55 3
Inspection 38,519 38 3
other: 0
other: 0
Ex nac Amount Total 0 0 0 0 676 000 676 000
Operating Costa
Category To Be Determined Total
General Fund 12,000 12,000
other: 0
Operating Coat Total 0 0 0 0 12,000 12.000
Addftional Comments:
Printed: OIl-A 8
Pa! 4
BIB]
09-16-1998-U01
03:16:23PM-U01
ADMIN-U01
CCRES-U02
98-U02
41-U02
^"R@M I
CITY OF LA QUINTA: CAPITAL IMPROVEMENT PROGRAM DETAIL
Prcj'ect Type: Street Improvements
P*ect: ADiS Sound Walis-Vanaus *ocnions
*Description
This annual project prov*des for construction of sound walis as needed at vanous h*gh pnorfty locatans Thme
locations are selected from a list where a sound wall is required as an environmental mttigaton measure stem mino
from construction of street capacit* impravements
Revenue Amounts
Caitegory To Be Determined Total
General Fund 0
Infrastructure 1,500.000 1,500.000
Project Area 1 0
Project Area 2 0
Ctner: 0
Other 0
Revenue Amount Total 0 0 0 0 1.500,000 1,500,000
Expense Amounts
Category To Be De**iriined Total
Administration 71,430 71.430
En*neenng 122.100 122,100
Construction 1,221,000 1,221,000
Inspection 85,470 85,470
Other: 0
Other 0
Expense Amount Total 0 0 0 0 1.500,000 1,500.000
Opemtinp Costs
Category To Be*Deiemiined Total
General Fund 0
Other.. 0
OpemtinpCostTotal 0 0 0 0 0 0
Additional Comments:
Pnnted 0*r-9*
Page 1*
BIB]
09-16-1998-U01
03:16:23PM-U01
ADMIN-U01
CCRES-U02
98-U02
41-U02
^"RAM I
C*TY OF LA QUINTA: CAPITAL IMPROVEMENT PROGRAM DETAIL
PToject Type: Fubl:c *a*mes
PToiect: ADiB Chitdcare Fadi*
Descripton
Constwct a chddcare facility at future schaai ate.
Revenue Amounts
Catellory To Be Deormine:l Total
General Fund 0
ln*lru*ture 0
ProjectArea 1 0
Project Area 2 0
other: Unknown 500,000 500.000
other: 0
Revenue Amount Total 0 0 0 0 500,000 500,000
Expense Amounts
Calenory To Be Delerm*'ned Total
Administrab*an 23,810 23810
Engineenng 40,700 4I*0
Construction 407,000 40 0
Inspeation 20,490 2 0
Other: 0
Other: 0
Expense Amount Total 0 0 0 0 500.000 500.000
Operatlnp Costs
Catipory To Be DE*miined Total
General Fund 0
Other: 0
O mUn CostTotal 0 0 0 0 0 0
AddItonal Comments:
Printed: 0* 98
F 16
BIB]
09-16-1998-U01
03:16:23PM-U01
ADMIN-U01
CCRES-U02
98-U02
41-U02
^"RBM I
CITY OF LA QUINTA: CAPITAL IMPROVEMENT PROGRAM DETAIL
Project Type: Median Landscaping
Project: AD17 Sinaba Median Landscapin*
Description
This project will install the City's Deseitscap* landscape theme within the medians an Calle Sinaba from Avenida
*ernudas to Eisenhower Drive.
Revenue Amounts
Calepory To Be Deteimine:l Total
General Fund 93.773 93,773
Infrastructure 0
Project Area 1 0
Project Area 2 0
Other 0
Other C
Revenue Amount Total 0 0 0 0 93,773 93*773
ExDense Amounts
Cat*pory To Be Determined Total
Administmtion 4.200 4,200
Engineenng 0
Construction 83,130 83,130
Inspection 6,443 6,M3
Other: 0
Other: 0
ixpense Amount Total 0 0 0 0 93.773 93.773 1
Operating Costs
Catepofy To IIIIe Determifled Total I
General Fund 16,640 16.640
Other: 0
Operating C8t Total 0 0 0 0 16.640 16.640
Addftlonal Comments:
Printed: 0*r-98
Page i7
BIB]
09-16-1998-U01
03:16:23PM-U01
ADMIN-U01
CCRES-U02
98-U02
41-U02
^"RCM I
CITY OF LA QUINTA: CAPITAL lMPROVEMEI*iT PROGRAM DETAIL
Project Type: Median Landscaping
Project: ADi S Avenue 50 Median Landscaping
DeeCTiption
This prnj*it will install the City's *DesertsCape" landscape theme within the medians an Avenue 50 from
Washington Street to Eisenhower Drive
7
Re*eiiue Amounts
Category To Be Og**rmine:i Total
General Fund 199,340 199,340
Infrastructure 0
Prn*e:t Area 1 0
Project Area 2 0
other: 0
other.. 0
Revenue Amount Total 0 0 0 0 199,340 199.340
Expenm Amounts
Category To Be Determined Total
Administration 8.840 10
Engineenng 0
Construction 176,798 i7*. a8
Inspection 13,702 13,702
other 0
other 0
Expenae Amount Total 0 0 0 0 199,340 199,340
Oliarating Colits
Category To Be D*taimii:e:l Total
General Fund 33,280 33,280
other 0
Oj:erating Cost Total 0 0 0 0 33.280 33,280
Addftional Comments:
Printed: Q* *e
Page 18
BIB]
09-16-1998-U01
03:16:23PM-U01
ADMIN-U01
CCRES-U02
98-U02
41-U02
^"RDM IL
CITY OF LA QUINTA: CAPITAL IMPROVEMENT PROGRAM DETAIL
Projeot Type: Median Landscape
Proleot: AD19 Calle Tamaico Median Landscaoe
Description
This project will install the City's Desertscape" landscape theme within the medians on Calle Tampico from
Washington Street to Eisenhower Drive.
Revenue Amounts
Category To Be Determined Total
General Fund 210,728 210,728
Infrastructure 0
Project Area 1 0
Project Area 2 0
Other: 0
Other 0
Revenue Amount Total 0 0 0 0 210,729 210.729
Expenue Amounts
Category To Be Determined Total
AdministraUon 9,346 9,346
Engineenng 0*
Construction 186,898 186,898
Inspection 14.485 14.485
other: 0
other: 0
Expense Amount Total 0 0 0 0 210,728 210.729
Operating Costs
Category To Be Oe**rmine:l Total
GenemI Fund 16,640 16.640
other: 0
Operating Cost Total 0 0 0 0 16,640 16.640
Addftlonal Comments:
Printed: 0*Apr-9*
Page Ic
BIB]
09-16-1998-U01
03:16:23PM-U01
ADMIN-U01
CCRES-U02
98-U02
41-U02
^"REMCITY OF LA QUINTA: CAPITAL IMPROVEMENT PROGRAM DETAIL
Pioject Type: City Park
Piolect: AD2O Second Mini-Park SitelCove Area
Description
Determine an appropriate location, and develop as a second mjni*ark in the cove area. 1
R*venue Amounts
Category To 8. Determined Total
General Fund 80,000 80,000
Infrastructure 0
Project Area 1 0
Project Area 2 0
other: 0
Other: 0
Revenue Amount Total 0 0 0 0 80,000 80,000
Ex nse Amounts
C 0 To Be Determined Total
Administration 4,000 0
Engineering 6.000 0
Construction 61.800 e 30
Inspection 6,200 6.200
other 0
Other: 0
Expense Amount Total 0 0 0 0 60,000 80.000
OperaUng Costa
Category ToBeDetermined Total
Genemi Fund 20,000 20,000
Other: 0
Operating Cout Total 0 0 0 0 20,000 20,000
Addftlonal Comments:
Printed: 0* 98
Ph** 20
BIB]
09-16-1998-U01
03:16:23PM-U01
ADMIN-U01
CCRES-U02
98-U02
41-U02
^"RFM I.
CITY OF LA QUINTA: CAPITAL IMPROVEMEIIT PROGRAM DETAIL
Pnoject Type:
PnoIect: AD21 Landsca*ino at Oleander Resevoir Levee
Deecrii::tlon
Provide, Iandsca*ing and irrigation to the Oleander Reservoir Levee 9ank adjacent to Eisenhower Drive south of the
Evacuaton Channel Crossing and to the west to AYenida Carranza
Category To B. Ost:rmlned Total
Genemi Fund 150,000 150,000
Infrastructure 0
Project Area 1 0
Project Area 2 0
Other: 0
Other 0
Revenue Amount Total 0 0 0 0 150,000 150.000
Expense Amounta
Category To Be *lerrrilned Total
7,500 7,500
P *
15,000 15,000
Construction 115,875 115.875
Inspection 11,825 11.825
Other 0
Other ol
ExpenseAmouritTotal 0 0 0 0 150,000 150000
Operating Cost:
Category To Be Determined Total
Genemi Fund 8,000 8,000
Other 0
Operuting Cod Total 0 0 0 0 8,000 8,000
Addftlonal Comment.:
Printed: *3*r-9*
Page 21
BIB]
09-16-1998-U01
03:16:23PM-U01
ADMIN-U01
CCRES-U02
98-U02
41-U02
^"RGM IL
CITY OF LA QUINTA: CAPITAL IMPROVEMENT PROGRAM DETAIL
Pmject Type: Facility Enhancement
Pmiect: AD22 Bike RentalsiSnack Shop at Bear Creek Channel Bike Path
Deacription
Purchase land and develop 5.000 sq. ft. bike rentausnack shop in commercial area around Francis Hack Park,
stripe Montezuma as typical bike lane to provide bike access from shop to Bear Creek Bike Path
Revenue Amounts
Cat.gory To S. Determined Total
General Fund 0
Infrastiucturn 0
Project Area 1 0
Project Area 2 0
other: To IRe Determined 506,800 506,800
other: 0
Revenue Amoufit Total 0 0 0 0 500.800 506.800
Expenie Amounts
C*ory To Be Detuirmivied Total
Administmtion 16,000 16,000
Engineering 32,000
Constiuction 354,000
Inspecuon 24.800 Co
Other Property Acquisition 80,000 * 00
other: 0
Expense Amount Total 0 0 0 0 506,800 506,800
Operating Casts
Category To Be Determined Total
Geheral Fund 0
other:
Operating Cost Total 0 0 0 0 0 0
Addftlonal Comments:
Printed: 034**-98
P 22
BIB]
09-16-1998-U01
03:16:23PM-U01
ADMIN-U01
CCRES-U02
98-U02
41-U02
^"RHM I
CfTY OF LA QUINTA: CAPITAL IMPROVEMENT PROGRAM DETAIL
Pioject Type:
Project: AD23 Desian 17 Acre Park Site at Westward Ho DrivefAdams
Deecri Ion
Seek Professional Services to provide a master plan concept arid prepare design documents necessary to develop
the City*s 17-acre Community Park site located
Revenue Amounta
Cg.pory To Be Determined Total
General Fund 0
Infrastructure 0
Project Area 1 0
Project Area 2 0
Cther: Quimby 225.000 225,000
Ctner: 0
Revenue Amount Total 0 0 0 0 225,000 225,000
Ex nee Amounta
Category To Be Determined Total
Administration 25,000 25,000
Engineering 175,000 175,000
Construction 0
Inspection 0
other: Masterplan 25,000 25,000
other.. 0
Expense Amount Total 0 0 0 0 225.000 225,000
Operating Coats
Category To Be Determined Total.
General Fund 0
other 0
Ol:eratingCostTotaiI 0 0 0 0 0 0
Addftlonal Comments:
Prirted: 0*r-98
Page 23
BIB]
09-16-1998-U01
03:16:23PM-U01
ADMIN-U01
CCRES-U02
98-U02
41-U02
^"RIM E
CITY OF LA QUINTA: CAPITAL IMPROVEMENT PROGRAM DETAIL
Project Type: Street Improvements
Project: AD24 Jeffemon Street Improvement(Avenue 54 to Indlo Blvd)
Dmrli:tlon
The City of La Quinta is currently serving as Lead Agency for this improvement on behalf of the Coachella Valley
Association of Governments CVAG) through its Regional Arterial Program. This project includes the preparation of
Plans, Specifications, and Estimates PS&E) to widen Jeffemon to its uftimate improvement with a bridge within the
City of lndio jurisdiction and a bridge and low water crossing within the City of La Quinta.
R**enue Amounts
Category ToBeDelermIned Total
General Fund 0
Infrastructure 3,049,200 3,049,200
Project Area 1 0
Project Area 2 0
other: CVAG 3,8i1,500 3,Sil,500
other: Sl-TPP 762,300 762,300
Revenue Amount Total 7,623,000 7,623,000
Expenue Amounts
Category To Be DetermIned T I
Administration
Engineering
Construction 7,623,000 7,623,000
Inspection 0
other: 0
other: 0
Expense Amount Total 0 0 0 0 7,623,000 7,62*,000
Operating Coats
Category Total
General Fund 0
other: 0
o ratin Cost Total 0 0 0 0 0 0
Additional Comments: The City shall be responsible for obtaining 50% of the funding necessary for
improvements within its jurisdictional boundaries. CVAG's Regional Arterial Program
shall fund the additional 50%.
Printed: 0i* *8
Page 24
BIB]
09-16-1998-U01
03:16:23PM-U01
ADMIN-U01
CCRES-U02
98-U02
41-U02
^"RJM I
CITY OF LA QUINTA: CAPITAL IMPROVEMENT PROGRAM DETAIL
Project Typo: Trail Improvements
Project: AD25 Village Trail Enhancements
Description
Ferranti, et.al. identify four hiking trails in La Quinta in their book 75 Great Hikes in and near Palm Springs & the
Coachella Valley," including Guedelupe Trail to Sugarloaf Cafe, the Boo Hoff Trail to La Quinta, Last Canyon via the
Boo Hoff Trail, and Bear Creek Canyon Ridge Project funds would establish trail heads, intorrnatian kiosk,
signagle. and marketing to enhance public access and usesage of trail systems.
Revenue Amounta
Category To B. Dotarmlne:l Total
General Fund 300,000 300,000
Infrastructure 0
Project Area 1 0
Project Area 2 0
other 200,000 200,000
other: 0
Revenue Amount Total 0 0 0 0 500,000 500,000
Expenm Amounts
Category To Be De*r'nlned Total
Administration 25,000 25,000
Engineering 50,000 50,000
Construction 386,250 386,250
Inspection 38,750 38,750
Other: 0
Other: 0
Expenee Amount Total 0 0 0 0 500,000 500,000
Operating Costs
C 0 To B. Determined Total
General Fund 0
Other: 0
Operating Cost Total 0 0 0 0 0 0
AddWonal Comments:
Printed: 0B*Apr-98
Page 25
BIB]
09-16-1998-U01
03:16:23PM-U01
ADMIN-U01
CCRES-U02
98-U02
41-U02
^"RKM IL
CiT* OF LA QUINTA: CAPITAL IMPROVEMENT PROGRAM DETAIL
Pmject Type:
Prolect: AD2* Constmct MuniciDal Library
Deacril:tion
Construction of 20.000 square foot library facility plus materials, on Civic Center Campus. 7
ltle*ue Amouivts
Cat.gory To Be D*E*nsin*d Total
Genaral Fund 0
Infrastructure 0
Project Area 1 0
Project Area 2 0
Other: 7,000.000 7,000,000
Other: 0
Revenue Amount Total 0 0 0 0 7,000,000 7,000,000
Exi:enee Amouma
C To Be DetermIned Total
Administration 350,000 ooo
Engineering 700,000 ** 000
Construction 5,407,500 5,4 500
Inspection 542,500 542,500
other 0
other: 0
Ex naeAmountTotal 0 0 0 0 7000.000 7000000
OperatIng Costs
Category ToBellle*niIned Total
General Fund 0
Other 0
OperatinaCoatTotal 0 0 0 0 0 0
AddItIonal Commema: Estimated Proiect Cast of $2351sg. ft. no land cost.
Printed: 0: 3r-9*
1-uge *
BIB]
09-16-1998-U01
03:16:23PM-U01
ADMIN-U01
CCRES-U02
98-U02
41-U02
^"RLM I
CITY OF LA QUINTA: CAPITAL IMPROVEMENT PROGRAM DETAIL
Project Type: Parks and Recreatian
Pro lect: AD27 Community Garden
Dmcrl*Ion
Acquirn Property, develop and maintain certain area as a Cam munity Garden Improvements to include security
*encin*. irrigation, minor shade structure, and recycle bins.
Ruvenue Amounts
Category To Be De*reiIned Total
Genemi Fund 20,000 20,000
Infrastructure 0
Project Area 1 0
Project Area 2 0
Other: 0
Other: 0
Revenue Amount Total 0 0 0 0 20,000 20.000
Exp*nee Amounts
C 0 ToBeDelermined Total
Administmton 1,000 1.000
Engineering 2,000 2,000
Constmction 15,450 15.450
Inspection 1,550 1,550
Other: 0
Other 0
Expenm Amount Total 0 0 0 0 20,000 20,000
Operating Coats
Calegory To Be DeteTmined Total
Genemi Fund 0
Other: 0
OperatlngcostTotal 0 0 0 0 0 0
AddItional Comments:
Printed: 0*r-98
Page 27
BIB]
09-16-1998-U01
03:16:23PM-U01
ADMIN-U01
CCRES-U02
98-U02
41-U02
^"RMMCITY OF LA QUINTA: CAPITAL IMPROVEMENT PROGRAM DETAIL
PmjectTypu:
Prolect: AD2B Bikelane'Sid*Y*'alk Crossin* of *iahwav 111 at Point Hap*y
Oeecrii:tlon
A Class I Bikelane crossing of Deep Canyon StorrmA'ater Channel at Highway iii. This yi,ill be a separate
bioyclelpedestrian bridge crossing of the Deep Canyon Channel. The *roject will join the bicyclelpedestrian
facufties in La Quinta wt the City of Indian Wells facilIties. It will be a shared cost facility because it serves both
cIties and lays*on the municipal boundary bet*i*en the two cIties appmxlmately 1'2 of project will be in La Quinta
and 112*in Indian WeIl*
Rmiiue Amounta
Ca*.pory To B. D*ermlf*d Total
Geneml Fund 0
Infrastructure 0
Project Area 1 0
Project Area 2 0
other: 75,000 75,000
other 0
Revenue Amount Total 0 0 0 0 75,000 75,000
Ex mAmounta
Culupory To B. Dueermli'.d Total
Adminiitmtion 3,750 50
Engineering 7.500 *00
Construction 67,938 *38
Inspection 5,813 5,813
Other 0
Other 0
Ex naeAmouvitTotal 0 0 0 0 75000 75000
OperatIng Co*t*
C 0 To B. DetermIned Total
Geneml Fund 0
Other 0
ODpTallngCoetTotail 0 0 0 0 0 0
Addftlonal Commegita:
Printed: 0* r-98
I'.ge 2B
BIB]
09-16-1998-U01
03:16:23PM-U01
ADMIN-U01
CCRES-U02
98-U02
41-U02