Loading...
CC Resolution 2016-043 TTM 2015-0008RESOLUTION NO. 2016-043 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LA QUINTA, CALIFORNIA ADOPTING A NEGATIVE DECLARATION OF ENVIRONMENTAL IMPACT AND APPROVING A TENTATIVE TRACT MAP TO SUBDIVIDE A 12.25 ACRE SITE INTO 36 RESIDENTIAL LOTS ON MONROE STREET, BETWEEN AVENUE 54 AND AIRPORT BOULEVARD CASE NUMBERS: ENVIRONMENTAL ASSESSMENT 2015-0007 TENTATIVE TRACT MAP 36561(TTM2015-0008) APPLICANT: PRISM REALTY CORPORATION WHEREAS, the City Council of the City of La Quinta, California did, on the 181h day of October, 2016, hold a duly noticed Public Hearing to consider a request by Prism Realty Corporation to subdivide approximately 12.25 acres into 36 residential lots, generally located on Monroe Street, between Avenue 54 and Airport Boulevard, more particularly described as: APN:767-320-039 WHEREAS, the Design and Development Department published a public hearing notice in The Desert Sun newspaper on October 7, 2016 as prescribed by the Municipal Code. Public hearing notices were also mailed to all property owners within 500 feet of the site; and, Environmental Assessment 2015-0007 WHEREAS, said Environmental Assessment complies with the requirements of "The Rules to Implement the California Environmental Quality Act of 1970" as amended (Resolution 83-63), in that the Design and Development Director has conducted an Initial Study (Environmental Assessment 2015-0007) and has determined that the project will not have a significant adverse impact on the environment, and is recommending that a Negative Declaration of environmental impact be certified; and, WHEREAS, the Design and Development Department mailed and published a Notice of Intent to adopt a Negative Declaration in compliance with Public Resources Code Section 21092 on the 13th day of May, 2016 to the Riverside County Clerk; and, WHEREAS, per AB-52 consultation requirements, the Design and Development Department has forwarded information regarding the proposed project to those Tribes referenced on the Tribal Consultation List and has followed up with all Tribes Resolution No. 2016-043 Environmental Assessment 2015-0007, Tentative Tract Map 36561 (TTM2015-0008) Applicant: Prism Realty Corporation Owner: Prism -Birch Associates, LLC Adopted: October 18, 2016 Page 2 of 6 requesting information or consultation and placed their recommendations for monitoring in the Conditions of Approval; and, WHEREAS, upon hearing and considering all testimony and arguments, if any, of all interested persons desiring to be heard, said City Council did find the following facts, findings, and reasons to justify adoption of said Environmental Assessment (Exhibit A): 1. That the Negative Declaration has been prepared and processed in compliance with the State CEQA Guidelines and the City's implementation procedures. The Planning Commission has independently reviewed and considered the information contained in the Environmental Assessment, and finds that it adequately describes and addresses the environmental effects of the project. Based upon the Initial Study, the comments received thereon, and the entire record of proceeding for this project, the Planning Commission finds that there are no significant environmental effects resulting from this project. 2. The project will not be detrimental to the health, safety, or general welfare of the community, either indirectly, or directly, in that no significant impacts were identified by Environmental Assessment 2015- 0007. 3. The project will not have the potential to degrade the quality of the environment, substantially reduce the habitat of a fish or wildlife population to drop below self-sustaining levels, threaten to eliminate a plant or animal community, reduce the number, or restrict the range of, rare or endangered plants or animals or eliminate important examples of the major periods of California history, or prehistory. 4. There is no evidence before the City that the project will have the potential for an adverse effect on wildlife resources or the habitat on which the wildlife depends. 5. The project does not have the potential to achieve short-term environmental goals, to the disadvantage of long-term environmental goals, as no significant effects on environmental factors have been identified under Environmental Assessment 2015-0007. Resolution No. 2016-043 Environmental Assessment 2015-0007, Tentative Tract Map 36561 (TTM2O15-0008) Applicant: Prism Realty Corporation Owner: Prism -Birch Associates, LLC Adapted: October 18, 2016 Page 3 of 6 6. The project will not result in impacts which are individually limited or cumulatively considerable when considering planned or proposed development in the immediate vicinity, as development patterns in the City will not be significantly affected by the project. 7. The project will not create environmental effects that will adversely affect the human population, either directly or indirectly, as no significant impacts have been identified which would affect human health, risk potential or public services. B. The City has on the basis of substantial evidence, rebutted the presumption of adverse effect set forth in 14 CAL Code Regulations 753.5(d). 9. Based upon the Initial Study and the entire record of proceedings, the Project has no potential for adverse effects on wildlife as that term is defined in Fish and Game Code §711.2. 10. The location of the documents which constitute the record of proceedings upon which the Planning Commission decision is based upon, are located in the La Quints City Hall, Design and Development Department, 78495 Celle Tampico, La Quints, California, 92253. Tentative Tract Map 36561 (TTM2015-0008) WHEREAS, at said Public Hearing, upon hearing and considering all testimony and arguments, if any, of all interested persons desiring to be heard, said City Council did make the following mandatory findings pursuant to Section 13.12.130 of the Municipal Code to justify approval of said Tentative Tract Map: 1. The proposed tentative tract map is consistent with the La Quinta General Plan. The proposed map conforms to the design guidelines and standards of the General Plan for Low Density Residential designated properties, as set forth in the Land Use Element, in that it will facilitate the construction of additional residential options while maintaining residential development standards including setbacks, pad elevations, and other design and performance standards that assure a high quality of development. The project density of approximately 2.9 units per acre Resolution No. 2016-043 Environmental Assessment 2015-0007, Tentative Tract Map 36561 (TTM2015-0008) Applicant: Prism Realty Corporation Owner: Prism -Birch Associates, LLC Adapted: October 18,2016 Page 4 of 6 is consistent with the Low Density Residential land use designation of up to four dwelling units per acre, as set forth in the General Plan. 2. The design or improvement of the proposed tentative tract map is consistent with the City's General Plan in that its street and parcel design are in conformance with applicable goals, policies, and development standards, and will provide adequate infrastructure and public utilities. 3. The design of the tentative tract map and the proposed improvements are not likely to cause substantial environmental damage nor substantially injure fish or wildlife or their habitat. The Design and Development Department has prepared Environmental Assessment 2015-0007 for this project, in compliance with the requirements of the California Environmental Quality Act (CEQA), and has determined that the project will not have a significant adverse impact on the environment, and is recommending that a Negative Declaration of environmental impact be adopted. 4. The design of the tentative tract map and the proposed improvements are not likely to cause serious public health problems. As conditioned, the proposed tentative tract map will not result in any increased hazard to public health or welfare, as the design has been reviewed by the appropriate responsible agencies for health and safety issues, with none identified. 5. The site of the proposed tentative tract map is physically suitable for the type of development and proposed density of development. As conditioned, the proposed design of the subdivision is physically compatible with the site with regards to level topography for the type of land use designation and potential development of the subject property, and in consideration of existing residential development in the surrounding area. 6. As conditioned, the proposed tentative tract map is consistent with all applicable provisions of the La Quinta Zoning Ordinance, including, but not limited to, minimum lot area requirements, any other applicable provisions of this code, and the Subdivision Map Act. Resolution No. 2016-043 Environmental Assessment 2015-0007, Tentative Tract Map 36561 (TTM2015-0008) Applicant Prism Realty Corporation Owner: Prism -Birch Associates, LLC Adopted: October 18, 2016 Page 5 of 6 As conditioned, the design of the tentative tract map will not conflict with easements, acquired by the public at large, for access through or use of property within the proposed subdivision, for access through or use of the property within the subdivision in that access is provided within the project and to adjacent public streets. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of La Quinta, California, as follows: SECTION 1. That the above recitations are true and constitute the findings of the City Council in this case. SECTION 2. That the City Council does hereby adopt Environmental Assessment 2015-0007, which includes a Negative Declaration, for the reasons set forth in this Resolution and as stated in the Environmental Assessment Checklist, attached as Exhibit A and on file in the Design and Development Department. SECTION 3. That the City Council does hereby approve Tentative Tract Map 36561 (TTM2015-0008), for the reasons set forth in this Resolution and subject to the attached Conditions of Approval. Exhibit s PASSED, APPROVED, and ADOPTED at a regular meeting of the City of La Quinta City Council, held on this the 18th day of October 2016, by the following vote: AYES: Council Members, Franklin, Pena, Rodi, Mayor Evans NOES: Council Member Osborne ABSENT: None ABSTAIN: None LGL� LINDA EVANS, Mayor City of La Quinta, California Resolution No. 2016-043 Environmental Assessment 2015-0007, Tentative Tract Map 36561 (TTM2015-0008) Applicant: Prism Realty Corporation Owner: Prism -Birch Associates, LLC Adopted: October 18,2016 Page 6 of 6 ATTEST, SUSAN MAYSELS, City Clerl City of La Quinta, California (CITY SEAL) APPROVED AS TO FORM: WILLIAM H. IHRKE, City Attorney City of La Quinta, California CITY COUNCIL RESOLUTION 2016-043 EXHIBIT B CONDITIONS OF APPROVAL - FINAL TENTATIVE TRACT MAP 36561 (TTM2015-0008) APPLICANT: PRISM REALTY CORPORATION OWNER: PRISM -BIRCH ASSOCIATES, LLC OCTOBER 18, 2016 Page 1 of 23 GENERAL 1. The applicant agrees to defend, indemnify and hold harmless the City of La Quinta ("City"), its agents, officers and employees from any claim, action or proceeding to attack, set aside, void, or annul the approval of this Tentative Tract Map, or any Final Map recorded thereunder. The City shall have sole discretion in selecting its defense counsel. The City shall promptly notify the applicant of any claim, action or proceeding and shall cooperate fully in the defense. 2. This Tentative Tract Map, and any Final Map recorded thereunder, shall comply with the requirements and standards of Government Code §§ 66410 through 66499.58 (the "Subdivision Map Act"), and Chapter 13 of the La Quints Municipal Code ("LQMC"). The City of La Quinta's Municipal Code can be accessed on the City's Web Site at www.la-quinta.org. 3. This Tentative Tract Map shall expire on October 18, 2018, two years from the date of City Council approval, unless recorded or granted a time extension pursuant to the requirements of La Quinta Municipal Code 13.12.160 (Extensions of time for tentative maps). 4. Prior to the issuance of any grading, construction, or building permit by the City, the applicant shall obtain any necessary clearances and/or permits from the following agencies if necessary: • Riverside County Fire Marshal • La Quinta Design and Development Department (Grading Permit, Green Sheet (Development Services Clearance) for Building Permits, Water Quality Management Plan(WQMP) Exemption Form - Whitewater River Region, Improvement Permit) • Riverside Co. Environmental Health Department Coachella Valley Unified School District (CVUSD) • Coachella Valley Water District (CVWD) • Imperial Irrigation District (IID) CITY COUNCIL RESOLUTION 2016-043 CONDITIONS OF APPROVAL - FINAL TENTATIVE TRACT MAP 36561 (TTM2015-0008) APPLICANT: PRISM REALTY CORPORATION OWNER: PRISM -BIRCH ASSOCIATES, LLC OCTOSER 18, 2016 Page 2 of 23 • California Regional Water Quality Control Board (CRWQCB) • State Water Resources Control Board • SunLine Transit Agency (SunLine) • South Coast Air Quality Management District Coachella Valley (SCAQMD) The applicant is responsible for all requirements of the permits and/or clearances from the above listed agencies. When the requirements include approval of improvement plans, the applicant shall furnish proof of such approvals when submitting those improvements plans for City approval. 5. Coverage under the State of California Construction General Permit must be obtained by the applicant, who then shall submit a copy of the Regional Water Quality Control Board's ("RWQCB") acknowledgment of the applicant's Notice of Intent ("NOI") and Waste Discharger Identification (WDID) number to the City prior to the issuance of a grading or building permit. 6. The applicant shall comply with applicable provisions of the City's NPDES stormwater discharge permit, Sections 8.70.010 et seq. (Stormwater Management and Discharge Controls), and 13.24.170 (Clean Air/Clean Water), LQMC; Riverside County Ordinance No. 457; the California Regional Water Quality Control Board - Colorado River Basin Region Board Order No. R7-2013- 0011 and the State Water Resources Control Board's Order No. 2012-0006- DWQ. A. For construction activities including clearing, grading or excavation of land that disturbs one (1) acre or more of land, or that disturbs less than one (1) acre of land, but which is a part of a construction project that encompasses more than one (1) acre of land, the Permitee shall be required to submit a Storm Water Pollution Protection Plan ("SWPPP") to the State Water Resources Control Board. The applicant or design professional can obtain the California Stormwater Quality Association SWPPP template at www.cabmphandbooks.com for use in their SWPPP preparation. B. The applicant shall ensure that the required SWPPP is available for inspection at the project site at all times through and including acceptance of all improvements by the City. CITY COUNCIL RESOLUTION 2016-043 CONDITIONS OF APPROVAL - FINAL TENTATIVE TRACT MAP 36561(TTM2015-0008) APPLICANT: PRISM REALTY CORPORATION OWNER: PRISM -BIRCH ASSOCIATES, LLC OCTOBER 18, 2016 Page 3 of 23 C. The applicant's SWPPP shall include provisions for all of the following Best Management Practices ("BMPs") (LQMC Section 8.70.020 (Definitions)): 1) Temporary Soil Stabilization (erosion control). 2) Temporary Sediment Control. 3) Wind Erosion Control. 4) Tracking Control. 5) Non -Storm Water Management. 6) Waste Management and Materials Pollution Control. D. All erosion and sediment control BMPs proposed by the applicant shall be approved by the City Engineer prior to any onsite or offsite grading, pursuant to this project. E. The SWPPP and BMPs shall remain in effect for the entire duration of project construction until all improvements are completed and accepted by the City Council. F. The inclusion in the Homeowners' Association (HOA) Conditions, Covenants, and Restrictions (CC&Rs), a requirement for the perpetual maintenance and operation of all post -construction BMPs as required; and the applicant shall execute and record an agreement that provides for the perpetual maintenance and operation of all post -construction BMPs is required. Developer shall reimburse the City, within thirty (30) days of presentment of the invoice, all costs and actual attorney's fees incurred by the City Attorney to review, negotiate and/or modify any documents or instruments required by these conditions, if Developer requests that the City modify or revise any documents or instruments prepared initially by the City to effect these conditions. This obligation shall be paid in the time noted above without deduction or offset and Developer's failure to make such payment shall be a material breach of the Conditions of Approval. CITY COUNCIL RESOLUTION 2016-043 CONDITIONS OF APPROVAL - FINAL TENTATIVE TRACT MAP 36561 (TTM2015-0008) APPLICANT: PRISM REALTY CORPORATION OWNER: PRISM -BIRCH ASSOCIATES, LLC OCTOBER18,2016 Page 4 of 23 8. Developer shall reimburse the City, within thirty (30) days of presentment of the invoice, all costs and actual consultant's fees incurred by the City for engineering and/or surveying consultants to review and/or modify any documents or instruments required by this project. This obligation shall be paid in the time noted above without deduction or offset and Developer's failure to make such payment shall be a material breach of the Conditions of Approval. 9. Prior to issuance of any permit(s), the applicant shall acquire or confer easements and other property rights necessary for the construction or proper functioning of the proposed development. Conferred rights shall include irrevocable offers to dedicate or grant access easements to the City for emergency services and for maintenance, construction and reconstruction of essential improvements. 10. The applicant shall offer for dedication on the Final Map all public street right- of-ways in conformance with the City's General Plan, Municipal Code, applicable specific plans, and/or as required by the City Engineer. 11. The public street right-of-way offers for dedication required for this development include: A. PUBLIC STREETS 1) Monroe Street (Primary Arterial) - 54 feet from the centerline of Monroe Street for a total 108-foot ultimate developed right of way in conformance with the City's General Plan except for additional right of way dedication to accommodate a deceleration/right turn only lane at the Monroe Street entry and to accommodate an acceleration lane for left turn out movements as shown on TTM 36561. 12. The applicant shall retain for private use on the Final Map all private street right-of-ways in conformance with the City's General Plan, Municipal Code, applicable specific plans, and/or as required by the City Engineer and as shown on TTM 36561. CITY COUNCIL RESOLUTION 2016-043 CONDITIONS OF APPROVAL - FINAL TENTATIVE TRACT MAP 36561 (TTM2015-0008) APPLICANT: PRISM REALTY CORPORATION OWNER: PRISM -BIRCH ASSOCIATES, LLC OCTOBER 18, 2016 Page 5 of 23 13. The private street right-of-ways to be retained for private use required for this development include: A. PRIVATE STREETS Private residential streets measured gutter flow line to gutter flow line shall have a 36-foot travel width. The travel width may be reduced to 32 feet with parking restricted to one side, and 28 feet if on -street parking is prohibited. The applicant shall establish provisions for ongoing enforcement of the parking restriction in the CC&R's. The CC&R's shall be reviewed and approved by the Design and Development Department prior to recordation. B. CUL DE SACS 1) The cut de sac shall conform to the shape shown on the tentative map with a 38-foot curb radius at the bulb or larger as shown on the tentative map. 14. Right-of-way geometry for standard cut -de -sacs and property line corner cut -backs at curb returns shall conform to Riverside County Standard Drawings #800, and #805, respectively, unless otherwise approved by the City Engineer. 15. Dedications shall include additional widths as necessary for dedicated right and left turn lanes, bus turnouts, and other features contained in the approved construction plans. Pursuant to this requirement, the Applicant shall include in the submittal packet containing the draft final map submitted for map checking, an offsite street geometric layout, drawn at 1" equals 40 feet, detailing the following design aspects: median curb line, outside curb line, lane line alignment including lane widths, left turn lanes, deceleration lane(s) and bus stop turnout(s). The geometric layout shall be accompanied with sufficient professional engineering studies to confirm the appropriate length of all proposed turn pockets and auxiliary lanes that may impact the right of way dedication required of the project and the associated landscape setback requirement as shown on TTM 36561. CITY COUNCIL RESOLUTION 2016-043 CONDITIONS OF APPROVAL - FINAL TENTATIVE TRACT MAP 36561 (TTM2015-0008) APPLICANT: PRISM REALTY CORPORATION OWNER: PRISM -BIRCH ASSOCIATES, LLC OCTOBER 18, 2016 Page 6 of 23 16. When the City Engineer determines that access rights to the proposed street right-of-ways shown on the approved Tentative Tract Map are necessary prior to approval of the Final Map dedicating such right-of-ways, the applicant shall grant the necessary right-of-ways within 60 days of a written request by the City. 17. The applicant shall offer for dedication on the Final Map a ten -foot wide public utility easement contiguous with, and along both sides of all private streets. Such easement may be reduced to five feet in width with the express written approval of IID. 18. The applicant shall create perimeter landscaping setbacks along all public right- of-ways as follows: A. Monroe Street (Primary Arterial) - 20-foot from the R/W-P/L. The listed setback depth shall be the average depth where a meandering wall design is approved. The setback requirements shall apply to all frontages including, but not limited to, remainder parcels and sites dedicated for utility purposes. Where public facilities (e.g., sidewalks) are placed on privately -owned setbacks, the applicant shall offer for dedication blanket easements for those purposes on the Final Map. 19. The applicant shall offer for dedication those easements necessary for the placement of, and access to, utility lines and structures, drainage basins, mailbox clusters, park lands, and common areas on the Final Map. 20. Direct vehicular access to Monroe Street from lots with frontage along Monroe Street is restricted, or as otherwise conditioned in these conditions of approval. The vehicular access restriction shall be shown on the recorded final tract map. 21. The applicant shall furnish proof of easements, or written permission, as appropriate, from those owners of all abutting properties on which grading, retaining wall construction, permanent slopes, or other encroachments will occur. CITY COUNCIL RESOLUTION 2016-043 CONDITIONS OF APPROVAL - FINAL TENTATIVE TRACT MAP 36561 (TTM2015-0008) APPLICANT: PRISM REALTY CORPORATION OWNER: PRISM -BIRCH ASSOCIATES, LLC OCTOBER 18, 2016 Page 7 of 23 22. With regards to the "Water Well Agreement" recorded May 04, 1989 as Instrument No. 143130 of Official Records, screening of the existing water well shall be installed prior to issuance of a building permit for Lot 26. Screening materials shall include walls and/or landscaping satisfactory to the Design and Development Director. All rights, easements, and welt infrastructure on Lot 26 of the map shall remain. 23. The applicant shall quitclaim on the Final Map or prior to approval of the Final Map the Imperial Irrigation District easement for pipe lines and power lines and incidental purposes recorded February 26, 1975 as Instrument No. 22519 of Official Records 24. The applicant shall cause no easement to be granted, or recorded, over any portion of the subject property between the date of approval of the Tentative Tract Map and the date of recording of any Final Map, unless such easement is approved by the City Engineer. FINAL MAPS 25. Prior to the City's approval of a Final Map, the applicant shall furnish accurate mylars of the Final Map. The Final Map shall be 1" = 40' scale. IMPROVEMENT PLANS As used throughout these Conditions of Approval, professional titles such as "engineer, "surveyor," and "architect," refer to persons currently certified or licensed to practice their respective professions in the State of California. 26. Improvement plans shall be prepared by or under the direct supervision of qualified engineers and/or architects, as appropriate, and shall comply with the provisions of Section 13.24.040 (Improvement Plans), LQMC. 27. The following improvement plans shall be prepared and submitted for review and approval by the Design and Development Department. A separate set of plans for each line item specified below shall be prepared. The plans shall utilize the minimum scale specified, unless otherwise authorized by the City Engineer in writing. Plans may be prepared at a larger scale if additional detail or plan clarity is desired. Note, the applicant may be required to prepare other improvement plans not listed here pursuant to improvements required by other agencies and utility purveyors. CITY COUNCIL RESOLUTION 2016-043 CONDITIONS OF APPROVAL - FINAL TENTATIVE TRACT MAP 36561 (TTM2015-0008) APPLICANT: PRISM REALTY CORPORATION OWNER: PRISM -BIRCH ASSOCIATES, LLC OCTOBER 18, 2016 Page 8 of 23 A. On -Site Rough Grading Plan B. PM10 Plan C. SWPPP D. WQMP 1" = 40' Horizontal 1" = 40' Horizontal 1" = 40' Horizontal (Plan submitted in Report Form) NOTE: A through D to be submitted concurrently. E. Off -Site Street Improvements/Storm Drain Plan 1" = 40' Horizontal, 1" = 4' Vertical F. Off -Site Signing & Striping Plan 1" = 40' Horizontal The Off -Site street improvement plans shall have separate plan sheet(s) (drawn at 20 scale) that show the meandering sidewalk, mounding, and berming design in the combined parkway and landscape setback area. G. On -Site Street Improvements/Signing & Striping/Storm Drain Plan 1" = 40' Horizontal,1"= 4' Vertical NOTE: E through G to be submitted concurrently. (Separate Storm Drain Plans if applicable) The following plans shall be submitted to the Building and Safety Division for review and approval. The plans shall utilize the minimum scale specified, unless otherwise authorized by the Building Official in writing. Plans may be prepared at a larger scale if additional detail or plan clarity is desired. Note, the applicant may be required to prepare other improvements plans not listed here pursuant to improvements required by other agencies and utility purveyors. H. On -Site Residential Precise Grading Plan 1" = 30' Horizontal Other engineered improvement plans prepared for City approval that are not listed above shall be prepared in formatted approved by the City Engineer prior to commencing plan preparation. CITY COUNCIL RESOLUTION 2016-043 CONDITIONS OF APPROVAL - FINAL TENTATIVE TRACT MAP 36561 (TTM2015-0008) APPLICANT: PRISM REALTY CORPORATION OWNER: PRISM -BIRCH ASSOCIATES, LLC OCTOBER 18,2016 Page 9 of 23 All Off -Site Plan & Profile Street Plans and Signing & Striping Plans shall show all existing improvements for a distance of at least 200-feet beyond the project limits, or a distance sufficient to show any required design transitions. All On -Site Signing & Striping Plans shall show, at a minimum; Stop Signs, Limit Lines and Legends, No parking Signs, Raised Pavement Markers (including Blue RPMs at fire hydrant) and Street name signs per Public Works Standard Plans and/or as approved by the Design and Development Department. "Rough Grading" plans shall normally include perimeter walls with Top Of Wall & Top Of Footing elevations shown. All footings shall have a minimum of 1-foot of cover, or sufficient cover to clear any adjacent obstructions. 28. The City maintains standard plans, detail sheets and/or construction notes for elements of construction which can be accessed via the Public Works 'Plans, Notes and Design Guidance" section of the City website (www.la-quinta.org). Please navigate to the Public Works home page and look for the Standard Drawings hyperlink. 29. The applicant shall furnish a complete set of all approved improvement plans on a storage media acceptable to the City Engineer (currently mylars). 30. Upon completion of construction, and prior to final acceptance of the improvements by the City, the applicant shall furnish the City with reproducible record drawings of all improvement plans which were approved by the City. Each sheet shall be clearly marked "Record Drawing" and shall be stamped and signed by the engineer or surveyor certifying to the accuracy and completeness of the drawings. The applicant shall have all approved myiars previously submitted to the City, revised to reflect the as -built conditions. The applicant shall employ or retain the Engineer of Record during the construction phase of the project so that the FOR can make site visits in support of preparing 'Record Drawing". However, if subsequent approved revisions have been approved by the City Engineer and reflect said "Record Drawing" conditions, the Engineer of Record may submit a letter attesting to said fact to the City Engineer in lieu of mylar submittal. CITY COUNCIL RESOLUTION 2016-043 CONDITIONS OF APPROVAL - FINAL TENTATIVE TRACT MAP 36561 (TTM2015-0008) APPLICANT: PRISM REALTY CORPORATION OWNER: PRISM -BIRCH ASSOCIATES, LLC OCTOBER 18, 2016 Page 10 of 23 IMPROVEMENT SECURITY AGREEMENTS 31. Prior to approval of any Final Map, the applicant shall construct all on and off - site improvements and satisfy its obligations for same, or shall furnish a fully secured and executed Subdivision Improvement Agreement ("SIA") guaranteeing the construction of such improvements and the satisfaction of its obligations for some, or shall agree to any combination thereof, as may be required by the City. 32. Any Subdivision Improvement Agreement ("SIA") entered into by and between the applicant and the City of La Quinta, for the purpose of guaranteeing the completion of any improvements related to this Tentative Tract Map, shall comply with the provisions of Chapter 13.28 (Improvement Security), LQMC. 33. Improvements to be made, or agreed to be made, shall include the removal of any existing structures or other obstructions which are not a part of the proposed improvements; and shall provide for the setting of the final survey monumentation. 34. Depending on the timing of the development of this Tentative Tract Map, and the status of the off -site improvements at the time, the applicant may be required to do the following as a condition of Final Map approval: A. Construct certain off -site improvements. B. Construct additional off -site improvements, subject to the reimbursement of its costs by others. C. Reimburse others for those improvements previously constructed that are considered to be an obligation of this tentative tract map. D. Secure the costs for future improvements that are to be made by others. E. To agree to any combination of these actions, as the City may require. Off -Site Improvements should be completed on a first priority basis. The applicant shall complete Off -Site Improvements in the first phase of construction or by the issuance of the 20 % Building Permit. CITY COUNCIL RESOLUTION 2016-043 CONDITIONS OF APPROVAL - FINAL TENTATIVE TRACT MAP 36561 (TTM2015-0008) APPLICANT: PRISM REALTY CORPORATION OWNER: PRISM -BIRCH ASSOCIATES, LLC OCTOBER 18, 2016 Page 11 of 23 In the event that any of the improvements required for this development are constructed by the City, the applicant shall, prior to the approval of the Final Map, or the issuance of any permit related thereto, reimburse the City for the costs of such improvements. 35. If the applicant elects to utilize the secured agreement alternative, the applicant shall submit detailed construction cost estimates for all proposed on - site and off -site improvements, including an estimate for the final survey monumentation, for checking and approval by the City Engineer. Such estimates shall conform to the unit cost schedule as approved by the City Engineer. Estimates for improvements under the jurisdiction of other agencies shall be approved by those agencies and submitted to the City along with the applicant's detailed cost estimates. Security will not be required for telephone, natural gas, or cable T.V. improvements. 36. Should the applicant fail to construct the improvements for the development, or fail to satisfy its obligations for the development in a timely manner, the City shall have the right to halt issuance of building permits, and/or final building inspections, withhold other approvals related to the development of the project, or call upon the surety to complete the improvements. GRADING 37. The applicant shall comply with the provisions of Section 13.24.050 (Grading Improvements), LQMC. 38. Prior to occupancy of the project site for any construction, or other purposes, the applicant shall obtain a grading permit approved by the City Engineer. 39. To obtain an approved grading permit, the applicant shall submit and obtain approval of all of the following: A. A grading plan prepared by a civil engineer registered in the State of California, CITY COUNCIL RESOLUTION 2016-043 CONDITIONS OF APPROVAL - FINAL TENTATIVE TRACT MAP 36561 (TTM2015-0008) APPLICANT: PRISM REALTY CORPORATION OWNER: PRISM -BIRCH ASSOCIATES, LLC OCTOBER 18, 2016 Page 12 of 23 B. A preliminary geotechnical ("soils") report prepared by an engineer registered in the State of California, C. A Fugitive Dust Control Plan prepared in accordance with LQMC Chapter 6.16, (Fugitive Dust Control), and D. A Best Management Practices report prepared in accordance with LQMC Sections 8.70.010 and 13.24.170 (NPDES Stormwater Discharge Permit and Storm Management and Discharge Controls). E. A WQMP prepared by an engineer registered in the State of California. All grading shall conform with the recommendations contained in the Preliminary Soils Report, and shall be certified as being adequate by soils engineer, or engineering geologist registered in the State of California. A statement shall appear on the Final Map that a soils report has been prepared in accordance with the California Health & Safety Code § 17953. The applicant shall furnish security, in a form acceptable to the City, and in an amount sufficient to guarantee compliance with the approved Fugitive Dust Control Plan provisions as submitted with its application for a grading permit. Additionally, the applicant shall replenish said security if expended by the City of La Quinta to comply with the Plan as required by the City Engineer. 40. The applicant shall maintain all open graded, undeveloped land in order to prevent wind and/or water erosion of such land. All open graded, undeveloped land shall either be planted with interim landscaping, or stabilized with such other erosion control measures, as were approved in the Fugitive Dust Control Plan. 41. Grading within the perimeter setback and parkway areas shall have undulating terrain and shall conform with the requirements of LQMC Section 9.60.240(F) except as otherwise modified by this condition. The maximum slope shall not exceed 3:1 anywhere in the landscape setback area, except for the backslope (i.e. the slope at the back of the landscape lot) which shall not exceed 2:1 if fully planted with ground cover. The maximum slope in the first six (6) feet adjacent to the curb shall not exceed 4:1 when the nearest edge of sidewalk is within six feet (6') of the curb, otherwise the maximum slope within the right of way shall CITY COUNCIL RESOLUTION 2016-043 CONDITIONS OF APPROVAL - FINAL TENTATIVE TRACT MAP 36561 (TTM2015-0008) APPLICANT: PRISM REALTY CORPORATION OWNER: PRISM -BIRCH ASSOCIATES, LLC OCTOBER 18, 2016 Page 13 of 23 not exceed 3:1. All unpaved parkway areas adjacent to the curb shall be depressed one and one-half inches (1.5") in the first eighteen inches (18") behind the curb. 42. Building pad elevations on the rough grading plan submitted for City Engineer's approval shall conform with pad elevations shown on the tentative map, unless the pad elevations have other requirements imposed elsewhere in these Conditions of Approval. 43. Building pad elevations of perimeter lots shall not differ by more that one foot from the building pads in adjacent developments. Where compliance within the above stated limits is impractical, the City may consider alternatives that are shown to minimize safety concerns, maintenance difficulties and neighboring -owner dissatisfaction with the grade differential. 44. Prior to any site grading or re -grading that will raise or lower any portion of the site by more than plus or minus half of a foot (0.5') from the elevations shown on the approved Tentative Tract Map, the applicant shall submit the proposed grading changes to the City Engineer for a substantial conformance review. 45. Prior to the issuance of a building permit for any building lot, the applicant shall provide a lot pad certification stamped and signed by a qualified engineer or surveyor with applicable compaction tests and over excavation documentation. Each pad certification shall list the pad elevation as shown on the approved grading plan, the actual pad elevation and the difference between the two, if any. Such pad certification shall also list the relative compaction of the pad soil. The data shall be organized by lot number, and listed cumulatively if submitted at different times. DRAINAGE 46. Stormwater handling shall conform with the approved hydrology and drainage report for Tentative Tract Map No. 36561. The applicant shall provide boring logs indicating no silt or clay layers or lenses were found within 15 feet below the basin bottom per Engineering Bulletin 06-16 in order to use a percolation rate higher than zero. If a percolation rate less than two inches per hour is approved by the City Engineer, the retention basin size may need to be increased in order to retain the design storm. CITY COUNCIL RESOLUTION 2016-043 CONDITIONS OF APPROVAL - FINAL TENTATIVE TRACT MAP 36561 (TTM2015-0008) APPLICANT: PRISM REALTY CORPORATION OWNER: PRISM -BIRCH ASSOCIATES, LLC OCTOBER 18, 2016 Page 14 of 23 47. The applicant shall comply with the provisions of LQMC Section 13.24.120 (Drainage), Retention Basin Design Criteria, Engineering Bulletin No. 06-16 - Hydrology Report with Preliminary Hydraulic Report Criteria for Storm Drain Systems and Engineering Bulletin No. 06-015 - Underground Retention Basin Design Requirements. More specifically, stormwater falling on site during the 100 year storm shall be retained within the development, unless otherwise approved by the City Engineer. The design storm shall be either the 1 hour, 3 hour, 6 hour or 24 hour event producing the greatest total run off. 48. Nuisance water shall be retained on site. Nuisance water shall be disposed of per approved methods contained in Engineering Bulletin No. 06-16 - Hydrology Report with Preliminary Hydraulic Report Criteria for Storm Drain Systems and Engineering Bulletin No. 06-015 - Underground Retention Basin Design Requirements. 49. In design of retention facilities, the maximum percolation rate shall be two inches per hour. The percolation rate will be considered to be zero unless the applicant provides site specific data indicating otherwise and as approved by the City Engineer. 50. No fence or wall shall be constructed around any retention basin unless approved by the Planning Manager and the City Engineer. 51. For on -site above ground common retention basins, retention depth shall be according to Engineering Bulletin No. 06-16 - Hydrology Report with Preliminary Hydraulic Report Criteria for Storm Drain Systems. Side slopes shall not exceed 3:1 and shall be planted with maintenance free ground cover. Additionally, retention basin widths shall be not less than 20 feet at the bottom of the basin. 52. Stormwater may not be retained in landscaped parkways or landscaped setback lots. Only incidental storm water (precipitation which directly falls onto the setback) will be permitted to be retained in the landscape setback areas. The perimeter setback and parkway areas in the street right-of-way shall be shaped with berms and mounds, pursuant to LQMC Section 9.100.040(B)(7). CITY COUNCIL RESOLUTION 2016-043 CONDITIONS OF APPROVAL - FINAL TENTATIVE TRACT MAP 36561 (TTM2015-0008) APPLICANT: PRISM REALTY CORPORATION OWNER: PRISM -BIRCH ASSOCIATES, LLC OCTOBER 18, 2016 Page 15 of 23 53. The design of the development shall not cause any increase in flood boundaries and levels in any area outside the development. 54. The development shall be graded to permit storm flow in excess of retention capacity to flow out of the development through a designated overflow and into the historic drainage relief route. 55. Storm drainage historically received from adjoining property shall be received and retained or passed through into the historic downstream drainage relief route. 56. The applicant shall comply with applicable provisions for post construction runoff per the City's NPDES stormwater discharge permit, LQMC Sections 8.70.010 et seq. (Stormwater Management and Discharge Controls), and 13.24.170 (Clean Air/Clean Water); Riverside County Ordinance No. 457; and the California Regional Water Quality Control Board - Colorado River Basin (CRWQCB-CRB) Region Board Order No. R7-2013-0011 and the State Water Resources Control Board's Order No. 2012-0006-DWQ. A. For post -construction urban runoff from New Development and Redevelopments Projects, the applicant shall implement requirements of the NPDES permit for the design, construction and perpetual operation and maintenance of BMPs per the approved Water Quality Management Plan (WQMP) for the project as required by the California Regional Water Quality Control Board - Colorado River Basin (CRWQCB-CRB) Region Board Order No.R7-2013-0011. B. The applicant shall implement the WQMP Design Standards per (CRWQCB-CRB) Region Board Order No. R7-2013-0011 utilizing BMPs approved by the City Engineer. A project specific WQMP shall be provided which incorporates Site Design and Treatment BMPs utilizing first flush infiltration as a preferred method of NPDES Permit Compliance for Whitewater River receiving water, as applicable. C. The developer shall execute and record a Stormwater Management/BMP Facilities Agreement that provides for the perpetual maintenance and operation of stormwater BMPs. CITY COUNCIL RESOLUTION 2016-043 CONDITIONS OF APPROVAL - FINAL TENTATIVE TRACT MAP 36561 (TTM2015-0008) APPLICANT: PRISM REALTY CORPORATION OWNER: PRISM -BIRCH ASSOCIATES, LLC OCTOBER 18, 2016 Page 16 of 23 UTILITIES 57. The applicant shall comply with the provisions of Section 13.24.110 (Utilities), LQMC. 58. The applicant shall obtain the approval of the City Engineer for the location of all utility lines within any right-of-way, and all above -ground utility structures including, but not limited to, traffic signal cabinets, electric vaults, water valves, and telephone stands, to ensure optimum placement for practical and aesthetic purposes. 59. Existing overhead utility lines within, or adjacent to the proposed development, and all proposed utilities shall be installed underground. All existing utility lines attached to joint use 92 KV transmission power poles are exempt from the requirement to be placed underground. 60. Underground utilities shall be installed prior to overlying hardscope. For installation of utilities in existing improved streets, the applicant shall comply with trench restoration requirements maintained, or required by the City Engineer. The applicant shall provide certified reports of all utility trench compaction for approval by the City Engineer. Additionally, grease traps and the maintenance thereof shall be located as to not conflict with access aisles/entrances. STREET AND TRAFFIC IMPROVEMENTS 61. The applicant shall comply with the provisions of LQMC Sections 13.24.060 (Street Improvements), 13.24.070 (Street Design - Generally) & 13.24.100 (Access for Individual Properties and Development) for public streets; and Section 13.24.080 (Street Design - Private Streets), where private streets are proposed. 62. Streets shall have vertical curbs or other approved curb configurations that will convey water without ponding, and provide lateral containment of dust and residue during street sweeping operations. If a wedge or rolled curb design is approved, the lip at the flowline shall be near vertical with a 1/8" batter and a CITY COUNCIL RESOLUTION 2016-043 CONDITIONS OF APPROVAL - FINAL TENTATIVE TRACT MAP 36561 (TTM2015-0008) APPLICANT: PRISM REALTY CORPORATION OWNER: PRISM -BIRCH ASSOCIATES, LLC OCTOBER 18, 2016 Page 17 of 23 minimum height of 0.1'. Unused curb cuts on any lot shall be restored to standard curb height prior to final inspection of permanent building(s) on the lot. 63. The applicant shall construct the following street improvements to conform with the General Plan (street type noted in parentheses) and in conformance with TTM 36561. A. OFF -SITE STREETS 1) Monroe Street (Primary Arterial): Widen the west side of the street along all frontage adjacent to the Tentative Map boundary to its ultimate width on the west side as specified in the General Plan and the requirements of these conditions. Rehabilitate and/or reconstruct existing roadway pavement as necessary to augment and convert it from a rural county -road design standard to La Quinta's urban arterial design standard. The west curb face shall be located thirty nine feet (39') west of the centerline, except at locations where additional street width is needed to accommodate: a) A deceleration/right turn only lane at the Monroe Street entry as approved by the City Engineer. b) An acceleration lane for left turn out movements as approved by the City Engineer. c) Bus turnout (if required by Sunline Transit) Other required improvements in the Monroe Street right or way and/or adjacent landscape setback area include: d) All appurtenant components such as, but not limited to: curb, gutter, traffic control striping, legends, and signs. e) 8-foot wide meandering sidewalk. The meandering sidewalk shall have an arrhythmic horizontal layout that utilizes concave and convex curves with respect to the curb CITY COUNCIL RESOLUTION 2016- CONDITIONS OF APPROVAL - RECOMMENDED TENTATIVE TRACT MAP 36561 (TTM2015-0008) APPLICANT: PRISM REALTY CORPORATION OWNER: PRISM -BIRCH ASSOCIATES, LLC OCTOBER 18, 2016 Page 18 of 23 line that touches the back of curb at intervals not to exceed 250 feet. The sidewalk curvature radii should vary between 50 and 300 feet, and at each point of reverse curvature, the radius should change to assist in creating the arrhythmic layout. The sidewalk shall meander into the landscape setback lot and approach within 5 feet of the multi -use trail at intervals not to exceed 250 feet. Half width of a 16' - foot wide raised landscaped median and/or an acceleration lane for left turn out movements along the entire boundary of the Tentative Tract Map or as approved by the City Engineer. The applicant shall extend improvements adjacent to the subdivision boundaries to ensure they safely integrate with existing improvements (e.g., grading; traffic control devices and transitions in alignment, elevation or dimensions of streets and sidewalks). B. PRIVATE STREETS 1) Private residential streets measured gutter flow line to gutter flow line shall have a 36-foot travel width. The travel width may be reduced to 32 feet with parking restricted to one side, and 28 feet if on -street parking is prohibited. The applicant shall establish provisions for ongoing enforcement of the parking restriction in the CC&R's. The CC&R's shall be reviewed and approved by the Design and Development Department prior to recordation. 2) The location of driveways of corner lots shall not be located within the curb return and away from the intersection when possible. C. PRIVATE CUL DE SACS 1) Shall be constructed according to the lay -out shown on the tentative map with 38-foot curb radius or greater at the bulb similar to the layout shown on the rough grading plan. 64. All gated entries shall provide for a three -car minimum stacking capacity for inbound traffic to be a minimum length of 62 feet from call box to the street; and shall provide for a full turn -around outlet for non -accepted vehicles. CITY COUNCIL RESOLUTION 2016- CONDITIONS OF APPROVAL - RECOMMENDED TENTATIVE TRACT MAP 36561 (TTM2015-0008) APPLICANT: PRISM REALTY CORPORATION OWNER: PRISM -BIRCH ASSOCIATES, LLC OCTOBER 18, 2016 Page 19 of 23 Where a gated entry is proposed, the applicant shall demonstrate that those passenger vehicles that do not gain entry into the development can safely make a full turn -around (minimum radius to be 24 feet) out onto the main street from the gated entry. Pursuant to said condition, there shall be a minimum of twenty five feet width provided at the turn -around opening provided. Entry drives, main interior circulation routes, standard knuckles, corner cutbacks, bus turnouts, dedicated turn lanes and other features shown on the approved construction plans, may require additional street widths as may be determined by the City Engineer. 65. The applicant shall design street pavement sections using CalTrans' design procedure for 20-year life pavement, and the site -specific data for soil strength and anticipated traffic loading (including construction. traffic). Minimum structural sections shall be as follows: Residential 3.0" a.c./4.5" c.a.b. Primary Arterial 4.5" a.c./6.0" c.a.b. or the approved equivalents of alternate materials. 66. The applicant shall submit current mix designs (less than two years old at the time of construction) for base, asphalt concrete and Portland cement concrete. The submittal shall include test results for all specimens used in the mix design procedure. For mix designs over six months old, the submittal shall include recent (less than six months old at the time of construction) aggregate gradation test results confirming that design gradations can be achieved in current production. The applicant shall not schedule construction operations until mix designs are approved. 67. General access points and turning movements of traffic are limited to the following: Primary Entry (Monroe Street): Right turn in, and left and right turn out. Left turn in movements are restricted. CITY COUNCIL RESOLUTION 2016- CONDITIONS OF APPROVAL - RECOMMENDED TENTATIVE TRACT MAP 36561 (TTM2015-0008) APPLICANT: PRISM REALTY CORPORATION OWNER: PRISM -BIRCH ASSOCIATES, LLC OCTOBER18,2016 Page 20 of 23 68. Improvements shall include appurtenances such as traffic control signs, markings and other devices, raised medians if required, street name signs and sidewalks. Mid -block street lighting is not required. 69. Improvements shall be designed and constructed in accordance with City adopted standards, supplemental drawings and specifications, or as approved by the City Engineer and as shown on TTM 36561. Improvement plans for streets, access gates and parking areas shall be stamped and signed by qualified engineers. CONSTRUCTION 70. The City will conduct final inspections of habitable buildings only when the buildings have improved street and (if required) sidewalk access to publicly - maintained streets. The improvements shall include required traffic control devices, pavement markings and street name signs. If on -site streets in residential developments are initially constructed with partial pavement thickness, the applicant shall complete the pavement prior to final inspections of the last ten percent of homes within the development or when directed by the City, whichever comes first. LANDSCAPING AND IRRIGATION 71. The applicant shall comply with Sections 13.24.130 (Landscaping Setbacks) & 13.24.140 (Landscaping Plans), LQMC. 72. The applicant shall provide landscaping in the required setbacks, retention basins, common lots and park areas. 73. Landscape and irrigation plans for landscaped lots and setbacks, medians, retention basins, and parks shall be signed and stamped by a landscape architect licensed in California. 74. The applicant shall submit all landscape plans for approval by the Planning Division with green sheet sign off by the Public Works Development Division. When plan checking has been completed by the Planning Division, the applicant shall obtain the signatures of CVWD and the Riverside County Agricultural Commissioner, prior to submittal for signature by the Planning Manager. CITY COUNCIL RESOLUTION 2016- CONDITIONS OF APPROVAL - RECOMMENDED TENTATIVE TRACT MAP 36561(TTM2015-0008) APPLICANT: PRISM REALTY CORPORATION OWNER: PRISM -BIRCH ASSOCIATES, LLC OCTOBER 18, 2016 Page 21 of 23 Landscape plans for landscaped medians on public streets shall be approved by the both the Planning Manager and the City Engineer. Where City Engineer approval is not required, the applicant shall submit for green sheet approval by the Development Services Division. Final landscape plans for on -site planting shall be reviewed by the Architecture and Landscape Review Committee and approved by the Planning Manager prior to issuance of first building permit. Final plans shall include all landscaping associated with this project. NOTE: Plans are not approved for construction until signed by the Planning Manager. 75. Landscape areas shall have permanent irrigation improvements meeting the requirements of the Planning Manager. Use of lawn areas shall be minimized with no lawn, or spray irrigation, being placed within 24 inches of curbs along public streets. 76. The applicant or his agent has the responsibility for proper sight distance requirements per guidelines in the American Association of State Highway and Transportation Officials (AASHTO) "A Polity on Geometric Design of Highways and Streets" latest edition, in the design and/or installation of all landscaping and appurtenances abutting and within the private and public street right-of- way. PUBLIC SERVICES 77. If necessary, the applicant shall provide public transit improvements as required by SunLine Transit Agency and as approved by the City Engineer. MAINTENANCE 78. The applicant shall comply with the provisions of Section 13.24.160 (Maintenance), LQMC. 79. The applicant shall make provisions for the continuous and perpetual maintenance of perimeter landscaping up to the curb, access drives, sidewalks, stormwater BMPs, and common areas. CITY COUNCIL RESOLUTION 2016- CONDITIONS OF APPROVAL - RECOMMENDED TENTATIVE TRACT MAP 36561 (TTM2015-0008) APPLICANT: PRISM REALTY CORPORATION OWNER: PRISM -BIRCH ASSOCIATES, LLC OCTOBER 18, 2016 Page 22 of 23 FEES AND DEPOSITS 80. The applicant shall comply with the provisions of LQMC Section 13.24.180 (Fees and Deposits). These fees include all deposits and fees required by the City for plan checking and construction inspection. Deposits and fee amounts shall be those in effect when the applicant makes application for plan check and permits. 81. Permits issued under this approval shall be subject to the provisions of the Development Impact Fee and Transportation Uniform Mitigation Fee programs in effect at the time of issuance of building permit(s). 82. Tentative Tract Map 36561 shall provide for parks through payment of an in -lieu fee, as specified in LQMC Chapter 13.48. The in -lieu fee (sometimes referred to as the "Quimby Fee") shall be based on the fair market value of the land within the subdivision. Land value information shall be provided to the Design and Director, via land sale information, a current fair market value of land appraisal, or other information on land value within the subdivision. The Director may consider any subdivider -provided or other land value information source for use in calculation of the parkland fee. PLANNING DIVISION 83. Should human remains be discovered during construction of the proposed project, the project contractor would be subject to either State law regarding the discovery and disturbance of human remains or the Tribal burial protocol. In either circumstance all destructive activity in the immediate vicinity shall halt and the County Coroner shall be contacted pursuant to State Health and Safety Code 7050.5. If the remains are determined to be of Native American origin, the Native American Heritage Commission (NAHC) shall be contacted. The NAHC will make a determination of the Most Likely Descendent (MLD). The City and Developer will work with the designated MLD to determine the final disposition of the remains. 84. As Monroe Street is a General Plan -designated Image Corridor, buildings within one hundred fifty feet of the edge of right-of-way shall be limited to single - story, with a maximum building height of 22 feet. CITY COUNCIL RESOLUTION 2016- CONDITIONS OF APPROVAL - RECOMMENDED TENTATIVE TRACT MAP 36561 (TTM2015-0008) APPLICANT: PRISM REALTY CORPORATION OWNER: PRISM -BIRCH ASSOCIATES, LLC OCTOBER 18, 2016 Page 23 of 23 85. The CC&R's shall contain a disclosure that notifies potential owners that the property is within and adjacent to the City's Equestrian Overlay District zoning overlay. 86. Street nome(s) shall be reviewed by the Design and Development Department and Fire Department at or prior to final map plan checking. 87. Conditions of approval agreed to in order to obtain support from the Estates at La Quints: The entrance/exit gate shall be located towards the mid -point of Lot 37. Lots 1, 9, 10, 23, 24, 29, 30, 35, and 36 shall be limited to single -story with a 22-foot maximum building height. • Pad elevations for TTM 36561 shall be equal or lower than the pad elevations of the Estates at La Quinta. • A landscaping buffer with a minimum depth of ten feet (except in the area adjacent to the emergency access area) shall be incorporated into Lot E. 88. A site development permit consisting of architectural and landscaping plans shall be reviewed and approved at a duly noticed public hearing by the Planning Commission. DCH I BI T A Of CI TY OF LA QU I NTA 78-495 Cal le Tampico La Quinta, CA 92253 Phone: (760) 777-7000 EN V I RON M EN TAL I N I TI AL STU DY Project Title: 54721 Monroe Street; TTM 36561 Case No: MP2015-0005 (TTM 36561), ZC2015-0003, TTM2015-0008, EA 2015-0007 Lead Agency City of La Quinta 78-495 Calle Tampico La Quinta, CA 92253 (760) 777-7125 Applicant: Shireen Lee Prism Realty Corporation 3189 Airway Avenue #B Costa Mesa, CA 92626-4612 Contact Person: Jay Wuu, Principal Planner City of La Quinta (760) 777-7125 Project Location: West side of Monroe Street La Quinta, CA 92253 APN: 767-320-039 General Plan/Zoning: General Plan: Low Density Residential Current Zoning: Very Low Density Residential with Equestrian Overlay Proposed Zoning: Low Density Residential Surrounding Land Uses: North: Single-family homes/Equestrian South: Single-family homes/Low Density Residential East: Agricultural fields/Low Density Residential West: Residential development /Low Density Residential TTM 36561 IS February 2016 Project Description: The proposed project is a residential development on approximately 12.25 acres located on Monroe Street, south of Avenue 54 in the Qty of La Quinta. The project site is currently vacant. Tentative Tract Map 36561 (TTM 36561) is proposed to subdivide the parcel and create 36 separate lots. The development will be comprised of 36 single-family residential lots with the average lot size of 9,757 square feet. The proposed project will comply with the development standards of the proposed Low Density Residential (RL) zone. The RL zone allows the construction of single-family homes with a maximum height of 28 feet and one - or two-story structures. An approximately 29,175 square foot picnic area is proposed on the south side of the subject property with passive, landscaped, open space area in the on -site retention basin. Five streets will be created to allow access within the proposed development. Primary access to the project will be on Monroe Street. Project Location and Limits: The proposed project is located on Monroe Street, south of Avenue 54 in the City of La Quinta, California. The project area consists of Assessor's Parcel Number 767-320-039. Other Required Public Agencies Approval: None -2- TTM 36561 IS February 2016 Exhibit 1 ITZ'Zl } w f CD _ Vial Lmgt �. h �P y} T�� a W JL LLI Y Qj 6 'l 41 1 W � I p i� 0 H . J -3— TTM 36561 IS February 2016 Exhibit 2 C^1 ME TTM 36561 IS February 2016 Exhibit 3 venug,50 _ .�� rL w *--A 52 �/ ry Source: Goggle Farth,2gl+5 !=+ r, -I L - TER NOVA Tentative Tract Map 36-561 Project Vicinity Map La Qifinta, California Exhibit -5- TTM 36561 IS February 2016 ENVI RONMENTAL FACTORS POTENTIALLY AFFECTED: The environmental factors checked below would be potentially affected by this project, involving at least one impact that is a "Potentially Significant Impact" as indicated by the checklist on the following paaes. ❑ Aesthetics ❑ Agriculture and Forestry Resources ❑ Air Quality ❑ Biological Resources ❑ Cultural Resources ❑ Geology /Soils ❑ Greenhouse Gas Emissions ❑ Hazards & Hazardous Materials ❑ Hydrology / Water Quality ❑ Land Use / Planning ❑ Mineral Resources ❑ Noise ❑ Population / Housing ❑ Public Services ❑ Recreation Transportation/Traffic Utilities / Service Mandatory Findings of El El Systems ❑ Significance DEfERMI NATI ON: (To be completed by the Lead Agency) On the basis of this initial evaluation: X I find that the proposed project COULD NOT have a significant effect on the environment, and a NEGATIVE DECLARATI ON will be prepared. I find that although the proposed project could have a significant effect on the environment, there will not be a significant effect in this case because revisions in the project have been made by or agreed to by the project proponent. A MITIGATED NEGATIVE DECLARATION will be prepared. I find that the proposed project MAY have a significant effect on the environment, and an ENVI RONMENTAL I MPACT REPORT is required. I find that the proposed project MAY have a "potentially significant impact" or "potentially significant unless mitigated" impact on the environment, but at least one effect 1) has been adequately analyzed in an earlier document pursuant to applicable legal standards, and 2) has been addressed by mitigation measures based on the earlier analysis as described on attached sheets. An ENVIRONMENTAL IMPACT REPORT is required, but it must analyze only the effects that remain to be addressed. I find that although the proposed project could have a significant effect on the environment, because all potentially significant effects (a) have been analyzed adequately in an earlier EIR or NEGATIVE DECLARATION pursuant to applicable standards, and (b) have been avoided or mitigated pursuant to that earlier EIRor NEGATIVE DECLARATION, including revisions or mitigation measures that are imposed upon the proposed project, nothing further is required. Signature Date -c- TTT\4 36561 IS February 2016 EVALUATI ON OF ENVI RONMENTAL I MPACTS: 1) A brief explanation is required for all answers except "No Impact" answers that are adequately supported by the information sources a lead agency cites in the parentheses following each question. A "No Impact" answer is adequately supported if the referenced information sources show that the impact simply does not apply to projects like the one involved (e.g., the project falls outside a fault rupture zone). A "No Impact" answer should be explained where it is based on project -specific factors as well as general standards (e.g., the project will not expose sensitive receptors to pollutants, based on a project -specific screening analysis). 2) All answers must take account of the whole action involved, including off -site as well as on -site, cumulative as well as project -level, indirect as well as direct, and construction as well as operational impacts. 3) Once the lead agency has determined that a particular physical impact may occur, then the checklist answers must indicate whether the impact is potentially significant, less than significant with mitigation, or less than significant. "Potentially Sgnificant Impact" is appropriate if there is substantial evidence that an effect may be significant. If there are one or more "Potentially Sgnificant Impact" entries when the determination is made, an El Ris required. 4) "Negative Declaration: Less Than Sgnificant With Mitigation Incorporated" applies where the incorporation of mitigation measures has reduced an effect from "Potentially Sgnificant Impact" to a "Less Than Sgnificant Impact." The lead agency must describe the mitigation measures, and briefly explain how they reduce the effect to a less than significant level (mitigation measures from Section XVII, "Earlier Analyses," maybe cross-referenced). 5) Earlier analyses may be used where, pursuant to the tiering, program EIR, or other CEQA process, an effect has been adequately analyzed in an earlier EI R or negative declaration. Section 15063(c)(3)(D). In this case, a brief discussion should identify the following: a) Earlier Analysis Used. Identify and state where they are available for review. b) Impacts Adequately Addressed. Identify which effects from the above checklist were within the scope of and adequately analyzed in an earlier document pursuant to applicable legal standards, and state whether such effects were addressed by mitigation measures based on the earlier analysis. c) Mitigation Measures. For effects that are "Less than Sgnificant with Mitigation Measures Incorporated," describe the mitigation measures, which were incorporated or refined from the earlier document and the extent to which they address site -specific conditions for the project. 6) Lead agencies are encouraged to incorporate into the checklist references to information sources for potential impacts (e.g., general plans, zoning ordinances). Reference to a previously prepared or outside document should, where appropriate, include a reference to the page or pages where the statement is substantiated. 7) Supporting Information Sources: A source list should be attached, and other sources used or individuals contacted should be cited in the discussion. 8) This is only a suggested form, and lead agencies are free to use different formats; however, lead agencies should normally address the questions from this checklist that are relevant to a project's environmental effects in whatever format is selected. 9) The explanation of each issue should identify: a) the significance criteria or threshold, if any, used to evaluate each question; -7- TT1\4 36561 IS February 2016 and b) the mitigation measure identified, if any, to reduce the impact to less than significance. 1.0 TTM 36561 IS February 2016 Potentially Less Than Less Than No Significant Significant w/ Significant I mpact I mpact Mitigation I mpact 1. AESTHETI CS-- Would the project: a) Have a substantial adverse effect on X a scenic vista? b) Substantially damage scenic resources, including, but not limited to, X trees, rock outcroppings, and historic buildings within a state scenic highway? c) Substantially degrade the existing visual character or quality of the site X and its surroundings? d) Create a new source of substantial light or glare which would adversely X affect day or nighttime views in the area? Source: 2035 General Ran, La Quinta Municipal Code, California Scenic Highway Mapping System, project materials. 1. a) Less than Significant I mpact. The surrounding properties generally enjoy views of the Santa Rosa Mountains, located to the west and southwest. Lower elevations are currently blocked by existing developments. A 17,757 square foot retention basin will be located on the east side of the property providing an adequate buffer between the proposed single-family residences and Monroe Street. In addition, a 29,175 square foot picnic area will be located on the south side of the subject property. Both of these design elements provide open space opportunities for the proposed development's residents. They also minimize the impact to the scenic vistas by having structures constructed at a distance that far surpasses the required setbacks. A perimeter wall and desert landscaping would further screen the proposed development. The proposed residential structures will comply with the Low Density Residential (RL) zone's development standards. The RL zone allows two-story structures with a maximum height of 28 feet. Given the distance from nearby developments and the limited height, the proposed project would create a less than significant impact to scenic vistas. b) Less than Significant I mpact. The proposed project is not located near an existing or proposed state scenic highway. Additionally, there are no scenic resources, for instance trees, rock outcroppings, or historical buildings located onsite. Nevertheless, Monroe Street is designated as an Image Corridor in the 2035 General Ran and provides valuable visual character and resources to the City and surrounding areas. Desert landscape will border the subject property adding the site's visual character. It is not anticipated that the proposed residential development will create an adverse effect to the scenic resources. A less than significant impact will occur. TT1\4 36561 IS February 2016 c) Less than Significant I mpact. The area in the general vicinity of the proposed site can be described as semi -rural with agricultural fields located east of the site, vacant land slated for single-family residential development to the west, a single-family home with equestrian facilities to the north, and a single-family residential development to the south. In 2009, the proposed area was graded and currently contains sparse re- growth of desert vegetation. For this reason, the site contains little to no significant scenic value. The proposed residential development will consist of 36 single-family homes. A perimeter wall and entrance gates will enclose the development. Landscaping will be limited to an approved plant palette that consists of native desert and drought -tolerant plants. Therefore, impacts to the visual character of the area will be less than significant. d) Less than Significant Impact. The proposed project will be required to abide by the City of La Quinta building codes and lighting ordinances, which require proper shielding of light sources and prohibit light spillage on adjacent properties. Prior to development a lighting plan will be submitted, approved, and all standard requirements will be applied. Lighting impacts related to the proposed project will be less than significant. Mitigation Measures: None Monitoring: None TT1\4 36561 IS February 2016 Potentially Less Than Less Than No Significant Significant w/ Significant I mpact I mpact Mitigation I mpact 11. AGRI CULTURE RESOURCES. Would the project: a) Convert Prime Farmland, Unique Farmland, or Farmland of Statewide Importance (Farmland), as shown on the maps prepared pursuant to the X Farmland Mapping and Monitoring Program of the California Resources Agency, to non-agricultural use? b) Conflict with existing zoning for agricultural use, or a Williamson Act X contract? c) I nvolve other changes in the existing environment which, due to their location or nature, could result in X conversion of Farmland, to non- agricultural use? Source: 2035 General Plan, "California Department of Conservation, published January 2012", and California Department of Conservation Farmland Mapping, project materials. 11. a) Less Than Significant I mpact. According to the California Department of Conservation, the subject site is not designated as Prime Farmland, Unique Farmland, or Farmland of Statewide Importance, nor is it used for agricultural purposes. Properties to the immediate east are designated as Prime Farmland by the California Department of Conservation, and are currently being used for agricultural purposes. The proposed project will not result in any changes to their agricultural uses. The subject property itself is designated as Low Density Residential in the City's General Plan. Therefore, less than significant impacts are anticipated to occur to Prime Farmland, Unique Farmland, or Farmland of Statewide Importance as a result of the proposed development. b) No Impact. There are no Williamson Act contracts on the subject property or adjacent properties. The City's General Plan currently designates the proposed property as Low Density Residential, and the proposed project is consistent with this designation. c) No Impact. As mentioned earlier (II -a), the subject property is not located on agricultural land; therefore, the development will not involve any change in the existing environment to result in conversion of Farmland to non-agricultural use. No impact is expected. Mitigation Measures: None Monitoring: None TTM 36561 IS February 2016 Potentially Less Than Less Than No Significant Significant w/ Significant I mpact I mpact Mitigation I mpact III . AI RQUALITY: Would the project: a) Conflict with or obstruct implementation of the applicable air X quality plan? b) Violate any air quality standard or contribute substantially to an existing X or projected air quality violation? c) Result in a cumulatively considerable net increase of any criteria pollutant for which the project region is non - attainment under an applicable federal X or state ambient air quality standard (including releasing emissions which exceed quantitative thresholds for ozone precursors)? d) Expose sensitive receptors to X substantial pollutant concentrations? e) Create objectionable odors affecting X a substantial number of people? Source: La Quinta General Plan, SCAQMD CEQA Handbook; 2003 PM10 Plan for the Coachella Valley, SCAQMD 2012 Air Quality Management Plan; CalEEMod Version 2013.2.2; project materials. I11. a) No Impact. The Coachella Valley, including the project area, is located within the Salton Sea Air Basin (SSAB), which is under the jurisdiction of the South Coast Air Quality Management District (SCAQMD). SCAQMD is responsible for monitoring criteria air pollutant concentrations and establishing management policies for the SSAB. All development within the SSAB is subject to SCAQMD's 2012 Air Quality Management Plan (2012 AQMP) and the 2003 Coachella Valley PM10 State Implementation Plan (2003 CV PM10 SI P). The project will be developed in accordance with all applicable air quality management plans. The AQMP is based, in part, on the land use plans of the jurisdictions in the region. The site is designated Low Density Residential in the General Plan. The project is proposing a Zone Change (ZC) to allow for a low density residential use instead of a very low density use. Given its location adjacent to exiting neighborhoods and limited scope, the project will be consistent with the intent of the General Plan and AQMP. No impacts associated with compliance with applicable management plans are expected. b) Less than Significant Impact. Criteria air pollutants will be released during both the construction and operational phases of the proposed project. The California Emissions Estimator Model (CalEEMod) Version 2013.2.2 was used to project air quality emissions -t 2- TTM 36561 IS February 2016 that will be generated by the project. Table 1 summarizes short-term construction - related emissions, and Table 2 summarizes ongoing emissions generated at operation. Construction Emissions The construction period includes all aspects of project development, including site preparation, grading, hauling, paving, building construction, and application of architectural coatings. For analysis purposes, it is assumed that construction will occur over a 2-year period from mid 2016 to mid 2018. As shown in Table 1, emissions generated by construction activities will be reduced to less than significant levels with implementation of mitigation measures. The data reflect average daily emissions over the 2-year construction period, including summer and winter weather conditions. The analysis assumes there will be a balance of materials onsite. Applicable minimization measures and best management practices include, but are not limited to the implementation of dust control practices in conformance with SCOAMD %le 403; proper maintenance and limited idling of heavy equipment; phasing application of architectural coatings; and the use of low -polluting architectural paint and coatings. Adherence to such measures will ensure construction related emissionswould remain less than significant. The complete list of minimization measures is provided at the end of this Section. Table 1 TTM 36561 Maximum Daily Construction -Related Emissions Summary (pounds per day) Construction Emissions' CO NOx RW 19% PM,o PM2.5 2016 50.31 63.71 6.57 0.06 10.14 6.62 2017 24.46 24.32 54.48 0.04 2.46 1.88 2018 2.48 1.77 54.44 0 0.26 0.18 SCAQMD Thresholds 550.00 0 100.0 75.00 150.0 0 150.0 0 55.00 Exceeds? No No No No No No ' Average of winter and summer emissions, Source: CalEEMOd model, version 2013.2.2 mitigated, 2016-2018. output tables generated 01.25.16. Operational Emissions Operational emissions are ongoing emissions that will occur over the life of the project. They include area source emissions, emissions from energy demand (electric and natural gas), and mobile source (vehicle) emissions. Traffic generation trip rates were derived from the project specific Traffic Report. Table 2 provides a summary of projected emissions at operation of the proposed project. -13- TTM 36561 IS February 2016 Table 2 TTM 36561 Operation -Related Emissions Summary (pounds per day) CO NO, ROG S02 PM10 PM2.5 Operational Emissions' 18.13 3.92 8.29 0.03 1.81 0.58 150.0 150.0 100.0 75.00 SCAQMD Thresholds 550.00 55.00 0 0 0 Exceeds? No No No No No No Average of winter and summer emissions, unmitigated, 2018. Source: CalEEMod model, version 2013.2.2 output tables generated 01.25.16. As shown in Table 2, operational emissions will not exceed SCAQMD thresholds of significance for any criteria pollutants. The data are conservative and reflect unmitigated operations. c) Less than Significant Impact. Historically, the Coachella Valley, in which the project site is located, has been classified as a "non -attainment" area for PM10 and ozone. In order to achieve attainment in the region, the 2003 Coachella Valley PM10 Management Plan was adopted, which established strict standards for dust management for development proposals. The Salton Sea Air Basin (SSAB) is currently (January 2016) a non- attainment area for PM,o and is classified as attainment/unclassifiable for PM2.5. The proposed project will contribute to an incremental increase in regional ozone and PM10 emissions. However, given its limited size and scope, cumulative impacts are not expected to be considerable. Project construction and operation emissions will not exceed SCAQMD thresholds for PM10 or ozone precursors (NOx). The project will not conflict with any attainment plans and will result in less than significant impacts. d) Less than Significant Impact. The nearest sensitive receptors are single-family residences immediately south of proposed project. Their distance from the building pads ranges from approximately 50-55 meters. To determine if the proposed project has the potential to generate significant adverse localized air quality impacts, the mass rate Localized Significance Threshold (LST) Look - Up Table was used. The Oty of La Quinta and subject property are located within Source Receptor Area 30 (Coachella Valley). Given the project's size and proximity to existing housing, the 5-acre site tables at a distance of 50 meters were used. Table 3 shows on -site emission concentrations for project construction and the associated LST. As shown in the table below, LSTs will not be exceeded under unmitigated conditions for CO and NOx. PM10 and PM2.5 show emissions under best management practices and standard dust control measures (SCAQMD Rule 403). Therefore, air quality impacts to nearby sensitive receptors during construction will be less than significant. -14- TTM 36561 IS February 2016 Table 3 TTM 36561 Localized Significance Thresholds (lbstday) CO NOx PM10 PM2.5 Construction 77.41 89.80 12.86 8.67 LST Threshold 3,237 340 44 11 Exceed? No No No No Emission Source: CalEEMod model, version 2013.2.2 output tables generated 01.25.16 LSTThreshold Source: LSTMass Rate Look -up Table, SCAQMD. e) Less than Significant Impact. The proposed project is not expected to generate objectionable odors during any of the phases of construction or at project buildout. The proposed project has the potential to result in short term odors associated with paving and other construction activities. However any such odors would be quickly dispersed below detectable thresholds as distance from the construction site increases, and will be temporary and periodic. Therefore, impacts from objectionable odors are expected to be less than significant. Construction Period Minimization Measures: The following measures will further reduce emission of potentially harmful pollutants and should be included in project grading and dust control plans, as well as in construction and construction traffic staging: 1. Construction equipment, delivery trucks, worker vehicles, and haul trucks will limit idling time to no more than 5 minutes. 2. The grading contractor shall certify in writing that all construction equipment is properly serviced and maintained in good operating conditions. Certification shall be provided to City Engineer for review and approval. 3. Diesel -powered construction equipment shall utilize aqueous diesel fuels, and be equipped with diesel oxidation catalysts. 4. A fugitive dust plan shall be prepared for the proposed project and shall be approved by the City Engineer. Said plan shall include but not be limited to the following best management practices: 5. Chemically treat soil where activity will cease for at least four consecutive days; 6. All construction grading operations and earth moving operations shall cease when winds exceed 25 miles per hour; 7. Water site and equipment morning and evening and during all earth -moving operations; 8. Operate street -sweepers on paved roads adjacent to site; -15- TTM 36561 IS February 2016 9. Establish and strictly enforce limits of grading for each phase of development; and/or 10. Stabilize and re -vegetate areas of temporary disturbance needed to accomplish each phase of development. 11. Wash off trucks as they leave the project site as necessary to control fugitive dust emissions. 12. Cover all transported loads of soils, wet materials prior to transport, provide adequate freeboard (space from the top of the material to the top of the truck) to reduce PM10 and deposition of particulate matter during transportation. 13. Use track -out reduction measures such as gravel pads at project access points to minimize dust and mud deposits on roads affected by construction traffic. 14. Construction equipment and materials shall be sited as far away from residential and park uses as practicable. 15. The following Best Control Measures (BCM) shall be utilized by the contractor, as required, to limit impacts to air quality: 1. BCM-1: Further Control of Emissions from Construction Activities: Watering, chemical stabilization, wind fencing, revegetation, and track -out control. 2. BCM-2: Disturbed Vacant Lands: Chemical stabilization, wind fencing, access restriction, and revegetation. 3. BCM-3: Unpaved Roads and Unpaved Parking Lots: Paving, chemical stabilization, access restriction, and revegetation. 4. BCM-4: Paved Road Dust: Minimal track -out, stabilization of unpaved road shoulders, and clean streets maintenance. 16. Existing power sources should be utilized where feasible via temporary power poles to avoid on -site power generation. 17. Each portion of the project to be graded shall be pre -watered prior to the onset of excavation, grading or other dust -generating activities. 18. On -going watering soil stabilization of disturbed soils, especially in the staging area, shall be employed on an on -going basis after the initiation of any grading activity on the site. Portions of the site that are actively being graded shall be watered regularly to ensure that a crust is formed on the ground surface, and shall be watered at the end of each workday. -t 6- TT1\4 36561 IS February 2016 I OLOGI CAL RESOURCES-- Would the Potentially Significant Less Than Significant w/ Less Than Significant No project: I mpact Mitigation I mpact Impact a) Have a substantial adverse effect, either directly or through habitat modifications, on any species identified as a candidate, sensitive, or special X status species in local or regional plans, policies, or regulations, or by the California Department of Fish and Wildlife or U.S. Fish and Wildlife Service? b) Have a substantial adverse effect on any riparian habitat or other sensitive natural community identified in local or X regional plans, policies, regulations or by the California Department of Fish and Game or US Fish and Wildlife Service? c) Have a substantial adverse effect on federally protected wetlands as defined by Section 404 of the Clean Water Act (including, but not limited to, marsh, X vernal pool, coastal, etc.) through direct removal, filling, hydrological interruption, or other means? d) Interfere substantially with the movement of any native resident or migratory fish or wildlife species or with X established native resident or migratory wildlife corridors, or impede the use of native wildlife nursery sites? e) Conflict with any local policies or ordinances protecting biological X resources, such as a tree preservation policy or ordinance? f) Conflict with the provisions of an adopted Habitat Conservation Plan, Natural Community Conservation Plan, or X other approved local, regional, or state habitat conservation plan? Source: 2035 General Plan, Coachella Valley MSHCP, project materials. IV. a) Less Than Significant Impact. The project area has been previously graded. As a result, the ground surface is heavily disturbed and there is only sparse vegetation along the perimeter that is composed of saltbush, which is not considered a sensitive natural community. Given the presence of saltbush the site is not considered viable for the burrowing owl. -17- TT1\4 36561 IS February 2016 Even though there are no sensitive biological species on -site, the potential exist for them to occur given the proposed site's habitat, soils, topography, and location. Development of the proposed project will result in the permanent loss of potential habitat on the valley floor. The subject site is located within the Coachella Valley Multiple Species Habitat Conservation Plan area, and payment of the required per - dwelling impact fee will serve as mitigation for any potential impact to sensitive species. b-c) No Impact. There are no riparian habitats or wetlands located on the site; therefore, no impact is expected on riparian species or habitat, wetlands or other sensitive natural communities, including marshes or vernal pools, or through direct removal, filling, or hydrological interruption of a natural drainage. d) No Impact. The subject site is located approximately 2 miles east of the Santa Fbsa and San Jacinto Mountains Conservation Area, which is a wildlife corridor for species such as the Peninsular Bighorn Sheep and the Desert Tortoise. Even so, the subject property does not serve as a wildlife movement corridor for any native resident or migratory fish or wildlife species, or as a native wildlife nursery site. As previously mentioned, the ground surface is disturbed due to grading. The site is also bounded by agricultural land to the east, and development to the south, west, and north. The proposed site is not expected to impact wildlife corridors or nursery sites. e,f) Less than Significant I mpact. The City of La Quinta has adopted the Coachella Valley Multiple Species Habitat Conservation Ran (CVMSHCP). As a result, the City is required to implement a Local Development Mitigation Fee (LDMF) for projects located within the CVMSHCP plan area. Although the proposed project site is not within a designated conservation area, as defined in the Ran, it is located with the general Ran boundaries, and the developer will be required to pay the LDMF. These fees are designed to offset potential impacts of cumulative projects on covered biological species, and assure that impacts are reduced throughout the Valley and City to less than significant levels. Mitigation: None Monitoring: None. -18- TTM 36561 IS February 2016 Potentially Less Than Less Than No Significant Significant w/ Significant I mpact I mpact Mitigation I mpact V. CULTURAL RESOURCES-- Would the project: a) Cause a substantial adverse change in the significance of a historical resource as X defined in'15064.5? b) Cause a substantial adverse change in the significance of an archaeological X resource pursuant to'15064.5? c) Directly or indirectly destroy a unique paleontological resource or site or unique X geologic feature? d) Disturb any human remains, including those interred outside of formal X cemeteries? Source: 2035 General Ran, County of Rverside General Plan (2014), "Update to the Historical/Archaeological and Paleontological Resources Assessment Studies For the Saddle Club Project; Tentative Tract Map No. 36561, project materials. V. a-c) No Impact. In 2006, a historical/archaeological and paleontological survey was conducted by CRM TECH to identify any potentially significant resources on the subject property (previously Assessor's Parcel Numbers 767-320-007 and -014). The cultural study was composed of a historical/archaeological resources records search, historical background research, contacting Native American representatives, and an intensive - level field survey of the property. No cultural resources were found during the study. The proposed project area is located within an area that the City classifies as having a high paleontological significance, underlain by ancient Lake Cahuilla (General Ran Exhibit 111-5). Concurrently, CRM TECH conducted a paleontological assessment of the subject property. The study included records searches, literature research, and the field inspection of the project area. The property has a relatively high potential for paleontological resources, specifically for Holocene -age invertebrate fossils associated with Ancient Lake Cahuilla. For this reason, paleontological monitoring during any earthmoving activities was recommended. Construction on the project area began in 2009, at which time CRM TECH carried out both archaeological and paleontological monitoring. A majority of the project area was graded and trenched during earthmoving activities. No archeological remains were encountered during monitoring activities. Similarly, no dense concentration of shells or any paleontological remains were found while monitoring. Consequently, the proposed project will not result in any adverse effect to historical, archaeological, or paleontological resources. d) No Impact. The proposed development would be subject to State law regarding the discovery and disturbance of human remains. It is unlikely that human remains will be encountered because the site has been previously graded. Even so, in the event that any previously unidentified or unanticipated human remains are discovered during project construction, State law requires all work to cease and that local law -19- TTM 36561 IS February 2016 enforcement be contacted. The human remains should be removed in a prescribed manner. Therefore, the proposed project will have no impact on human remains. Mitigation: None. Monitoring: None. -20- TTM 36561 IS February 2016 Potentially Less Than Less Than No Significant Significant w/ Significant I mpact I mpact Mitigation I mpact VI . GEOLOGYAND SOI LS-- Would the project: a) Expose people or structures to potential substantial adverse effects, including the risk of loss, injury, or death involving: i) Rupture of a known earthquake fault, as delineated on the most recent Alquist-Priolo Earthquake Fault Zoning X Map issued by the State Geologist for the area or based on other substantial evidence of a known fault? ii) Strong seismic ground shaking? X iii) Seismic -related ground failure, X including liquefaction? iv) Landslides? X b) Result in substantial soil erosion or X the loss of topsoil? c) Be located on expansive soil, as defined in Table 18-1-Bof the Uniform X Building Code (1994), creating substantial risks to life or property? d) Have soils incapable of adequately supporting the use of septic tanks or alternative waste water disposal X systems where sewers are not available for the disposal of wastewater? Sources: 2035 General Plan; "Geotechnical Update - TTM 36561", prepared by Sladden Engineering, April 7, 2014; project materials. VI . a) i. No Impact. The proposed project site is not located within an Alquist-Priolo Earthquake Fault Zone (General Ran Exhibit IV-2); the nearest fault is the San Andreas Fault, located 4 miles north of the City. There will be no impacts associated with fault rupture on the project site. ii. Less than Significant. The project area is situated in a seismically active area based on the proximity of three regionally significant faults: the San -Jacinto -Coyote Creek segment, Burnt Mountain and San Andreas. The San Andreas Fault has the potential to generate a moment magnitude 7.4 earthquake. The project site would experience strong ground shaking during such an earthquake. All construction on the site will be required to adhere to the standards and requirements of the uniform Building Code for -21- TT1Vl 36561 IS February 2016 Seismic Zone 4, thus reducing the impacts related to strong ground shaking to less than significant levels. iii. Less than Significant. Exhibit IV-3 of the La Quinta 2035 General Ran designates the proposed site as an area of high liquefaction susceptibility. The project area is characterized by fine-grained granular sediments that are normally susceptible to liquefaction and has historically shallow groundwater within 30 feet of ground surface. This development will be required to adhere to the City's Development Code and the Uniform Building Code Standards at the time of construction. These project -specific analyses will further reduce impacts associated with seismically induced liquefaction to less than significant levels. iv. No Impact. The proposed project is located in a relatively flat area, mildly sloping to the southeast. The closest landforms susceptible to landslides, the Santa Rosa Mountains, are located approximately 2 miles west of the proposed project area. It is unlikely that a landslide will cause an adverse effect to the proposed project. Surface drainage is in a general direction of north to south to the low point in the southeast corner. No impacts are anticipated. b) Less than Significant. According to the City's General Plan, Exhibit IV-5, the site is located in an area that is identified as a High Wind Erosion Hazard zone. The project area is susceptible to high winds that can case wind erosion, soil displacement, and accumulation. The project proponent is required to submit a dust control and management plan as part of the permitting process (See Air Quality discussion). During grading operations the project has the potential to produce airborne and waterborne erosion. Implementation of dust control management practices and Oty requirements for surface water management will reduce impacts associated with soil erosion and loss of topsoil to less than significant levels. c) Less than Significant. The project area contains alluvial sand and gravel with fine- grained lakebed deposits. The project area is situated on lands composed of alluvial sand and clay soils as shown in Exhibit IV-4 of the General Ran. These soil types are expansive. For this reason, the following minimization measures will greatly reduce the impacts associated with lateral spreading, subsidence, liquefaction or collapse to less than significant levels. d) No Impact. The proposed project occurs in an urbanized area of the Gty. The proposed project will be required to connect to sanitary sewer lines in the area, and no septic systems will be permitted. The sewer connections are along Monroe Street. No impact is expected. Mitigation: None required. Geotechnical Minimization Measures: 1. The building areas should be over -excavated to a depth of at least 3 feet below existing grade or 3 feet below the bottom of the footings whichever is deeper. The soil during over -excavation should then be scarified to a depth of 1-foot, moisture conditioned and re -compacted to at least 90 percent relative compaction. The excavated material may then be replaced as engineered fill -22- TT1\4 36561 IS February 2016 material. The engineered fill material should be spread in thin lifts and compacted at near optimum moisture content to a minimum of 90 percent relative compaction. Imported fill material shall have an Expansion Index not exceeding 20. 2. Footings should extend at least 12 inches beneath lowest adjacent grade. Isolated square or rectangular footings should be at least two feet square and continuous footings should be at least 12 inches wide. Continuous footings may be designed using an allowable bearing value of 1500 pounds per square foot (psf) and isolated pad footings may be designed using an allowable bearing pressure of 1800 psf. Allowable increases of 250 psf for each additional 1 foot of width and 250 psf for each additional 6 inches of depth may be utilized if desired. The maximum allowable bearing pressure should be 2500 psf. The allowable bearing pressures are applicable to dead and frequently applied live loads. The allowable bearing pressures may be increased by 1/3 to resist wind and seismic loading. Care should be taken to see that bearing and/or subgrade soil is not allowed to become saturated from the ponding of rainwater or irrigation. Drainage from the building areas should be rapid and complete. 3. Resistance to lateral loads can be provided by a combination of friction acting at the base of the slabs or foundations and passive earth pressure along the sides of the foundations. A coefficient of friction of 0.40 between soil and concrete may be used with consideration to dead load forces only. A passive earth pressure of 250 pounds per square foot, per foot of depth, may be used for the sides of footings that are placed against properly compacted native or approved nonexpansive import soil. Passive earth pressure should be ignored within the upper 1 foot exceptwhere confined (such as beneath a floor slab) The bearing soil is generally non -expansive and falls within the "very low" expansion category in accordance with the 2013 (CBC) classification criteria. Monitoring: None required. -23- TTM 36561 IS February 2016 Potentially Less Than Less Than No VII. GREENHOUSE GAS EMISSIONS-- Significant Significant Significant Impact Would the project: I mpact w/ I mpact Mitigation a) Generate greenhouse gas emissions, either directly or indirectly, that may X have a significant impact on the environment? b) Conflict with an applicable plan, policy or regulation adopted for the X purpose of reducing the emissions of greenhouse gases? Source: CalEEMod Version 2013.2.2, project materials. VII. a,b) Less than Significant. The proposed project will generate greenhouse gas (GHG) emissions during both construction and operation. As mentioned in Section I II (Air Quality), CaIEEMod was used to quantify air quality emission projections, including greenhouse gas emissions. Construction related greenhouse gas emissions will be temporary and will end once the project is completed. Operation of the proposed project will create on -going greenhouse gases through the consumption of electricity and natural gas, moving sources, the transport and pumping of water for onsite use, and the disposal of solid waste. Table 4 provides projected short-term and annual GHG generation for the proposed project Table 4 TTM 36561 GHG Emissions from Construction and Operation (Metric Tons/Year) CO2 CH4 N2O CO2e Construction Activities 670.50 0.15 0.00 673.57 Operational Activities 606.23 0.65 0.00 621.16 CalEEMod model, version 2013.2.2 output tables generated 01.13.15. Values shown represent the total annual, unmitigated GHG emission projections for construction and operation of the proposed project, 2018. State legislation, including AB32, aims for the reduction of greenhouse gases to 1990 levels by 2020; however, there are currently no thresholds for greenhouse gases associated with commercial developments in the SCAQMD. It is recognized that GHG impacts are intrinsically cumulative. As such, project construction and operation will be conducted in a manner that is consistent with applicable rules and regulation pertaining to the release and generation of GHG's. Statewide programs and standards will further reduce GHG emissions generated by the project, including new fuel - efficient standards for cars, and newly adopted Building Code Title 24 standards. The proposed project will have a less than significant impact on the environment from the emission of GHG's and will not conflict with any applicable GHG plans, policies or regulations. Mitigation: None required. Monitoring: None required. -24- TTM 36561 IS February 2016 Potentially Less Than Less Than No Significant Significant w/ Significant I mpact I mpact Mitigation I mpact VI 11. HAZARDS AND HAZARDOUS MATERIALS --Would the project: a) Create a significant hazard to the public or the environment through the X routine transport, use, or disposal of hazardous materials? b) Create a significant hazard to the public or the environment through reasonably foreseeable upset and X accident conditions involving the release of hazardous materials into the environment? c) Emit hazardous emissions or handle hazardous or acutely hazardous materials, substances, or waste within X one -quarter mile of an existing or proposed school? d) Be located on a site which is included on a list of hazardous materials sites compiled pursuant to Government Code X Section 65962.5 and, as a result, would it create a significant hazard to the public or the environment? e) For a project located within an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would X the project result in a safety hazard for people residing or working in the project area? f) For a project within the vicinity of a private airstrip, would the project result X in a safety hazard for people residing or working in the project area? g) Impair implementation of or physically interfere with an adopted X emergency response plan or emergency evacuation plan? h) Expose people or structures to a significant risk of loss, injury or death involving wildland fires, including where X wildlands are adjacent to urbanized areas or where residences are intermixed with wildlands? Source: 2035 General Plan, CA Department of Toxic Substances, project materials. -25- TT1\4 36561 IS February 2016 VI I. a-b) Less than Significant I mpact. The proposed project will be required to comply with all local, regional and State laws. This residential development will not create a significant hazard to the public related to the transportation of hazardous materials. Small amounts of chemicals for household cleaning may be transported or stored by homeowners; however, they will be minimal and cause similar risks as those associated with existing residential uses in the area. Limited quantities of chemicals may also be transported to and stored onsite for the routine maintenance of swimming pools and turfed areas. c) Less than Significant Impact. The nearest schools to the proposed project are Coachella Valley High School, approximately 2 miles southeast, and Harry S Truman Dementary School and La Quinta Middle School, approximately 3.5 miles to the northeast. The project site is situated approximately 4 miles south of Highway 111, and 5 miles west of Interstate 10 and the Union Pacific Railroad, on which hazardous materials may be transported through the region. The proposed project, therefore, will have a less than significant effect on the transporting of hazardous materials or release of hazardous waste into the environment or near a school. d) No Impact. The project site is not located on or near a hazardous materials site as identified by the California Department of Toxic Substances Control. It will not create a significant hazard to the public or environment. e-f) No Impact. The project site is located approximately 4 miles north of the Jacqueline Cochran Regional Airport. The project site is not susceptible to hazards associated with aviation. g) No Impact. The proposed project will not physically interfere with local or regional roadway networks, or interfere with implementation of an emergency response or evacuation plan. The proposed project will have access to the City's existing street grid for emergency purposes, through Monroe Street. No impacts are expected. h) No Impact. The project site is located on the valley floor, and is in a highly urbanized area. There will be no impacts associated with wildland fires. Mitigation: None. Monitoring: None. -26- TTM 36561 IS February 2016 Potentially Less Than Less Than No Significant Significant w/ Significant I mpact I mpact Mitigation I mpact IX. HYDROLOGY AND WATER QUALITY -- Would the project: a) Violate any water quality standards or X waste discharge requirements? b) Substantially deplete groundwater supplies or interfere substantially with groundwater recharge such that there would be a net deficit in aquifer volume or a lowering of the local groundwater table X level (e.g., the production rate of pre- existing nearby wells would drop to a level which would not support existing land uses or planned uses for which permits have been granted)? c) Substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a X stream or river, in a manner which would result in substantial erosion or siltation on- or off -site? d) Substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river, or substantially increase X the rate or amount of surface runoff in a manner which would result in flooding on - or off -site? e) Create or contribute runoff water which would exceed the capacity of existing or planned stormwater drainage systems or X provide substantial additional sources of polluted runoff? f) Place housing within a 100-year flood hazard area as mapped on a federal Rood Hazard Boundary or Rood Insurance Rate X Map or other flood hazard delineation map? g) Place within a 100-year flood hazard area structures which would impede or X redirect flood flows? Source: 2035 General Plan; FEMA Rood Insurance Rate Map Panel #2233G; project materials; Hydrology Study for TTM 36561 prepared by PBLA Engineering, Inc., 2015; Preliminary Water Quality Management Plan for TTM 36561 prepared by PBLA Engineering, Inc., 2015. -27- TTM 36561 IS February 2016 IX. a) No Impact. The proposed site is relatively flat, mildly sloping to the southeast. The proposed project will not violate any water quality standards or waste discharge requirements. The National Pollutant Discharge Elimination System (NPDES) requirements will be implemented for storm flows, insofar as the City will require that the applicant prepare and implement a Stormwater Pollution Prevention Plan (SWPPP) and a Water Quality Management Plan (WQMP). The project proponent has provided a Preliminary Water Quality Management Plan to the City. The proposed development will be connected to existing sewer lines on Monroe Street. The wastewater produced by the proposed project will be transported to and processed at the Coachella Valley Water District's (CVWD) Mid -Valley Water Reclamation Plant (WFIP-4) in Thermal. These measures will prevent any violations to water quality or waste discharge requirements. Hence, no impacts are anticipated as a result of the proposed development. b) Less than Significant. Coachella Valley Water District (CVWD) will supply domestic water to the proposed project. CVWD has prepared an Urban Water Management Plan 2010 Update, which is a long-term document that facilitates the planning for current and future water demands. The UWMP demonstrates that the District has available, and can supply, sufficient water to serve the proposed project. In the short term, water will be required during site grading. At buildout, water users will be required to comply with CVWD's and the City's water -efficiency requirements, including the use of drought -tolerant planting materials and limited landscaping irrigation. Execution of these and other applicable requirements will assure that ground water supplies and recharge impacts are reduced to less than significant levels. c-f) Lessthan Significant. The subject property does not contain any streams or rivers, and storm water issues associated with this development will be limited to local drainage. A hydrology study was prepared for the proposed project. The main focus of the hydrology study was to analyze the capability of the retention basin to accept and dissipate a 100-year storm event. Storm water runoff from a 100-year, 24-hour storm will be contained within an on -site retention basin totaling 17,757 square feet. The site will drain overland and through storm drain systems to a retention basin at the easterly area of the project. This basin will serve to mitigate any increase in post - development runoff. These areas are depicted on the project's Hydrology Map. The City will require that the hydrology for the project comply with its standard requirements, thus reducing impacts to less than significant levels. g-i) Less than Significant. The subject property is designated Zone X on FEMA's Flood Insurance Rate Maps, which is defined as an area of moderate to low risk of flood hazard. The proposed project will not place housing within the boundaries of the 100- year flood hazard area nor will it expose people or structures to a significant risk of loss, injury, or death involving flooding. j) No Impact. A seiche is the oscillation of water in an enclosed body of water (for example a lake). The proposed project area is not located near an enclosed body of water. For this reason, no impact would occur. It is not likely that La Quinta will be affected by a tsunami because the City is located approximately 60 miles from the pacific coast. No impact would occur. Mudflow would be associated with a reservoir, which could break resulting in flooding or mudflow to downstream properties. No -28- TTM 36561 IS February 2016 reservoirs are located in the vicinity of the proposed project. For this reason, no impact would occur. Mitigation: None required. Monitoring: None required. -29- TTM 36561 IS February 2016 Potentially Less Than Less Than No Significant Significant w/ Significant I mpact I mpact Mitigation I mpact X. LAND USE AND PLANNI NG- Would the project: a) Physically divide an established X community? b) Conflict with any applicable land use plan, policy, or regulation of an agency with jurisdiction over the project (including, but not limited to the X general plan, specific plan, local coastal program, or zoning ordinance) adopted for the purpose of avoiding or mitigating an environmental effect? c) Conflict with any applicable habitat conservation plan or natural community X conservation plan? Sources: 2035 General Ran, 2003 CVMSHCP Figure 4-1: Conservation Areas; project materials. X. a) No Impact. The subject property is located in a semi -rural part of La Quinta between planned resort -style residential development and low-density/agricultural land uses. The proposed project will not divide an established community for the reason that the project site is current vacant. No impact is expected. b) Less Than Significant Impact. The General Ran designates the subject site as Low Density Residential. The proposed project complies with the General Ran's standards. However, the subject site is designated as Very Low Density Residential with an Equestrian Overlay in the City's Zoning Ordinance. The properties west and south of the proposed site are zoned as Low Density Residential. The residential development immediately south of the subject site is composed of single-family residences with a density that is somewhat less but comparable to the proposed project. West of the proposed site is a development that is slated for single-family residential structures. The proposed project would be similar to the approved, surrounding developments. Even though the proposed development's density is compatible to the surrounding properties, this is a higher density than a RVL zone allows. For this reason, the project proponent has filed a Change of Zone application to have the project area rezoned as Low Density Residential. The change is compatible with surrounding development and land use designations. c) No I mpact. The project site is not located within any conservation areas as identified in the CVMSHCP (See IV e-f). However, the property is within the general boundaries of the Ran, and therefore, the project proponent will be required to pay the Local Development Mitigation Fee (LDMF). These fees are applied to new developments to mitigate the impacts on sensitive resources. Therefore, the proposed project will not impact the existing C1/MSHCP. -30- Mitigation: None required. Monitoring: None required. TTM 36561 IS February 2016 -31- TTM 36561 IS February 2016 Potentially Less Than Less Than No Significant Significant w/ Significant I mpact I mpact Mitigation I mpact XI . MI NEPAL RESOURCES-- Would the project: a) Result in the loss of availability of a known mineral resource that would be X of value to the region and the residents of the state? b) Result in the loss of availability of a locally -important mineral resource recovery site delineated on a local X general plan, specific plan or other land use plan? Sources: 2035 General Plan, project materials. XI.a,b) No Impact. Mineral resources in the City consist primarily of sand and gravel. The proposed project site is located in Mineral Resource Zone MRZ-1, which indicates that no resources occur (Exhibit III-1, 2035 General Plan). There will be no impact to mineral resources as a result of the proposed project. Mitigation: None required Monitoring: None required -32- TTM 36561 IS February 2016 Potentially Less Than Less Than No Significant Significant w/ Significant I mpact I mpact Mitigation I mpact XII. NOISE - Would the project result in: a) Exposure of persons to or generation of noise levels in excess of standards established in the local general plan or X noise ordinance, or applicable standards of other agencies? b) Exposure of persons to or generation of excessive groundborne vibration or X groundborne noise levels? c) A substantial permanent increase in ambient noise levels in the project X vicinity above levels existing without the project? d) A substantial temporary or periodic increase in ambient noise levels in the X project vicinity above levels existing without the project? e) For a project located within an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, X would the project expose people residing or working in the project area to excessive noise levels? f) For a project within the vicinity of a private airstrip, would the project X expose people residing or working in the project area to excessive noise levels? Source: 2035 General Plan Noise Dement, "TTM 36561 -- Preliminary Noise Review" prepared by Kunzman Associates, I nc., September 2015, project materials. XI1. a) Less than Significant. The City of La Quinta Noise Element of the General Plan provides guidelines for community noise impacts per land use designation. Presently, the City's Municipal Code noise standards for residential land uses allow noise levels of 60 dBA from 7am to 10pm, and 50 dBA from 10pm to 7am. The primary source of noise in the Oty and project area stems from traffic. Monroe Street will be the primary source of off -site exterior noise impacting the project area. Tables IV-1 and IV-2 of the Noise Element provide noise analysis of various locations throughout the City. The average daily noise levels generated from traffic at Monroe Street is 64 dBA. This does not reflect the noise reduction from the existing perimeter wall. -33- TT1\4 36561 IS February 2016 The proposed project is located in proximity to residential land uses immediately south of the subject site. City standards list residential land uses as "noise sensitive," thereby restricting allowable noise levels within the planning area. The CSty requires that exterior noise levels not exceed 65 dBA CNEL in outdoor living areas, and interior noise levels not to exceed 45 dBA CNEL in all habitable rooms. Noise will be generated by project operation and related traffic along Monroe Street at levels consistent with existing surrounding development. As such, noise impacts to surrounding residential land uses will be less than significant. b) Less than Significant. The source of groundborne vibration or groundborne noise for the proposed project is temporary and related to construction activities. Even so, construction activities will be located over 60 feet from the nearest home. This distance will reduce the potential for vibration effects. Once the construction phase ends, there will be no groundborne vibration or groundbrone noise. Impacts are therefore expected to be less than significant. c-d) Less than Significant. Surrounding land uses in proximity to the proposed project include low density residential to the south, currently vacant lands to the west and north, and agricultural lands to the east. The proposed project is consistent with lands immediately south of the subject site and will generate comparable noise levels. However, certain noise reduction measures are recommended to reduce the temporary noise levels during the construction period, and are provided below. These measures are set in place to protect the well being of the sensitive receptors, in this case a residential community from potential disturbances that are associated with noise. Noise -related impacts are anticipated to be less than significant. e,f) No Impact. The project site is located approximately 4 miles to the north of the Jacqueline Cochran Regional Airport. Although an occasional overflight is unlikely, the approach patterns do not occur in the vicinity of the proposed project. There are no private airstrips in the region. Therefore, there will be no impact associated with airport noise. Minimization measures: 1. Use of Mufflers: During the site excavation and grading, construction contractors shall equip all construction equipment, fixed or mobile, with properly operating and maintained mufflers, consistent with manufacturer standards. 2. De -direction of the noise: The contractor shall place all stationary construction equipment in such a direction that emitted noise is directed away from the noise sensitive receptors nearest the project site. 3. Proper shutdown of equipment when not in use: Equipment shall be properly shut off and not left to idle when not in use. 4. Choice of distant equipment staging areas. The contractor shall locate equipment staging in areas that will create the greatest distance between construction -related noise/vibration sources and sensitive receptors nearest the project site during all project construction. -34- 5. Avoid sensitive receptors contact: All jackhammers and pneumatic equipment away from sensitive receptors. Monitoring: None required TTM 36561 IS February 2016 portable stationary noise sources including shall be shielded and noise shall be directed -35- TTM 36561 IS February 2016 Potentially Less Than Less Than No Significant Significant w/ Significant I mpact I mpact Mitigation I mpact XI 11. POPULATI ON AND HOUSI NG- Would the project: a) Induce substantial population growth in an area, either directly (for example, by proposing new homes and X businesses) or indirectly (for example, through extension of roads or other infrastructure)? b) Displace substantial numbers of existing housing, necessitating the X construction of replacement housing elsewhere? c) Displace substantial numbers of people, necessitating the construction X of replacement housing elsewhere? Source: 2035 General Plan Housing Dement, "Report E-5: Population and Housing Estimates for Cities, Counties, and the State, January 1, 2011-2014, with 2010 Benchmark," CA Dept. of Finance, Demographic Research Unit, January, 2016, project materials. XII I. a) No Impact. The proposed development will result in 36 detached single-family residential units. According to the California Department of Finance, the 2015 household size in La Quinta is 2.60 persons per household. Based on this factor, the project has the potential to add approximately 91 persons to the City's population. Even though the project will induce population growth, it is consistent with the gradual growth occurring over time in the Oty. I mpacts to population are anticipated to be less than significant. b-c) Less Than Significant Impact. The proposed site is mostly vacant with one single- family home slated for demolition. The resulting displacement of potential residents will be less than then significant. The proposed development is a residential project and will be adding 36 single-family dwelling units to the City's housing stock. There will be a less than significant impact to housing. Mitigation: None required Monitoring: None required -36- TTM 36561 IS February 2016 Potentially Less Than Less Than No Significant Significant w/ Significant I mpact I mpact Mitigation I mpact XI V. PUBLI C SERVI CES a) Would the project result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times or other performance objectives for any of the public services: Fire protection? X Police protection? X Schools? X Parks? X Other public facilities? X Source: 2035 General Plan, "Report E-5: Population and Housing Estimates for Cities, Counties, and the State, January 1, 2011-2014, with 2010 Benchmark," CA Dept. of Finance, Demographic Research Unit, January, 2016, Google Earth accessed January 2016, project materials. XI V. a) Fire Protection- Less than Significant Impact The City of La Quinta contracts with the County of Rverside Fire Department (RCFD) for fire protection services. The nearest fire stations to the project area include: Station No. 32 78111 Avenue 52 Station No. 70 54001 Madison Street Station No. 93 44555 Adams Street The nearest exiting fire station (Station #70) that would respond first to an incident is located approximately 1 mile northwest of the project site at 54001 Madison Street. The other two fire stations are located at 78111 Avenue 52 (#32) and 44555 Adams Street (#93). All County -operated stations feature a minimum of one trained paramedic as part of their three -person engine company per RCFD policy. The Fire -37- TTM 36561 IS February 2016 Department operates four additional stations in surrounding communities that are available for emergency response. The Department's first -in -response times range from two to six minutes, and it has an Insurance Services Office (ISO) public protection class rating of four (on a scale of 1 through 10, with 10 being the highest) based on the provision of staffing, communication, water system for suppression, building standards, and other criteria. As explained in the Population discussion, the addition of an estimated 91 persons will not create a significant impact on fire protection services. As a result a less than significant impact is expected. Police Protection- Less than Significant Impact The City of La Quinta contracts with the Rverside County Sheriffs Department for the provision of police protection services. This project can increase the demand for police protection but will not require the construction of new police facilities. Project plans will be reviewed by the Sheriffs Department, and development will occur in accordance with Oty standards to assure adequate police protection is provided. No significant project -related impacts are anticipated. Schools- Less Than Significant I mpact The proposed project will result in residential development that could potentially increase the school -age population. Even so, based on the California Department of Finance, the 2015 household size in La Quinta is 2.60 persons per household, the proposed project is slated for 36 dwelling units and results in an addition of 91 persons. The proposed project is located within the Coachella Valley Unified School District and will be required to pay the State mandated developer fee to help address and offset the potential impacts to local schools. Fees will be collected prior to the issuance of building permits. A less than significant impact will occur once the fees are paid. Parks - Less Than Significant I mpact. The project is not expected to substantially increase the use of existing neighborhood and regional parks or other recreational facilities. In fact, the project proposes the a dog run/picnic area to be used by the proposed project's residents, further alleviating the impact to parks to a less than significant level. Even so, the City imposes the Quimby Act, which allows local governments to exact parkland or in -lieu fees, or both. For these reasons, the proposed project will create a less than significant effect to the City's park facilities. Mitigation: None required Monitoring: None required -38- TTM 36561 IS February 2016 Potentially Less Than Less Than No Significant Significant w/ Significant I mpact I mpact Mitigation I mpact XV. RECTZEATI ON -- a) Would the project increase the use of existing neighborhood and regional parks or other recreational facilities X such that substantial physical deterioration of the facility would occur or be accelerated? b) Does the project include recreational facilities or require the construction or expansion of recreational facilities X which might have an adverse physical effect on the environment? Sources: 2035 General Ran, project materials. XV. a-b) No Impact. Residents of La Quinta currently have access to 72 acres of parks, 147 acres of nature preserves containing recreational parkland areas, 845 acres of regional parks, a 525-acre municipal golf course, and numerous other private and public recreational facilities. The City sets a requirement for providing a minimum of 5 acres per 1,000 residents. When this standard is applied to the estimated General Ran buildout population, a total of 403 acres of neighborhood and community parks will be required to adequately serve the City and its sphere of influence. The proposed development consists of 36 detached single-family residential units, which may increase the City's population by 91 persons. The proposed project offers a dog run/picnic area, private yard for each dwelling unit, and an open space component that will serve as both passive recreational space and a retention basin. In addition, the proposed project will participate in the City's parkland in -lieu program to offset impacts associated with parks generated by the 91 new residents of the project. Impacts are anticipated to be less than significant. Mitigation: None required Monitoring: None required -39- TT1\4 36561 IS February 2016 Potentially Less Than Less Than No Significant Significant w/ Significant I mpact I mpact Mitigation I mpact XVI . TRANSPORTATI ON/TRAFFI C -- Would the project: a) Cause an increase in traffic which is substantial in relation to the existing traffic load and capacity of the street system (i.e., result in a substantial X increase in either the number of vehicle trips, the volume to capacity ratio on roads, or congestion at intersections)? b) Exceed, either individually or cumulatively, a level of service standard established by the county congestion X management agency for designated roads or highways? c) Result in a change in air traffic patterns, including either an increase in X traffic levels or a change in location that results in substantial safety risks? d) Substantially increase hazards due to a design feature (e.g., sharp curves or dangerous intersections) or X incompatible uses (e.g., farm equipment)? e) Result in inadequate emergency X access? f) Result in inadequate parking X capacity? g) Conflict with adopted policies, plans, or programs supporting alternative transportation (e.g., bus turnouts, X bicycle racks)? Source: 2035 General Plan, " TTM 36561 - Focused Traffic Analysis" prepared by Kunzman Associates, Inc. October 16, 2015. Engineering Bulletin No. 06-13. Project materials. XVI . a-b) Less than Significant Impact. Kunzman Associates, Inc. prepared a Traffic Impact Report in October 2015 for the proposed project. According to the Traffic Impact Analysis and pursuant to Engineering Bulletin No. 06-13 (EB #06-13), a traffic impact study must be prepared for all new development projects that meet certain criteria established in the Bulletin. The City has established Level of Service D as the minimum Level of Service for its intersections. Total daily trips generate by the proposed project will be 333. Total AM peak trips will be 27 and total PM peak trips will be 35. Currently, Monroe Street operates a LOS B and will continue to provide this level once the proposed project is completed. According to the traffic impact report, the proposed -40- TTM 36561 IS February 2016 project access at Monroe Street is expected to operate within acceptable Levels of Service within the peak hours. In addition, it is anticipated that the proposed project will produce no significant traffic impacts at the intersection of the proposed project access and Monroe Street. Therefore, impacts related to roadway capacity and level of service are considered less than significant. c) No Impact. The nearest airport, Jacqueline Cochran Regional Airport, is located approximately 4 miles southeast of the proposed site. Although there is potential for an occasional fly over, the proposed project will not impact air traffic patterns. d) Less than Significant Impact. The proposed project is required to meet the City's Development Code standards for roadway, parking and intersection designs, and is not expected to significantly impact traffic safety. Impacts will be less than significant. e) Less than Significant Impact. Access to the proposed project is via a major arterial on Monroe Street and a gated emergency vehicle only access through the adjacent community at the western project boundary. Design guidelines further ensure that emergency access will be created and preserved for the proposed project. The proposed project will not result in inadequate emergency access. f) No Impact. The proposed project will provide the required amount of parking consistent with design guidelines for residential development. No impact is expected. g) Less than Significant Impact. The proposed project will not conflict with adopted policies, plans, or programs regarding public transit, bicycle, or pedestrian facilities, or otherwise decrease the performance or safety of such facilities. Sunline Tranist provides public transit to the Coachella Valley, including La Quinta. The closest SunLine route, Route 91, is located approximately 3 miles from the proposed project. Mitigation: None required Monitoring: None required -41- TTM 36561 IS February 2016 Potentially Less Than Less Than No Significant Significant w/ Significant I mpact I mpact Mitigation I mpact XVI 1. UTI LI TI ES AND SERVI CE SYSTEMS. Would the project: a) Exceed wastewater treatment requirements of the applicable Regional X Water Quality Control Board? b) Require or result in the construction of new water or wastewater treatment facilities or expansion of existing X facilities, the construction of which could cause significant environmental effects? c) Require or result in the construction of new storm water drainage facilities or expansion of existing facilities, the X construction of which could cause significant environmental effects? d) Have sufficient water supplies available to serve the project from existing entitlements and resources, or X are new or expanded entitlements needed? e) Result in a determination by the wastewater treatment provider that serves or may serve the project that it X has adequate capacity to serve the project's projected demand in addition to the provider's existing commitments? f) Be served by a landfill with sufficient permitted capacity to accommodate X the project's solid waste disposal needs? g) Comply with federal, state, and local statutes and regulations related to solid X waste? Source: Project materials. XVI 1. a) Less than Significant I mpact. The Coachella Valley, and the subject site, are located within the Colorado River Basin region of the Regional water Quality Control Board, which administers the wastewater discharge requirements. All development will be connected to existing sewer lines along Monroe Street. Project wastewater will be transported to and processed at CVWD's Mid -Valley Water Reclamation Plant (WRP-4) in Thermal. CVWD implements all the requirements of the Regional Water Quality Control Board as they relate to wastewater discharge requirements and water quality -42- TTM 36561 IS February 2016 standards. The proposed project will increase wastewater flows to the treatment plant, but its impact on water quality standards or waste discharge requirements will be less than significant, because of the implementation of mandated standards. b-e) Less Than Significant Impact. The subject site falls under the jurisdiction of the Coachella Valley Water District (CVWD) for domestic water supplies and wastewater treatment. The subject property will be connected to existing water and sanitary sewer lines along Monroe Street. For this reason, no new regional infrastructure will be required. Wastewater produced by the proposed project will be processed at the Mid - Valley Water Reclamation Plant (WRP-4) located in Thermal that has a capacity of approximately 9.5 million gallons per day (mgd). Although the proposed project will increase wastewater flows to the treatment plant it will not adversely impact water quality standards. CVWD has prepared an Urban Water Management Plan 2010 Update, which is a long- term planning document that helps it plan for current and future water demands. The Plan demonstrates that the District has available, or can supply sufficient water to serve the aty and project area. The project will also be required to implement water conservation programs, including a drought tolerant landscaping plan and the CalGreen Building Code, which requires that high efficiency fixtures be used. The project is consistent with current land use designations set forth in the General Plan and therefore has been considered in future water demand projections. CVWD is also responsible for regional stormwater management in the Coachella Valley, the is project area is adequately protected from stormwater flows by the Coachella Valley Stormwater Channel (Whiewater Fiver), and drainage issues affecting the subject property are limited to the management of local drainage. To manage onsite stormwater flows, the project proponent will be required to develop a stormwater management plan and drainage plan prior to approval of the project. It is not anticipated that new or expanded off -site stormwater management facilities will be required to serve the project. The project will be required to provide electric, telephone and cable service through the applicable providers. Service is available adjacent to the site. The applicant will be required to construct connections to these services to the standards established by each service provider. f,g) No Impact. Burrtec, the City's solid waste contractor, will serve the proposed facility. Trash generated by the project will be hauled to the transfer station located in Cathedral City, west of the City, and then will be transported to one of four regional landfills. All four landfills have sufficient capacity to accommodate the proposed project. Burrtec is required to meet all local, regional, State and federal standards for solid waste disposal. Mitigation: Not required. Monitoring: Not required. -43- TT1\4 36561 IS February 2016 Potentially Less Than Less Than No Significant Significant w/ Significant I mpact I mpact Mitigation I mpact XVI 11. MANDATORY Fl NDI NGS OF SI GNI R CANCE -- a) Does the project have the potential to degrade the quality of the environment, substantially reduce the habitat of a fish or wildlife species, cause a fish or wildlife population to drop below self- sustaining levels, threaten to eliminate X a plant or animal community, reduce the number or restrict the range of a rare or endangered plant or animal or eliminate important examplesof the major periods of California history or prehistory? b) Does the project have the potential to achieve short-term, to the disadvantage X of long-term environmental goals? c) Does the project have impacts that are individually limited, but cumulatively considerable? ("Cumulatively considerable" means that the incremental effects of a project are X considerable when viewed in connection with the effects of past projects, the effects of other current projects, and the effects of probable future projects)? d) Does the project have environmental effects which will cause substantial X adverse effects on human beings, either directly or indirectly? XVI 11. a) Less than Significant Impact. The proposed project is located south of Avenue 54 on Monroe Street, and is surrounded by developed or previously disturbed lands. There will be no substantial reduction in wildlife habitat nor will it restrict the movement or range of any plant or animal. The development of the project will not result in negative impacts to any important examples of California history or prehistory. Even so, in the event that cultural artifacts are uncovered during site disturbing activities, a qualified archaeologist will be called in to evaluate and if deemed necessary recover and document the resources to reduce project -related impacts to less than significant levels. -44- TT1\4 36561 IS February 2016 b) Less than Significant Impact. The proposed project is consistent with the City's General Plan's designation of Low Density Residential. Conversely, the site's has a zoning designation of Very Low Density Residential with an Equestrian Overlay which conflicts with the proposed project. Surrounding properties are currently zoned as Low Density Residential and have comparable densities to the proposed development. Furthermore, the proposed single-family residential development would be similar to the existing development immediately to the south and to the development under construction to the west of the project site. A zone change to Low Density Residential would allow a somewhat greater density while maintaining a less than significant impact to surrounding properties. For this reason, the project proponent has submitted a Change of Zone (ZC) application to the City. The change would result in zone being re -designated as Low Density Residential. Upon approval of the ZC the project will be consistent with long-term goals. A less than significant impact is anticipated. c) Less than Significant Impact. The project does not result in significant impacts, nor would it induce growth that could result in cumulative impacts. The project represents a continued progression in anticipated growth in the city. d) Less than Significant I mpact. The project's potential environmental effects have been mitigated to a less than significant level by the measures outlined in the Initial Study and development requirements of the Oty of La Quinta. Further, as mitigated the project will not cause substantial adverse effects on human beings. This Agency intends to adopt a Mitigated Negative Declaration based upon the supporting documentation herein. References CSty of La Quinta 2035 General Ran City of La Quinta Municipal Code. CalEEMOd Version 2013.2.2 -45- TTM 36561 IS February 2016 "Report E-5: Population and Housing Estimates for Cities, Counties, and the State, January 1, 2011-2014, with 2010 Benchmark," CA Dept. of Finance, Demographic Research Unit, January 7, 2016. 2003 Coachella Valley MSHCP FEMA Rood Insurance Rate Map Panel #2233G CA Department of Toxic Substances SCAQMD CEQA Handbook 2003 PM10 Plan for the Coachella Valley SCAQMD 2012 Air Quality Management Plan California Department of Conservation Farmland Mapping California Scenic Highway Mapping System "TTM 36561 - Focused Traffic Analysis", prepared by Kunzman Associates, I nc., October 16, 2015. "Update to the Historical/Archaeological and Paleontological Resources Assessment Studies for the Saddle Club Project; Tentative Tract Map No. 36561 ", prepared by CRMI TECH, March 18, 2015. "TTM 36561 - Preliminary Noise Review", prepared by Kunzman Associates, Inc., September 30, 2015. "Geotechnical Update - TTM 36561", prepared by Sladden Engineering, April 7, 2014. "Hydrology Report - TTM 36561", prepared by PBLA Engineering, Inc., March 3, 2015. "Preliminary Water Quality Management Plan for TTM 36561", prepared by PBLA Engineering, Inc., February 16, 2015. -46-