Loading...
PW Stephens/Desert Club Asbestos Removal 89 P.W. STEPHENS CONTRACTORS INC. ~ COMMERCIAL / INDUSTRIAL / RESIDENTIAL ~I~1~'~ 8390 MIRAMAR PLACE, SUITE D SAN DIEGO, CALIFORNIA 92121 FAX (619) 558-4558 / TEL (619) 558-9690 ST. LIC. No. 443402 To:CITY OF LA QUINTA P.O. BOX 1504 LA QUINTA, CA. 92253 ATTENTION: TOM HARTUNG MARCH 15, 1989 DATE: SHEET 1 OF (~) SHEETS PROJECT:~A QUINTA DESERT CLUB PROPOSAL 3-07 LOCATION: ~ CA. P. W. Stephens Contractors, Inc., hereinafter designated as PWSCl, proposes to furnish all )abor, material and equipment to complete work as follows: REMOVE A_ND DISPOSE OF ASBESTOS CONTAINING ACOUSTICAL CEILING SPRAY. REMOVE AND DISPOSE OF ALL CARPET. (CONTAMINATED), DEMO WALLS, MIRRORS, PANELLING, ETC. AS NECESSARY. H.E.P.A. VACUUM ALL FURNITURE AND SET ASIDE FOR OTHERS TO DISPOSE OF. H.E.P.A. VACUUM AND CLEAN ENTIRE INSIDE OF BUILDING. NOTE: IT MAY NOT BE POSSIBLE TO GET THE UPHOLSTERED FURNITURE CLEAN ENOUGH TO SAVE. IF SO, THERE WILL BE SOME ADDITIONAL DISPOSAL COSTS INVOLVED. I SUGGEST YOU ALLOW APPROXIMATELY $4,800.00 FOR THIS. TERMS AND CONDITIONS The Work: PWSCI will supply all Work as described, in accordance with the documents ("Bid Documents") and time schedule I"Time Schedule") referenced herein Schedule Change: PWSCl's obligation hereunder is based upon the Schedule, both as to duration and sequence· In the event of any significant change inSchedule,the bid price and Schedule shag be equitably adjusted· PWSCI shag also receive an equitable adjustment of the bid price if this contract is terminated otherwise than for PWSCI's material breach Work Week: Unless otherwise stated, PWSCI will supply labor for the Work on a regular 40-hour Week without overtime, If the Customer requires overtime, PWSCI will be reimbursed for the premium portion of wages paid (including payrog taxes and insurance) plus a reasonable allowance for loss of productivity caused bv the overtime Guarantee: PWSCl warrants and guarantees that for a period of one vear from date of comp[etion of the Work, it will repair or replace anv Work which is defective in mate- rials or workmanship or which does not conform to the specifications set forth in the Bid Documents· PWSCI's liability is Umited to the foregoing and it shah not in any case be liable for indirect, incidental or consequentia[ damages of any kind, Additionagv, PWSCI does not guarantee the performance of any material for other than those uses for which the materia~ is intended, in no case shall PWSCI's liability exceed that of the product manufacturer's guarantee· rker s cum ensation insurance for its employees n the forms and amounts required by law. In addition, PWSCI will supply general bability Insurance: PWSC will supply wu .'. P · · on re uest) with e comb ned single lira t of $ , and auto insurance described in a certificate of msurance Isupphed to the customer q -- Site Access: Customer agrees to insure that prior tn any asbestos-abatement operations, the asbestos-control area and/or asbestos-storage area shah be vacated and shall n of the rD'act In the event that any ndividua other than PWSCI employees enters the asbes- remain closed ,o all persons other than PWSCl employees] for ~aebldeU~oatr,Oan ciaimsPrelat,~e ,o asbestos exposure arising therefrom and that Customer will indemnify and tos-control area Customer agrees that PWSCI shall not be held Y defend PWSCI from all such claims, Bonds: Upon request and at the expense of Customer, PWSCl will furnish performance and payment bonds written by a corporate surety. The cost of any such bond is not included in the b d price unless spec fically stated otherwise· · month, Customer will pay the contract price in lug within 30 days of compietion of the Work. Other Payments: For Work commenced and completed in any orae calendar wise, Customer will pay the contract price in progress payments as follows: 90% of the contract value of work performed during each month will be payable within 30 days of the progress bil~ing and the balance of the contract price will be payable in full upon completion of the Work· The cost of materials shall be included in the contract value of Work performed upon delivery to jobeite. Changes and Extras Custome may change the Work at any time and from time to time, including changes in scope, methods, scheduling or performance requirement, in which case the contract price and completion date w I be equitably adjusted· Whenever the Customer, its employees, contractors, and subcontractors luther than PWSCI), use ladders, scaffolding, tools, vehicles, equipment or prop- equitable adjustment in price shall be made and the contract time modified accordingly· Force Majeure; PWSCI shall not be deemed in default nor be liable for damages for any failure or delay in performance of its Work which arise out of causes beyond its PWSCI is a registered carcinogen contractor [EPA #CAX000016915 and Cai/OSHA # 3625) and hazardous waste hauler {DOH #1225). This proposal is subject to change and may be withdrawn if not accepted within 60 days of above date. It is subiect to and includes all terms and con- ditions listed above. CONTRACT PRtCE$ 28.552.00 ACCEPT E D/~^~J~° 11 .... 71 ~ Mayo DATE: April 14, 1989 P.W. STEPHE TRACTO NC* / ~Y~, GLENN A. HENLEY - BRANCH I~AGER -SAN DIEG We hope this proposal meets with your approval.