Loading...
Riverside Co/Fred Waring-Washington 941 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26', 27 28 COOPERATIVE AGREEMENT FOR THE DESIGN AND CONSTRUCTION OF ROADWAY WIDENING AND RE -STRIPING OF PORTIONS OF FRED WARING DRIVE AND TRAFFIC SIGNAL MODIFICATION AT THE INTERSECTION OF FRED WARING DRIVE AND STREET This agreement entered into this /? day of 1994, is between the County of Riverside, referred to herein as "COUNTY", and the City of La Quinta, referred to herein as "CITY". RECITALS (1) COUNTY and CITY desire to widen and reconstruct Fred Waring Drive from California Street to 1,000 feet east of Washington Street and modify traffic control signals and lighting at the intersection of Fred Waring Drive and Washington Street, which work is referred to herein as the "PROJECT", and desire to specify the terms and conditions under which the PROJECT is to be engineered, constructed, financed and operated. (2) A portion of the PROJECT lies within the incorporated limits of the CITY, and the remaining portion lies within the COUNTY. SECTION I CITY AGREES: (1) To deposit with COUNTY within 25 days of receipt of billing therefore the sum of $35,000, which billing shall be forwarded to CITY prior to COUNTY's bid advertising date of a construction contract for PROJECT, which figure represents one-third of CITY's estimated share of the expense of construction engineering and construction costs required to complete the APO 19 1994 �,3.Z 11 2 31 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 M-1 PROJECT, as shown on Exhibit "A", which is attached hereto and incorporated herein by the reference. Upon completion of two- thirds of PROJECT construction, as agreed between CITY and COUNTY, CITY shall pay to COUNTY an additional $35,000. Upon completion of all work, all final construction costs, including construction engineering, shall be submitted to CITY as a written billing from COUNTY, and CITY shall pay the remaining sum due within 30 days thereafter. (2) To certify that all necessary rights -of -way have been obtained for the PROJECT construction. (3) To fund and pay in full for all rights -of -way acquired for PROJECT in favor of CITY. Rights -of -way acquired in favor of COUNTY shall be funded and paid in full by COUNTY. (4) To provide prompt reviews and approvals, as appropriate, of submittals by COUNTY and to cooperate in timely processing of plans, specification and cost estimates. (5) To issue free of charge, upon application by COUNTY or COUNTY's delegated agent, the necessary Encroachment Permits for required work within CITY street rights -of -way. SECTION II COUNTY AGREES• (1) To pay for its share of all costs ($84,000) as shown on said Exhibit "A". (2) To prepare, through its Transportation Department, Plans, Specifications and Estimates ("PS&E") for PROJECT with COUNTY or consultant forces. Said PS&E are to be prepared in accordance with the Standard Plans and Specifications of the State of California Department of Transportation, the standards 2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15j 161 17 18 19 20 21 22 23 24 25 26 27 ON and practices of the CITY and the COUNTY, and all applicable laws and regulations. Said PS&E are subject to review and final approval by CITY prior to advertisement for bids for PROJECT. (3) To fund 100% of the costs to acquire necessary rights -of -way, if any, that are located within the unincorporated boundaries of COUNTY, for the PROJECT. (4) In determining construction engineering costs, COUNTY shall keep accurate records regarding hours worked, equipment used, vehicle unit mileage recorded and administrative charges incurred, and said PROJECT records shall be available for review by CITY. (5) To advertise, award and administer a public works contract for the construction of PROJECT improvements. Improvements which lie within CITY rights -of -way or affect CITY facilities, shall be clearly so defined in the bid schedule. (6) To obtain CITY approval of all contract change orders before additional work is authorized. (7) Upon final acceptance of the constructed PROJECT improvements, COUNTY will prepare a statement of costs and will submit to CITY for payment any amount over and above the aforesaid advance deposit required to complete CITY's financial obligation pursuant to this Agreement. (8) Upon completion of all work under construction contract and final acceptance of completed signal modification by the COUNTY, maintenance of the signal will be performed by COUNTY in accordance with the signal maintenance agreement now in effect between CITY an COUNTY. 3 1 SECTION III 2 IT IS MUTUALLY AGREED AS FOLLOWS: 3 (1) The costs shown in Exhibit "A" are estimates only and the CITY 4 and COUNTY shall each pay in full for their respective shares 5 of the PROJECT costs that are within each jurisdiction's 6 boundary as described in the bid schedule. 7 (2) For the basis of this agreement, the total cost of the PROJECT 8 is estimated to be one hundred eighty-nine thousand dollars 9 ($189,000). 10 (3) Construction by COUNTY of improvements referred to herein which 11 lie within CITY rights -of -way or affect CITY facilities, shall 12 not be commenced until COUNTY's original contract plans 13 involving such work have been reviewed and approved by signature 14 of COUNTYYIs Transportation Director, or his delegated agent, and 15 by CITY's Public Works Director, or his delegated agent, and 16 until any and all necessary Encroachment Permits authorizing 17 such work have been issued by CITY to COUNTY therefor. Receipt 18 by COUNTY of COUNTY's contract plans signed by CITY shall 19 constitute CITY acceptance of and official approval of said 20 plans. 21 (4) In construction of said work, COUNTY will furnish a 22 representative to perform the functions of Resident Engineer, 23 and CITY may furnish a representative. The CITY's 24 representative may consult with COUNTY's representative, 25 however, the decisions of the COUNTY's representative shall be 26 considered final, except with respect to change orders in 27 accordance with Section II Article (6). 28 (5) Execution of the Agreement by CITY grants COUNTY the right to 4 1 2 enter upon CITY right-of-way to construct the PROJECT referred 3 to herein. 4 (6) No alteration or variation of the terms of this Agreement shall, 5 be valid unless made in writing and signed by the parties hereto 6 and no oral understanding or agreement not incorporated herein 7 shall be binding on any of the parties hereto. 8 (7) Each party hereto shall indemnify, defend,save and hold 9 harmless the other party and its officers, agents, servants and 10 employees, of and from any and all liabilities, claims, demands, 11 debts, suits, actions and causes of action, including, but not 12 by way of limitation, for property damage, personal injury or 13 wrongful death, arising out of or in any manner connected with 14 any act or omission of such indemnifying party and its offers, 15 agents, servants or employees done or performed pursuant to the 16 terms and provisions hereof. 17 (8) COUNTY agrees to follow all applicable public bid requirements of the Public Contract Code in connection with the PROJECT. 18 19 20 21 22 23 24 ` 25 26 27 28 5 11 2 3 4 5 AI 7 8 9 10 11 12 14 15 16 17 18 19 20 21 22 23 24 25 26 DEB/RB/� February 28 Notices: Any notice required to be sent pursuant to this Agreement shall be sent by regular mail, addressed as follows: County of Riverside City of La Quinta David E. Barnhart, Robert L. Hunt, Director of Transportation City Manager P.O. Box 1090 P.O. Box 1504 Riverside, CA 92502 La Quinta, CA 92253 IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed by their duly authorized representatives on the day and year first above written. COUNTY OF RIVERSIDE TM Chair , WIRMN YUUNGLOVE Board of Supervisors APR 1 9 1994 ATTEST: Gerald A Mal y, Clerk of tard 10 APPROVED TO FORM: I :.. . Pk Wi Liam C. Katzenstein, County Counsel REC NDED FOR APPROVAL: zz.ler- 9n'-=4/ David E. Barnhart, Director of Transportation /DC/rep 5, 1994 CITY OF LA QUI A N By: Mayor ATTEST: By* k APPROVED AS TO FORM: By:uira�`: �iinEiA City Attorney's'Office 0 4�9[-y J.3 E X H I B I T " A" ESTIMATE OF COSTS ROADWAY WIDENING, RE -STRIPING AND SIGNAL MODIFICATION OF FRED WARING DRIVE City's County's Construction Item Costs Costs Striping Removal $ 5,000 $17,000 Re -striping 2,000 10,000 Roadway Widening 66,000 25,000 Signal Modification 32,000 32,000 TOTAL $105,000 $84,000 DC/rep