Loading...
Riverside Co/Fred Waring-Washington Traffic Sig 871 AGREEMENT 2;; FOR 3; THE DESIGN AND CONSTRUCTION OF A TRAFFIC SIGNAL AT 4; FRED WARING DRIVE AND WASHINGTON STREET 5;; THIS AGREEMENT is between the County of Riverside (COUNTY) and 6;; the City of La Quinta (CITY) to provide for the Project (PROJECT) 7;; to design and construct a traffic signal and highway lighting 8;; system at the intersection of Fred Waring Drive and Washington 9;; Street. 10ii WHEREAS, a portion of this intersection lies within the 11;; incorporated limits of the CITY and the remaining portion lies 12;; within the COUNTY, and 13;; WHEREAS, the COUNTY and the CITY desire to complete the PROJECT 14;; to design and construct a traffic signal and highway lighting system at the intersection of Fred Waring and Washington Street. 16ii IT IS AGREED: 17;; 1. COUNTY, through its Road and Survey Department, will provide H 18;; design and construction engineering for the PROJECT. Design 19;' engineering consists of preparation of plans, specifications, 20; and documents. Construction engineering consists of 21;; construction survey, inspection, and administrative effort to 22' maintain PROJECT accounting records. 23; 2. In determining construction engineering costs, COUNTY shall 24;; keep accurate records regarding hours worked, equipment used, 25;; vehicle unit mileage recorded and administrative charges 26;; incurred, said PROJECT records shall be available for review 27;; by CITY. 28; 3. The total cost of the PROJECT which is to include design 711 811 4 i 911 ii 1011 5 11!! 12 13 14 15 16 1711 18 ii 19 i 2011 6. 2111 7. 22ii 23 i 2411 2511 ii 261 1 ii 271 2811 8. engineering, construction engineering, traffic signal equip- ment and the cost of the construction of the traffic signal and highway lighting system, shall b- allocated to the CITY and COUNTY on the basis of the portion of the project in each jurisdiction. It is determined for this PROJECT, that the CITY portion is 25 percent and the COUNTY portion is 75 percent of the total cost. For the basis of this agreement, the total cost of the PROJECT is estimated to be ninety thousand dollars ($90,000). COUNTY upon final acceptance of the constructed PROJECT improvements, will prepare a statement of costs and will submit to CITY for payment within 30 days thereafter. Upon completion of all work under construction contract and final acceptance of completed signal installation by the COUNTY, maintenance of the signal will be performed by COUNTY in accordance with the signal maintenance agreement now in effect between CITY and COUNTY. Costs of maintenance shall be apportioned between and paid by the parties of the same percentages as determined in Section number 3 of this Agreement. Any notice required to be sent pursuant to this Agreement shall be sent by regular mail, addressed as follows: CITY OF LA QUINTA COUNTY OF RIVERSIDE RONALD KIEDROWSKI LEROY D. SMOO'T CITY MANAGER ROAD COMMISSIONER P.O. BOX 1504 P.O. BOX logo LA QUINTA, CA 92234 RIVERSIDE, CA 92502 Each party, as to any claim or liability out of any act or 111 omission by sai party, with reference to any work to be 211 performed by or authority delegated to such party hereunder, 11 1 311 shall defend, indemnify and hold harmless the other party, 11 411 its officers anJ employees. i i 511 Dated: 1/0—(-7 Dated: OCT 20197_ i Mayor air a , Board of 7H Supervisors 121 1 131 i 14 i 15 i i 161 171 18 19 i i 201 i 211 22 " 23 24 25 ii 26 11 ii 27 2811 Approved as to Form: By: City Attorney RB:jag Rev: 7/7/87 Attest: Gerald A. Maloney, Clerk of the Board By: _S.W[_�� l -.- Deputy Uerk of the Board Approved as to Form: Ger,pld J. Geerlings, CotfPty Counsel By: puty County Counse OCT 2 0 1987 4.6