Loading...
CC Resolution 2003-015RESOLUTION NO. 2003-015 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LA QUINTA, CALIFORNIA, APPROVING DEVELOPMENT STANDARD CHANGES FOR A MULTI -USE COMMERCIAL/LIGHT INDUSTRIAL CENTER ON 36 t ACRES LOCATED GENERALLY BETWEEN ADAMS STREET AND DUNE PALMS ROAD AND NORTH OF STATE HIGHWAY 111 CASE NO.: SPECIFIC PLAN 99-036, AMENDMENT #2 APPLICANT: DAVID AND JAMIE REULMAN Assessor's Parcel Numbers: 649-020-049 to -051 and -054 to -067 Portion NW% of Section 29, T5S, R7E SBBM WHEREAS, the City Council of the City of La Quinta, California, did on the 71h day of September, 1999, approve Specific Plan development standards and design guidelines allowing retail, office, industrial and associated land uses on 36 t acres by adoption of Resolution No. 99-111; and WHEREAS, the City Council of the City of La Quinta, California, did on the 41h day of June, 2002, approve changes to the Specific Plan development standards and design guidelines for the 36 t acre development in support of Site Development Permit 2002-734 for Sky West Corporation by adoption of Resolution No. 2002-85; and WHEREAS, the La Quinta Community Development Department has determined that the request has been previously assessed in conjunction with Environmental Assessment 99-383 and certified by the City Council on September 7, 1999, by Resolution No. 99-110 for Specific Plan 99-036. No changed circumstances, conditions or new information is proposed which would trigger the preparation of a subsequent Environmental Assessment pursuant to Public Resources Code Section 21166; and WHEREAS, the City mailed public hearing notices to all property owners and those within 500 feet of the project site on January 17, 2003, pursuant to Chapter 9.200 of the Zoning Ordinance and published a notice in the Desert Sun newspaper on January 26, 2003 for the February 11, 2003 Planning Commission meeting. All written correspondence is on file with the Community Development Department; and Resolution No. 2003-015 Specific Plan 99-036, Amendment #2 David and Jamie Reulman March 4, 2003 Page 2 WHEREAS, the Planning Commission of the City of La Quinta, California, did on the 11 th day of February, 2003, hold a duly noticed Public Hearing to review of an Amendment to the La Quinta Corporate Centre development standards, namely a change to Condition #44(D) of City Council Resolution No. 2002-85, to allow a parking lot aisleway within 39 feet of curb face of Dune Palms Road and other related changes in Planning Area #4 for on -site accessways serving Highway 111. The Planning Commission, on a 5-0 vote, adopted Resolution 2003-006 (previously Resolution 2003-005) recommending to the City Council approval of the Amendment, subject to findings and conditions; and WHEREAS, the Community Development Department mailed public hearing notices to all property owners and those within 500 feet of the project site on February 12, 2003, pursuant to Chapter 9.200 of the Zoning Ordinance and published a notice in the Desert Sun newspaper on February 19, 2003 for the March 4, 2003 City Council meeting. All written correspondence is on file with the Community Development Department; and WHEREAS, the City Council of the City of La Quinta, California, did on the 4th day of March, 2003, hold a duly noticed Public Hearing to review of an Amendment to the La Quinta Corporate Centre development standards, namely a change to Condition #44(D) of City Council Resolution No. 2002-85, to allow a parking lot aisleway within 39 feet of curb face of Dune Palms Road and other related changes in Planning Area #4 for on -site accessways serving Highway 1 1 1; and WHEREAS, at said Public Hearing, upon hearing and considering all testimony and arguments, if any, of all interested persons wanting to be heard, said City Council did make the following mandatory findings recommending approval of said Specific Plan Amendment: 1 . The proposed Specific Plan Amendment is consistent with the goals and policies of the La Quinta General Plan and supports the development of regional commercial and commercial park uses north of Highway 1 1 1 to the regional stormwater channel, as conditioned. 2. The proposed Specific Plan Amendment will not be detrimental to the public health, safety and welfare, as the parking lot design changes for Planning Area #4 are compatible with the newly built gasoline service station at 79-490 Highway 1 1 1, as conditioned. 3. The proposed Specific Plan Amendment is compatible with the City's Zoning Ordinance in that it supports the development of commercial and industrial uses in the Regional Commercial and Commercial Park Zoning Districts, respectively. Resolution No. 2003-015 Specific Plan 99-036, Amendment #2 David and Jamie Reulman March 4, 2003 Page 3 4. The recommended conditions ensure orderly growth within the master planned area while providing necessary urban services. Development applications within the project area will be further reviewed by Site Development Permit or Conditional Use Permit applications as set forth in the attached documents. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of La Quinta, California, as follows: 1. That the above recitations are true and constitute the findings of the City Council in this case; 2. That it does hereby require compliance with the Conditions of Approval (Exhibit "B") for the proposed Specific Plan Update (Exhibit "A"); 3. That it does hereby reconfirm the conclusion that Environmental Assessment 99-383 assessed the environmental concerns of this Specific Plan pursuant to City Council Resolution No. 99-110; and 4. That it does approve Specific Plan 99-036 (Amendment #2) for the reasons set forth in this Resolution, subject to the attached conditions. PASSED, APPROVED, and ADOPTED at a regular meeting of the La Quinta City Council held on this 4" day of March, 2003, by the following vote, to wit: AYES: Council Members Henderson, Sniff, Mayor Adolph NOES: None ABSENT: Council Members Osborne, Perkins ABSTAIN: None (IN - DON AD LPH, ayor City of La Quinta, California Resolution No. 2003-015 Specific Plan 99-036, Amendment #2 David and Jamie Reulman March 4, 2003 Page 4 ATTEST: JU .'GREEK, CMC, �,it lerk City of La Quinta, California (City Seal) APPROVED AS TO FORM: A H INE JENSO ",tyy Attorney City of La Quinta, California SPECIFIC PLAN THE LA QUINTA CORPORATE CENTRE Specific Plan 99-036, Amendment #2 Exhibit '"A" SECT/ON 1 - SUMMARY 1.10 - PURPOSE The purpose of the La Quinta Corporate Centre Specific Plan is to 'set forth the detailed development principles, guidelines, and programs to facilitate the development of a 36- acre site located on the north side of Highway 111 between Adams Street and Dune Palms Road. This Specific Plan is intended to meet the requirements for a Specific Plan as set forth in State law. The State of California authorizes cities and counties to adopt Specific Plans as an appropriate tool in implementing their General Plans. Such a plan is to include the detailed regulations, conditions, programs, and any proposed legislation that is necessary for the systematic implementation of the General Plan. The Specific Plan provides the linkage between the General Plan, the general goals and policies of the City, and the detailed implementation of that plan with tools such as Zoning and Subdivision Ordinances. The Government Code Section 65451 sets forth the minimum requirements of a Specific Plan and states: "A Specific Plan shall include a text and diagram or diagrams which specify all of the following in detail: 1). The distribution, location, and extent of the uses of land, including open space, within the area covered by the plan. 2). The proposed distribution, location and extent and intensity of major components of public and private transportation, sewage, water, drainage, solid waste disposal, energy, and other essential facilities proposed to be located within the area covered by the plan and needed to support the land uses described by the plan. 3). Standards and criteria by which development will proceed, and standards for the conservation, development, and utilization of natural resources, where applicable. 4). A program of implementation measures including regulations, programs, public works projects, and financing measures necessary to carry out paragraphs (1), (2), and (3)." The Specific Plan shall include a statement of the relationship of the specific plan to the General Plan. The establishment of specific performance, design, and development standards is set forth to guide the development of the subject property in such a way as to implement the General Plan while maintaining some flexibility to respond to changing conditions which may be a factor in any long term development program. 1 SPECIFIC PLAN THE LA QU/NTA CORPORATE CENTRE Specific Plan 99-036, Amendment #2 Exhibit "A" The document also acts to augment the City's Zoning Ordinance by providing particular design guidelines, a tailored list of allowable, conditionally allowable, and prohibited uses for the site, and unique development standards. 1.20 - EXECUTIVE SUMMARY 1.20.1 - The Land The La Quinta Corporate Centre is a proposed mixed commercial development on 36 acres of property located approximately 330 feet east of Adams Street and north of Highway 1 1 1 within the City of La Quinta. The property is delineated. by the. City's General Plan as Commercial Park and Mixed/Regional Commercial and is Zoned Regional Commercial (CR) with a Non -Residential Overlay. The site is vacant except for newly constructed buildings in Planning Area 1 and 4. Areas of the site have been mass graded thereby removing large changes in grade elevations across the various parcels. Preliminary pad heights for future building have been established based on plans approved by the La Quinta Public Works Department. The site has nearly 1,700 feet of frontage on Highway 1 1 1 and comes within 330 feet of Adams Street on the west side and abuts Dune Palms Road on the east side. Property to the south, across Highway 1 1 1, is either involved with the La Quinta Auto Mall Specific Plan (Specific Plan 97-034), or vacant. Property to the west is currently vacant but a hotel and restaurant complex development has been approved for the site under Specific Plan 98-033. The property to the north, across the CVWD flood control channel is the La Quinta High School. To the west, abutting the site is a small self - storage facility of 3.96 acres. Further to the west across Adams Street is the Wal- Mart Center (Specific Plan 89-014, One -Eleven La Quinta Shopping Center). The Home Depot Center (Specific Plan No. 96-027, Jefferson Plaza) is located to the east of the site by approximately 1,200 feet. The project site is shown on the aerial photograph in Exhibit 2. Commercial and business park use of the subject site was analyzed in the City's General Plan EIR that was approved in 1992, and updated on March 20, 2002. The Natural Resources Element of the General Plan identified the subject property as being potential habitat to the Coachella Valley Fringed Toed Lizard and within the approved Habitat Fee area. Irk SPECIFIC PLAN THE L4 QUINTA CORPORATE CENTRE Specific Plan 99-036, Amendment #2 Exhibit "A" 1.20.1 a - The Ownership There are 16 underlying parcels. Exhibit 1 indicates the parcel configuration in 1999 and Exhibit 7 the existing parcel configuration. 1.20.2 - The Project The La Quinta Corporate Centre is a multi -phased multi -use complex. The property location is one of prominence for the City of La Quinta and as such the development ideas and standards will complement the City's image as the Gem of the Desert. The multi -use retail center will contain a variety of uses, the summary of proposed regional commercial uses and building sizes, totaling 332,400 square feet, is as follows: ProQosed Built Multi -tenant industrial/office users - 91,600 square feet 25,958 sq. ft. +-- Retail floor area - 79,300 square feet 0 sq. ft. Mid -rise office building - 113,000 square feet 0 sq. ft. Financial space - 6,500 square feet 0 sq. ft. Fitness center - 30,000 square feet See below Service station - 2,000 square foot (approximate) See below The following uses are a part of the overall site development but are not included in the retail/office calculations: 1. One gasoline service station (2,940 sq. ft. USA Petroleum on 1.3 acres) 2. Nine industrial lots on 6 + acres 0 5,500 sq. ft. World Gym on 1.2 acres and 34, 270 sq. ft. Sky West project on 2.25 acres) 3. One self and RV storage facility (54,925 sq. ft. Storage USA on 3.78 acres) 4. One CVWD well site Special Note: See Condition of Approval # 61 Exhibit 5 depicts the conceptual site plan for the proposed development. The La Quinta Corporate Centre will be integrated through reciprocal access easements for access and parking with the adjacent developments, including the recently approved Hotel One -Eleven Specific Plan, which is directly west of the site. The allowable, conditionally allowable, and prohibited uses shall be generally as set forth in the Zoning Code regulations, the modifications are noted in Section 2.60.2.1. A separate property owners association will maintain the common area improvements. 3 SPECIFIC PLAN THE LA QU/NTA CORPORATE CENTRE Specific Plan 99-036, Amendment #2 Exhibit "A" The main site access will be from Highway 111 at La Quinta Centre Drive. The entrance, which will be signalized, will include landscaping, center identification including a water feature within the setback area but outside of the public right of way. Two minor driveways are also located on Highway 1 1 1. The project will be phased to suit market conditions with on and off site improvements phased to accommodate the demands of each proposed stage of development. The improvements will be completed prior to the occupancy of any building within that phase. Highway 111 improvements may be phased. The phasing will depend on the development schedule and will be coordinated with CalTrans. Additional information on phasing can be found in Section 2.20. 4 SAFORC PLAN THE LA QUINTA CORPORATE CENTRE Specific Plan 99-036, Amendment #2 Exhibit "A" Exhibit 1 — Assessor's Map 17-N AC It c�� o zfi Q ss Mal 3.NAC !►7tACNf %*41 wpm� guts S7 »>s � rt, �TE, p .y aw wow ' 67 MR S , 61 60 59 1 ' r &2i AC NT 61 / 1.17 AC AC 1.4 43 mm iw.« sew u � 192 AC a Illy >w0 O 15.62 AC M 3 L37 AC . I 63 &IIIAACPAR �T g i •�� 49 L 7.41 AC Kr �f,� X62 Ac 65 JIMACNT MR 12 &42 AC <5 1 DATA: a is •I P15 91/11 ASSE 'S W1P 9K649 F6.02 Rivera I County, Calif. I �%QZ L I 13 0.41 AC 14 L24 AC I MA ffiI-GHWA '' 37 V --- - - PM 192/53 57 F PM 193/26-21 F PM 197/33-36 F 5 Will V7 6L /$�� , ? + � _ '�'3'r � �= � .... ��q� — "].'! y` � e� � a ?4'�� '�, �.` �f n.� :r"•�0.'� i��'�j��r����i'if"~�'"'� � • l'' o T UPS ULV,U JC.0 k1i fay Aw A to F 11'41:1� U.qLlr %o Eli V, CM "QI 14 R `k .^ F Wry .�, �(i'- `�N w< +if ••MeS 4 t "OA-44 6' "T �1 • - 41P 40 on EST A—W a 77. ,iw 4 _44 a Cozy '11111� A, -1 AL . M W sap 44 ur Ae SPECIFIC PLAN THE LA OU/NTA CORPORATE CENTRE Specific Plan 99-036, Amendmenx 2 k ... Exhibit "A" 1.20.3 - THE PROCESS 1.20.3.1 - Relationship to the General Plan Implementation of development within The La Quinta Corporate Centre Specific Plan area is intended to carry out the goals and policies contained in the General Plan of the City of La Quinta in a planned and orderly fashion. All development within The La Quinta Corporate Centre Specific Plan shall be consistent with the provisions of the La Quinta General Plan. The Land Use Map of the General Plan for the site is shown in Exhibit 3. The project relationship to General Plan policies and objectives is located in Appendix One. More specifically the main Elements of the General Plan, which will be implemented upon the development of The La Quinta Corporate Centre, are: • Land Use - The General Plan delineates the Highway 111 corridor for Mixed/Regional Commercial (M/RC) land uses. A portion of the site adjacent to the storm channel is designated Commercial Park (CP). The proposed project is consistent with the approved general plan designations. A Floor Area Ratio (FAR) of 0.35 is required within the specific plan area, unless otherwise noted. • • Circulation - The Circulation Element of the General Plan outlines the design and location of required street improvements to complete the transportation system in the City. The La Quinta Corporate Centre will complete portions of two important links in the City's circulation network, Highway 111 and Dune Palms Road. Included in the improvements will be sidewalks, bicycle links, bus stops, and signal improvements. In addition to the roadway improvements, the project site has frontage on two designated image corridors; a Primary Image Corridor along Highway 111 and a Secondary Image Corridor on Dune Palms. Compliance with these special roadway corridors improvements will complement and evoke the unique identity and character sought by the City of La Quinta. • Environmental Conservation - The Specific Plan outlines the use of drought tolerant planting and irrigation techniques to further the City's policies of water efficient landscaping and preservation of the water quality through best management practices for surface water containment. The plan will also include the development of roadways, water, sewer and flood control improvements. 7 SPECIFIC PLAN THE L4 0UINTA CORPORATE CENTRE Specific Plan 99-036, Amendment #2 Exhibit "A" 1.20.3.2 - Relationship to Zoning and Development Process The property is already properly planned and zoned for most of the uses projected for the site. Exhibit 4 depicts the Zoning designations on the site and the surrounding parcels. The City of La Quinta requires a Specific Plan to establish an overall master development plan in the circumstance of the CR Zoning classification. Individual development applications will be processed under normal City requirements at the time of the application for Site Development Permits (architecture, landscape architecture, signage, final grading, etc.) as well as any special provisions authorized pursuant to this Specific Plan. The Planning Commission can consider site plan changes to each planning area during review of a developer's -project. Those uses that may require Conditional Use Permits as set forth in the Zoning Ordinance of the City of La Quinta shall submit such an application unless otherwise modified within the Plan. Such conditional uses could include mixed use commercial and residential, wholesaling, vocational schools, bars and taverns, among others. 1.2.3.3 - Deleted by Condition #63 of City Council Resolution 99-1 1 1. 1.20.3.4 - Relationship to Other Agencies In addition to City approvals, permits will be required by CalTrans for the work along Highway 1 1 1, and by the Coachella Valley Water District (CVWD) for moderate extensions to water and sewer lines as well as levee improvements. Other infrastructure extensions will be required by the Imperial Irrigation District (electrical power), Verizon Communications for telephone service and AOL Time Warner for cable TV service. SAWM/C PLAN THE LA QU/NTA CORPORATE CENTRE Specific Plan 99-036, Amendment #2 Exhibit "A" Exhibit 3 - General Plan w -0 to 0 w E SPECIFIC PLAN THE L4 QU/NTA CORPORATE CENTRE Specific Plan 99-036, Amendment #2 Exhibit "A" Exhibit 4 - Zoning Map 10 KO SAFORC PLAN THE LA QU/NTA CORPORATE CENTRE Specific Plan 99-036, Amendment #2 Exhibit "A" Exhibit 5 - Site Plan w�aao tare Highway 1 i , _ 1 ------ -- ---- Revised - 5/14/2002 11 Co u A de SPECIFIC PLAN THE LA QU/NTA CORPORATE CENTRE Specific Plan 99-036, Amendment #2 Exhibit "A" Exhibit 6 - Planning Areas C AC AC SPECIFIC PLAN THE L4 QUINTA CORPORATE CENTRE Specific Plan 99-036, Amendment #2 Exhibit "A" Exhibit 7 - Existing Parcels 55 54 PAIR 2 O " 3.78 AC NT �►S' �e PAR 57 PAR S 56 3 N PM 19743 4115.1; A NT 58 ._ a sooe, PAR 9 EX � • • P AR 6 60 62 L 0 0 59 3.26 AC NT - 61 PAR 8 52639 a AC NT V a PM 197132 54aA4 313.65 PAR 10 A Cal64 0 N 63 ;� a PAR n 3.16ACNT40 T oa 7.61 AC NT 4�� = k>>3 1 41e 65 1oe.39 PAR 72 1.02 AC NT ps � 0 ll E oft a4 P.18 61 4c 66 117 AC o � 6 1.92 AC 15.52 AC 5o m e t� aO; , - 3.62 AC b� d 50 ,'`� .31 AC 3.43 AC 51 `s I o_ u.+4 20o z - 3747 AU o Ot c-T.us S li 13 SPECIFIC PLAN THE LA QUINTA CORPORATE CENTRE Specific Plan 99-036, Amendment #2 Exhibit "A" SECT/ON 11- SPECIFIC PLAN 2.10- PROJECT DESCRIPTION 2.10.1 - The Site The site is 36 + /- acres, comprising various parcels under separate ownerships, located adjacent to the northeast corner of Highway 1 1 1 and Adams Street within the City of La Quinta. Planning Acres /Square FAR Base Zoning Proposed Uses Area Footage PA 1 12.22 acres .35 Commercial auto body & 532,303 sq. ft. except the Park services, RV & storage self storage, facility hardware & (.50) supply, fitness center, general office, limited medical PA 2 7.30 acres .35 Mixed/Regional general retail, 317,988 sq. ft. Commercial food service, support service & financial PA 3 3.00 acres .35 Mixed/Regional general office & 130,680 sq. ft. Commercial retail PA 4 11.41 acres .35 Mixed/Regional general office & 144,600 sq. ft. Commercial retail 2.10.2 - Site Plan The site plan will feature extensive and coordinated landscape buffers to both Highway &I SPEOF/C PLAN THE LA QU/NTA CORPORATE CENTRE Specific Plan 99-036, Amendment #2 Exhibit "A" 111 and Dune Palms Road. These buffers and the significant building setbacks will complement the City's planning efforts to unify the Highway 111 streetscape. The Plan will provide for integrated architecture, landscape architecture and signage concepts as well as cooperation with the adjacent parcels for internal circulation and shared access. The building footprints and land uses indicated should be considered as a concept. The Plan contains a summary of permitted land uses and the precise location and land use type will be determined during the individual site development review. The intensity of the proposed plan is anticipated to be less than the approved General Plan allowance for the site. The breakdown of the conceptual floor area ratio (FAR) by Planning Area is as follows: PA 1 (Industrial Lots) 12.22 acres - .35 FAR* 532,303 sq. ft. land area** 186,306 sq. ft. floor area (possible) *except for the self -storage, which is proposed at .50 FAR * *Well site not included PA 2 (Regional Commercial) 7.30 acres - .35 FAR 317,988 sq. ft. land area 111,295 sq. ft. floor area PA 3 (Regional Commercial/Office) 3.00 acres - .35 FAR 130,680 sq. ft. of land area 45,738 sq. ft. of floor area PA 4 (Regional Commercial) 11.41 acres - .35 FAR 497,020 sq. ft. of land area 173,956 sq. ft. of floor area The project, on a cumulative basis, shall not exceed 0.35 FAR, pursuant to Condition #62 of City Council Resolution No. 99-111. The Planning Commission can consider site plan changes to each planning area during review of developer's project. 2.10.3 - Landscape Plan The landscape concept follows a "desert oasis" theme emphasizing water efficient materials exhibiting color and form and a minimal use of turf areas. The main entry 15 SPECIFIC PLAN THE LA QU/NTA CORPORATE CENTRE Specific Plan 99-036, Amendment #2 Exhibit "A" feature. Parking areas in the center will feature the concept of a high canopy tree form to reduce the conflict between landscape elements and project graphics. The on -site storm water drainage will be directed to the adjacent storm channel. The landscape pattern will also incorporate pedestrian friendly access to encourage movement to the different uses within the site. 2.10.4 - Utilities Utility extensions will be moderate with most utilities existing at the perimeter of the site. Some upgrades will be required by the individual utilities. The timing of Highway 1 1 1 improvements will be at the discretion of CalTrans working with the City Public Works Department. Section 2.50 delineates the necessary utility improvements. 2.10.5 - Art in Public Places The requirement for Art in Public Places will be satisfied in accordance with Chapter 2.65 of the La Quinta Municipal Code. 2.20 - PHASING 2.20.1 - Phasing Description As currently scheduled, the project will probably be constructed in multiple phases. Each phase will contain building pads and perimeter improvements as well as any necessary internal circulation improvements. Because of the concerns usually raised about phased development and the undesirability of public improvements being unfinished, the improvements necessary for each phase to stand alone will be completed prior to the occupancy of any building within that phase. Build -out will occur over time as the pad areas are leased and site development plans are approved. The initial phase of development will contain the westerly portion of the main on -site circulation improvements, lighting, and infrastructure as well as perimeter improvements such as walls perimeter landscaping, and signs. The site will be rough graded in phases and finish grades will be established after approval of the site development plans for each phase. Phased off -site improvements will include the frontage of Highway 1 1 1 (curb/gutter, landscaped parkway, median and infrastructure extensions), Adams Street (curb/gutter, landscaped median, landscaped parkway and infrastructure extensions), 16 SPECIFIC PLAN THE LA QU/NTA CORPORATE CENTRE Specific Plan 99-036, Amendment #2 Exhibit "A" and the frontage along Dune Palms Road (curb/gutter, landscaped parkway and necessary infrastructure extensions). 2.20.2 - Infrastructure Phasing The infrastructure development will include the frontage of Highway 111 (curb/gutter, landscaped parkway, and necessary infrastructure extensions) and the frontage of Dune Palms Road (curb/gutter, landscaped parkway, and infrastructure extensions). Utilities will be extended to the site as necessary. The improvements will be phased according to the on site development. Any necessary encroachment permits will be obtained. Exhibits 8, 9 and 10 depict the location and scope of infrastructure improvements. 2.30 - Grading 2.30.1 - Grading Plan Portions of the site may be mass graded as a part of the initial site preparation to accommodate the phased development of the site and the internal road system. The rough pads will be established within each phase for the various end -users and related commercial or industrial sites. Grading easement or permission to grade will be secured if grading on adjacent properties is necessary to accommodate a particular phase. It is estimated that the grading operation will move approximately 200,000 cubic yards (raw cut) and 140,000 cubic yards (raw fill). Due to shrinkage and phasing it is anticipated that there will be a balance of soil on the site. Exhibit 11 depicts the rough grading and drainage concept for the property. 2.30.2 - Erosion Control The project will comply with the City's erosion control ordinance. The grading operations shall include adequate provisions for wind and water erosion control during as well as after grading operations have ceased. This will include treatment of the pad sites that may remain undeveloped. The details of erosion control shall be included in the project's Storm Water Pollution Prevention Plan (SWPPP) and PM 10 Plan. Pre -Grading: The portions of the site to be graded shall be pre -watered to a depth of three feet prior to the onset of grading operations. �i SPECIFIC PLAN THE LA QU/NTA CORPORATE CENTRE Specific Plan 99-036, Amendment #2 Exhibit "A" During Grading: Once grading has commenced, and until grading has been completed, watering of the site and/or other treatment(s) determined to be appropriate shall be ongoing. Post Grading: All disturbed areas shall be treated to prevent erosion for the term that the area will remain undeveloped. Wherever feasible, final landscape and irrigation shall be installed. 2.30.3 - SWPPP/NPDES/PM 10 Since the Coachella Valley experiences periods of moderate to heavy wind conditions, wind-blown dust and sand is a concern with mass grading operations, especially for those sites in excess of five acres. Because of health concerns, the Environmental Protection Agency has instituted a plan in the valley to curb excess PM 10 (small particle dust). The City also participates in the National Pollutant Discharge Elimination System program. The grading concept for the project will involve mass grading the entire site and fine grading of the first phase of construction. The City of La Quinta requires SWPPP, NPDES and PM 10 plans to control the wind and water born erosion associated with such grading operations. The project will comply with the City's requirements relative to these programs. 18 VEC/f/C PLAN THE LA QUJNTA CORPORATE CENTRE Specific Plan 99-036, Amendment #2 Exhibit "A" Exhibit 8 - Sewer Service Plan 9 SPECIFIC PLAN THE L4 QU/NTA CORPORATE CENTRE Specific Plan 99-036, Amendment #2 Exhibit "A" Exhibit 9 - Water Service Plan SPECIFIC PLAN THE LA QUINTA CORPORATE CENTRE Specific Plan 99-036, Amendment #2 Exhibit "A" Exhibit 10 - Street Cross Sections Xf a rr M Y 21 SPECIFIC PLAN THE LA QU/NTA CORPORATE CENTRE Specific Plan 99-036, Amendment #2 Exhibit "A" 2.40 - DRAINAGE/FLOOD CONTROL 2.40.1 - Hydrology The majority of the site lies in flood Zone C according to the FIRM maps. The easterly portion is designated Zone B. Zone C includes areas that are not considered to be subject to flooding during a 500-year event. Zone B areas have the potential to flood during a 100-year event and the FEMA regulations require that the building pad elevations be raised one foot above the base flood elevation. The adjacent channel will be lined per the standards of CVWD. This improvement will remove potential flood hazard from the site. There are no tributary flows that have to be accommodated in the development of the site. 2.40.2 - Flood Control Master Plan The stormwater drainage system in the City of La Quinta is administered by the CVWD. Generally speaking, the system consists of improvements to the natural drainage channels that run through the City. The development of property will include provisions to conduct stormwater into these channels. The City or CVWD requires no drainage fees, however, as stated above improvements will be required to line the adjacent flood channel. 2.40.3 - On -Site Stormwater Retention Due to the site's location adjacent to the stormwater channel, no on -site retention will be required. Stormwater will be conducted directly to the channel. 2.40.3.1 - Nuisance Water Nuisance water attributed to the project will be collected and directed to areas within the landscape. A series of dry wells will be installed to percolate this water. The amount of nuisance water is expected to be reduced due to the use of water efficient landscape and irrigation materials. 2.50 - UTILITIES The La Quinta Corporate Centre is well served by utilities and is situated in a corridor planned for a relatively intense scope of commercial development. Some minor utility extensions are anticipated in conjunction with the project. During the research 22 SPECKIC PLAN THE LA QUINTA CORPORATE CENTRE Specific Plan 99-036, Amendment #2 Exhibit "A" investigation for development of this Specific Plan, Coachella Valley Water District (CVWD) was contacted. The District has indicated that there is sufficient capacity in the utilities to accommodate the project and the needs of the immediate users in the area for both water and sanitary sewer. 2.50.1 - Sewer Plan Sanitary sewer facilities for La Quinta are provided by CVWD. The nearest main is an existing 18-inch line located westerly of the site in Adams Street. Another main, 15" in size is located approximately 1,800 feet east of the site. To the extent feasible, the flows from the site will gravity flow to the main in Adams Street. No up -sizing of this facility will be required. In the event that the flow cannot be directed to the existing line in Adams Street (because of elevation differences), an extension of the line located easterly of the site will be required. The lack of contiguous parcel ownership may create a delay in serving the three most northeasterly parcels of Planning Area One. These are industrial lots that will be offered for sale and individual development. The timing of their development will be dependent on the easterly parcel developing and extending the sewer line to reach the site. As an alternative, an easement through the adjacent parcel for the extension of the sewer line could be obtained. If adjacent development (across Dune Palms Road) will be utilizing this easterly main, up -sizing to an 18" line may be necessary. Exhibit 8 shows the schematic design for sewer facilities. 2.50.2 - Water Plan Water service for La Quinta is provided by CVWD. Existing water service is provided via three mains: a 12" main located on the south side of Highway 111, an 18" line in Dune Palms Road and an 18" main in Adams Street. CVWD will require an 18" main that connects the Adams Street main to the main located in Dune Palms Road. So that there will be no disruption to circulation on Highway 111 this connection will be made in the proposed public street that traverses the northerly portion of the site. An on -site loop system will be created to maintain adequate levels of service and to meet fire flows demands. Exhibit 9 shows the schematic design for water service. 2.50.3 - Electrical Plan The Imperial Irrigation District provides electric facilities in La Quinta. The nearest service location is on Dune Palms Road, north of the Whitewater River Channel. The District indicates that the design of the electrical service will depend on final load 23 SPECIFIC PLAN THE L4 QU/NTA CORPORATE CENTRE Specific Plan 99-036, Amendment #2 Exhibit "A" calculations for the overall project. The District will require the installation of underground facilities through the center to join with future projects to the east. 2.50.4 - Other Utilities The Southern California Gas Company provides natural gas services. The nearest service is a three-inch gas line approximately 35'-0" west of the centerline along Adams Street. The line ends approximately 18 feet south of the CVWD flood control channel. A four -inch gas main is located approximately 75 feet north of the centerline of Highway 111 and ends approximately 48 feet into the site. These lines will be used to provide service to the site. AOL Time Warner, with the nearest facilities located in Highway 1 1 1, provides television cable service. Service will be extended to the site from this point of connection. Verizon Communications will provide telephone service. Fiberoptic cable will be available at the corner of 48th Avenue and Adams Street. Verizon Communications expects to serve the project from this location. Waste Management of the Desert provides waste disposal service. Plans for incorporating recycling facilities shall be considered with the development. Community Development Staff upon submission of Site Development Plans shall review facilities for compliance with City ordinances. 2.60 - LAND USE 2.60.1 - Land Use Plan The CR and CP development standards contained in the City of La Quinta Zoning Ordinance shall be followed except where specifically modified by this Specific Plan. The Plan establishes development standards for the entire site including an integrated design for the Highway 1 1 1 and Dune Palms Road frontages. These standards will include considerations for building siting, architecture, lighting, landscape, public art, and parking. These guidelines are intended to be consistent with the La Quinta General Plan goals, policies, and objectives. The key General Plan provisions are reiterated in Appendix One. The proposed plan anticipates a range of users including but not limited to, retail and 24 SPECIFIC PLAN THE LA QU/NTA CORPORATE CENTRE Specific Plan 99-036, Amendment #2 Exhibit "A" food services, a health fitness club, service commercial, medical offices, general office (commercial and industrial) and industrial storage. The site has been divided into four Planning Areas according to major user types (See Exhibit 6). ♦ Planning Area 1 (PA 1) - is dedicated to commercial/industrial development on individual lots. The goal of this Area is to provide 0.5 + acre lots that have necessary circulation and commercial services nearby for industrial users. The uses anticipated could range from retail to storage to auto painting to general offices. Planning Area One is located along the stormwater channel at the northwesterly end of the site. ♦ Planning Area 2 (PA 2) - is located on the westerly side of the site. The area is devoted to retail businesses. The Highway 111 frontage and outlying pads will be dedicated to retail and restaurant development. ♦ Planning Area 3 (PA 3) - is located adjacent to the main entry along Highway 111 and is dedicated to office park and retail development. ♦ Planning Area 4 (PA 4) - is dedicated to multiple tenant industrial/office, storage, general office, retail and support uses. This Planning Area is located along the eastern side of the site adjacent to Dune Palms Road. There is a possibility that the self -storage use may locate within this planning area. The proposed location, in PA 1, adjacent to the existing facility may not be an acceptable marketing strategy and an alternative location within the Plan may be necessary. The Planning Commission can consider site plan changes to each planning area during review of a developer's project. 2.60.1.1 - Industrial Development - Planning Area One This planning area includes individual lots available for commercial or industrial development. The Plan provides for uses, which are compatible with the City's CP Zoning designation and devoted to light industrial development. Lot sizes range from 0.53 acres to 1.05 acres in size. Development on the individual lots would occur in accordance with the design parameters and permitted uses of the Specific Plan and the processing procedures of the City of La Quinta. Anticipated uses include the following: storage yards, hardware and contractor's supply, automotive specialty repair and services such as 25 SPECIFIC PLAN THE LA QU/NTA CORPORATE CENTRE Specific Plan 99-036, Amendment #2 Exhibit "A" windshield replacement, glass tinting, stereo sales and installation and the like. A fitness center is also desired within this Planning Area. Permitted uses can also include general offices and medical uses. 2.60.1.2 - Commercial Development - Planning Areas Two, Three & Four Planning Area 2 includes service commercial uses such as nail salons, dry cleaners, copy services, real estate and financial offices and food services (both full service and take-out) for the needs of the shoppers and workers located within the immediate vicinity. Major users could also include a drug store and clothiers. Planning Area 3 may include a mid -rise office building. Planning Area 4 will provide a park -like setting for general office users along the Highway 1 1 1 frontage and a mixture of the users found in the other two areas. There will be offices, both general and medical and industrial related users such as blueprint or copy services, engineering and design services. 2.60.1.3 - Parking Standards The City of La Quinta Zoning Ordinance sets forth standards for parking for various land use types. The Ordinance leaves open the opportunity to demonstrate that an alternative standard may be more appropriate for a new development concept; based on either on sharing parking between uses, or a determination based on alternative parking demand calculations. The industrial lots within the Plan will meet the City's regulations with respect to parking unless alternative standards are approved with each site development applications. The total number of parking spaces being provided for the regional commercial is 1,366 spaces, this exceeds the City's regulations. However, the distribution throughout the site is not the same as if the land uses were occurring on standalone parcels. The area of the Plan that is the most limited is the area around the fitness center. This localized deficiency is not seen as critical to the overall functioning of the site. The City's requirements for a fitness center are significant, more so than in surrounding cities. Applying the standards from other valley cities indicates that there should be sufficient parking in the area. Secondly, the mixture of uses (service commercial and food service) will allow the workers already on -site to use the retail businesses reducing off site trips and parking demands. See Condition #64. SPECIFIC PLAN THE LA QU/NTA CORPORATE CENTRE Specific Plan 99-036, Amendment #2 Exhibit "A" Fitness Center Parking Demand CITY TOTAL Cathedral City 105 spaces* Indio 150 spaces La Quinta 200 spaces Palm Desert 200 spaces Palm Springs 75 spaces RATIO one space/250 sq. ft. for the first 8,000 and one/300 sq. ft. thereafter one space per 200-sq. ft. of floor area one space per 150-sq. ft. of floor area one space per 150-sq. ft. of floor area one space per 400-sq. ft. of floor area Note: There is no standard so general retail was used. 2.60.2 - Development Standards The uses and development standards within the La Quinta Corporate Center shall be generally in accordance with the provisions of the La Quinta Zoning regulations. Should conflict occur between the regulations and the Plan, the provisions of the Plan shall prevail. Where ambiguity occurs the Zoning regulations shall prevail. 2.60.2.1 - Permitted/Conditional and Prohibited Uses The City's Zoning Ordinance delineates the range of allowed, conditionally allowable and prohibited uses for each zoning classification. A limited number of deviations from these standards are proposed within the Plan (Appendix Three). Planning Area One (PAII) - CP Zone: Planning Area One shall be developed in a manner consistent with the CP zone subject to the following modifications. The following are additions/modifications to the CP zone list of "Principle Uses" which would be permitted in Planning Area One of the La Quinta Corporate Centre: Retail Stores up to 25,000 sq./ft: (limited to sales of merchandise that supplement and relate to the primary businesses of the CP zoning designation (small equipment and tool sales, plumbing, electrical and contractor's sales yards, auto parts and the like). Plant nurseries and sales, wholesale and retail, without onsite propagation. Showrooms/catalog stores with onsite inventory not to exceed 75% of the GFA. Animal hospitals, clinics and pet grooming 27 SPECIFIC PLAN THE LA QU/NTA CORPORATE CENTRE Specific Plan 99-036, Amendment #2 Reservoirs and water tanks Automobile repair specialty shops (i.e., installation, etc.) Automobile repairs, body work and painting Health and fitness centers Contractor's storage yards General business offices Exhibit "A" window tinting, stereo sales and Medical offices (2,000 sq. ft. or less per tenant) The following are additions/modifications to the CP zone list of "Prohibited Uses" which would not be permitted in Planning Area One of the La Quinta Corporate Centre: Restaurants, greater than 2,000 square feet with conventional seating Restaurants, drive through Golf Courses and Country Clubs Museums and art galleries Social clubs and senior centers Churches, temples and other places of worship Private elementary, intermediate and high schools Planning Areas Two, Three and Four (PA 2, 3 and 4) - M/CR Zone• Planning Areas Two and Three shall be developed in a manner consistent with the CP zone subject to the following modifications. The following uses are additions/modifications to the CR zone list of "Principle Uses" which would be permitted in Planning Areas Two, Three and Four of the La Quinta Corporate Centre: Veterinary clinics/animal hospitals Health clubs and fitness centers over 5,000 square feet Automobile service stations, with or without mini -market Day Care facilities Self -storage (PA 4 only) The following additions to the CR zone list of "Principle Uses" which would not be permitted in Planning Areas Two, Three and Four of the La Quinta Corporate Centre: Wholesale, warehouse and commercial distribution centers in excess of 5,000 sq. ft. Truck or equipment rentals New or used sales of automobiles, trucks, recreational vehicles or boats 28 SPEGFIC PLAN THE LA 0UINTA CORPORATE CENTRE Specific Plan 99-036, Amendment #2 Exhibit "A" Automobile, truck, recreational vehicle or boat service centers Contractor's or equipment storage yards Central cleaning or dry-cleaning laundry plants Communications facilities, towers or antennas as a primary use Sign making Fortune telling and palmistry Sexually -oriented businesses Private elementary, intermediate and high schools Senior housing Land use determinations may be reviewed by the Community Development Director as set forth in Section 9.20.040 of the City's Zoning Ordinance. SUMMARY OF STANDARDS BY PLANNING AREA PA 1 PA 2 PA 3 PA 4 Maximum Bldg. Height 35' 50' 50' 50' Setback - Hwy. 111 n/a 50' 50' 50' single story Setback - Hwy. 111 n/a 150' 150' 150' multi story Setback - Image Corridor n/a 20/ 10 20/ 10 20/ 10 Setback - Perimeter 20/ 10 20/ 10 20/ 10 20/ 10 Streets & cul-de-sacs Setback - Interior 0 0 0 0 property lines within the project Setback - Exterior 10, 5' 0' 5' property lines adjacent to the project Maximum Plan FAR 0.35 * (0.50 FAR may be permitted for the self -storage site) Note: See Condition #1 1 of City Council Resolution No. 2002-85. 29 SPECIFIC PLAN THE L4 QU/NTA CORPORATE CENTRE Specific Plan 99-036, Amendment #2 Exhibit "A" 2.70 - DESIGN GUIDELINES 2.70.1 - General Architectural Theme The desired architectural style of the project is contemporary desert based on California Mission, Spanish, southwest and inspired themes found in La Quinta. 2.70.2 - Building Materials and Colors A. Stucco: hand smoothed or vertical -raked textures preferred. B. Masonry: flagstone, adobe or Spanish -style brick, split -faced, fluted, or slumpstone- faced block. C. Wood: exposed, heavy timber, rough sawn beams, glu-lam beams and peeler poles with stain finish (transparent or opaque). D. Glass Block and Stained glass. E. Weathering Metals: copper, iron, bronze used as accents and detail areas. F. Off-white to medium earth tones. Wood surfaces shall be stained using medium to dark earth tones and complementary southwest colors (aqua, teal, terra cotta, and whitewash). The Planning Commission has the authority to approve substitute building materials and color tones during consideration of the specific development project. 2.70.2.1 - Building Forms Building forms, where possible, shall exhibit some stepping both in plan and elevation. This may include the use of covered pedestrian areas adjacent to the buildings and elsewhere as appropriate. 2.70.2.2 - Prohibited Forms Formula, strongly themed or "corporate" architecture is prohibited. As an example, golden arches over the roof of a McDonald's restaurant building is not permitted. 2.70.2.3 - Roofs Hip, gable and shed roof designs or combinations thereof consistent with the general architectural theme are acceptable and encouraged for main building masses. Acceptable roofing materials for pitched roofs include clay tile, and weathering metals. 30 SPECKIC PLAN THEM QUINTA CORPORATE CENTRE Specific Plan 99-036, Amendment #2 Exhibit "A" Where clay tile materials are used, a multi -hued mixture of earth tones (terra cotta, buff, olive, and the like) shall be used. Roof parapets should vary in height to create an interesting roofline. Although the use of clay tile and weathering metal roofs is recommended throughout, it is not specifically required for secondary or service -building roofs provided other roof designs are not incompatible with the general architectural theme. 2.70.2.4 - Equipment Screening Roof mounted mechanical equipment, duct -work and vents shall be screened from view by an architectural device consistent with the building design (e.g., stucco parapets, etc.), provided the design features are approved by the City's Architecture and Landscape Review Committee (ALRC) . 2.70.2.5 - Fencing and Walls Automobile service areas and service shops, shall be effectively screened from view by masonry walls of the same or complementary materials as the main building walls. Permitted Materials Stucco -covered frame construction Stucco -covered Masonry Block Wood as a decorative item Brick or masonry blocks Cultured or river stone Wrought Iron or tubular steel 2.70.2.6 - Outdoor Storage Screening Prohibited Materials Chain Link Wood (25 % or more) Security type materials (barbed or razor wire) Vehicle or materials storage associated within any use in the plan shall be screened from public view by means of a solid 6'-0" high masonry wall (i.e., stucco wall or other type of decorative block material). Areas around the outside of a storage facility shall be landscaped using trees, shrubs, and vines, subject to review and approval by the City's Architecture and Landscape Review Committee. 2.70.2.7 - Site Lighting All lighting shall be designed and located so as to confine direct light within the project boundaries (including landscape buffer areas located along the street frontages). Since 31 SPECIFIC PLAN THE LA QU/NTA CORPORATE CENTRE Specific Plan 99-036, Amendment #2 Exhibit "A" the City of La Quinta has generally maintained low lighting levels, this lighting for this project shall be consistent with lower lighting levels wherever practical. Security lighting, if required, shall be approved with each site development review. General: All lighting will comply with the City's Outdoor Lighting Ordinance. The lighting systems shall be designed and installed so fixtures are mounted perfectly horizontal with no tilt to the mounting, or exposed lighting sources. All poles (up to 24'-0" high) used shall be of a decorative or non -glossy finish, such as paint powder coating or an anodized surface. No shiny metal poles or fixtures shall be permitted. Forty-eight inch high bollard lighting is encouraged for traffic entrances and pedestrian sidewalks. Parking and Loading Areas: On -site lighting source for display or parking lot lighting shall be metal halide fixtures (e.g., 175 watt bulbs) mounted on square tubular steel poles, finished as stated above. The maximum height for any light source shall be of 24 feet or less above finish grade. All lenses shall be of a flush design. Lighting levels shall be an average of one footcandle with a ratio of average light to minimum light of three to one. Under lighting of internal drive aisles is allowed, provided parking stalls are adequately lit and the lighting plan is approved by the Community Development Director. 2.70.2.8 - Noise The operation of the industrial users could include repair and service of automobiles, trucks and include other heavy equipment. It is the intent of this Specific Plan that the layout and design for users, which have the potential to generate noise, will be designed to the extent possible to contain the noise generated. The layout shall orient the openings to the interior of the sites away from other users. The noise standards established by the City shall be applied throughout the project. Roll -up service doors shall not be visible from adjacent public streets. A second design requirement will be the prohibition of a general usage public address (p.a.) system. There are a variety of communication systems available that can replace p.a. type devices for most applications. These alternatives include pagers, and personal telecommunication systems. Any roof mounted telecommunication equipment shall be screened from view by roof structures. The siting of a monopalm telecommunication antenna in the project requires Planning Commission review and approval. However, no monopalm shall be located within 150 feet of Highway 1 1 1 and Dune Palms Road, nor exceed a height antenna height 32 SPECIFIC PLAN THE L4 QUINTA CORPORATE CENTRE Specific Plan 99-036, Amendment #2 Exhibit "A" of 80 feet from finished grade. A monopalm antenna shall not be located within 800 feet of another cellular telephone site. Other types of freestanding communication towers are not permitted unless they are aesthetically pleasing to the off -site viewer (e.g., light pole -style antenna, etc.). 2.80 - CIRCULA T/ON The La Quinta Corporate Centre proposes to develop the adjacent street system in a manner consistent with the City of La Quinta General Plan Circulation Plan and also in accord with CalTrans requirements. The property is located on Highway 111, a State highway designated by the City's General Plan as a Major Arterial requiring a half street width of 70 feet. The site also abuts Dune Palms Road, which is designated as a Secondary Arterial, requiring a half width street of 55 feet. Additional right-of-way dedication and street improvements for the streets will be required as a condition of approval of the project. The timing and design of improvements for Highway 111 will be coordinated with CalTrans. All necessary encroachment permits will be obtained. The project proposes to share access and circulation with the hotel/restaurant project, which abuts the subject property on its west boundary. The Hotel 111 Specific Plan approved by the City Council on February 23, 1999, incorporates the concept of shared access with this site. The property to the east shall ultimately continue with the circulation pattern set forth in the Plan by continuing the Corporate Centre Drive, providing reciprocal access and parking and by completing the entry on Highway 111. There are four entry points to the site from Highway 111. The main entry of the La Quinta Corporate Centre aligns with the main entry of the La Quinta Auto Mall project. The primary on -site circulation meanders west -to -east -through the site. Parking areas and minor circulation aisles are connected to this main aisle. Depending upon the site development plans additional connections may be made to connect the commercial portion with the individual lots located along the north boundary of the project. The internal drive also connects to the Hotel 111 site at the west boundary. The La Quinta Zoning Ordinance requires provisions be made for bicycle parking based on land use. The Plan will comply with the City requirements for bicycle parking. Loading spaces required are pursuant to Section 9.150 of the City's Zoning Ordinance. The plan does not propose any alteration to the City's requirement for loading spaces. The location and number of spaces will depend on the ultimate users and this issue will be addressed through the individual site development permits. 33 SPECIFIC PLAN THE LA QU/NTA CORPORATE CENTRE Specific Plan 99-036, Amendment #2 Exhibit "A" of 80 feet from finished grade. A monopalm antenna shall not be located within 800 feet of another cellular telephone site. Other types of freestanding communication towers are not permitted unless they are aesthetically pleasing to the off -site viewer (e.g., light pole -style antenna, etc.). 2.80 - CIRCULATION The La Quinta Corporate Centre proposes to develop the adjacent street system in a manner consistent with the City of La Quinta General Plan Circulation Plan and also in accord with CalTrans requirements. The property is located on Highway 1 1 1, a State highway designated by the City's General Plan as a Major Arterial requiring a half street width of 70 feet. The site also abuts Dune Palms Road, which is designated as a Secondary Arterial, requiring a half width street of 55 feet. Additional right-of-way dedication and street improvements for the streets will be required as a condition of approval of the project. The timing and design of improvements for Highway 111 will be coordinated with CalTrans. All necessary encroachment permits will be obtained. The project proposes to share access and circulation with the hotel/restaurant project, which abuts the subject property on its west boundary. The Hotel 1 1 1 Specific Plan approved by the City Council on February 23, 1999, incorporates the concept of shared access with this site. The property to the east shall ultimately continue with the circulation pattern set forth in the Plan by continuing the Corporate Centre Drive, providing reciprocal access and parking and by completing the entry on Highway 111. There are four entry points to the site from Highway 1 1 1. The main entry of the La Quinta Corporate Centre aligns with the main entry of the La Quinta Auto Mail project. The primary on -site circulation meanders west -to -east through the site. Parking areas and minor circulation aisles are connected to this main aisle. Depending upon the site development plans additional connections may be made to connect the commercial portion with the individual lots located along the north boundary of the project. The internal drive also connects to the Hotel 1 1 1 site at the west boundary. The La Quinta Zoning Ordinance requires provisions be made for bicycle parking based on land use. The Plan will comply with the City requirements for bicycle parking. Loading spaces required are pursuant to Section 9.150 of the City's Zoning Ordinance. The plan does not propose any alteration to the City's requirement for loading spaces. The location and number of spaces will depend on the ultimate users and this issue will be addressed through the individual site development permits. 33 SPECIFIC PLAN THE LA QUINTA CORPORATE CENTRE Specific Plan 99-036, Amendment #2 Exhibit "A" 2.80.1 - Off -Site Circulation System The existing conditions around the site include partial improvements on both abutting public streets. The General Plan standards for improvements that will be required in conjunction with this project are consistent with other recent road improvements in the vicinity. The construction of the required improvements will continue the process of implementing the adopted General Plan Circulation Plan. Exhibit 11 shows the proposed cross sections for the streets affecting the project. In addition to pavement, curb, gutter, median and sidewalk/bike path improvements, financial participation in the traffic signal planned at the project's main access point (Highway 111 and La Quinta Centre Drive) is anticipated. As stated in earlier sections the phasing of the public improvements will be commensurate with the level of development that they are intended to serve. Occupancy of any structure within the plan will be contingent upon completion of the necessary public improvements. 2.80.2 - Public Transportation Demand Management Bus turnouts and shelters shall be provided as a part of the project's public street improvements pursuant to requirements of SunLine Transit, the Public Works Director and CalTrans. Prior to issuance of building permits for individual Site Development Permits, applicants shall submit a Transportation Demand Management (TDM) Plan to the Public Works and Community Development Departments. The plans shall address capital improvement and operational standards as set forth in the City's TDM Ordinance. Any transit -related improvements required by the Sunline Transit Agency as a condition to development will not constitute compliance with the plan submittal requirements. 2.80.3 - Site Circulation and Unnamed Industrial Drive (Corporate Centre Drive) Corporate Centre Drive shall serve the properties on the north side of the project using a 64-foot right-of-way. The roadway intersection with Dune Palms Road and Adams Street is located more than 600 feet from the intersection of Highway 111 providing ample room for stacking and maneuvering of larger vehicles often associated with industrial users. This roadway will also allow the industrial lots to be served by direct 34 SPECIFIC PLAN THE L4 QU/NTA CORPORATE CENTRE Specific Plan 99-036, Amendment #2 Exhibit "A" access to Adams Street and Dune Palms Road, separating the large vehicle traffic from the mixed -use portion of the site. Until such time as the middle parcel (15 + acres) is developed, a cul-de-sac will be located at the westerly and easterly terminus of Corporate Centre Drive. The commercial center circulation plan is depicted on the overall site plan. The commercial center will develop its own internal circulation system, which will provide reciprocal access between all adjacent parcels including the previously approved Hotel 111 Specific Plan (98-033). A main vehicle corridor will traverse the commercial portion of the site in an east -west direction. However, the final circulation design will depend on the ultimate users and the configuration of buildings. The internal access for the commercial center will be accessed via a main entry from the signal at Highway 111 and by three minor driveway locations around the perimeter of the center. Once on the property, users will be able to visit the different portions of the site by using the internal roadways without exiting onto a public street. The interior roadway design will use proper engineering principles including but not limited to, adequate distance between intersecting drives and eliminating conflicts between backing vehicles and travel lanes. The plan anticipates cooperation in extending the on -site circulation system including the completion of the main access from Highway 111 upon development of the adjacent parcel. The completion of the circulation system includes the east half of the main access from Highway 1 1 1, the industrial roadway and the commercial area parking and circulation network. 2.90 - LANDSCAPE CONCEPTS The landscape concept follows a "desert oasis" theme emphasizing water efficient materials exhibiting color and form. Parking areas in the commercial center will feature the concept of a high canopy tree form to reduce the conflict between landscape elements and project graphics. The project will feature extensive streetscapes along Highway 111 and Dune Palms Road. The City of La Quinta has adopted streetscape program for Highway 111. It is the intent of this Specific Plan to complement that effort within the landscaped setback area by incorporating design principles into the guidelines for the project. The adopted design theme is included as Appendix Four. 35 SPEORC PLAN THE LA QUINTA CORPORATE CENTRE Specific Plan 99-036, Amendment #2 Exhibit "A" 2.90.1 - Landscape Development Standards The La Quinta Corporate Centre will meet the minimum standards for landscape improvements, including parking lot shading as set forth in the City's Zoning Ordinance and other relevant documents. The trees used throughout the site shall be eight to 10 feet in height with a minimum container size of 24" box and a minimum trunk size of 1.5-inch caliper. Shrubs shall be a minimum of five gallons in size, unless specifically approved otherwise. 2.90.2 - Landscape Palette Landscape materials selected for detailed landscape plans (other than Highway 111) shall be chosen from the materials listed below. The plant palette for the Highway 111 frontage is contained in the Highway 111 Design Theme Plan contained in Appendix Four. 2.90.3 - Landscape Maintenance A landscape maintenance handbook shall be established to develop standard maintenance practices for the overall project. Of particular concern, is to allow tree forms to fully develop in the parking lot areas in order to achieve the required percentage of shading as set forth in the Zoning Ordinance. The landscape for the commercial center shall also be under a single maintenance contract managed by the center or by the Property Owners Association in the event that multiple ownership exists. 2.90.4 - Landscape Improvements The site development permit applications will address the specifics of the landscaping with the exception of the Highway 111 frontage, which will follow the City's adopted design theme. TREES ACACIA SMALII ACACIA STENOPHYLLA CERCIDIUM FLORIDUM MASTER PLANT LIST SWEET ACACIA SHOESTRING ACACIA BLUE PALO VERDE 36 SPECIFIC PLAN THE LA QU/NTA CORPORATE CENTRE Specific Plan 99-036, Amendment #2 CERDIDIUM PRAECOX GEIJERA PARVIFOLIA LYSILOMA THORNBERI SOPHORA SECUNDIFLORA PALMS CHAMAEROPS HUMILIS WASHINGTONIA FILIFERA WASHINGTONIA ROBUSTA PHOENIX DACTYLIFERA ARECASTRUM ROMANZOFFIANUM BRAHEA ARMATA SHRUBS CAESALPINIA PULCHERRIMA CASSIA SPECIES ENCELIA FARINOSA JUSTICIA SPICIGERA LEUCOPHYLLUM C. SPECIES NERIUM OLEANDER 'PETITE PINK' NOLINA PARRYI RAPHIOLEPIS (.'SPECIES' SALVIA G. 'SIERRA LINDA' SIMMONDSIA CHINENSIS THEVETIA PERUVIANA XYLOSMA CONGESTUM 'COMPACTA' GROUNDCOVER ANNUAL COLOR ACACIA R. 'DESERT CARPET' BACCHARIS CENTENNIAL DALEA GREGGII LANTANA MONTEVEDENSIS LANTANA M. 'GOLD SPOT' OENOTHERA BERLANDIERI ROSMARINUS 0. 'LOCKWOOD FOREST' SANTOLINA VIRENS VERBENA RIGIDA PALM SPRINGS 'GOLD' WILDFLOWERS DESERT WILDFLOWER MIXTURE Exhibit "A" SONORAN PALO VERDE AUSTRALIAN WILLOW FEATHER BUSH TEXAS MOUNTAIN LAUREL MEDITERRANEAN FAN PALM CALIFORNIA FAN PALM MEXICAN FAN PALM DATE PALM (ACCENT ONLY) QUEEN PALM (ACCENT ONLY) MEXICAN BLUE PALM (ACCENT ONLY) RED BIRD OF PARADISE CASSIA BRITTLE BUSH MEXICAN HONEYSUCKLE TEXAS RANGER DWARF OLEANDER DWARF MEXICAN GRASS TREE INDIA HAWTHORN SAGE JOJOBA YELLOW OLEANDER DWARF XYLOSMA SEASONAL FLOWERS TRAILING ACACIA BACCHARIS PROSTRATE INDIGO BUSH PURPLE PROSTRATE LANTANA YELLOW PROSTRATE LANTANA MEXICAN PRIMROSE DWARF ROSEMARY GREEN SANTOLINA VERBENA GRAVEL TAILINGS CALIFORNIA POPPIES, VERBENA, ETC. 37 SPECIFIC PLAN THE LA allINTA CORPORATE CENTRE Specific Plan 99-036, Amendment #2 Exhibit "A" Special Note: Palm trees inside the development shall be untrimmed to provide a roosting site for bats per General Plan Biological Resources Program 3.3. The use of lawn shall be limited to parkway and art piece areas, subject to review and approval by the Planning Commission and/or City Council. 2.10 - SIGNS The City shall approve a comprehensive sign plan for each building complex prior to the issuance of building permits. A preliminary sign concept including location, general size, materials and lighting, shall be submitted with each site development plan or conditional use permit application. The main principles of the comprehensive sign plan shall be compliance with the sign regulations of the La Quinta Zoning Ordinance, except as otherwise set forth herein. Only channel letter building signs are permitted. The concept being presented represents an integrated approach to center identification for such a large parcel. Overall center identification is achieved with an entry statement on Highway 111 and entry monumentation on each of the secondary street frontages. These "Centre" identification signs will create an address for the individual tenants who are not permitted to have freestanding identification signs. The La Quinta Corporate Centre plan has four signs, two on Highway 111 and two on Dune Palms Road (Exhibit 12). 2.10.1 - Signs for the Commercial Center As the leasing program develops and the tenants are identified, the major tenant identification signs may be subject to alteration, which would require approval by the City of La Quinta Planning Commission. The appropriate signage for the ultimate user(s) of this portion of the project will be determined upon development of detailed site development plans. The concept for tenant signs throughout the Corporate Centre shall include a single - sign allowance per user located on the building. Alternative locations may be considered based on the most effective use of graphic identification. The multi -tenant buildings shall integrate a concept for signs into the architectural scheme. Freestanding signs may identify the center, freestanding (single user) buildings or a combination of both. No individual tenants, located within a multiple tenant building 38 SPECIFIC PLAN THE LA QU/NTA CORPORATE CENTRE Specific Plan 99-036, Amendment #2 Exhibit "A" may be identified by a freestanding sign, except that single tenants with more than 10,000 gross (leased floor) area may be identified on the complex signs. All freestanding signs shall be of a monument style. Within the regional commercial portion of the Plan, a service station site has been identified. The sign identification for this, type of user shall include the mandatory State of California pricing signs, which may be freestanding and located in the landscape setback area and identification on the building or canopy. The commercial center will have a center identification sign along the Highway 1 1 1 frontage. In addition there will monumentation at the west and east secondary access points on Highway 1 1 1. In general, monument signs shall conform to the City of La Quinta standards, except that single tenants with more than 15,000 gross (leased floor) area may be identified on the complex signs. Exhibits 12 through 18 depict the sign locations and design concepts for the project identification signs. Final monument sign designs may be altered to reflect the detailed architectural character of the Centre. 2.10.2 - Signs for the Industrial Center Generally, the sign provisions for the individual industrial lots shall be in accordance with the City of La Quinta sign regulations of the Zoning Ordinance. The structures with multi -tenant use shall follow the pattern of the commercial portion of the development in that the multi -tenant buildings shall integrate a concept for signs into the architectural scheme, which shall become the basis for the comprehensive sign plan for the building. The signs shall be approved with each site development plan or conditional use permit review. Freestanding signs for the single -user properties shall be in conformance with the City of La Quinta standards, ensuring design graphics match those contained in Exhibit 15 of the Plan. 2.10.3 - Signs — Area Calculations Sign applications within the La Quinta Corporate Centre shall be processed in conformance with Condition of Approval #68. 39 SPEURC MAN THE LA OUINTA CORPORATE CENTRE Specific Plan 99-036, Amendment #2 Exhibit "A" Exhibit 11 - Preliminary Grading Plan F SPECIFIC PLAN THE LA QU/NTA CORPORATE CENTRE Specific Plan 99-036, Amendment #2 Exhibit "A" Exhibit 12 - Sign Concepts - Summary CO - - co ik Q O - 0 a - a }' W •° c E .W w c W c °° C c o c o y a Z m M :R 10 V ° 1 1 d as as d 0 1�1 / w-•-•-•-••- •••-••� o�. v...�v1�11V1111VIIII II IVI •'\ \ 7 iHIM j� •� a js ti ~ h sn Swrar 40 41 sPEMM PLAN THE LA 0UINTA CORPORATE CENTRE Specific Plan 99-036, Amendment #2 Exhibit "A" Exhibit 13 - Sign Concepts W W W T r O O O G -J�--- .9 tl N- 42 SPECIFIC PLAN THE LA QU/NTA CORPORATE CENTRE Specific Plan 99-036, Amendment #2 Exhibit "A" Exhibit 14 - Sign Concepts z W INC W W V � W x < V W Z ug U. G r 'N• O ZZ •. J Cr J i W U• :�I aKI SPECIRC PLAN THE LA QU/NTA CORPORATE CENTRE Specific Plan 99-036, Amendment #2 Exhibit *'A" Exhibit 15 - Sign Concepts I • : Q W Q W ,W (� Q x < <i W . Z 0 v_ z • LU U w < i ' W W 0 V X W z 81 0 J~ U = c a E11 SPECIFIC PLAN THE LA QU/NTA CORPORATE CENTRE Specific Plan 99-036, Amendment #2 Exhibit "A" Exhibit 16 - Sign Concepts J Q O LL' CL Q LL O U) Z O F- o Z O U 00 0 LU F-- Q _Z 2 W F- m X LLI 45 SPECIFIC PLAN THE LA aUINTA CORPORATE CENTRE Specific Plan 99-036, Amendment #2 Exhibit "A" APPENDIX ONE GENERAL PLAN POLICIES 46 SPECIFIC PLAN THE LA QU/NTA CORPORATE CENTRE Specific Plan 99-036, Amendment #2 Exhibit "A" APPLICABLE GENERAL PLAN POLICIES The General Plan of the City of La Quinta was adopted in 1992 and includes Goals, Objectives and Policies that were deemed by the City necessary to properly implement the plan. The key policies that affect the development of the subject property are as follows: LAND USE ELEMENT Policy 1.2: "The City will encourage an integration of a wide range of support services at employment centers, including child care, occupational health, fitness facilities and convenience retail shops." The Plan provides a variety of building types, sizes and locations so that there is maximum flexibility in attracting businesses appropriate for the M/RC classification. A Floor Area Ratio of 0.35 is planned within the 36-acre development. Policy 2.1: "Residential development shall not be permitted within 600 feet of Highway 111 in the Regional Commercial designation, except as allowed in the nonresidential overlay in the Development Code." The Plan complies with the Non -Residential Overlay by not permitting residential uses. Policy 4 - Specific Plans of Land Use shall be required for all projects of 20 acres or more before any land divisions. The Plan complies with this policy. General Land Use Policy 6 - "In -fill development shall be encouraged by placing capital improvement projects in the developed areas of the City as top priorities." The Plan proposes project and infrastructure phasing in Section 2.20. Policy 10: "The City shall maintain its "dark sky" ordinance." The plan proposes low-level landscape lighting and down focused lighting within the parking areas. C3� SPECIRC PLAN THE LA OU/NTA CORPORATE CENTRE Specific Plan 99-036, Amendment #2 Exhibit "A" TRAFFIC AND CIRCULATION ELEMENT Policy 1 - "Establish and maintain a master plan of roads, which sets forth detailed improvement plans and schedules for implementation, to assure minimal levels of roadway segment and intersection operations at V/C ratio of 0.80 and LOS D, respectively." A traffic study has been completed for the Plan and the improvements proposed will preclude the Level of Service from being below level "D". Policy 1.1: "Initiate and complete a master plan of roads, which includes targets for ultimate rights -of -way and pavement widths and provides a schedule for securing right- of-way and constructing improvements consistent with the projected needs and standards set forth in the City Circulation Element and Program EIR." The public road sections will comply with the City adopted road sections. Policy 2.2: "Review new and redeveloping project along Washington Street, Adams Street and Highway 111 with the intent of limiting access and aligning and/or consolidating access drives in a manner which minimizes conflicting turning movements and maximizes the use of existing and planned signalized intersections." A traffic study has been completed for the Plan, surrounding and adjacent developments. When warranted, traffic signals will be installed on Highway 111. Access points will be located and comply with best practice methods. Policy 6: "Develop and encourage the use of continuos and convenient bicycle routes and multi -use trails to places of employment, recreation, shopping schools, and other high activity areas with potential for increased bicycle, equestrian, golf cart and other non -vehicular use." The plan complies with Exhibit 3.10 of the General Plan. Policy 2.3: On Major Arterials, the minimum intersection spacing shall be 1,060 feet for commercial projects. "Intersection spacing may be reduced to 500' at the Whitewater Wash Channel and La Quinta Evacuation Channel. The design speed shall be 60 mph. Left turn median cuts may be authorized if turn pocket does not interfere with other existing or planned left turn pockets. Right in/right out access driveways shall exceed the following minimum separation distances (in all cases, distances shall be measured between curb returns): — more than 250' on the approach leg to a full turn intersection; — more than 150' on the exit leg from a full turn intersection; — 48 SPECIFIC PLAN THE LA QU/NTA CORPORATE CENTRE Specific Plan 99-036, Amendment #2 Exhibit "A" more than 250' between driveways. All access configurations shall be subject to City Engineer review and approval." The plan complies with these provisions by minimizing the amount of individual driveways and the use of medians. The access points have been consolidated along Highway 1 1 1. In addition to the main entrance there are four minor access points along the 2,300 feet of frontage. The landscape concept will comply with the City's adopted design theme for Highway 1 1 1. In addition the Plan provides for landscape design enhancements along Dune Palms Road. Turf should be used in a manner consistent with citrus trees —sparingly and in high visibility locations. Primary image corridors shall include street traffic signals, street lighting systems, street furniture, bus shelters, street name signs, and noise berms/barriers, which are designed in a coordinated and consistent theme unique to La Quinta. At key intersections, primary image corridors shall include treatments which may include special roadway paving, hardscape/screen wall arrangements and displays of public art. The Plan will comply with adopted design standards. The landscape concept will comply with the City's adopted design theme for Highway 1 1 1. In addition the Plan provides for landscape design enhancements along Dune Palms Road. Turf should be used in a manner consistent with citrus trees —sparingly and in high visibility locations. Policy 14: "The City shall maintain building height limits along Primary, Secondary, and Agrarian Image Corridors in its Development Code." The maximum building height along the image corridors will be 22 feet (excluding architectural projections) within the Highway 1 1 1 corridor (i.e., first 150 feet), unless otherwise allowed by the Planning Commission. Buildings outside of the height restricted area may be up to 35 feet high. Policy 13: "In order to preserve the aesthetic values on the City's streets, minimum landscape setbacks shall be as follows": Highway 1 1 1 - 50 feet Secondary Arterial - 10 feet The plan complies with this policy. Biological Resources Policy 3: "Native, drought-tolorant desert plant materials shall be 49 SPECIRO PLAN THE LA QU/NTA CORPORATE CENTRE Specific Plan 99-036, Amendment #2 Exhibit "A" incorporated into new development to the greatest extent practical. Invasive, nonnative species shall be discouraged." The plan complies with this policy. Turf should be used in a manner consistent with citrus trees —sparingly and in high visibility locations. Public Utilities Policy 3: "All utility and electric wires up to 34.5 kilovolts serving new development shall be installed underground." The utilities to the site and within the site will be located underground. Public Utilities Policy 4.1 "To the greatest extent practical, all new utility equipment boxes, including but not limited to traffic signal equipment, and electrical and telephone equipment, shall be located either under ground, or away from street corners and effectively shielded from public view. Undergrounding of these facilities is preferred." Project conditions will be imposed to comply with this policy. Policy 4: "Encourage expansion of ridership and the service area of the public transit systems operated by the Sunline Transit Authority within the City." The plan will provide for transit stops and facilities to be determined during review of development applications. ENVIRONMENTAL CONSERVATION Paleontologic Resources Policy 1: "The City shall require the preparation of paleontologic resource analyses by a qualified paleontologist for all development proposals which occur in areas of High Sensitivity." A cultural resources report has been submitted to the City for review. The mitigation measures contained in EA 99-383 shall be met, as prescribed. Paleontologic Resources Program 1.3: "Mitigation plans prepared as part of paleontologic resource analyses shall be implemented as part of mitigation monitoring and reporting programs." The plan will comply with the mitigation measures proposed in the cultural report and City Council Resolution 99-110. SPECIFIC PLAN THE LA OU/NTA CORPORATE CENTRE Specific Plan 99-036, Amendment #2 Exhibit "A" Cultural Resources Element Policy 3.2: "The city shall use its regulatory power to ensure the proper protection of cultural resources and avoid or minimize adverse effects on such resources from private projects that require discretionary city actions." The plan will comply with the mitigation measures proposed in the cultural report and City Council Resolution 99-1 10. INFRASTRUCTURE AND PUBLIC SERVICES Flooding and Hydrology Policy 5.1 (2"d paragraph): "New development immediately adjacent to the Coachella Valley Stormwater Channel shall continue to have the option of discharging 100-year stormwater flows directly into the stormwater channel." The Plan will convey stormwater to the Coachella Valley Stormwater Channel as well as install levee lining adjacent to the project as defined under the improvement plans presented to the City Council in 1999. AIR QUALITY ELEMENT Air Quality Policy 6: "New development shall be designed and constructed in a manner which minimizes the emission of project related pollutants." An air quality report has been submitted and the mitigation measure will be incorporated into the plan. Air Quality Program 7.2: "Continue to support and implement the provision of the State Implementation Plan for PM 10 in the Coachella Valley." Dust control measures have been made part of the plan. Energy Policy 2: "The City shall promote the development and use of alternative, clean, renewable energy resources." The plan proposes low-level landscape lighting and down focused lighting within the parking areas. Security lighting for buildings and parking areas shall be metal halide, unless otherwise approved during review of the development plans. ' 51 CITY COUNCIL RESOLUTION NO. 2003-015 .--, CONDITIONS OF APPROVAL - FINAL SPECIFIC PLAN 99-036 (AMENDMENT #2) - LA QUINTA CORPORATE CENTRE DAVID AND JAMIE REULMAN MARCH 4, 2003 GENERAL 1. Condition previously deleted; condition number retained. 2. The applicant/developer agrees to defend, indemnify, and hold harmless the City of La Quinta (the "City"), its agents, officers and employees from any claim, action or proceeding to attack, set aside, void, or annul the approval of this specific plan amendment. The City shall have sole discretion in selecting its defense counsel. The City shall promptly notify the applicant of any claim, action or proceeding and shall cooperate fully in the defense. 3. Prior to the issuance of a grading, construction or building permit, the applicant/developer shall obtain permits and/or clearances from the following public agencies: • Fire Marshal • Public Works Department (Grading Permit, Improvement Permit) • Community Development Department • Riverside County Environmental Health Department • Desert Sands Unified School District • Coachella Valley Water District (CVWD) • Imperial Irrigation District (IID) • California Water Quality Control Board (CWQCB) • Caltrans The applicant is responsible for any requirements of the permits or clearances from those jurisdictions. If the requirements include approval of improvement plans, applicant shall furnish proof of said approvals prior to obtaining City approval of the plans. The applicant shall comply with applicable provisions of the City's NPDES stormwater discharge permit. For projects requiring project -specific NPDES construction permits, the applicant shall submit a copy of the CWQCB acknowledgment of the applicant's Notice of Intent prior to issuance of a grading or site construction permit. The applicant shall ensure that the required Storm Water Pollution Protection Plan is available for inspection at the project site. Resolution No. 2003-015 Conditions of Approval - Final Specific Plan 99-036 (Amendment #2) - La Quinta Corporate Centre Adopted: March 4, 2003 Page 2 4. The applicant shall comply with the terms and requirements of the Development Impact Fee in effect at the time of issuance of building permits. PROPERTY RIGHTS 5. Prior to the issuance of a grading, construction or building permit, the applicant shall acquire or confer required or necessary property rights including easements and rights of way. 6. The applicant shall dedicate or grant public and private street right of way and utility easements in conformance with the City's General Plan, Municipal Code, applicable specific plans, and as required by the City Engineer. 7. Rights of way required of this development shall comply with the City's General Plan as follows: A. Highway 1 1 1 - the remainder of applicant's 70-foot half of a 140-foot right of way plus additional right of way if required by Caltrans or the design of the improvements. B. Dune Palms Road - the remainder of the applicant's 44-foot half of an 88- foot right of way plus additional width at Highway 1 1 1 to accommodate dual left turn lanes. The additional width section shall be 60-foot half - width from Highway 1 1 1 to 300 feet north and taper from that point northerly to 44 feet. C. Corporate Centre Drive - 64-foot right of way from western boundary (connecting to SP 98-033) to Dune Palms Road. If right of way across the "Not A Part" property is unavailable, the applicant shall, by separate deed, grant temporary right of way for construction of cul-de-sacs at the road's termini at that property. The temporary grant shall automatically expire when the industrial road is completed and the cul-de-sacs removed. D. Commerce Court (cul de sac) - 64-foot right of way. 8. Street right of way geometry for culs de sac, knuckle turns and corner cut- backs shall conform with Riverside County Standard Drawings #800, 801 and #805 respectively unless otherwise approved by the City Engineer. Resolution No. 2003-015 Conditions of Approval - Final Specific Plan 99-036 (Amendment #2) - La Quinta Corporate Centre Adopted: March 4, 2003 Page 3 9. Dedications or grants shall include additional widths as necessary for corner dedicated right and left turn lanes, bus turnouts, and other features contained in the approved construction plans. 10. If the City Engineer determines that street rights of way are necessary prior to development of this property, the applicant shall grant the rights of way within 60 days of written request by the City. 11. The applicant shall create perimeter setbacks along public rights of way as follows (listed setback depth is the average depth if a meandering wall design is used) : A. Highway 1 1 1 - 50 feet B. Adams Street, Dune Palms Road, Corporate Centre Drive, and Commerce Court - 10 feet Setback requirements apply to all frontage including sites dedicated or granted for utility purposes. Where public facilities (e.g., sidewalks) are placed on privately -owned land, the applicant shall dedicate or grant blanket easements for those purposes. 12. The applicant shall dedicate or grant easements necessary for placement of and access to utility lines and structures. 13. The applicant shall dedicate or grant abutter's rights of access to public streets from all frontage except access points shown on the approved site plan. IMPROVEMENT PLANS As used throughout these conditions of approval, professional titles such as "engineer," "surveyor," and "architect" refer to persons currently certified or licensed to practice their respective professions in the State of California. 14. Improvement plans shall be prepared by or under the direct supervision of qualified engineers and landscape architects, as appropriate. Plans shall be submitted on 24" x 36" media in the categories of "Rough Grading," "Precise Grading," "Streets & Drainage," and "Landscaping." All plans except precise Resolution No. 2003-015 Conditions of Approval - Final Specific Plan 99-036 (Amendment #2) - La auinta Corporate Centre Adopted: March 4, 2003 Page 4 grading plans shall have signature blocks for the City Engineer. Precise grading plans shall have signature blocks for Community Development Director and the Building Official. Plans are not approved for construction until they are signed. "Streets and Drainage" plans shall normally include signals, sidewalks, bike paths, gates and entryways, and parking lots. "Landscaping" plans shall normally include irrigation improvements, landscape lighting and perimeter walls. Plans for improvements not listed above shall be in formats approved by the City Engineer. 15. The City may maintain standard plans, details and/or construction notes for elements of construction. For a fee established by City resolution, the applicant may acquire standard plan and/or detail sheets from the City. 16. When final public street plans are approved by the City, the applicant shall furnish accurate Auto cad files of the approved plans on storage media acceptable to the City Engineer. The files shall utilize standard Auto cad menu items so they may be fully retrieved into a basic Auto cad program. At the completion of construction and prior to final acceptance of improvements, the applicant shall update the files to reflect as -constructed conditions. If the plans were not produced in Auto cad or a file format which can be converted to Auto cad, the City Engineer may accept raster -image files of the plans. IMPROVEMENT AGREEMENT 17. Depending on the timing of development of the specific plan area and the status of off -site improvements at that time, the applicant may be required to construct improvements, to reimburse others who construct improvements that are obligations of this development, to secure the cost of the improvements for future construction by others, or a combination of these methods. In the event that any of the improvements required herein are constructed by the City prior to their construction by the applicant, the applicant shall reimburse the City for the cost of those improvements. 18. Prior to issuance of any grading or building permits, the applicant shall construct any remaining or deferred improvements and satisfy obligations required by Resolution No. 2003-015 •--- Conditions of Approval - Final Specific Plan 99-036 (Amendment #2) - La Quints Corporate Centro Adopted: March 4, 2003 . Page 5 these conditions, Caltrans and/or utility authorities or furnish an executed, secured agreement to do so. For secured agreements, security provided, and the release thereof, shall conform with Chapter 13, LQMC. 19. If improvements are secured, the applicant shall provide estimates of improvement costs for checking and approval by the City Engineer. Estimates shall comply with the schedule of unit costs adopted by City resolution or ordinance. For items not listed in the City's schedule, estimates shall meet the approval of the City Engineer. Estimates for utilities and other improvements under the jurisdiction of other agencies shall be approved by those agencies. Security is not required for telephone, gas, or T.V. cable improvements. 20. If on -site improvements are phased with multiple administrative approvals (e.g., Site Development Permits or maps), all obligations for public improvements shall be satisfied or secured prior to approval of the first phase unless otherwise approved by the City Engineer. 21. If the applicant fails to construct improvements or satisfy obligations in a timely manner or as specified in an approved phasing plan, the City shall have the right to halt issuance of building permits or final building inspections or otherwise withhold approvals related to the development of the project until the applicant makes satisfactory progress on the improvements or obligations or has made other arrangements satisfactory to the City. GRADING 22. The applicant shall furnish a preliminary geotechnical ("soils") report and a grading plan prepared by a qualified engineer. The grading plan shall conform with the recommendations of the soils report and be certified as adequate by a soils engineer or engineering geologist. The plan must be approved by the City Engineer prior to issuance of a grading permit. 23. Slopes shall not exceed 5:1 within public rights of way and 3:1 in landscape areas outside the right of way unless otherwise approved by the City Engineer. 24. The applicant shall endeavor to minimize differences in elevation at abutting properties. Resolution No. 2003-015 Conditions of Approval - Final Specific Plan 99-036 (Amendment #2) - La auinta Corporate Centre Adopted: March 4, 2003 Page 6 25. Prior to occupation of the project site for construction purposes, the applicant shall submit and receive approval of a Fugitive Dust Control plan prepared in accordance with Chapter 6.16 (LQMC) to the Public Works Department. The applicant shall furnish security, in a form acceptable to the City, in an amount sufficient to guarantee compliance with the provisions of the permit. 26. The applicant shall maintain cleared or graded land to prevent wind and water erosion of soils. The land shall be planted with interim landscaping or provided with other erosion control measures approved by the Community Development and Public Works Departments. 27. Prior to issuance of building permits, the applicant shall provide building pad certifications stamped and signed by qualified engineers or surveyors. For each pad, the certification shall list the approved elevation, the actual elevation, the difference between the two, if any, and pad compaction. The data shall be organized by lot number and listed cumulatively if submitted at different times. DRAINAGE 28. The tributary drainage area shall extend to the centerline of adjacent public streets. 29. Storm drainage historically received from adjoining property shall be retained on site or disposed of in the same manner as on -site storm runoff. 30. Nuisance water shall be retained on site and disposed of in a manner acceptable to the City Engineer. 31. If the applicant proposes discharge of stormwater to the Whitewater Drainage Channel, the applicant shall indemnify the City from the costs of any sampling and testing of the development's effluent which may be required under the City's NPDES Permit or other City- or area -wide pollution prevention program, and for any other obligations and/or expenses which may arise from such discharge. The indemnification shall be executed and furnished to the City prior to issuance of any grading, construction or building permit and shall be binding on all heirs, executors, administrators, assigns, and successors in interest of land within the specific plan area excepting therefrom those portions required to be dedicated or deeded for public use. The form of the indemnification and the assignment of responsibility (if any) shall be acceptable to the City Attorney. Resolution No. 2003-015 Conditions of Approval - Final Speciflc Plan 99-036 (Amendment #2) - La Quinta Corporate Centre Adopted: March 4, 2003 Page 7 UTILITIES 32. The applicant shall comply with legally -enforceable requirements of utility authorities. 33. The applicant shall obtain the approval of the City Engineer for the location of all proposed utility lines within the right of way and all above -ground utility structures including, but not limited to, traffic signal cabinets, electrical vaults, water valves, and telephone stands, to ensure optimum placement for practical and aesthetic purposes. 34. Existing aerial utilities and all proposed utilities within or adjacent to the proposed development shall be installed underground. Power lines exceeding 34.5 kv are exempt from this requirement. 35. Utilities shall be installed prior to overlying hardscape. For installation of utilities in existing, improved streets, the applicant shall comply with trench restoration requirements maintained or required by the City Engineer. The applicant shall provide certified reports of trench compaction. STREET AND TRAFFIC IMPROVEMENTS 36. The City is contemplating adoption of a revised infrastructure fee program. Any property within this specific plan which has not received final development approval when the program takes effect may be subject to the program as determined by the City. 37. The applicant is responsible for the following street improvements which shall conform with the General Plan street type noted in parentheses. Dimensions and features shall conform with the City's General Plan in effect at the time of construction if different from those listed. A. Highway 111 - The north half (58 feet) of a 116-foot street improvement including landscape median, 50 percent of the traffic signal modification at the project main entry and an eight -foot sidewalk. B. Dune Palms Road - Construct half -width street improvement plus six-foot sidewalk. Half street shall be 48-feet from the Highway 111 curb return Resolution No. 2003-015 Conditions of Approval - Final Specific Plan 99-036 (Amendment #2) - La Quinta Corporate Centre Adopted: March 4, 2003 Page 8 to a point 285 feet north and from that point taper 55:1 northerly to 32- foot width. The applicant shall re -stripe traffic lanes and modify the traffic signal at this intersection as required including, but not necessarily limited to, installation, relocation or reconfiguration of poles, arms, heads, and traffic sensor loops. C. Corporate Centre Drive (formerly Industrial Road) - 40-foot travel width (between curb faces) from Adams Street to east boundary of hotel site plus 5-foot sidewalks. The applicant shall have full responsibility for any required traffic signals or a fair share responsibility if adjacent developments utilize signals for access. If right of way is available across the "Not A Part" property (APN: 649- 020-006), the applicant may be required to construct that portion of the road subject to reimbursement. If not available, the applicant shall construct cul de sacs at the industrial road's termini at that property. D. Bike Path - Construct a "Class A" Bike Path along the south embankment of the Whitewater Storm Channel (within the Channel right of way) from Adams Street to Dune Palms Road along the project property line, subject to CVWD approval. E. Parking Lot - The on -site parking lot shall conform with the provisions of the LQMC, General Plan and Zoning Ordinance unless otherwise specified in the Specific Plan. Bus turnouts, dedicated turn lanes and other features in the approved plans may warrant additional street widths as deemed necessary by the City Engineer. 38. Improvements shall be designed and constructed in accordance with the LQMC, adopted standards, supplemental drawings and specifications, and as approved by the City Engineer. Improvement plans for streets and parking areas shall be stamped and signed by qualified engineers. 39. Condition deleted (same as Condition #8); condition number retained. 40. The applicant may be required to extend improvements beyond development boundaries to ensure they safely integrate with existing improvements (e.g., grading; traffic control devices and transitions in alignment, elevation or dimensions of streets and sidewalks). Resolution No. 2003-015 --- Conditions of Approval - Final Specific Plan 99-036 (Amendment *2) - Le Quints Corporate Centre Adopted: March 4, 2003 Page 9 41. Improvements shall include appurtenances such as traffic control signs, markings and other devices, street name signs, and sidewalks. Mid -block street lighting is not required. 42. The applicant shall design street pavement sections using Caltrans' design procedure (20-year life) and site -specific data for soil strength and anticipated traffic loading (including construction traffic). Minimum structural sections shall be equivalent to the following: Residential & Parking Areas 3.0" a.c./4.50" a.b. Collector 4.0"/5.00" Secondary Arterial 4.011/6.00" Primary Arterial 4.511/6.00" Major Arterial 5.511/6.50" 43. The applicant shall submit current mix designs (less than two years old at the time of construction) for base, asphalt concrete and Portland cement concrete. The submittal shall include test results for all specimens used in the mix design procedure. For mix designs over six months old, the submittal shall include recent (less than six months old at the time of construction) aggregate gradation test results confirming that design gradations can be achieved in current production. The applicant shall not schedule construction operations until mix designs are approved. 44. General access points, turning movements of traffic and internal circulation are subject to the following: A. Main Project Entry - On Highway 1 1 1 midway between Adams Street and Dune Palms Road and aligning with the Auto Center's main entry on south side of Highway 111 - Full turning movements allowed with traffic signal installation. B. Secondary Accesses on Highway 111 - As allowed by Caltrans and approved by the City Engineer. Right-in/right-out only. Minimum spacing of 250 feet between curb returns of any adjacent driveways or streets. City staff shall support the applicant's efforts to add a driveway in excess of the Caltrans standard. C. Access Drive on Dune Palms Road - Minimum spacing of 250 feet Resolution No. 2003-015 Conditions of Approval - Final Specific Plan 99-036 (Amendment #2) - La Quinta Corporate Centre Adopted: March 4, 2003 Page 10 between the access drive curb return and the Highway 1 1 1 curb return. D. Access drives from arterial streets shall not have parking spaces taking direct access therefrom and shall not be intersected by a parking aisle or another parking accessway for a minimum distance of 82 feet from the curb face of Highway 1 1 1 (excluding parcels in Planning Area #4), and 39 feet from the curb face of Dune Palms Road. Parking accessways for Planning Area #4 onto Highway 1 1 1 shall be setback a minimum distance of 50 feet from the property line, subject to approval of a Site Development or Conditional Use Permits. E. Corporate Centre Drive - Access locations as depicted in the Specific Plan. Access drive geometries shall comply with current City standards and policies. 45. The applicant shall submit an interior circulation plan for review and approval of the City Engineer. The plan shall be drawn to scale and include dimensions, curve data and corner radii for main interior circulation routes. 46. Prior to approval of any final map that subdivides land, or any lot line adjustment that adjusts the size of existing lots with the Specific Plan area, reciprocal access easements shall be provided as necessary to implement the circulation patterns approved by the Specific Plan. The easterly portion of the Specific Plan area shall provide at least two internal access routes within the parking lots leading to the abutting property located to the west which is not a part of this Specific Plan. If the applicant desires to construct an access route to the signal on Highway 1 1 1 at La Quinta Drive, the applicant shall obtain an executed reciprocal access easement and agreement. The location and language of the access easement shall meet the approval of the City Engineer and the City Attorney. The easement provision may include a requirement for the abutting property owners to reimburse the applicant a pro-rata share of the commercially reasonable cost of construction and maintenance of the shared access routes (including signal if applicable). Such provisions shall provide for arbitration of disputes regarding the provision of the agreement. LANDSCAPING Resolution No. 2003-015 ,_._.. Conditions of Approval - Final Specific Plan 99-036 (Amendment #2) - La Quints Corporate Centro Adopted: March 4, 2003 Page 11 47. The applicant shall provide landscaping in required setbacks. 48. Landscape and irrigation plans shall be signed and stamped by a licensed landscape architect. The applicant shall submit plans to the Community Development Department. When plans are approved, the applicant shall obtain the signatures of CVWD and the Riverside County Agricultural Commissioner prior to final signing by the City. 49. Landscape areas shall have permanent irrigation improvements meeting the requirements of the City. Use of lawn shall be minimized with no lawn or spray irrigation within 18-inches of curbs along public streets. PUBLIC SERVICES 50. The applicant shall provide public transit improvements as required by Sunline Transit and/or the City Engineer. QUALITY ASSURANCE 51. The applicant shall employ construction quality -assurance measures which meet the approval of the City Engineer. 52. The applicant shall employ or retain qualified civil engineers, geotechnical engineers, surveyors, or other appropriate professionals to provide sufficient construction supervision to be able to furnish and sign accurate record drawings. 53. The applicant shall arrange and bear the cost of measurement, sampling and testing procedures not included in the City's inspection program but required by the City as evidence that construction materials and methods comply with plans and specifications. 54. Upon completion of construction, the applicant shall furnish the City reproducible record drawings of all public improvement plans which were signed by the City Engineer. Each sheet shall be clearly marked "Record Drawings," "As -Built" or "As -Constructed" and shall be stamped and signed by the engineer or surveyor certifying to the accuracy of the drawings. The applicant shall revise the CAD or raster -image files previously submitted to the City to reflect as -constructed conditions. Resolution No. 2003-015 Conditions of Approval - Final Specific Plan 99-036 (Amendment #2) - La Quinta Corporate Centre Adopted: March 4, 2003 Page 12 MAINTENANCE 55. The applicant shall make provisions for continuous, perpetual maintenance of all on -site improvements, perimeter landscaping, access drives, sidewalks, and drainage outfalls. The applicant shall maintain required public improvements until expressly released from this responsibility by the appropriate public agency. FEES AND DEPOSITS 56. The applicant shall pay the City's established fees for plan checking and construction inspection. Fee amounts shall be those in effect when the applicant makes application for plan checking and permits. FIRE DEPARTMENT CONDITIONS 57. All water mains and fire hydrants providing required fire flows shall be constructed in accordance with the appropriated sections of CVWD Std. W-33, subject to the approval by the Riverside County Fire Department. 58. All roads need to be a minimum of 20 feet unobstructed width for emergency access. 59. Specific access plans shall be submitted for review. COMMUNITY DEVELOPMENT DEPARTMENT CONDITIONS 60. Any Site Development Permit applications submitted to the City for review shall substantially conform to the text and exhibits contained in the Specific Plan. The Planning Commission can consider site plan changes to each planning area during review of a developer's project. 61. Any land use or combination of land uses proposed for the Regional Commercial portion of the site shall demonstrate, as part of the Site Development Permit process, that the development standards and square footage for the proposed land use or group of land uses will not exceed the square footage specified on page 3 of the Specific Plan, Section 1.20.2. In addition, any industrial lot developed in Planning Area 1 shall conform -to the development standards contained in the Zoning Ordinance. Should a land use or group of land uses Resolution No. 2003-015 •-- Conditions of Approval - Final specific Plan 99-036 (Amendment #t2) - La Quints Corporate Centre Adopted: March 4, 2003 Page 13 exceed the maximum square footage shown on page 3 of the Specific Plan for commercial uses, or in the Zoning Ordinance for industrial uses, a Specific Plan amendment and associated environmental review shall be required. 62. The maximum square footage proposed for the project shall not exceed 0.35 FAR cumulatively, excluding RV storage site and well site. Each proposed land use, or phase of land uses, shall demonstrate their conformance with the FAR requirement as part of the Site Development Permit process. 63. The two-story portion of the 53,000 square foot office building in Planning Area 4 shall be located a minimum of 150 feet from the Highway 111 property line. The building height shall be reduced to a maximum of 22 feet in height, to conform with the standards for Primary Image Corridors. 64. Parking for each proposed phase or building of the proposed project shall conform to the City's Zoning standards in effect at the time of Site Development Permit review. Parking requirements shall be reviewed with each Site Development Permit application. Should shared or reduced parking be requested, calculations for same shall conform to the City's formulas and standards, as contained in the Zoning Ordinance. In no case shall parking for the regional commercial center be less than a total of 1,366 spaces, as required in the Specific Plan. 65. Each building or buildings proposed for construction shall be required to pay the school mitigation fee in effect at the time of construction, prior to the issuance of a building permit. 66. The tenants and property owners shall be responsible for the maintenance of parking areas, interior roadways, sidewalks, landscaping and other common area amenities through a common association. 67. Condition completed; condition number retained. 68. The signage program and associated exhibits shall be modified to reflect the following: A. Sign D shall not exceed 100 sq. ft. in total area. B. Sign G shall not exceed 100 sq. ft. in total area. C. Sign F shall not exceed 50 sq. ft. in total area. D. No additional monument signs shall be permitted, except for Industrial Resolution No. 2003-015 Conditions of Approval - Final Specific Plan 99-036 (Amendment #2) - La Quinta Corporate Centre Adopted: March 4, 2003 Page 14 Lot users. E. All tenants shall be permitted one wall -mounted sign and one under - canopy sign meeting the regulations of Section 9.160 of the Municipal Code. Only channel lettering building signs are allowed. Individual building tenant signs shall not exceed 50 square feet in overall size, including logo emblems. Exterior building mounted signs shall be limited to first floor level tenants. Businesses located above the first floor level shall be restricted to directory signs placed at main building entries and courtyards. F. Gasoline ID and price signs (one per street frontage), meeting the regulations of Section 9.160 of the Municipal Code. All proposed signs shall be made a part of the Site Development Permit under which the signs will be constructed. All Site Development Permit applications involving signage shall submit an analysis which demonstrates consistency with this Condition of Approval. A Sign Program shall be submitted for any multiple tenant building. Each sign program shall be reviewed and approved by the Planning Commission. 69. Any area of the site which is graded, but which is not to be developed as part of the phase under construction, shall be turfed to limit blowsand hazard and provide an aesthetically pleasing vista. No building permits will be issued unless compliance with this condition is met. 70. The applicant shall comply with the mitigation measures contained in EA 99- 383 (City Council Resolution 99-1 10). 71. Drive -through restaurants shall not be open to the public between the hours of 2:00 a.m. to 6:00 a.m. 72. A development application for the 15.52 acre property (APN: 649-020-006) in the middle of the specific plan area shall necessitate an amendment to the plan, pursuant to General Plan Land Use Program 4.3. 73. Restaurants that have seating for 100 people or more may sell alcoholic beverages to their customers with a State ABC license. 74. All roof mounted mechanical equipment shall be screened by roof parapets so that they cannot be viewed from adjacent properties. Prior to occupancy of any future building, a visual inspection shall be made from all sides of the building from a distance of 800 feet to confirm that the roof parapets conceal any roof mounted equipment.