Loading...
Patrik Davis Assoc/Library 04 i1 patrik davis associates architecture. planning. interiors February 4, 2004 Mr. Tom Hartung, Director of Building and Safety City of La Quinta 78-495 Calle Tampico P.O. Box 1504 La Quinta, CA 92253 Re: Fee Proposal La Quinta City Library Review Dear Tom: Per your request, Patrik Davis Associates is pleased to submit a proposal to provide the following professional services. Services Constructability Review: The proposed scope of services include the review for constructability of the 90% progress construction documents for the City of La Quinta Library. This facility is being designed by a California architect-led team of engineering consultants. We understand that this project is a 20,000 sq. ft. single story facility of which approximately 50% of the floor area will be initially finished. The purpose of our review will be to determine the completeness of the documentation as relates to biddability, constructability and potential construction phase cost increases. We will not comment on or review the architectural or structural design integrity nor the adequacy of the building systems. We feel that we can complete this work within two weeks of receiving two sets of the documents (specifications and drawings). Value Engineering Review: The proposed scope of services include a review of the same documents described above with the task of identifying elements of the project that can be revised without sacrificing a measurable amount of building service and functionality. The overall goal will be to offer suggestions where cost savings might be realized. The potential cost savings would need to be determined and evaluated by the City and your design and cost estimating team. We can complete this work in conjunction with the Constructability Review within three weeks of receiving the documents and a copy of the most current cost estimate and code analysis. Fees For the above services, we propose the following fees: . Constructability Review $3800 . Value Engineering Review $2300 Total $6100 Reimbursable expenses are in addition to the above and will be billed as they accrue. These expenses include special mailings, printing costs and any travel-related costs. As we do not expect any travel costs, I would estimate that these expenses will not exceed $150. Thank you Tom for asking us to further continue to serve the City of La Quinta. We feel we are well suited for this challenge given both our past national Library experience and the current design work we are providing for your future City Hall expansion. If you have any questions, please do not hesitate to give me a call. IYY~ ohn Eloe ~'"o".. ~ ðo/z /ð ~~~~,/: . ~ 2rt) ð y- . Tom Genovese, City Manager Date 0404/1.12 245 south cascade avenue. montrose. colorado (\1401 . 970249.5404 . fax 970.249.2768. wwwpäamontrose.com I