06210; PM102020-0006PHASE "A": ROUGH GRADING (SITE PREP & MOBILIZATION) CONTINUED CITY OF LA QUINTA PLAN SET NO. SITE DETVLS• TM 34243 4. INITIAL STAGING AREA: AS SHOWN ON SHEET 2 IF YOU SEE DUST COMING FROM EQUIPMENT STORAGE AS SHOWN ON SHEET 2 THIS PROJECT PLEASE CALL. TEMPORARY OFFICE AS SHOWN ON SHEET 2 EMPLOYEE PARKING AS SHOWN ON SHEET 2 (760) 200- 6607 5. WHEEL WASHING PROVISIONS: All '�IREETS PAVED - 6. SPEED RESTRICTION SIGN LOCATION., POSTED AT CONSTRUCTION NTRAN C FS F YOU DONT GET A RESPONSE WITHIN ONE HOUR, PLEASE CALL: THE CITY OF LA QUINTA PUBLIC WORI(S DEPARTMENT 7. NUMBER OF POSTED "DUST CONTROL SIGNS" ONE (1) SIGNS INSTALLED 760-416-5315 (TYP. 1 PER FRONTING ROAD OR 1 PER 660 FEET OF FRONTAGE) 8. OTHER PRELIMINARY WORK. REPORT THE PERMIT OR PR06JECT NUMBER AND THE PHONE NUM ABOVE OR CALL AR QUALITY MANAGEMENT DISTRICT AT1-800-288-7084 TO REDUCE JOB -SITE TRACK -OUT INSTALL "TRACKCLEAN" OR SIMILAR TYPE RUMBLE STRIPS : BEFOR INITIATING ANY ONSITE ACTIVITY RELATED TO GRADING. 96" MIN' GROUND PHASE "B" ROUGH GRADING (MASS GRADING PERIMETER WALLS) DUST CONTROL SIGN DETAIL LEVEL --- - NOT TO SCALE TMA TION PROJECT NAME: TRACT NO. 34243 STREET ADDRESS: AVENUE 58 TRACT/PARCEL NUMBER. TM 34243 TOTAL PROJECT ACREAGE. 20.1 ACRES, (DISTURBED AREA = 8.54 AC.) LOCATION OF WATER SOURCE AND FLOW RATE.' CVWD ( UNKNOWN GPM ) LOCATION OF BACKUP SOURCE AND FLOW. CVWD (1500 GPM MIN.) MAX CUBIC YARDS OF EARTH MOVEMENT: 0 C.Y., ROUGH GRADING /S COMPLETE AMOUNT OF EXPORT. NONE DISPOSAL SITE/S: NONE ON SITE STORAGE PILES. NONE PRIMARY SOIL TYPE: SANDY ALLUVIAL & FINE GRAINED SILTY DUST CONTROL BUDGET $10,000 OWNER INFORMATION OWNERS NAME/S: AV CONSTRUCTION, LLC OWNERS ADDRESS: PO BOX 13290 PALM DESERT, CA 92255 CONTACT PHONE NUMBER, (24 HOURS) (760) 200-6607 OWNER'S AQMD CERTIFICATION NUdRBER. CV2011-010146-10766 OWNERS SIGNATURE AND DATE: _ /' 2lLj --L'DZ k PHASING OF GRADING AC IVITIES THE AMOUNT OF ACTIVE DISTURBED AREA MUST BE LIMITED TO WHAT CAN BE EFFECTIVELY WATERED 4 TIMES PER DAY BY EITHER SPRINKLERS OR WATER TRUCKS. TYPICAL 2000 GALLON WATER TRUCKS CAN EFFECTIVELY WATER ABOUT 4 ACRES PER HOUR. THEREFORE AN 8 HR. WORKDAY DIV/DED BY 4 WATER/NGS PER DAY TIMES 4 AC./HR. = 8 ACRES PER TRUCK. SINCE WATER TRUCKS ARE ALLOWED TO WORK 7 DAYS A WEEK, 24 HOURS A DAY, IN SOME LOCATIONS, UP TO 24 AC. PER TRUCK MAY BE ACHIEVED THAT WAY, WITH SPECIAL PERMISSION. LARGER PROJECTS MUST HAVE MORE TRUCKS, MORE HOURS, MORE SPRINKLERS, OR LESS DISTURBED AREA AT ANY ONE TIME AREAS ALREADY GRADED OR STOCKPILED MUST BE STABILIZED WITH CHEMICALS, HYDROMULCH, OR VEGETATION, BEFORE ADDITIONAL AREAS CAN BE STRIPPED FOR GRADING. THE PHASING PATTERN BELOW SHALL BE SHOWN /N THE REFERENCE MAP ON THIS SHEET AT UPPER RIGHT. DRIVING ROUTES THROUGH A PROJECT MUST BE COUNTED IN ALL PHASES WHERE THEY ARE ONLY TREATED WITH WATER. IT IS BETTER TO TREAT THEM WITH AN APPROVED "OIL" (LIKE ENV/ROKLEEN) OR SIMILAR NON -CRUSTING DUST PALLIATIVE, TO SAVE WATER. ASSUME 1 2000 GALLON WATER TRUCK CAN EFFECTIVELY WATER 8 ACRES PER DAY ON NONE HIGH WIND DAYS. DURING HIGH WIND DAYS, THE NUMBER OF TRUCKS MAY INCREASE DEPENDING ON THE SITUATION. THE UTILITY TRENCHING PHASE AND STREET IMPROVEMENT PHASE WILL OBTAIN ITS OWN WATER TRUCK. PHASE A CLEAR AND GRUB M 0 R S E START DATE END DATE DISTURBED ACREAGE STABILIZED ACRES SPRINKLER ACRES WATER TRUCKS COMPLETE N/A N/A N/A N/A PHASE B ROUGH GRADING FET WEST OF MAD/ ON STREET START DATE END DATE DISTURBED ACREAGE STABILIZED ACRES SPRINKLER ACRES WATER TRUCKS COMPLETE N/A N/A N/A N/A PHASE C UTILITY TRENCHING AND STREET IMPROVEMENTS S C H U L T Z START DATE END DATE DISTURBED ACREAGE STABILIZED ACRES SPRINKLER ACRES WATER TRUCKS COMPLETE N/A N/A N/A N/A PHASE D BUILDING AND LANDSCAPING � START DATE END DATE DISTURBED ACREAGE STABILIZED ACRES SPRINKLER ACRES WATER TRUCKS 1/01/21 6/01/23 8.54 0 0 1 FUGITIVE PM10 DUST CONTROL _MEASURES SCALE: SEE ABOVE :5i HERE IS THE SUMMARIZED MATRIX OF REQUIRED DUST MITIGATION MEASURES IDENTIFIED BY PHASE A R / n PRE -GRADING SITE WATERING (IRRIGATION SYSTEM FOR MIN. 72 HRS. ) SIGNS POSTED ON SITE WITH 24 HR. PHONE NUMBER(S) FOR DUST CONTROLLER SAND FENCING (ON ALL SIDES OF PROJECT LACKING EXISTING MASONRY WALLS OR WIND BLOCK.) SITE WATERING 7 DAYS A WEEK (IRR/CATION SYSTEM, MIN. 4 TIMES PER 24 HRS., OR BY WATER TRUCKS, MIN. 4 TIMES PER 24 HRS, 1 TRUCK / 8 ACRES) PERIMETER SPRINKLER SYSTEM (ALL SIDES, CONTINUOUS NIGHT WATERING WHEN WINDY) GRAVEL (MIN. 1.5" DIAM. X 4" DEEP AT OFF-STREET STORAGE AND PARKING AREAS) WHEEL CLEAN/NG AT TRUCK EXITS, ("RUMBLE STRIPS', DRIVE-THROUGH PONDS, GRAVEL AREAS, ETC. DETAIL METHOD ON REFERENCE MAP AT AT RIGHT) INACTIVE AREA SOIL STABILIZERS (POLYMER, HYDROMULCH, APPROVED OIL, OR PLANTS) ACTIVE AREA SOIL STABILIZERS (ENVIROKLEEN "OIL", OR SIMILAR WETTING AGENTS) STOP ALL VEHICLE ACTIVITY EXCEPT WATER TRUCKS WHEN WIND > 25 MPH STREET SWEEPING WHENEVER NEEDED PERMANENT VEGETATION / LANDSCAPING BLOCK WALLS ROAD PAVING NOTE.- THESE CONTROL METHODS ARE DISCUSSED IN DETAIL IN THE "DUST CONTROL PLAN REVIEW GUIDANCE FOR LOCAL GOVERNMENT" FROM THE SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT, (S.C.A.Q:M.DL. AND AVAILABLE FROM THE CITY OF LA QUINTA PUBLIC WORKS/ENG/NEERJNG DEPARTMENT. PROJECT R CORDKEEP/NG/REPORT• RECORD ALL ACTIVITIES, CONTRACTS ANb MATERIALS PURCHASES ASSOCIATED WITH BLOWSAND/FUGITIVE DUST PROGRAM. WEEKLY REPORTS SHOULD BE SUBMITTED TO THE COUNTY OF RIVERSIDE BUILDING DEPARTMENT FOR REVIEW. THIS "FEEDBACK" WILL EVENTUALLY HELP THE COUNTY TO DETERMINE WHAT METHODS OF DUST CONTROL ARE MOST COST EFFECTIVE IN IN BOTH SHORT TERM AND LONG TERM SITUATIONS. SEE THE REPORT FORM THAT'S AVAILABLE FROM THE COUNTY OR /N THE AFORESAID DOCUMENT. FUGITIVE PM10 DUST CONTROL PROGRAM DETAILS EACH MITIGATION MEASURE OR CONTROL PROGRAM SHALL BE DESCRIBED IN DETAIL BELOW AND ON ADDITIONAL SHEETS AS NECESSARY. PLEASE USE THE REQUIRED DUST CONTROL PLAN EXHIBIT (AT RIGHT OR ATTACHED) TO INDICATE THE LOCATION OF ON-SITE WATER AVAILABILITY, STAGING AREAS TEMPORARY IRRIGATION LINES, TRUCK/WHEEL WASHERS, TEMPORARY SAND FENCING, CONSTRUCTION PHASING, WORKER'S PARKING AREAS, GRAVELED ENTRANCE/EXIT AND OTHER THINGS AS NEEDED. PHASE "A": CLEARING AND GRUBBING (SITE PREP & MOBILIZATION) SPECIFIC PROCEDURES 1. PREWATER/NG METHODS. SPRINKLER ENTIRE SITE TO AT LEAST 70X OPTIMUM MOISTURE CONTENT TO OVEREXCAVAT/ON DEPTH 2. GRADING/EXCAVATING DUST CONTROL METHOD' WATER WITH 2,000 GAL WATER TRUCKS (TOTAL = 2). 3. OFFSITE WORK PERMISSION NEEDED: NA 4. PERIMETER DUST MITIGATION METHOD AND ACCESS CONTROL: CHAINLINK AND SAND FENCING AROUND THE ENTIRE SITE. 5. INITIAL STAGING AREA: SEE PLAN 6. WHEEL WASHING PROVISIONS SEE PLAN 7. WEEKEND DUST CONTROL MITIGATION. WATER WITH 2,000 GAL WATER TRUCK MINIMUM OF 4 PASSES PER DAY OR AS NEEDED. B. UNPAVED ROAD DUST CONTROL MITIGATION METHOD: WATER MINIMUM OF 4 PASSES OR AS NEEDED. RESTRICT TRAVELING SPEEDS TO 10 MPH. 9. STORAGE AND STOCKPILE DUST CONTROL MITIGATION METHOD: NO STOCKPILE ON-SITE 10. WITHIN 10 DAYS OF CEASING ACTIVITY, AN OPERATOR SHALL IMPLEMENT AT LEAST ON OF THE FOLLOWING LONG- TERM STABILIZATION TECHNIQUES FOR ANY DISTURBED SURFACE AREA WHERE CONSTRUCT70N ACTIVITIES ARE NOT SCHEDULED TO OCCUR FOR AT LEAST 30 DAYS: A. REVEGETATION THAT RESULTS /N 75 PERCENT GROUND COVERAGE PROVIDED THAT AN ACTIVE WATERING SYSTEM IS /N PLACE AT ALL TIMES, OR B. ESTABLISHMENT OF A STABILIZED SURFACE THROUGH WATERING WITH PHYSICAL ACCESS RESTRICTION SURROUND/NG THE AREA; OR C. USE OF CHEMICAL STABILIZERS TO ESTABLISH A STABILIZED SURFACE WITH PHYSICAL ACCESS RESTRICTION SURROUNDING THE AREA. SITE SPECIFIC DETAILS (PLEASE DESCRIBE ANY SPECIFIC OR ADDITIONAL CONTROL MEASURE PROPOSED.) 1. PRE -WATERING METHOD (AS SHOWN IN 1. OR AS DETAILED HERE): WATER AVAILABILITY, INITIAL STAGE ONSITE EXISTING CVWD FIRE HYDRANTS 1.500 [,'I'M MINIMI lM 2. OFF-SITE WORK PERMISSION NEEDED: J. ACCESS WILL BE CONTROLLED BY. TWO (2) ACCESS FROM AVENUE 58 ....v...,.. r .,---- , "I 1Yvlca HDuvc - /VVI AtYLICAdLt (UALANGLD SITE) 2. GRADING/EXCAVATING DUST CONTROL METHOD: WATER WITH 2,000 GAL WATER TRUCKS, 8 ACRES PER TRUCK (TOTAL = 3) (MINIMUM 4 TIMES PER 24 HRS.) J. INACTIVE DISTURBED AREA DUST CONTROL MITIGATION METHOD. WATER MINIMUM OF 2 TIMES DAILY OR AS NEEDED. MAY USE AN APPROVED AQMD SOIL STABILIZER AS NECESSARY. 4. PERIMETER DUST MITIGATION METHOD AND ACCESS CONTROL: CHA/NLINK AND SAND FENCING AROUND THE ENTIRE SITE. 5. INITIAL STAGING AREA: SEE PLAN 6. WHEEL WASHING PROVISIONS: SEE PLAN 7 WEEKEND DUST CONTROL MITIGATION: WATER WITH 2,000 GAL WATER TRUCKS MINIMUM OF 4 PASSES PER DAY OR AS NEEDED. 8. UNPAVED ROAD DUST CONTROL MITIGATION METHOD: WATER MINIMUM OF 4 PASSES OR AS NEEDED. RESTRICT TRAVELING SPEEDS TO 10 MPH. STOP WORK AND INCREASE WATER/NG AS NEEDED IF MINIMUM DUST CONTROL WATERING IS FOUND TO BE INADEQUATE. 9. STORAGE AND STOCKPILE DUST CONTROL MITIGATION METHOD: SEE NOTES ABOVE. 10. WITHIN 10 DAYS OF CEASING ACTIVITY, AN OPERATOR SHALL IMPLEMENT AT LEAST ON OF THE FOLLOWING LONG- TERM STABILIZATION TECHNIQUES FOR ANY DISTURBED SURFACE AREA WHERE CONSTRUCTION ACTIVITIES ARE NOT SCHEDULED TO OCCUR FOR AT LEAST 30 DAYS: A. REVEGETATION THAT RESULTS /N 75 PERCENT GROUND COVERAGE PROVIDED THAT AN ACTIVE WATERING SYSTEM IS IN PLACE AT ALL TIMES, OR 8. ESTABLISHMENT OF A STABILIZED SURFACE THROUGH WATERING WITH PHYSICAL ACCESS RESTRICTION SURROUNDING THE AREA; OR C. USE OF CHEMICAL STABILIZERS TO ESTABLISH A STABILIZED SURFACE WITH PHYSICAL ACCESS RESTRICTION SURROUNDING THE AREA. CHEMICAL SURFACE COLORANT TO BE TAN AND MIXED PER MANUFACTURES DIRECTIONS. SITE SPECIF7C DETAILS: (PLEASE DESCRIBE ANY SPECIFIC OR ADDITIONAL CONTROL MEASURE PROPOSED.) 1. HAUL ROUTE: NOT APPLICABLE, ROUGH GRADING IS COMPLETE 2. SOIL STABILIZATION METHODS. ACTIVE AREA WATER SCHEDULE: (M/N. 4 TIMES PER 24 HRS) ONE (1) 2,000 GAL WATER TRUCK 4 TIMES/24 HRS. WEEKEND WATERING SCHEDULE. (MIN 4 TIMES PER 24 HRS. ) TWO (1) 2,000 GAL WATER TRUCKS 4 TIMES/24 HRS. INACTIVE AREA STABILIZATION METHOD(S): (ACRYLIC POLYMER, HYDROMULCH, PLANTINGS, BIODEGRADABLE "OIL", OR AS DESCRIBED HERE) J. PERIMETER BLOCK WALL SCHEDULE.' PERIMETER MASONRY WALL IS EXISTING ALONG SOUTH, WEST AND NORTH BOUNDARIES, PA410 FENCING TO BE UTILIZED UNTIL EASTERLY WALL IS RA/SED TO MEET 6' MIN. HEIGHT. 4. OTHER. A) INSTALL SECURITY BARRIER TO PREVENT DISTURBANCE OF NEWLY GRADED BUILDING PADS IMMEDIATELY UPON INITIATION OF THIS PHASE OF GRADING. B) TO REDUCE JOB -SITE TRACK -OUT INSTALL "TRACKCLEAN" OR SIMILAR TYPE RUMBLE STRIPS BEFOR INITIATING ANY ONSITE ACTIVITY RELATED TO GRADING. PHASE "C": FINISH GRADING (UTILITY & STREET CONST) SPECIFIC PROCEDURES I. HAULING PROCEDURES: SEE NOTES ABOVE. 2. GRADING/EXCAVATING DUST CONTROL METHOD: WATER WITH 2,000 GAL WATER TRUCK (TOTAL = 1). J. INACTIVE DISTURBED AREA DUST CONTROL MITIGATION METHOD: WATER MINIMUM OF 2 TIMES DAILY OR AS NEEDED. MAY USE AN APPROVED AQMD SOIL STABILIZER AS NECESSARY 4. PERIMETER DUST MITIGATION METHOD AND ACCESS CONTROL: CHA/NLINK AND SAND FENCING AROUND THE ENTIRE SITE. 5. STAGING AREA: SEE PLAN 6. WHEEL WASHING PROVISIONS: SEE PLAN 7 WEEKEND DUST CONTROL MITIGATION: WATER WITH 2,000 GAL WATER TRUCKS MINIMUM OF 2 PASSES PER DAY OR AS NEEDED. B. UNPAVED ROAD DUST CONTROL MITIGATION METHOD: WATER MINIMUM OF 4 PASSES OR AS NEEDED. RESTRICT TRAVELING SPEEDS TO 10 MPH. 9. STORAGE, STOCKPILE, OR TRENCHING DUST CONTROL A41TIGATION METHOD. ONE 2,000 GAL WATER TRUCK MIN/MUM 4 TIMES PER 24 HRS. 10. WITHIN 10 DAYS OF LEAS/NG ACTIVITY, AN OPERATOR SHALL IMPLEMENT AT LEAST ON OF THE FOLLOWING LONG- TERM STABILIZATION TECHNIQUES FOR ANY DISTURBED SURFACE AREA WHERE CONSTRUCTION ACTIVITIES ARE NOT SCHEDULED TO OCCUR FOR AT LEAST 30 DAYS: A. REVEGETATION THAT RESULTS /N 75 PERCENT GROUND COVERAGE PROVIDED THAT AN ACTIVE WATERING SYSTEM IS /N PLACE AT ALL TIMES; OR B. ESTABLISHMENT OF A STABILIZED SURFACE THROUGH WATERING WITH PHYSICAL ACCESS RESTRICTION SURROUNDING THE AREA, OR C. USE OF CHEMICAL STABILIZERS TO ESTABLISH A STABILIZED SURFACE WITH PHYSICAL ACCESS RESTRICTION SURROUNDING THE AREA. CHEMICAL SURFACE COLORANT TO BE TAN AND MIXED PER MANUFACTURES DIRECTIONS. (rLtAJt ULbUMIUL ANY SPECIFIC OR ADDITIONAL CONTROL MEASURE PROPOSED.) I. TRENCH STOCKPILE TREATMENT 2,000 GAL WATER TRUCKS MINIMUM 4 TIMES PER 24 HRS. 2. INACTIVE AREA TREATMENT (ACRYLIC POLYMER, HYDROMULCH, PLANTINGS, BIODEGRADABLE "OIL", OR AS DESCRIBED HERE) 3. STREET PAVING SCHEDULE.- STREET PAVING /S COMPLETE 4. STAGING AREA MOVEMENT SCHEDULE: 5. OTHER.' A) MAINTAIN SECURITY BARRIER TO PREVENT DISTURBANCE OF NEWLY GRADED BUILD/NG PADS B) TO REDUCE JOB -SITE TRACK -OUT, MAINTAIN "TRACKCLEAN' OR SIMILAR TYPE RUMBLE STRIPS C) MAINTAIN THREE (3) 2,000 GALLON WATER TRUCKS WATERING AS NEEDED PHASE "D": FINISH GRADING (Rl l7r (/Ill w RLDG_ CONST l ANDcrePInlr) SITE SPECIFIC DETAILS: 1. HAULING PROCEDURES: SEE NOTES ON SHEET 1. 2. DISTURBED AREA DUST CONTROL METHOD: (TOTAL 1 TRUCK REQUIRED) WATER WITH 2,000 GAL WATER TRUCK MIN/MUM OF 2 PASSES OR AS NEEDED. J. INACTIVE DISTURBED AREA DUST CONTROL MITIGATION METHOD., PERMANENTLY STABILIZED. 4. PERIMETER DUST MITIGATION METHOD AND ACCESS CONTROL: REPLACE WITH WALL. 5. STAGING AREA: SEE PLAN 6. WHEEL WASHING PROVISIONS: REMOVED 7. WEEKEND DUST CONTROL MITIGATION. WATER WITH 2,000 GAL WATER TRUCKS MINIMUM OF 2 PASSES PER DAY OR AS NEEDED. 8. UNPAVED ROAD DUST CONTROL MITIGATION METHOD: ALL ROADWAYS PAVED. 9. STORAGE, STOCKPILE, OR TRENCHING DUST CONTROL MITIGATION METHOD: SEE NOTES ABOVE 10. WITHIN 10 DAYS OF CEASING ACTIVITY, AN OPERATOR SHALL IMPLEMENT AT LEAST ON OF THE FOLLOWING LONG- TERM STABILIZATION TECHNIQUES FOR ANY DISTURBED SURFACE AREA WHERE CONSTRUCTION ACTIVITIES ARE NOT SCHEDULED TO OCCUR FOR AT LEAST 30 DAYS: A. REVEGETATION THAT RESULTS /N 75 PERCENT GROUND COVERAGE PROVIDED THAT AN ACTIVE WATERING SYSTEM IS /N PLACE AT ALL TIMES; OR B. ESTABLISHMENT OF A STABILIZED SURFACE THROUGH WATERING WITH PHYSICAL ACCESS RESTRICTION SURROUNDING THE AREA, OR C. USE OF CHEMICAL STABILIZERS TO ESTABLISH A STABILIZED SURFACE WITH PHYSICAL ACCESS RESTRICTION SURROUNDING THE AREA. (PLEASE DESCRIBE ANY SPECIFIC OR ADDITIONAL CONTROL MEASURE PROPOSED.) I. BUILDING PAD WATERING HAND WATER/NG 2. FORMWORK AND TRENCH WATERING HAND WATERING 3. PER/METER LANDSCAPE SCHEDULE: (AS SOON AS POSSIBLE) 4. OTHER.* A) MAINTAIN SECURITY BARRIER TO PREVENT DISTURBANCE OF NEWLY GRADED BUILDING PADS B) TO REDUCE JOB -SITE C) MAINTAIN ONE (1) 2,000 TRACK -OUT MAINTAIN GALLON WATER TRUCKS "TRACKCLEAN" OR SIMILAR WATERING AS NEEDED TYPE RUMBLE STRIPS IN THE CITY OF LA QUINTA, COUNTY OF RIVERSIDE, STATE OF CALIFORNIA TRACT No. 34243, CORAL MOUNTAIN PERMIT NO. 12069 ME z O /j DATE: Z M 0 R S E z DATE. 12-14-21 PROJECT NAME TRACT NO 34243 I' ' THE HIDEAWAY STREET ADDRESS / SITE LOCATION. AVENUE 56 Suite 218 O� 0 -- NORTH SIDE OF AVENUE 8 APPROX 1000 FET WEST OF MAD/ ON STREET W W WINDS BLOW N.W. TO S.E.) W EASTERLY RESIDENAA/ AVENUE 54 cu) c SOUTHEASTERLY VACANT S C H U L T Z Q SOUTHERLY VACANT L LJ O z O SOUTHWESTERLY- Vacnnlr RFsIDENTIA/ cbergh®mdsconsulting.net * O � z � NORTHWESTERLY RESIDENTAI w DATE: 2 �� Z O O SURVEYORS OF CALF PRE -GRADING SITE WATERING (IRRIGATION SYSTEM FOR MIN. 72 HRS. ) SIGNS POSTED ON SITE WITH 24 HR. PHONE NUMBER(S) FOR DUST CONTROLLER SAND FENCING (ON ALL SIDES OF PROJECT LACKING EXISTING MASONRY WALLS OR WIND BLOCK.) SITE WATERING 7 DAYS A WEEK (IRR/CATION SYSTEM, MIN. 4 TIMES PER 24 HRS., OR BY WATER TRUCKS, MIN. 4 TIMES PER 24 HRS, 1 TRUCK / 8 ACRES) PERIMETER SPRINKLER SYSTEM (ALL SIDES, CONTINUOUS NIGHT WATERING WHEN WINDY) GRAVEL (MIN. 1.5" DIAM. X 4" DEEP AT OFF-STREET STORAGE AND PARKING AREAS) WHEEL CLEAN/NG AT TRUCK EXITS, ("RUMBLE STRIPS', DRIVE-THROUGH PONDS, GRAVEL AREAS, ETC. DETAIL METHOD ON REFERENCE MAP AT AT RIGHT) INACTIVE AREA SOIL STABILIZERS (POLYMER, HYDROMULCH, APPROVED OIL, OR PLANTS) ACTIVE AREA SOIL STABILIZERS (ENVIROKLEEN "OIL", OR SIMILAR WETTING AGENTS) STOP ALL VEHICLE ACTIVITY EXCEPT WATER TRUCKS WHEN WIND > 25 MPH STREET SWEEPING WHENEVER NEEDED PERMANENT VEGETATION / LANDSCAPING BLOCK WALLS ROAD PAVING NOTE.- THESE CONTROL METHODS ARE DISCUSSED IN DETAIL IN THE "DUST CONTROL PLAN REVIEW GUIDANCE FOR LOCAL GOVERNMENT" FROM THE SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT, (S.C.A.Q:M.DL. AND AVAILABLE FROM THE CITY OF LA QUINTA PUBLIC WORKS/ENG/NEERJNG DEPARTMENT. PROJECT R CORDKEEP/NG/REPORT• RECORD ALL ACTIVITIES, CONTRACTS ANb MATERIALS PURCHASES ASSOCIATED WITH BLOWSAND/FUGITIVE DUST PROGRAM. WEEKLY REPORTS SHOULD BE SUBMITTED TO THE COUNTY OF RIVERSIDE BUILDING DEPARTMENT FOR REVIEW. THIS "FEEDBACK" WILL EVENTUALLY HELP THE COUNTY TO DETERMINE WHAT METHODS OF DUST CONTROL ARE MOST COST EFFECTIVE IN IN BOTH SHORT TERM AND LONG TERM SITUATIONS. SEE THE REPORT FORM THAT'S AVAILABLE FROM THE COUNTY OR /N THE AFORESAID DOCUMENT. FUGITIVE PM10 DUST CONTROL PROGRAM DETAILS EACH MITIGATION MEASURE OR CONTROL PROGRAM SHALL BE DESCRIBED IN DETAIL BELOW AND ON ADDITIONAL SHEETS AS NECESSARY. PLEASE USE THE REQUIRED DUST CONTROL PLAN EXHIBIT (AT RIGHT OR ATTACHED) TO INDICATE THE LOCATION OF ON-SITE WATER AVAILABILITY, STAGING AREAS TEMPORARY IRRIGATION LINES, TRUCK/WHEEL WASHERS, TEMPORARY SAND FENCING, CONSTRUCTION PHASING, WORKER'S PARKING AREAS, GRAVELED ENTRANCE/EXIT AND OTHER THINGS AS NEEDED. PHASE "A": CLEARING AND GRUBBING (SITE PREP & MOBILIZATION) SPECIFIC PROCEDURES 1. PREWATER/NG METHODS. SPRINKLER ENTIRE SITE TO AT LEAST 70X OPTIMUM MOISTURE CONTENT TO OVEREXCAVAT/ON DEPTH 2. GRADING/EXCAVATING DUST CONTROL METHOD' WATER WITH 2,000 GAL WATER TRUCKS (TOTAL = 2). 3. OFFSITE WORK PERMISSION NEEDED: NA 4. PERIMETER DUST MITIGATION METHOD AND ACCESS CONTROL: CHAINLINK AND SAND FENCING AROUND THE ENTIRE SITE. 5. INITIAL STAGING AREA: SEE PLAN 6. WHEEL WASHING PROVISIONS SEE PLAN 7. WEEKEND DUST CONTROL MITIGATION. WATER WITH 2,000 GAL WATER TRUCK MINIMUM OF 4 PASSES PER DAY OR AS NEEDED. B. UNPAVED ROAD DUST CONTROL MITIGATION METHOD: WATER MINIMUM OF 4 PASSES OR AS NEEDED. RESTRICT TRAVELING SPEEDS TO 10 MPH. 9. STORAGE AND STOCKPILE DUST CONTROL MITIGATION METHOD: NO STOCKPILE ON-SITE 10. WITHIN 10 DAYS OF CEASING ACTIVITY, AN OPERATOR SHALL IMPLEMENT AT LEAST ON OF THE FOLLOWING LONG- TERM STABILIZATION TECHNIQUES FOR ANY DISTURBED SURFACE AREA WHERE CONSTRUCT70N ACTIVITIES ARE NOT SCHEDULED TO OCCUR FOR AT LEAST 30 DAYS: A. REVEGETATION THAT RESULTS /N 75 PERCENT GROUND COVERAGE PROVIDED THAT AN ACTIVE WATERING SYSTEM IS /N PLACE AT ALL TIMES, OR B. ESTABLISHMENT OF A STABILIZED SURFACE THROUGH WATERING WITH PHYSICAL ACCESS RESTRICTION SURROUND/NG THE AREA; OR C. USE OF CHEMICAL STABILIZERS TO ESTABLISH A STABILIZED SURFACE WITH PHYSICAL ACCESS RESTRICTION SURROUNDING THE AREA. SITE SPECIFIC DETAILS (PLEASE DESCRIBE ANY SPECIFIC OR ADDITIONAL CONTROL MEASURE PROPOSED.) 1. PRE -WATERING METHOD (AS SHOWN IN 1. OR AS DETAILED HERE): WATER AVAILABILITY, INITIAL STAGE ONSITE EXISTING CVWD FIRE HYDRANTS 1.500 [,'I'M MINIMI lM 2. OFF-SITE WORK PERMISSION NEEDED: J. ACCESS WILL BE CONTROLLED BY. TWO (2) ACCESS FROM AVENUE 58 ....v...,.. r .,---- , "I 1Yvlca HDuvc - /VVI AtYLICAdLt (UALANGLD SITE) 2. GRADING/EXCAVATING DUST CONTROL METHOD: WATER WITH 2,000 GAL WATER TRUCKS, 8 ACRES PER TRUCK (TOTAL = 3) (MINIMUM 4 TIMES PER 24 HRS.) J. INACTIVE DISTURBED AREA DUST CONTROL MITIGATION METHOD. WATER MINIMUM OF 2 TIMES DAILY OR AS NEEDED. MAY USE AN APPROVED AQMD SOIL STABILIZER AS NECESSARY. 4. PERIMETER DUST MITIGATION METHOD AND ACCESS CONTROL: CHA/NLINK AND SAND FENCING AROUND THE ENTIRE SITE. 5. INITIAL STAGING AREA: SEE PLAN 6. WHEEL WASHING PROVISIONS: SEE PLAN 7 WEEKEND DUST CONTROL MITIGATION: WATER WITH 2,000 GAL WATER TRUCKS MINIMUM OF 4 PASSES PER DAY OR AS NEEDED. 8. UNPAVED ROAD DUST CONTROL MITIGATION METHOD: WATER MINIMUM OF 4 PASSES OR AS NEEDED. RESTRICT TRAVELING SPEEDS TO 10 MPH. STOP WORK AND INCREASE WATER/NG AS NEEDED IF MINIMUM DUST CONTROL WATERING IS FOUND TO BE INADEQUATE. 9. STORAGE AND STOCKPILE DUST CONTROL MITIGATION METHOD: SEE NOTES ABOVE. 10. WITHIN 10 DAYS OF CEASING ACTIVITY, AN OPERATOR SHALL IMPLEMENT AT LEAST ON OF THE FOLLOWING LONG- TERM STABILIZATION TECHNIQUES FOR ANY DISTURBED SURFACE AREA WHERE CONSTRUCTION ACTIVITIES ARE NOT SCHEDULED TO OCCUR FOR AT LEAST 30 DAYS: A. REVEGETATION THAT RESULTS /N 75 PERCENT GROUND COVERAGE PROVIDED THAT AN ACTIVE WATERING SYSTEM IS IN PLACE AT ALL TIMES, OR 8. ESTABLISHMENT OF A STABILIZED SURFACE THROUGH WATERING WITH PHYSICAL ACCESS RESTRICTION SURROUNDING THE AREA; OR C. USE OF CHEMICAL STABILIZERS TO ESTABLISH A STABILIZED SURFACE WITH PHYSICAL ACCESS RESTRICTION SURROUNDING THE AREA. CHEMICAL SURFACE COLORANT TO BE TAN AND MIXED PER MANUFACTURES DIRECTIONS. SITE SPECIF7C DETAILS: (PLEASE DESCRIBE ANY SPECIFIC OR ADDITIONAL CONTROL MEASURE PROPOSED.) 1. HAUL ROUTE: NOT APPLICABLE, ROUGH GRADING IS COMPLETE 2. SOIL STABILIZATION METHODS. ACTIVE AREA WATER SCHEDULE: (M/N. 4 TIMES PER 24 HRS) ONE (1) 2,000 GAL WATER TRUCK 4 TIMES/24 HRS. WEEKEND WATERING SCHEDULE. (MIN 4 TIMES PER 24 HRS. ) TWO (1) 2,000 GAL WATER TRUCKS 4 TIMES/24 HRS. INACTIVE AREA STABILIZATION METHOD(S): (ACRYLIC POLYMER, HYDROMULCH, PLANTINGS, BIODEGRADABLE "OIL", OR AS DESCRIBED HERE) J. PERIMETER BLOCK WALL SCHEDULE.' PERIMETER MASONRY WALL IS EXISTING ALONG SOUTH, WEST AND NORTH BOUNDARIES, PA410 FENCING TO BE UTILIZED UNTIL EASTERLY WALL IS RA/SED TO MEET 6' MIN. HEIGHT. 4. OTHER. A) INSTALL SECURITY BARRIER TO PREVENT DISTURBANCE OF NEWLY GRADED BUILDING PADS IMMEDIATELY UPON INITIATION OF THIS PHASE OF GRADING. B) TO REDUCE JOB -SITE TRACK -OUT INSTALL "TRACKCLEAN" OR SIMILAR TYPE RUMBLE STRIPS BEFOR INITIATING ANY ONSITE ACTIVITY RELATED TO GRADING. PHASE "C": FINISH GRADING (UTILITY & STREET CONST) SPECIFIC PROCEDURES I. HAULING PROCEDURES: SEE NOTES ABOVE. 2. GRADING/EXCAVATING DUST CONTROL METHOD: WATER WITH 2,000 GAL WATER TRUCK (TOTAL = 1). J. INACTIVE DISTURBED AREA DUST CONTROL MITIGATION METHOD: WATER MINIMUM OF 2 TIMES DAILY OR AS NEEDED. MAY USE AN APPROVED AQMD SOIL STABILIZER AS NECESSARY 4. PERIMETER DUST MITIGATION METHOD AND ACCESS CONTROL: CHA/NLINK AND SAND FENCING AROUND THE ENTIRE SITE. 5. STAGING AREA: SEE PLAN 6. WHEEL WASHING PROVISIONS: SEE PLAN 7 WEEKEND DUST CONTROL MITIGATION: WATER WITH 2,000 GAL WATER TRUCKS MINIMUM OF 2 PASSES PER DAY OR AS NEEDED. B. UNPAVED ROAD DUST CONTROL MITIGATION METHOD: WATER MINIMUM OF 4 PASSES OR AS NEEDED. RESTRICT TRAVELING SPEEDS TO 10 MPH. 9. STORAGE, STOCKPILE, OR TRENCHING DUST CONTROL A41TIGATION METHOD. ONE 2,000 GAL WATER TRUCK MIN/MUM 4 TIMES PER 24 HRS. 10. WITHIN 10 DAYS OF LEAS/NG ACTIVITY, AN OPERATOR SHALL IMPLEMENT AT LEAST ON OF THE FOLLOWING LONG- TERM STABILIZATION TECHNIQUES FOR ANY DISTURBED SURFACE AREA WHERE CONSTRUCTION ACTIVITIES ARE NOT SCHEDULED TO OCCUR FOR AT LEAST 30 DAYS: A. REVEGETATION THAT RESULTS /N 75 PERCENT GROUND COVERAGE PROVIDED THAT AN ACTIVE WATERING SYSTEM IS /N PLACE AT ALL TIMES; OR B. ESTABLISHMENT OF A STABILIZED SURFACE THROUGH WATERING WITH PHYSICAL ACCESS RESTRICTION SURROUNDING THE AREA, OR C. USE OF CHEMICAL STABILIZERS TO ESTABLISH A STABILIZED SURFACE WITH PHYSICAL ACCESS RESTRICTION SURROUNDING THE AREA. CHEMICAL SURFACE COLORANT TO BE TAN AND MIXED PER MANUFACTURES DIRECTIONS. (rLtAJt ULbUMIUL ANY SPECIFIC OR ADDITIONAL CONTROL MEASURE PROPOSED.) I. TRENCH STOCKPILE TREATMENT 2,000 GAL WATER TRUCKS MINIMUM 4 TIMES PER 24 HRS. 2. INACTIVE AREA TREATMENT (ACRYLIC POLYMER, HYDROMULCH, PLANTINGS, BIODEGRADABLE "OIL", OR AS DESCRIBED HERE) 3. STREET PAVING SCHEDULE.- STREET PAVING /S COMPLETE 4. STAGING AREA MOVEMENT SCHEDULE: 5. OTHER.' A) MAINTAIN SECURITY BARRIER TO PREVENT DISTURBANCE OF NEWLY GRADED BUILD/NG PADS B) TO REDUCE JOB -SITE TRACK -OUT, MAINTAIN "TRACKCLEAN' OR SIMILAR TYPE RUMBLE STRIPS C) MAINTAIN THREE (3) 2,000 GALLON WATER TRUCKS WATERING AS NEEDED PHASE "D": FINISH GRADING (Rl l7r (/Ill w RLDG_ CONST l ANDcrePInlr) SITE SPECIFIC DETAILS: 1. HAULING PROCEDURES: SEE NOTES ON SHEET 1. 2. DISTURBED AREA DUST CONTROL METHOD: (TOTAL 1 TRUCK REQUIRED) WATER WITH 2,000 GAL WATER TRUCK MIN/MUM OF 2 PASSES OR AS NEEDED. J. INACTIVE DISTURBED AREA DUST CONTROL MITIGATION METHOD., PERMANENTLY STABILIZED. 4. PERIMETER DUST MITIGATION METHOD AND ACCESS CONTROL: REPLACE WITH WALL. 5. STAGING AREA: SEE PLAN 6. WHEEL WASHING PROVISIONS: REMOVED 7. WEEKEND DUST CONTROL MITIGATION. WATER WITH 2,000 GAL WATER TRUCKS MINIMUM OF 2 PASSES PER DAY OR AS NEEDED. 8. UNPAVED ROAD DUST CONTROL MITIGATION METHOD: ALL ROADWAYS PAVED. 9. STORAGE, STOCKPILE, OR TRENCHING DUST CONTROL MITIGATION METHOD: SEE NOTES ABOVE 10. WITHIN 10 DAYS OF CEASING ACTIVITY, AN OPERATOR SHALL IMPLEMENT AT LEAST ON OF THE FOLLOWING LONG- TERM STABILIZATION TECHNIQUES FOR ANY DISTURBED SURFACE AREA WHERE CONSTRUCTION ACTIVITIES ARE NOT SCHEDULED TO OCCUR FOR AT LEAST 30 DAYS: A. REVEGETATION THAT RESULTS /N 75 PERCENT GROUND COVERAGE PROVIDED THAT AN ACTIVE WATERING SYSTEM IS /N PLACE AT ALL TIMES; OR B. ESTABLISHMENT OF A STABILIZED SURFACE THROUGH WATERING WITH PHYSICAL ACCESS RESTRICTION SURROUNDING THE AREA, OR C. USE OF CHEMICAL STABILIZERS TO ESTABLISH A STABILIZED SURFACE WITH PHYSICAL ACCESS RESTRICTION SURROUNDING THE AREA. (PLEASE DESCRIBE ANY SPECIFIC OR ADDITIONAL CONTROL MEASURE PROPOSED.) I. BUILDING PAD WATERING HAND WATER/NG 2. FORMWORK AND TRENCH WATERING HAND WATERING 3. PER/METER LANDSCAPE SCHEDULE: (AS SOON AS POSSIBLE) 4. OTHER.* A) MAINTAIN SECURITY BARRIER TO PREVENT DISTURBANCE OF NEWLY GRADED BUILDING PADS B) TO REDUCE JOB -SITE C) MAINTAIN ONE (1) 2,000 TRACK -OUT MAINTAIN GALLON WATER TRUCKS "TRACKCLEAN" OR SIMILAR WATERING AS NEEDED TYPE RUMBLE STRIPS IN THE CITY OF LA QUINTA, COUNTY OF RIVERSIDE, STATE OF CALIFORNIA TRACT No. 34243, CORAL MOUNTAIN FUGITIVE DUST (PM -10) MITIGATION PLAN BEING A SUBDIVISION OF A PORTION OF THE SOUTH 1/2 OF THE SOUTH 1/2 OF SECTION 21, TOWNSHIP 6 SOUTH, RANGE 7 EAST, SAN BERNARDINO BASE AND MERIDIAN PHASE "E" FINISH GRADING (DRAINAGE SWALES AND SITE LANDSCAPING) SPECIFIC PROCEDURES I. HAULING PROCEDURES: SEE NOTES ABOVE. 2. DISTURBED AREA DUST CONTROL METHOD. WATER WITH 2,000 GAL WATER TRUCK MINIMUM OF 4 PASSES OR AS NEEDED. (TOTAL 1 TRUCK REQUIRED) J. INACTIVE DISTURBED AREA DUST CONTROL MITIGATION METHOD: PERMANENTLY STABILIZED. 4. PERIMETER DUST MITIGATION METHOD AND ACCESS CONTROL: REPLACE WITH HIGHER WALL, EAST BOUNDARY. 5. STAGING AREA: SEE PLAN 6. WHEEL WASHING PROVISIONS: REMOVED 7. WEEKEND DUST CONTROL MITIGATION. WATER WITH 2,000 GAL WATER TRUCKS MINIMUM OF 4 PASSES PER DAY OR AS NEEDED. 8. UNPAVED ROAD DUST CONTROL MITIGATION METHOD: ALL ROADWAYS PAVED. 9. STORAGE, STOCKPILE, OR TRENCHING DUST CONTROL MITIGATION METHOD. SEE NOTES ABOVE. 10. WITHIN 10 DAYS OF CEASING ACTIVITY, AN OPERATOR SHALL IMPLEMENT AT LEAST ON OF THE FOLLOWING LONG- TERM STABILIZATION TECHNIQUES FOR ANY DISTURBED SURFACE AREA WHERE CONSTRUCTION ACTIVITIES ARE NOT SCHEDULED TO OCCUR FOR AT LEAST 30 DAYS: A. REVEGETATION THAT RESULTS IN 75 PERCENT GROUND COVERAGE PROVIDED THAT AN ACTIVE WATERING SYSTEM IS /N PLACE AT ALL TIMES, OR B. ESTABLISHMENT OF A STABILIZED SURFACE THROUGH WATERING WITH PHYSICAL ACCESS RESTRICTION SURROUNDING THE AREA; OR C. USE OF CHEMICAL STABILIZERS TO ESTABLISH A STABILIZED SURFACE WITH PHYSICAL ACCESS RESTRICTION SURROUNDING THE AREA. ABATEMENT OF DUST MITIGATION FAILURE AN IRREVOCABLE LICENSE IS HEREBY GRANTED OR CAUSED TO BE GRANTED TO THE CITY OF LA QUINTA TO PERMIT THE ENTRY UPON THE SITE AT ALL TIMES AND UNDER THE FOLLOWING CIRCUMSTANCES., A. IN THE EVENT THAT WIND SPEEDS IN EXCESS OF 25 M.P.H. ARE FORECAST TO OCCUR BY THE SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT (SCAQMD) FOR A PARTICULAR DAY; B. IN THE EVENT OF AN ON-SITE ANEMOMETER THAT CONFORMS TO ALL SCAQMD STANDARDS REGISTERING 2 WIND GUSTS IN EXCESS OF 25 M.P.H WITHIN CONSECUTIVE 30 MINUTE PERIODS OR C. IN THE EVENT FUGITIVE DUST EMISSIONS ARE VISIBLE FROM ANY BOUNDARY LINE. AND D. THE CITY IS UNABLE, BY TELEPHONE, TO ESTABLISH A PERSONAL CONTACT WITH THE GENERAL CONTRACTOR, OR THE RESPONSIBLE DUST CONTROL PERSON AFTER A 60 MINUTE CONSECUTIVE PERIOD WHICH SHALL COMMENCE WITH THE FIRST TELEPHONE CALL WHETHER ANSWERED OR NOT THE CITY MAY THEN, WITHOUT PREJUDICE, INITIATE ONE OR ALL OF THE BELOW LISTED ACTIONS: 1. THE CITY MAY CAUSE THE CESSATION .OF ANY ON-SITE ACTIVITY, INCLUDING BUT NOT LIMITED TO EARTH MOVING, CONSTRUCTION, DEMOLITION OR VEHICULAR MOVEMENT AND MANUEVER/NG. EXISTING FUGITIVE DUST MITIGATION MEASURES SHALL CONTINUE. 2. IN THE EVENT THAT AN ON-SITE IRRIGATION SYSTEM /S NOT INSTALLED AND/OR OPERATIONAL, THE CITY WILL CAUSE THE SITE TO BE WATERED. IN ANY CONTRACT BETWEEN THE GENERAL CONTRACTOR AND ANY WATER -PROVIDING VENDOR, SUCH AS A WATERING TRUCK OPERATION OR IRRIGATION SYSTEM PROVIDER/OPERATOR, THE CITY AND THE ENVIRONMENTAL OBSERVER SHALL BE NAMED AS AN AUTHORIZED AGENT FOR PERUPOSES OF ORDERING OR CALLING -OUT WATER TRUCKS OR CAUSING AN IRRIGATION SYSTEM TO BE MADE OPERATION. SHOULD THE GENERAL CONTRACTOR NOT AHVE SUCH A CONTRACT OR HAVE FAILED TO DESINATE THE CITY AND THE RESPONSIBLE DUST CONTROL INDIVIDUAL AN AN AGENT OR NOT INF09RMED THE CITY OF THE CONTRAC07-S NAME, ADDRESS AND PHONE NUMBER, OR THE CITY IS UNALBLE TO CONTACT THE CONTRACTOR AFTER A RESONABLE EFFORT ISMADE TO DO SO, THE CITY SHALL AUTHORIZE ANY OTHER VENDOR AS 17-S AGAENT FOR PERUPOSED OF ENTRY UPON THE SITE TO ATTEMPT TO MITIGATE ANY POTENTIAL DUST CONTROL PROBLEMS. J. IN THE EVENT AN ON-SITE IRR/GATIN SYSTEM 1S INSTALLED, THE CITY WILL CAUSE THE IRRIGATION SYSTEM TO OPERATE. THE GENERAL CONTRACTOR SHALL TAKE ALL NECESSAYR STEMPS TO ENSURE THE THE CITY HAS THE MEANS TO ACEESESS THE SITE AND THE VALVES OF THE IRR/CATION SYSTEM; THAT IS, THE KEYS TO ANY AND LLALOCKES PROVIDED TO THE CITY ENGINEER BY THE END OF THE NET WORK DAY FOLLOW/NG THE INSTALLATION OF ANY SUCH LOCK, EACH KEY SHALL BE PLAINLY AND CLEARLY MARKEED WITH THE PROJECT NAME AND COREESPOND/NG LOCK (MAIN GATE, SOTH IRRIGATION SYSTEM, ETC.). E IF, IN THE OPINION OF THE CITY ENGINEER OR HIS DESIGNEE, TH INTENSITY FREQUIENCY OR DURATION OF FUGITIVE DUST EM/SS/ONS FROM THE SITE CONSTITURT£S A HAZARD TO THE SAFETY OF THE PUBLIC, BY INTRUSION BEYOOND THE PROJECT BOUNDARY, THE CITY ENGINEER OR HIS DESIGNEE OR AGENT MAY IMMEDIATELY ENTER UPON THE SITE OR IMMEDIATELY TAKE OTHER SUCH ACTION AS MAY BE NECESSARY TO REMEDY THE HAZARD, SUCH AS BUT NOT LIMITED TO COMMENCING WATERING ON THE SITE OR ORDERING THE CESATION OF ANY EMISSION-GENERTING ACTIVITY OCCUR/NG ON-SITE. F. ANY OF THE ABOVE ACTIONS SHAL BE CONSTRUED AS AN ABATEMENT FOR WHICH THE CITY WILL "BACK CHARGE" THE GENERAL CONTRACTOR, DEVELOPER, AND/OR THE OWNER AS THE CITY SHALL DEEM APPROPRIATE. PERMIT NO. 12069 PROJECT DATA (SEE ATTACHED PLAN ALSO) z O /j FUGITIVE DUST (PM -10) MITIGATION PLAN BEING A SUBDIVISION OF A PORTION OF THE SOUTH 1/2 OF THE SOUTH 1/2 OF SECTION 21, TOWNSHIP 6 SOUTH, RANGE 7 EAST, SAN BERNARDINO BASE AND MERIDIAN PHASE "E" FINISH GRADING (DRAINAGE SWALES AND SITE LANDSCAPING) SPECIFIC PROCEDURES I. HAULING PROCEDURES: SEE NOTES ABOVE. 2. DISTURBED AREA DUST CONTROL METHOD. WATER WITH 2,000 GAL WATER TRUCK MINIMUM OF 4 PASSES OR AS NEEDED. (TOTAL 1 TRUCK REQUIRED) J. INACTIVE DISTURBED AREA DUST CONTROL MITIGATION METHOD: PERMANENTLY STABILIZED. 4. PERIMETER DUST MITIGATION METHOD AND ACCESS CONTROL: REPLACE WITH HIGHER WALL, EAST BOUNDARY. 5. STAGING AREA: SEE PLAN 6. WHEEL WASHING PROVISIONS: REMOVED 7. WEEKEND DUST CONTROL MITIGATION. WATER WITH 2,000 GAL WATER TRUCKS MINIMUM OF 4 PASSES PER DAY OR AS NEEDED. 8. UNPAVED ROAD DUST CONTROL MITIGATION METHOD: ALL ROADWAYS PAVED. 9. STORAGE, STOCKPILE, OR TRENCHING DUST CONTROL MITIGATION METHOD. SEE NOTES ABOVE. 10. WITHIN 10 DAYS OF CEASING ACTIVITY, AN OPERATOR SHALL IMPLEMENT AT LEAST ON OF THE FOLLOWING LONG- TERM STABILIZATION TECHNIQUES FOR ANY DISTURBED SURFACE AREA WHERE CONSTRUCTION ACTIVITIES ARE NOT SCHEDULED TO OCCUR FOR AT LEAST 30 DAYS: A. REVEGETATION THAT RESULTS IN 75 PERCENT GROUND COVERAGE PROVIDED THAT AN ACTIVE WATERING SYSTEM IS /N PLACE AT ALL TIMES, OR B. ESTABLISHMENT OF A STABILIZED SURFACE THROUGH WATERING WITH PHYSICAL ACCESS RESTRICTION SURROUNDING THE AREA; OR C. USE OF CHEMICAL STABILIZERS TO ESTABLISH A STABILIZED SURFACE WITH PHYSICAL ACCESS RESTRICTION SURROUNDING THE AREA. ABATEMENT OF DUST MITIGATION FAILURE AN IRREVOCABLE LICENSE IS HEREBY GRANTED OR CAUSED TO BE GRANTED TO THE CITY OF LA QUINTA TO PERMIT THE ENTRY UPON THE SITE AT ALL TIMES AND UNDER THE FOLLOWING CIRCUMSTANCES., A. IN THE EVENT THAT WIND SPEEDS IN EXCESS OF 25 M.P.H. ARE FORECAST TO OCCUR BY THE SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT (SCAQMD) FOR A PARTICULAR DAY; B. IN THE EVENT OF AN ON-SITE ANEMOMETER THAT CONFORMS TO ALL SCAQMD STANDARDS REGISTERING 2 WIND GUSTS IN EXCESS OF 25 M.P.H WITHIN CONSECUTIVE 30 MINUTE PERIODS OR C. IN THE EVENT FUGITIVE DUST EMISSIONS ARE VISIBLE FROM ANY BOUNDARY LINE. AND D. THE CITY IS UNABLE, BY TELEPHONE, TO ESTABLISH A PERSONAL CONTACT WITH THE GENERAL CONTRACTOR, OR THE RESPONSIBLE DUST CONTROL PERSON AFTER A 60 MINUTE CONSECUTIVE PERIOD WHICH SHALL COMMENCE WITH THE FIRST TELEPHONE CALL WHETHER ANSWERED OR NOT THE CITY MAY THEN, WITHOUT PREJUDICE, INITIATE ONE OR ALL OF THE BELOW LISTED ACTIONS: 1. THE CITY MAY CAUSE THE CESSATION .OF ANY ON-SITE ACTIVITY, INCLUDING BUT NOT LIMITED TO EARTH MOVING, CONSTRUCTION, DEMOLITION OR VEHICULAR MOVEMENT AND MANUEVER/NG. EXISTING FUGITIVE DUST MITIGATION MEASURES SHALL CONTINUE. 2. IN THE EVENT THAT AN ON-SITE IRRIGATION SYSTEM /S NOT INSTALLED AND/OR OPERATIONAL, THE CITY WILL CAUSE THE SITE TO BE WATERED. IN ANY CONTRACT BETWEEN THE GENERAL CONTRACTOR AND ANY WATER -PROVIDING VENDOR, SUCH AS A WATERING TRUCK OPERATION OR IRRIGATION SYSTEM PROVIDER/OPERATOR, THE CITY AND THE ENVIRONMENTAL OBSERVER SHALL BE NAMED AS AN AUTHORIZED AGENT FOR PERUPOSES OF ORDERING OR CALLING -OUT WATER TRUCKS OR CAUSING AN IRRIGATION SYSTEM TO BE MADE OPERATION. SHOULD THE GENERAL CONTRACTOR NOT AHVE SUCH A CONTRACT OR HAVE FAILED TO DESINATE THE CITY AND THE RESPONSIBLE DUST CONTROL INDIVIDUAL AN AN AGENT OR NOT INF09RMED THE CITY OF THE CONTRAC07-S NAME, ADDRESS AND PHONE NUMBER, OR THE CITY IS UNALBLE TO CONTACT THE CONTRACTOR AFTER A RESONABLE EFFORT ISMADE TO DO SO, THE CITY SHALL AUTHORIZE ANY OTHER VENDOR AS 17-S AGAENT FOR PERUPOSED OF ENTRY UPON THE SITE TO ATTEMPT TO MITIGATE ANY POTENTIAL DUST CONTROL PROBLEMS. J. IN THE EVENT AN ON-SITE IRR/GATIN SYSTEM 1S INSTALLED, THE CITY WILL CAUSE THE IRRIGATION SYSTEM TO OPERATE. THE GENERAL CONTRACTOR SHALL TAKE ALL NECESSAYR STEMPS TO ENSURE THE THE CITY HAS THE MEANS TO ACEESESS THE SITE AND THE VALVES OF THE IRR/CATION SYSTEM; THAT IS, THE KEYS TO ANY AND LLALOCKES PROVIDED TO THE CITY ENGINEER BY THE END OF THE NET WORK DAY FOLLOW/NG THE INSTALLATION OF ANY SUCH LOCK, EACH KEY SHALL BE PLAINLY AND CLEARLY MARKEED WITH THE PROJECT NAME AND COREESPOND/NG LOCK (MAIN GATE, SOTH IRRIGATION SYSTEM, ETC.). E IF, IN THE OPINION OF THE CITY ENGINEER OR HIS DESIGNEE, TH INTENSITY FREQUIENCY OR DURATION OF FUGITIVE DUST EM/SS/ONS FROM THE SITE CONSTITURT£S A HAZARD TO THE SAFETY OF THE PUBLIC, BY INTRUSION BEYOOND THE PROJECT BOUNDARY, THE CITY ENGINEER OR HIS DESIGNEE OR AGENT MAY IMMEDIATELY ENTER UPON THE SITE OR IMMEDIATELY TAKE OTHER SUCH ACTION AS MAY BE NECESSARY TO REMEDY THE HAZARD, SUCH AS BUT NOT LIMITED TO COMMENCING WATERING ON THE SITE OR ORDERING THE CESATION OF ANY EMISSION-GENERTING ACTIVITY OCCUR/NG ON-SITE. F. ANY OF THE ABOVE ACTIONS SHAL BE CONSTRUED AS AN ABATEMENT FOR WHICH THE CITY WILL "BACK CHARGE" THE GENERAL CONTRACTOR, DEVELOPER, AND/OR THE OWNER AS THE CITY SHALL DEEM APPROPRIATE. VICINITY MAP FIRST SUBSTITUTE MYLAR THIS MYLAR IS IDENTICAL TO THE MYLAR APPROVED BY THE CITY ENGINEER ON ON 11/28/2012, EXCEPT FOR THE REVISIONS NOTED Qj HEREON. 2� STANLEY C. MO SE DATE: R.C.E. 20596 NOT TO SCALE C. No, 20596 w r) m o; Exp. 9-30-21 l HAVE BEEN FULLY DESIGNED BY: AND DRAWN BY: CHECKED BY: APPLICATION CONSENT (CLEARING AND GRUBING CONTRACTOR) (SEWER TRENCH CONTRACTOR) I HAVE READ THE CONDITIONS OF THE FUGITIVE I HAVE READ THE CONDITIONS OF THE FUGITIVE DUST CONTROL PLAN AND THE OWNER HAS DUST CONTROL PLAN AND THE OWNER HAS AUTHORIZED THE IMPLEMENTATION OF ALL ITS AUTHORIZED THE IMPLEMENTATION OF AL ITS PROVISIONS THROUGHOUT PROJECT BUILDOUT PROVISIONS THROUGHOUT PROJECT BUILDOUT. NAME: NOT APPLICABLE NAME., NOT APPLICABLE COMPANY NAME COMPANY NAME. - TRADE: CLEARING & GRUBBING TRADE. - LICENSE CLASS, LICENSE CLASS: NO.: NO.: CONTACT PHONE NUMBER: CONTACT PHONE NUMBER: SIGNATURE. SIGNATURE: DA TE: DATE (GRADING CONTRACTOR) 1 HAVE READ THE CONDITIONS OF THE FUGITIVE DUST CONTROL PLAN AND THE OWNER HAS AUTHORIZED THE IMPLEMENTATION OF AL ITS PROVISIONS THROUGHOUT PROJECT BUILDOUT. NAME NOT APPLICABLE COMPANY NAME: TRADE. LICENSE CLASS. NO.: CONTACT PHONE NUMBER.- SIGNATURE: UMBER.SIGNATURE.• DA TE. (WATER TRENCH CONTRACTOR) 1 HAVE READ THE CONDITIONS OF THE FUGITIVE DUST CONTROL PLAN AND THE OWNER HAS AUTHOR/ZED THE IMPLEMENTATION OF AL ITS PROVISIONS THROUGHOUT PROJECT BUILDOUT. NAME: NOT APPLICABLE COMPANY NAME: TRADE: LICENSE CLASS: NO.: CONTACT PHONE NUMBER: SIGNATURE 9A TE: OWNER'S CERTIFICATION (STORM DRAIN TRENCH CONTRACTOR) I HAVE READ THE CONDITIONS OF THE FUGITIVE DUST CONTROL PLAN AND THE OWNER HAS AUTHORIZED THE IMPLEMENTATION OF AL ITS PROVISIONS THROUGHOUT PROJECT BUILDOUT. NAME NOT APPLICABLE COMPANY NAME. TRADE LICENSE CLASS NO.: CONTACT PHONE NUMBER SIGNATURE: DATE: (PAVING CONTRACTOR) _ I HAVE READ THE CONDITIONS OF THE FUGITIVE DUST CONTROL PLAN AND THE OWNER HAS AUTHORIZED THE IMPLEMENTATION OF AL ITS PROVISIONS THROUGHOUT PROJECT BUILDOUT. NAME NOT APPLICABLE COMPANY NAME. TRADE.' LICENSE CLASS: NO.: CONTACT PHONE NUMBER: SIGNATURE: DA TE TO INSURE IMPLEMENTATION OF THE DUST CONTROL MITIGATION MEASURES, A FINANCIAL SECURITY OF $2000/PROJECT ACREAGE SHALL BE REQUIRED PRIOR TO THE ISSUANCE OF ANY PERMIT. ANY FINANCIAL SECURITIES COLLECTED UNDER THE PROVISIONS OF THIS REQUIREMENT SHALL BE HELD BY THE CITY. OF LA QUINTA FOR POTENTIAL USE IN MITIGATING SOURCES OF FUGITIVE DUST NOT ADEQUATELY MITIGATED BY THE PROPERTY OWNER/S OR RESPONSIBLE DUST CONTROL PERSON. ALL UNUSED SECURITY SHALL BE RETURNED TO THE PROPERTY OWNER ONCE THE CITY HAS ACCEPTED THE FINAL IMPROVEMENT AND ISSUED CERTIFICATES OF OCCUPANCY. I CERTIFY THAT l HAVE READ THIS FUGITIVE DUST CONTROL PLAN AND UNDERSTAND THAT I AM RESPONSIBLE FOR THE COMPLIANCE OF THIS PROJECT TO THE DUST CONTROL PROVISIONS NOTED OR REFERENCED HEREIN ! UNDERSTAND THAT THE DUST CONTROL SECURITY THAT I'VE POSTED WITH THE CITY OF LA QUINTA MAY BE USED BY THE CITY, AND ADD/TONAL CHARGES, IF NEEDED, TO MITIGATE ANY VISIBLE EM/SS/ONS OR FUGITIVE DUST IF l FAIL TO KEEP THE DUST UNDER CONTROL. ! UNDERSTAND THAT DUST CONTRTOL IS REQUIRED 24 HOURS PER DAY, 7 DAYS PER WEEK FROM THE INITIAL DATE THAT THIS SITE IS DISTURBED IN ANY WAY FROM THE NATURAL VEGETATED CONDITION, AND SHALL CONTINUE UNTIL THE TIME THAT THE PROJECT SITE AND ALL IMPROVEMENTS ARE COMPLETED AND THE PROJECT SITE IS ACCEPTABLY RE -VEGETATED AND PAVED. RESPONSIBILITY FRO THE DUST CONTROL ON THE SITE CAN NOT BE TRANSFERRED SOLELY BY TRANSFERRING ALL OR A PORTION OF THIS PROPERTY TO OTHER CONTRACTORS, BUILDERS, OR OWNERS, A REPLACEMENT PM 10 PLAN AND DUST CONTROL SECURITY SHALL BE SUBMITTED FOR ANY TRANSFERRED PORTION OF THE PROJECT I CERTIFY THAT ! HAVE READ THIS APPLICATION AND THAT THE INFORMATION CONTAINED HEREIN /S TRUE AND CORRECT. ! AGREE TO COMPLY -WITH THE CITY FUGITIVE DUST ORDINANCE, AQMD RULE 403, 4031 AND THE FINAL COACHELLA VALLEY S.I.P. AND ALL LAWS RELATING TO CLEARING, GRADING, UTILITIES, LANDSCAPING, AND BUILD/NG OPERATIONS. ! AUTHORIZE REPRESENTATIVES OF THE CITY OF LA QUINTA TO ENTER UPON THE ABOVE MENTIONED PROPERTY FOR INSPECTION AND/OR ABATEMENT PURPOSES, AND / AGREE TO HOLD HARMLESS THE CITY OF LA QUINTA AND ITS REPRESENTATIVES FROM LIABILITY FOR ANY ACTIONS RELATED TO THIS PERMIT OWNER'S NAME/S: AV CONSTRUCTION, LLC OWNER'S ADDRESS: PO BOX 13290, PALM DESERT CA 92255 CONTACT C PHONE NUMBER: (24 HOURS) (760) 200-6607 OWNER'S AQMD CERTIFICATION NUMBER: CV2011-010146-10166 DATE: 2�Z SIGNATURE.• RESPONSIBLE DUST CONTROL PERSON I CERTIFY THAT I HAVE READ THIS FUGITIVE DUST CONTROL PLAN AND UNDERSTAND THAT 1 AM RESPONSIBLE FOR THE COMPLIANCE OF THIS PROJECT TO THE DUST CONTROL PROVISIONS NOTED OR REFERENCED HEREIN. AS THE AUTHOR/ZED RESPONSIBLE PERSON FOR THIS PROJECT l WILL LIST MY PHONE NUMBER ON THE REQUIRED SITE SIGNS, AND I WILL RESPOND TO DUST COMPLAINTS WITHIN THE 1 HOUR LIMIT I UNDERSTAND THAT DUST CONTROL IS REQUIRED 24 HOURS PER DAY 7 DAYS PER WEEK, FROM THE DATE THAT THE PROJECT IS FIRST DISTURBED /N ANY WAY FROM THE NATURAL VEGETATED CONDITION, AND CONTINUE UNTIL THE TIME THAT THE PROJECT SITE AND ALL IMPROVEMENTS ARE COMPLETED AND THE PROJECT SITE IS ACCEPTABLY RE -VEGETATED AND PAVED. ! ALSO CERTIFY THAT l HAVE ATTENDED AN AQMD SEMINAR ON FUGITIVE DUST CONTROL. NAME: RUSSELL JONES COMPANY NAME. AV CONSTRUCTION, LLC ADDRESS: PO BOX 13290, PALM DESERT CA 92255 CONTACT PHONE NUMBER: (24 HOURS) (760) 200-6607 AQ D CERTIFICATION NUMBER: CV2011-010146-1'0166 S/GN URE• DATE.• 2 '11 2.02- I PREPARED UNDER THE DIRECTION OF: AVENUE 52 PROJECT DATA (SEE ATTACHED PLAN ALSO) z O /j DATE: Z M 0 R S E z DATE. 12-14-21 PROJECT NAME TRACT NO 34243 I' ' THE HIDEAWAY STREET ADDRESS / SITE LOCATION. AVENUE 56 Suite 218 O� 0 -- NORTH SIDE OF AVENUE 8 APPROX 1000 FET WEST OF MAD/ ON STREET W W WINDS BLOW N.W. TO S.E.) W EASTERLY RESIDENAA/ AVENUE 54 cu) c SOUTHEASTERLY VACANT S C H U L T Z Q SOUTHERLY VACANT L LJ O z O SOUTHWESTERLY- Vacnnlr RFsIDENTIA/ cbergh®mdsconsulting.net * O � z � NORTHWESTERLY RESIDENTAI w DATE: 2 �� Z O O SURVEYORS OF CALF Li SCALE: SEE ABOVE :5i Q CURRENT LAND USAGE.- RESIDENTIAL BRY N MCKINNEY PGA CM v PROPOSED LAND USAGE.. RESIDENTIAL A USBR DISC SET IN CONCRETE POST P.W. DIRECTOR CITY LOT., -- TRACT.- 34243 WEST STAMPED) AT THE S.W. CORNER OF ELEV.= -64.955 + 500.00 = 435.045 AIRPORT BLVD. DISTURBED AREA: 8.54 ACRES z Cn O WATER AVAILABILITY, INITIAL STAGE ON-SITE EXISTING CVWQ FIRE HYDRANTS Z (AVENUE 56) . (J7 0 Q PROJECT SITE AVENUE 58 VICINITY MAP FIRST SUBSTITUTE MYLAR THIS MYLAR IS IDENTICAL TO THE MYLAR APPROVED BY THE CITY ENGINEER ON ON 11/28/2012, EXCEPT FOR THE REVISIONS NOTED Qj HEREON. 2� STANLEY C. MO SE DATE: R.C.E. 20596 NOT TO SCALE C. No, 20596 w r) m o; Exp. 9-30-21 l HAVE BEEN FULLY DESIGNED BY: AND DRAWN BY: CHECKED BY: APPLICATION CONSENT (CLEARING AND GRUBING CONTRACTOR) (SEWER TRENCH CONTRACTOR) I HAVE READ THE CONDITIONS OF THE FUGITIVE I HAVE READ THE CONDITIONS OF THE FUGITIVE DUST CONTROL PLAN AND THE OWNER HAS DUST CONTROL PLAN AND THE OWNER HAS AUTHORIZED THE IMPLEMENTATION OF ALL ITS AUTHORIZED THE IMPLEMENTATION OF AL ITS PROVISIONS THROUGHOUT PROJECT BUILDOUT PROVISIONS THROUGHOUT PROJECT BUILDOUT. NAME: NOT APPLICABLE NAME., NOT APPLICABLE COMPANY NAME COMPANY NAME. - TRADE: CLEARING & GRUBBING TRADE. - LICENSE CLASS, LICENSE CLASS: NO.: NO.: CONTACT PHONE NUMBER: CONTACT PHONE NUMBER: SIGNATURE. SIGNATURE: DA TE: DATE (GRADING CONTRACTOR) 1 HAVE READ THE CONDITIONS OF THE FUGITIVE DUST CONTROL PLAN AND THE OWNER HAS AUTHORIZED THE IMPLEMENTATION OF AL ITS PROVISIONS THROUGHOUT PROJECT BUILDOUT. NAME NOT APPLICABLE COMPANY NAME: TRADE. LICENSE CLASS. NO.: CONTACT PHONE NUMBER.- SIGNATURE: UMBER.SIGNATURE.• DA TE. (WATER TRENCH CONTRACTOR) 1 HAVE READ THE CONDITIONS OF THE FUGITIVE DUST CONTROL PLAN AND THE OWNER HAS AUTHOR/ZED THE IMPLEMENTATION OF AL ITS PROVISIONS THROUGHOUT PROJECT BUILDOUT. NAME: NOT APPLICABLE COMPANY NAME: TRADE: LICENSE CLASS: NO.: CONTACT PHONE NUMBER: SIGNATURE 9A TE: OWNER'S CERTIFICATION (STORM DRAIN TRENCH CONTRACTOR) I HAVE READ THE CONDITIONS OF THE FUGITIVE DUST CONTROL PLAN AND THE OWNER HAS AUTHORIZED THE IMPLEMENTATION OF AL ITS PROVISIONS THROUGHOUT PROJECT BUILDOUT. NAME NOT APPLICABLE COMPANY NAME. TRADE LICENSE CLASS NO.: CONTACT PHONE NUMBER SIGNATURE: DATE: (PAVING CONTRACTOR) _ I HAVE READ THE CONDITIONS OF THE FUGITIVE DUST CONTROL PLAN AND THE OWNER HAS AUTHORIZED THE IMPLEMENTATION OF AL ITS PROVISIONS THROUGHOUT PROJECT BUILDOUT. NAME NOT APPLICABLE COMPANY NAME. TRADE.' LICENSE CLASS: NO.: CONTACT PHONE NUMBER: SIGNATURE: DA TE TO INSURE IMPLEMENTATION OF THE DUST CONTROL MITIGATION MEASURES, A FINANCIAL SECURITY OF $2000/PROJECT ACREAGE SHALL BE REQUIRED PRIOR TO THE ISSUANCE OF ANY PERMIT. ANY FINANCIAL SECURITIES COLLECTED UNDER THE PROVISIONS OF THIS REQUIREMENT SHALL BE HELD BY THE CITY. OF LA QUINTA FOR POTENTIAL USE IN MITIGATING SOURCES OF FUGITIVE DUST NOT ADEQUATELY MITIGATED BY THE PROPERTY OWNER/S OR RESPONSIBLE DUST CONTROL PERSON. ALL UNUSED SECURITY SHALL BE RETURNED TO THE PROPERTY OWNER ONCE THE CITY HAS ACCEPTED THE FINAL IMPROVEMENT AND ISSUED CERTIFICATES OF OCCUPANCY. I CERTIFY THAT l HAVE READ THIS FUGITIVE DUST CONTROL PLAN AND UNDERSTAND THAT I AM RESPONSIBLE FOR THE COMPLIANCE OF THIS PROJECT TO THE DUST CONTROL PROVISIONS NOTED OR REFERENCED HEREIN ! UNDERSTAND THAT THE DUST CONTROL SECURITY THAT I'VE POSTED WITH THE CITY OF LA QUINTA MAY BE USED BY THE CITY, AND ADD/TONAL CHARGES, IF NEEDED, TO MITIGATE ANY VISIBLE EM/SS/ONS OR FUGITIVE DUST IF l FAIL TO KEEP THE DUST UNDER CONTROL. ! UNDERSTAND THAT DUST CONTRTOL IS REQUIRED 24 HOURS PER DAY, 7 DAYS PER WEEK FROM THE INITIAL DATE THAT THIS SITE IS DISTURBED IN ANY WAY FROM THE NATURAL VEGETATED CONDITION, AND SHALL CONTINUE UNTIL THE TIME THAT THE PROJECT SITE AND ALL IMPROVEMENTS ARE COMPLETED AND THE PROJECT SITE IS ACCEPTABLY RE -VEGETATED AND PAVED. RESPONSIBILITY FRO THE DUST CONTROL ON THE SITE CAN NOT BE TRANSFERRED SOLELY BY TRANSFERRING ALL OR A PORTION OF THIS PROPERTY TO OTHER CONTRACTORS, BUILDERS, OR OWNERS, A REPLACEMENT PM 10 PLAN AND DUST CONTROL SECURITY SHALL BE SUBMITTED FOR ANY TRANSFERRED PORTION OF THE PROJECT I CERTIFY THAT ! HAVE READ THIS APPLICATION AND THAT THE INFORMATION CONTAINED HEREIN /S TRUE AND CORRECT. ! AGREE TO COMPLY -WITH THE CITY FUGITIVE DUST ORDINANCE, AQMD RULE 403, 4031 AND THE FINAL COACHELLA VALLEY S.I.P. AND ALL LAWS RELATING TO CLEARING, GRADING, UTILITIES, LANDSCAPING, AND BUILD/NG OPERATIONS. ! AUTHORIZE REPRESENTATIVES OF THE CITY OF LA QUINTA TO ENTER UPON THE ABOVE MENTIONED PROPERTY FOR INSPECTION AND/OR ABATEMENT PURPOSES, AND / AGREE TO HOLD HARMLESS THE CITY OF LA QUINTA AND ITS REPRESENTATIVES FROM LIABILITY FOR ANY ACTIONS RELATED TO THIS PERMIT OWNER'S NAME/S: AV CONSTRUCTION, LLC OWNER'S ADDRESS: PO BOX 13290, PALM DESERT CA 92255 CONTACT C PHONE NUMBER: (24 HOURS) (760) 200-6607 OWNER'S AQMD CERTIFICATION NUMBER: CV2011-010146-10166 DATE: 2�Z SIGNATURE.• RESPONSIBLE DUST CONTROL PERSON I CERTIFY THAT I HAVE READ THIS FUGITIVE DUST CONTROL PLAN AND UNDERSTAND THAT 1 AM RESPONSIBLE FOR THE COMPLIANCE OF THIS PROJECT TO THE DUST CONTROL PROVISIONS NOTED OR REFERENCED HEREIN. AS THE AUTHOR/ZED RESPONSIBLE PERSON FOR THIS PROJECT l WILL LIST MY PHONE NUMBER ON THE REQUIRED SITE SIGNS, AND I WILL RESPOND TO DUST COMPLAINTS WITHIN THE 1 HOUR LIMIT I UNDERSTAND THAT DUST CONTROL IS REQUIRED 24 HOURS PER DAY 7 DAYS PER WEEK, FROM THE DATE THAT THE PROJECT IS FIRST DISTURBED /N ANY WAY FROM THE NATURAL VEGETATED CONDITION, AND CONTINUE UNTIL THE TIME THAT THE PROJECT SITE AND ALL IMPROVEMENTS ARE COMPLETED AND THE PROJECT SITE IS ACCEPTABLY RE -VEGETATED AND PAVED. ! ALSO CERTIFY THAT l HAVE ATTENDED AN AQMD SEMINAR ON FUGITIVE DUST CONTROL. NAME: RUSSELL JONES COMPANY NAME. AV CONSTRUCTION, LLC ADDRESS: PO BOX 13290, PALM DESERT CA 92255 CONTACT PHONE NUMBER: (24 HOURS) (760) 200-6607 AQ D CERTIFICATION NUMBER: CV2011-010146-1'0166 S/GN URE• DATE.• 2 '11 2.02- I IN THE CITY OF LA QUINTA, STATE OF CALIFORNIA < Q FUGITIVE DUST EMISSION 1 CONTROL PLAN SHT. 1 TRACT NO. 34243, CORAL MOUNTAIN of 2 SHTS. J 0 - POR. OF S 1/2 OF S 1/2, SEC. 21, T.6S., R.7E., S.B.B&M O FOR: AV CONSTRUCTION, LLC W.O. NO: 2 1:\82400\RG\PM10- dwg 2/03/21 pMld -aV@0-000b PREPARED UNDER THE DIRECTION OF: z PROJECT DATA (SEE ATTACHED PLAN ALSO) VE SS Q� lOiygY /j DATE: Z M 0 R S E z DATE. 12-14-21 PROJECT NAME TRACT NO 34243 J' 7 . STREET ADDRESS / SITE LOCATION. AVENUE 56 Suite 218 O� 0 -- NORTH SIDE OF AVENUE 8 APPROX 1000 FET WEST OF MAD/ ON STREET 0 ADJOIN/NG PROPERTY /NFO. (FOR SENSITIVITY TYP. WINDS BLOW N.W. TO S.E.) EXP. DATE 9/30/_21 EASTERLY RESIDENAA/ Voice: 760-674-5776 No. 20596 m J SOUTHEASTERLY VACANT S C H U L T Z Q SOUTHERLY VACANT APPROVED BY: SOUTHWESTERLY- Vacnnlr RFsIDENTIA/ cbergh®mdsconsulting.net * O WESTERLY NORTHWESTERLY RESIDENTAI DATE: 2 �� Z U NORTHERLY RESIDENTIAL SURVEYORS OF CALF NORTHEASTERLY RESIDENTIAL SCALE: SEE ABOVE B E N C H M A R K: C CURRENT LAND USAGE.- RESIDENTIAL BRY N MCKINNEY EXP. DATE 9/30 22 CM v PROPOSED LAND USAGE.. RESIDENTIAL A USBR DISC SET IN CONCRETE POST P.W. DIRECTOR CITY LOT., -- TRACT.- 34243 PERMIT NO.: STAMPED) AT THE S.W. CORNER OF ELEV.= -64.955 + 500.00 = 435.045 MONROE STREET AND 58TH AVENUE A.P.N. 760-240-014 PARCEL SIZE.- 20.1 ACRES DISTURBED AREA: 8.54 ACRES O WATER AVAILABILITY, INITIAL STAGE ON-SITE EXISTING CVWQ FIRE HYDRANTS Z IN THE CITY OF LA QUINTA, STATE OF CALIFORNIA < Q FUGITIVE DUST EMISSION 1 CONTROL PLAN SHT. 1 TRACT NO. 34243, CORAL MOUNTAIN of 2 SHTS. J 0 - POR. OF S 1/2 OF S 1/2, SEC. 21, T.6S., R.7E., S.B.B&M O FOR: AV CONSTRUCTION, LLC W.O. NO: 2 1:\82400\RG\PM10- dwg 2/03/21 pMld -aV@0-000b PREPARED UNDER THE DIRECTION OF: VE SS Q� lOiygY /j DATE: Z M 0 R S E 41865 BOARDWALK, J' 7 . Suite 218 O� Palm Desert, CA 92211 STA EY C. MO E EXP. DATE 9/30/_21 Voice: 760-674-5776 No. 20596 m R.C.E. 20596 S C H U L T Z Exp. 9-30-21 a APPROVED BY: cbergh®mdsconsulting.net * C1Vll. P � DATE: 2 �� Z PLANNERS ENGINEERS SURVEYORS OF CALF SCALE: SEE ABOVE B E N C H M A R K: BRY N MCKINNEY EXP. DATE 9/30 22 466 USBR (29TH ENGRS 1941 RIV. CO. ti A USBR DISC SET IN CONCRETE POST P.W. DIRECTOR CITY ENGINEER R.C.E. 49418 DATE: DECEMBER, 2020 STAMPED) AT THE S.W. CORNER OF ELEV.= -64.955 + 500.00 = 435.045 MONROE STREET AND 58TH AVENUE IN THE CITY OF LA QUINTA, STATE OF CALIFORNIA < Q FUGITIVE DUST EMISSION 1 CONTROL PLAN SHT. 1 TRACT NO. 34243, CORAL MOUNTAIN of 2 SHTS. J 0 - POR. OF S 1/2 OF S 1/2, SEC. 21, T.6S., R.7E., S.B.B&M O FOR: AV CONSTRUCTION, LLC W.O. NO: 2 1:\82400\RG\PM10- dwg 2/03/21 pMld -aV@0-000b VICINITY MAP NOT TO SCALE FUGITIVE DUST CONTROL NOTES 1. -WHEN LOCAL WIND EXCEED 25 MPH, THE FOLLOWING (BUT NOT LIMITED TOO) SHALL BE DONE A. ALL GRADING ACTIVITIES SHALL BE SUSPENDED EXCEPT WATER TRUCKS USED TO CONTROL FUGITIVE DUST. 2. THE RESPONSIBLE DUST CONTROL PERSON SHALL MAINTAIN A LIST OF CITY APPROVED RESPONSIBLE DUST CONTROL PERSONS AUTHORIZED TO IMMEDIATELY CORRECT FUGITIVE DUST (RULE 403, 403.1, AND C.V. SIP) AND NUISANCE (RULE 402) VIOLATIONS. THIS LIST SHALL ALSO CONTAIN ADDITIONAL EQUIPMENT (WATER TRUCKS) OPERATORS AVAILABLE 24/7. 3. PM -10 FENCING SHALL BE 6' CHAINLINK FENCE WITH WINDSCREEN POSTS HALL BE 2-1/4" DIA 0 8' O.C. WITH 1-5/8" TOP RAIL. POSTS SHOULD BE EMBEDDED 3' INTO NATIVE SOIL. WINDSCREEN SHOULD BE PLACED ON WEST OR NORTH SIDE OF FENCE. WINDSCREEN SHOULD BE ATTACHED TO FENCE WITH METAL GROMMETS 0 2FT O.C. TOP AND BTTM. PLACE GROMMETS 0 2FT O.C. VERTICALLY AT EVERY POST. 4. DUST MITIGATION MEASURES (VEHICLES, TOWERS, LOADING AREA, FENCING, ETC) SHALL BE IN PLACE PRIOR TO THE PRECONSTRUCTION MEETING OR ISSUEING OF GRADING PERMIT. (MEETING GOVERNS) 5. THE FOLLOWING SOIL STABILIZATION PRODUCTS ARE POSSIBLE OPTIONS FOR SOIL STABILIZATION BUT MUST BE APPLIED EVERY 6 MONTHS AND NO FOOT OR VEHICULAR TRAFFIC IS ALLOWED: A. SOIL-SEMENT ACRYLIC POLYMEREMULSION 180 GALLONS OF CONCENTRATE PER ACRE. 9:1 WATER: CEMENT B. ENVIROTAC II 10:1 RATIO ) ( ) C. FIBER-SORB1 1-1/2' LAYER (100 TONS PER ACRE) SOME VEHICULAR TRAFFIC ALLOWED D. COMPOSITE 300 GAL OF ENVIROTEC + 600 LBS PAPER FIBER MULCH + 8 PARTS WATER. MATERIAL CERTS REQUIRED. 6. DURING SOIL IMPORT/EXPORT ACTIVITIES THE FOLLOWING SHALL BE ACCOMPLISHED A. A VALID GRADING PERMIT SHALL BE ACTIVE AT BOTH THE IMPORT AND EXPORT SITE. B. PREMOISTENED AT THE IMPORT AND EXPORT SITES PRIOR TO LOADING TRANSPORTS C. PREMOISTENED SOIL PRIOR TO COVER IN THE LOADING TRANSPORTS TO NEAR 70 CONTENT. D. ALL TRUCKS SHALL BE COVERED AND HAVE A MINIMUM OF 6" OF FREEBOARD PRIOR TO HAULING. E. STREET CLEANING SHALL OCCUR, AS NECESSARY, AT IMPORT AND EXPORT LOCATION. 7. TRAINING FOR AQMD CERTIFICATION CAN BE ACCOMPLISHED BY CALLING SHARON ZAMORA 0 909-396-2183 8. REMOVAL OF SIGN/S ARE GROUNDS FOR TEMPORARY OR PERMANENT CANCELLATION OF THE PERMIT. 9. PAVED ACCESS TO THE BUILDING SITES SHALL BE REQUIRED PRIOR TO FRAMING OF THE BUILDINGS. THIS CONSTRUCTION STAGE USUALLY INDICATES AN INCREASE IN THE NUMBER OF WORKERS AND THEIR VEHICLES. ALSO, THE PAVED ACCESS IS REQUIRED FOR FIREFIGHTING PURPOSES. IF PAVING IS DESIRED BEFORE ALL UTILITIES AND/OR LATERALS ARE INSTALLED, THE BASE LIFT OF ASPHALT IS SUFFICIENT FOR ACCESS. THE A.C. CAN BE "CAPPED" LATER, LEAVING A FINAL SURFACE THAT IS FREE OF UTILITY CUTS AND PATCHES. 10. WITHIN 10 DAYS OF CEASING ACTIVITY, AN OPERATOR SHALL IMPLEMENT AT LEAST ONE OF THE FOLLOWING LONG-TERM STABILIZATION TECHNIQUES FOR ANY DISTURBED SURFACE AREA WHERE CONSTRUCTION ACTIVITIES ARE NOT SCHEDULED TO OCCUR FOR AT LEAST 30 DAYS: A. REVEGETATION THAT RESULTS IN 75 PERCENT GROUND COVERAGE PROVIDED THAT AN ACTIVE WATERING SYSTEM IS IN PLACE AT ALL TIMES; OR B. ESTABLISHMENT OF A STABILIZED SURFACE THROUGH WATERING WITH PHYSICAL ACCESS RESTRICTION SURROUNDING THE AREA; OR C. USE OF CHEMICAL STABILIZERS TO ESTABLISH A STABILIZED SURFACE WITH PHYSICAL ACCESS RESTRICTION SURROUNDING THE AREA. CHEMICAL SURFACE COLORANT TO BE TAN AND MIXED PER MANUFACTURES DIRECTIONS. 11. STAFF TRAINING A. PROVIDE TRAINING FOR STAFF AND MANAGEMENT AT A REGULARLY SCHEDULED AQMD WORKSHOP (CALL SHARRON FUJIMOTO AT (909)-396-2183 B. REQUIRE ALL SUBCONTRACTORS AND BUILDERS TO ATTEND A REGULARLY SCHEDULED AQMD WORKSHOP. 12. PROJECT SIGNAGE A. 1 SIGN MINIMUM AND PER FRONTAGE STREET B. SIGN/S MUST BE PRESENT AT PRECON MEETING C. SIGN/S MUST BE INSTALLED PRIOR TO GRADING PERMIT ISSUED D. REMOVAL OF SIGN/S ARE GROUNDS FOR TEMPORARY OR PERMANENT CANCELLATION OF THE PERMIT. 13. HAULING PROCEDURES A. TRUCKS HAULING DIRT ON PAVED ROADS MUST MAINTAIN 5' OF FREEBOARD AND BE TARPED. B. THE HAUL ROUTE SHALL BE PLACED ON THIS PLAN OR APPROVED BY THE CITY ENGINEER. C. THE IMPORT AND EXPORT SITE MUST HAVE A VALID GRADING PERMIT AND FUGITIVE DUST CONTROL PLAN PRIOR TO DISTURBING SITES. D. THE SOIL IN HAUL TRUCKS SHOULD BE AT A MINIMUM OF 70% OF OPTIMUM MOISTURE CONTENT. E. ALL VEHICLES GOING FROM DIRT AREAS ONTO PAVED STREETS SHALL HAVE TIRES AND WHEELS INSPECTED AND WASHED IF NECESSARY TO AVOID "TRACKING OUT' DIRT. F. IF PERIMETER WALLS ARE TO BE BUILT, THEY SHOULD BE GIVEN HIGH PRIORITY SINCE THEY WILL HELP TO CATCH BLOWSAND AND COULD THEREBY REDUCE THE AMOUNT OF STREET SWEEPING REQUIRED. G. DTC CONCENTRATE MAY ALSO BE USED AS A SPRAY ON TARP (SEE WWW.SSPCO.ORG) 14. STORAGE AND STOCKPILE HANDLING WIND SHELTERING A. INSTALL PM10 FENCING ON 3 SIDES OF PILE EQUAL TO HEIGHT OF PILE. B. COVERINGS CAN BE USED ON SMALL PILES AND SECURE THEM. STOCKPILE OR TRENCH PILE STABILIZATION METHODS A. CONTINOUS WATERING BY TRUCK OR SPRINKLERS B. CHEMICAL STABILIZATION WITH CONTINOUS MONITORING MATERIAL HANDLING A. CONFINE LOAD IN/OUT TO DOWNWIND SIDE OF PILE B. PILES GREATER THAN 8FT IN HEIGHT MUST BE A MINIMUM OF 10OFT AWAY FROM OCCUPIED BUILDINGS. 15. AREAS SUBJECT TO FREQUENT DISTURBANCES A. EQUIPMENT STAGING AREAS ARE TO BE TREATED WITH AT LEAST ONE INCH WASHED GRAVEL MAINTAINED TO A DEPTH OF FOUR INCHES OR TREATED WITH CHEMICAL DUST SUPPRESSANTS DESIGNED BY THE MANUFACTURER FOR TRAFFIC AREAS, AND APPLIED IN ACCORDANCE WITH THE MANUFACTURER'S SPECIFICATIONS AND IN SUFFICIENT CONCENTRATIONS AND FREQUENCY TO ENSURE COMPLIANCE WITH THE APPLICABLE TEST METHODS. B. EMPLOYEE PARKING AREAS ARE TO BE COVERED WITH AT LEAST ONE INCH WASHED GRAVEL MAINTAINED TO A DEPTH OF FOUR INCHES OR TREATED WITH CHEMICAL DUST SUPPRESSANTS DESIGNED BY THE MANUFACTURER FOR TRAFFIC AREAS, AND APPLIED IN ACCORDANCE WITH THE MANUFACTURER'S SPECIFICATIONS AND IN SUFFICIENT CONCENTRATIONS AND FREQUENCY TO ENSURE COMPLIANCE WITH THE APPLICABLE TEST METHODS. IF AN INTERNAL ROADWAY NETWORK IS PAVED, EMPLOYEES ARE TO BE INSTRUCTED TO PARK ONLY ON PAVED AREAS. 16. RECORD KEEPING FORMS A. PER FORMAT IN SECTION 6-2 COACHELLA VALLEY FUGITIVE DUST CONTROL HANDBOOK. LEGEND AREA OF ON-SITE CONSTRUCTION/IMPROVEMENTS COMPLETE/STABILZED (ALL OFF-SITE IMPROVEMENTS COMPLETE/STABILIZED) EXISTING SIX FOOT HIGH PERIMETER WALL SIX FOOT HIGH PM -10 DUST CONTROL FENCING ---- TRACT BOUNDARY NOTES: 1. INSTALL 6' HIGH CHAN LINK, FABRIC COVERED WIND FENCE ALONG ALL PROPERTY LINES AND STREET RIGHT-OF-WAY, EXCEPT AREAS WHERE 6' GARDEN WALL IS EXISTING. 2. 6' PM10 FENCE TO BE MAINTAINED AT ALL TIMES SOURCES OF FUGITIVE DUST SCALE: 1"-80' 160 320 1. EARTHMOVING:ALL EARTHMOVING ACTIVITIES WILL BE LIMITED TO THE ONSITE AREA, IMPORT OF MATERIAL FROM OFFSITE SOURCES WILL BE PERFORMED IN ORDER TO PREPARE THE SITE FOR THE RESIDENTIAL LOTS. 2. UNPAVED ROAD TRAVEL: THE SITE WILL HAVE UNPAVED ROADS TO THE VARIOUS CONSTRUCTION SITES. AVERAGE DAILY TRAFFIC LEVELS WILL BE 40 TRIPS PER DAY. 3. VEHICULAR TRACK -OUT: VEHICLES WHICH EXIT THE SITE HAVE POTENTIAL TO TRACK MATERIAL ONTO AVENUE 58. THERE WILL BE IMPORT OF SOIL TO THE SITE. WORKER'S VEHICLES, DELIVERY TRUCKS AND THE MAINTENANCE TRUCK FOR EARTHMOVING EQUIPMENT WILL ENTER AND EXIT THE SITE. ON THE AVERAGE, 40 VEHICLES WILL EXIT THE SITE DAILY. 4. DISTURBED SURFACE AREA: THE ENTIRE SITE WILL BE DISTURBED FROM ITS NATURAL CONDITION DURING THE GRADING OPERATION. GENERAL NOTES 1. A WIND FENCE SHALL BE ERECTED AS SHOWN ON THE PLAN PRIOR TO START OF GRADING AND SHALL REMAIN IN PLACE UNTIL SUCH TIME AS NON -ERODIBLE CONDITIONS PREVAIL 2. ALL GRADING ACTIVITIES SHALL CEASE WHEN WIND SPEED REACHES 25 MPH. SITE SHALL BE KEPT CONTINUOUSLY WATERED TO PREVENT BLOWING DUST WHILE WINDS EXCEED 25 MPH. 3. WATERING SHALL BE DONE PRIOR TO ROUGH GRADING USING AN ONSITE IRRIGATION SYSTEM PRIOR TO BEGINNING OF GRADING ACTIVITIES. PRE -WATERING SHALL ALSO BE COMPLETED ALONG EQUIPMENT ROUTES FROM MAJOR CUT / FILL ACTIVITIES AS WELL AS ACCESS AND PARKING AREAS. WATERING SHALL CONTINUE DURING ROUGH GRADING OPERATIONS TO PRECLUDE DUST GENERATION. 4. ALL AREA STREETS SHALL BE INSPECTED DAILY AND SWEEPING ORDERED WHEN SILT AND SAND ACCUMULATE. 5. UN -DEVELOPED BUILDING PADS SHALL BE TEMPORARILY STABILIZED (CHEMICAL APPLICATION). 6. WATERING SHALL CONTINUE FOR THE DURATION OF FINAL GRADING ACTIVITIES UTILIZING THE ONSITE DOMESTIC WATER SYSTEM. 7. ESTIMATED PM -10 COST: $10,000 8. NO STOCKPILE ON-SITE 9. ANY UNPAVED ROADWAYS TO BE WATERED AS NECESSARY (ALL STREETS HAVE BEEN PAVED) 10. WHEEL WASHING AREA, IF NEEDED, TO BE LOCATED AT CONSTRUCTION ENTRANCE. REASONABLY AVAILABLE CONTROL MEASURES NO. MEASURE USED DESCRIPTION OR JUSTIFICATION 1. EARTHMOVING NOT -APPLICABLE, ALL EARTHMOVING OPERATIONS ARE COMPLETE 2. UNPAVED ROAD TRAVEL: NOT -APPLICABLE, ALL ROADWAYS HAVE BEEN PAVED, 3: VEHICULAR TRACK -OUT CLEANING AVENUE 58 WILL BE SWEPT AT THE END OF EACH WORK DAY AND ANY MATERIAL THAT HAS BEEN TRACKED OUT WILL BE REMOVED AND RETURNED TO THE SITE. GRAVEL NOT APPLICABLE - ALL CONSTRUCTION VEHICLES TO PARK ON PAVED STREETS. CONSTRUCTION ENTRANCE CONTINGENCY MEASURE: ADDITIONAL INSPECTION AND STREET SWEEPING WILL BE MADE IF TRACK -OUT MATERIAL IS OBSERVED ON AVENUE 58 NEAR THE ENTRY ROAD. 4. DISTURBED SURFACE AREAS WIND FENCE: A WIND FENCE SHALL BE INSTALLED AS SHOWN TO REDUCE WIND SPEEDS AND TO PREVENT WINDBLOWN MATERIAL FROM LEAVING THE SITE. CONTINGENCY MEASURE: WATER WILL BE APPLIED TO ALL DISTURBED SURFACE AREAS FROM WHICH VISIBLE DUST EMISSIONS ARE OBSERVED. Z1\ REVISE PLAN TO DEPICT PORTIONS OF PROJECT SITE THAT HAVE BEEN FULLY IMPROVED, STABLIUZED AND OCCUPIED. UPDATE EOR TO REFRESH EXPIRED PLAN. DESIGNED BY: DRAWN BY: FIRST SUBSTITUTE MYLAR THIS MYLAR IS IDENTICAL TO THE MYLAR APPROVED BY THE CITY ENGINEER ON ON 11/28/2012, EXCEPT FOR THE REVISIONS NOTED AHEREON. QROFESS/pN� C. No. 20596 ^ m STANLEY C. ORSE a Exp. 9-30-21 R.CE. 2_0596 *9r CIVIL �* DATE: !63,/20 SOF CALF CHECKED BY: AX ftT 17 19 20 21 -- ao 1 O , , i OQ 23 HERMITAGE 18 EX. MASONRYGARDEN WALL TO BE UTILIZED OR PM -10 17ENCING 17 19 27 14 WATER SOURCE: EXISTING CVWD FIRE "' HYDRANT (TYPICAL) LOT H 7RAC Y NO. 30 096-2 LAT. 123. 22 2_3 11 24 z J PIPE) EX. MASONRY GARDEN WALL TO BE UTILIZED FOR PM -10 FENCING a2 24 3t; �L I Q 47 56 f , Q j I i U I , - 1 25 11 31 I 46 57 EX. MASONRY GARDEN WALL TO BE UTILIZED FOR P -10 FENCING I 10 j 2627 / 44 y 0 LOT G g ill - I� ' z LOT H - I 43 60 IF 7 l 28 61 42 i 6 nl 29 a( o0 5 I 41 �I �' z I cMJ 30 �� v� al 1 40 o I 4 63 31 39 s Fn L 32 WATER SOURCE: a EXISTING CVWD FIRE - -------- HYDRANT (TYPICAL) r-- ---, EXISITNG 65 2 I 69 I r.l. GATES I I 68 67 - I 70 LOT II pf 2 EX. MASONRY GARDEN WALL TO BE UTILIZED FOR PM -10 FENCING i I I [-LOT J - L ------J 66 Z LOT E _ Q LOT L LOT C LOT Z LOT H _ O EXTING CURB LOT K L - Q F}E Lryff-}--- --- a� EX. MASONRY GARDEN WALL TO DUST CONTROL SIGN INITIAL STAGING AREA, PRIMARY CONSTRUCTION ENTRANCE/EXIT U BE UTILIZED FOR PM -10 FENCING EQUIPMENT STORAGE (EXISTING PAVED ROAD) AND EMPLOYEE PARKING C CONSTRUCTION OFFICE, CM IV CONTRACTOR/DEVELOPER TO FOLLOW c MONITORING TEMPLATE PER AQMD SPECIFICATIONS. Z AVENUE 52 z H ESS PREPARED UNDER THE DIRECTION OF: j O � w THE HIDEAWAY Q ,?,OV 41 w n� � w w 2 w C. C. �o �� �s STANLEY C. M SE AVENUE 54 CIO Cnn Voice: 760-674-5776 CONTROL PLAN SHT. 1 No. 20596 z Ex . 9-30-21 Exp. ry a w O z O cbergh®mdsconsulting.net TRACT NO. 34243 CORAL MOUNTAIN of 2 SHTS. z¢ * * Ty CIVIL CO DATE: Z % PLANNERS ENGINEERS LLJ z O � v �Q TF W -,7;; Q PGA SCALE: SEE ABOVE B E N C H M A R K: #466 USBR (29TH ENGRS 1941 RIV. CO. A USBR DISC SET IN CONCRETE POST POR. OF S 1/2 OF S 1/2, SEC. 21, T.6S., R.7E., S.B.B&M WEST O AIRPORT BLVD. ENGINEERP. DATE 9/30/22 DATE: DECEMBER, 2020 (LEV STAMPED)AT A+ 500.00 _COR5.04OP MONROE STREET AND 58TH AVENUE z NO: r 2 (AVENUE 56) 0 .dwg 2/03/21 Q PROJECT SITE 21000 AVENUE 58 VICINITY MAP NOT TO SCALE FUGITIVE DUST CONTROL NOTES 1. -WHEN LOCAL WIND EXCEED 25 MPH, THE FOLLOWING (BUT NOT LIMITED TOO) SHALL BE DONE A. ALL GRADING ACTIVITIES SHALL BE SUSPENDED EXCEPT WATER TRUCKS USED TO CONTROL FUGITIVE DUST. 2. THE RESPONSIBLE DUST CONTROL PERSON SHALL MAINTAIN A LIST OF CITY APPROVED RESPONSIBLE DUST CONTROL PERSONS AUTHORIZED TO IMMEDIATELY CORRECT FUGITIVE DUST (RULE 403, 403.1, AND C.V. SIP) AND NUISANCE (RULE 402) VIOLATIONS. THIS LIST SHALL ALSO CONTAIN ADDITIONAL EQUIPMENT (WATER TRUCKS) OPERATORS AVAILABLE 24/7. 3. PM -10 FENCING SHALL BE 6' CHAINLINK FENCE WITH WINDSCREEN POSTS HALL BE 2-1/4" DIA 0 8' O.C. WITH 1-5/8" TOP RAIL. POSTS SHOULD BE EMBEDDED 3' INTO NATIVE SOIL. WINDSCREEN SHOULD BE PLACED ON WEST OR NORTH SIDE OF FENCE. WINDSCREEN SHOULD BE ATTACHED TO FENCE WITH METAL GROMMETS 0 2FT O.C. TOP AND BTTM. PLACE GROMMETS 0 2FT O.C. VERTICALLY AT EVERY POST. 4. DUST MITIGATION MEASURES (VEHICLES, TOWERS, LOADING AREA, FENCING, ETC) SHALL BE IN PLACE PRIOR TO THE PRECONSTRUCTION MEETING OR ISSUEING OF GRADING PERMIT. (MEETING GOVERNS) 5. THE FOLLOWING SOIL STABILIZATION PRODUCTS ARE POSSIBLE OPTIONS FOR SOIL STABILIZATION BUT MUST BE APPLIED EVERY 6 MONTHS AND NO FOOT OR VEHICULAR TRAFFIC IS ALLOWED: A. SOIL-SEMENT ACRYLIC POLYMEREMULSION 180 GALLONS OF CONCENTRATE PER ACRE. 9:1 WATER: CEMENT B. ENVIROTAC II 10:1 RATIO ) ( ) C. FIBER-SORB1 1-1/2' LAYER (100 TONS PER ACRE) SOME VEHICULAR TRAFFIC ALLOWED D. COMPOSITE 300 GAL OF ENVIROTEC + 600 LBS PAPER FIBER MULCH + 8 PARTS WATER. MATERIAL CERTS REQUIRED. 6. DURING SOIL IMPORT/EXPORT ACTIVITIES THE FOLLOWING SHALL BE ACCOMPLISHED A. A VALID GRADING PERMIT SHALL BE ACTIVE AT BOTH THE IMPORT AND EXPORT SITE. B. PREMOISTENED AT THE IMPORT AND EXPORT SITES PRIOR TO LOADING TRANSPORTS C. PREMOISTENED SOIL PRIOR TO COVER IN THE LOADING TRANSPORTS TO NEAR 70 CONTENT. D. ALL TRUCKS SHALL BE COVERED AND HAVE A MINIMUM OF 6" OF FREEBOARD PRIOR TO HAULING. E. STREET CLEANING SHALL OCCUR, AS NECESSARY, AT IMPORT AND EXPORT LOCATION. 7. TRAINING FOR AQMD CERTIFICATION CAN BE ACCOMPLISHED BY CALLING SHARON ZAMORA 0 909-396-2183 8. REMOVAL OF SIGN/S ARE GROUNDS FOR TEMPORARY OR PERMANENT CANCELLATION OF THE PERMIT. 9. PAVED ACCESS TO THE BUILDING SITES SHALL BE REQUIRED PRIOR TO FRAMING OF THE BUILDINGS. THIS CONSTRUCTION STAGE USUALLY INDICATES AN INCREASE IN THE NUMBER OF WORKERS AND THEIR VEHICLES. ALSO, THE PAVED ACCESS IS REQUIRED FOR FIREFIGHTING PURPOSES. IF PAVING IS DESIRED BEFORE ALL UTILITIES AND/OR LATERALS ARE INSTALLED, THE BASE LIFT OF ASPHALT IS SUFFICIENT FOR ACCESS. THE A.C. CAN BE "CAPPED" LATER, LEAVING A FINAL SURFACE THAT IS FREE OF UTILITY CUTS AND PATCHES. 10. WITHIN 10 DAYS OF CEASING ACTIVITY, AN OPERATOR SHALL IMPLEMENT AT LEAST ONE OF THE FOLLOWING LONG-TERM STABILIZATION TECHNIQUES FOR ANY DISTURBED SURFACE AREA WHERE CONSTRUCTION ACTIVITIES ARE NOT SCHEDULED TO OCCUR FOR AT LEAST 30 DAYS: A. REVEGETATION THAT RESULTS IN 75 PERCENT GROUND COVERAGE PROVIDED THAT AN ACTIVE WATERING SYSTEM IS IN PLACE AT ALL TIMES; OR B. ESTABLISHMENT OF A STABILIZED SURFACE THROUGH WATERING WITH PHYSICAL ACCESS RESTRICTION SURROUNDING THE AREA; OR C. USE OF CHEMICAL STABILIZERS TO ESTABLISH A STABILIZED SURFACE WITH PHYSICAL ACCESS RESTRICTION SURROUNDING THE AREA. CHEMICAL SURFACE COLORANT TO BE TAN AND MIXED PER MANUFACTURES DIRECTIONS. 11. STAFF TRAINING A. PROVIDE TRAINING FOR STAFF AND MANAGEMENT AT A REGULARLY SCHEDULED AQMD WORKSHOP (CALL SHARRON FUJIMOTO AT (909)-396-2183 B. REQUIRE ALL SUBCONTRACTORS AND BUILDERS TO ATTEND A REGULARLY SCHEDULED AQMD WORKSHOP. 12. PROJECT SIGNAGE A. 1 SIGN MINIMUM AND PER FRONTAGE STREET B. SIGN/S MUST BE PRESENT AT PRECON MEETING C. SIGN/S MUST BE INSTALLED PRIOR TO GRADING PERMIT ISSUED D. REMOVAL OF SIGN/S ARE GROUNDS FOR TEMPORARY OR PERMANENT CANCELLATION OF THE PERMIT. 13. HAULING PROCEDURES A. TRUCKS HAULING DIRT ON PAVED ROADS MUST MAINTAIN 5' OF FREEBOARD AND BE TARPED. B. THE HAUL ROUTE SHALL BE PLACED ON THIS PLAN OR APPROVED BY THE CITY ENGINEER. C. THE IMPORT AND EXPORT SITE MUST HAVE A VALID GRADING PERMIT AND FUGITIVE DUST CONTROL PLAN PRIOR TO DISTURBING SITES. D. THE SOIL IN HAUL TRUCKS SHOULD BE AT A MINIMUM OF 70% OF OPTIMUM MOISTURE CONTENT. E. ALL VEHICLES GOING FROM DIRT AREAS ONTO PAVED STREETS SHALL HAVE TIRES AND WHEELS INSPECTED AND WASHED IF NECESSARY TO AVOID "TRACKING OUT' DIRT. F. IF PERIMETER WALLS ARE TO BE BUILT, THEY SHOULD BE GIVEN HIGH PRIORITY SINCE THEY WILL HELP TO CATCH BLOWSAND AND COULD THEREBY REDUCE THE AMOUNT OF STREET SWEEPING REQUIRED. G. DTC CONCENTRATE MAY ALSO BE USED AS A SPRAY ON TARP (SEE WWW.SSPCO.ORG) 14. STORAGE AND STOCKPILE HANDLING WIND SHELTERING A. INSTALL PM10 FENCING ON 3 SIDES OF PILE EQUAL TO HEIGHT OF PILE. B. COVERINGS CAN BE USED ON SMALL PILES AND SECURE THEM. STOCKPILE OR TRENCH PILE STABILIZATION METHODS A. CONTINOUS WATERING BY TRUCK OR SPRINKLERS B. CHEMICAL STABILIZATION WITH CONTINOUS MONITORING MATERIAL HANDLING A. CONFINE LOAD IN/OUT TO DOWNWIND SIDE OF PILE B. PILES GREATER THAN 8FT IN HEIGHT MUST BE A MINIMUM OF 10OFT AWAY FROM OCCUPIED BUILDINGS. 15. AREAS SUBJECT TO FREQUENT DISTURBANCES A. EQUIPMENT STAGING AREAS ARE TO BE TREATED WITH AT LEAST ONE INCH WASHED GRAVEL MAINTAINED TO A DEPTH OF FOUR INCHES OR TREATED WITH CHEMICAL DUST SUPPRESSANTS DESIGNED BY THE MANUFACTURER FOR TRAFFIC AREAS, AND APPLIED IN ACCORDANCE WITH THE MANUFACTURER'S SPECIFICATIONS AND IN SUFFICIENT CONCENTRATIONS AND FREQUENCY TO ENSURE COMPLIANCE WITH THE APPLICABLE TEST METHODS. B. EMPLOYEE PARKING AREAS ARE TO BE COVERED WITH AT LEAST ONE INCH WASHED GRAVEL MAINTAINED TO A DEPTH OF FOUR INCHES OR TREATED WITH CHEMICAL DUST SUPPRESSANTS DESIGNED BY THE MANUFACTURER FOR TRAFFIC AREAS, AND APPLIED IN ACCORDANCE WITH THE MANUFACTURER'S SPECIFICATIONS AND IN SUFFICIENT CONCENTRATIONS AND FREQUENCY TO ENSURE COMPLIANCE WITH THE APPLICABLE TEST METHODS. IF AN INTERNAL ROADWAY NETWORK IS PAVED, EMPLOYEES ARE TO BE INSTRUCTED TO PARK ONLY ON PAVED AREAS. 16. RECORD KEEPING FORMS A. PER FORMAT IN SECTION 6-2 COACHELLA VALLEY FUGITIVE DUST CONTROL HANDBOOK. LEGEND AREA OF ON-SITE CONSTRUCTION/IMPROVEMENTS COMPLETE/STABILZED (ALL OFF-SITE IMPROVEMENTS COMPLETE/STABILIZED) EXISTING SIX FOOT HIGH PERIMETER WALL SIX FOOT HIGH PM -10 DUST CONTROL FENCING ---- TRACT BOUNDARY NOTES: 1. INSTALL 6' HIGH CHAN LINK, FABRIC COVERED WIND FENCE ALONG ALL PROPERTY LINES AND STREET RIGHT-OF-WAY, EXCEPT AREAS WHERE 6' GARDEN WALL IS EXISTING. 2. 6' PM10 FENCE TO BE MAINTAINED AT ALL TIMES SOURCES OF FUGITIVE DUST SCALE: 1"-80' 160 320 1. EARTHMOVING:ALL EARTHMOVING ACTIVITIES WILL BE LIMITED TO THE ONSITE AREA, IMPORT OF MATERIAL FROM OFFSITE SOURCES WILL BE PERFORMED IN ORDER TO PREPARE THE SITE FOR THE RESIDENTIAL LOTS. 2. UNPAVED ROAD TRAVEL: THE SITE WILL HAVE UNPAVED ROADS TO THE VARIOUS CONSTRUCTION SITES. AVERAGE DAILY TRAFFIC LEVELS WILL BE 40 TRIPS PER DAY. 3. VEHICULAR TRACK -OUT: VEHICLES WHICH EXIT THE SITE HAVE POTENTIAL TO TRACK MATERIAL ONTO AVENUE 58. THERE WILL BE IMPORT OF SOIL TO THE SITE. WORKER'S VEHICLES, DELIVERY TRUCKS AND THE MAINTENANCE TRUCK FOR EARTHMOVING EQUIPMENT WILL ENTER AND EXIT THE SITE. ON THE AVERAGE, 40 VEHICLES WILL EXIT THE SITE DAILY. 4. DISTURBED SURFACE AREA: THE ENTIRE SITE WILL BE DISTURBED FROM ITS NATURAL CONDITION DURING THE GRADING OPERATION. GENERAL NOTES 1. A WIND FENCE SHALL BE ERECTED AS SHOWN ON THE PLAN PRIOR TO START OF GRADING AND SHALL REMAIN IN PLACE UNTIL SUCH TIME AS NON -ERODIBLE CONDITIONS PREVAIL 2. ALL GRADING ACTIVITIES SHALL CEASE WHEN WIND SPEED REACHES 25 MPH. SITE SHALL BE KEPT CONTINUOUSLY WATERED TO PREVENT BLOWING DUST WHILE WINDS EXCEED 25 MPH. 3. WATERING SHALL BE DONE PRIOR TO ROUGH GRADING USING AN ONSITE IRRIGATION SYSTEM PRIOR TO BEGINNING OF GRADING ACTIVITIES. PRE -WATERING SHALL ALSO BE COMPLETED ALONG EQUIPMENT ROUTES FROM MAJOR CUT / FILL ACTIVITIES AS WELL AS ACCESS AND PARKING AREAS. WATERING SHALL CONTINUE DURING ROUGH GRADING OPERATIONS TO PRECLUDE DUST GENERATION. 4. ALL AREA STREETS SHALL BE INSPECTED DAILY AND SWEEPING ORDERED WHEN SILT AND SAND ACCUMULATE. 5. UN -DEVELOPED BUILDING PADS SHALL BE TEMPORARILY STABILIZED (CHEMICAL APPLICATION). 6. WATERING SHALL CONTINUE FOR THE DURATION OF FINAL GRADING ACTIVITIES UTILIZING THE ONSITE DOMESTIC WATER SYSTEM. 7. ESTIMATED PM -10 COST: $10,000 8. NO STOCKPILE ON-SITE 9. ANY UNPAVED ROADWAYS TO BE WATERED AS NECESSARY (ALL STREETS HAVE BEEN PAVED) 10. WHEEL WASHING AREA, IF NEEDED, TO BE LOCATED AT CONSTRUCTION ENTRANCE. REASONABLY AVAILABLE CONTROL MEASURES NO. MEASURE USED DESCRIPTION OR JUSTIFICATION 1. EARTHMOVING NOT -APPLICABLE, ALL EARTHMOVING OPERATIONS ARE COMPLETE 2. UNPAVED ROAD TRAVEL: NOT -APPLICABLE, ALL ROADWAYS HAVE BEEN PAVED, 3: VEHICULAR TRACK -OUT CLEANING AVENUE 58 WILL BE SWEPT AT THE END OF EACH WORK DAY AND ANY MATERIAL THAT HAS BEEN TRACKED OUT WILL BE REMOVED AND RETURNED TO THE SITE. GRAVEL NOT APPLICABLE - ALL CONSTRUCTION VEHICLES TO PARK ON PAVED STREETS. CONSTRUCTION ENTRANCE CONTINGENCY MEASURE: ADDITIONAL INSPECTION AND STREET SWEEPING WILL BE MADE IF TRACK -OUT MATERIAL IS OBSERVED ON AVENUE 58 NEAR THE ENTRY ROAD. 4. DISTURBED SURFACE AREAS WIND FENCE: A WIND FENCE SHALL BE INSTALLED AS SHOWN TO REDUCE WIND SPEEDS AND TO PREVENT WINDBLOWN MATERIAL FROM LEAVING THE SITE. CONTINGENCY MEASURE: WATER WILL BE APPLIED TO ALL DISTURBED SURFACE AREAS FROM WHICH VISIBLE DUST EMISSIONS ARE OBSERVED. Z1\ REVISE PLAN TO DEPICT PORTIONS OF PROJECT SITE THAT HAVE BEEN FULLY IMPROVED, STABLIUZED AND OCCUPIED. UPDATE EOR TO REFRESH EXPIRED PLAN. DESIGNED BY: DRAWN BY: FIRST SUBSTITUTE MYLAR THIS MYLAR IS IDENTICAL TO THE MYLAR APPROVED BY THE CITY ENGINEER ON ON 11/28/2012, EXCEPT FOR THE REVISIONS NOTED AHEREON. QROFESS/pN� C. No. 20596 ^ m STANLEY C. ORSE a Exp. 9-30-21 R.CE. 2_0596 *9r CIVIL �* DATE: !63,/20 SOF CALF CHECKED BY: AX ftT 17 19 20 21 -- ao 1 O , , i OQ 23 HERMITAGE 18 EX. MASONRYGARDEN WALL TO BE UTILIZED OR PM -10 17ENCING 17 19 27 14 WATER SOURCE: EXISTING CVWD FIRE "' HYDRANT (TYPICAL) LOT H 7RAC Y NO. 30 096-2 LAT. 123. 22 2_3 11 24 z J PIPE) EX. MASONRY GARDEN WALL TO BE UTILIZED FOR PM -10 FENCING a2 24 3t; �L I Q 47 56 f , Q j I i U I , - 1 25 11 31 I 46 57 EX. MASONRY GARDEN WALL TO BE UTILIZED FOR P -10 FENCING I 10 j 2627 / 44 y 0 LOT G g ill - I� ' z LOT H - I 43 60 IF 7 l 28 61 42 i 6 nl 29 a( o0 5 I 41 �I �' z I cMJ 30 �� v� al 1 40 o I 4 63 31 39 s Fn L 32 WATER SOURCE: a EXISTING CVWD FIRE - -------- HYDRANT (TYPICAL) r-- ---, EXISITNG 65 2 I 69 I r.l. GATES I I 68 67 - I 70 LOT II pf 2 EX. MASONRY GARDEN WALL TO BE UTILIZED FOR PM -10 FENCING i I I [-LOT J - L ------J 66 Z LOT E _ Q LOT L LOT C LOT Z LOT H _ O EXTING CURB LOT K L - Q F}E Lryff-}--- --- a� EX. MASONRY GARDEN WALL TO DUST CONTROL SIGN INITIAL STAGING AREA, PRIMARY CONSTRUCTION ENTRANCE/EXIT U BE UTILIZED FOR PM -10 FENCING EQUIPMENT STORAGE (EXISTING PAVED ROAD) AND EMPLOYEE PARKING C CONSTRUCTION OFFICE, CM IV CONTRACTOR/DEVELOPER TO FOLLOW c MONITORING TEMPLATE PER AQMD SPECIFICATIONS. Z H ESS PREPARED UNDER THE DIRECTION OF: j M O R S E 41865 BOARDWALK, Suite 218 IN THE CITY OF LA QUINTA, STATE OF CALIFORNIA Q ,?,OV 41 DATE: 2 � Palm Desert, CA 92211 FUGITIVE DUST EMISSION 2 � C. C. �o �� �s STANLEY C. M SE EXP. DATE 9 30 21 • S C H U L T Z Voice: 760-674-5776 CONTROL PLAN SHT. 1 No. 20596 z Ex . 9-30-21 Exp. ry a R.C.E. 20596 APPROVED BY; cbergh®mdsconsulting.net TRACT NO. 34243 CORAL MOUNTAIN of 2 SHTS. z¢ * * Ty CIVIL DATE: Z % PLANNERS ENGINEERS SURVEYORS J d �Q TF pF CAL\F&wwe SCALE: SEE ABOVE B E N C H M A R K: #466 USBR (29TH ENGRS 1941 RIV. CO. A USBR DISC SET IN CONCRETE POST POR. OF S 1/2 OF S 1/2, SEC. 21, T.6S., R.7E., S.B.B&M O P W. DIRECTOR/CITY CTORECITY ENGINEERP. DATE 9/30/22 DATE: DECEMBER, 2020 (LEV STAMPED)AT A+ 500.00 _COR5.04OP MONROE STREET AND 58TH AVENUE FOR: AV CONSTRUCTION, LLC W.O. NO: r 2 I:\82400\RG\PM10- .dwg 2/03/21