Loading...
2008 Costco - Hwy 111 & Depot DriveCOOPERATIVE AGREEMENT FOR THE DESIGN AND CONSTRUCTION OF HIGHWAY 111 STREET IMPROVEMENTS AT DEPOT DRIVE This agreement entered into this Z-IT4 day of OGTO�, 2008, is between the City of La Quinta, a Municipal Corporation, referred to herein as LA QUINTA," and Costco Wholesale Corporation, referred to herein as "COSTCO." LA QUINTA and COSTCO are collectively referred to in this Agreement as "PARTIES." RECITALS (1) Pursuant to City Council Resolution No. 2006-005 Conditions of Approval — Final Tentative Parcel Map 33960 Costco Wholesale and Komar Investments January 3, 2005, COSTCO was required to improve the street on Hwy 111 as follows (the "HWY 111 CONDITION"): "A 24-foot wide raised landscaped median along the entire boundary of the Specific Plan plus variable width as needed to accommodate a dual left turn for the westbound Highway 111 turning left to southbound Depot Drive. The length shall be as required by Caltrans but a minimum 250 feet. The raised landscaped median may be deferred until the City of La Quinta's Highway 111 Widening project from Adams Street to Jefferson Street as required by Caltrans and the City Engineer. (2) LA QUINTA has designed and is constructing improvements on Highway 111 between Adams Street and Jefferson Street and has included bid items for the HWY 111 CONDITION. (3) COSTCO desires LA OUINTA to include the HWY 111 CONDITION construction as part of LA QUINTA's Highway 111 Street Improvement Project. (4) COSTCO agrees to pay LA QUINTA the estimated costs to construct the HWY 111 CONDITION, in an amount equal to US$185,000.00 as COSTCO's full and final discharge of the HWY 111 CONDITION. NOW THEREFORE, for good and valuable consideration, the receipt and sufficiency of which is acknowledged, the PARTIES agree as follows: Section I LA QUINTA AGREES: (1) To pay for the HWY 1 1 1 CONDITION design, engineering, inspection/testing/survey, and administrative costs. (2) To prepare the HWY 111 CONDITION Plans, Specification, Estimates (PS&E). PS&E are to be prepared in accordance with the Standard Plans and Specifications of the State of California Department of Transportation, the standards and practices of LA QUINTA and all applicable laws and regulations. (3) To have final design documents and drawings for the HWY 111 CONDITION prepared by or under the direction of a civil engineer registered and licensed in the State of California, and that the plans, specifications, and any reports shall bear the professional seal, certificate and signature of the professional engineer responsible for their preparation. (4) To advertise, award and administer a public works contract for the construction of the HWY 111 CONDITION improvements. (5) To release an discharge COSTCO from any and all responsibility to perform, or pay for any costs (soft or hard) pertaining to, the construction of the HWY 111 CONDITION improvements from and after COSTCO's payment of US$185,000.00 to LA QUINTA. (6) To maintain the improvements, including the HWY 111 CONDITION improvements, within the street right of way. (7) LA QUINTA will place on the agenda and recommend for City Council acceptance the release of the bonds being held for COSTCO's off -site improvements after receipt of COSTCO's payment of US$185,000.00 for the HWY 111 CONDITION costs and after the conditions listed on Exhibit A for project final acceptance have been met.. Section II COSTCO AGREES: (1) To pay an amount equal to US$185,000.00, which is the estimated cost of constructing the HWY 111 CONDITION, and to deposit such amount with LA QUINTA within thirty (30) days of receipt of billing therefor. (2) To complete the required conditions listed on Exhibit A for Final Acceptance of Improvements and release of associated securities. Section III IT IS MUTUALLY AGREED AS FOLLOWS: (1) No alteration or variation of the terms of this Agreement shall be valid unless made in writing and signed by all parties, and no oral understanding or agreement not incorporated herein shall be binding on either party hereto. (2) Upon completion of all work under this Agreement, ownership and title to all materials, equipment, and appurtenances installed will be owned by LA QUINTA. (3) Neither COSTCO nor any officer or employee thereof shall be responsible for any damage or liability occurring by reason of anything done or omitted to be done by LA QUINTA under or in connection with any work, authority or jurisdiction delegated to LA QUINTA under this Agreement. It is further agreed that LA QUINTA shall fully indemnify and hold COSTCO harmless from any liability imposed for injury occurring by reason of anything done or omitted to be done by LA QUINTA under or in connection with any work, authority or jurisdiction delegated to LA QUINTA under this Agreement. NOTICES: Any notice required to be sent pursuant to this Agreement shall be sent by regular mail, addressed as follows: (Remainder of page intentionally left blank) COSTCO WHOLESALE CORP Costco Wholesale Corporation c/o Tim Anderson 999 Lake Drive Issaquah, WA 98027 Dated M Titl CITY OF LA QUINTA Thomas P. Genovese, City Manager 78-495 Calle Tampico P.O. Box 1508 La Quinta, CA 92247 Dated: /yp d. APPROVED AS TO FORM: By: � herine Jenson ityCat Attorney AA3062 WCHAPEI.A iSMI K. N C.A �Sl EF1 8121399 ILL.WACHOVIA LAKF DRIVE N OR CKCK DATE ISSAQUAH. WA 98027 g rM o0 01I13/09 (425) 313.8100 CHECK AMOUNT *****185000 DOLLARS 00 CENTS $185,O-00.00 GDSTCO WHOLESALE FilY POD AFTER 90 DAYS 'PAY TO THE ORDER OF CITY OF LA U I NTA - CQMMUNITY DEVELOPMENT DEP ar 778 49g55 CALLE TAMPICO 1504 AUUi SGNATURE LA QOlNTA CA 92253-1504 _ y AU R4UA]IED iCiNRIURE _.[74yD F>�REp� ALONG THIS PERFORATION -- INVOICE NUM{3EA DATE POIRA INVOH:E AMOUNT DISCOUNT AMOUNT PAYMENT AMOUNT 1005 12/08/08 185,000.00 .00 185,000.00 � c T-OR PAYMENT acc�ou i No. uescri -,-nttc lion pay i 6w oo- L)o receiv6 d JAN 2 6 2001 City of La Qulnta Planning Depadment 84458-Oo� Cnk#:8121399 $185,000.00 $.00 $185,000.00 VENDOR NO. f TOTAL INVOICE TOTAL DISCOUNT CltECK AMOUNT CITY Y LQ "ATA Date: *►11 CUSTOCR RE:ClP_ *** 1Ic81O9 02 Recei0t no: iO163 Description99 x'+antity DYERRIDE: REVENUE Aao�n� Trans number: 1.00 tl&WO@.0O 110861 COSTCO PpIgENT CIP 1743 401-0000-364,00-00 Tender detail CK EPECf Total tendexeR 81c1399 1185rDOO.00 . Total payment iI$5O�4a.O t1850@O.O0 Trans date: 1/7/09 Tire: 16:31:40 *** THANK YOU FOR YOUR PAYMENT *** •4M1.ry.41.M1•44411,} LS4'L'r'�L •r •. •_ti.yg tiv hyylNM1 Mr4•L+. FOR QUESTIONS PLEASE CALL 760-777-7150 City of La Quinta 78-495 Calle Tampico, La Quinta, CA 92253 Phone (760) 777-7078 Fax (760) 777-7051 dpearl@la-quinta.org TO Costco Wholesale Attn: Tim Anderson 999 Lake Drive Issaquah, Washington 98027 Cooperative Agreement for the Design and Construction for Highway 111 Street Improvements at Depot Drive; Final Tentative Parcel Map 33960 INVOICE DATE: JANUARY 22, 2021 INVOICE # 1005 PAYMENT TERMS DUE DATE Due on receipt January 8, 2009 DESCRIPTION ir ' 7Reimbursement fees totaling $185,000.00 fora 24-foot wide aped median along the entire boundary of the plus variable width as needed to accommodate a dual left turn for the westbound Highway 111 turning left to southbound Depot Drive. UNIT PRICE $185,000.00 LINE TOTAL $185,000.00 7 1 * Obligation must be paid within 30 days of receipt of billing SUBTOTAL SALES TAX TOTAL $185,000.00 NA $185,000.00 Make all checks payable to The City of La Quinta Thank you!