Loading...
FEMA LOMRPsomas Transmittal Form PS 0 M A S 3187 Red Hill Avenue, Suite 250 Costa Mesa, CA 92626 Voice: 714-751-7373 Fax: 714 -545 -8883 Date: 10/18/04 Job No. 1LAQ010100 Task 00007 Project: La Quinta Master Drainage Plan To: Steven Speer, Assistant City Engineer - Public Works Department (760) 777 -7078 City of La Quinta 78495 Calle Tampico La Quinta, CA 92253 We Are Transmitting: Via: For Your: Please: 0 Per Your Request ❑ Mail r Approval ❑ Acknowledge fJ Enclosed [71 Overnight El Review and C Return Enclosures 0 Under separate cover ❑ UPS Comment ❑ Respond By: E] Prints D Messenger ❑ Distribution IJ Transparencies 2 Hand C Information/Files G Specifications ❑ Fed Ex 0_ Signature CD/Diskettes ❑ Fax FTP / E- Mail Enclosures: .... (If enclosures are not as noted, please inform us immediately) Qty: Description: Date: 1 copy Master Drainage Plan (draft) 10/15/04 Remarks: t iiase rand comment. The �-1 pplemental LOMR submittal is included in.Appendix o - (tabbed'Sig n Here) and forward a copy to FEMA along with the requested check. Page 1 of 1 Issued By: Bill Whittenberg \ Copies P With Enclosures: Nick Nickerson, NAI Consulting https: / /intra. psomas. com / project /transmittal /transprint.cfin ?tb id =79728 10/18/2004 11 Ic W3, fL: v3 I 11 Ic Lm 0 3 for the City 1' -7- oi 't jLa Quinta �X, r r r•:4 \. .. .. �Y.�. .. • City of La Quinta or MASTER DRAINAGE ' - - ►I Prepared by P S O M A S 3187 Red Hill Avenue, Suite 250 Costa Mesa CA 92626 October 2004 ff _]Z0fA TM J E3 City of La Quinta Table of Contents Master Drainage Plan • TABLE OF CONTENTS EXECUTIVE SUMMARY ............................................................................ ...........................ES -1 1.0 INTRODUCTION ............................................................................ ............................... 1 -1 1.1. SCOPE OF STUDY .............................................................. ............................... 1=1 1.2 PROJECT DESCRIPTION ................................................... ............................... 1 -1 1.2.1 Location .................................................................... ............................... 1 -1 1.2.2 Topography and Soils ............................................... ............................... 1 -3 1.2.3 Climate ...................................................................... ............................... 1 -4 1.2.4 Existing Population and Land Uses .......................... ............................... 1 -4 1.2.5 Infrastructure ............................................................. ............................... 1 -4 2.0 BASE MAP OF EXISTING FACILITIES ....................................... ............................... 2 -1 2.1 GENERAL INFORMATION ......................................:........ ............................... 2 -1 2. 1.1 Aerial Photo and Topography ................................... ............................... 2 -1 2.1.2 Boundary, Parcel and Land Use Data ....................... ............................... 2 -1 2.1.3 FEMA Flood Zone Data ... ......................................... ............................... 2 -2 2.2 DRAINAGE FACILITIES ................................................... ............................... 2 -2 • 2.2.1 Regional Facilities .................................................... ............................... 2 -2 2.2.2 On -Site Facilities ........... ............................................ ............................... 2 -5 3.0 ENGINEERING DESIGN CRITERIA ........ :.................................................................. 3 -1 3.1 COUNTY REQUIREMENTS (FOR PUBLIC PROJECTS) .............................. 3 -1 3.2 CITY REQUIREMENTS (FOR PRIVATE PROJECTS) .... ............................... 3 -2 3.3 `HIGH CONFIDENCE' VS. `EXPECTED VALUE' LEVELS ......................... 3 -3 3.4 RECOMMENDED REQUIREMENTS ............................... ........ ........................ 3 -4 3.5 WATER QUALITY PERMITTING REQUIREMENTS .... ............................... 3 -4 3.5.1 New Development / Redevelopment ........................ ............................... 3 -4 3.5.2 Construction Activities ............................................. ............................... 3 -6 3.5.3 Municipal Agency Activities .................................... ............................... 3 -8 4.0 DRAINAGE EVALUATION AND ANALYSIS ............................ ............................... 4 -1 4.1 FEMA ANALYSIS ............................................................... ................................ 4 -1 4. 1.1 Methdology ............................................................... ............................... 4 -2 4.1.2 Results ................................................:..................................................... 4 -2 4.1.3 Recommendations ........................................................ ............................4 -4 4.2 PERCOLATION TESTING .................................................. ............................... 4 -4 4.2.1 Overview ................... 4 -4 4.2.2 Study Methods and Results ....................................... ............................... 4 -5 4.2.3 Conclusions and Recommendations ......................... ............................... 4 -5 October 15, 2004 Page i fooz 'gi .4aqoll0 • . ................................................ ........................... .................................... O*L ................................................................................. 1-9 smollvllwl-1 0*9 Z-9 ................. SWU.IOOI(l Qjujs Z*Z*9 Z-9 .............. SU-MJOOJl ILJ;)P;)j I Z.g 1-S**'*******SMOIIVCINHWWOD"NHHLdflJ'dOJSWSIMVHDHWONI(IIIMJ- Z*9 1-9 ........... SmolsflIDNOD 1*9 1-9 smouvamawwoo� amv smoisfiiDNoD o*g UvId a2vu - IVIG -lalsvN slualuoDfo alqvL vitqn6 v7fO dJ!D City of La Quinta Table of Contents Master Drainage Plan • LIST OF TABLES, FIGURES, APPENDICES L.1 LIST OF TABLES Exhibit. 1B 1 -1 Climate Summary: Annual Averages ............................................... ............................... 1 -4 2 -1 Existing Land Uses ........................................................................... ............................... 2 -1 2 -2 FEMA Flood Designations .....................:......................................... ............................... 2 -2 2 -3 Other Major Regional Facilities ........................................................ ............................... 2 -5 4 -1 Percolation Test Locations ................................................................ ............................... 4 -5 4 -2 Percolation Test Results .................................................................... ............................... 4 -5 L.2 LIST OF FIGURES Exhibit. 1B 1 -1 General Vicinity Map: City of La Quinta ................ ............................... Land Use Map — Overall 1 -2 Satellite Photo: Salton Sink .............................................................. ............................... 1 -3 2 -1 Main Regional Facilities: Aerial Photo ..............................:.............. ............................... 2 -3 2 -2 Whitewater River: Watershed Map ..................................................... ............................2 -4 2 -3 Whitewater River Storm Channel: USGS Map ................................ ............................... 2 -4 4 -1 La Quinta Flood Zones: 1991 FIRM Panel ...................................... ............................... 4 -1 4 -2 Updated Flood Plain Analysis: Overall Area ................................... .......................:....... 4 -3 4 -3 Updated Flood Plain Analysis: Zone AO ........................................ ............................... 4 -3 • 4 -4 Updated Flood Plain Analysis: Zone X ........................................... ............................... 4 -4 L.3 LIST OF APPENDICES Appendix A. Exhibits Exhibit 1A — General Base Map — Overall Exhibit. 1B — General Base Map — Cove Area Exhibit 2 — Land Use Map — Overall Exhibit 3A — FEMA Flood Zone Map — Overall Exhibit 3B — FEMA Flood Zone Map — Cove Area Exhibit 4A — Drainage Map — Overall Exhibit 4B — Drainage Map — Cove Area Appendix B. Portions of 1991 FEMA Flood Insurance Rate Map (FIRM) for City of La Quinta Appendix C. Supplement `A' to Riverside County Drainage Area Management Plans (DAMP) New Development Guideline Appendix D. Request for Letter of Map Amendment (LOMA) Initial Submittal (5 /24/04) Supplemental Submittal 1 (6/9/04) Supplemental Submittal 2 (10/04) • Appendix E. Percolation Testing Technical Memorandum from GeoPentech (9/22/04) October 15, 2004 Page iii City of La Quinta Master Drainane Plan SECTION 1.0 INTRODUCTION 1.1 SCOPE OF STUDY Section 1.0 The scope of the update to the Master Drainage Plan consists of the following: • Developing a base map consisting of aerial photography, topography, parcel and centerline data and existing backbone storm drain systems within the City (Section 2) • Reviewing basic engineering design criteria for drainage and flood control within the City (Section 3) • Analyzing existing public facilities, particularly addressing FEMA Flood Zones, in the northeast area of the `Cove' (Section 4.1) • Perform percolation testing to verify /establish infiltration rate criteria for future retention basins (Section 4.2) • Identifying hydraulic deficiencies in the existing storm drain infrastructure (if necessary) • Determining potential improvements to the storm drain infrastructure (if necessary) • Prioritizing and estimating cost of recommended projects (if necessary) • Preparing a report presenting the findings of this project. 1.2 PROJECT DESCRIPTION 1.2.1 LOCATION The City of La Quinta is located approximately 125 miles east of Los Angeles in central Riverside County. The city is within the Coachella Valley, which extends 50 miles from Palm Springs to the Salton Sea. The city is bound by the Santa Rosa Mountains to the west, the City of Indian Wells to the northwest, the City of Indio to the northeast, and unincorporated areas of Riverside County to the north and south. This report focuses particularly on the Cove area, which is located in the southwest portion of the City and is bounded by Calle Tampico to the north, Calle Tecate to the south, Avenida Montezuma to the west and Avenida Bermudas to the east. Figure 1 -1 is a general vicinity map for the City of La Quinta. General Base Maps of the City and the Cove area are provided in Appendix A as Exhibits IA and 113 respectively. October 15, 2004 Page 1 -1 0 I ' City of La Quinta Master Drainage Plan FIGURE 1 -1 GENERAL VICINITY MAP: Section 1.0 Source: City of La Quinta October 15, 2004 Page 1 -2 I City of La Quinta Section 1.0 t Master Drainage Plan • 1.2.2 TOPOGRAPHY AND SOILS The city terrain ranges in elevation from 20 feet below sea level to approximately 1,600 feet above sea level (BSI, 1987). The city is located in an area known as the Salton Sink, which consists of a gradually sloping plain extending from San Gorgonio Pass (11,485 feet above sea level at Mt. Gorgonio) to the Salton Sea (240 feet below sea level). The Salton Sink was once part of the Gulf of California but was separated from the Pacific Ocean by the delta created from silt deposits by the Colorado River (Indio, 2004). Figure 1 -2 is a satellite photo of the Salton Sink. _ • FIGURE 1 -2 r SATELLITE PHOTO: SALTON SINK "'t' �f �,. v.. �' �`•r..' CA �` r7 "' '1�I�' !�''` --r] 1• e� r o •Y. i �- ( •1'� r`�•�N-0 xH,rt.'r�i' ��� • •.,ti ':44 '�•S} „• ! t.�l i -�4 'fit 53 ' k��p {_�,: j „�,..�• ^may' Q• t ; � .� i° '�+ •,�,•. "" '.W � . � ' �. Iy ���:�= .�,.4f � � L.• f �':'Y. i - •�ifL �J ,`ri ± 7• ^�7.• .ti r . ( .t..•'` . � r�lk yr ,`�l x'11 " �;- _ ;^•"z, i � '}��{.�'. -`. t.• ,az h1a,.�. ;`;F�� �%rsa. ~'�I • • City of La Quinta �(J Section 1.0 Master Drainage Plan 1.2.3 CLIMATE The City of La Quinta is characterized by a warm, dry climate, largely due to the surrounding mountains. Table 1 -1 summarizes climate information based on data from the Western Regional Climate Center (WRCC). TABLE 1 -1 CLIMATE SUMMARY: ANNUAL AVERAGES Average Max. Temperature, F 89.0 Average Min. Temperature F 58.1 Mean Annual Precipitation, in 3.12 Period of Record December 1927 to March 2004 Gauge location Indio Fire Station (044259) Source: WRCC, 2004. 1.2.4 EXISTING POPULATION La Quinta is'one of the California's fastest growing cities, starting with a population of about 5,200 at its incorporation in 1982 and growing to about 30,450 in 2004. The mean annual increase in population is about 9 %, with an estimated_ project of 53,900 by 2025. The city occupies approximately 24 square miles. 1.2.5 INFRASTRUCTURE This study characterizes the overall drainage infrastructure by distinguishing between two categories: • Regional facilities which generally convey runoff from the surrounding waters to the Whitewater River and are operated-and maintained by the Coachella Valley Water District (CVWD); and • On -site (local) facilities which generally convey runoff from local streets and lots'to the regional facilities and are usually maintained by the City. Existing infrastructure is characterized in Section 2. While regional facilities are discussed in this Master Plan, the scope of this document focuses primarily on local facilities. October 15, 2004 Page 1 -4 f October 15, 2004 Page 1 -4 ,1 City of La Quinta Master Drainage Plan Section, 2.0 SECTION 2.0 BASEMAP OF EXISTING FACILITIES 2.1 GENERAL INFORMATION The basemap developed for the City of La Quinta consists of both general information as well as locations of existing drainage facilities. General information includes the following: • Aerial photo • Topography • Boundary, parcel and land use data • FEMA flood zone data 2.1.1 AERIAL PHOTO AND TOPOGRAPHY Aerial photography, provided by the City, was Eagle aerial with 1 -meter pixel resolution. Four - foot topographic contours were generated from the United States Geological Survey (USGS) National Elevation Dataset (NED) elevation model. The datum for horizontal adjustments and positions was the North American Datum of 1983 (NAD 83). The datum for vertical adjustments and elevations will be the North American Vertical Datum of 1988 (NAVD 88). All horizontal values are published in the California Coordinate System 1983 (CCS83), Zone 6, State Plane values in U.S. Survey Feet. • ' 2.1.2 BOUNDARY, PARCEL AND LAND USE DATA Boundary, parcel and land use data was provided by the City. Existing land uses are summarized in Table 2 -1. • TABLE 2 -1 EXISTING LAND USES 0 Land Uses Agricultural - Irrigated Farmland (1) Parks (P) Commercial — General (CC) Residential — High Density (HDR) Commercial — Mixed Retail (M /RC) Residential — Medium -High Density (MHDR) Commercial — Neighborhood (NC) Residential — Medium Density (MDR) Commercial — Proposed (CP) Residential — Low Density (LDR) Commercial — Village (VC) Residential — Very Low Density (VLDR) Golf Course (GC) Waterbodies (W) Open (0) Town Center — Residential and Commercial (TC) Open Space (OS) Vacant Source: City of La Quinta General Plan A Land Use Map is included in Appendix A as Exhibit 2. October 15, 2004 Page 2 -1 City of La Quinta Section 2.0 Master Drainage Plan l • 2.1.3 FEMA FLOOD ZONE DATA As part of the National Flood Insurance Program (NFIP), the Federal Emergency Management Agency (FEMA) designates various flood zones to communities based on Flood Insurance Study (FIS). Table 2 -2 summarizes the various flood zone designations for the City. TABLE 2 -2 FEMA FLOOD ZONE DESIGNATIONS Flood Zone Description A Special Flood Hazard Areas Inundated by 100 -Year Flood: • No base flood elevations determined Special Flood Hazard Areas Inundated by 100 -Year Flood: AO • Flood depths of 1 to 3 feet (usually sheet flow on sloping terrain) • Average depths determined Other Flood Areas: • Areas of 500 -year flood • Areas of 100 -year flood with average depths of less than 1 foot or with X drainage areas less than 1 square mile and Areas protected by levees from 100 -year flood Other Areas: • Areas determined to be outside 500 -year flood plain Source: FEMA, 1991 • FEMA Flood Zone Maps for the overall city and the Cove area are included in Appendix A as Exhibits 3A and 3B respectively. Portions of the FEMA Flood Insurance Rate Map (FIRM) are included in Appendix B. 2.2 DRAINAGE FACILITIES As discussed in the previous section, this Master Plan distinguishes between two portions of the drainage infrastructure: • Regional facilities which generally convey runoff from the surrounding waters to the Whitewater River and are operated and maintained by the Coachella Valley Water District (CVWD); and • On -site facilities which generally convey runoff from local streets and lots to the regional facilities and are usually maintained by the City. While regional facilities are discussed in this Master Plan, the scope of this document focuses primarily on local facilities. 2.2.1 • REGIONAL FACILITIES The main regional drainage facilities in the City of La Quinta are the La Quinta Evacuation Channel and the Whitewater River Storm Channel (also known as the Coachella Valley Storm Channel). The La Quinta. Evacuation Channel conveys stormwater in a northeasterly direction to the Whitewater River Storm Channel, which drains in an easterly direction toward the City of October 15, 2004 Page 2 -2 City of La Quinta ` Section 2.0 Master Drainage Plan '*7 • Indio. ;Figure 2 -1 shows an aerial photograph of the La Quinta Evacuation and Whitewater River Storm Channels. FIGURE 2 -1 MAIN REGIONAL FACILIITES: AERIAL PHOTO The Whitewater River is the main drainage course for the entire Coachella Valley from north of Palm Springs to the Salton Sea and is part of the Colorado River Basin Region. Figure 2 -2 { shows the' Whitewater River watershed. Figure 2 -3 shows a portion of the Whitewater River Storm Channel through the city of La Quinta. October 15, 2004 s Page 2 -3 City of La Quinta Master Drainage Plan FIGURE 2 -2 WHITEWATER RIVER: WATERSHED MAP Section 2.0 Source: Riverside County Flood Control.& Water Conservation District, 2004. FIGURE 2 -3 WHITEWATER RIVER STORM CHANNEL: USGS MAP i sr Page 2 -4 1-111-1 6 C 30' • i I Source: USGS October 15, 2004 sr Page 2 -4 City of La Quinta Section 2.0 Master Drainage Plan Portions of the Whitewater River historically meandered, laterally migrating after subsequent storms; however, flood protection efforts by the Coachella Valley Water District (CVWD) have realigned, widened. and deepened the stormwater channel to resolve regional flood problems. Downstream of the main inlet area above Palm Springs, the channel has a 500 -foot right-of-way. y with a bottom widthiof approximately 260 feet. Bank protection along the channel ranges from 16 to 20 feet high, and the channel is about 50 miles long (CVWD, 2004). ..Other major regional facilities include the Bear Creek System, the La Quinta North Diversion, the Oleander Reservoir, and the East La Quinta System. These are summarized in Table 2 -3 summarizes the major regional facilities for the City. These facilities as well as the La Quinta Evacuation Channel and Whitewater Storm Channel are operated and maintained by CVWD. TABLE 2 -3 OTHER MAJOR REGIONAL FACILITIES { • Regional Facility Description Bear Creek System Conveys the Standard Project Flood (SPF) from off -site areas west of the city; flows northerly to the Oleander Reservoir La Quinta North Diversion Conveys the SPF from off -site areas from off -site mountain areas northwest of the city; flows southerly to the Oleander Reservoir Oleander Reservoir Detention basin within existing golf course; detains off -site flows East La Quinta System Detains and conveys runoff from SPF; flows via 60" RCP to La Quinta Evacuation Channel Source: BSI, 1987 2.2.1 ' ON -SITE FACILITIES On -site facilities were mapped based on storm drain plans provided by the City; in addition, a number of catch basin inlets were field verified.. As previously discussed, these facilities convey" stormwater to the regional facilities. These are shown on the Drainage Maps included in Appendix A as Exhibits 4A and 4B. October 15, 2004 Page 2 -5 City of La Quinta Master &rainajee Plan SECTION 3.0 ENGINEERING DESIGN CRITERIA Section 3.0 This Master Plan effort includes the review of basic engineering design criteria for drainage and flood control within the City of La Quinta. As part of this effort, both County criteria and criteria from neighboring cities (within the Coachella Valley) were reviewed. The use of `high confidence' levels vs. `expected' values was also considered. In addition, a discussion of water quality permitting requirements is presented. This section summarizes the findings of the review and recommendations for the City of La Quinta. Engineering design criteria for the following municipalities was reviewed: • Riverside County Flood Control and Water Conservation District (hereafter referred to as `the County') • City of Indio • Cathedral City • City of Palm Desert • City of Rancho Mirage These cities were considered representative of all those in. the Coachella Valley. Upon review, it was found that all cities under consideration use County criteria for drainage and flood control for local drainage facilities (the County and the Coachella Valley Water District (CVWD) are responsible for regional drainage facilities), including those cities, such as La Quinta, which are technically outside the boundaries of RCFCWCD. Therefore, Psomas recommends that the following design criteria be used for the City of La Quinta. 3.1 COUNTY REQUIREMENTS (FOR PUBLIC PROJECTS) The Riverside County Subdivision Ordinance (Number 460) has required protection of all new developments from the 100 -year flood since 1955. The County recommends 100 -year protection for all dwelling units, including those not covered under Ordinance No. 460. Specifically, the County's minimum design requirements are as follows (taken from Plate A -2 of the County Hydrology Manual): • The 100 -year flood must be contained within street R/W limits; • The 10 -year flood must be contained within street top of curbs (where the City allows use of streets for flood control and drainage purposes); and • A minimum of 1 foot of freeboard must be provided between street R/W line and any dwelling unit building pad. Ordinance No. 460 further contains the following additional requirements specific to tract drainage, for land divisions where lot grading is not proposed: • Where streets cross natural drainage courses, culverts must be provided which accommodate the 100 -year flow and which allow a maximum ponding elevation of 2 feet below the road centerline profile grade; • The 10 -year event may be permitted to overtop the roadway in dip sections where the City deems that topography, soil conditions, adjacent development and available all - weather routes indicate feasibility; October 15, 2004 Page 3 -1 City of La Quinta Master Drainage Plan Section 3.0 • In dip sections, culverts accommodating the 10 -year event (not less than 18 inches in diameter or equal) must be provided; • Where streets cross improved channels, culverts adequate to accommodate the channel design flow must be provided; • Asphalt concrete is not permitted for use as a channel liner; and • When the natural flow of surface water onto adjacent property is substantially altered, drainage facilities that direct the flow to an adequate outlet must be provided (or an easement provided for drainage purposes). 12 CITY REQUIREMENTS (FOR PRIVATE PROJECTS) In addition to the above requirements, the City of La Quinta has specific requirements that are part of the City's Standard Conditions of Approval for drainage improvements. • For projects that are part of a golf course community or other development where tract - by -tract retention is unnecessary: Stormwater handling shall conform with the approved hydrology and drainage report for (the "Name" of the underlying development). Nuisance water shall be disposed of in an approved manner. • For parcel /single lots, or as needed if existing system does not exist: Nuisance water shall be retained onsite and disposed of via an underground percolation improvement approved by the City Engineer. • • Standard drainage conditions for all other developments are as follows: 45. The applicant shall revise proposed retention basins to comply with the provisions of Section 13.24.120 (Drainage), LQMC, Engineering Bulletin No. 97.03. More specifically, stormwater falling on site during the 100 -year storm shall be retained within the development, unless otherwise approved by the City Engineer. The tributary drainage area shall extend to the centerline of adjacent public streets. The design storm shall be either the 3 hour, 6 hour or 24 hour event producing the greatest total run off. U • If individual lot retention is approved: 46 The applicant shall meet the individual -lot retention provisions of Chapter 13.24.120 (Drainage), sub - section "K.", LQMC. Stormwater shall normally be retained in common retention basin(s) as shown on the Tentative Parcel Map. Individual lot basins or other retention concepts may be approved by the City Engineer for lots 2 'h acres in size or larger or where the use of common retention is determined by the City Engineer to be impracticable. If individual lot retention is approved, the applicant shall meet all individual lot retention provisions of Chapter 13.24, LQMC. 47. In design of retention facilities, the maximum percolation rate shall be two inches per hour. The percolation rate will be considered to be zero unless the applicant provides site specific data indicating otherwise. 48. Nuisance water shall be retained on site. In residential developments, nuisance water shall be disposed of in a trickling sand filter and leach field or equivalent system approved by the City Engineer. The sand filter and leach field shall be designed to contain surges of up to 3 gph/1,000 sq. ft. of landscape area, and infiltrate S gpd/1,000 sq. ft. October 15, 2004 Page 3 -2 City of La Quinta Master Drainage Plan • Discretionary where required: 49. The project shall be designed to accommodate purging and blowoff water (through underground piping and /or retention facilities) from any on -site or adjacent well sites granted or dedicated to the local water utility authority as a requirement for development of this property. 50. No fence or wall shall be constructed around any retention basin unless approved by the Community Development Director and the City Engineer. 51. For on -site common retention basins, retention depth shall be according to Engineering Bulletin 97.03, and side slopes shall not exceed 3:1 and shall be planted with maintenance free ground cover. For retention basins on individual lots, retention depth shall not exceed two feet. • Use as necessary: 52. Stormwater may not be retained in landscaped parkways or landscaped setback lots. Only incidental storm water (precipitation which directly falls onto the setback) will be permitted to be retained in the landscape setback areas. The perimeter setback and parkway areas in the street right -of -way shall be shaped with berms and mounds, pursuant to Section 9.100.040(B)(7), LQMC. • Other requirements: 53. The design of the development shall not cause any increase in flood boundaries, levels or frequencies in any area outside the development. 54. The development shall be graded to permit storm flow in excess of retention capacity to flow out of the development through a designated overflow and into the historic drainage relief route. 55. Storm drainage historically received from adjoining property shall be received • and retained or passed through into the historic downstream drainage relief route. Section 3.0 0 If an applicant proposes discharge directly into the Coachella Valley Stormwater Channel (CVSC) 56. When an applicant proposes discharge of storm water directly, or indirectly, into the Coachella Valley Stormwater Channel, the applicant shall indemnify the City from the costs of any sampling and testing of the development's drainage discharge which may be required under the City's NPDES Permit or other City- or area -wide pollution prevention program, and for any other obligations and/or expenses which may arise from such discharge. The indemnification shall be executed and furnished to the City prior to the issuance of any grading, construction or building permit, and shall be binding on all heirs, executors, administrators, assigns, and successors in interest in the land within this tentative parcel map excepting there from those portions required to be dedicated or deeded for public use. The form of the indemnification shall be acceptable to the City Attorney. If such discharge is approved for this development, the applicant shall make provisions in the final development CC &Rs for meeting these potential obligations. Per discussions with representatives at CVWD, CVWD does not allow additional direct discharges to the Whitewater /Coachella Valley Stormwater Channel within the City of La Quinta. 3.3 `HIGH CONFIDENCE' VS. `EXPECTED VALUE' LEVELS • The `high confidence' level was originally developed in order to predict flows from fully developed watersheds and represents an 85% confidence interval. In other words, by using the October 15, 2004 Page 3 -3 City of La Quinta ���Y Section 3.0 Master Drainage Plan • `high confidence' level, on a regional basis, only 15% of flows would be under - predicted. The `expected value' analysis, on the other hand, is a 50% confidence interval and is considered by some agencies (such as the County of Orange) as a more appropriate value for the evaluation of existing facilities. Still other agencies, such as the U.S. Army Corps of Engineers, utilize `expected probability' results (a 60% to 70% confidence interval) for 10 -year through 100 -year results. The Riverside County Flood Control and Water Conservation District, however, does not differentiate between analysis for new and existing development; the `high confidence' level is used for both. As stated previously, the City of La Quinta is technically outside the jurisdiction of the RCFCWCD. Therefore, the City may opt to use a different confidence interval for local drainages. However, due to the nature of flooding in the Coachella Valley (i.e., characterized by discrete, extreme events as opposed to continuous flow), the `high confidence' level is an appropriate confidence interval and Psomas recommends its use for the development of the City of La Quinta Master Drainage Plan. 3.4 RECOMMENDED REQUIREMENTS Psomas recommends that the City of La Quinta utilize County requirements for all public projects; additional requirements may be added for private projects, similar to the examples given herein. Psomas further recommends the use of `high confidence' levels for design flows and soil type and infiltration rate testing for projects that incorporate infiltration features. • 3.5 WATER QUALITY PERMITTING REQUIREMENTS The following is a summary of stormwater permitting requirements for New Development / Redevelopment, Construction, and Municipal Agency activities for the City of La Quinta governed by the Regional Water Quality Control'Board (RWQCB) in the Colorado River Basin — Region 7. Appendix C includes Supplement `A' to the Riverside County Drainage Area Management Plans, New Development Guidelines (Supplement `A'). 3.5.1 NEW DEVELOPMENT / REDEVELOPMENT New Development is considered construction on an undisturbed parcel. A Redevelopment project is any project where major modifications to an existing site or structure requiring a permit are undertaken. Routine maintenance, interior remodeling, re- roofing, and parking lot maintenance are not included. In addition, a Redevelopment project is not to be confused with the projects undertaken by the Redevelopment Agency. 3.5.1.1 Planning Review Procedures Permittees are required to implement the following stormwater management measures during planning, construction, and completion phases of a development project. 1. Permittees are required to present procedures for approval of grading, building, and • similar permits modified including Best Management Practices (BMPs) listed in the October 15, 2004 Page 3 -4 City of La Quinta �(P Section 3.0 Master Drainage Plan New Development Guidelines, otherwise known as Supplement `A' and attached to this memo. Supplement `A' satisfies the requirements of BMP R15 and comprises the single largest component of the new development and redevelopment program element. 2. Permittees are required to make information from Supplement `A' available to applicants for development as early in permitting process as possible. 3. Permittees will develop implementation procedures for New Development BMP guidelines, including training and education for employees who will implement Supplement `A' information. 4. Implementing staff will notify the applicant at the earliest possible opportunity if there is a known water quality problem that might affect the proposed development. 5. Permittees will include educational outreach on the above stated guidelines including Supplement `A' to architects, engineers and other land development personnel. 6. Permittees will adopt and implement the development and approval review procedures outlined in Supplement `A,' as described. 3.5.1.2 General Conditions (To Be Applied by Municipalities) For discretionary actions that include a precise plan of development: • Prior to issuance of building permits, the permit applicant shall include in its development plans for approval by the County /City official(s) water quality • management controls by specifically identifying BMPs that will be used onsite to control predictable pollutant runoff. • The permit applicant shall identify the structural and non - structural measures specified in this Supplement or other equally effective standard detailing implementation of BMPs whenever they are applicable to the project; the assignment of long -term maintenance responsibilities; and shall reference the location of structural BMPs. For Subdivisions of Land: • Applicant shall identify and include in its plans those routine structural and non- structural BMPs outlined in Supplement `A' or other equally effective standard for approval of County /City official(s). 3.5.1.3 Special Conditions Special conditions are as follows: • Prior to issuance of certificates for building use and occupancy or building permits for individual tenant improvements or construction permits for a tank or pipeline, uses shall be identified and, for special uses (where the proposed improvements will store, generate, or handle hazardous materials in quantities that will require permitting and inspections once operational), the applicant shall propose plans and • measures for chemical management (including, but not limited to, storage, emergency October 15, 2004 Page 3 -5 n �J Cl City of La Quinta Section 3.0 Master Drainage Plan �f response, employee training, spill contingencies and disposal) to the satisfaction of the County /City building official(s). • Chemical management plans shall be approved by the County /City and other appropriate agencies such as County /City Fire Department, the Health Services Agency's Department of Environmental Health, and sewer and/or water agencies to ensure implementation of each agency's respective requirements. Approval by the appropriate agencies shall be furnished to the Building and Safety Department, prior to the issuance of any certificates of use and/or occupancy. • Certificates or permits may be ministerially withheld if features needed to properly manage chemicals cannot be incorporated into a previously completed building, center, or complex. • A list of specified uses and occupancies of concern should be developed by each jurisdiction according to their needs. 3.5.1.4 - Educational Program for Developers and Contractors An Educational program will contain legal, administrative, and technical information needed to acquaint developers and contractors with the National Pollutant Discharge Elimination System (NPDES) program. 3.5.2 CONSTRUCTION ACTIVITIES 3.5.2.1 Public Works Projects 0 Permittees must notify the RWQCB of any public works construction projects that would normally require coverage under the State Water Resources Control Board (SWRCB) Construction Activity Permit (General Construction Permit). • Permittees must develop and implement Storm Water Pollution Prevention Plans (SWPPPs) for construction activities that exceed five acres of disturbed soil. Following this process, the Permittees are not required to submit a NOI to the SWRCB; however, public works construction monitoring includes site inspections before anticipated storm events and after actual storm events to verify SWPPP implementation. 3.5.2.2 Non- Public Works Projects (Private Sector) • Permittees will inform contractors, operators, and agency staff about upcoming educational and training workshops on construction site erosion control and construction materials management sponsored by a professional organizations and public agencies. Materials are to be made available at the public counter and staff bulletin boards, as appropriate. • Permittees are to review legal description of Part 1 Permit Application and existing grading and erosion control ordinances, if any, to determine the adequacy of existing controls for construction site erosion, sedimentation, and construction material October 15, 2004 Page 3 -6 •' 0 • City of La Quinta Section 3.0 Master Drainage Plan pollutants (i.e. paints, masonry wastes, etc.). The evaluation should also include an assessment of enforcement actions. • Permittees will establish a model construction site control ordinance for potential future adoption by the co- applicants in Riverside County. The ordinance will require control of pollutants from construction sites including erosion and construction material. • Permittees must verify that applicants have filed a NOI prior to the issuance of a grading permit for projects that require coverage under the General Construction Permit. 3.5.2.3 Public and Private Sector Projects Permittees will include education on the New Development Guidelines, or Supplement `A,' in outreach to architects, engineers and other land development personnel. • In addition, permittees will identify priorities for inspecting sites and enforcing control measures for construction projects that disturb greater than 5 acres (Phase 1 requirements), between 1 and 5 acres (Phase II requirements), and sites disturbing less than 1 acre. 3.5.2.4 ' Training • Permittees will develop and provide informational and appropriate training sessions that can be provided to staff who conduct construction site inspections. Topics will cover Phase 1 and Phase II regulations, SWPPP preparation, and site inspection criteria and priorities. • Permittees will describe workshops and efforts to publicize them to target audience. • Permittees will describe educational materials developed in support of Supplement 4A.1 • Permittees will confirm that existing ordinances adequately address Phase I and Phase H requirements. • Permittees will confirm compliance with Supplement `A.' • Permittees will list priorities, develop implementation schedule for inspections. Conduct site inspections within existing building/grading inspection framework based on priorities. October 15, 2004 Page 3 -7 City of La Quinta Master Drainage Plan 3.5.3 MUNICIPAL AGENCY ACTIVITIES Section 3.0 Permittees will coordinate with other watershed stakeholders (e.g., Caltrans and the Bureau of Indian Affairs). 3.5.3.1 Sewage Systems • Municipalities are to follow sewage response plans to prevent unintentional sewage spills from entering the municipal storm drain system. The sewage response plan includes procedures for notifying the RWQCB and other appropriate agencies, containing and cleaning up the spill. • Permittees are to review and revise, if necessary, and implement sewage spill response plans. 3:5.3.2 Municipal Facilities and Operators • Permittees are required to conduct employee training in both stormwater and non - stormwater BMPs related to municipal facilities and operations. • Permttees are directed to identify storm sewer systems which drain areas where fleet vehicles are stored and maintained and determine drainage paths for runoff to the storm drain system. In accordance with this requirement, permittees must develop a • work plan to be submitted to the RWQCB. • Permittees are to prepare a model pollution prevention plan for maintenance areas for implementation. • Permittees are to incorporate BMPs from Supplement `A' on new maintenance and materials storage areas, where applicable. • Permittees will continue to rely primarily on staff training and education to minimize pollutant discharge from publicly maintained landscaped areas such as parks, medians, and civic center areas. However, the permittees will adopt a BMP to reinforce state regulations for pesticide use. 3.5.3.3 Streets and Roads • Requires municipal employee training specifically designed to educate staff on pavement maintenance, repair, and cleaning. • Requires municipalities to contract a service provider for sweeping major streets, catch basin clean-out services, and sweep collector streets at regular intervals. 3.5.3.4 Storm Drain Systems • Requires inspections, cleaning of retention/detention basins, debris basins, open channels, drain inlets, and catch basins. Report improper discharges to storm • drainage system. October 15, 2004 Page 3 -8 City of La Quinta Master Draina 2e Plan • 3.5.3.5 Training Section 3.0 • Permittees will conduct comprehensive training sessions that focus on all aspects of municipal facilities and roadway operations for public works staff in the form of annual refresher workshops. 3.5.3.6 Reporting / bocumentation Permittees .will accomplish evaluation and assessment of BMP performance and compliance through the following reporting and documentation activities: • Permittees with jurisdiction over a wastewater collection system to confirm the sewage spill response plans are developed and current. • Permittees will show compliance by ensuring that vehicle maintenance and material storage yards develop and maintain a pollution prevention plan. • Permittees will show compliance by listing vehicle maintenance and materials storage areas and indicating sections that have been implemented. • Permittees will continue the use of existing data collection forms. Permittees will quantify the percentage of landscape maintenance personnel that have received training/outreach. Permittees will document any other staff training activities. • Permittees will provide a list of personnel for pesticide application and verify • certification. • Permittees will show compliance of BMPs by providing copy of a BMP fact sheet. . • Permittee will verify specifications included in applicable contracts. • . Permittees will verify that stencils are maintained on all inlets. • Permittees will monitor statewide Phase I and Phase H municipal program activities and participate in evaluation of activities. • Permittees will describe maintenance activities. • October 15, 2004 Page 3 -9 City of La Quinta Master Drainage Plan •t SECTION 4.0 DRAINAGE EVALUATION AND ANALYSIS Section 4.0 Based on the City's 1991 Flood Insurance Rate Map (FIRM), certain areas of La Quinta are within FEMA Flood Hazard Zones, particularly the northeast area of the `Cove.' One of the - . main purposes of the Master Drainage Plan was to resolve this by accomplishing the following: • reviewing existing on -site public facilities • identifying hydraulic deficiencies • ' determining potential improvements to limit flood hazard areas • establishing prioritization as well as cost estimates for recommended projects. After a review of both on -site facilities and background data for the 1991 FIRM, it .was determined that much of the City's flood hazard areas could be reduced by submitting a request to FEMA for a Letter of Map Revision (LOMR). This request for a LOMR, submitted on May 24, 2004, is included in Appendix D and is summarized in Section 4.1. Additionally, percolation testing done as part of this scope and is summarized in Section 4.2. 4.1 FEMA ANALYSIS The City's 1991 FIRM was based on a flood plain analysis conducted in 1990, which concluded that a substantial part of the downtown area northeast of the Cove was designated as Flood Zone • AO, or having 100 -year flood depths between 1 to 3 feet (usually sheet flow on sloping terrain). Figure 4 -1 shows a portion of the 1991 FIRM. FIGURE 4 -1 LA QUINTA FLOOD ZONES:, ,,. 1991 FIRM PANEL • I- Source: FEMA October 15, 2004 Page 4 -1 • City of La Quinta Master Drainage Plan Section 4.0 Since those analyses were conducted, the City has constructed a number of facilities to intercept major portion of the area contributing to the flood hazard. These improvements include the following: • On -site retention basins to minimize flooding south of the La Quinta Evacuation Channel between Eisenhower Drive and Rondo Street • Storm drains along Calle Madrid, Colima, Nogales, Sonora and Sinaloa to divert runoff into retention basins (incorporated in the Tradition Golf Course) which ultimately drain to the La Quinta Evacuation Channel. As part of the Master Drainage Plan, the 1990 FEMA analyses were re- evaluated to determine the potential reduction in flood hazard due to these drainage improvements. 4. 1.1 METHODOLOGY The 1990 analyses were based on a hydraulic model called HEC -2 which was developed by the United States Army Corps of Engineers (USACE) Hydrologic Engineering Center (HEC). HEC - 2 is a 1- dimensional, fixed -bed, steady- state, open channel model that has since been supplanted by the River Analysis System (RAS) known as HEC -RAS. Consistent with FEMA guidelines and methodology, flood plain analyses were conducted in two steps: • .Creating a HEC -RAS model that was calibrated to reproduce the same results from the 1990 HEC -2 model • Update the HEC -RAS model based on reduced ' flows resulting from the drainage improvements By intercepting and diverting flows to retention basins (and ultimately to the La Quinta Evacuation Channel), the- drainage improvements reduce the area contributing to the flood hazard. Therefore updated flows were calculated by proportionally reducing the 1990 flows based on the reduction in tributary area. 4.1.2 RESULTS As a result of updating the flows based on reduced tributary area, the updated HEC -RAS model calculated lower water surface elevations than the 1990 HEC -2 model, with 100 -year flood depths generally less than one foot. The new maximum 100 -year flood depth was approximately 1.2 feet, located at the intersection of Avenue 52 and Calle Rondo. An updated flood plain map is included as part of the LOMA submittal in Appendix D; a portion of it is shown in Figure 4 -2. As shown on the updated, flood plain map and Figure 4 -3, a small area downstream of Calle Rondo and south of Avenue 52 (cross section 148 +50) remains designated as Zone AO. However, the majority of the upstream area, south of the La Quinta Evacuation Channel between Eisenhower Street and Calle Rondo should now be designated Zone X; this is shown in Figure 4- 4. October 15, 2004 Page 4 -2 M,;- � - I -- .., , - I 3 `t i k } a , i City of La Quinta Section 4.0 Master Drainage Plan FIGURE 4 -2 UPDATED FLOOD PLAIN ANALYSIS: ZONE X 4.1.3 RECOMMENDATIONS Based on the findings of the updated flood plain analysis, it is recommended that the City ofILa Quinta request FEMA for a LOMA to change flood hazard designation for the area upstream of Calle Rondo to Zone X. As previously mentioned, this request for a LOMA was submitted in May 2004 and is included in Appendix D. 4.2 PERCOLATION TESTING " 4.2.1 OVERVIEW Like other cities within the Coachella Valley, the City of La Quinta utilizes detention and retention` basins to temporarily contain runoff from sources such as stormwater and landscape irrigation, allowing such surface flows to either evaporate or percolate into the subsurface. The City requires new developments to provide sufficiently sized basins to manage 'these surface water flows. As such, percolation tests were conducted to determine infiltration rates expected for areas within the City. This section presents only a summary of these tests. More detailed information is presented in .the Percolation Testing Technical Memorandum (dated September 22, 2004), which is included in Appendix E. October 15, 2004 , r Page 4 -4 City of La Quinta Master Drainaee Plan • 4.2.2 STUDY METHODS AND RESULTS • Section 4.0 Percolation tests were conducted at four different sites. These locations are summarized in Table 4 -l. TABLE 4 -1 PERCOLATION TEST LOCATIONS Type Location Test Method Effective Porosity ( %) Hideaway residential development — Large diameter infiltrometer test Unsaturated Hideaway — north Sandy Loam 2.9 north side 2.0 1.0 Hideaway residential development — Large diameter infiltrometer test Unsaturated 14 5.3 2.7 south side Sandy Loam Unsaturated Andalusia residential development I Large diameter infiltrometer test Saturated Existing retention basin site Slug-test Source: GeoPentech, September 2004 Results of the testing are summarized in Table 4 -2. TABLE 4 -2 PERCOLATION TF,ST RRSTILTS Test Site Soil Type Downward Flow Rate ( ft/day) Effective Porosity ( %) Vertical Hydraulic Conductivit ( ft/day) (in/hr). Hideaway — north Sandy Loam 2.9 14 2.0 1.0 Hideaway — south Fine Sand 7.9 14 5.3 2.7 Andalusia Sandy Loam 1.3 12 1 0.63 0.32 Wet Basin — Test 1 Loamy Sand n/a n/a 3.2 1.6 Wet Basin — Test 2 Loamy Sand n/a n/a 2.0 1.0 Source: GeoPentech, September 2004 4.2.3 CONCLUSIONS AND RECOMMENDATIONS It is recommended that new developments utilize a vertical hydraulic conductivity value, i.e. infiltration rate, of 0.6 ft/day (0.3 in/hour) along with other appropriate design criteria to adequately size retention basins. If a development were to include a retention basin based on an infiltration rate higher than 0.6 ft/day, it is recommended that additional large- diameter infiltrometer tests be conducted at the proposed retention basin sites. Such tests should account for divergence of flow in the soil due to lateral unsaturated flow consistent with the test procedures described in Appendix E. It is also recommended that subsurface explorations be conducted to identify the possible presence of low permeability layers at depths that could limit or impede the percolation of captured surface flows. Infiltration rates are expected to decrease with time due to clogging of • the surface soils; as such, it is recommended that a management plan be prepared for each retention basin to maintain the maximum percolation rates possible. October 15, 2004 Page 4 -5 City of La Quinta Master Drainage Plan SECTION 5.0 CONCLUSIONS & RECOMMENDATIONS 5.1 CONCLUSIONS Section 5.0 Base maps, included in Appendix A, have been compiled for the City of La Quinta including information such as • Aerial orthophotography • Topographic contours • Boundary and parcel data • Land use / zoning data • FEMA flood zone data Base maps include mapping of storm drains, storm drain manholes and catch basins based on plans provided by the City. Maps also incorporate field verification efforts to locate catch basins.. Electronic versions of the inventory are stored in AutoCAD and GIS format. The consideration of engineering design criteria included • A review of County and City requirements • A discussion of `High Confidence' vs. `Expected Value' levels • Water quality permitting requirements as part of New Development, Redevelopment, Construction and Municipal Agency activities • A review of on -site facilities and background data for the 1991 FEMA Federal Insurance Rate Map (FIRM) determined that the City's flood hazard areas could be reduced by requesting a Letter of Map Revision (LOMR). The LOMR request as well as updated hydraulic analyses were submitted to FEMA "in May 2004 and are currently being reviewed; this is included in Appendix D. Based on this LOMR request to reduce flood hazard areas, no capital improvement projects are recommended at this time. • Based on percolation tests conducted as part of this scope, it is recommended that design of future retention basins consider, among other design criteria, an infiltration rate of 0.6 ft/day (0.3 in/hr). Designs based on infiltration rates higher than 0.6 ft/day should be confirmed by additional percolation tests consistent with procedures outlined in Appendix E. 5.2 FUNDING MECHANISMS FOR FURTHER RECOMMENDATIONS While no capital improvement projects are recommended at this time, the City may identify potential projects in the future. For example, the City may identify nuisance flooding areas with varying degrees of priority. This section describes the financing alternatives for future potential capital improvements beyond the scope of this Master Drainage Plan. It describes potential sources of funds for projects but does not address the amount of funds the City could raise or the repayment impacts. October 15, 2004 Page 5 -] City of La Quinta Master Drainaee Plan • 521 FEDERAL PROGRAMS Section 5.0 5.2.1.1 U.S. Department of Agriculture, NRCS Small Watershed Flood Control Program The Natural Resource Conservation Service (NRCS) Small Watershed Flood Control Program assists local organizations in conducting watershed surveys and investigations, and in planning and installing structural . and land treatment measures for watershed protection and flood prevention. The flood control purpose of the program has been used extensively in California to help local communities address flooding problems. Most flood control detention basins and channels were built with the primary purpose of flood control and are being operated and maintained by local flood control districts, most of whom have adequate resources for this responsibility. Approximately $88 million is available under this program. 5.2.2 STATE PROGRAMS 5.2.2.1 Integrated Regional Water Management Grant Program (Prop 50), SWRCB Under the State Water Resources Control Board ( SWRCB), the Integrated Regional Water Management (IRWM) Grant Program (Proposition 50) is currently in the public comment period, with an RFP anticipated later this fall. The following opportunities are available: • Planning Grant Program: Provides $10 million for planning grants that foster development or completion of IRWM Plans, to enhance regional planning efforts, and to assist more applicants to become eligible for Implementation Grant Funding. • Implementation Grant Program: Provides $150 million for projects that protect communities from drought, protect or improve water quality, improve local water security by reducing dependence on imported water and include at least one of the specified projects detailed in the application guidelines. Projects must be an implementation measure of an adopted IRWM Plan, and proposals must be submitted by a regional agency or regional group, as long at least one of the members is a public agency or non - profit entity. This is to encourage integrated regional strategies for management of water resources and promote a new model for water management. 5.2.2.2 Agricultural Drainage Loan Program, SWRCB The Agricultural Drainage Loan Program was created by the Water Conservation and Water Quality Bond Act of 1986 to address treatment, storage, conveyance, or disposal of agricultural drainage water that threatens waters of the State. This program provides loans with a funding cap of $20 million for implementation projects and $100,000 for feasibility studies. Loan repayments are for a period of up to 20 years. Applications are currently being accepted. 5.2.2.3 I -Bank Infrastructure State Revolving Fund Loan Program, CTTCA Under the California Technology, Trade and Commerce Agency ( CTTCA), the Infrastructure State Revolving Fund Loan Program provides loans from $250,000 to $10 million with terms up to 30 years for any of the following types of projects: City streets, County highways, State • highways, Drainage, Water supply and flood control, Educational facilities, Environmental October 15, 2004 Page 5 -2 is City of La Quinta Section 5.0 Master Drainage Plan , mitigation measures, Parks and recreational facilities, Port facilities, Public transit, Sewage collection and treatment, Solid waste collection and disposal, Water treatment and distribution, Defense conversion, Public safety facilities, and Power and communications facilities. Applications are currently being accepted to be placed on a priority list. 5.2.3 LOAN FINANCING PROGRAMS Most of the commonly used sources of funds for drainage facilities that do not rely on user charges involve special districts. The interest rates on these sources of debt financing are not subsidized, as are some of the state and federal loans, and will vary with market conditions and the time of the sale. For the last several years, these rates have been in the range of 5 1/2 to 7 percent. Along with par -as- you -go financing, several special districts are described below. 5.2.3.1 Pay -as- you -go Under a pay -as- you -go approach, revenues from impact fees would generate funding for construction. Impact fees would be collected and deposited in a special fund until enough money accumulates to begin a construction project. The size of the construction outlay may make pay - as- you -go a difficult approach or, at a minimum, require project phasing and supplementary funding from other sources. A drainage fee per acre (developer impact fee) could be established for new development or redevelopment projects for this purpose. The impact fee amount would be regulated by Section 66000 of the California Government Code, which governs impact fees relative to not being more than the costs that can be attributed to each new user. 5.2.3.2 Assessment Districts Assessment Districts formed under the conventional statutes (Improvement Acts of 1911, Municipal Improvement Act of 1913, and the Improvement Bond Act of 1915) provide some of less costly financing available because of the real estate security. Assessment districts do not require a vote, but do require notice and a protest at a required hearing by more than 50 percent of the property owners within the proposed district can stop the proceedings. Assessment districts can be initiated by a petition of property owners or by City Council action. Only improvements that provide a special benefit to properties can be assessed to a property. Improvements that provide a general regional benefit to property outside the district would not be eligible to include in an assessment district or would have to be funded by contributions outside the assessment district. 5.2.3.3 Community Facilities (Mello -Roos) Districts The Mello -Roos Community Facilities Act of 1982 authorized cities, counties and special districts to form a community facilities district to finance the construction, improvement, purchase or operation of public facilities that benefit a defined service area. Two or more governmental agencies may form jointly finance facilities through a CFD and joint financing agreements. The CFD may authorize and issue bonds if approved by two - thirds of the voters within the district. Bonds would be repaid through special tax assessments, but the assessment October 15, 2004 Page 5 -3 • City of La Quinta Section 5.0 Master Drainage Plan methodology is more flexible and does not have to be strictly based on benefit derived from the public facilities as with an assessment district. October 15, 2004 Page 5 -4 City of La Quinta Master Drainage Plan • SECTION 6.0 LIMITATIONS Section 6.0 This Master Drainage Plan has been prepared utilizing storm drain plans and drainage reports provided by the City of La Quinta. As no independent validation of these plans and reports occurred has part of this scope, Psomas shall not be held responsible for their results. The hydraulic analyses presented herein have been prepared in accordance with guidelines established by the United States Army Corps of Engineers (USACE) Hydrologic Engineering Center. (HEC), Federal Emergency Management Agency. (FEMA) and the Riverside County Flood Control and Water Conservation District (RCFC &WCD). Evaluation of the appropriateness of these guidelines and the accuracy of FEMA data are beyond the scope of this work. HEC -RAS is a one - dimensional, fixed -bed, steady -state hydraulics model. Hydraulic results presented herein are limited to assumptions inherent in the model. This document has been prepared at a level of detail appropriate for the scope of work. The methodology employed in these analyses was selected to characterize existing drainage infrastructure and identify current deficiencies to reduce flood hazard areas within the City. Further detailed analysis may be necessary for further stages of the project. The use of this document is limited to addressing the purpose and scope previously defined by the City of La Quinta. The analyses presented in this document are not intended to be used for • detailed design. Psomas shall not be held responsible for any unauthorized application of this, report and the contents herein. The opinions presented in this report have been derived in accordance with current standards of civil engineering practice No other warranty is expressed or implied. October 15, 2004 Page 6 -1 City of La Quinta Master Drainage Plan Section 70 SECTION 7.0 REFERENCES BSI Consultants (June, 1987). Master Plan of Drainage Report for the City of La Quinta. City of La Quinta (2004). City of La Quinta Home Page. Website url: http: / /www.la- uinta.or Coachella Valley Water District (CVWD). Website url: http: / /www.cvwd.org/water &cv.htm Federal Emergency Management Agency (FEMA) (August, 1991). Flood Insurance Rate Map (FIRM) for City of La .Quinta, California, Riverside County, Panel 5 of 10. Community - Panel Number 060709 0005 B. Key to the City. Website url: http: / /www.i)e. net /- rksnow /cacountylaquinta.htm #statistics San Diego State University (March, 1994). LANDSAT Thematic Mapper false -color image of the Salton trough region of California (Scene ID 50203- 17462), acquisition date 20 Sept 1984 Riverside County Flood Control and Water Conservation District (1977). Hydrology Manual. Riverside County Flood'Control and Water Conservation District (2004). Website url: http: / /www.floodcontrol.co. riverside. ca. us /stormwater /content/whitewaterws.htm Western Regional Climate Center (March, 2004). Climate Summary for Indio Fire Station (044259). Website url: http:// www. wrcc. dri. edu /cgi- bin/cliMAIN.pl ?caindi +sca Page 7 -1 • Exhibit 1 A: • Exhibit 1 B: • Exhibit 2: • Exhibit 3A: • Exhibit 3B: • Exhibit 4A: • Exhibit 413: APPENDIX A EXHIBITS: General Base Map — Overall General Base Map — Cove Area _and Use Map — Overall FEMA Flood Zone Map — Overall FEMA Flood Zone Map — Cove Area Drainage Map — Overall Drainage Map — Cove Area i APPENDIX B Portions of FEMA Flood Insurance Rate Map (FIRM) for City of La Quinta August 19, 1991 1 f t•• i f • APPROXIMATE .•, 0 1000 �ft NATIONAL FLOOD INSURANCE PROGRAM aS bra m it ? S GM��u s U.,g� t II ;tc.. bi swv�'„ 3.� •Y erc ,N, i- S�'.Q`'�+ tts� .'�• d' ' tc+:t MI .,� >�- „� J ..rin f+ k^ r r •�'f �'f � � - ie���.,si+: �-'::L 'c�' .vJ.a k f�i ��� �' � `�` 5 � U . +k�3 ",�- .Y3,`.�' .. �s. 'i�, p µ��'S. +:n ui rrt �,�.. � � M A'. s �E• ��,.,i^ i� „�2, t FIRM' ,y. •+ „.5� ar �.}"kt i ' 'Lf..-,.�,.�A •�:hx4^� . � 3 �^` %�.a �i.�. a4�,c"Yt - ���a.�.�� �v'4.i��. ,'Ek.,,i -i ? s`4i'; - c'��s7i S`'� 8 r` u'” �v�" ±� T ?�•� ?�''?* -'^•_ 5� :..��k,, -':y� x#� f�_ , +� fir• - •^'. . � f may, 1 t: i, , , 3. f'i 8 ➢ ?f.: �.'• -, k�r}%3` +;' i•Aaa� ..�,y _ ��a^ - 1 '� ' . �r}eat±� -• „}W; _.°YI � -%-' r?e��tr�~;�` G,n�� '°B- '1�- ,����, r ��y - -,y,. ,,..i• .:t$FY -� .. _,,+ .¢ +-` / s a-cY- y.:."'3E;,.t�i�'. ° " *.,�” : kT" vra • ''� -"•' •i' .�?u.. ..s �..,., �. cat L. r q r_� ..R A ' INSURANCE RATE :�; �i:� -•2.. "��'�' ^7 :?f ^ "•L. r 1�:�•'. -•m y '�.,�," ,•F�; "T"';>'i - �c � •�rY ;:•:� s .�f<':h;::-�'- �.`�°' FLOOD � �,`,,' �. •�mt'k''ks'�Mz�,`,.-��.?�' -. - .�., ....d ;;b , L:• �," 5,;`. � G."- 35: �•"�-`^ .'F'- 'b•,':�'yk._,,•:,it ..5g`g t�brmj x +•?shs -"a•:m. a.=' o .1r 'i "��a_ -L�•; •.; 9C.8•.``•,x: -•' �4E ^: fig 11•. �.� - ,oTycn-�T g` • _3 ���.a'i; ?i a, , _,a,eY - _ ^:� .k"- ,� =- ...�,� ,t �� - -. ti }3_�en•`':. .,ty k 'e._. ��''^+?'e,� � xEEi�� ,•ro ��i" ;i�? :�k ,,�.::a,.3'x� F�jiC,Ft�1:-.�' ;-. ,`�, ;;.a,�.. .�.,,,��"t�. '��s3t .�`�'.fit:�a���:� .."r�s4.,. �.4 ;easy y .Ks�`N,,•,3, �y„�Yxv,. L. .��,."'e9 , -r.;qe "'.. . a a....e_$.. as"�,C_. .s Y1uan ��.. n�f: 'v�:4 _ ^•� r�7�, ' •��„r3.:,�� o �p�' �u.•'�.���..F3;$�� - `ar��l'r� T`!1 - .�j. 'x,� d. . r c.�. _ ^ T� V ..S• -.,� � ���`.. �"�• [ . `��'L ;l�E.f �%` 1's:$ 3•�7�'�..w•' ". i� " � ks� ,'�yjlJ.� 3 , - d�t�•'�''�`,� ��FC'� ''''J LI ys�: �j`C 'fix: a.�* �G� .��_ -��a - �J.-w* '�7 `�F'+R"`4Y�.,,Fr �` '�- .�:'S'D d2• •ro. �'�; °�x� �'S �m �. C.,�., �� !� ��r�m�''.<+�i •` vi. U k :$ ••'��`d"`•,�•„� _ :s; ".' y � F�J.�,�, -. ..:;?�".:�ry i. � � y'�_: y�- :},yak?• � • ,. L� $fig , '•-.� :s, [ LA QUINTA �•• `'j,m � F i : � LA JARITA i I • e�Re�••+W G:'s .,X.; ii M b � a - _1 D • &'"'�. �- .. �,F l RIVERSIDE COUNTY 4, 1Ru a �I � t OF 1. (SEE MAP INDEX FOR PANELS NOT PRINTED) 4v , ti:Y) . �� �� • :�S 8'�: j�Y,.nrb5 � . Sr:. • PANEL LOCATION I S COMMUNITY-PANEL Eu 060709 0005 B Emu WillC • k MAP REVISED: AUGUST 19, 1991' _ 7 • • ,� 99 � � �Z� Jt i Emergency Management IN loin 0 • :Y i - S. a;.ti io a erfical Datum of 1929 � i �:�,,. the Natnal Geodetic V 1, NOTES z a 111 s2t�� ys 3 �. s1 {Yx R VIA. - 'T is map is for use in administering the National Flood Insurance ti " •� "' .flie r, Y TRANOUIL0 Rogram; it does not necessarily identify all areas subject to flooding, ' APPROXIMATE SCALE IN FEET.' pprticularly from local drainage sources ofsmallsiie ,or all planimetric fdaturesoutsideSpecial Flood HazardAreas. " 1000 0 1000 ` .. _ rw•a��'r�.- ,.�,rit�� �.v' t�M�.t%3�°5�} xW�� � `,�rf =� . ,} - �' Z0 N-E X , , : 1,, ifs k a n r y r Areas of special flood hazard (100 -year flood) include Zones A, A1.30, At, AH, A0, A99, V, V1 -30 AND VE. a t r - fi n g,v s + Certain areas not in Special Flood Hazard Areas may be protected by ' u 1 flgod control Structures. Boundaries of the floodways wvdre computed at cross sections and interpolated between cross sections. The floodways were based on '• t a 1 F.r +'i �" "' hydraulic considerations with regard to requirements of the Federal I��IIIIIIIIII ��.NATIONAL FLOOD INSURANCE PROGRAM Emergency Management Agency. Floodway widths in some areas may be too narrow to show to scale. Flloodway widths are provided in the Flood Insurance Study Report. , Coastal base flood elevations apply only landward of the shoreline. F IN ` I I gl�a�fh�gre t ` J ;mot: �. a � _ For adjoining map panels see separately printed Map Index FLOOD INSURANCE RATE MAP a . � • .;. _ ,f MAP REPOSITORY. - • ° City of Engineering Department ; , f k. 78 -105 Calle Estado, .. , La Quinta, California 92253. CITY OF , 3 j (Maps available for reference only, not for distribution) { 14 r is INITIAL LNE19,198 CATION: �AL� ®�lelYA JUNE 19, 1985 FLOOD HAZARD BOUNDARY MAP REVISIONS: RIVERSIDE COUNTY: I La Quinta Evacuation Channel ` • if _ FLOOD INSURANCE RATE MAP EFFECTIVE: ` JUNE 19, 1985 • ° FLOOD INSURANCE RATE MAP REVISIONS: PANEL 5 OF 10 • - ti# Map revised August 19,1991 to change zone'designations, to change ,(SEE MAP INDEX FOR PANELS NOT PRINTED) special flood hazard areas, to add special flood hazard areas, to delete, special flood hazard areas, to change floodway, to update map format ` anq to update cofporate limits. 0. 100 YEAR FLOOD Q CONTA)NED IN CHANNEL• - D to "k e. ITI .,PANEL LOCATION ~� "COMMUNITY- PANEL NUMBER r - 060709 0005 0 r Td determine if flood insurance is available, contact an insurance I - t aj; nt,or call the National Flood Insurance Program at (800) - - - s 63 6620. ; a ` _ _ M,- MAP REVISEQ:, 'AUGUST 19, 1991 • - - ei - -� • -.+T Fes.+, - - - " - . t __` _ -. ._ .. - i ., � _ � • Y v{ �, W. „� Y. '• - _' +t_', * APPROXIMATE SCALE IN'FEET ` + o o � 1 • .' .• I . r , a s AVENUE 1. "` i000 0' - l000 Federal Emergency Management 'Agency t ' uj 0—, , + t , ` - • t w This is an official copy of a portion of the above referenced flood map. it - - ` - - - 'was extracted using F -MIT On- Line.". This map does not reflect changes r 4Ak - _ • - - W - "- or amendments which may have been made subsequent to the date on the ' P NATIONAL FLOOD INSURANCE PROGRAM title block. For the latest'product information about National Flood Insurance Pro - - -- _ -- - - • - = 9 ram flood maps check the FEMA Flood Map Store at www.msc.fema.gov . • t,r - t. iTl - LEGEND. { SPECIAL FLOOD HAZARD -AREAS INUNDATED ' •')" BY 100 -YEAR FLOOD '' i APPROXIMATE SCALE IN FEET V I ' ZONE A No base flood elevations determined.' 1000 0' 1000. • s L q - - •�" i _ u ZONE AE Base flood elevations determined. ? r r • .- - ZONE AH- Flood depths of 1 to 3 feet (usually areas of , • t. f ponding); base flood elevations determined. ZONE AO Flood depths of 1 to 3 feet (usually sheet v flow on sloping terrain); average depths •~ n determined. For areas of alluvial fan flood- W I' ing,velacitiesalsodetermined. �llllllllllllll NATIONAL FLOOD INSURANCE PROGRAM IIIIIIIIIIIIIIIIIIIIIIII ZONE A99 To -be protected from 100 -year flood by . Federal flood protection system under - ' construction; no base elevations determined. ZONE V Coastal flood 'with velocity hazard (wave . - i ` action); no base flood,, elevations deter.- • x y' '. T s- r mined. - ZONE VE Coastal flood with velocity hazard (wave I. • °I r Q ^� action); base flood elevations determined. FLOOD INSURANCE RATE MAP - t c - FLOODWAY AREAS IN ZONE AE '. LES - I AVENUE - - fy a OTHCR FLOOD AREAS ' _ r • . , ; t , ' ' • 1 `J j ZONE X Areas of 500 -Year 'flood; areas of CITY OIF - 100 -year flood with average depths g �7�T1 �+ of less than 1 foot or with drainage L ' A Q V I ' areas less than 1 square mile;•and ut areas protected by levees from 100- 1 CALIFORNIA ~s year flood. - RIVERSIDE COUNTY ; OTHER AREAS I ZdNE X ZONE X Areas determined, to be outside 500- 3,c yR1 _ • year flood plain. ' wry N ZONE D Areas in -which flood hazards are <,� p undetermined. ' -SF� PANEL 5OF10 'w M�r��a� ' Flood Boundary Y - .(SEE MAP INDEX FOR PANELS NOT PRINTED) • •� ���M�� Floodway. Boundary ,.. • - .. 4 y .. Zone D Boundary J ; :t a�S , _ Boundary Dividing. Special Flood xy *z f7s�az K Hazard Zones, and Boundary �> v a "sNE�>VtIA D rill �r •r ply .s. err Dividing Areas of Different <.��� ..1 '',,Y Coastal Base' Elood Elevations � S ecial Flood Hazard 4.. ! Within p t''5;` „' a.�i'��1�` a �. " m�i:..; ��• Zones. ` : 513 Base Flood Elevation Lirie; Ele 3- . �,�'����sd;. r�,;z '�u 0:,!.::4.,��:'. <� vation in Feet* ��ry1'• ?��''??�•'{i:.'a}_��r.- r1t'.-'' •t�.-. 1 ,•�. -� PANEL LOCATION • 7 F.'J” N. .,f. "4 S _ , -1.. + a�, •r+ ��"� � tE;��"�;. ii�^ '� � s f •R", - t r .: _ _ � L 'tt a41 0 "yi tit.t� rFELt�F'• *;�::..: '.. ' :+- D Cross Section Line NUMBER - 5 }; `qty 5 „ Base Flood Elevation in Feet C h Ter ,t �r dry;\ s z ° •� (EL 987) Where Uniform Within Zone* OUO %09 0005 0 -'�" i zr. <'� =hs� - • • -�1tCM 6.4 1 ra••I _ J+y1y ! Y�.` .•FV�:5 •, _ , k. ?.y ; k, <., „ ; �;, -RM7X' Elevatidn Reference Mark =-w'y MAP REVISED: f . *Referenced to' he National Geodetic Vertical Datum of 1929 • Ma r J1nz,r,, �v t L � : .AUGUST 19, 1991 - ,.. r- i • - . eT Yex 'Lt 3�.•i''.�1� 'r ;r, ".o•'i: `°3 ak"'{ ` -i _ NOTES E� v. s - •y I'M + T is map is for use'in administering the National Flood Insurance 111 - y - "t`•.`,r',`.ya' .r- <!e`Y$F�e.. WE -).• _: VIA_ g - - . Xogram; it does not necessarily identify-all F _ • ,., , e a,i2 a r�: TRANQl11LL0 Y fy all areas subject to flooding, ra y � O e r.y• {y Nom, - �,: Orticularly from local drainage sources of small siie, or all planimetric ' _ t of yr i r � h 's� ` r•� to atures outside Special Flood Hazard Areas. ! r :l _ - „a3 >` "r, N,4, _ '``'i..k•�r'i �gx{a ''u'i.i r- �R �Ja. - 4y�� r , , - ZO N{E X . -� } 6 Y, �� f4� • r ; , a . Areas of special flood hazard.(100 -year flood) include Zones A, A1.30, Federal Emergency Management Agency W -far 4•.Y -r'''S - ,�_ At, AH, AO, A99, V, V1-30 AND VE. •' • tibf - in r Cert ain areas not in Special Flood Hazard Areas may be protected by y) > 9 u r ? 6od control structures. y h `F L - oV - - �• , {'j ��' - - .t •°'" _Boundaries of the floodways were computed at cross sections and 'This is an official co _ • i •{��Ky . � �rFT* �,�},v,•,,, 'r. t py.of a- portion of the above referenced flood map. It Interpolated between CfOSS 52C110n5. The fI00dWay5 were based on was extracted using F -MIT On -Line. This map does not reflect changes' •`� Y t�nb va tr ', hydraulic considerations with regard to requirements of the Federal , or amendments which may have been made subsequent to the date on the • - " • '"�`",* '�-sy,. -� t+r fr�'Y`� -/ °'�'' - Em title block. For the latest product information about National Flood Insurance ergency Management AgOnCy. _ - - ",'% -' 7 „; fc s k g'rt;y;K'<ft-.' • - Program flood maps check the FEMA Flood Map Store at www.msc.fema.gov - • - r. •.r -a s yr: .� t _ APPENDIX C Supplement "A" to Riverside County Drainage Area Management Plans (DAMP) New Development Guidelines AUG 12 2003 11:05 FR PSOMAS 714'545 8883 TO WEST LA OFFICE• P.02 SUPPLEMENT A.. TO THE RT%)ERSIDE COUNTY DRA .NvAGE AREA kt- kNAGEMEI T PLANS A COOPERATIVE PROJECT OF NTY OF RIVERSIDE, INCORPORATED CITIES, COACHED. A VALLEY WATER DISTRICT AND HE RIVERSIDE COUNTY FLOOD CONTROL ,.ND WATER CONSERVATION DISTRICT AUG 12 2003 11:05 FR PSOMAS 714 545 8883 TO WEST LA OFFICE P.03 ATPLEMENT-A TO THE MERSME COUNTY DRAINAGE AREA MANAGEMENT PLANS ATE W DEVELOPMENT GU DEZTMS I f� Printed by Riverside County - Priming Services APHI 199.6 -AUG 12 2003 11:05 FR PSOMAS 714 S4s 8883 TO WEST LA OFFICE P.04 ACKNOWLEDGMENTS The development of this document, Supplement "'A" to The Sarita Ana, Santa. Margarita and. White -Aster Diaziinage Area Management Plan .(Better known as the New Development Guidelines), took the time and extorts of•a great many people over a year and a half First of all, the $anta Ana/Santa'Margarita National Pollutant Discharge'Elim natioii' System (NPDES).Advisory Committee thanks the Orange County Envirbninental Management Agency for the use of their work; it helped to establish the pattern and content of this document. 8peeial• thanks to I&. Jerry Linton for his very capable and unselfish leadership a.s dzairruan. of the Consirution and New Development Sub- committee. Thanks to Ana ro Diaz for keeping the sub- comrairree minutes ai d making rbe myrads of changes that occurred during the development of this document. Many thanks to the following sub - committee members: �__ ... ___ ... Pavlova Vitale- -- - -• _ Saata -Ana Regional W CQ B__ * Corrdsponding member The Construction and New Development Sub - Committee would like to thank the ekpert pardcipahts who provided.rhe necessary information and testimony needed to fairly develop the guidelines found in rl is document Richard Boon Gerald Breitbart McEn da.Luthin Ilk; Shetler Ron Wibmiss l.'_F (Kim) Wiseman Orange County LMA California Restatirant Association Arco Products Company County Environmental Health Westem States Petroleum Association Chevron U.S.A. Products Company Their comments and assistance contributed submutially to the development of the present (( document- Bob Brock City ofMm7ieta Jason Christie Riverside Counry Flood Control Chuck Collins Riverside County Coordinating Comte (Trans Pacific Consultants) Arturo Diaz, :Secretary Riverside County FIood Control Delia.Garzison City ofRiverside Rodney Hanway* Building Iudtsuy Association f Shelli Lamb Riverside - Corona RCD �1 Jerr Lia;ga, Chaizman Citation Builders '^.. - -- - • - -hhn Phipps- - - - -- - - SSan�ieg` o�egio`n7 "wQCB- John Poiirkaz ini City of Temecula Mark .Raab City of Norco lvdmi Ray) 'Lewis Homes John Ristow Riverside County Transportation Vlren Shah City of Corona �__ ... ___ ... Pavlova Vitale- -- - -• _ Saata -Ana Regional W CQ B__ * Corrdsponding member The Construction and New Development Sub - Committee would like to thank the ekpert pardcipahts who provided.rhe necessary information and testimony needed to fairly develop the guidelines found in rl is document Richard Boon Gerald Breitbart McEn da.Luthin Ilk; Shetler Ron Wibmiss l.'_F (Kim) Wiseman Orange County LMA California Restatirant Association Arco Products Company County Environmental Health Westem States Petroleum Association Chevron U.S.A. Products Company Their comments and assistance contributed submutially to the development of the present (( document- •AUG.12 2003 11:05 FR PSOMAS 714 545 8883 TO WEST LA OFFICE P.05 TABLE OF CONTENTS, r1.0 INTR03)UCbQN ..................... . . - -• - -- - ......... -- - -- -- -... -- - -. - - ----- -..... -- 2.0 BACKGROUND : - -- - •- - -- — - -- -- - .__. .:. .�...:._ ........... ............ ...- ----------------- __._.:. 1 DEVELOPMENT PLANNING PROCESS ...... ---------- ------------------------------------------------------- � 4_0 BNT S=CTTON 4.1 Non- smicwaal Meanxes -------------- ----- - - - - -- - - -- -,_....:_._....--- ..............--=----- .... - - -- ..............., 4- 42 Routine Srmciatral BIvgs.�_ - -.�__ __----------------------------------- ---- ------------- �._.._. _ 7 �( 4.3 Special Structural BMPs.....--------------- --- ------- ............--= ...... ................................. 9 �- 5.0 -- - Rr�GCAMNAL PROGRAM FOR DEVELOPERS AND CONTRACTORS 9 I � -:485 •� � — - Table 1: Appropriate NonstrueturaI BMP's Table 2: Routine Structural Bw's ATTACHMENT SeIecrion and Design of Sto=wamx Quality Conrrols (under separate cover) PUG 12 2003 11:08 FR PSOMAS 1.0 INTRODUCTION 714 545 8883 TO WEST LA OFFICE P.OG This document is to be used by Riverside Counry NPDES Co- permittees county -wide. -as -a supplement to the Drainage Area Management Plan(s) (DAMP). it was developed by;the Construction and 1\Tew Development Sub - committee, and approved by the NPDES Advisory �:ammittee. Appendix G of the Orange County Drainage Area Nanagement Plan, damd April 1993, served as a model for the development of this document. ® The objective in preparing this Supplement "A" was to iden-df post construction source pollutant ® Rrev ntioz, mod_ treattuent_ peasures that could be incorporated. •into- - development pmjects..-This Supplement recommends which Best Management Practices, (BMPs) should be required• as'standard practice. for projects with =que water quality issues additional applicable -solutions may be required on a case by case basis. : The DAMP does not specify a minimum development size to be considered ered for MP applications nor does it specify which land. uses should receive the most .attention- In general, DWP are. required on a wide variety of land uses, both residential and non - residential. BMPs should also be required on accessory uses of concern (such as outdoor material/e:quipmeat storage, vehicle/ . equipment fueling .and service) and certain low intensity, but potentially high poIluting uses (such as golf courses and plant nurseries). C` 26 BACKGROUND In 1987 Congress amended the Clean Water Act to re w •the ermitting of stormwater dis �e s from municipal storm drain systems. The .tPA promulgated regulations in 1990 to enact the new law, 1a the regulations (and the preceding draft i-egulations), EPA listed the County of Riverside as a country that must obtain an NPDES penmt_ The - Regional -Grater- Quality Control Boards (RWQCB) -enforce the EPA; regulations and -the Clean _... Water Act in California. Facia RWQCB in Riverside County has required the County, Cities, Riverside County Flood Control and Water Conservation District •and Coachella Valley Water rDistrict (asapplicable) to be included in the NPDES permits. The NPDES permits require the permittees to control the discharge of pollutants to the Waters of tor, United States by the implementation ofBMPs. Tbe'se BNd?s are listed in the Santa Ana and Santa Margarita Permits and DA.MPs and in the `Proposed Management Programs' section of the Eastern Riverside Counry NP1DES Pant Application.. j The .members of the Santa Ana/Santa Margarita Advisory Committee recognized the sensitive issue of imposing development and construction B_MTs on the buldizig industry_ They, therefore, formed the Construction and New Development Sub - Committee. The sub - committee included representatives from the co- p rrmitrees develo pme nr companies, Building Industry Association, Western States Petroleum Association, engineering companies and the Riverside Counry Coordinating Committee. The group developed this document Svitb particular insight from and �`• cooperation of the development industry. The BMPs proposed herein viilI meet the permit mqu=ments while not imposing undue burden on those that are to implement the actions Cauca for. AUG 12 2003 11:06 FR PSOMAS 714 545 Bee3 TO WEST LA OFFICE P.07 00". 3:0 DEVELOPMENT OW4N1NG PROCESS The Municipal Storm WAter Permit states that stormwater quality management should ;be • considered during a project's.planning phase, implemented Burin . construction, and ultimately maintained for the fife -of the project_ As.such, standard conditions• of approval were developed; to ' address land iise areas of concern to mkiin —the amount of pollution entering the drainage system_ r _r i Each municipality should require the - implementation of BMPs for redevelopment and specified new. development. A redevelopment prc ject.is any project where major modifications to an existing site- and/of structure requirxag a permit is underraken.-R&rine maintenance-- intenor"remodeling, minor structural additions, reroofing, and maintenance.ofparking lots -are intended-to be.exempt A redevelopment project is not to be confused a ith the projects sponsored- by a Redeveloprmear Agency of a j urisdiction. It is assumed that each jurisdiction will. further define a "redevelopment project", util', iing.its, owu pemdning criteria_ Planning review procedures must be adopted -and uniformly implemented by all the municipalities to ensure consistency. The typical process is outlined as follows: 1. The present municipal procedure for approval of grading, building, and similar permits will be modified to include incorporation of the •BNIPs listed. in Tables l -and 2,1 as applicable. _, . _ _.._ - • �_ . . M palitYes_wiU *make rhis�upplemeat d� l implemenration. of B_MPs Available _ to development applicants through the permitting/land development process. Applicants will be informed at the earliest possible point ofprocessing of these requirements. 3_ Municipalities will develop implementation proecdures for the new development BMP midelines, including training and education for the employees that implement this Supplement. Implementing staff will notify applicant -at the earliest possible 1opportunit, if them is a known water quality problem which might affect the proposed development_ The municipal permitting/development review process will verify that plans contain all. the applicable BMPs. Compliance is intended to be a matter of incorporating the measures specified in this Supplement or other acceptable •standard into the plans and submittals currentlY required by each municipality, and the review process wiII effectively be a verification that these are included. GEPIERAL CONDITIONS to be applied .by municipalities: For discretionary actions that include a precise plan of development: L Prior to permits, issuance of building pe the permit applicant shall include in -its -• developmentpla is for approval by County /City Off!cial(s) water quality management controls by specifically identifying BMPs that vviII be used onsite to control predictable pollutant nn 6 ff- AUG 12 2003 11:06 FR PSOMAS 714 545 9ee3 TO WEST LA OFFICE P.08 The permit applicant..shall identify y Tiamuctural and non - structural measures SP ecified in this Supplement :or other equally effective s=dard detailing implementation of BMPs whenever they arc applicable to the project (when the project has a loading. dock, for example); the assignment oflong -term inainTenance responsibilities (specifyin& ibe developer, parcel owner, maintenance association, lessee, etc.); and shall reference the location(S) •of structural BIv)ps. 'For Subdivisions of Land: 2. Prior to recordation and if determined applicable by County /City Official(s), applicant shall identify and'include in its plans those routine ' structural and non - structural ,BliPs outlined in this Supplement or other -equally effective standard, fof approval of County/ City officials. Both conditions Wand 2' also functionally apply io public.projects wbere'the local jurisdiction technically chooses not to issue formal permits to itself or hired contractors, but nonetheless undertakes the work. SPLCXAL CONllMONS; o When a building is being proposed for which no anticipated use is designated or when an -unamticipated. element of land use or occupancy is proposed after a basic building has already . been coxnpleted, use of language similar to the following cmdition•is recommended for inclusion - - in-the- con ditionsvvhich-mrzst b- e- satisE�e& priorto -issuanm—r ofttre-appropriaie-pr&=:i�' Prior to issuance of certificates of use and occupancy or building permits for individual tenant timprovements or construdtiou permits for a tank or pipeline, uses shall be identified and, for specified uses (where the proposed improvements will store, generate or handle hazardous materials in quantities that .will require permitting and inspection once operational), the appIicA9T shall propose plans,aad measures for chemical. management- Cmcluding,.bur not. -... - -- - hyffil? 9 Tn nraQP PrnP- raPni+U rnr.,r..,c•n ­1­_ _ ­ .— c... to the satisfaction o#•the CO unry /City Building Official(s). Chemical management plans shall be approved by the Cotmty /City and other. appropriate agencies such as County /City Fire Department, the Health Services Agency's Department Iof Environmental Health, and sewering and/or water agencies to ensure implementation of each agency's respective requirements: Approval by the appropriate--agencies shall be ' fvxnished to the Building arid Safety D epartrnent, prior to. the issuance of any certificates of use and/or occupancy. Certificates or permits may be ministerially withheld if featuies needed to properly manage chemicals cannot be incorporated, into a previously completed building, center, or complex. A list of specified uses and occupancies of concern sbotld be developed by each jurisdiction according to their needs. 3 RUG 12 2003 11:06 FR PSOMAS 714 545 8883 TO WEST LA OFFICE P.09 A. • 4:0 BMP SELECTION The DAMP requires identifcation and implemeritation of BWs for new developmeht via regulatory and enforcement activities. This Supplemerrt lists particular routine structural and non - strocmral BWs thatv;ilI be evaluated for application and intensity for these activities- Thus, some • of the BM-Ps listed herein -vrill become conditions- of approval for new deveIopmeat and constr ucti.om The measures identified in Tables 1 and Z are to be deemed "standard practice" to be regriired on new developments, as specified. Two,geaeral Terms used in -this supple-inem are-defined by example as follows: Surcniral Controls; physical facilities or controls, which may include secondary containment, first flush diversion, .detention/retention,huins- infiltration trenches/basips, oil/ grease separators, grass swales, and engineering and design modification of existing structures. These examples include both routine structural contibls and special structural controls. Non- 5IIliCtuz'dl Controls: In general, these would be activities or pro &lmc to educate the public on proper disposal ofhazardoushoxic wastes, regulatory- approaches, street sweeping and facility marumhanee, detection and elimination of illicit connections and illegal damping. Each new development will be required,to implement appropriate, non- structural BIvg's In keeping lutionx to *T;n;mT7E the with- •the -size- and- t3�e. of .development�.and_pozenUal_fr sormwater pol introduction ofpollutants onto the drainage system. Each riew development will also be required to -implement appropriate "routine" stnictural BMPs in keeping with the site and type of development, and potential for stormwazer pollution. "Routine" sttuccural BMPs are economical, practicable, small scale measures which can be feasibly applied �__ .... at the smallesz_unit of development A major concept of the Counry's NPDES stormwater „quality program, as .set forth in the Riverside County DAMP, is a regional approach to stormwater quality planning and management on a I watershed basis. Later, "special” snuctural Blv>ps may be installed to address any specific water quality problems identified iri the watershed planning process. "Special" structural BWs . are engineered facilities designed to address-specific water quality problems identified in the watershed planning process, runoffmanagemerit plan, EEQA process, or similar watershed planning. There may be the need to revisit these requirements at-anas yet unspecified date or frequency. Eforts will be directed toward determining the •e&ectiveness of strucrurzd BMPs 1>�fore rhey are required_ Those measures which demonstrate superior cost- effectiveDess, considering right -0f;wav, const fticti.on, operation, mainteaanee, monitoring,• and pollutant removal, may be adopted as special st cmtal BMPs for application as indicated during the warershed planning studies. 4.1 Non-structural Measures C4� ?N71_ Educarioa for Pro Owze Tenants.and Occupants - Project conditions of approval P�3' � for all new developments will require that the developer provide environmental awareness education materials on general good housekeeping pracrices that contribute AUG 12 2003 11:06 FR PSOMAS I .. J s I r� i= 714 545 8883 TO WEST LA OFFICE P.10 to protection of stormwater, quality to all initial residents, occupants /tenants. Such materials will be.provided to the developer through the co- permin6es'. Couar tide education progrann. Different materials for resi8ential, office commercial, retail eom.mercial, vehicle - related cotnmercial, and industrial uses will be'involved. Nz. Activity Restrictions - If a property givers .association (POA) or homeowners association .(l;-IOA) is formed, conditions, covenants, and'restri&dons shall include measures shown in Table No. T•forthe purpose of surface water giiahry:PzoiecriOt. . Common Area Laiidscape Management All• pesticides shall be applied 'in strict " accordance td pesticide application laws as stamddh the.State.of California Agrieudtural Code. All pesticide applicators shall be certified by the State as a Qualified Applicator or bd dir&ctly supervised by, a Qualified Applicator. All fertdizErs shall be applied at The rate stipulated by the manufacturer. Fertilizer Applicators shall be trained in the proper procedures of deterininiing fertilizer rates and calibration of application equipment_ Fertilizer shall be applied hi such a manner as Io *avoid application onto hardscape surfaces. .Annual soil tests ai-e recommended to advise on which fertilizer elements are needed to avoid application of unnecessary elements, or over application. .The local water agency or* resource conservation district can assist with detailed info rmati01J. con cerning this BMP . 2T4. Common Area Catch Basin Inspection - For developments with POAsIHOAs and privately maintained drainage systems, the association will be regi&ed to have privately owned -catch basins, spectcdrand-,­if necessary;-eleaneil-rior tii tke�tar� erson, no" later than October 1 Sth each year. _ NTS POA/HOA Common Area• Litter .QOntroI -For developments with,an association, the POA/HOA will be required to impl6mem trash management and litter control procedures in the common- areas aimed at reducing pollution of drainage. water. The associations may contact with their landscape mainteriaaee.fizitzs tb pmvid� this seryiee. -- - _ - - - Of trash recepfacles in common areas, noting trash disposal violations by homeowners or businesses, and repdrting the violations tb the association for investigation- N5_ Street Sweeping private Streets and parking Lots - For'developmemrs with POAs/HOAs,. and privately owned streets and parking lots; the association will be required to have the streets and parking Iots swept prior to the storm season; no later than October 15th each year. N7.. Udderground Storage Tank Compliance - Compliance with State regulations dealing with underground stooge tanks will:be enforced by the County Department of Environmental Health on behalf of the State. NS. Spill Contingency Plan -A spill contingency plan (Business Plat/Hazardous Materials Management PIan) shall be prepared by the oAner /operator in accordance.with Section C• 6.95 of the California Health and Safety Code. The Environmental Health Deparanent or the Fire Deparixent in the- City of Riverside, CororL, or Banning shall be responsible for enforcement. Spills will be immediately cleaned up according to the Spill Contingency Ply IA r 0 AUG 12 2003 11:07 FR PSOMAS 714 545 8883 TO WEST LA OFFICE P.11 N9, 'Hazardous Materials Disclosure Compliance - CompIiance v-irh County /Cry ordinances shall be enforced by the Environmental Health Department or the Fire Department in the City of Riverside, Corona; or Banning. NI 0. Uniform Fire Code );mplementation Plan - Compliance with Article: 80 of the Uniform 'Fire- Code enforced by fire pf tection agency will. be required. Nll. Title 22 CCR *Compliance = Ga6i npliance Ajrh Title 32 of the California' Code of Regulations d relevant sectimms of the California Health & Safety Code regarding ath - hazardous waste managtruent will be 'enforced b�; the County Department of Environmental Health- on behalfbf the State. N12. Houselceeping of Loading Docks.- Loading docks for grocery, drug and.discount stores,' and• wxtehouse type commercial,and iadustriatl buildings, must be• kept in a clean ;and - orderly condition through a regular program of- sweeping;. litter control, and immediate cleanup of spills and broken containers, Polluted material or wash waters shall not be allowed to discharge into a storm drain. N13. Employee Training/Edubaxion •Program' (see NI) as it would apply to_future •employees of individual businesses - Based on information provided-,through the County -wide education program, developer either prepares manual(s) for initial purchasers' of business sites -or, for development that is constructed for .an�unspecified.ause, conveys . �dmmitmen far ibis -respo ib i to:POA• ortpux haseL ' NI4. )3W Maiurenance - The responsibility for implemenratioa of each non - structural BN2 and scheduled cleaning of all shzicunal BMP controls shall be ideatified (olwn, r; agency name, phone number, and address). AUG 12 2003 11:07 FR PSOMAS I I 4.2 Routine Structural BNIPs 714 545 e9e3 TO (JEST LA OFFICE P.12 SL _ ControI of Impervious Runoff - Impervious ai-eas shall be graded and constructed so as to drain tb• a filtration BW, such as a landscaped area or equally effective alternative wherever practicable and as recommended by-the- engineer of record. Direct drainage from impervious areas to the street or a.storm drain facility is discouraged and should -be avoided.-For example, parking lot catch basins -could be placed in landscaped areas with allowances for mirror. pondng. S2_ Common Afea Efficient Irrigation - All sites shall employ M iWri =.pro r=mable.. irrigation controllers'vviiich have enough programs to break up all irrigation stations into hydrozones. If practical and feasible, rain shutoff devices shall be empl6yed-to prevent irrigation after significant precipitation. Irrigation systems shall be designed so areas which have different water use requirements. are not mixed on the same station (bydrozones). Assistance in implementing a schedule based on plant watdr needs .is available from CWS or Mobile Lab_ The use of drip irrigation should be considered for all planter areas which have a shrub density that will 'cause excessive spray imerference of an overhead irrigation system. Use flaw reducers to mitigate broken heads next to sidewalks, streets and driveways. S3. Common Area Runoff- m;n;m;ring Landscape Design - Group plants with similar water requirements in order to reduce excess irrigation runoff and promote surface filtration; where practical,. Examples could include the fallowing; a_ Use mulches in planter areas without ground cover to avoid sedimentation runo$ b. Set irrigation tines to avoid runoff This will involve splitting nightly irrigations into several short cycles if slope and soil conditions warrant_ c. Use only enough water to provide for adequate plant health and growth. d. Use the water budget mode to make global✓weatherrelated scheduling changes. e. Use CMS data for global changes so they will accurately reflect weather changes. f_ Install appropriate plant materials for the location, in accordance Rath sunset climate zones. g. Install plants with low water requirements and consider the use of native plant material where possible and recommended by the landscape architect. S4_ Commvairy Car Wash Racks - In high density multi= family developments (apartments, stacked flats) larger. than 100 units where car washing is allowed, and developmerxt having a common parking area, a designated car wash area which does not drain diEtctly to a storm drain shall be provided for common usage_ Au example of such an area would 'be joint use of an open space or visitor parking area- Wash waters from this mma may be directed to the sarLimry. sewer (with prior approval of the sewering agency), to an engineered infiltration, or. equally *effective- alternative. 7 AUG 12 2003 11:07 FR PSOMRS 714 545 8883 TO WEST LA OFFICE P.13 SS. Wash Water Conrrols for Food preparation Areas - Food establishments (per State Health and Safety Code 27520) shall have contained' areas, floor sink(s) and/or m6p rsink(s) with sanitary sewer connections for cleaning of kitchen floor gnats' and• for disposal of wash waters containing k!T-chen and food wastes, if located outside_ Ae- contained area shall also be coverdd to prevent entry ofstorrnwater. . S6. Trash Contafruer ( dum ps fe r) Areas - Trash c ontainer (dumpstEr) areas shall hav e draiaage'frotn adjoining roofs and pavements diverted around the area(s), and: a_ Dunn sters shall be leak attached workable • p proof and have. atta k:able cot ers- b. Trash container areas are. to bd screened -or walled to prevent offshe T=porr of trash.. S7. Self-contained Areas for Vehicle WaShing/Steam Cleaning/ Maintenance/Repair/ Material .Processing = Self - contained areas are required for washfii /steam cleaning, wet material processing, and mainteaance activities, specifically: ' a . For businesses where uashmg .o f v ehicl es . without t steam cI earzng occurs, provide wash racks eonstrucred in. accordance with local sewering agency guidelines or btha x acceptable standard and with' the prior approval of The sewering agency (Note; Discharge monitoring may be - required by the sewering agency). b. Where.sieam cleaning occurs, provide wash racks as in S7.a., or structttraily contain (with a cover to restrict the entry of Aormwater during rain events) runoff f from such areas onsite for commercial waste removal. C. Where wet material .processing occurs (e.g., electroplating), secondary, containment structures shall be provided to hold spills resulting from accidents,; Ieakiirg tacks qr egcupaient. br ari " "off er tin IM5hed Yeleaseis (Note: If these-are­- ._ plumbed to the sanitary sewer, the structures and plumbing shall be in accordance •with State and local spill containment and reporting requirements and have the prior approval of the sewering agency). Also see N10. d_ Where vehicle repair/Anintenance occurs, impermeable berms,- drop inlets,.trench catch basins, or overflow containment suuetures shall be provided around repair bays to prevent spilled materials and wash -down waters from entering the storm drain system. S8. OuTdoor Storage : Where a plan of development proposes or building plaits incorporate outdoor containers of oils, fuels, solvents, coolants, wastes, and other chemicals, the areas where these materials are to be used or stored must be protected by secondary cantaimnent structures such as a berm, dike, or. curb (sec-N1 0). For commercial outdoor vehicle and equipment salvage yards, and commercial outdoor recycling, the entire storage area shall drain Through water quality inlets (see SPI). AUG 12 2003 11:07 FR PSOMAS I. l I 714 545 BeB3 TO WE=SI LH UH-iUE r.14 S9: Motor Fuel Concrere Dispensing Areas - Araeas used for fuel dispensing shall be paved with concrete (use of asphalt prohibited).. Concrete surfacing must extend a minimum of 8' from the face side of each pump receptacle and 4' from,the nose of the pump island. In adaition,'the fuel dispensing area shall be graded and, constructed so as to prevent drainage flow through the concrete fueling area. S10. Motor-Fuel ' Dispensing Area Canopy - All motor fuel concrete dispensing areas are to -have a canopy strtleture. Canopy roof downspouts are to be rouied to prevent drainage across the concrete fueling area. S11. Energy I)Mpatdrs - Energy dissipators, such aS riprap, are to be installed at the outlets of new storm• drains which enter unlined channels in accordance with applicable agency specificidons. S22. Catch Basin Stenciling - Phrase .`°No Dumping - Only Rain in the Drain" or equally effective phrase as approved by the County /ary NPDES Advisory Committee is to . be stenciled on catch basins to alert the public as to the destination 6f,poIlutants discharged into stormwater. S13. Diversion of Below Grade Loading Dock Drainage - Below grade loading docks for grocery stores and warehouse/distn -budon centers of fresh food.irems will drain through water quality inlets (see SPI), or to 'an eugineered infiltration system, or an equally effective alteanative. S14. Inlet Trash Racks - -Where appropriate to reduce intake and transport through the storm drain system of large floatable debris, trash racks shall be provided where drainage from open areas enters storm drains (Caltrans Standard Plan D96 and D98-C, or equivalent). _,Special Structural SMPs SPI. Water Quality Inlets - Water Quality Inlets designed to remove free phase liquid petroleum compounds, grease, floatable debris and settleable solids can be used in the following applidations: No-s, S7, S8; and S13. S.O EDUCATIONAL PROGRAM'FOR DEVELOPERS AND CONTRACTORS f The following defines the. required educational program'for developers and contractors in response j . to the Riverside County DAMP(S): This DAMP Supplement "A" with its attachments will contain the legal, administrative, and technical information needed to acquaint developers and contrcors with the NPDES prograill. Riverside County developers and contractors have been implementing erosioiz control plans for many years and are familiar with that portion of the program: New requirements resulting from • the NPDES Permit and tho DAMP are contained herein. D RUG 1C edWJ 11:08 FR PSOMAS 714 545 8883 TO WEST LA OFFICE P.15 r 04 It is, Therefore; recommended that the Building Indtttly A.ssociatiou and the Associated General. Contractors be asked to use their newsl -ttters to alert their members of the information coniained M this Supplement The Supplement text wui be made available`by the County and Cities as part of the development review process. I - CIP 10 G on fill Con a-Ma1 mhos ping of Loading N&B _ doyen Ttalning • Malnlnnanca TAOILE 1 APPROPRIATE NO0 STRUCTURAL BMPs Q es en a OWN a e 8111office se uaran s Fuel 1315pambf --wh WeRepa r x Center Werohouse(Qroce Maintenance X X X o 3 N2 ! X x U, JN4 X X X K X X X X NB X X X Ne x X X m w N10 X X X a N {! X X X rr N12 1 1 X I I X D N13 X X X K x o N14 I - I X _ X X T rr -� — ""'" OF ""�'� "'� �` tom• . N TABLE z ROUTINE STRPCTURAL. BMPa a T n uslr a sla oe estueran s ue spens ng' e e c Repair 1 73 Center lWarehouaGIGToceiv I Maintenance -o cn 0 ,Qn{rol of Impervious Runoff S1 X X X. X X ID cn ommon Area Elficlen(hrl atlon SZ X X X X X X .ommon Area :unoll•Mlnlmizln Landsca a S3 X' I X X X X X ummlinIt y Car Wash Racks 34 X lsah Water Conlrola For - ood pre arallon Areaa 53 X '89h Container. Dum eter Areas - St3 K X X X . -X MI- Conlalned Ateas forWashingl team Cleantn lRe airiMatL Procesaln '(84 1. X X A cn uldoor Store e ' So ! X [o w Dior Fuel Concrete 01gansing Area 39 ' X W otor Fuel Disponaing Area Canopy (51oj M -ret Dlsel ators S11 X X X m itch pnsln Stenciling S1� X X X. . _ r vorslon of Loading Dock DrAlns s -(313 X T 01 Trash Racks S14 X X X m OM'. Special siructural BMPs such as water quality Inlets may be rgquired.for Individual prd .)acts, such as equipment aetvage yards, that may have unique storm welet . runoff Issues. Please refer to the Suppitment text for additional Informallon. Hula l c efoui a i i : wu F K HSOMHS 714 545 8883 TO WEST LA OFFICE P.18 SANTA ANA WATERSHED NPDES PERMITTEES City of Beaumont • City -of Cadmesa City of Canyon *L'akes - City of Corona City ofHemet• City of Lake Elsinore . Ciry of Moreno Valle Y . City ofwor;& City of Perils - City of Riverside County of, Fjwc side. , < •City of San Jacinto � f . Riverside County Flood Control and Water Conservation District's SANTA MARGARITA WATERSHED NPDES PEF* M1TTEES Ciry ofMuirieta C of'emeeula -- County ofRiverside r Riverside County Flood Control a-rid Water Conservation District* _ E3NATP�y1aTFRSEiE1� J ES -FERMI - _ - - City of$anning ' Cathedral City Ciry of Coachella l City of Desert Hot Springs Ciry of Indian Wells Ciry of Indio Ciry of La Quinta Ciry of Palm. Desert Ciry of Palm Springs 'Ciry ofRancho.N irage Coachella Valley Water District* County of Riverside" Riverside County Flood Control and Water Conservation District* Principal Permittce ** TOTAL PAGE . 1 8 i:V: APPENDIX D Request for Letter of Map Revision (LOMB) • Initial Submittal (May 24, 2004) • Supplemental Submittal 1 (June 9, 2004) • Supplemental Submittal 2 (October 2004) N O. Box 1504 8 -495 CALLE TAMPICO (760).777 -7000 A QUINTA, CALIFORNIA 92253 FAX .(760) 777 -7101 04 of hower Avenue, Suite 600 VA 22304 Manager LOMA Request for the City of La Quinta Base.d..on ,More Accurate • Hydrologic. Data :.. > S - ur review of the effective Flood Insurance Rate Map for the City of La note that a large part of the City is mapped as Zone A and is based ate hydrology and topography. We submit the attached request to 'IRM based on more up to date data. ;ary forms and backup material are attached. Because this submittal i the submission of more accurate data, it is exempt from review fees. tact our-engineers Soorgul.Wardak with Psomas and Associates at 73,::or Doug Hamilton with Exponent at 949 - 341 -6016 with any aestions. Jo sson cs Director /City Engineer 'gul Wardak, Psomas j Hamilton, Exponent )EER\LEI7ERSW40524A.doc �� (0 This package includes: 1. Description of the project site and Methodology 2. Necessary forms and map 3. HEC -RAS generated report for modified flow 4. BBC-RAS generated report to re- produce HEC -2 results 5. Modified Q's for HEC -RAS modeling 6. Catch Basins (C.B.) calculations 7. Previous study HEC -2 run hard copy 8. Previous study Hydrology report hard copy C FEDERAL EMERGENCY MANAGEMENT AGENCY O.M.B No. 3067 -0148 RIVERINE HYDROLOGY & HYDRAULICS FORM Expires September 30,2005 PAPERWORK REDUCTION ACT Public reporting burden for this form is estimated to average 3 hours per response. The burden estimate includes the time for reviewing instructions, searching existing data sources, gathering and maintaining the needed data, and completing, reviewing, and submitting the form. You are not required to respond to this collection of information unless a valid OMB control number appears in the upper right corner of this form. Send comments regarding the accuracy of the burden estimate and any suggestions for reducing this burden to: Information Collections Management, Federal Emergency Management Agency, 500 C Street, SW, Washington DC 20472, Paperwork Reduction Project (3067- 0148). Submission of the form is required to obtain or retain benefits under the National Flood Insurance Program. Please do not send your completed survey to the above address. Flooding Source: Note: Fill out one form for each flooding source studied A. HYDROLOGY 1. Reason for New Hydrologic Analysis (check all that apply) ❑ Not revised (skip to section 2) ❑ No existing analysis ® Improved data ❑ Alternative methodology ❑ Proposed Conditions (CLOMR) ❑ Changed physical condition of watershed 2. Comparison of Representative 1 %- Annual- Chance Discharges Location See Tables 1 and 2 Drainage Area (Sq. Mi.) S. Methodology for New Hydrologic Analysis (check all that apply) FIS (cfs) Revised (cfs) ❑ Statistical Analysis of Gage Records ® Precipitation /Runoff Model [TR -20, HEC-1, HEC -HMS etc.] ❑ Regional Regression Equations ❑ Other (please attach description) Please enclose all relevant models in digital format, maps, computations (including computation of parameters) and documentation to support the new analysis. The document, "Numerical Models Accepted by FEMA for NFIP Usage" lists the models accepted by FEMA. This document can be found at: http:/ Avww.fema.gov /fhm /en_modi.shtm. 4. Review /Approval of Analysis If your community requires a regional, state, or federal agency to review the hydrologic analysis, please attach evidence of approval /review. 5. Impacts of Sediment Transport on Hydrology Was sediment transport considered? ❑ Yes ® No If yes, then fill out Section F (Sediment Transport) of Form 3. If No, then attach your explanation for why sediment transport was not considered. 1. Reach to be Revised Downstream Limit 108 +00 Upstream Limit 234 +50 Hydraulic Method Used B. HYDRAULICS Description Cross Section Water - Surface Elevations (ft.) Effective Proposed /Revised See Table 4 Hydraulic Analysis HEC -RAS [HEC -2 , HEC -RAS, Other (Attach description)] FEMA Form 81 -89A, SEP 02 Riverine Hydrology & Hydraulics Form MT -2 Form 2 Page 1 of 2 B. HYDRAULICS (CONTINU 3. Pre - Submittal Review of Hydraulic Models FEMA has developed two review programs, CHECK -2 and CHECK -RAS, to aid in the review of HEC -2 and HEC -RAS hydraulic models, respectively. These review programs verify that the hydraulic estimates and assumptions in the model data are in accordance with NFIP requirements, and that the data are comparable with the assumptions and limitations of HEC- 2/HEC -RAS. CHECK -2 and CHECK -RAS identify areas of potential error or concern. These tools do not replace engineering judgment. CHECK -2 and CHECK -RAS can be downloaded from http:/ /www.fema.gov /fhm /frm_soft.shtm. We recommend that you review your HEC -2 and HEC -RAS models with CHECK -2 and CHECK -RAS. If you disagree with a message, please attach an explanation of why the message is not valid in this case. Review of your submittal and resolution of valid modeling discrepancies will result in reduced review time. HEC- 2/HEC -RAS models reviewed with CHECK- 2/CHECK -RAS? ® Yes ® No 4. Models Submitted Duplicate Effective Model* Natural File Name: fo2 -got Floodway File Name: N/A Corrected Effective Model* Natural File Name: Floodway File Name: Existing or Pre - Project Conditions Model Natural File Name: fo3- got Floodway File Name: Revised or Post - Project Conditions Model Natural File Name: Floodway File Name: Other - (attach description) Natural File Name: Floodway File Name: *Not required for revisions to approximate 1 %- annual- chance floodplains (Zone A) — for details, refer to the corresponding section of the instructions. The document "Numerical Models Accepted by FEMA for NFIP Usage" lists the models accepted by FEMA. This document can be found at: http: / /www.fema.gov /fhm /en_modl.shtm. C. MAPPING REQUIREMENTS A certified topographic map must be submitted showing the following information (where applicable): the boundaries of the effective, existing, and proposed conditions 1 %- annual- chance floodplain (for approximate Zone A revisions) or the boundaries of the 1 %- and 0.2 %- annual- chance floodplains and regulatory floodway (for detailed Zone AE, A0, and AH revisions); location and alignment of all cross sections with stationing control indicated; stream, road, and other alignments (e.g., dams, levees, etc.); current community easements and boundaries; boundaries of the requester's property; certification of a registered professional engineer registered in the subject State; location and description of reference marks; and the referenced vertical datum (NGVD, NAVD, etc.). Note that the boundaries of the existing or proposed conditions floodplains and regulatory floodway to be shown on the revised FIRM and /or FBFM .rust tie -in with the effective floodplain and regulatory floodway boundaries. Please attach a copy of the effective FIRM and /or FBFM, annotated o show the boundaries of the revised 1%- and 0.2 %- annual- chance floodplains and regulatory floodway that tie -in with the boundaries of the effective 1 %- and 0.2 %- annual- chance floodplain and regulatory floodway at the upstream and downstream limits of the area of revision. D. COMMON REGULATORY REQUIREMENTS 1. For CLOMR requests, do Base Flood Elevations (BFEs) increase? ❑ Yes ® No For CLOMR requests, if either of the following is true, please submit evidence of compliance with Section 65.12 of the NFIP regulations: • The proposed project encroaches upon a regulatory floodway and would result in increases above 0.00 foot. • The proposed project encroaches upon a SFHA with BFEs established and would result in increases above 1.00 foot. 2. Does the request involve the placement or proposed placement of fill? ❑ Yes ® No If Yes, the community must be able to certify that the area to be removed from the special flood hazard area, to include any structures or proposed structures, meets all of the standards of the local floodplain ordinances, and is reasonably safe from flooding in accordance with the NFIP regulations set forth at 44 CFR 60.3(a)(3), 65.5(a)(4), and 65.6(a)(14). Please see the MT -2 instructions for more information. 3. For LOMR requests, is the regulatory floodway being revised? ❑ Yes ®No If Yes, attach evidence of regulatory floodway revision notification. As per Paragraph 65.7(b)(1) of the NFIP Regulations, notification is required for requests involving revisions to the regulatory floodway. (Not required for revisions to approximate 1 %- annual- chance floodplains [studied Zone A designation] unless a regulatory floodway is being added. Elements and examples of regulatory floodway revision notification can be found in the MT -2 Form 2 Instructions.) 4. For LOMR requests, does this request require property owner notification and acceptance of BFE increases? ❑ Yes ® No If Yes, please attach proof of property owner notification and acceptance (if available). Elements of and examples of property owner notification can be found in the MT -2 Form 2 Instructions. FEMA Form 81 -89A, SEP 02 Riverine Hydrology & Hydraulics Form MT -2 Form 2 Page 2 of 2 FEDERAL EMERGENCY MANAGEMENT AGENCY OVERVIEW & CONCURRENCE FORM PAPERWORK BURDEN DISCLOSURE NOTICE O.M.B No. 3067 -0148 Expires September 30, 2005 Public reporting burden for this form is estimated to average 1 hour per response. The burden estimate includes the time for reviewing instructions, searching existing data sources, gathering and maintaining the needed data, and completing, reviewing, and submitting the form. You are not required to respond to this collection of information unless a valid OMB control number appears in the upper right corner of this form. Send comments regarding the accuracy of the burden estimate and any suggestions for reducing this burden to: Information Collections Management, Federal Emergency Management Agency, 500 C Street, SW, Washington DC 20472, Paperwork Reduction Project (3067- 0148). Submission of the form is required to obtain or retain benefits under the National Flood Insurance Program. Please do not send your completed survey to the above address. A. REQUESTED RESPONSE FROM FEMA This request is for a (check one): ❑ CLOMR: A letter from FEMA commenting on whether a proposed project, if built as proposed, would justify a map revision, or proposed hydrology changes (See 44 CFR Ch. 1, Parts 60, 65 & 72). ® LOMR: A letter from FEMA officially revising the current NFIP map to show the changes to floodplains, regulatory Foodway or flood elevations. (See Parts 60 & 65 of the NFIP Regulations.) B. OVERVIEW 1. The NFIP map panel(s) affected for all impacted communities is (are): Community No. Community Name State Map No. Panel No. Effective Date Ex: 480301 City of Katy TX 480301 0005D 02/08/83 480287 Hams County TX 48201C 0220G 09/28/90 0704 City of La Quinta CA 060704 0005B 8 -19 -91 2. Flooding Source: Local Streets 3. Project Name /Identifier: La Quinta 4. FEMA zone designations affected: Ao, X (choices: A, AH, AO, Al -A30, A99, AE, AR, V, V1 -V30, VE, B, C, D, X) 5. Basis for Request and Type of Revision: a. The basis for this revision request is (check all that apply) ® Physical Change ® Improved Methodology /Data ❑ Regulatory Floodway Revision ❑ Other (Attach Description) Note: A photograph and narrative description of the area of concern is not required, but is very helpful during review. b. The area of revision encompasses the following types of flooding and structures (check all that apply) Types of Flooding: ❑ Riverine ❑ Coastal ® Shallow Flooding (e.g., Zones AO and AH) ❑ Alluvial fan ❑ Lakes ❑ Other (Attach Description) Structures: ❑ Channelization ❑ Levee / Floodwal ❑ Bridge /Culvert ❑ Dam ❑ Fill ❑ Other, Attach Description FEMA Form 81 -89, SEP 02 Overview & Concurrence Form MT -2 Form 1 Page 1 of 2 i C C. REVIEW FEE Has the review fee for the appropriate request category been included? ❑ Yes Fee amount: $ ® No, Attach Explanation Please see the FEMA Web site at hftp://www.fema.gov/fhm/frm—fees.shtm for Fee Amounts and Exemptions. D. SIGNATURE All documents submitted in support of this request are correct to the best of my knowledge. I understand that any false statement may be punishable by fine or imprisonment under Title 18 of the United States Code, Section 1001. Name: Company: City of La Quinta Mailing Address: Daytime Telephone No.: Fax No.: E -Mail Address: Signature of Requester (required): Date: As the community official responsible for floodplain management, I hereby acknowledge that we have received and reviewed this Letter of Map Revision (LOMR) or conditional LOMR request. Based upon the community's review, we find the completed or proposed project meets or is designed to meet all of the community floodplain management requirements, including the requirement that no fill be placed in the regulatory floodway, and that all necessary Federal, State, and local permits have been, or in the case of a conditional LOMR, will be obtained. In addition, we have determined that the land and any existing or proposed structures to be removed from the SFHA are or will be reasonably safe from flooding as defined in 44CFR 65.2(c), and that we have available upon request by FEMA, all analyses and documentation used to make this determination. Community Official's Name and Title: Telephone No.: ,,Community Name: City of La Quinta, CA Community Official's Signature (required): Date: CERTIFICATION BY REGISTERED PROFESSIONAL ENGINEER AND /OR LAND SURVEYOR This certification is to be signed and sealed by a licensed land surveyor, registered professional engineer, or architect authorized by law to certify elevation information. All documents submitted in support of this request are correct to the best of my knowledge. I understand that any false statement may be punishable by fine or imprisonment under Title 18 of the United States Code, Section 1001. Certifier's Name: Soorgul Wardak License No.: C52913 Expiration Date: 12-31-2006 Company Name: Psomas and Associates Telephone No.: (714) 751 -7373 Fax No.: (714)- 545 -8883 Signature: ��' r` Date: 5 -13 -04 Ensure the forms that are appropriate to your revision request are included in your submittal. Form Name and (Number) Required if ... ® Riverine Hydrology and Hydraulics Form (Form 2) New or revised discharges or water - surface elevations ❑ Riverine Structures Form (Form 3) Channel is modified, addition /revision of bridge /culverts, addition /revision of levee /floodwall, addition /revision of dam Coastal Analysis Form (Form 4) New or revised coastal elevations ❑ Coastal Structures Form (Form 5) Addition /revision of coastal structure Seal (Optional) ❑ Alluvial Fan Flooding Form (Form 6) Flood control measures on alluvial fans FEMA Form 81 -89, SEP 02 Overview & Concurrence Form MT -2 Form 1 Page 2 of 2 C* 2004 FIood Plain Analysis within the City Of La Quinta In 1990 a flood plain analysis was performed for the City of La Quinta, California. Subsequently, the FIRM was revised in 1991. Most of the downtown area was in the flood plain designated AO. Since, 1991, the City has constructed a number of storm drains that intercept a major portion of the storm water that contributed to the AO designation. One objective was to minimize the flooding in the area located south of La Quinta Evacuation Channel and between Eisenhower and Rondo Street. For this purpose, the City of La Quinta constructed on -site retention basins to prevent the runoff from off -site areas, such as Q1 through Q9 from flowing into this area (See Figure 1). In addition to this, the city constructed storm drains along Madrid; Coloma, Nagolas, Sonora and Sinaloa Streets,to divert the runoff into these proposed retention basins or divert the runoff through storm drain into La Quinta Evacuation Channel. The City has conducted an analysis of the flood plain with the objective of determining the benefits of the storm drain construction. Methodology To examine the benefits of the storm drain construction, the 1990 BEC -2 model was • cl reconstructed and calibrated to reproduce the same results for the 1990 model (see Table 3). The 2004 reconstructed BEC -RAS model used the same cross sections as the 1990 model. Then, the BEC -RAS model was run with reduced flows resulting from the storm drains diversion. The flow parameters were then calculated. The upstream flows from the Cove area are diverted by storm drains, in the streets mentioned earlier, to detention basins on the east side of Aveneda Bermudas (the basins are incorporated into the Tradition Golf Course). The water from the basins is then discharged to the La Quinta Evacuation Channel and does not re -enter the study area. The diversion of runoff from the off -site areas (i.e. Q1 through Q9) and the diversion of runoff through the storm drains resulted in reduced Q's for water surface profile analysis. The modified discharges used in the BBC -RAS analysis are shown in Table 2. ( see also Table 1) Results The calculated flow for the study area resulted in lower water surface elevation overall. The water depths generally less than one foot. The maximum depth of 14.3 inches is at the intersection of Avenue 52 and Rondo Street (i.d. Station 148 +50; see Table 4 for depths of flow). As shown in the revised flood plain map, the area downstream of Station 148 +50 is designated as AO zone, and upstream area south of La Quinta Evacuation Channel and between Rondo and Eisenhower Street is designated as X zone. Ce n Recommendation It is recommended that a Letter of Map Amendment (LOMA) be issued to the City of La Quinta. The LOMA should designate the area shown in Plate 1 as Flood Plain designation X. nz3 COZ dob ' tto�r ... ' \, - • •� -•--- • a £ISENNOWCR 111 ✓� / B • ` A3 �.h •� I / ��� j — AT - . fir �_ �- ,��� � � � •• -:r� - ,� -- � • .�, � � �' � 8�s� - .-� - L ,i ice, _ _.0 ,—• � r '9 �� .C��' c'. NI •_tea -__ . .. � T , %� - + .� off � ( '• - ib luo .......... 4 -r:. :e a �•• a,:o� � y '`� I / •� IZ f .1 Aq d0. 7 'A` zi 11 C-O Table 1 ADJUSTED PEAK DISCHARGES THAT WERE NOT USED IN HEC -RAS ANALYSIS The on -site area between C5 and C6 is (sq.mi) 0.2 The on -site area between C6 and C7 is sq.mi) 0.2 The on -site area between C7 and C8 is ( sq.mi ) 0.2 Concentration drainage area Adjusted Runoff unit discharge q Peak Q Adjusted Q for point sq.mi) drainage area ( inch) q (cfs /sq.mi /in) cfs Area ( cfs) s .mi Previous stud C1 0.46 0.46 2.9 468 624 624 C2 0.49 0.49 2.9 441 627 627 C3 0.56 0.56 2.9 434 705 705 C4 0.72 0.72 2.9 403 841 841 C5 0.82 0.82 2.9 369 877 877 C6 * * 1.51 1.02 2.9 295 1,292 873 C7 1.91 1.22 2.9 253 1,401 895 C8 2.17 1.42 2.9 -226 1,422 931 C9 ** 2.23 1.48 2.9 214 1,384 931 C10 ** 2.27 1.52 2.9 201 1,323 931 C11 2.77 2.02 2.9 193 1,550 1131 Note: Ina previous study, the discharge used in HEC -2 at section located near C9 and C10, was taken 1,422 cfs In the present study, the discharge used in HEC -RAS at section located near C11 was taken 1,131 cfs * 'For consistency, the D/S discharges should be equal or greater than the immediate U/S discharge. The discharge used in HEC -RAS is 877 cfs instead of 873 cfs • 00, • C.. Table 2 ADJUSTED PEAK DISCHARGES USED IN HEC -RAS ANALYSIS WHICH WERE MODIFIED FOR SD FLOW Total flow diverted from the SD system at Madrid Street is cfs 210 Total flow diverted from the SD system at Colima Street is cfs 291 Total flow diverted from the SD system at Nagoles Street is cfs 210 Total flow diverted from the SD system at Sonora Street is cfs 216 Total 927 Total flow diverted from the SD s stem at Sinaloa Street is 56 Station Number Computed Qs The Q's used HEC -RAS Model (1) in HEC -RAS Model cfs 234 +50 106.2 105 227 +00 109.2 110 220+00 142 140 209 +50 267 270 196 +50 303 300 181 +20 [2] 303 300 168 +50 303 300 148 +50 321 320 145 +20 321 320 138 +80 321 320 134 +80 357 360 121 +70 357 360 108 +00 557 560 1 The Q's computed and used in HEC -RAS are equal to 's from the last column of Table 1, minus 's diverted through storm drain system from Madrid Street SD , through Sinaloa Street SD downstream. [2] For consistency, the D/S discharges should be equal or greater than the immediate U/S discharge. • Ta� • COMPARISON BETWEEN WATER SURFACE ELEVATION COMPUTED BY HEC -RAS AND HEC -2 Reach River Sta IQ Total IMin Ch E! JW.S. Elev I Crit W.S. JE.G. Elev JE. G. Sloe Vel Chnl Flow Area ITop Width IFroude#Chl JWSHEC-2[111 Difference cfs ft (ft) ft (ft) (ft/ft ) I (ft/s) (sq ft ft (ft) (ft) Reach 1 234.5 624 69.3 69.94 69.94 70.12 0.006746 3.36 185.64 531.76 1 69.94 0.0 Reach 1 227 627 58.2 59.06 59.06 59.3 0.006367 3.91 160.26 350 1.02 59.06 0.0 Reach 1 220 705 50.2 51.49 51.47 51.72 0.004716 3.95 189.12 383.12 0.91 51.48 0.0 Reach 1 209.5 841 45 45.79 45.79 46.03 0.006122 3.97 211.63 438.51 1.01 45.68 -0.1 Reach 1 196.5 877 40 41.09 41.14 0.001411 1.66 526.83 818.31 0.37 40.98 -0.1 Reach 1 181.2 1294 39.1 40.36 40.37 0.000303 0.69 1872.95 2073.56 0.13 40.29 -0.1 Reach 1 168.5 1401 38.1 39.7 39.72 0.000964 1.16 1211.67 1475.41 0.22 39.63 -0.1 Reach 1 148.5 1420 35 36.86 36.28 36.93 0.002163 2.08 683.71 633.79 0.35 36.82 0.0 Reach 1 145.2 1420 34.6 35.78 35.53 35.87 0.006566 2.42 586.77 994.55 0.56 35.68 -0.1 Reach 1 138.8 1420 32 32.87 32.93 0.003365 1.92 738.94 1071.94 0.41 32.83 0.0 Reach 1 134.8 1420 30.6 31.7 31.28 31.75 0.002614 1.84 772.45 991.12 0.37 31.57 -0.1 Reach 1 121.7 1420 28 29.47 28.75 29.51 0.001197 1.6 888.56 782.79 0.26 29.47 0.0 Reach 1 108 1554 24.5 25.4 25.28 25.53 0.01175 2.85 545.5 1120 0.72 25.4 0.0 [1 ] Water surface elevation from previous HEC -2 run for FIRM preparation ( FIRM date August 19, 1991) • Taf 0 SHALLOW FLOODING DEPTHS AT DIFFERENT STATIONS AFTER THE DISCHARGES WERE MODIFIED FOR HEC -RAS RUNS Reach River Sta Q Total Min Ch El W.S. Elev I Crit W.S..j E.G. Elev I E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl Difference ( inches) cfs ft ft ft ft ft/ft ) (ft/s) (s .ft ft WS -Min. Chl El Reach 1 234.5 105 69.3 69.59 69.59. 69.68 0.00846 2.34 44.93 263.11 1 3.5 Reach 1 227 110 58.2 58.64 58.64 58.74 0.007775 2.64 41.69 190.99 1 5.3 Reach 1 220 140 50.2 51.1 50.94 51.18 0.003338 2.25 62.1 191.1 0.7 10.8 Reach 1 209.5 270 45 45.43 45.43 45.58 0.007107 3.15 85.78 282.03 1.01 5.2 Reach 1 196.5 300 40 40.7 40.72 0.001343 1.22 245.98 586.92 033 8.4 Reach 1 181.2 300 39.1 39.72 39.72 01000382 0.46 658.67 1618.95 0.13 7.4 Reach 1 168.5 300 38.1 38.99 38.58 39 0.000977 0.77 388.33 874.33 0.2 10.7 Reach 1 148.5 320 35 36.19 35.75 36.21 1 0.002069 1.16 275.46 590.25 03 14.3 Reach 1 145.2 320 34.6 35.34 35.11 35.37 0.003977 1.38 231.62 624.86 0.4 8.9 Reach 1 138.8 320 32 32.37 32.23 32.4 0.005474 1.37 234.28 817.02 0.45 4.4 Reach 1 134.8 360 30.6 31.26 31.28 0.001759 0.99 365.45 888.14 0.27 7.9 Reach 9 121.7 360 28 28.67 28.39 28.69 0.002225 1.2 300.05 647.02 0.31 8.0 Reach 1 108 560 24.5 25.32 25.03 25.34 0.002602 1:23 453.57 1053.74 0.33 9.8 CATCH BASINS FLOW CAPACITY LOCATED ALONG DIFFERENT STREETS � lo L� Flow analysis of catch basins (C.B.) that discharge runoff into storm drain located • along Nagoles Street. Total number of C.B. with length 16 feet is 18 Total number of C.B. with length 18 feet is 10 Total number of C.B. with length 24 feet is 2 Total number of C.B. with length 9 feet is 1 Q/L =0.4 where L is the length of C.B. Qt= 525 * 0.4 = 210 cfs The effective diverted flow is about 60 % of the total flow CID �r Flow analysis of catch basins (C.B.) that discharge runoff into storm drain located along Sonora Street. Total number of C.B. with length 18 feet is 6 Total number of C.B. with length 10 feet is 6 Total number of C.B. with length 21 feet is 10 Total number of C.B. with length 8 feet is 3 Total number of C.B. with length 12 feet is 5 Total number of C.B. with length 14 feet is 2 Total number of C.B. with length 25 feet is 2 00- Q/L =0.4 where L is the length of C.B. Qt = 540 * 0.4 = 216 cfs The effective diverted flow is about 80 % of the total flow r• Flow analysis of catch basins (C.B.) that discharge runoff into storm drain located l along Sonora Street. Total number of C.B. with length 18 feet is 6 Total number of C.B. with length 10 feet is 6 Total number of C.B. with length 21 feet is 10 Total number of C.B. with length 8 feet is 3 Total number of C.B. with length 12 feet is 5 Total number of C.B. with length 14 feet is 2 Total number of C.B. with length 25 feet is 2 CO- Q/L =0.4 where L is the length of C.B. Qt = 540 * 0.4 = 216 cfs The effective diverted flow is about 80 % of the total flow .r (0 � - r1 Flow analysis of catch basins (C.B.) that discharge runoff into storm drain located along Sinaloa Street. Total number of C.B. with length 7 feet is 7 Total number of C.B. with length 14 feet is 5 Total number of C.B. with length 12 feet is 1 Total number of C.B. with length 10 feet is 1 Q/L =0.4 where L is the length of C.B. Qt= 141 *0.4 =56cfs The effective diverted flow is about 100 % of the total flow :f s (• Flow analysis of catch basins (C.B.) that discharge runoff into storm drain located along Sinaloa Street. Total number of C.B. with length 7 feet is 7 Total number of C.B. with length 14 feet is 5 Total number of C.B. with length 12 feet is 1 Total number of C.B. with length 10 feet is 1 Q/L =0.4 where L is the length of C.B. Qt= 141 *0.4 =56cfs �• The effective diverted flow is about 100 % of the total flow, r 1 :.... "...." .....:...... _ .......... . ..... :... :.......... ,............. ,........... •---- .. .......... . .......... f........... ... .... ". . � "" (A) DISCHARGE ......1........- p..... -. 1......5......}..... >...i .. -... ... .........._. -. - .. : PER FOOT OF I( - . ..LENGTH OF CURB OPENING. .. ... < .. .. -.` '..... 0.5 INLETS WHEN INTERCEPTING 100% OF GUTTER FLOW a= .Q /L i. 0.1 ..... .......... . ...... ..... . ........ .,.... ". - - 0.05 :.. ,. . ... :. . ...... .... .. j I 0 0.01 0.01 0.05 0.1 0.5 ( 1 DEPTH OF FLOW — y — FEET (B) PARTIAL INTER- 0.5 ; CEPTION RATIO a /yam, FOR INLETS OF QP LENGTH LESS �Q THAN L o .... 0.1 0.05 0.1 LP 0.5 1 CAPACITY OF INLETS FIGURE 5-10 5 -39 ��• HEGRAS GENERATED REPORT (FOR FLOOD PLAIN MAP] [BETWEEN RODON] AND [EISENHOWER STREET] HEC -RAS Version 3.0.1 Mar 2001 U.S. Army Corp of Engineers Hydrologic Engineering Center 609 Second Street, Suite D Davis, California 95616 -4687 (916) 756 -1104 X X XXXXXX XXXX XXXX XX XXXX X X X X X" X X X X X X X X X X' X X X X XXXXXXX XXXX X XXX XXXX XXXXXX XXXX X X X X X X X X X X X X X X X X X X X X X XXXXXX XXXX X X X X XXXXX Hec -Ras Output for,Modified Discharges PROJECT DATA Project Title: Flood plain analy for the City La Quinta Project File : LaQuinta.prj Run Date and Time: 5 /12/2004 11:48:02 AM Project in English units PLAN DATA Plan Title: plan for modified flow due to SD Plan File : m: \1LAQ010100 \engr \design \hydr \LaQuinta.p02 Geometry Title: Geom. data taken from HEC -2 hard copy Geometry File m: \1LAQ010100 \engr \design \hydr \LaQuinta.901 Flow Title Flow data was modified for SD extraction Flow File m: \1LAQ010100 \engr \design \hydr \LaQuinta.f02 Plan Summary Information: Number of: Cross Sections = 13 Mulitple Openings = 0 Culverts = 0 Inline Weirs = 0 Bridges = 0 Computational Information Water surface calculation tolerance = 0.01 Critical depth calculaton tolerance = 0.01 Maximum number of'interations = 20 Maximum difference tolerance = 0.3 Flow tolerance factor = 0.001 Computation Options Critical depth computed only where necessary Conveyance Calculation Method: At breaks in n values only Friction Slope Method: Average Conveyance Computational Flow Regime: Subcritical Flow FLOW DATA Flow Title: Flow data was modified for SD extraction Flow File : m: \lLAQ010100 \ehgr \design \hydr \LaQuinta.f02 Flow Data (cfs) River Reach RS PF 1 Major Flow PathsReach 1 234.5 105 Major Flow PathsReach 1 227 110 Major Flow PathsReach 1 220 140 Major Flow PathsReach 1 209.5 270 Major Flow PathsReach 1 196.5 300 Major Flow PathsReach 1 181.2 300 Major Flow PathsReach 1 168.50 300 Major Flow PathsReach 1 148.5 320 Major Flow PathsReach 1 145.2 320 Major Flow PathsReach 1 138.8 320 Major Flow PathsReach 1 134.8 360 Major Flow PathsReach 1 121.70 360 Major Flow PathsReach 1 108.00 560 Boundary Conditions River Reach Profile Upstream Major Flow PathsReach 1 PF 1 GEOMETRY DATA Geometry Title: Geom. data taken from HEC -2 hard copy Geometry File m: \1LAQ010100 \engr \design \hydr \LaQuinta.g01 CROSS SECTION RIVER: Major Flow Paths REACH: Reach 1 RS: 234.5 INPUT Description: Station Elevation Data hum= 6 Downstream Normal S = .0026 Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev 0 70 75 69.3 210 69.4 345 69.9 450 69.5 550 70 Manning's n Values num= 3 Sta n Val Sta n Val Sta n Val 0. .018 0 .018 550 .018 Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan. 0 550 ..750 750 750 .3 .4 CROSS SECTION RIVER: Major Flow Paths REACH: Reach 1 RS: 227 INPUT Description: Station Elevation Data num= 3 Sta Elev Sta Elev Sta Elev 0 59 140 58.2 350 59 Manning's n Values num= 3 Sta n Val Sta n Val Sta n Val 0 .018 0 .018 350 .018 Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan. 0 350 700 700 700 .3 .4 CROSS SECTION RIVER: Major Flow Paths REACH: Reach 1 RS: 220 INPUT Description: Station Elevation Data num= 6 Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev 0 51.3 100 51.2 235 51 300 50.2 390 51.6 540 51.9 Manning's n Values num= 3 Sta n Val Sta n Val Sta n Val 0 .018 100 .018 390 .018 Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr.. Expan. 100 390 1050 1050 1050 .3 .4 CROSS SECTION RIVER: Major Flow Paths REACH: Reach 1 RS: 209.5 INPUT Description: Station Elevation Data num= 6 Sta Elev - Sta Elev Sta Elev Sta Elev Sta Elev 0. 50 50 46.7 220 45.1 385 45 500 45.6 725 46.1 Manning's n Values num= 3 Sta n' Val Sta n Val Sta n Val 0 .018 50 .018 725 .018 Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.. 50 725 1300 1300 1300 .3 .4 CROSS SECTION RIVER: Major Flow Paths REACH: Reach 1 RS: 196.5 INPUT Description: Station Elevation Data num= 10 Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev 0 45.9 150 40 290 43.9 390 40 600 40 850 43.2 1000 41 1230 40.3 1330 40.5 1870 44 Manning's n Values num= 3 Sta n Val Sta n Val Sta n Val 0 .025 0 025 1870 .025 Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan. 0 1870 1530 1530 1530 .3 .4 CROSS SECTION RIVER: Major Flow Paths REACH: Reach 1 RS: 181.2 INPUT Description: Station Elevation Data num= 7 Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev 0 43 20 40 470 39.2 1110 39.3 1400 39.1 1700 39.5 2110 40.4 Manning's n Values num= 3 Sta n Val Sta n Val Sta n Val 0 .035 20 .035 2110 .035 Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan. 20 2110 1250 1250 1250 .3 .4 CROSS SECTION RIVER: Major Flow Paths REACH: Reach 1 RS: 168.50 INPUT Description: Station Elevation Data num= 7 Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev 0 45 240 40 670 39.3 1120 38.1 1400 38.6 1600 38.8 2100 40.3 ' Manning Is n Values num= 3 Sta n Val Sta n Val Sta n Val 0 .035 240 .035 2100 .035 Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan. 240 2100 2000 2000 2000 .3 .4 CROSS SECTION RIVER: Major Flow Paths REACH: Reach 1 RS: 148.5 INPUT Description: Station Elevation Data num= 7. Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev 0 40 1100 39 2400 38.6 2500 35 2800 36, 3050 36 3200 40 Manning's n Values num= 3 Sta n Val Sta n Val Sta n Val 0 .035 1100 .035 3200 .035 Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan. 1100" 3200 300 300 300 .3 .4 CROSS SECTION RIVER: Major Flow Paths REACH: Reach 1 RS: 145.2 INPUT Description: Station Elevation Data num= 4 Sta Elev. Sta Elev, Sta Elev Sta Elev 1600 36 1850 34.6 2780 36 3000. 38 Manning's n Values num= 3 Sta n Val Sta n Val Sta n Val 1600 .035 1600 .035 2780 .035 Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan. 1600 2780 640. 640 640 .3 .4 CROSS SECTION RIVER: Major Flow Paths REACH: Reach 1 RS: 138.8 INPUT Description: Station Elevation Data num= 5 Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev 0 35 210 32.6 800 32 1250 32 1270 34.2 Manning's n Values num= 3 Sta n Val Sta n Val Sta n Val 0 .035 0 .035 1270 .035 Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan. 0 1270 400 400 400 .3 .4 CROSS SECTION RIVER: Major Flow Paths REACH: Reach 1 RS: 134.8 INPUT Description: Station Elevation Data num= 5 Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev 2350 32.23 2650 30.7 3100 31 3400 30.6 3500 33 Manning's n Values num= 3 Sta n Val Sta n.Val Sta n Val 2350 .035 2350 .035 3500 .035 Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan. 2350 3500 1310 1310 1310 .1 .3 CROSS SECTION RIVER: Major Flow Paths REACH: Reach 1 RS: 121.70 INPUT Description: Station Elevation Data num= 6 Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev 950 31.9 1000 28.3 1450 28 1650 28.7 1700 28.7 1900 31 Manning's n Values num= 3 Sta n Val Sta n Val Sta n Val 950 .035 950 .035 1900 .035 Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan. 950 1900 1370 1370 1370 .3 .4 CROSS SECTION RIVER: Major Flow Paths REACH: Reach 1 RS: 108.00 INPUT Description: The most D/S Section Station Elevation Data num= 6 Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev 250 28 290 26.5 1070 25.8 1400 25.2 2200 24.5 2550 26 Manning's n Values num= 3 Sta n Val Sta n Val Sta n Val 250 .035 250 .035 2550 .035 ' • .I F Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan. 250 2550 0 0 0 .3 .4 SUMMARY OF MANNING'S N VALUES River:Major Flow Paths Reach River Sta Reach 1 234.5 Reach 1 227 Reach 1 220 Reach 1 209.5 Reach 1 196.5 Reach 1 181.2 Reach 1 168.50 Reach 1 148.5 Reach 1 .145.2 Reach 1 138.8 Reach 1 134.8 Reach 1 121.70 Reach 1 108.00 SUMMARY OF REACH LENGTHS River: Major Flow Paths Reach River Sta Reach 1 234.5 Reach 1 227 Reach 1 220 Reach 1 209.5 Reach 1 196.5 Reach 1 181.2 Reach 1 168.50 Reach 1 148.5 Reach 1 145.2. Reach 1 138.8 Reach 1 134.8 Reach 1 121.70 Reach 1 108.00 nl n2 n3 .018 .018 .018 .018 .018 .018 .018 .018 .018 .018 018 .018 .025 .025 .025 .035 .035 .035 .035 .035 .035 .035 .035 .035 .035 .035 .035 .035 .035 .035 .035 .035 .035 .035 .035 .035 .035 .035 .035 Left Channel Right 750 750 750 700 700 700 1050 1050 1050 1300 1300 1300 1530 1530 1530 1250 1250 1250 2000 2000 2000 300 300 300 640 640 640 400 400 400 1310 1310 1310 1370 1370 1370 0 0 0 SUMMARY OF CONTRACTION AND EXPANSION COEFFICIENTS • River: Major Flow Paths Reach River Sta. Contr. Expan. Reach 1 '234.5 .3 .4 Reach 1 227 .3 .4 Reach 1 220 .3 .4 Reach 1 209.5 .3 .4 Reach 1 196.5 .3 .4 Reach 1 181.2 .3 .4 Reach 1 168.50 .3 .4 Reach 1 148.5 .3 .4 Reach 1 145.2 .3 .4 Reach 1 138.8 .3 .4 Reach 1 134.8 .1 .3 Reach 1 121.70 .3 .4 Reach 1 108.00 .3 .4 Profile Output Table - Standard Table 1 Reach River Sta Q Total Min Ch E1 W. S. Elev Crit W. S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft /ft) (ft /s) (sq ft) (ft) Reach 1 234.5 105.00 69.30 69.59 69.59 69.68 0.008460 2.34 44.93 263.11 1.00 Reach 1 227 110.00 58.20 58.64 58.64 58.74 0.007775 2.64 41.69 190.99 1.00 Reach 1 220 140.00 50.20 51.10 50.94 51.18 0.003338 2.25 62.10 191.10 0.70 Reach 1 209.5 270..00 45.00 45.43 45.43 45.58 0.007107 3.15 85.78 282.03 1.01 Reach 1 196.5 300.00 40.00 40.70 40.72 0.001343 1.22 245.98 586.92 0.33 Reach 1 181.2 300.00 39.10 39.72 39.72 0.000382 0.46 658.67 1618.95 0.13 Reach 1 168.50 300.00 38.10 38.99 38.58 39.00 0.000977 0.77 388.33 874.33 0.20 Reach 1 148.5 320.00 35.00 36.19 35.75 36.21 0.002069 1.16 275.46 590.25 0.30 Reach 1 145.2 320.00 34.60 35.34 35.11 35.37 0.003977 1.38 231.62 624.86 0.40 Reach 1 138.8 320.00 32.00 32.37 32.23 32.40 0.005474 1.37 234.28 817.02 0.45 Reach 1 134.8 360.00 30.60 31.26 31.28 0.001759 0.99 365.45 888.14 0.27 Reach 1 121.70 360.00 28.00 28.67 28.39 28.69 0.002225 1.20 300.05 647.02 0.31 Reach 1 108.00 560.00 24.50 25.32 25.03 25.34 0.002602 1.23 453.57 1053.74 0.33 0 • Profile Output Table - Standard Table 2 Reach River Sta E.G. Elev W.S. Elev (ft) (ft) (ft) (ft) Reach 1 234.5 69.68 69.59 Reach 1 227 58.74 58.64 Reach 1 220 51.18 51.10 Reach 1 209.5 45.58 45.43 Reach 1 196.5 40.72 40.70 Reach 1 181.2 39.72 39.72 Reach 1 168.50 39.00 38.99 Reach 1 148.5 36.21 36.19 Reach 1 145.2 35.37 35.34 Reach 1 138.8 32.40 32.37 Reach 1 134.8 31.28 31.26 Reach 1 121.70 28.69 28.67 Reach 1 108.00 .25.34 25.32 Vel Head Frctn Loss C & E Loss (ft) (ft) (ft) 0.08 6.07 0.01 0.11 3.25 0.01 0.08 5.58 0.02 0.15 3.26 0.05 0.02 0.99 0.01 0.00 0.72 0.00 0.01 2.78 0.00 0.02 0.84 0.00 0.03 2.97 0.00 0.03 1.11 0.01 0.02 2.58 0.00 0.02 3.35 0.00 0.02 Q Left Q Channel (cfs) (cfs) 105.00 110.00 140.00 270.00 300.00 300.00 300.00 320.00 320.00 320.00 360.00 360.00 560.00 Q Right Top Width (cfs) (ft) 263.11 190.99 191..10 282.03 586.92 1618.95 874.33 590.25 624.86 817.02 888.14 647.02 1053.74 • HEC -RAS GENERATED REPORT [ FOR RE- PRODUCING HEC -2 RESULTS] c.. m HEC -RAS Version 3.0.1 Mar 2001 U.S. Army Corp of Engineers Hydrologic Engineering Center 609 Second Street, Suite D Davis,' California 95616 =4687 (916) 756 -1104 X ^ X xxxxxx xxxx xxxx xx } xxx X X X X X X X X X X X X X X X X X X X XXXXXXX XXXX X XXX XXXX XXXXXX XXXX X X X X X X X X X X X X X X X X X X X X X XXXXXX . X= X X X X XXXXX Output for re- producing HEC -2 water surface elevation PROJECT DATA Project Title: Flood plain analy for the City La Quinta Project File : LaQuinta.prj Run Date and Time: 5/12/2004 5:14:18 PM Project in English units Project Description: .PLAN DATA Plan Title: Plan to re- produce HEC -2 values Plan File m: \lLAQ010100 \engr \design \hydr \LaQuinta.p04 Geometry Title: Geom. data taken from HEC -2 hard copy Geometry File m: \iLAQ010100 \engr \design \hydr \LaQuinta.g01 Flow Title Flow data taken from HEC2 (original) Flow File m: \lLAQ010100 \engr \design \hydr \LaQuinta.f03 Plan Summary Information: Number of: Cross Sections = 13 Mulitple Openings = 0 Culverts = 0 Inline Weirs = 0 Bridges = 0 Computational Information Y Water surface calculation tolerance = 0.01 Critical depth calculaton tolerance = 0.01 Maximum number of interations = 20 Maximum difference tolerance = 0.3 Flow tolerance factor = 0.001 Computation Options Critical depth computed only where necessary Conveyance Calculation Method: At breaks in n values only Friction Slope Method: Average Conveyance Computational Flow Regime: Subcritical Flow FLOW DATA Flow Title: Flow data taken from HEC2 (original) Flow File : m: \1LAQ010100 \engr \design \hydr \LaQuinta.f03 Flow Data (cfs) River Reach RS PF 1 Major Flow PathsReach 1 234.5 624 Major Flow PathsReach 1 227 627 Major Flow PathsReach 1 220 705 Major Flow PathsReach 1 209.5 841 Major Flow PathsReach 1 196.5 877 Major Flow PathsReach 1 181.2 1294 Major Flow PathsReach 1 ..168.50 1401 Major Flow PathsReach 1 148.5 1420 Major Flow PathsReach 1 145.2 1420 Major Flow PathsReach 1 138.8 1420 .Major Flow PathsReach 1 134.8 1420 Major Flow PathsReach 1 121.70 1420 Major Flow PathsReach 1 108.00 1554 Boundary Conditions River Reach Profile Major F1ow,PathsReach 1 PF I GEOMETRY DATA Geometry Title: Geom. data taken from HEC -2 hard copy Geometry File m: \iLAQ010100 \engr \design \hydr \LaQuinta.g01 CROSS SECTION RIVER: Major Flow Paths Upstream Downstream Known WS = 25.4 REACH: Reach 1 RS: 234.5 INPUT Description: Station.Elevation Data num= 6 Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev 0 70 75 69.3 210 69.4 345 69.9 450 69.5 550 70 Manning's n Values num= 3 Sta n Val Sta n Val Sta n Val 0 .018 0 .018 550 .018 Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan. 0 550 750 750 750 .3 .4 CROSS SECTION - RIVER: Major Flow Paths REACH: Reach 1 RS: 227 INPUT Description: Station Elevation Data num= 3 Sta Elev Sta Elev Sta Elev 0 59 140 58.2 350 59 Manning's n Values num= 3 Sta n Val Sta n Val Sta n Val 0 .018 0 .018 350 .018 Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan. 0 350 700 700 700 .3 .4 CROSS SECTION RIVER: Major Flow Paths REACH: Reach 1 RS: 220 INPUT Description: Station Elevation Data num= 6 Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev 0 51.3 100 51.2 235 51 300 50.2 390 51.6 540 51.9 manning Is n Values num= 3 Sta n Val Sta n Val Sta n Val 0 .018 100 .018 390 .018 Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan. 100 390 1050 1050 1050 .3 .4 CROSS SECTION _..RIVER: Major Flow Paths REACH: Reach 1 RS: 209.5 INPUT Description: Station Elevation Data num= 6 Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev 0 50 50 46.7 220 45_.1 385 45 500 45.6 725 46.1 Manning's n Values num= 3 Sta n Val Sta n Val Sta n Val 0 .018 50 .018 725 .018 Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan. 50 725 1300 1300 1300 .3 .4 CROSS SECTION RIVER: Major Flow Paths REACH: Reach 1 RS: 196.5 INPUT Description: Station Elevation Data num= 10 Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev 0 45.9 150 40 290 43.9 390 40 600 40 850 43.2 1000 41 1230 40.3 1330 40.5 1870 44 Manning's n Values num= 3 Sta n Val Sta n Val Sta n Val 0 .025 0 .025 1870 .025 Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan. 0 1870 1530 1530 1530 .3 .4 CROSS SECTION RIVER: Major Flow Paths REACH: Reach 1 RS: 181.2 INPUT Description: - Station Elevation Data num= 7 Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev . 0 . 43 20 40 470 39.2 1110 39.3 .1400 39.1 1700 39.5 2110 40.4 Manning's n Values num= 3 Sta n Val Sta n Val Sta n Val 0 .035 20 .035 2110 .035 Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan. 20 2110 1250 1250 1250 .3 .4 CROSS SECTION RIVER: Major Flow Paths REACH: Reach 1 RS: 168.50 INPUT Description: Station Elevation Data num= 7 Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev 0 45 240 40 670 39.3 1120 38.1 1400 38.6 1600 38.8 2100 40.3 Manning's n Values num= 3 Sta n Val Sta n Val Sta n Val 0 .035 240 .035 2100 .035 Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan. 240 2100 2000 2000 2000 .3 .4 CROSS SECTION RIVER: Major Flow Paths REACH: Reach 1 RS: 148.5 INPUT Description: Station Elevation Data num= 7 Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev 0 40 1100 39 2400 38.6 2500 35 2800 36 3050 36 3200 40 Manning's n Values num= 3 Sta n Val Sta n Val Sta n Val 0 .035 1100 .035 3200 .035 Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan. 1100 3200 300 300 300 .3 .4 CROSS SECTION RIVER: Major Flow Paths REACH: Reach 1 RS: 145.2 INPUT Description: Station Elevation Data num= 4 Sta Elev Sta Elev Sta Elev Sta Elev 1600 36 1850 34.6 2780 36 3000 38 Manning's n Values num= 3 Sta n Val Sta n Val Sta n Val 1600 .035 1600 .035 2780 .035 Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan. 1600 2780 640 640 640 .3 .4 CROSS SECTION RIVER: Major Flow Paths REACH: Reach 1 RS: 138.8 INPUT Description: Station Elevation Data num= 5 CROSS SECTION RIVER: Major Flow Paths REACH: Reach 1 RS: 108.00 INPUT Description: The most D/S Section Station Elevation Data num= 6 Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev 250 28 290 26.5 1070 25.8 1400 25.2 2200 24.5 2550 26 Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev 0 35 210 32.6 800 32 1250 32 1270 34.2 Manning's n Values num= 3 .Sta n Val Sta n Val Sta n Val 0 .035 0 .035 1270 .035 Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan. 0 1270 400 400 400 .3 .4 CROSS SECTION RIVER: Major Flow Paths REACH: Reach 1 RS: 134.8 'INPUT Description: Station Elevation Data num= 5 Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev 2350 32.23 2650 30.7 3100 31 3400 30.6 3500 33 Manning's n Values num= 3 Sta n Val Sta n Val Sta n Val 2350 .035 2350 .035 3500 .035 Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan. 2350 3500 1310 1310 1310 .1 3 CROSS SECTION RIVER: Major Flow Paths REACH: Reach 1 RS: 121.70 INPUT Description: Station Elevation Data num= 6 Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev 950 31.9 1000 28.3 1450 28 1650 28.7 1700 28.7 1900 31 Manning's n Values num= 3 Sta n Val Sta n Val Sta n Val 950 .035 950 .035 1900 .035 Bank Sta: Left Right Lengths: Left Channel Right. Coeff Contr. Expan. 950 1900 1370 1370 1370 .3 .4 CROSS SECTION RIVER: Major Flow Paths REACH: Reach 1 RS: 108.00 INPUT Description: The most D/S Section Station Elevation Data num= 6 Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev 250 28 290 26.5 1070 25.8 1400 25.2 2200 24.5 2550 26 SUMMARY OF REACH LENGTHS River: Major Flow Paths Reach River Sta. Left Manning's n Values num= 3 Reach 1 234.5 750 Sta n Val Sta n Val Sta n Val 227 700 700 250 .035 250 .035 2550 .035 1050 1050 1050 Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan. 250 2550 0 0 0 1530 .3 .4 SUMMARY OF MANNING'S N VALUES 181.2 1250 1250 1250 Reach River:Major Flow Paths 2000 2000 2000 Reach 1 Reach River Sta. nl 300 n2 n3 145.2 Reach 1 234.5 640 .018 .018 .018 400 Reach 1 227 Reach .018 .018 .018 1310 Reach 1 220 1 .018 .018 .018 1370 = Reach 1' 209.5 108.00 .018 .018 .018 Reach 1 196.5 .025 .025 .025 Reach 1 181.2 .035 .035 .035 Reach 1 168.50 .035 .035 .035 Reach 1 148.5 .035 .035 .035 Reach 1 145.2 .035 .035 ..035 Reach 1 138.8 .035 .035 .035 Reach 1 134.8 .035 .035 .035 _ Reach 1 121.70 .035 .035 .035 Reach 1 108.00 .035 .035 .035 SUMMARY OF REACH LENGTHS River: Major Flow Paths Reach River Sta. Left Channel Right Reach 1 234.5 750 750 750 Reach 1 227 700 700 700 Reach 1 220 1050 1050 1050 Reach 1 209.5 1300 1300 1300 Reach 1 196.5 1530 1530 1530 Reach 1 181.2 1250 1250 1250 Reach 1 168.50 2000 2000 2000 Reach 1 148.5 300 300 300 Reach 1 145.2 640 640 640 Reach 1 138.8 400 400 400 Reach 1 134.8 1310 1310 1310 'Reach 1 121.70 1370 1370 1370 = Reach 1 108.00 0 0 0 SUMMARY OF CONTRACTION AND EXPANSION COEFFICIENTS River: Major Flow Paths Reach River Sta. Contr. Expan. Reach 1 234.5 .3 4 Reach 1 227 .3 .4 Reach 1 220 .3 .4 Reach 1 209.5 .3 .4 Reach 1 196.5 .3 .4 Reach 1 181.2 .3 .4 Reach 1 168.50 .3 .4 Reach 1 148.5 .3 .4 Reach.l 145.2 .3 .4 Reach 1 138.8 .3 .4 Reach 1 134.8 .1 .3 Reach 1 121.70 .3 .4 Reach 1 108.00 .3 .4 Profile Output Table - Standard Table 1 Reach River Sta. Q Total Min Ch E1 W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft /ft) (ft /s) (sq ft) (ft) Reach 1 234.5 624.00 69.30 69.94 69.94 70.12 0.006746 3.36 185.64 531.76 1.00 Reach 1 227 627.00 58.20 59.06 59.06 59.30 0.006367 3.91 160.26 350.00 1.02 Reach 1 220 705.00 50.20 51.49 51.47 51.72 0.004716 3. -95 189.12 383.12 0.91 Reach 1 209.5 841.00 45.00 45.79 45.79 46.03 0.006122 3.97 211.63 438.51 1.01 Reach 1 196.5 877.00 40.00 41.09 41.14 0.001411 1.66 526.83 818.31 0.37 Reach 1 181.2 1294.00 39.10 40.36 40.37 0.000303 0.69 1872.95 2073.56 0.13 Reach 1 168.50 1401.00 38.10 39.70 39.72 0.000964 1.16 1211.67 1475.41 0.22 Reach 1 148.5 1420.00 35.00 36.86 36.28 36.93 0.002163 2.08 683.71 633.79 0.35 Reach 1 145.2 1420.00 34.60 35.78 35.53 35.87 0.006566 2.42 586.77 994.55 0.56 Reach 1 138.8 1420.00 32.00 32.87 32.93 0.003365 1.92 738.94 1071.94 0.41 Reach 1 134.8 1420.00 30.60 31.70 31.28 31.75 0.002614 1.84 772.45 991.12 0.37 Reach 1 121.70 1420.00 28.00 29.47 28.75 29.51 0.001197 1.60 888.56 782.79 0.26 Reach 1 108.00 1554.00 24.50 25.40 25.28 25.53 0.011750 2.85 545.50 1120.00 0.72. Profile Output Table - Standard Table 2 Reach River Sta E.G.,Elev W.S. Elev Vel Head Frctn Loss C & E Loss Q Left Q Channel Q Right Top Width (ft) (ft) (ft) (ft) (ft) (cfs) (cfs) (cfs) (ft) Reach 1 234.5 70.12 69.94 0.18 4.91 0.02 624.00 531.76 Reach 1 227 59.30 59.06 0.24 3.78 0.00 627.00 350.00 Reach 1 220 51.72 51.49 0.23 5.68 0.00 53.56 651.44 3'83.12 Reach 1 209.5 46.03 45.79 0.25 3.30 0.08 841.00 438.51 Reach 1 196.5 41.14 41.09 0.04 0.76 0.01 877.00 818.31 Reach 1 181.2 40.37 40.36 0.01 0.64 0.00 0.10 1293.90 2073.56 . Reach 1 168.50 39.72 39.70 0.02 2.78 0.01 1401.00 1475.41 Reach 1 148.5 36.93 36.86 0.07 1.05 0.01 1420.00 633.79 Reach 1 145.2 35.87 35..78 0.09 2.93 0.01 1420.00 994.55 Reach 1 138.8 32.93 32.87 0.06 1.18 0.00 1420.00 1071.94 Reach'1 134.8 31.75 31.70 0.05 .2.23 0.00 1420.00 991.12 Reach 1 121.70 29.51 29.47 0.04. 3.95 0.03 1420.00 782.79 Reach 1 108.00 25.53 25.40 0.13 1554.00 1120.00 Previous Effective Hydrology And HEC -2 Analysis � C-1 I L \.I WATER SURFACE PROFILES .VERSION OF NOVEMBER 1976 .UPDATED APRIL 1980. HP =UX VERSION JUNE 1985 Mon Jun 11 14:31:10 PDT 1990 X X XXXXXXX XXXXX X X X X X X X X. X XXXXXXX XXXX X X X X X X X X X X X• X XXXXXXX XXXXX U:S. ARMY C Aff-f �0toti f # 24 THE HYDROLO . * '609 SECOND * DAVIS, CALI *. (§16)'440-2 * * * * * * * * * * * * ** XXXXX XXXXX X X X XXXXX X x XXXXXXX C a4p '�y i 1 HEC2 RELEASE DATED NOV 76 UPDATED APRI 1980. ERROR CORR - 01,.02,03,04 MODIFICATION - 50151,"52,53,54 L East la quinta >. Improved condi- 3 100 -year flood L ICHECK INQ .0. 0: NPROF IPLOT t�• flood insurance study- case.6x (center /main channel) tion,;eff.ective ch width in street area is reduced to half event,topo updated on 9- 30- 88;Peak Q revised on 6-5-90 - NINV IDIR STRT METRIC HVINS Q .0. 0. .000000 .00 1.5 5. PRFVS XSECV XSECH FN ALLDC IBW 1 -1.000 .000- - 1..000 .000 .000 .000 - 1..000 .000 I: L 2 2 2 1 R 2 . 0 3.5 108.000 28-.000 26._000 1420.000 .035 .035 .300 .400 .000 .000 WSEL . FQ ' 25.400 :000 CHNIM ITRACE .000 .000 .000 M 6.000 2.50 O-QD 2550.000 .000 .000 .000. .000 .00 '.000 2.6..500 290.000. 25.800 1070.000 2_P ..2 1400.000 ^ 24 „.500 2550.000 .000 .000 .0.00. .000 .000 .000 .00 .000 .000 .000 .000 .000 .000 .000 .00 121.700 6.000 3.1.900 950.000 31.0 _ OX00- .030 .030 1420.000 .000 950.000 1900.000 2-8.300 1000.000. .000 .000 .030 .000 .000 .000 13.4.800 5.000 23`SiL._Q00 35� 00.000 32.230 2350.000 30.700 .2650.000 1370.000 1370.000 28._'000 1450.000 .000 000 .000 .000 ..000 .000 1310.'000 1310.000 - 31:000 3100.000 1370.000 .000 2_8.700 1650 .000 .000 .000 .000 .000 .000 1310.000 1 .000 30.600 - 3400.000 .00 28. 70 .00 1% . 00 .00 .00 "33.00 b--o 1 138.800 5.000 .000, 127.0.000 400.000 400.000 400.000 .000 .00 3 �0 800.000- 32.000 1250.000 • 34.20 R '35.6 .000 32.60.0- 21.0.000 36.000 2780.000 38.000 -3000.0'00 '.00 1 145:200 4.000 1600.000 2780.000 R' 36.000 .1600.000 300.000 34:600 .1850.000 2 1420.000 .000 .000 .000 1 148.500 7.000 11.0..000 3200.000 R 40.0010 ..000 39..000 1100.000 R 36.000 3050- -000 40.000 -_- 3200'..000 2 1401.000 .000 .000 .000 3 �0 800.000- 32.000 1250.000 • 34.20 640.000 640.000 640.000 .000 .00 36.000 2780.000 38.000 -3000.0'00 '.00 ..000 .000 .000 .000 .00 300.000 300.000 300.000 .000 .00 38.600 2400.000 35.000 2500.000 36.00 .000 .000 .000 .000 .00 .000 .000 .000 .000 .00 :1 168.500 7.000 240:000 2100.000 2000.000 2000.000 2000.000 .000 .00 . R 45.000 .000 40.00'0 240.000 39.300 670.000 38.100 1120.000 3L-60 R 38 8- 1600.0'00 40.300 2100.000 .000 .000 .00.0 .000 .00 .2 1294.000- .000 .000 .000 .000 .000 .000 .000 ..00 1 181.200 7.000 20.000 .2110.000 1250.000 .1250.000 1250.000 .000 .00 .R. .000 40.000 20.000 39.200 470.000 39.300 1110.000 39.10 R .500 700.000 0400 2110.000 .000 .000 .000 .000 0 2 877.000' .000 .000 .000 .000 .000 .000 .000 .00 C .-025 .025 .025 .000 .000 .000 .000 .000 .00. :1 196.500 10.000 .000 1870.000 1.530.000 1530.000 1530.000 .000 .00 R 45.900 ..000 40.000 150.000 43.900 290.000 40.000 a2.0- 00 40.,00 R 43.200 850.000 41.000 1000.000 40.300 1230.000 40.500 1330.000 00w 2 841.0.00 .000 .000 .000 .000 .000 .000 .000 .00 C .018 .018 .018 .000 .00.0 .000 .000 .000 .00 :l 209.500 6.000 50.000 725.000 1300.000 1300.000 1300.000 .000 .00 R 50.000 .000 46.700 50.000 45.100 220.000 45.000 385_.000 45.60 R6.�00 725.000 .000 .000 '.000 .000 .000 .00.Or :'00 :2- 705.000 .000 .000' .000 .000 .000 .000 .000 .00 :1 220.000 6.000 100.000 3.OQ 1090.000 1050.000 1050.000 .000 .00 R 51.300 .000 51.2.00 100.000 51.000 235.000 50.200 300.000 51.60 R 51.900 540.000 .000 .000 .000 .000 .000 .000 00 :2 627.000 .000 .000 .000 .000 .000 .000 .000 .00 :1 227'.000 3.000 .0.00 350.000 700.000 700.000 700.000 .000 .00 R 59.000 .000 58.200 140.000 59.000 350.000 .000 .000 .00 :2 624.000 .000 .000 .000 .000 .000 .000 .000 .00 :1 234.500 6.000 .000 550.000 750.000 750.000 75.0.000 .000 .00 R 10.000 .000 69.300 75.000 69.400 210.000 69.900 345.000 69.50 R 70.000 550..000 .000 .000 .000 .0'00 .000 .000 .00 y 0 0 0 0 0 0 6 0 0 SECNO DEPTH CWSEL" CRIWS WSELK EG HV HL OLOSS BANK.ELEV Q QLOB QCH QROB ALOB ACH AROB VOL TWA LEFT /RIGHT TIME VLOB VCH VROB XNL XNCH XNR' WTH ELMIN SSTA SLOPE XLOBL XLCH XLOBR ITRIAL IDC. ICONT CORAR'" TOPWID ENDST PROF 1 RITICAL DEPTH TO BE CALCULATED AT ALL CROSS SECTIONS CHV= .300 CEHV= .400 SECNO 108.000' 108.00 .90 25.40 25.38 25.40 25.61 .21 .00 .00 78.00 1554. 0. 1554. 0. 0. .420. 0. 0. 0. 26.00 .00 .00 3.70 .00 .035 .03.5 .035 .000 24.50 1290.00 .022323 0. 0. 0. 0 4 0 .00 940.00 2230.00 SECNO 121.700 121.70 1.47 29.47 28.76 .00 29.50 .03 3.83 .05 31.90 1420. 0. 1420. 0. 0. 1002. 0. 22. 29. 31.00 .27 .00 1.42 .00 .035 .035 .035 .035 28.00 98.3.73 .000961 1370. 1370. 1370. 5 15 0• .00 896.33 1880.06 ' SECNO 134.800 134.80 .97 31.57 31.28 .00 31.64 .07 2.12 .02 32.23 1420. 0.- 1420. 0. 0. 648. 0. 470' 57. 33.00 .43 .00 2.19 .00 .03'0 .030 .030• .033 30:60 2479.51 .003304 1310. 1310. 131.0.. 4 14 0, .00 960.89 3440.40 rSECNO 138.800 138.80 .83 32.83 32.55 .00 3.2.90 .06 1.25 .00 35.00 1420. 0. 1420. 0. 0. 700. 0. 53. 66. 34.20 .49 .00 2.03 .00 .030 .030 .030 .032 32.00 189.19 .002947 400. .400. 400. 3 11 0 .00 1068.43 1257.62 tSECNO 145.200 145.20 1.08 35.68 35.53 .00 35.81 .13 2.89 .03 36.00 1420. 0. 1420. 0. 0. 491. 0. 62. 81. 36.0.0 :55 00' 04-0. 2.89- .00 .030 .0301' • .030- .032 34.60 1657.23 • .00775'3 -640. 640: 4 8 0 .00 909.88 2567.11 SECNO 148.500 148.50 1.82 36.82 36.32 .00 36.89 .08 1.07 .02 39.00 1420. 0. .1420. 0. 0. 63.3. 0. 66. 86. 40.00 .59 .00 2.24 .00 .030 .030 .030 .032 35.00 2449.50 .002040 300.. 300. 300. 4 11 0 .00 631.17 3080.67 SECNO DEPTH CWSEL CRIWS WSELK EG HV HL OLOSS BANK ELEV Q . QLOB QCH QROB ALOB ACH AROB VOL TWA LEFT /RIGHT TIME VLOB VCH VROB XNL XNCH XNR WTN ELMIN SSTA SLOPE XLOBL XLCH XLOBR ITRIAL IDC ICONT CORAR TOPWID ENDST 3ECNO 168.500 168.50 1.53. 39.63 39.02 .00 39.66 .03 2.75 .02 40.00 1401. 0. 1401. 0. 0. 1079. ,0: 105. 133. 40.30 1.02 .00 1.30 .00 .030 .030 .030 A31 38.10 464.63 .000986 2000. 2000.. 2000. 5 8 0 ,.00 1413.47 1878.11 SECNO 181.200 181.20 1.19 40.29 39.57 .00 40.30 .01 .63 .01 40.00 1294.. 0'. 1294. 0. 0. 1710. 0. 145. 182. 40.40 1.47 .23 .76 .00 .030 .030 .030 .031 39.10 18.11 .060295 1250. 1250. 1250. 2 17 0 .00 2038.85 2056.96 SECNO 196.500 265 DIVIDED FLOW 196.50 .98 40.98 4.0.55 .00 41.02 .04 .71 .01 45.90 877. 0. 877. 0. 0. 565. 0. 185. 234. 44.00 1.75 .00 1.55 .00 .02'5 .025 .025 .030 40.00 124.98 .001225 1530. 1530. 1530. 2" 14 0 .00 875.76 1404.68 - SECNO 209.500 185 MINIMUM SPECIFIC ENERGY •720 CRITICAL DEPTH ASSUMED 209.50 .68 45.68 45.68 .00 45.90 .22 3.03 .07 '46.70 841. 0. 8.41. 0. 0. 221. 0. 197. 25.4. 46.10 1.84 .00 3.81 .00 .018 .018 .018 .028 45.00 - 158.8.0 .006356 1300. 1300. 1300. 0 19 0 .00 502.60 661.40 SSECNO 220.000 1280 CROSS SECTION 220.00 EXTENDED .19 FEET 5.81 ..00 51.20 202. 265. 51.60 .027 50.20 0.28 .00 383.05 .383.05 • 220.00 51.48 .51.47 .00 51.71 .23 .705, 53. 652. 0. 24. 165. 0. 1.92 2.20 3.96 .00 .018 .018 .018 .004746_ 1050. 1050. 1050. 2 17 0 5.81 ..00 51.20 202. 265. 51.60 .027 50.20 .00 .00 383.05 .383.05 • SECNO DEPTH CWSEL CRIWS WSELK EG HV HL OLOSS BANK ELEV Q QLOB QCH QROB ALOB ACH AROB VOL TWA LEFT %RIGHT TIME V.LOB VCH VROB XNL XNCH XNR WTN ELMIN SSTA SLOPE XLOBL XLCH XLOBR ITRIAL IDC ICONT CORAR TOPWID ENDST iECNO 227.000 180 CROSS SECTION 227.00 EXTENDED .06 FEET L85 MINIMUM SPECIFIC ENERGY 720 CRITICAL DEPTH ASSUMED 227.00 .86 59.06 59.06 .00 59.30 .24 3.80 .00 59.00 627. 0. 627. 0. 0. 160. 0. 205. 271. 59.00 1.97 .00 3.91 .00 .018 .018 .018 .027 58.20 .00 .006369 700. 700. 700. 0, 23 0 .00 350.00 350.00 ,ECNO 234.500 L85 MINIMUM SPECIFIC ENERGY 720 CRITICAL DEPTH ASSUMED 234.50 .64 69.94 69.94 .00 70.11 .18 5.00 .02 70.00 624. 0. 624. 0. 0. 184. 0. 208. 278. 70.00 2.03 .00 3..39 .00 .018 .018 .018 .026 69.30 6.95 .006974... 750. 750. 750. 0 19 0 .00 533.97 540.92 . i .. �•� __. _.. .fir_:. HEC2 RELEASE DATED NOV 76 UPDATED APRI 1,980 ERROR CORR - '01,02,03,04 MODIFICATION - 50,51,52,53,54 TE- ASTERISK ( * -) AT LEFT OF CROSS- SECTION NUMBER INDICATES MESSAGE.IN SUMMARY OF ERRORS LIST 0 -year flood event,top MMARY PRINTOUT TABLE 150 SECNO XLCH ELTRD ELLC ELMIN Q CWSEL CRIWS EG 10K *S 108.000 .00 .00 .00 24.50 1554.00 25.40 25.38 25.61 223.23 121.700 1370.00 .00 .00 28.00 1420.00 29.47 28.76 29.50 9.61 134.800 1310.00 .00 .00 30.60 1420.00 31.57 31.28 31.64 33.04 138.800 400.00 .00 .00 32.00 1420.00 32.83 32.55 32.90 29.47 145.200 640.00 .00 .00 34.60 142.0.00 35.68 35.53 35.81 77.53 148.500 300.00 .00 ..00 35.00. 1420.00 36.82 36.32 36.89 20.40 168.500 2000.00 .00 .00 38.10 1401.00 39.63 39.02 39.66 9.86 181.200 1250.00 .00 .00 39.10 1294.00 40.29. 39.57 40.310 2.95 196.500 1530.00 .00 .00 40.00 877.00 40.98 40.55 41.02 12.25 209.500 1300.00 .00 ..00 45.00 841.00 45.68 45.68 45.90 63.56 220.000 1050.00 .00 .00 50.20 705.00 51.48 51.47 51.71 47.46 227.000 700.00 .00 .00 58.20 627.00 59.06 59.06 59.30 63.69 .0 -year flood ev.ent,top 701ARY PRINTOUT. TABLE 150 SECNO Q CWSEL. DIFWSP DIFWSX DIFKWS TOPWID XLCH 108.000. 1554.00 25.40 .00 .00 .00 •940.00 .00 121.700 1420.00 29.47 .00 4.07 .00 896.33 1370.00 134.800 1420.00 31.57 .00 2.10 .00 960.89 1310.00. 138.800 1420.00 32.83 .00 1.26 .00 1068.43 400'.00 145.200 1420.00 35.68 .00' 2.85. .00 909.88 640.00 148.500 1420.00 36.82 .00 1.14 .00 631.17 300.00 168.500 1401.00 39.63 .00 2.82 .00 1413.47 2000.00 181.200 1294.00 40.29 ..00 .65 .00 2038.85 1250.00 196.500 877.00 40.98 ..00 .70 .00 875.76 1530.00 209.500 841.00 45.68 .00 4.69 .00 502.60 1300.00 220.000 705.00 51.48 .00 5.81 .00 383.05 1050.00 . 227.000 627.00 59.06 .00 7.57 .00 350.00 700.00 234.500 624.00 69.94 .00 10.88 .00 53.3.97 750.00 o - UMMARY OF ERRORS UTION SECNO= 209.500 PROFILE= 1 CRITICAL DEPTH ASSUMED UTION SECNO= 209.500 PROFILE= 1 MINIMUM SPECIFIC ENERGY UTION SECNO= 227.000 PROFILE= 1 CRITICAL DEPTH ASSUMED UTION SECNO= 227.000 PROFILE= 1 MINIMUM SPECIFIC ENERGY ' UTION SECNO= 234.500 PROFILE= 1 CRITICAL DEPTH ASSUMED UTION SECNO= 234.500 PROFILE= 1 MINIMUM SPECIFIC ENERGY rural termination of program execution A0017 I LO ATTACHMENT A 100 -Year Flood Discharge and 500 -Year Flood Discharge LE X. I Ul-li IbA I all I.-- IL % t "**41b C roll Q JD x jo 4w gem 7 40000.00 W2... ..... 4L fo..... .... > 40� In G. CIO > -4 I-- ........................ .......... E-2 X-v 4K �i Aoo - y� TR -55 GRAPHICAL DISCHARGE METHOD Project La Quinta -C] User: ora County State: CA Checked: Subtitle: Flood Insurance Study Data: Drainage Area : -.46 -Sq Mi Runoff Curve Number 82 Time of Concentration: 0.63 Hours Rainfall Type II Pond and Swamp Area NONE . Storm Number 1 100 Frequency (yrs) '24 -Hr Rainfall (in) 4.8 Ia /P Ratio 0.09 Used 0.10 Runoff (in) 2.90 Unit Peak Discharge 468 (cfs /sgmi /in) Pond and' Swamp Factor 1.00 0.0 Ponds Used . 624 Peak Discharge (cfs) L� VERSION 1.11 Date: 06 -11 -90 Date: TR-55 GRAPHICAL DISCHARGE METHOD VERSION 1.11 Project : La'Quinta -c? User: ora. Date: 06-11-90 County : State: CA Checked: Date: Subtitle: Flood Insurance Study Data: Drainage Area .49 Scl Mi Runoff Curve Number 82 Time of Concentration: 0.70 Hours Rainfall Type II Pond and SViAmp Area NONE- - " Storm Number. ---------- ! ----------------106 1. ---- P r equency (yrs) I 24-Hr Rainfall (in) 4.8 Ia/P Ratio 0.09 Used 0.10 Runoff (in) 2.90 Unit Peak Discharge 441 (cfs/sqmi/in) Pond and Swamp Factor 1.00 -0.0% Ponds Used ----------------- w ------- - - - - -- Peak Discharge (cfs) 627 CP d 6 /oO I TR -55 GRAPHICAL DISCHARGE METHOD Project : La Quinta - c3 User: ora County State: CA Checked: Subtitle: Flood Insurance Study . Data: Drainage Area .56 Sq Mi Runoff Curve Number 82 Time of Concentration: 0.72 Hours Rainfall Type II Pond and Swamp Area NONE. Storm Number 1 ------------ - - - - - -- Frequency (yrs) 100 24 -Hr Rainfall (in) 4.8 Ia /P Ratio 0.09 Used 0.'10 Runoff (in) .: 2.90. Unit Peak Discharge 434 (cfs /sgmi /in) Pond and Swamp Factor 1.00 0.0% Ponds Used Peak Discharge (cfs) 705 VERSION 1.11 Date: 06 -11 -90 Date C4- TR -55 GRAPHICAL DISCHARGE METHOD VERSION 1.11 Project : La Quinta- --C4 User: Zora Date: 06 -11 -90 County State: CA Checked: Date: Subtitle: Flood Insurance Study Data: Drainage Area .72 Sq Mi Runoff Curve Number 82 Time of Concentration: 0.82 Hours Rainfall Type II Pond and Swamp Area NONE Storm Number 1 �. --------------------- -- - - - - -- i Frequency (yrs) 100 24 -Hr Rainfall (in) 4.8 Ia /P Ratio 0.09 Used 0.10 Runoff (in) 2.90 Unit Peak`Discharge 403 (cfs /sgmi /in) Pond and Swamp Factor 1.00 0.0% Ponds Used Peak Discharge (cfs) 841 1 • C'S TR -55 GRAPHICAL DISCHARGE METHOD Project : La Quinta - c User: Zora County State: CA Checked: Subtitle: Flood Insurance Study Data: Drainage Area .82 Sq Mi Runoff Curve Number 82 Time of Concentration: 0.95 Hours Rainfall Type II Pond and Swamp Area NONE Storm Number 1 -------- ; ------------- - - - -- Frequency (yrs) 100 24 -Hr Rainfall (in) 4.8 Ia /P Ratio 0.09 Used 0.10 Runoff. (in) 2.90 Unit Peak Discharge 369 (cf s /sgmi/ in ) Pond and Swamp Factor 1.00 0.0% Ponds -Used ---------------- - - - - -- - - - - -- Peak, Discharge (cfs). 877 C�b VERSION 1.11 Date: 06 -11 -90 Date: I TR -55 GRAPHICAL DISCHARGE METHOD VERSION 1.11 Project La Quinta - C 6 User: Zora Date: 06 -11 -90 County State: CA Checked: Date: Subtitle: Flood Insurance Study Data: Drainage.Area 1.51 Sq Mi Runoff Curve Number 82 Time'-of Concentration: 1.35 Hours_ Rainfall TKpe • II Pond and Swamp Area NONE „ �- Storm Number - - - -- - - -1 -- - -------- - Frequency (yrs) 100 . •24 -Hr Rainfall (in) 4.8 Ia /P Ratio 0.09 Used 0.10 Runoff (in) 2.90 Unit Peak Discharge 295 (cfs /sgmi /in) Pond and Swamp Factor 1.00 040% Ponds Used - - -- - - - -- ------- - - - -- Peak Discharge (cfs) - - - 1294 • c7 r .,TR-55 GRAPHICAL DISCHARGE METHOD VERSION 1.11 Project : La Quinta - C-7 User: ZorA Date: 06-11-90 County : State: CA Checked: Date: Subtitle: Flood Insurance Study Data: Drainage Area-, 1.91 Sq Mi Runoff Curve Number 82 time of concentration: 1.70 Hours Rainfall Type II Pond and SwamD Area NONE �Storm . lNumber — ---------------------- ------ Frequency (yrs) 724-Hr 100 Rainfall (in) 4.8 Ia/P Ratio 0.09 Used 0.10 Runoff (in) 2.90. Unit Peak Discharge 253 (cfs/sqm*/in) Pond and Swamp Factor 1.00 - 0.0% Ponds Used ------------ --------- Peak Discharge (cfs) ---- 1401 c� TR -55 GRAPHICAL DISCHARGE.METHOD VERSION 1.11 Project La Quinta -- Cg User: Zora Date: 06 -11 -90 County State: CA Checked: Date: Subtitle:.Flood Insurance Study Data: Drainage Area 2.17 Sq Mi Runoff Curve Number 82 Time-of Concentration: 2.00 Hours Rainfall Type II Pond and Swamp Area NONE Storm Number 1 Frequency (yrs) 100 24 -Hr Rainfall (in) 4.8 Ia /P Ratio 0.09 Used 0.10 Runoff (in) , 2490 Unit Peak Discharge 226. (cfs /sgmi /in) Pond and Swamp Factor 1.00 0.0% Ponds Used Peak Discharge (cfs) 1420 _ C9 TR -55 GRAPHICAL DISCHARGE METHOD VERSION 1.11 Project Lai Quinta - ` Q User: Zora Date: 06 -11 -90 County State: CA Checked: Date: Subtitle: Flood Insurance Study Data4: Drainage Area 2.23 Sq Mi Runoff Curve-'Number 82 Time of Concentration: 2.15 Hours Rainfall Ty-pe II Pond and Swamp Area NONE Storm Number 1 Frequency (yrs) 100 24 -Hr Rainfall (in) 4.8 Ia /P Ratio 0.09 Used 0.10 Runoff (in) 2.90 .Unit Peak Discharge 214 (cfs /sgmi /in) Pond and Swamp Factor 1.00 0.0% Ponds Used -- ` - - -�- - - - - -- Peak Discharge cfs X3385 - � Fr�r Cvr� se�t�r�isi� uat �- 9c 14zo Gls - 9 B cle. Ile c- 2 3 d El /DO 7 C -/n TR -55 GRAPHICAL.DISCHARGE METHOD Project : La Quinta - c; o User: Zora County State: CA Checked: Subtitle: Flood Insurance Study Data: Drainage Area 2*.27 Sq Mi Runoff Curve Number 82 Time of Concentration: 2.35 -Hours Rainfall Type II. Pond and Swamp Area NONE Storm Number 1 - - - - -- - - - - -- Frequency (yrs) 100 24 -Hr Rainfall (in) 4.8 Ia. /'P Ratio 0.09 Used 0.10 Runoff (in) 2.90 Unit Peak Discharge 201. (cfs /sgmi /in) Pond and Swamp Factor 1.00 0.0% Ponds Used Peak Discharge (cfs) 1321 • 4Vclo 8 VERSION 1.11 Date: 06 -11 -90 Date: . AV _ " TR -55 GRAPHICAL DISCHARGE METHOD VERSION 1.11 Project La Quinta.- Cf► User: Zora Date: 06 -11 -90 County State: CA Checked: Date: Subtitle. Flood Insurance Study Data: Drainage Area. 2.77 Sq Mi Runoff Curve Number. 82 Time of Concentration: 2.47 Hours Rainfall Type iI Pond and Swamp Area NONE �7 Storm Number 1 Frequency (yrs) 100 24 -Hr Rainfall (in) 4.8 Ia/P Ratio 0.09 Used 0.10. Runoff (in) 2.90 Unit Peak Discharge 193 (cfs. /sqmi /in) Pond and "Swamp Factor 1.00 0.0 Ponds Used Peak Discharge (cfs) 1554 • • � 1 P.O. Box 1504 78 -495 CALLE TAMPICO LA QUINTA, CALIFORNIA 92253 August 9, 2004 LOMA Depot 3601 Eisenhower Avenue, Suite 600 Alexandria, VA 22304 Re: Case No.: 04- 09 -1155P Community: City of La Quinta, CA Community No.: 060709 (LACZ 01 0( (760) 777 -7000 FAX (760) 777 -7101 Enclosed are the supplemental items requested in your letter of June 9, 2004. The enclosure includes: 1. A diskette containing input and out put files for all submitted hydraulic models 2. A certified map by a licensed surveyor with the datum used to prepare the work map. 3. A copy of the current effective FIRM panes annotated to reflect the revised floodplain boundary delineations. Please contact our engineers Soorgul Wardak with Psomas at 714 - 751 -7373 or Doug Hamilton with Exponent at 949 - 341 -6016 with any technical questions. Sincerely, imothy Jo a son, P. E. Public Works Director /City Engineer C' Soorgul Wardak, Psomas . Doug Hamilton, Exponent W r . i. - I I I I I �, i � , , f- _ � ' I � 'a': � Y '. a ' �, " # "• �. p r ,- . T � �Y`�� U_ € C �` w A�x � '�—'L �y .` y¢L ga.3} �-� q � � E y � � ,� D"M�pO r.J a�ay Y'rp 3 ' y� e ,4. '( i. , , • • s ; v Ct 6 ] I rk � k � 1 K I , i I ` nA,jS /• �b{- .1 4 �EyyFM $ H�e y • J� .N�� � Q 1,A �.,4� ` J �. .` �T . x � '� ' � » f •1iN'IvZ�''A I II 4 U� s D ¢ . "ayMiAJJ�^,�1LL 'A • ^ : °`1 '� . > . �- •. � - � m1a. , _S. -kth�Jr f , sr - •ETFz I .' { g� �j 4 , I `?�,7 �1}�; £'1�F�� \ ' 1 4� n�'Iw ';„, ,'ir Y.�+ "7 7 y,G $ (g �a'n� a(r•%��a� _ Tt 'si�;N U•.l � •. ! . 5 3 TF' jry � 1 ` t ' � . . a ., - L>' SFf ', 1 , : I i; •_ JJ � = *� W 'A. � O� }I �- f '. i ' ) i i _ J: ��� Ae1.•L�3Da �R O' '_ ` ; � � R' � (/ �J ��#,� .� ��/�� P'/ �/ % / q�/« �s tl0� � S c 11 SI4 k1i �f .`i 4' ♦: ,3_ .R 0 iC 2 i o f> l i` � a: F#t�g3i�+�t„_` La�`} ? ,` tsr``�� . �/L J` 'i,�' r ' L ' �•' wFH L_ G a . J S� �{ t� %� IF } 4�G-" .p t : '—: ,�1IS�`T y * ( 4f�'J J�F5x ,J 't' ^^y)t*. � l 1{N� , �•t '' t L A ILV E 'E �j y _ - •. , - r • + - - .�I f �I.III.IlIlI. f I IIf I IIIIIIIIIIIiII I APP R OX' IM� ' AT E SCALE LE IN FEET ZONEy X 1000 • - ` 1 0_ 00 CALLE FELIPE -CALLE 0 M AZATLAN 2atninq Dike NATIOHALFL000 INSURANCE PRO- C_ R AM 0. � u: 1 O FIRM, FLOOD INSURANCE RATE MAP GUAY MA1j CITY OF A NAR NJA ID LA QUINTA, z�NE X ... _. : . CALIFORNIA I _ A VENID' A I RIVERSIDE-COUNTY OUNTY AVEN ARITA AVA ZONE X. PANEL5 Of 10 II I I I IIZ( OhO, aOnNY Cn, E e. l . A _ D�' � INVW a%� " • d a � � -LO -$ - t � a�r?�i ? j a � �AM , V5 E r L �1NN� C" - OIA D I R A � A L.. . %° JE ,h ' taUfl - 0 i M1 1 pE-a Q Q b > 1 Z 't L, L '.E � �iQ Q Y '"'"•y`L .1I• .t"l. j �O Q Z Q " . �L„6 a LQa x >W aC z S " i 8- t 6a� % 'W .N> oii w a D � 1Ht , ' C�$Gt` W ,A�W O x Wy . o es:S -.:' � W Q a - - �a r;_ _ ` I .O D Q DI'. Er ? q J % 2 �N ( a E�-, . N G 4 a a � �O� 1 A Q O > 6O � D I�A_ , ,ZA� : Y O.aiD1]nqq y41- , 'R ; V ` , I VE 'E`dL W55�•y7 I}�kt ' ' d C - • B � ��.%r1'l� ) JLiiLI . ; A f '�.i) n , WFl , . i . '- Yl • . � P�� yY ' „I2 5'irfljy l5"DT {I �•iyf y�t y X a UOe . IdI ppnpapkmp. tppFne pt a . , n ..tI»h, Sl nNe Eo CI pE Pp [ a.MMma. t eAr r- y P oP nInoNw .uO ncE p om c% F dmp Oa op m R m» - p Pw v.P Au mmNnaeEp xa yL eun9 np d c- m NOT OT ppm pcPo l a - R. p. a mnmI9pNpp np9TE o Dm I t', C. C us PANEL LOCATION O W COMMUNITYPANEL NUMBER G4 KEY '060709 0005,0 LLE FORTUNA .2 CALLE CADIZ CALLE 6ARCELONA MAP REVISED: Bo Crek CALLE GUATEMALA 5 CALLC HUENEME AUGUST 19,1 G CALLE ;LOILO F100D• T CALLE dACU MBA CONTAINE CHANNEL . s CALLE KALMA 100YEAR FLOOD CAL IN CONDUIT Fed¢ralEmergen0y Management Agency RM ZONE .A ZO N E' A TN, Y Cla cop m o tm . g t 1M Ilw »N i F 1 4mp , JOINSPANE1,0010 , - • Pn ;mm loptl mope check Ne FEIM Flppp Mep Strop at wa+r msc.(e,np.ptry , '0 • • • O 0� l9 ND StiG ` NATIONAL FLOOD INSURANCE PROGRAM FEMA MAP COORDINATION CONTRACTOR Mr. Timothy R. Jonasson Public Works Director /City Engineer City of La Quinta P.O. Box 1504 La Quinta, CA 92253 Dear Mr. Jonasson: June 9, 2004 RECEIVED JUtl 17 20% IN REPLY REFER TO: Case No.: 04- 09 -1145P PUBLIC WORXS Community: City of La Quinta, CA Community No.: 060709 316- ACK.FRQ This responds to your request dated May 24, 2004, that the Department of Homeland Security's Federal Emergency Management Agency (FEMA) issue a revision to the Flood Insurance Rate Map (FIRM) for the above- referenced community. Pertinent information about the request is listed below. Identifier: La Quinta Flooding Source: Local Streets FIRM Panel(s) Affected: 0005 B We have completed an inventory of the items that you submitted. The items identified below are required before we can begin a detailed review of your request. 1. Please submit a diskette containing input and output files for all submitted hydraulic models. 2. The submitted topographic work map is not certified by a licensed engineer or surveyor. Please submit a certified copy of the topographic work map, and indicate the datum used to prepare the work map. 3.. Please submit a copy of the effective FIRM panel that is annotated to reflect the revised floodplain boundary delineations on the submitted work map. All required items are to be submitted to us at the address shown at the bottom of this page., If all required items are not submitted within 90 days of the date of this letter, we will treat any subsequent request as an original submittal, and it will be subject to all submittal/payment procedures. If you are unable to meet the 90 -day deadline for submittal of required items, and would like FEMA to continue processing your request, you must request an extension of the deadline. This request must be submitted to us in writing and must provide (1) the reason why the data cannot be submitted within the requested timeframe, and (2) a new date for the submittal of the data. FEMA receives a very large volume of requests and cannot maintain inactive requests for an indefinite period of time. Therefore, the fees will be forfeited for any request for which neither the requested data nor a written extension. request is received within 90 days. When you write us about your request, please include the case number referenced above in your letter. 3601 Eisenhower Avenue, Alexandria, Virginia 223046425 PH: 703.960.8800 FX: 703.960.9125 Michael Baker Jr., Inc., under contract with the FEDERAL EMERGENCY MANAGEMENT AGENCY, is a Map Coordination Contractor for the National Flood Insurance Program ti 2 • If you have general questions about your request, FEMA policy, or the National Flood Insurance Program please call the FEMA Map Assistance Center, toll free, at 1- 877 -FEMA, MAP (1- 877 - 336 - 2627). If you have specific questions concerning your request, please call the Revisions Coordinator for your State, Ms. Sheila Norlin, who may be reached at (703) 317 -3054. cc: Mr. Soorgul Wardak Psomas and Associates Ll Sincerely, Sheila M. Norlin National LOMC Manager Michael Baker Jr., Inc. P.O. Box 1504 78 -495 CALLE TAMPICO n (760) 777-'7000 C'•b `,OFn� LA QUINTA, CALIFORNIA 9225,3 FAX (760) 777 -7101 October 18, 2004 LOMA Depot 3601 Eisenhower Avenue, Suite 600 Alexandria, VA 22304 Re: Case No.: 04- 09 -1155P Community: City of La Quinta, CA I. Community No.: 06070.9 Enclosed are the additional supplemental items requested in your letter of September 14, . 2004.. The enclosure includes:. L' 'A check in the amount of $4,200. for the review fee of the LOMA submittal. 2. An Application/Certification Form 1 entitled `Overview & Concurrence Form,' with Section D complete. 3. Plans for.the catch basins located at Madrid, Colima, Gogales, Sonora and Sinaloa Streets and for the retention basins used to contain the flow (on CD). 4. Street plans for Deacon Street and Avenida Bermuda (on CD). Please . contact our engineers Soorgul Wardak with Psomas at 714 - 751 -7373 or Doug Hamilton with Exponent at 949 -341 -6016 with any technical questions. Sincerely, jimothy R. nas Public Works Director /City Engineer c: Soorgul Wardak, Psomas Doug Hamilton, Exponent ' �'it� o�oLa Quints CHECK N0. 60672 FEDERAL EMERGENCY MANAGEMENT 1269 10/22/2004 DATE INVOICE ACCOUNT DESCRIPTION AMOUNT • 10/15/04 04- 05 -1145P 101 - 7002 - 431734.04 FLOOD CONTROL M 4,200.00 • 4,200.00 H'CK:NO: FEDERAL EMERGENCY MANAGEMENT AGENCY I O .'M.B No. 3067 -0148 OVERVIEW & CONCURRENCE FORM Expires September 30, 2005 PAPERWORK BURDEN DISCLOSURE NOTICE Public reporting burden for this form is estimated to average 1 hour per response. The burden estimate includes the time for reviewing instructions, searching existing data sources, gathering and maintaining the needed data, and completing, reviewing, and submitting the form. You are not required to respond to this collection of information unless a valid OMB control number appears in the upper right corner of this form. Send comments regarding the accuracy of the burden estimate and any suggestions for reducing this burden to: Information Coll ections'Management, Federal Emergency Management Agency, 500 C Street, SW, Washington DC 20472, Paperwork Reduction Project (3067- 0148). Submission of the form is required to obtain or retain benefits under the National Flood Insurance Program. Please do not send your completed survey to the above address. A. REQUESTED RESPONSE FROM FEMA This request is for a (check one): ❑ CLOMR: A letter from FEMA commenting on whether a proposed project, if built as proposed, would justify a map revision, or proposed hydrology changes (See 44 CFR Ch. 1, Parts 60, 65 & 72)., . ® LOMR: A letter from FEMA officially revising the current NFIP map to show the changes to floodplains,' regulatory foodway or flood elevations. (See Parts 60 & 65 of the NFIP Regulations.) B. OVERVIEW 1. The NFIP map panel(s) affected for all impacted communities is (are): Community No. Community Name State Map No. Panel No. Effective Date Ex: 480301 City of Katy TX 480301 0005D 02/08/83 480287 Harris County TX 48201 C 0220G 09/28/90 060704. City of La Quinta CA 060704 0005B 8 -19 -91 2. Flooding Source: Local Streets 3. Project Name /Identifier: La Quinta 4. FEMA zone designations affected: Ao, X (choices: A, AH, AO,,A1 -A30, A99, AE, AR, V, V1 430, VE, B, C,. D, X) 5. Basis for Request and Type of Revision: a. The basis for this revision request is (check all that apply) ® Physical Change ® Improved Methodology /Data ❑ Regulatory Floodway Revision ❑ Other (Attach Description) Note: A photograph and narrative description of the area of concern is not required, but is very helpful during review. b. The area of revision encompasses the following types of flooding and structures (check all that apply) Types of Flooding: ❑ Riverine ❑ Coastal ® Shallow Flooding (e.g., Zones AO and AH) ❑ Alluvial fan ❑ Lakes ❑ Other (Attach Description) Structures:. ❑ Channelization ❑ Levee / Floodwal ❑ Bridge /Culvert ❑ Dam ❑ Fill ❑ Other, Attach Description FEMA Form 81 -89, SEP t)2 Overview & Concurrence Form MT -2 Form 1 Page 1 of 2 4 C. REVIEW FEE Has the review fee for the appropriate request category been included? Please see the FEMA Web site at http: / /www.fema ❑ Yes Fee amount: $ ® No, Attach Explanation for Fee Amounts and Exem D. SIGNATURE All documents submitted in support of this request are correct to the best of my knowledge. I understand that any false statement may be punishable by fine or imprisonment under Title 18 of the United States Code, Section 1001. Name: Timothy Jonasson Company: City of La Quinta Mailing Address: Daytime Telephone No.: Fax No.: 760 - 777 -7043 760- 777 -7155 P.O. Box 1504, La Quinta, CA 92253 , -Mail Address: Tjonasson ®la - quinta.org F E g Signature of Requester (required): Date: As the community official responsible for floodplain management, I hereby acknowledge that we have received and reviewed this Letter of Map Revision (LOMR) or conditional LOMR request. Based upon the community's review, we find the completed or proposed project meets or is designed to meet all of the community floodplain management requirements, including the requirement that no fill be placed in the regulatory floodway, and that all necessary Federal, State, and local permits have been, or in the case of a conditional LOMB, will be obtained. In addition, we have determined that the land and any existing or proposed structures to be removed from the SFHA are or will be reasonably safe from flooding as defined in 44CFR . 65.2(c), and that we have available upon request by FEMA, all analyses and documentation used to make this determination: Community Official's Name and Title: Timothy Jonason, Public works Director Telephone No.: 760- 777 -7043 ommunity Name: City of La Quinta, CA Community Official's Signature (required): Date: CERTIFICATION BY REGISTERED PROFESSIONAL ENGINEER AND /OR LAND SURVEYOR This certification is to be signed and sealed by a licensed land surveyor, registered professional engineer, or architect authorized by law to certify elevation information. All documents submitted in support of this request are correct to the best of my knowledge. I understand that any false statement may be punishable by fine or imprisonment under Title 18 of the United States Code, Section 1001. Certifier's Name: Soorgul Wardak License No.: C52913 Expiration Date: 12 -31- 2006 . Company Name: Psomas and Associates Telephone No.: (714) 751 -7373 Fax No.: (714)- 545 -8883 Signature: Date: 5 -13 -04 Ensure the forms that are appropriate to your revision request are included in your submittal. Form Name and (Number). Required if ... ® Riverine Hydrology and Hydraulics Form (Form 2) New or revised discharges or water - surface elevations ❑ Riverine Structures Form (Form 3) Channel is modified, addition /revision of bridge /culverts, addition /revision of levee / floodwal, addition /revision of dam ❑ Coastal Analysis Form (Form 4) New or revised coastal elevations ❑ Coastal Structures Form (Form 5) Addition /revision of coastal structure Seal (Optional) ❑ Alluvial Fan Flooding Form (Form 6)' Flood control measures on alluvial fans FEMA Form 81 -89, SEP 02 Overview & Concurrence Form MT -2 Form 1 Page 2 of 2 vAR -4ND 5 �GJ4 NATIONAL FLOOD INSURANCE PROGRAM FEMA MAP COORDINATION CONTRACTOR September 14, 2004 Mr.. Timothy R. Jonasson IN REPLY REFER TO: Public Works Director / City Engineer Case No.: 04= 05 -1145P P.O. Box 1504. Community: City of La Quinta, CA La Quinta, CA 92253 Community No.: 060709 316- ACK.FRQ Dear Mr. Jonasson: This responds to your letter dated August 9, 2004, concerning a May 24, 2004, request that.the Department of Homeland Security's Federal Emergency Management Agency (FEMA) issue a revision to the Flood Insurance Rate Map (FIRM) for the above - referenced community. Pertinent information about the request is listed below. Identifier: La Quinta Flooding Source: Local Streets FIRM-Panel(s) Affected: 0005 B FEMA has implemented a procedure to recover costs associated with reviewing and processing requests for modifications to published. flood information and maps. Effective September 1, 2002, FEMA revised that fee schedule. A copy of the notice summarizing the current fee schedule, which was published in the Federal Register, is enclosed for your information. In accordance with this schedule, the fee for your request is $4,200 and must be submitted before we can continue processing your request. Payment of this fee must be made in the form of a check or money order, made payable in U.S. funds to the National. Flood Insurance Pro am (NFIP), or credit card payment. For identification purposes, the case number referenced above must be included on the check or money order. We will not perform a detailed technical review of your request until we receive. this payment. Payment must be forwarded to one of the addresses listed below Using U.S. Postal Service: Federal Emergency Management Agency Fee- Charge System Administrator P.O. Box 3173 Me 'field, VA 22116 -3173 Using overnight service: FEMA Fee - Charge System Administrator c/o Dewberry & Davis METS Division, Stop 19A 8.401 Arlington Boulevard Fairfax, VA 2203.1 We have completed, an inventory of the items that you submitted. The items identified below are required before we can begin a detailed review of your request. 1. On the submitted Application/Certification Form 1, entitled "Overview & Concurrence Form," Section D is incomplete. Please submit a completed Form 1 (copy enclosed). 3601 Eisenhower Avenue, Alexandria, Virginia 22304 -6425 PH: 703.960.8800 FX. 703.960.9125 Michael Baker Jr., Inc., under contract with the FEDERAL EMERGENCY MANAGEMENT AGENCY, is a Map Coordination C`o.ntractor for the National Flood Insurance Program s 2 2. Please submit as -built plans, certified by a registered professional engineer, for the catch basins ®. located at Madrid, Colima, Nagoles, Sonora, and Sinaloa Streets and for the retention basins used to contain the flow. 3.. Please provide street plans, including elevations, certified by a registered professional engineer, for Deacon Street and Avenida Bermuda in the.revised area. All required items (except the required fee) are to be submitted to us at the address shown at the bottom of the first page. If all required items.are not submitted within 90 days of the date of this letter, we will treat any subsequent request as an original submittal, and it will be subject to all submittal/paynient procedures. If you are unable to meet the 90 -day deadline for submittal of required items, and would like FEMA to continue processing your request, you must request an extension of the deadline. This request must be submitted to us in writing and must provide (1) the reason why the data cannot be submitted within the requested timeframe, and (2) a new date for the submittal. of the data. FEMA receives a very large volume, of requests and cannot maintain inactive requests for an indefinite period of time. Therefore, the fees will be forfeited for any request for which neither the requested data nor a written extension request is received within 90 days. When you write us about your request, please include the case number referenced above in your letter. If you have general questions about your request, FEMA policy,. or the NFIP, please call the FEMA Map Assistance Center, toll free, at 1-877-FEMA MAP (1- 877 - 336 - 2627). If you have specific questions concerning your request, please call the Revisions Coordinator for your State, Ms. Kathryn Conley, who may be reached at (703) 960 -8800, ext. 3017. Sincerely, Enclosures cc: Mr. Soorgul Wardak Psomas and Associates • Sheila M. Norlin National LOMC Manager Michael Baker Jr., Inc. y VAR mow. °� Federal Emergency Management Agency `r Washington, D.C. 20472 �lAND StiGJ FEE SCHEDULE FOR PROCESSING REQUESTS FOR MAP CHANGES This notice contains the fee schedule for processing certain types of requests for changes to National Flood Insurance Program (NFIP) maps. The fee schedule allows FEMA to further reduce the expenses to the NFIP by more fully recovering the costs associated with processing conditional and final map change requests. The fee schedule for map changes is effective for all requests dated September. 1, 2002, or later and supersedes the fee schedule that was established on June 1, 2000. To develop the fee schedule for conditional and final map change requests, FEMA evaluated the actual costs of reviewing and processing requests for Conditional Letters of Map Amendment (CLOMAs), Conditional Letters of Map Revision — based on Fill. (CLOMR -Fs), Conditional Letters of Map Revision (CLOMRs), Letters of Map Revision — based on Fill (LOMR -Fs), Letters of Map Revision (LOMRs), and Physical Map Revision (PMRs). Rased on our review of actual cost data for Fiscal Years 2000 and 2001, FEMA has established the following review and processing fees, which are to be submitted with all requests that are not otherwise exempted under 44 CFR 72.5. Fee Schedule for Requests for CLOMAs, CLOMR -Fs, and LOMR -Fs Request for single - lot/single- structure CLOMA and CLOMR -F .......................................................... $500 Request for single- lot/single structure LOMR -F ........................ :....................................................... $425 Request for single - lot/single- structure LOMR -F based on as -built information. (CLOMR -F previously issued by us) ............. .............................. ...........................$325 Request for multiple- lot/multiple- structure CLOMA ......................................:... .:............................. $700 Request for multiple - lot/multiple- structure CLOMR -F and LOMR -F ................ ...................:........... $800 Request for multiple - lot/multiple- structure LOMR -F based'on as -built information (CLOMR -F previously issued) .................. ........ $700 Fee Schedule for Requests for CLOMRs Request based on new hydrology, bridge, culvert, channel, or combination ofany of these ............................................................................................. .........:..................... $4,000 Request based on levee, berm, or other structural measure .............................. ............................... $4,500 Fee Schedule for Requests for LOMRs and PMRs Requesters must submit the review and processing fees shown below with requests for LOMRs and PMRs that are not based on structural measures or alluvial fans. Request based on bridge, culvert, channel, or combination thereof .................. ............................... $4,200 Request based on.levee, berm, or other structural measure..; .......................................................... $6,000 Request based on as -built information submitted as follow -up to CLOMR .................................... $3,800 Fees for CLOMRs, LOMRs, and PMRs Based on Structural Measures on Alluvial Fans FEMA has maintained $5,000 as the initial fee for requests for CLOMRs and LOMRs based on structural measures on alluvial fans. FEMA will also continue to recover the remainder of the review and processing costs by invoicing the requester before issuing a determination letter, consistent with current practice. The prevailing private- sector labor rate charged to FEMA ($50 per hour) will continue to be used to calculate the total reimbursable fees. Payment Submission Requirements Requesters must make fee payments for non - exempt requests before we render services. This payment must be in the form of a check or money order or by credit card payment. Please make all checks and money orders in U.S. funds payable to the National Flood Insurance Program. We will deposit all fees collected to the National Flood Insurance Fund; which is the source of funding for providing this service. •-• ii.- i"7"'° sK�tis., ��'" r' �'. �' i' ti�'+ �} �r�. �X��E #rt^ri�:+t���,�rt�a�e..w�.KS�� r�,t'si» �`v,�,a�:.x,,��,f�.,. �.ia"�''y'�+' -.�yy^ � "'is"'��- '"vi�t+� 9►,�",�'•�'�'"z`.'"r'�;,;y� „�"`� ,, �.. r: • . 1 t t i w f� APPENDIX E Percolation Testing Technical Memorandum from GeoPentech (September 22, 2004) t; rA j' FINAL DRAFT, GeoPentech September 22, 2004 Mr William Whittenberg, P.E., DEE PSOMAS - 310 Redhill Ave, .Suite 250 Costa Mesa, CA 92626' . r� � - SUBJECT: - PERCOLATION TESTING — LA QUINTA, CALIFORNIA ` Deai Mr. Whittenberg: This report describes percolation testing that has been conducted by the PSOMAS team for the City of ILa -Quints (the City), California.. '''As part of the PSOMAS team, GeoPentech provided .preparation of .percolation test procedures, observed and reviewed percolation field testing, completed data analysis "of collected test results, and prepared this report documenting our findings of this study. _Based on our discussion'with PSOMAS and the•City, we understand that the City directs storm water, landscapes irrigation runoff and other surface water flows to basins or ponds where the mater is allowed to evaporate and percolate into the subsurface. New developments require adequately sized basins for management of surface water flows. A key element in the design and utilization of basins or ponds is the percolation rate expected -for given areas within the City. `Thekpreferred approach.to estimating percolation rates is to test as large an area as possible up to full-scale for as : long ' as possible in order to • minimize unknown subsurface conditions that can dramatically in percolation rates ". � Large -scale tests also provide a measure of clogging within the, basin' and future management requirements. 'However, for this assignment it was. not feasible. to use either test basins or`ponds to estimate percolation rates, therefore, as'an ,' alternative the approach' used the large- diameter infiltrometer test method developed by Herman Bou�ver and his; colleagues at Ari zona State University. This method has been found to provide reasonable estimates of the possible range in percolation rates when a sufficient number'of careful tests are ,completed and the results are combined with an understanding of the sites geologic characteristics. Results from large - diameter infiltrometer testing are enhanced when coupled with baekhoe test pits'of adequate depth to visually inspect subsurface soils for horizons or soil types that may impede percolation. Results from these .tests are used to provide an example of the rate that a basin may expect to drain following a runoff event where water collects in a basin. STUDY METHODS'. Large diameter mfiltrometer tests were ,conducted at three dry (unsaturated) locations shown on Figure 1. 'These .locations were at the northern and southern sides of the Hideaway residential development and at the Andalusia residential development, which are on the 'east and southeast 601 N. Parkcenter Drive, Suite 210, Santa Ana, California 92705 Phone (714) 796-9100 Fax (714) 796 -9191 Web Site: www.geopentech.com Mr. William Whittenberg, P.E., DEE FINAL DRAFT September 22, 2004 • Page -2 sides of the City. In addition, an existing retention basin site with saturated soil conditions was used to evaluate differences between the percolation rates for soils under "dry" unsaturated and "wet' saturated conditions. The infiltrometer tests for unsaturated soils were conducted on May 5, 2004 at the northern Hideaway residential development site and July 22, 2004 at the southern Hideaway and Andalusia sites. Following infiltrometer testing, several potholes 4 to 5 feet deep were excavated with a backhoe to observe the subsurface soils to that depth. In addition, two short-term slug tests were performed July 23, 2004 in saturated sediments at the retention basin at Dune Palms Drive and Desert Stream Drive (Figure 1). Large diameter infiltrometer tests in unsaturated soils were conducted in accordance with the procedures developed by Bouwer, et al., 1997 1, as follows: 1. Steel cylinders approximately 2 feet in diameter by 2 to 2.5 feet long with a beve led edge were driven straight down into the ground about 3 to 4 inches and soil was then packed against the inside and outside of the cylinder to get a good soil - cylinder contact. 2. Water was then poured into the cylinder avoiding soil erosion to fill the cylinder to a depth of 1 Predicting infiltration and ground water mounding for artificial recharge; Bouwer, H., Back, J. and Oliver, • J., October 1997. 9/28/2004 ®Final Draft.doc GeoPentech about 12 to 24 inches and time was recorded. 3. The water level was allowed to decline approximately 4 to 5 inches, the water level decline was measured, clock time was recorded, and the cylinder was filled back up to the starting level. 4. This was repeated until the accumulated water level decline equaled or exceeded 50 inches or the elapsed time exceeded 5.5 hours. • 5. A backhoe was used to dig outside the cylinder and through the total depth of the wetted soil and the lateral and vertical dimensions of the wet soil was measured. 6. The infiltration rate for the final decline in water level and the measured vertical and lateral extent of the wetted soils were used to calculate the downward flow rate (i.e. infiltration rate corrected by removing the effects of lateral divergence in flow), effective soil porosity and the vertical hydraulic conductivity of the saturated soils. For the saturated soil test location, the following procedures were used: 1. A test hole was dug with a shovel to a diameter of approximately 8 inches wide and a depth of approximately 8 -10 inches deep. 2. A 4 -inch diameter 5 -foot long PVC casing was then placed into the hole and tapped into place and stabilized with metal fence posts driven at approximately 45 degree angles into the ground. 3: A 1 -inch bed of sand was placed at the bottom of the hole and the remaining opening outside the casing was filled with bentonite chips and hydrated. 4. The bentonite was allowed to hydrate for 15 minutes and the casing was then filled with approximately 4.8 feet of water. A pressure transducer was placed at the bottom of the casing; the transducer calibration was checked and it was then used to measure the fall in water level in the casing with time. 1 Predicting infiltration and ground water mounding for artificial recharge; Bouwer, H., Back, J. and Oliver, • J., October 1997. 9/28/2004 ®Final Draft.doc GeoPentech Mr. William Whittenberg, P.E., DEE September 22, 2004 • Page -3 • FINAL DRAFT 5. The change in water level measured in the casing with time was used to estimate the hydraulic conductivity of the saturated soils of the retention basin in accordance with the procedures described by Bouwer and Rice, 19762. Although the slug tests were set up to estimate vertical hydraulic conductivity, the results represent both horizontal and vertical components of this parameter. Because horizontal hydraulic conductivity is generally much greater than the vertical component, the results would tend to overestimate the expected long -term infiltration rate. In order to account for horizontal flow in the saturated soil beneath the casing that occurred during the tests, analysis of the test results assumed a horizontal to vertical hydraulic conductivity ratio of 10 to 1. This assumption is based on profe ssional judgment and literature that generally reports a horizontal to vertical hydraulic conductivity ratio between 2 and 203. The reported results and those shown on the charts for the wet basin tests in the attachment are for vertical hydraulic conductivity. TEST RESULTS AND ANALYSIS Percolation data measured during testing is presented in the attachment to this report along with calculation of the downward flow rate and saturated soil hydraulic conductivities. Analyses of the wet basin slug tests are also provided in the attachment. Shallow potholes did not identify low permeability soils that would limit or reduce percolation. The results of the testing along with key test site features are summarized in the table below. PERCOLATION TEST RESULTS SUMMARY Test Site Soil Type Downward Flow Rate ft/day Effective Porosity % Vertical Hydraulic Conductivity ft/day, (in/hr) North Hideaway Sandy Loam 2.9 14 2.0 (1.0) South Hideaway Fine Sand 7.9 14 5.3 (2.7) Andalusia Sandy Loam 1.3 12 0.63 (0.32) Wet Basin Test 1 Loamy Sand n/a n/a 3.2(l.6) Wet Basin Test 2 Loamy Sand n/a n/a 2.0 (1.0) n/a: Not derived by testing method. DISCUSSION OF RESULTS Testing to estimate the infiltration rate at three unsaturated ' soil sites in La Quinta was conducted using a large- diameter (approximately 2 feet), single cylinder infiltrometer. Measurements of water level drop in the cylinder with time and the vertical and lateral extent of wetted soils at the conclusion of the tests were used to correct the infiltration late for lateral divergence in the soil below the infiltrometer to derive a downward flow rate. The downward flow rates were used along with the soil's water entry value to calculate estimated vertical hydraulic conductivity for the soil at 2 A slug test for determining hydraulic conductivity of unconfined aquifers with completely or partially penetrating wells; Bouwer, H. and R.C. Rice, 1978. • 3 Applied Hydrogeology, Third Ed.; Fetter, Jr., C.W. 1994; Vadose Zone Hydrology; Stephens, D.B., 1996. 9/28/2004 GeoPentech Final Draft.doc Mr. William Whittenberg, P.E., DEE September 22, 2004 • Page -4 FINAL DRAFT the test sites. Two falling head slug tests were also conducted in a basin currently receiving surface water runoff to estimate the vertical hydraulic conductivity of the saturated soils on the floor of the basin. Because the slug test results are a composite of horizontal and vertical hydraulic conductivity, the results were corrected assuming a ratio of 10 to 1, horizontal to verticaf. .The vertical hydraulic conductivities estimated from the different testing completed for this study ranged from 0.63 feet/day (0.32 in/hour) to 5.3 feet/day (2.7 in/hour). These estimates can be used to assess infiltration rates at the test site locations for retention basins that would be used to capture and retain surface water runoff without clogging of the surface sediments and without :low permeability, restricting layers at depth. The soils tested were classified as either a sandy loam (North Hideaway and Andalusia sites) or fine sand (wet basin and South Hideaway sites). Potholes at the Hideaway and Andalusia sites excavated b 4 to 5 feet below ground surface did not identify low permeability sediments that would limit or reduce percolation. Figure 2 shows predicted water level declines in a hypothetical basin with time for the various vertical hydraulic conductivities estimated for the different test sites within the City. These examples assume the basin is filled to a level of 10 feet initially and is allowed to percolate into the subsurface with no additional inflow of water and no mounding of water beneath the basin. The chart shows that just over 1 week would be required to drain a basin underlain by low conductivity soils such as at the Andalusia site, whereas areas underlain by more permeable sandy soils would drain within approximately 1 to 3 days. These infiltration rates would be expected to decrease over • time as organic material and fine-grained sediments build up on the basin soils filling near surface interstitial pores and/or forming a lower permeability clogging layer. CONCLUSIONS AND RECOMMENDATIONS Percolation tests were conducted at three unsaturated soil sites within the City using a large - diameter infiltrometer test method and at one saturated soil site using a slug -test method. Soils characterized at the test sites were either sandy loam or fine sand. The vertical hydraulic conductivity estimated for these soils ranged from 0.63 ft/day (0.32 in/hour) to 5.3 feet/day (2.7 in/hour). We recommend for new developments that a vertical hydraulic conductivity value (i.e. infiltration rate) of 0.6 ft/day (0.3 in/hour) is used along with the estimated maximum surface water discharge for an area to design appropriately sized retention basins. Should a developer desire applying a different infiltration rate, we recommend conducting additional large- diameter infiltrometer tests at planned retention basin sites. These tests should account for divergence of flow in the soil due to lateral unsaturated flow consistent with the test procedures used for the study described in this report. We also recommend completing subsurface explorations to identify the possible presence of low permeability layers at depth that could limit or impede the percolation of captured surface flows. As infiltration rates will decrease with time due to clogging of the surface soils, we further recommend a management plan be prepared for each retention basin to maintain the maximum percolation rates possible. • 9/28/2004 ® GeoPentech Final Draft.doc Mr. William Whittenberg, P.E., DEE FINAL DRAFT September 22, 2004 Page -5 We appreciate the opportunity to work with you on this assignment. Please do not hesitate to contact us should you have any questions regarding this draft letter report. Sincerely, GeoPentech Eric S. Fordham, C.Hg. 283 Principal Hydrogeologist Figures 1 and 2 Attachments • • 9/28/2004 GeoPentech Final oraft.doc R, 19WAR TM , i "zrl is t MW I 4 i =rX'► .. '?;.':a mod. ..i« t,:.. -- -, � '�_� r � - 0 0 10 8 M M m 0 5 L d V R 4 3 2 0 S — 0. 63 ft/d — 2.0 ft/d — 3.2 ft/d 5.3 ft/d 1 2 3 4 5 6 7 Time (days) is Predicted Basin Infiltration for Different Hydraulic Conductivities Figure 2 0 0 0 is 100 F- 10- CL U) n in 10-3 Wet Basin Test 1 0.0 88.2 176.4 264.6 352.8 441.0 Time (sec) 0 M 100 C N 4) 10 -1 U c� Cn F 10 -2 103 Wet Basin Test 2 M 164.2 328.4 Time (sec) 492.6 656.8 821.0 _ - -- Bouwer & Rice Results Hydraulic Conductivity 2.0 ft /d Initial Displacement 4.8 ft i xx x x x x - - ..- W -. - -. M 164.2 328.4 Time (sec) 492.6 656.8 821.0 • PERCOLATION DATA SHEET Project City of La Quinta Job No. Test Hole Andalusia Date of Test Diameter of Test Cylinder (in.) 25 Soil Classification Percolation Tested By: D. Gamon Soil Type • 1LAQ01-0100 7/22/2004 SM saddv loam Reading No. Time of Reading Time Interval (min.) Initial. Water Level (inches) Final Water Level (inches) Difference in Water Level (inches) Total Water Percolated (inches) Percolation Rate (min. /in) 1 10:49 -11:14 25 24 21 3 3 8.3 2 11:14 -12:02 48 .24 21 3 6 16.0 3 12:02 -12:53 51 24 21 3 9 17.0 4 12:54 -13:53 59 24 20.75 3.25 12.25 18.2 5 13:54 -14:24 30 24 22 2 14.25 15.0 6 14:25 -15:36 71 24 20 4 18.25 17.8 7 15:37 -16:30 53 24 21 3 21.25 17.7 8 9 10 12 13 14 15 16 17 18 19 20 Total Time minutes 3371 Total inches 21.25 Average 15.9 Wetting Front Dimensions Lateral (inches) 58 • Vertical (inches) 32 Page 1 of 6 I INFILTRATION RATE AND'HYDRAULIC CONDUCTIVITY CALCULATION Test Hole Andalusia Infiltration rate last water level drop [ ft/day]; i„ = y,/dt„ 6.8 Corrected infiltration rate [ft/day]; ice, _ (i„ *pi *r2) /pi *(r +x)2 1.3 Effective Porosity; yt *pi *r2 /L *pi(r +x)2 12% Water entry value [ft]; h1Ne -0.82 Hydraulic conductivity [ ft/day]; K = iW *L /(z +L -h,,) 0.63 Hydraulic conductivity [cm /sec]; . 2.21 E -04 • Geometry and symbols for single- ring"infiltrometer From: Bouwer, et.al, 1997 Page 2 of 6 • PERCOLATION DATA SHEET Time Interval (min.) Project City of La Quinta Job No. 1LAQ010100 Test Hole North Hideaway Date of Test 5/5/2004 Diameter of Test Cylinder (in.) 23 Soil Classification SM Percolation Tested By: Hogan Wright Soil Type sandy loam 40 Reading No. Time of Reading Time Interval (min.) Initial Water Level (inches) Final Water Level (inches) Difference in Water Level (inches) Total Water Percolated (inches) Percolation Rate (min. /in) 1 9:42 - 9:52 10 12.6 8.6 4 4 2.5 2 9:54 - 10:09 15 12.3 8.5 3.8 7.8 3.9 3 10:11 - 10:30 19 12.5 7.6 449 12.7 3.9 4 10:41 - 10:56 15 12.3 8.4 3.9 16.6 3.8 5 10:58 11:14 16 12.7 8.5 4.2 20.8 3.8 6 11:16 -11:31 15 12.4 8.5 3.9 24.7 3.8 7 11'33 - 11:48 15 12.8 8.7 4.1 28.8 3.7 8 11:50 - 12:04 14 12.5 8.7 3.8 32.6 3.7 9 12:06 -12:20 14 12.5 8.7 3.8 36.4 3.7 10 12:22 - 12:36 14 12.6 8.6 4 40.4 3:5 11 12:38 - 12:52 14 12.5 8.6.. 3.9 44.3 3.6 12 12:54 - 1:09 15 12.7 8.8 3.9 48.2 3.8 13 1:11 - 1:27 16 12.6 8.5 4.1 52.3 3.9 14 1:29 -1:45 16 12.7 8.6 4.1 56.4 3.9 15 _ 1:47 - 2:03 16 12.5 8.5 4 60.4 4.0 16 2:05 - 2:20 15 12.2 8.2 4 64.4 3.8 17 2:22 - 2:35 15 12.2 8.4 3.8 68.2 3.9 18 2:36 - 2:51. 15 12.2 8.4 3.8 72 3.9 19• 20 Total Time minutes 2691 Total inches l' 72 1 Average 1 3.7 Wetting Front Dimensions Lateral (inches) 75 Vertical (inches) 47 G Page 3of6 • • • INFILTRATION RATE AND HYDRAULIC CONDUCTIVITY CALCULATION Test Hole North Hideaway Infiltration rate last water level drop [ft/day]; i, = yn/dtn 30.4 Corrected infiltration rate [ ft/day]; i,, _ (in*pi *r2) /pi *(r +x)2 2.9 Effective Porosity; yt *pi *r2/L *pi(r +x)2 14% Water entry value [ft]; hWe -0.82 Hydraulic conductivity [ft/day]; K = iW *U(z +L -hY18) 2.00 Hydraulic conductivity [cm /sec]; 7.06E -04 Geometry and symbols for single -ring infiltrometer From: Bouwer, et.al, 1997 Page 4 of 6 • Reading No. PERCOLATION DATA SHEET Time Interval (min.) Project City of La Quinta Job No. 1 LAQ010100 Test Hole South Hideaway. Date of Test 7/22/2004 Diameter of Test Cylinder (in.) 25 Soil Classification SW Percolation Tested By: D. Gamon Soil Type fine sand • Reading No. Time of Reading Time Interval (min.) Initial Water Level (inches) Final Water Level (inches) Difference in Water Level (inches) Total Water Percolated (inches) Percolation Rate (min. /in) 1 11:31 -12:17 46 24 9 15 3 3.1 2 12:21 -12:33 12 24 20 4 7 3.0 3 12:34 -13:10 36 24 11 13 20 2.8 4 13:15 -13:26 11 24 19 5 25 2.2 5 13:29 -13:40 11.5 24 20 4 29 2.9 6 13:42 -13:53 11 24 20 ' 4 33 2.8 7 13:55 -14:07 12 24 19 5 38 2.4 8 9 10 11 12 13 14 15 16 ,17 18 19 • 20 Total Time minutes 139.51 Total inches 50 Average 2.8 Wetting Front Dimensions • Lateral (inches) 63 Vertical (inches) 55 Page 5 of 6 • • 40 M INFILTRATION RATE AND HYDRAULIC CONDUCTIVITY CALCULATION Test Hole South Hideaway Infiltration rate last water level drop [ ft/day]; in = y,/dt„ 50.0 Corrected infiltration rate [ ft/day); i,,, _ (i„ *pi *r2) /pi *(r +x)2 7.9 Effective Porosity; yt *pi *r2 /L *pi(r +x)2 14% Water entry value [ft]; h,,e -0.49 Hydraulic conductivity [ft/day]; K = i,,, *U(z +L -hWe) 5.26 Hydraulic conductivity [cm /sec]; 1.85E -03 Geometry and symbols for single -ring infiltrometer From: Bouwer, et.al, 1997 Page 6 of 6 1 r ' - - - 'TRACT 24890' - ` T AINAGpm i IN AND t p GRADING NOTES PAVING NOTES CLUB HOUSE LOT' 1. ALL UNDERGROUND FACILITIES IINCLUDINGLATERALS SHALL BE INPLACE, THE 1. ALL GRADING SHALL BE DONE IN ACCORDANCE WITH CHAPTER 70 OF THE AND TRENCHES COMPACTED AND) TESTED PRIOR TO PAYING.. ��� �'���� COURSE' UNIFORM [BUILDING CODE, 111E SOILS RET'OR'T' PREPARED UY TIIE SOILS ENGINE'E'R AND GFOLOGISI' DESIGNATED BELOW, AND THESE PLANS. 2• ALL EXISTING IMPROVEMENTS INCLUDING CURB AND GUTTERS, SIDEWALKS, ASPHALT CONCRETIE OR P.C.C. PAYING, WHICH ARE BEING }� j ���j j ,�/y�" ' w 2. AREAS OF FUTURE CONSTRUCTION SIIALI. BF PLANTED WITH A SEED MIX JOINED OR MATCHED IN CONNECTION WITH THIS PROJE=CT, SHALL BE LA QUINTA, CALIFORNIA. APPROVED BY TILE CITY OF LA QUIN'TA. JOINED OR MATCHED IN A MANNER NECESSARY SATISFACTORY TO THE CITY ENGINEER, INCLUDING NECESSARY SAW CUTTING, REMOVAL, 3. IF TIIE CIVIL ENGINEER OF SOILS ENGINEER ARE CHANGED DURING THE. REPLACEMENT AND CAPPING. COURSE OF WORK, ALL (YORK SIIALI. BE STOPPED UNTIL A REPLACEMENT HAS AGREED TO ACCEPT THE RESPONSIBILITY FOR CL•R'lIFICATION UPON 3. A "PRIME COAT" SIIALI, BE APPLIED TO THE SURFACE OF THE UNTREATF•D COMIIILFTION OF TIIE (YORK. AGGREGATE BASE, A'1' THE RATE OF 0.25 GAL. /YD. UNLESS DELETED BY 'THE 4. DUItINGROUGIIGRADI NO, 01'ERA'l' IONS, ANU flit IC)R1'OCONS "I'RUCTIONOI' CITY ENGINEER. THE PRIMECOA 'I['SHALLBE• ANMC- 70,SC- 70,NIC -250 LIQUID ASPHALT. PLRNIANENT DRAINAGE CONTROLS, IT SHALL UE TIIE KESPONSIBILfrY OF y i THE CONTRACTOR TO PROVIDE GOOD DRAINAGE AND PREVENT PONDING 4. A "TACK COAT" (PAINT BINDER) SHALL BE APPLIED BETWEEN PAVF.Ir1ENT OFWATER AND DAMAGETQADJOININGPROPERTIESORTOFINISLTEDWORK LAYERS, CONCRETE SURFACES AND ON EXISTING PAVEMENT 1'0 RE ON THE SI'Z'E. RESURFACED AT THE RATE OF OUO GAL. /YD. THE TACK COAT SHALL BE TYPE SSI ASPHALTIC EMULSION MVITH A 60 -70 GRADE LIQUID ASPHALT. 5. ALL BRUSH, VEGETATION AND OTHER DELETERIOUS MATERIAL, SUCH AS p W D RUBBISH, SHALL BE COLLECTED, PILED, AND REMOVED FROM TIIE SITE 5. 'IHE VISCOSITY GRADE OF PAVING ASPHALT SHALL BE AR- 4000OR AR -8000, � PRIOR 'ro PLACING FILL, LEAVING T[1E SITE FREE AND CLEAR FROM TO BE DETERMINED BY THE CrrY! ENGINEER AT THE TIME OF PAVING. � � Gl �+ v � P0MEL0 STREET OBJECTIONABLE MATERIAL. 6. THE FINAL OR SURFACE LAYER OF ASPHALT CONCRETE SHALL NOT BE vi I 6. ANY UNDERGROUND STRUCTURES SUCII AS CESSPOOLS, SEPTIC TANKS, PLACED UNTIL ALL ON -SITE IMIPROVEMENTS HAVE BEEN COMPLETED, ; WELLS OR PIPES NOT LOCATED PRIOR 1'0 GRADING ARE TO BE REMIOVEO INCLUDING ALL EARTHWORK GRRADING. OR TREATFD IN A MANNER PRESCRIBED BY THE SOILS ENGINEER. _ _ 2 a 7. MANHOLES AND VALVE BOX FRIAMIES SHALL BE ADJUSTED TO FINISHED Y 6 r HCL _ -24 T SOIL, ALLUVIUM, OR ROCK MATERIALS DE'T'ERMINED BY THE SOILS GRADES AFTER COMPLETION OF CONSTRUCTION, ! 2 ENGINEER AS BEING UNSUITABLE FOR PLACEMENT IN COMPACTED FILLS I7. /O /NY. 4y SHALL BE REMOVED FROM THE SILL. THE SURFACE SIIALI. THEN BE 8_ ANY EXISTING TRAVELWAYS IN WHICH EXCAVATION IS MADE IN s`aoOSO L /NEA3- /�lifCP PLOWED OR SCARIFIED TO A MINIMUM DEPTH OF A 6 INCHES UN'l11, TIIE: CONJUNCTION WITH THIS PROJECT SHALL BE COVERED BY A SEPARATE .Yrd00 O SURFACE IS FREE FROM UNEVEN FEATURES THAT WOULD TEND TO PERMIT. THIS AREA SHALT. BIE PROPERLY POSTED AND LIGHTED IN PREVENT UNIFORM COMPACTION BY THE EQUIPMENT USED. CON FORMANCEWITHTHE STATE I MAN UAL OF WARNING SIGNS, LIG[I "CS,A \ND DEVICES FOR USE IN THE PERFORMANCE OF !YORK UPON HIGHWAYS, IN 25 8. THE UPPER 3 FEET BELOW ADJACENT FINISH GRADE WITHIN A PERIMETER ORDER TO ELIMINATE ANY HAZARDS. OF 5 FEET OUTSIDE OF EACH PROPOSED STRUCTURE SIIALI. BE DENSIFIL•D 1 -0 A MINIMUM RELATIVE COMPACTION Oh 90'8, BY METHODS OUTLINED IN 9. ALL EXISTING PAVEMENT WIT'IIIN THIS PROJECT SHALL EITHER BE 9b THE SOILS REPORT PREPARED BY SOILS ENGINEER AND GEOLOGIST REMOVED OR STRUCTURALLY 'TESTED TO VERIFY THE STRUCTURAL ( � � � DESIGNATED BELOW. CAPABILITIES AND 'THE RE•SUL:TS SHALL BE APPROVED BY THE CITY h V J 11�IIdV• •RCP 2; It, ENGINEER. Q IVE' p " 9. MATERIALS FOR CONIPACTED FILL SHALL CONSIST OF MATERIALS Si V 6J '5:0.0020 ' APPROVED BY THE SOILS ENGINEER. FILL SOILS SHALL BE FREE FROM 10. THE CURB SHALL BE 'ETCHED" SHOWING LATERAL LOCATIONS: "S" FOR _.__._ 24 - - - - -- - - - : -- -- - - - �; ORGANIC VEGETABLE' h1A'1'TER AND OTHER UNSUII-ABLE SUBSTANCES. SEWER, "G" FOR GAS, AND "E" FOBZ ELECTRICAL> I � Dh b h YO - 10. THE MIA'I ERIAL USED IN THE COMPACTING PROCESS SHALL TIE EVENLY 11. 'TRAFFIC STRIPING, LEGENDS /AND PAVEMENTS MARKERS, TYPE AND U \ix SPREAD, WATER ED, PROCESSED, AND COMPACTED IN - 1.111N LIFTS NOT 'TO LOCATIONS SHALL BE APPROVED BY THE CITY ENGINEER. EXCEED 6 INCITES IN THICKNESS TO OUTAIN A UN1170RNILY DENSE LAYER. IL WHEN THE MOISTURE C'ON'TENT IS BELOW THAT SPECIFIED BY THE SOILS CONSTRUCTION NOTES v k 'X4 ENGINEER, WATER SHALL BE ADDED BY -TIIE CONTRACTOR UNTIL THE I` MIO1s ru1tE CONTENT Is Nrn1t OPTIMUM AS SPECIFIED. AND ESTIMATED QUANTITIES z ; ; a kQ 12. ❑'LIEN THE MOISTURE CON'I'L'Nl' IS ABOVE THAT SI ECIFIED UY TIIE SOILS a ts ENGINEER THE MATERIAL, SHALL BE AERATED BY BLADING, MIXING, OR It�- CONSTRUCT Y AC OVER 4' AB 152,980 SF OTHER ME'rHoUs SATISFACTORY TO THE SOILS ENGINEER UNTIL THE MOISTURE CONTENT IS NEAR OPTIMUM AS SPECIFIED. (2� _CONSTRUCT 6* CURB AND GUTTEER (L5') PER DETAIL 4,186 LF V N cy h Q O `�' /N9TALL 95:54 LF 3C".PCP 13. AFTER EACH LAYER HAS BEEN PLACED, MIXED, AND SPREAD EVENLY IT BELOW /11/BTALL 2W w2 4f 21 "AVP SHALL BE THOROUGHLY COMPACTED TO 906 OF THE MAXIMUM 30 - CONSTRUCT 6' CURB PER RIVERSM COUNTY STD. PLAN' 3,040 LF (1000-0) LABORATORY DENSITY IN COMPLIANCE WITH A.S.T.M[. D- 1557 -70. NO. 204 1•I. NOTHING IN THESE PLANS SHALL RELIEVE THE CON TRACTOR FROM a- INSTALL 18- RCP (D -LQAD PER VIROFILE) 9891E //d"fL 42.23 - OBTAINING PERMITS AS RL'QUIRED BY TIIE CITY 01: LA QUIN'I'A MUNICIPAL Q �j " /B 'RCP C ?gAp-D) 15 4 m CODE. 5 INSTALL. 36 RCP (D -LOAD PER PIROFILR) 535 LF V / �� �� ` INSTALL 30' RCP (D -LOAD PER PRtOFI1,E) 781E LINE! A ' 15. T[ IE SOILS ENGINEER SII ALLINSPECTTHE PLACEMENT OF FILL DURINGT HE GRA DING PROCESS ANDSIIALL FILE A WRITTEN REPORT UPON COMPLETION 7O-- CONST. MAL NO. I PER L.A.C.F_C.U!• STD. PLAN 2 -D102 OF GRADING STATING HIS OBSERVATIONS AS TO COMPLIANCE WITH THE 5EA { J SOILS REPORT. CONST. DRYWELL PER DETAIL OIN SHT. 1 3 EA 16. ALL (YORK SHALL BE DONE IN ACCORDANCE lYITLI 'TIIE STANDARD PLANS (�9 -- CONST. CURB INLET CATCLI BAS11N PER COUNTY j N �y �j F/jy /Sf/ i OF THE CITY OF LA QUINTA AND THE STANDARD SPECIFICATIONS FOR OF RIVERSIDE STD. PLAN NO. 300) (L =4') 5 EA ; P1 h yl w S[/RFi4CB PUBLIC WORKS CONSTRUCT ION, LATEST EDI TION, AND RIVERSIDE COUNTY S I'ANDARDS AND SPECIFICATIONS ORDINANCE NO. 461 LATEST EDITION. 0- INSTALL 2 V RCP (D -LOAD PER PIROFILE) 108 LF 1nZ 12 CONSTRUCT Y A.C. OVEN NATIVIE MATERIAL 70,197 SF 17. GRADING SHALL BE IN ACCORDANCE WI'rll THE ENGINEERED GRADING: � _ _25- REQUIREMENTS OF THE UNIFORM( BUILDING CODE, LATEST EDI 1 -ION, AND 13 PARKING LO 11- STRIPING, LS R '`) t SOILS ItEPORT NO.'T3 -109&?l VATFD gle5tffl PREPARED BY i3}7FJIt1EJnW INQ, rEl EPHONE(61$134v -158b 14 INS -rALL BRICK AND MORTAR PILUG 3 E N 15 CONSTRUCT BARRICADE, REFLECTOR $ SIGN PER RIVERSIDE GCtJNTY AWELO 67NEEi 18. THE CONTRACTOR SHALL NOTIFY THE CITY BUILDING INSPECTOR 48 , `� \• 9 HOURS PRIOR TO ANY GRADING, BRUSHING OR STD. PLAN NO. 810 3 EA CLEANING AND EACH PHASE 01: CONSTRUCTION AT (619) 564 -2246, AND 48 HOURS PRIOR '1'O 16 C(N•ISTIIUCT2"x4' REDWOOD HEADER 120 LF � \" H6L 3.0.030 REQUIRING INSPECTION. 47 REMOVE BWK AND MORTARPUJG 1 EA 30 30 _...- - -- --.. -_.._. _..._._..�Q. _.._._- _ - - -. -- �Q _- __.. -. _ ---• - - -. __ -. I'). TIIr CONTRACTOR SHALL UERESPONSI FILL FOR PKOVIDINGANEFFECi 'LYE 18 PROTECT EXISTING IRPo( 3ATION PIPE (APPROXIMATE LOCATION) NOTIFY s =o.dp20 y� MEANS OF DUST CONTROL WmCII SHALL INCLUDE PROVISIONS FOR OWNER AND ENGINEER CASE OF COIJCT AND ABANDON EA THE " s'O.D /ap ; Na -- ADEQUAI-E WATERING DURING TE GRADING PROCESS AND PROVISIONS � � N NRF Z g• FOR CONTINUANCE OF DUST CONTROL AFTER THE GRADING UNTIL SUCH 19 INSTALL CONDWIT ENCASEMENT ; tg CY 'r1MTE THAT't'HE GRADED SURFACE PRESENT EFFICIENT YRO'fECI'IYE COVER e AGAINST W(NU Olt WATER EROSION THAT SPECIAL. DUST CON'T'ROL 70 6' P.C.C. CONIFiEfE APRON tae SF 14 MEASURES ARE NO LONGER NECESSARY. _ rFp _ '' 1/ 8" PVC DRAM PPE 140 LF ?5 - -- `�. Z5 20. IF BURIED REMAINS ARE ENCOUNTERED DURING DEVELOPMENT, A QUALIFIED ARCILAEOLOGIS'f SHALL BE CUN'1'AC'fEU IMMEDIATELY AND &2_3_ .7X7 DFM t3t�l WITH 6" M-#CK WALLS 6 EA' APPROPRIATE MITIGAT'!ON MEASURES CAN BETAKEN. Gy %a�- -i GO(M6TRIKK:T GC)NCt#EfE COLLAR :'PER COUNTY OF RNEASDE 21. ALL FILLS SHALL BE, COMPACTED TO A MINIMUM OF NINETY (90) PERCENT v STD. PAM NO. 1 EA ,� ' �' EP E -�� 8.0.004 OF MAXIMUM DENSITY AS DETERMINED BY UNIFORMED BUILDING CODE 4 W ( � - �+� cp� p STANDARD NO.70 -1 OR EQUIVALE•N- 1- ASAPI'ROVED UY •r11ECl'rY ENGINEER. ' - Q I O FIELD DENSITY SHAJ.L BE DETERMINED [N ACCORDANCE WIT11 THE u% 0 �` - .. -__� ! ____ __._.- 20 20.- .____,_ ... ! ___._.__ -- _.____.. _...__._ - ZQ N IV, �p ' ! UNIFORM BUILDING CODE NO. 70 2, OR EQUIVALENT, AS UEl'EIZAIINEU BY THE CITY ENGINEER. ' ESTINME OF EARTHWORK QUANTITIES: 22. LOCATIONS OF FIELD DENSITY TEST SHALL BE DETERMINED BY THE SOILS � \ � � V � ' `d Q q ai '7 Rt � � V � I /NS7AL.L. 202. B9 LF� /8 "RCP (/150-0) ENGINEER OR API'ROVEU "fES'fING AGENCY AND SIIALI. BE SUFFICIENT IN Q h M h 'r" pd'PW EQUIVAL6Vi BOTH HORIZONTAL. AND VERTICAL PLACEME•N'r TO PROVIDE A. CLU13 HOUSE AREA CUrt (C,Y,) FILL (C,Y.) A �l 1 ^+ti .!+, O y+. o3 bti RrPRESEN "TA'rIVE TESTING OF ALL FILL PLACED. TESTING IN AREAS OF A CRI'TIC'AL NATURE OF SPECIAL EMPHASIS SHALL BE IN ADDITION TO THE RAW CUT /FILL 16,072 6,764 . z NORMAL REPRESENTATIVE SAMPLINGS. IN574ZZM9 -dV /NST[LCQ831F J SUBSIDENCE (0.2') (1,911) 951 /a -PVC / soR asJ f " 1e QcP �zaYJ D) o N o i 23. 1'l1E FINAL COMPACTION RET'OR'T AND AI'1'FtOYAL FttOki '1'lIE SOILS C9 � 1► ENGINEER SHALL CONTAIN 171E TYPE OF FIELD 'rr -sTING I'ERFORhIE'D. TREE STRIPPING (02) •(1,911) 484 ^� �? ti 04 w N EACII TESI' SLIALL BE IDENTIFIED WITH THE METHOD OF OUTAINING TIIE n N D N /NSTALC 77.98 LF IN -PLACE DENSITY, WHETHER SAND CONE OR DRIVE RING AND SHALT. BE OVEREX. BLDG. AREA (3') 5,344 5,344 Q o N 30 RCP (1600 OJ . I SO NOTED FOR EACH Z'ES'T. SUFFICIENT MAXIMUM DENSITY' " DrTERM1t NATIONSHAI_ LBEPERFORMEDTO VERIFY THE ACCURACY OF TIIE OVEREX. PARKING (1) 13,583 13,583 10 MAXIMUM DENSITY CURVES USED BY THE FIELD TECHNICIAN. hVST.4CLB117LF SHRINKAGE (15 %) 4,068 - /e'A�cP (zee7o -v) L /NE "A• 2 so 24. ALL TRAVELED WAYS MUST BE CLEANED DAILY OF ALL. DIRT, MUD AND DEBRIS DEPOSITED ON THEM AS A RESULT OF GRADING OPERATION. SUBTOTAL 31,177 31,194 w CLEANING IS TO BE DONE TO THE SATISFACTION OF CITY ENGINEER. L /NE `A" I N 25. CONSTRUCTION OPERATIONS AND MAINTENANCE OF EQU11'M1ENT WI HIN / O ONE HALF MALE OF HUMAN OCCUPANCY SHALL BE PERFORMED ONLY DURING'TIIE TIME PERIODS AS FOLLOWS: 2. GOLF HOLE /TUNNEL OCTOBER IST - APRIL 301'11; MONDAY - FRIDAY 7:00 ANt'ro 5:30 I'M SATURDAY 8:00 AM TO 5:00 1'M RAW CUT /FILL 47,225 146 MAY AY 1ST- SEPTEMBER 30TH; MONDAY - FRIDAY 6:00 AN, TO 7:00 PM1 SA FRRDAY 8:00 AM 1'O 5:00 NO SUBSIDENCE (0.2) (2,666) L�NpSCAPE YORK -ShA_: $1::= 'HGPilBlrt) AIL: Tw ',)N SLNDA( VR FEDEH/AL HO:JDAYS., 11 FA 3 EMEAT 26. 'I IIE LOCATIONS OF EXISTING UNDERGROUND UTILITIES AIt ESI10WN IN AN STRIPPING (2,666) APPROXIMATE WAY ONLY. THE CONTRACTOR SHALL DETERMINE -1.11E EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK• HE AGR EESTO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH SUBTOTAL 41,893 146 I MIIGHT BE OCCASIONED BY HIS FAILURE TO EXACTLY LOCATE ANI7 0 PRESERVE ANY AND ALL UNDERGROUND UTILITIES. d5' 20' /0' /0' 27. STREET NAME SIGNS AND TRAFFIC CONTROL, SIGNS, TYPE AND LOCATION TOTAL. 73,Q7U $1,34U 10 � 4 �Ot �N Fi1TUn� � SHALL BE APPROVEDBYTHE CITY ENGINI- Elt.'1'RAFFICSTRIPIN(i,LEGENDS T ),5x ANU PAVEMENT MIARK ERS, TYPE AND LO' SHALL BE APPROVED BY FIr4SHED (31 ADE '['HE CITY ENGINEER. -�� _ P�VE.4IFNT 30 •�--- �•-" 28. T IIECONTRACTORSI IALL NOT DIST URIF EXISTINGSURVLYMONl1MEN'TSOR - f�:cIST. -� LIENCII MIAIFI�� A191 -L12IIF FLt£ -f I =AFI}EJIt -I E}TJFTE3- F1TiRIPIEi CNSTICI)CTIEJ o-- GRADk _"- REMOVAL AND REPLACEMENT SHALL DE DONE BY A REGISTERED CIVIL ENGINEER WITH AND R.C.E. NUMBER BELOW 33,966, OR A LICENSED LAND I z SURVEYOR ONLY. 3:1 SLOPE ROADBED WIDTH TO THIS POINT 29.- AFTER CLEAR INGEXISTING GROUND SHALL BE SCARiFFD TOAM1INIMUMI ¢ 25 25 OF 6" ON TIIE ENTIRE SITE OR AS RECOMMILNUED BY A SOILS REPORT. 6" � V -6" 30. MAXIMUM CUT AND Fll.l. SLOPES = 2:1. 3 /8 "RAIaIUS 1.5" P 5UPERSEDED SEPARATE PLA�V) + 1 RADIUS � q N 31. MINIMUM BUILDING PAD DRAINAGE SLOPES = 2.0'8,. DRAINAGE SWALES i'�: '!Y• °•' W n\j 6"frC � 3 SHALL BE A MIINIMIUM OF 0.3' DEEP AND BE CONSTRUCTED A MINIMUM OF 2' FROM THE TOP OF CUT OR FILL SLOPES. A1JNIMUMI SWALE SLOPE= 0.50 %. '; -6' CURB FACE !q ± T b TUNNEL r`?+ CAR HITH • .. (Nor PART CF rwi if P"uJE1vSEtdT) � \(PJ0 25 32. AI.L S'I'REG(' SEC "fIONS AKE 1'ENTATIYE, 'rllE MIINIMUM SECTION IS 3' A.C. �. I 3/8' SURFACING 35 u 20 --- - ._- - - -•- - --- -_ -- - _.. -_ -- - - .- .--- .___.- _.._ - - -- __... __ ._ ..._..._._. .. �T) -- - -- - ZD PART OF THIS IMPflOVF� 12.5' 314" RADIUS [V �- J OVER 4" A.U. CLASS 11, ADDITIONAL SOIL TEST MAY BETAK E•N AFTL'R HOUGH GRADING 1'O DETERMINE EXACT SECTION REQUIREMENTS_ .. ' F /N /SN SLGPFACE 0 33. ALL UNDERGROUND FACILl1'IES, 1YITI1 LATERALS, SLIALL UE IN PLACE AND n _ �Ar � * A' � oP� � , � IbA Ilr INSPETHE CTED PRIOR TO PAVING, INCLUDING, BUT NOT LIMITED TO THE �. A 6'' FOLLOWING: SEWER, WATER, ELECTRIC, GAS AND DRAINAGE. \ 20. 34. BLOCK WALLS ARE NOT PART OF THE GRADING PERMIT. St1UMl'r FOR 6 r - - -- � 30 17 35. I9 SEPARA 1'E BUILDING PERMIT. I 7- 1.5" LEVEL LIME I f7GY m 35. ALT. CONSTRUCTION AREASSHALL BE PROPERLY POS'l El) AND LIGHTED IN ON CONFORMANCE WITH FHESlATE MANUAL OF WARNING SIGNS, LIGHTS, 00'4WDERA18S AND DEVICES FOR USE IN TIIE PL'RFORNIANCE OF WORK•UPON IIIGHWAYS,IN CLASS "B' CONCRETE ORDER TO ELIMIINATE ANY HAZARDS, S.0.0 1.351 CU. Fr. / LF A 6 _ CU. YD. = 19.96 LF 25 MINIMUM PERMISSIBLE GRADE 0.35% u 1. Z +06 i. ep ° UNDERFPASS PROFILE TYPE A CURB U�� " '�- h >,t '� �• tlowz. r 20' 2 �o- h o (N.T.S.) � ° �Ix O VERY. 1" -- 4. • PAV SEE EXTER/OR o >N h o Ej STREET NYOROLOCY Q� N STUDY TRACT24890 •IVSTALL /7J24 LF- 18 "RCP (15X-.0) °° No. 20596 D I IK E■P.9 -30 -93 L /NE "L'to J'q,£CIVIA Of CAUL ?2.29.00 9'0c 31' b (0 22.2-9.01 6'er APPROVED lyNCO �G �13p� _ 4 t ,eeYrsEO caTCyeasiNTa�X2'BROOAt�sao•Y.N N6L /9 OR,�D1�tG PAVING DRAINAGE I PL A NOW •°TRACT W ' B )-OUSE PARKIN CIS CITRUS cptlRS LA MM11<i�, TYPICAL. SECTION /y APPROVED BY: '- '1 CITY _ ANK ,y- .Y{..DS . RE DATE: 2.2-r.- I/ RC E NO_ _� EXPHcS Fr30 9A ' 3 3 POMSLO i9 22 +2d00atF ?a� �1C 22 +23.024V 22*2100 jCBN 7 � DATE �( bg � N. 22 +2/.00 8 0llr 8 2 � ZZ+�CO a'Yf /31310V � g� Z6•E A� �, 22+•/9.02 /O 'CF � �- Gq� � R AND FRAME qtr --�'' � 50th AVENUE 3016P COMPACTED 22•/2.00 6'0' �9 N Q 22 +13.71 6'CF t)AACKFILL PRE -CAST MANFK)� �1� bl- 0l a PER STD. PIYAJN.li t1 AVENIDA ULTIMO I/ LOCATION �0 � 9 V7 � O � 20 Q �, O 'A AVENIDA NUJUNGA ; � • � 0 V \ m LD DEWL. `A' )�LVINI NARANJA z O Vj O N AVENIDA TAWCO ,-- -- LD AETA /� 'B' /rVSTALlL SG•W w w THE CITRUS < - /d'RCP<2A2o -D) - /B f�, ^P11�'DI AVENIDA I A PONDA u COURSE q't)' DIA. AVE A LA T FREE TENT. TRACT NV. PER PLAN f I NO. 24890 8" ABS DRAIN PIPE'" � ,.., ;. '- •' ' � I 3 O 12" RCP 8" AB n 12 T CONCRETE COLLAR ` - PRE-CAST PERFOHATED CONCRETE RING F ' D$ .1? A' A. 12'.7 w b Vil S- 0.0339 Y - BACKFILL WITH 3/6" WASI-ED ROCK L /NE "D„ 1B ' -- - - - - IO "')"F/ UNDISTURBED SOIL _ DRYWELL DETAIL 5 :0:0/00 " 1 CURB FACE • EDGE OF 16' GUTTF.RI I 3 * CATCH BASIN PARKING.LOT ± .. PLAN VEW N N ; USE Z" LOCAL DEPBES 2N: • O _ Y r) o , � INSTA��'60.Q• ?y 4� i i I- L /NE .!3'� .._. �. 30' 30' 115' 1 20' 110', 20' 15' 30' 30' 8 PARKING LOT ( PARKING LOT 1 2 ' P. TYP. -- TY SECTION A -A TYPICAL PARKING LOT SECTION (N.T,S.) 24' LINE *A-3" 52n �1 Fes' NOTE: --_. ICINI *ry MAT' APPKOVAL OF THESE I°LANS 13 FOI+C DRAINAGE AND "°""' ° ""' . �-�^ • l \11WG IMrICOVFMF-NT OF 7HE CLUB HOU'5E• MWKING CITY of LA QUiNTA NOT TO SCALE ` LOT AND EL+TTPANC£ 5TMET (rtZ)MBI•0) ONLY. S�A.RATE PIER Set No. APt'T lAL WILL 13E ICEgUIRZO FCAr CLU15 bCQ5F_ BUILDING AND ITS AD-10IYING IMPteCOV�CIENT, 9 O'] f„ �...." 1�� -„_,. _... Vie? ti✓� • n, 1 SOIL ENGINEER/GEOLOGIST: .•,.: �; �I, ��-.,�• BUENA tNGN�ERS, INC. ,�.N% 7.�Yti /.4 79 -811 COUNTRY CLUB DRIVE SL TE #4`- .,,_ `.1, BERMUDA D11tIES, CA. 92201 619 345-1588 ( ) p / ! S!<+NET) DATE ^!I'B/I F /N1Sf1 SURFACE b (0 2 2 APPROVED lyNCO �G CITY OF LA QUI NTA _ 4 t ,eeYrsEO caTCyeasiNTa�X2'BROOAt�sao•Y.N N6L /9 OR,�D1�tG PAVING DRAINAGE I PL A NOW •°TRACT W ' B )-OUSE PARKIN CIS CITRUS cptlRS LA MM11<i�, TYPICAL. SECTION /y APPROVED BY: '- '1 CITY _ ANK ,y- .Y{..DS . RE DATE: 2.2-r.- I/ RC E NO_ _� EXPHcS Fr30 9A ' SCALE: 11 I 1 = 40 POMSLO 4 VENTURE S11I11 100 IRVUI&, CALJ_F(JKNIA 92718.1999 (714) 753.9011 ♦ FAX (714) 753.9727' _ 13! $ ' 4.0.0 DATE . W.O. FOR: F•f, IHZIOU 9 �IPO g� Z6•E A� �, npYpf�R EI►1 RGP op 25 50th AVENUE rn �9 N Q a AVENIDA ULTIMO I/ LOCATION C V7 � O � 20 Q �, O 'A AVENIDA NUJUNGA ; � • � V \ m )�LVINI NARANJA z O Vj O N AVENIDA TAWCO ,-- -- 4VSlALL 4363LF /rVSTALlL SG•W w w THE CITRUS < - /d'RCP<2A2o -D) - /B f�, ^P11�'DI AVENIDA I A PONDA u COURSE AVE A LA T FREE TENT. TRACT Q f I NO. 24890 AVENIDA NWSTRA d AVENUE LINE *A-3" 52n �1 Fes' NOTE: --_. ICINI *ry MAT' APPKOVAL OF THESE I°LANS 13 FOI+C DRAINAGE AND "°""' ° ""' . �-�^ • l \11WG IMrICOVFMF-NT OF 7HE CLUB HOU'5E• MWKING CITY of LA QUiNTA NOT TO SCALE ` LOT AND EL+TTPANC£ 5TMET (rtZ)MBI•0) ONLY. S�A.RATE PIER Set No. APt'T lAL WILL 13E ICEgUIRZO FCAr CLU15 bCQ5F_ BUILDING AND ITS AD-10IYING IMPteCOV�CIENT, 9 O'] f„ �...." 1�� -„_,. _... Vie? ti✓� • n, 1 SOIL ENGINEER/GEOLOGIST: .•,.: �; �I, ��-.,�• BUENA tNGN�ERS, INC. ,�.N% 7.�Yti /.4 79 -811 COUNTRY CLUB DRIVE SL TE #4`- .,,_ `.1, BERMUDA D11tIES, CA. 92201 619 345-1588 ( ) p / ! S!<+NET) DATE ^!I'B/I ��^� LANDMARK' �' '! !; LAND CO. r"t P.O. BOX 1000 LA QUNTA, CA 92243 619 564 450 MORSE CONSULTING GROUP PLANNING • ENGINEERING • SURVEWNG REVISIONS: APPROVED PREPARED BY: DATE: f +�a�0 'E> P R' S9 - 0 -93 APPROVED BW N COtMi` s `6AT[ '� CITY OF LA QUI NTA _ 4 t ,eeYrsEO caTCyeasiNTa�X2'BROOAt�sao•Y.N OR,�D1�tG PAVING DRAINAGE I PL A NOW •°TRACT W ' B )-OUSE PARKIN CIS CITRUS cptlRS LA MM11<i�, APPROVED BY: '- '1 CITY _ ANK ,y- .Y{..DS . RE DATE: 2.2-r.- I/ RC E NO_ _� EXPHcS Fr30 9A ' SCALE: 11 I 1 = 40 BENCHMARK: �E�'•+Q ++O 275 MILEStWH ON MSEM CN STP'�FEOT. 330/0 EETT WA114 g9+ GENTEf ufE OF AV ENE 62, 30 0 iiET EAST OF fE! TE l ' FtE o. wabrr4TON 3TREET. 6.0 PEeT 30VTN OF PpnER Pq•E s9BY210. A 1.25 pLN RON PIPE tf,2 IFFY NGY1 N souTlc wr OWARTEN of bccnON 6, T,sRreT "Cii N P,,GES 75 AND 41. 4 VENTURE S11I11 100 IRVUI&, CALJ_F(JKNIA 92718.1999 (714) 753.9011 ♦ FAX (714) 753.9727' _ $ DATE . W.O. FOR: F•f, I i I \- ° _ --�'-w%_� \- � -_ --._ . - ` � - ^ _ --- - ' \ -- ! - ' " �\ \ \-`�_ - .'._( \.�-_�1 , � a( - -� "/ .`- - .-- _. _- � -_�.-JJ ,- . ,- `_-. ` % �� /\ - . - - '__\� ( _ / \ - ♦ �. � . _ ' " ' �4� "� -1 '� � --( rl - J � `- -- 3 -�` \`- o-3 \ •��a�(w1Z� 211=% � ?_ - \ 4 3,'0 d �6 4 2 C j / � " ��O 3a-�--- '7.� 5 1�E I� 8 .- � - 1 I ` _ - J ..l ` / f I_ ` t,ti � .v / �`- -. / '' / .t 1 -0 -6~- \ � ) �{ %Y'� � ._ �t • : l `-\ � / .`\ J_ +`}) +' \ :_ i - - � (3�,.�•"/ _''8�/ '"\ -~ ` �z- - �/ J _3 \ � . � ! - ) 'r � / - � i- � � I �"( \ ` A� l � .F . ,i.` � F> i• O� 1 )N , / 1 -� s 2 - r '1� - 3 ". % 6I � ( , j" 1' ` ' A 3� �d - 1 A1 1 , -I n f - 2 � ;1 i � . - ' - ' j I - I � "� }} II �i I ' � ,� � a 1 �� .r . Oz .f . o ju '" ' - \ �,( + ` f - '3� /� " -�- 3J�\ - / ' . _t _` . - 9 _ ! �3 } - - -� � -� -- � : (\ ,� � , ` • 1 4 / ` -� /.-r � 3-� .l .� --- � , 'J � /L-` • 1 1 ' �4 \ - i ' / •✓ __ { �f .- 1 / \ S I .- ( . \1 ^ � ' // J � .3 • 3 4 '' t / 4� .! i\/� � l� .� I! ? _ 0 �, ��-3l, , ce - ) \ � ' 8 ' T � `3� 1 ! �- � - 1% J . ` � t _- �.I -� s �-_� o � � �`i \ " _ �\ ,93I � ' � .�-+ B e, j _''r\ � ; � f � z7 g\ i � 1 / / ,.I ? \� y � \ • ' \ % \ I - _ � ,- . I f�I _� I ; , ,i i i = I 1 N 1 .' l .� r i -< J , ���}-/l - / \1 �/ /- /� > )}j ' � \ ry. - � � � �."' -.• ^ j •l .f . � . 4 t m u' l - - rr ✓ 3zr �.F � ,\� \ � f_ . 1� � _ \ , . b � 2 ' j am � �� \ � , - r\ � ! � 1 \ 1 � .� 8 1 .f \ g '_ - . • • o o - � g _ S+ 0- - - -_ • -' 6 . _, . .1,> -.r , - r �• �\ - ��� ! \ � - � . � ..� '..%o.\ �_H 33. i 1 . 3�3. .2r" :3f 2 \ 1 7 .1 5 4 \ t _ � : 4 . 1 f � . " � " ; � / ` / � / j i � '� t Il t 1 j �'L (\�•'♦� "! . ' _' 6 ) - ' ` . ._I A ' is i rr' :y'r� �? gl9 a tF33Ss� _y k1)t _, •' 1 '� � A*F 7/ . ±B�:i p{ys : iF ',F + � z . _ � £s ��f' �� � a +an.° . 7x t T $ ` T .s\ 3 i\z.a . °' r _ �n..aiia� a ''.^' a� t# +'1 t ce:I .":_ P:f1 r ! \ _; . . "�., , ' � \ R v \ ; , - `�`-'3'T.3- `1 . S1 e FI{ :g}}II T •z°�r x " = L S\ 4si #;33 `.I�lr5 � .�T. [° C�rE y.r n s.�5 ^, fs:�J a � s t L'.i ' • .s - 'ifi rc�> � .:a� Y = z'' + � "yi.� .0 z " +� 3 n s ,� 1,-ft t� p Li - � 0 4 ! . r , ° � \ � r , ' . ' - \ - fS a',, x c� � rr O' - i r' �rs .''. -1 - j : _ S.r w..K�1 5I . . 1PP A � ,X '\ - � •3 'y tj+:rsLa .I _♦ .�s:'5�-re:z � i- "'.:� ;. 3*. a/ Iµ a .•" . `� 4 -, i i , -• ;f ` '- C .z Y $ I + ' C�' xs 'sr >t y.f � z 1 ,« z'a iT�E = ! a .,- 7�. ,. £ S c 1 , I ,1I . .i . , -,1 a "� B� I , I-cT `: �= �.C'Cl i �Y.l&'a'�,3r r � �.4 • r.*i3 �u C ./ \�> .L1s,i __ � 50 � � T - s,, . `�3i�i. � 1 " • . 9 {g `_ : ,s� y +.0 - sT \ �# . . ,.t •i „�1 . . �- rif ? rt z� 'a r�3 - r �s Y� '' Sw ti x� " 1 � Ji _ < ,` y i:,Y i t� r • ' � 1 . Y,�. 'sa . � r��s 7 ; )_i.r � - _r :ixz _.t , : T1...- a ` ? �`3'f.� � _i ., r r r a# Ii"_ar �? 1. `. ?P. 1 ,_Q x '�r - s .? -,Y ) .il , rks t s .� £�a 4." � iGr d . c�F r ' . � , sE .. y- 8 T i 3h ' r ` ( , - � 1 ,_,Yi' e V'y� Y ,- P � 1_.:?.L•'�rg.. + - t°-r `' r� tI� 3 ` .� 3}«i aS )'- 1"_) A .u!"� `„ L�'{ � ,t '`x• 5 r.� ?z ro� x4I► .z .s �k i r �F.. ;•. t - �i 'i3. nii.�f; .. .-' t ' t ti y '1�� 7 .lz t , ' r " s T ��+ `?ni , a. � « c N �4.' :�s: . � Tk rs'xt9. z ,y .� �1� r FY % ✓ ,-• - y 'v ,r 1 r � r l ,, '^•- .::? w S T .. 1 �� ! .' , � � 1+_ • �is' 4�p � 3. e\ T� • . - '. � /r xa'. 's. , ^_,' y' �r a� � e : x t � x a _ . : qx £ = a � . ? ♦ O \ � 3T `r !-.w r k �-1J 1 7 ?r S v1 's !0t � t s' g 3 rd F; T Es ,T. 3 +i `7_^�'r�� ,.'� 4�;: Tv Fp .-$� 'i i��A x-�N e r _ >' � F . ; ` 'sr_ 'J .��.: k $ Y a' _-:�> , 'ki < a ' ,'�' _ � ? $ '� .` ;� sr � T S . {l- , - _ t3 r _ •.. . , .' . : . . - ± r I1 7 z. j ._M1% r a . -a _ . _- 0 > � . . . _ ( a -s r i ,/ . . .- s, .� ..- . . .� . .,. . �.- _6.=. i iI 1 I :k- . a •� �- .= ` 5s � � �I" - , ♦ f L . O I . V Li � � . ` <•. � . �'f 1� t f)r ) l � r E -Y .'� A ��. - g ~ ..��+ � �_ �C"r���r�'T . -"�•y g �. L _ rF:-' -_L h . �''�;�F:.� .. . . 4z4 {. , , . s i S ' . ' � .. +! s� , � � d.✓ 1 r, -.a • .x ,s _ + z� o : > q. h . �1 3 r Q 3 n _ t . �. .F <- ,, • 4 �o- r aY 3. :_ . _ r . : , r ° + r >r �- . .,.s =r �.� +_ . - .,= 'i _ r - "_ �. _ .v'h, .� O � S + 3_ s s g ' � 9 , r" ". - .. � ,.� � . }2, � � * t�' �4 � r ry N _ '.}r p �'.r- t .5 .' ` _ia _ � F .r ,� •�" '_ ..�t " . = .' : - C3 - . . � , :_ �r p Ys>vi r.._ . :a:� . � f . :a • 'i 1': �� � 1 E *+ w_ • .a �_ . � ?. . : t/ »#�i;� - T iL . � - •� A' r '� - ' .! J� 4 -_ ' � fs Y�Y 3s - . > c i - 2x/ t ' _ s .- s . ,,- _�. - 3.. .�3i 3� J.� i ,� T .y *�,/ ~.-' , . K sf� s<' <i � ��{- _ '1� . • . r �' �. 3 [- !I i� - I i i " y'-� ' h ;JY�1 z� :� � , 'i '- -i _ • � tx -• � 3, �s _•, _ . c r"8 s _ - t , � �' ham' ` at ` � E- e � � �1 :i-3 ; z I-a»r . ,' ti� .ir i- • '� tr a , .�1\ :3 .• J� f1 �_.. :_r ° fu- . r., n f z T . � s _ i Q rr _( t� �:`.Q . _A�" . \S R} a -�L . � c ; - 3, •� .l,k;- lv- i:,. ; �, d i<�_� :,i=� � s , , �+ � "Y . � � I I .: Z �) Q tm �� � `$ . `sa.-f v ./1 �.. = .Q �3 ��� � ���„: s #= ."/ O yf a c st '*Q. � 3 {a ��si . 6 �4i' -z 4 � - sP`I {'' - 7, ', „ "T i : 3` .Ly -;' ' , y .1 \ . .r �,:r - f� � _ �4 . :_ _ 1, � � . r " _ i► � /. _ � f r r ,tV � ms 1 ':'' i a , tt _ �\ X - j i -c In�p.+ 4 � 3;} ° '�; *� s � t . rr - t '� '" � '� , \ �� a_-'1 3s •4� wm -�T •� ,. X " a •;` .F :y O. I _<. _I f \3 _ - n r , : s � ' /(,7. . \ y-J - 4/� '�ti .� :•-� � - 4 .'N1g Q _ �'.� F. ;-- 31 `,.- y . E L , � 1 ` l : c :- T " } . � /� : t 1_• ,; '� 3 �- 2 '3 . f „*^l . � - ` «1^ � " . . ' £ � � r 4 .� �. s t- r � \ � : �Q . 'I F .: r . 3 C 5: S J =i . - : s . / § _*� � ,i . _ " 1 ? i >+h . ► t - a � ') 3r � I ._ ps - 1 ,- "s 0 s F- •a t . : . �r- �s = :�� ir , 1 _ ' ; � � - x f � .:, " , � ! + t f Fa.3 �i. p -rF ` �♦ : V 'y -7i •' 3 ' t , i• #,x' '. "� ' - '� <.r'� S ` T_ � ! ti �s ,i..:•d_ ' (- a•; pIY , +. iry `< S0. - .. i� .fi . r� i Qt' � FRi # t . ,► , L _f' ( r S. TI • tis i> .• .j! � f - - . i- s . t Rt ." _ es _ : i ' _ ,.T .1 ' - ,_ ' t r � i -.' t , �f . r ., i--� �,� �z � 'A +� .-. �_ 3r� . � ( - � lr ' ,� '.� Y 4 . o2 • - . y . i v - : y Y - _ •••: -s . -./. , YYY G !- ` . r- ."i 3•.fr 7"r s I rF � � `. . � _- l ' .'- 1J .X � `a ' . - �D � 1�_\Q. <Y ' _ . > ' ± y � . ; . _ / ' 1� � � i �\�k r ,� "� arte. 1 � ? , N ® ."� -:f -w< "' r � _ - Fr3 t re- Y31 + } � _.,-q . 7� • - .-- ''-.�C ' 6 , ; * . , c - • �� • • T }_ 4_sJ- � � - � :.�� ;x° .a .:;���`� _<_-T. :� 1_. ,_�.- �y (�-µ = " . -5 U � �� T, � t:. T -�: 1- .!•r r " 0 >F' .�' Y m ' � _ ' ` � ' . � t r�� ". 1 ' � - (_ t ' 9 . I " nI , \ i ° 1 - . J , ` �j . ' f. �.� _\ 2 ,-skZ .�t n_ � o S� :`', rx �� � p$ , � ' , , . �i\ ' ,� _ F/ 'tm, � ,; r d _is y. . d _ 3r ; �is: < ` r 1 , s� � �s / w � t . x,MQ_ .P . r \ D 1_ / . t n r 9 d. > �� �..G0i� � f. . r� . o �x t F { l . ^ _ '• � :. r rs T u � ��I, s B{ 4' . . � a r . \ -U ~ i•-'.1 6 'F, `jy t' .6 T ,n j� s_ . 4 " ;. 9 - yr! '_ s: c♦./ l,�� `�2 : } .r f I .� :. 9 . R tt ,- 'T a''� : ' -3 -;E'' � � , � � x • F : IO� .£ . � '0 r ( F z eT -i �y2_ ! ' � ,' T # r # • r � T / .+6_ /..�- a 3'i . L � B _. � .i`- ♦1 7S.iL' ' " ? ". r . / O •; ' C . ; " _�. a :�< . ��6 c / " s E' �T, c�• < . g � ` u=' � � j.�.. �� n..�r , a tr .�' .r � . .V'. ` 'v.. = 10 „� T •�/ # ` xr1 \3 . l • c_� P . , .` 31 am ��G . ( � : .I �., ..t . _ . "�r �r -V t ` � 1/ . : ` € l 0 �''hi - a [ .V � JJ x �- _ � '� rS c �.r ' � . . `` - � - s 3: .T� Q / 6 . c 4 '- t � � � "/ - +.a •A . ' . 3 r \( xf i s � ma% �' s, z d* 2 3 : t r ..tcOr �,J�' . 3/ / rP • r i � , ' 4 a ' � _ + � , j j �3 � � � a .0 � ,.`/ .� - i • t F`�- it .>� V6 • :'\ ,ro � x' �i .3! ,; ; r 1" r i� ' a ;�i . _' r� - • 'J �1 C 3\r ,� / r � / , a <• h � . 'T3 �'..� . .r .0 . x , 2 . -� . .� . ' • .s � e : . >. . '. , : t � > -jr - \ � 4 J�. to � _ �� - � . , . T _ . � � / t. yP . t'i{ * � i .„ _ . ..,�. r G_ `s : j ,' . . . . , f Z . Y . �?i r ct�- : � _ ? .E .5/ M u- _ �,. --. ,. �r ' s _ / z 3r . }trf • _, .r.� �z-/ rc 9; ._� - � M1 _ . _ .. a �s: . - ) v - 9 , . -"1r.. � h . > -A i � _ . - 4 7 : � � _ • y �- -T e i ,r r o }- _a s� r V w ` . ' ._ _ � : . ° - 'z • ic a _ f { 4 S .� '0 , ,.� �-.s. - / s. :` - , .< , � � .• Y_- _ iqi !( , .. - ;_} r I��-Q z . ' ' � :.1 I I - , / . , '� . \ 41: .t .. .- : J- t•. U ,. '1 .•f ; 1 : :. •;Mr`. ._ rAa . ? ': t t '.-. > <i,Ss�. :. ._ £ _ _ . .r 0. � y % �., ', .',>y 1- ,: • l� 4 .. _ �� , _ -. 1_r2w.��- : "v. . , � - ' ,a t Q t _:. Z -A ��( � 9 >x a a• L _ , - � . r ._ '. L . t ' .Z o Ie �0 o o � Es ,-� d �o H � � Si r . f n � j ' : rP ' . Y • . . � C , , . � n . ° 1 a. . ,..d . t' , l,,'_ „ . - a n . , r _. ° _S' t, .r.n 0 . .. _xa , =._.. h ., ( , ,.- . . •f._ ,<r s.`ri t : . , � , .> '� • _ ": < . v i`♦) . € .-. 9.: � � .<.� .Y . : ./ - � rr t = � si* .� 3 )�I . . S � .v -_ z , r :a3 <o,, :._. s, ' .. _ . l �d_ l.<6., <- r..:�..;f ,f.l s.'6 "z ..F � _ . � .S. ° . . � r . .P . '\ rT ` •a` ,v . ' [.^uoz r,5 w- ' . . +Y. s .'r• ' ,= _Fr .O�,I ox�048 -..„ � '',s-n tt z ►,-. 1 .�1 �, -- � l � ' I -. ^Y . I a_ . a ' >` . � e r• .z .3' • °��,> � .'$\.! 3r:'- . .".• . i: i aT £' . • .- .,' , c_ s :.' � �E1 / • •La' �' � iG ' 1 r. ; - 1 = \ t <r �_ I ''Rr.' : . _ : f'a_':� � „ ? 1 .� : r/ ~ �?- � zs L � i ."am. fi.. ! , x .. � � ,/ .'-'a�7",. .`, . 3F: rr.5 . -: t l - f" .i, •:. z te- a L• � ' � � , �.� r 1 o �S S _ / - _ e '_ T . .'i.iv E r s.. I+ i> r =. ji� . �.t 3J :' t - °a\ -: -/ «- \� c; r�ep.? a ,x �:� - T.° s u � FJ3 �` .'�`� "� . r i � r.; P .,, .?o, . i•I i 1 _ :r : Jr ? v ° >. � �. � a.` •..r: :Fn .? _ ? n8 r+\ s : # .. :(.- ! : ?a . �r 'x . ' n � 3 i 'i cx 3 - � t�/ ' =§ t. r _ + l' . �,,�. L3 tt: , i � Q a7Z . *r Et i%:' •`...x.sL-:� '_,'.sE, .'_� .i:-} , �. � � . ' :. F. a : n, . re q' A� -. r . w"._ n. �. s .. .,l:.eu•( . .'.- ,# �5,:- , L ,•'a . ;I .s t.� , te� <-i.�- .:� - i > !1S `w.. _ S :� � . a, . ) #l. .< tz % ,;.[ F ' .: z r • i`2 y/3 •. ..`< r ,.fi : .' ;! n : . 4 �£- F�2ax 3 :-u.3, , - " - • cxa > .'<a_' � w s•;.r -i;:. e:z_ -, ., 7i . \ ( , .,I i :. ,f � .t � .?.� a � .4.<`�. . a„ nB I1 a .a£ ! :s 4-: i.x , :i �,P �ssF,. ,c" ' ` i •30 . � _ k a k f't„b E � ' 3- t r � LL f . 2 }'c '' �SA ia +�:2 i�•a ' '. •`' t ^ � s -, " s � - " sr T s � a � 3. - , ' •} - u� - Ya`- < 1 � 3.�1rn,� � .E(> xr r���t.'. D I : S .,J -� ,N' r..Q : =- B , � � t,�Dx , : a< aC. . 'G . , s - £ . .� �. . 7: /-n .§n .iF` ?��. .'? . � _a. . :� i• L F -.J I U , Zn �.-��:;x . � tt, \ ? qx � . .? >. >, " s { .,✓ x< x�. ? r / . a.S , .a� • 7 �` ,rZ 'w.. .J ...+ � 'a ' - s_ � :si •s�.S .., +., 5 1 .,: Y Ng � r.5 - _ .Yr t :�_$ 3) \r 338 � cr.3...F. � t l '- �. � =§ .^ r "? % i ' � r: • . - � - :x_ �a°. iy b:.":5.a ' [tr3l .. ,' '_, .,,•J, ��i.*s-£ 3 i �t.S." • . T:.eA ,? ,£rt X � � ` , s� .t. -N z .H u.9z.Fv . , v n - <._♦/. `kr> r {Pt3�zB/' .uG s-?� '� �°:'E,. � , a�° A�J .c . x Ia9 �y " : . • . �_ 3JN .' �� a xn i;.' .f °„p . . t� i -YE + _ 3 •f . °./ v.. N� 0 : a.. .. ` � , ? � "6 .•a < F '-:_ � sV , ;ti � _ dt• F t � 1- : � - i ".iC ," - cQ - i1��l ;•./ .-. 8:,? +� � ' ,. / f 1 ^, \ • < . . ' , r. I t k 1 1a M1 ` _ ' > '• :`i y e F i t 1 . �Y • r "- �. °1I {�M1 ` r i J 9 � r <: "I�t•�n / � E � . 9 •, .rf r�•sN \ ,� � • r ` , t D z /gX:1•R '.' p 3t fir5 01 i to l 15t , l � l4. . • p O. p . 5 g{ E . 1=s 4 Y � k bz/ l 1 P. , J < s�F�ANr DA > / TEMP u 00 33 CVWD WELL SITE 342 3 8 J G ALANG i 6 O 38 � ,z ' 1sL� . J � / 0 0 . r -_r � FUTURE GRADING , d -4 \ 3�1 r it RECREATION � p r^ .4 : 0. € p ... oC J ✓ 0 f � 6 • 33,8 ADO[ 1.6 3 1,3 ' E .. � . ,� a�x � ' s Ii�1. - Z 0 ¢ . Q ! � 9 i -- 9 211RCP O r- �. o 0 LW-'A^ 3U i / �\ 32 P ST F IMPROVEMEilS ' r }.x 3L ra(FUTURE I �130 EE SEE sTOn i PROS C 77 o Z v 26 �0 � � a t � p 73 `) C y w 1 33,5 ( LWE A � i 6 z � JU NCTION ST RUCTURE DETAL � 14 0 c� CRATE AO STA. 6 + 48.41 y0 L. __ SED FINISHED SURFACE Z LINE KNS FOR TEMPORARY ELEVAT PARKIG LO I , \ 2�4 r � b Q 0 / 3 / 1 ir V V( f ( w Y e3 0 ? W ? 00 CUu1i I t` \ 0 U . ' I 1 I I 1 I I 1 i o C 7 - i 2I 9' .s4 I evi ` 0.4 0 -4) 'Ott 35.1 1 i F F. _ 33 62 15T. CLUE HOU_ 34,7 337 DRAINAGE INLET 31.3, 0 DETAIL B 1 s07ti N TS. ay 0 34.4 c) 0 3 �C 31. gig TC S a 2 l �. t gr0, Or 4 9 33, g 2 Lj 24 ; 30.4 E ' 26.4 3? 9 24- .- c3 ^ CLUS H OSR CONSTRUCTION NOTES . S \,LA EE EPARATE N FOR UBCONSTRUCT 3" AC OVER 4' AB I ENT OF kL OUSE /V /7f75.Ad / -- S PER DETAIL J � CONSTRUCT 6" CURB AND GUTTER (1.5 0 0 Z. ° r 32 ON SHT. 1 18 "Iffy a 9 0 a,- m CONSTRUCT 6' CURB PER RIVERSIDE COUNTY STD. PLAN Q 2 N O. 204 x ,4 INSTAL. 18" RCP (D -LOAD PER PROFILE) OR PVC PIPE W NON AFFiC AR o l 0 ` /D =4 INSTALL 36' RCP (D -LOAD PER PROF -11,F) 31 .00, 01 3 INSTALL 30" RCP (D -LOAD PER PROFILE) 01, �� CONST. FAIL N•n. 1 PER L.A.C.F.C.D. SID.. PLAN 2 -D 102' Q t rap 0 CONST. DRYVELL PER DETAIL ON SIIT. 1 36, 31 " 9 g � CONST. CURB INLET CATCH BASIN PER COUNTY OF ).0 0 1 3 4� IVERSIDE STD. PLAN NO. 300 RCONST. MODIFIED CURB INLET CATCH BASIN PER COUNTY iiso f3 OF RIVERSIDE 'STD: PLAN NO. 300 AND DETAIL ON SHT. 1 24 INSTALL 21' RCP (D -LOAD PER PROFILE) 0 00' I - A CONS FRUCT3" A.C. OVER NATIVE MATERIAL NOE CWB RpUSE BUI_OI6 Lo<AnoN Y3 30.7 T T A2pCENT MPOVEMENT S IOTA PARC of ` PARKING LO THIS M, -6N. SEMAFtAM ArrKONAL WILL BE I 36 1 1NSTt\LL BRICK Nll MUR "iAlP.U9l it a ; CONSTRUCT BARRICZ, REFLE E' PER RIVERSDE UNTY ROUGH GtADING ONLY STD. PLM NO. 810 J 32 7 DETAIL A CONSTRUCT-2d--7r-4" REDWOOD HEADER NT.S. U-0 32 PROTECT EXISTN IRRIGATI P!, ABANDON LOCATION) -FY 3) OWNEA AND ENGINEER M CASE L 4 tl f s 1NSTAL6QONCR=TE - CONSTRUCT CCC a 1 � • CONSTRUCT 1K PVC DRA PIPE st4 / W 30.6 NSTALL 2' X 2' OOKS AN BCb THICK WALLS g ---11 ,b 275 01 ✓ I 3111 I 24 } .: .( 31.2B T Nr A FR 3 � ro 323 I T se. I PRAC T GiErt +0 \� o " T - _ \�� r 7 0 3/50 O 22 Y �26 �-�� 8 t I G oo ! I 6 i ?.9.6 3U 034, ) 0 V� 34 t 34.6 °\ 1 6C a 1,92 6 2 \\ I \ ,9 35..� \ r \ \ J - � G \ `♦ � ( 0 s XI \ I 0 g ! 3 \ ✓ 13 /Jt2759 EC 33.5 2 3L3 31.3 0 10 1 ` 30,1 i8 =5 - 0 C`- CURVE L14TA No, -3P, A .•� DATE, , �,�, /r IISTERED 1 IEXPRES 0.93sss ra , 25,00' 39.27' 25:p0'' 31'47%18°` 0.0 J' A$' 18 00'00j-` TO-./O Q 31.42' )- a 4 VENTURE a SUITE 100 IRVINE= CALIFORNIA 92718 -1999 1714]753 -9011 FAX (714)753-9227 FILE NO. 5 1 rS:04'07r (., 140. = plym i ra Q5' ;4'07" :96 �'3 1� 4`- a 5' 7:99' 3'24`v4r "• 11.70' 5.88 4,'3 '41 0.00 38.101' 2Q.0 "f' 45'22'•05" t 34.6 °\ 1 6C a 1,92 6 2 \\ I \ ,9 35..� \ r \ \ J - � G \ `♦ � ( 0 s XI \ I 0 g ! 3 \ ✓ 13 /Jt2759 EC 33.5 2 3L3 31.3 0 10 1 ` 30,1 i8 =5 - 0 C`- CURVE L14TA No, -3P, A .•� DATE, , �,�, /r IISTERED 1 IEXPRES 0.93sss 90-00'00/ 25,00' 39.27' 25:p0'' 31'47%18°` 0.0 J' A$' 18 00'00j-` TO-./O Q 31.42' )- a 4 VENTURE a SUITE 100 IRVINE= CALIFORNIA 92718 -1999 1714]753 -9011 FAX (714)753-9227 FILE NO. 5 1 rS:04'07r (., 140. 38' S:20 '- ra Q5' ;4'07" :96 �'3 1� 4`- a 5' 7:99' 3'24`v4r "• 11.70' 5.88 4,'3 '41 0.00 38.101' 2Q.0 "f' 45'22'•05" 30,00' 1 Q .94 - / 15'05' " 96.00' S 29' 2. ' /3 0. 41'09"'1 .W4.00, .. 87.83' t.cl45.668- /a b-060.1 - 11'39'06 ", 140.00' 28.47' 14.28' /6 11'39'06. 120.001--2+.4 12.24! \ FUTURE { VIFIROVEMENT � 18 --3 g Q g ! 4 I I I z \ \\ O 31:9 cp 3/.49 00 g 3 x'3.5 / 32.2 `, �i � � ,•� \\ � ���4` \�-`���� ``�- 24 T �"'`� �•o! � 3LTSrC •\C+ g� �I \• _� 4 ; ) f/ \ L 26� $/ �o 100'Ofl 3U.r J 1 '" / s \ `, \ ` , V 'r�• �liG /tit°°- �{� $ ri I >� / /a2` ? '\ , \� \ `\ ; \ t✓ �F 3!50 �� 31.s ,qty tJ 0 �`. � ` V '` \\ i\ ,i' • .` � X10 1G r' 10 1 r l �' ��R>ANS Is �O� Dsi;AIN/+F;E'•PNo P{��llNG\ •� •�� >.�4.7 ,�tDy,�[rr. � � �� � IMPRCNiSMECIT VE CLUZ HO(J` ( RKI(fC3 LoT FNTt STREEI- (ffcIMEU4) qo}-Y. SEPF ATE At°I°1M1VX- WII;:L Pt-- \ y /j'`• \ � ° r. � I E;I T'T Iii\ !!.IiPl1A / - } 4 [" - l % {` \ \(�``` `� \� %jt"♦'J� ( c EQIk7 h\ C\ \ `e F"\ lSE t�\ L l ` ` ANQ_ 1T5 aOS?IN ,\ \ sz16 7 ' Q � ?a(I Sr 3 ( / 1P 3 - EV.3093 , \ 0 CIVIL _o♦ \F �6 Y` 1 F1 / _ ....._.w.. 1 - - -- - --� 33.2 ( Qi_ ?,3 30,6 31.3 29,9 1 �fv 25 REVISIONS: APPROVED PRF_PAAEDSY: CITY OF LA QUINTA + REV /,?EO CR7CNBAS /NTO Z:12'dROOKs BOX. t _ !�',:'fj'f/1 LANDMARK �Ipr� a C �✓" / c LAND CO. i < l_y- i ✓ / /!) P.O. BOX 1000 LA CfUNTA CA 92243 619 564 4500 / rMORSE CONSULTING GROUP PLANNING • ENGINEERING *SURVEYING .•� DATE, , �,�, /r IISTERED 1 IEXPRES 0.93sss `� OF 2 SHEETS GRADING PAVING AND DRAINAGE PLAN TRACT 24890 CLUB. HOl ISF PARKING C11MUS C/�,, THF yt , nv`� W- LA DUI: IAA CA. APPROVED BY: �,_ ,'r ,i•�. 1: - CITY, GNEER`-fRAWREYNOLDS DALE: R C E NO: 32Z4Q- EXPHES 6.30 94 2 -Z7� 9� SCALE: 11 1 1 = 40 BENCH MARK:' E. ='+ 11s„ 1T5 FaES $JUI,h't1'N ?SH+GiCN STflEET. 75.10 FEET N01!T ,mj "-glvegierw€?N,'ET:TW rr+:n': ORI OF CMIER ME U N.'L-CE `.G.i4u 4 BAIT or cmim LEE OF WA$ }WGTf44.yTWT11OFEiTFquTNOFPOWER POLE t iU 2- A i ] "CH A N W FEr nG J p sCVi E♦sr- quAgrEi F.•�crU,a rasnTE rso-JV 'W'FF i51JA ii. 4 VENTURE a SUITE 100 IRVINE= CALIFORNIA 92718 -1999 1714]753 -9011 FAX (714)753-9227 FILE NO. DA W.O. FOR: F -B. 0- 29.9 30.1 ��P��/ - �`� /5 / n I I I I 37 - Sti I 36 +00.00 O O 45 + 63.00 41JNDE- pA.-S, r Df RF ASb A i 5RGvEfvV`-'14T UIV* -L 1 { 29.9 a • M z O z A a T! � � a 0 I 4 AB 73 REQUIRES EVERY PERSON PLANNING TO CONDUCT EXCAVATION NOTIFY A REGIONAL NOTIFICATION CENTER AT LEAST TWO PRIOR TO EXCAVATION AND, IF PRACTICAL, THE AREA TO BE EXCAVATED SHALL BE DELINEATED. A VERIFICATION NUMBER WILL BE GIVEN UPON SUCH NOTIFICATION WITHOUT WHICH ANY PERMIT OR DIRECTIVE GIVING PERMISSION TO EXCAVATE SHALL BE INVALID. VERIFICATION NUMBERS EXPIRE IN 14 DAYS. FOR BEST COMMUNICATION, PERSONS PERFORMING EXCAVATION SHOULD MEET THE UTILITY COMPANIES AT THE JOB SITE. FOR MORE INFORMATION YOU CAN CONTRACT THE LOCAL REGIONAL INFORMATION CENTER. UNDERGROUND SERVICE ALERT 3030 SATURN STREET, SUITE 200 BREA, CA 92621 1 -(800) 227 -2600 UNDERGROUND UTILITIES ALL UNDERGROUND UTILITIES OR STRUCTURES REPORTED BY THE OWNER OR OTHERS AND THOSE SHOWN ON THE RECORDS EXAMINED ARE INDICATED WITH THEIR APPROXIMATE LOCATION AND EXTENT. THE OWNER, BY ACCEPTING THESE PLANS OR PROCEEDING WITH IMPROVEMENTS PURSUANT THERETO, AGREES TO ASSUME LIABILITY AND TO HOLD UNDERSIGNED HARMLESS FOR ANY DAMAGES RESULTING FROM EXISTENCE OF UNDERGROUND UTILITIES OR STRUCTURES NOT REPORTED TO THE UNDERSIGNED, NOT INDICATED OR SHOWN ON THE RECORDS EXAMINED. THE CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARY MEASURES TO PROTECT THE UTILITIES OR STRUCTURES SHOWN AND ANY OTHER UTILITIES OR STRUCTURES FOUND AT THE SITE. IT SHALL BE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE OWNERS OF THE UTILITIES OR STRUCTURES CONCERNED BEFORE STARTING WORK. GRADING NOTES 1. IF THE CIVIL ENGINEER OR SOILS ENGINEER ARE CHANGED DURING THE COURSE OF WORK, ALL WORK SHALL BE STOPPED UNTIL A REPLACEMENT HAS AGREED TO ACCEPT THE RESPONSIBILITY FOR CERTIFICATION UPON COMPLETION OF THE WORK. 2. ALL BRUSH, VEGETATION AND OTHER DELETERIOUS MATERIAL, SUCH A RUBBISH SHALL BE COLLECTED, PILED AND REMOVED FROM THE SITE PRIOR TO PLACING FILL, LEAVING THE SITE FREE AND CLEAR FROM OBJECTIONABLE MATERIAL. 3. ANY UNDERGROUND STRUCTURES SUCH AS CESSPOOLS, SEPTIC TANKS, WELLS OR PIPES NOT LOCATED PRIOR TO GRADING ARE TO BE REMOVED OR TREATED IN A MANNER PRESCRIBED BY SOILS ENGINEER, 4. SOIL, ALLUVIUM, OR ROCK MATERIALS DETERMINED BY THE SOILS ENGINEER AS BEING UNSUITABLE FOR PLACEMENT IN COMPACTED FILLS SHALL BE REMOVED FROM THE SITE. THE SURFACE SHALL THEN BE PLOWED OR SCARIFIED TO A MINIMUM DEPTH OF 6 INCHES UNTIL THE SURFACE IS FREE FROM UNEVEN FEATURES THAT WOULD TEND TO PREVENT UNIFORM COMPACTION BY THE EQUIPMENT USED. 5. BUILDING AREAS SHOULD BE OVEREXCAVATED TO DEPTH OF AT LEAST FIVE (5) FEET BELOW THE ' BOTTOM OF THE FOOTINGS. THE EXPOSED SURFACE SHOULD BE SCARIFIED, MOISTURE CONDITIONED AND RECOMPACTED TO AT LEAST NINETY (90) PERCENT OF MAXIMUM DENSITY. THE PREVIOUSLY REMOVED SOILS SHOULD BE REPLACED IN THIN LIFTS AT NEAR OPTIMUM MOISTURE CONTENT AND COMPACTED TO AT LEAST (90) PERCENT OF MAXI DENSITY. OVEREXCAVATION AND COMPACTION SHOULD BE VERIFIED BY TESTING THIS APPLIES TO THE BUILDING AREAS AND AT LEAST FIVE (5) FEET BEYOND FOOTING LIMITS EXCEPT ADJACENT TO THE EXISTING EQUIPMENT BUILDING WHICH WILL BE LIMITED BY THE PRESENCE OF THE SHORING AND UNDERPINNING SYSTEM. 6. MATERIALS FOR COMPACTED FILL SHALL CONSIST OF MATERIALS APPROVED BY THE SOILS ENGINEER. FILL SOILS SHALL BE FREE FROM ORGANIC VEGETATION MATTER AND 01THER UNSUITABLE SUBSTANCES. 7. THE MATERIAL USED IN THE COMPACTING PROCESS SHALL BE EVENLY SPREAD, WATERED, PROCESSED AND COMPACTED IN THE LIFTS NOT TO EXCEED 6 INCHES IN THICKNESS TO OBTAIN A UNIFORMLY DENSE LAYER. 8. WHEN THE MOISTURE CONTENT IS BELOW THAT SPECIFIED BY THE SOILS ENGINEER, WATER SHALL BE ADDED BY THE CONTRACTOR UNTIL THE MOISTURE CONTENT IS NEAR OPTIMUM AS SPECIFIED. 9. WHEN THE MOISTURE CONTENT IS ABOVE THAT SPECIFIED BY THE SOILS ENGINEER THE MATERIAL SHALL BE AERATED BY BLADING, MIXING, OR OTHER METHODS SATISFACTORY TO THE SOILS ENGINEER UNTIL THE MOISTURE CONTENT IS NEAR OPTIMUM AS SPECIFIED. 10. WHERE FILLS ARE MADE ON HILLSIDES OR EXPOSED SLOPE AREAS, GREATER THEN TEN (10) PERCENT, HORIZONTAL BENCHES SHALL BE CUT INTO FIRM UNDISTURBED NATURAL GROUND TO PROVIDE A HORIZONTAL BASE SO THAT EACH LAYER IS PLACED AND COMPACTED ON A HORIZONTAL PLANE. THE INITIAL BENCH AT THE TOE OF THE RILL SHALL BE AT LEAST TEN(10) FEET IN WIDTH ON FIRM, UNDISTURBED NATURAL GROUND AT THE ELEVATION OF THE TOE STAKE PLACED AT THE NATURAL ANGLE OF REPOSE OR DESIGN SLOPE AND WIDTH AND FREQUENCY OF SUCCEEDING BENCHES WIILL VARY WITH THE SOIL CONDITIONS AND THE STEEPNESS OF SLOPE. 111, IF BURIED REMAINS ARE ENCOUNTERED DURING DEVELOPMENT, A QUALIFIED ARCHAEOLOGIST SHALL BE CONTACTED IMMEDIATELY AND APPROPRIATE MITIGATION MEASURES CAN BE TAKEN. 12. EARTH - MOVING AND WORKING OPERATIONS SHALL BE CONTROLLED TO PREVENT WATER FROM RUNNING INTO EXCAVATED AREAS. EXCESS WATER SHALL BE PROMPTLY REMOVED AND THE SITE KEPT DRY. FILL MATERIAL SHALL NOT BE PLACED, SPREAD OR ROLLED DURING UNFAVORABLE WEATHER CONDITIONS. WHEN THE WORK IS INTERRUPTED BY HEAVY RAIN, FILL OPERATIONS SHALL NOT BE RESUMED UNTIL FIELD TESTS BY THE SOILS ENGINEER INDICATE THAT THE MOISTURE CONTENT AND DENSITY OF THE FILL ARE AS PREVIOUSLY SPECIFIED. 13. COMPACTION SHALL BE BY SHEEPSFOOT ROLLERS, VIBRATING SHEEPSFOOT ROLLERS, MULTIPLE -WHEEL PNEUMATIC -TIRED ROLLERS OR OTHER TYPES OR ACCEPTABLE COMPACTING ROLLERS. ROLLERS SHALL BE OF SUCH DESIGN THAT THEY WILL BE ABLE TO COMPACT THE FILL TO THE SPECIFIED DENSITY. ROLLING SHALL BE ACCOMPLISHED WHILE THE FILL MATERIAL IS WITHIN THE SPECIFIED MOISTURE CONTENT RANGE. ROLLING OF EACH LAYER SHALL BE CONTINUOUS OVER ITS ENTIRE AREA AND THE ROLLER SHALL MAKE SUFFICIENT TRIPS TO INSURE THAT THE REQUIRED DENSITY HAS BEEN OBTAINED. 14. FILL AND BACKFILL SHOULD BE COMPACTED TO THE MINIMUM OF NINETY (90) PERCENT OF MAXIMUM DRY DENSITY OBTAINED BY THE ASTM D 1557 TEST METHOD. 15. AUXILIARY STRUCTURES INCLUDING FREESTANDING OR RETAINING WALLS SHOULD HAVE THE EXISTING SOILS 3' BENEATH THE BOTTOM OF THE FOOTING OF THE STRUCTURE COMPACTED TO 90 %. THE GRADING REQUIREMENTS APPLY TO THREE (3) FEET BEYOND THE FACE OF WALLS. 16. FIELD DENSITY TESTS WILL BE PERFORMED BY THE SOIL ENGINEER DURING GRADING OPERATIONS. AT LEAST ONE (1) TEST SHALL BE MARE FOR EACH FIVE HUNDRED (500) CUBIC YARDS OR FRACTION THEREOF PLACED WITH A MINIMUM OF TWO (2) TESTS PER LAYER IN ISOLATED AREAS. WHERE SHEEPSFOOT ROLLERS ARE USED, THE SOIL MAY BE DISTURBED TO A DEPTH OF SEVERAL INCHES. DENSITY TESTS SHALL BE TAKEN IN COMPACTED MATERIAL BELOW THE DISTURBED SURFACE. WHEN THESE TESTS INDICATE THAT THE DENSITY OF ANY LAYER OF FILL, OR PORTION THEREOF IS BELOW THE REQUIRED DENSITY, THIS PARTICULAR LAYER OR PORTION SHALL BE REWORKED UNTIL 17. THE METHODS FOR REMOVAL OF SUBSURFACE IRRIGATION AND UTILITY LINES WILL DEPEND ON THE DEPTH AND LOCATION OF THE LINE. ONE OF THE FOLLOWING METHODS MAY BE USED: 1) REMOVE THE PIPE AND COMPACT THE SOIL IN THE TRENCH ACCORDING TO THE APPLICABLE PORTIONS OF THESE GRADING RECOMMENDATIONS, 2) THE PIPE SHALL BE CRUSHED IN THE TRENCH. THE TRENCH SHALL THEN BE FILLED AND COMPACTED ACCORDING TO THE APPLICABLE PORTIONS OF THESE GRADING SPECIFICATIONS, 3) CAP THE ENDS OF THE LINE WITH CONCRETE TO MITIGATE ENTRANCE OF WATER, THE LENGTH OF THE CAP SHALL NOT BE LESS THAN FIVE (5) FEET. THE CONCRETE MIX SHALL HAVE A MINIMUM SHRINKAGE. 18. ABANDONED WATER WELLS ON THE SITE SHALL BE CAPPED ACCORDING TO THE REQUIREMENTS OF THE APPROPRIATE REGULATORY AGENCY. THE STRENGTH OF THE CAP SHALL BE AT LEASE EQUAL TO THE ADJACENT SOILS. THE FINAL ELEVATION OF THE TOP OF THE WELL CASING MUST BE A MINIMUM OF THIRTY -SIX (36) INCHES BELOW ADJACENT GRADE PRIOR TO GRADING OR FILL OPERATIONS. STRUCTURE FOUNDATIONS SHOULD NOT BE PLACED OVER THE CAPPED WELL PRIVATE ENGINEERING NOTE CONSTRUCTION CONTRACTOR AGREES THAT IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, CONSTRUCTION CONTRACTOR WILL BE REQUIRED -TO ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OR CONSTRUCTION OF THE PROJECT. INCLUDING SAFETY OF ALL PERSONS AND PROPERTY; THAT THIS REQUIREMENT SHALL BE MADE TO APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS, AND CONSTRUCTION CONTRACTOR FURTHER AGREES TO DEFEND, INDEMNIFY AND HOLD DESIGN PROFESSIONAL HARMLESS FROM ANY AND ALL LIA BIL ITY REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING LABILITY ARISING FROM THE SOLE NEGLIGENCE OF DESIGN PROFESSIONAL. SEE SHEET 2 DESIGNED BY: E.L. Tract No. 248901111111111 4 CONSTRUCTION ITEM QUANTITY UNIT GENERAL NOTES ' ttir� w 4 n 1. ALL WORK SHALL BE IN DONE IN ACCORDANCE WITH THE STANDARD PLANS OF THE CITY 56 OF LA QUINTA AND THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION, • LATEST EDITION, AND RIVERSIDE COUNTY STANDARDS AND SPECIFICATIONS ORDNANCE o '' NO. 461, LATEST EDITION. z 2. THE CONTRACTOR SHALL OBTAIN ALL PERMITS AS REQUIRED BY THE CITY OF LA QUINTA o w OR OTHER GOVERNING AGENCIES. 0 `q 3. THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE �11ii1t� r "� � ~+► WAY ONLY. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING B 0 UTILITIES BEFORE COMMENCING WORK, HE AGREES TO BE FULLY RESPONSIBLE FOR ANY 117 AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY HIS FAILURE TO EXACTLY LOCATE :��r.�- �3��s� � ' �:� AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. fI �, 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL, REPLACEMENT OR 12 RELOCATION OF ALL REGULATORY, WARNING AND GUIDE SIGNS. rGi�I 5. STREET NAME SIGNS AND TRAFFIC CONTROL SIGNS, TYPE AND LOCATION SHALL BE 13 APPROVED BY THE CITY ENGINEER. TRAFFIC STRIPING, LEGENDS AND PAVEMENT 1,000 MARKERS, TYPE AND LOCATIONS SHALL BE APPROVED BY THE CITY ENGINEER. 14 6. THE CONTRACTOR SHALL NOT DISTURB EXISTING SURVEY MONUMENTS OR BENCH MARKS 360 NOTED ON THE PLANS, OR FOUND DURING CONSTRUCTION. REMOVAL AND REPLACEMENT i SHALL BE DONE BY A REGISTERED CIVIL ENGINEER WITH AN R.C.E. NUMBER BELOW 33,966, 2 OR A LICENSED LAND SURVEYOR ONLY. jf 7. GRADING SHALL BE IN ACCORDANCE WITH THE ENGINEERED GRADING REQUIREMENTS OF 39 THE UNIFORM BUILDING CODE, LATEST EDITION, AND 17 SOILS ENGINEERING REPORT, PREPARED BY BUENA ENGINEERS, INC. CALIFORNIA I DATED DECEMBER 14, 1984, REPORT NO. 84--12 -239 UPDATE LEMER TROJ. NO. 00 -10-- -470 DATE: 10 -20 -00 PREPARED BY: SLADEF'N ENGINEERING 8. THE CONTRACTOR SHALL NOTIFY THE CITY PUBLIC WORKS INSPECTOR 48 HOURS PRIOR TO ANY GRADING, BRUSHING OR CLEARING AND EACH PHASE OF CONSTRUCTION AT (760) 777 -7075 AND 48 HOURS PRIOR TO REQUIRING INSPECTIONS. 9. DURING ROUGH GRADING OPERATIONS AND PRIOR TO CONSTRUCTION OF PERMANENT DRAINAGE STRUCTURES, TEMPORARY DRAINAGE CONTROL SHALL BE PROVIDED TO PREVENT PONDING WATER AND DAMAGE TO ADJACENT PROPERTY. l 10. CONSTRUCTION OPERATIONS AND MAINTENANCE OF EQUIPMENT WITHIN ONE HALF MILE OF HIUMAN OCCUPANCY SHALL BE PERFORMED ONLY DURING THE TIME PERIODS AS FOLLOWS: OCTOBER 1ST TO APRIL 30TH: MONDAY- FRIDAY 7:00 AM TO 5:30 PM MAY 1ST TO SEPTEMBER 30TH: MONDAY- FRIDAY 6:00 AM TO 7:00 PM T WORK SHALL. BE PROHIBITED ANY TIME ON SUNDAY OR FEDERAL HOLIDAY. • a 11. AFTER CLEARING EXISTING GROUND SHALL BE SCARIFIED TO A MINIMUM OF 6" ON THE r ENTIRE SITE OR AS RECOMMENDED BY SOILS REPORT. z 12. MAXIMUM CUT AND FILL SLOPES = 2:1. 13. PADS SHALL BE COMPACTED TO A MINIMUM OF 90% RELATIVE DENSITY PER A.S.T.M. o SPECIFICATIONS AND ABOVE MENTIONED SOILS REPORT. a 14. MINIMUM BUILDING PAD DRAINAGE SHALL BE 2 %. DRAINAGE SWALES SHALL BE A MINIMUM OF 0.3' DEEP AND CONSTRUCTED A MINIMUM OF 2' FROM THE TOP OF CUT OR FILL SLOPES MINIMUM. SLOPE OF SWALES SHALL BE 0.50 %. 15. ALL FILLS SHALL BE COMPACTED TO A MINIMUM OF NINETY (90) PERCENT OF MAXIMUM a DENSITY AS DETERMINED BY UNIFORM BUILDING CODE SEC. 7010 OR EQUIVALENT AS APPROVED BY THE CITY ENGINEER. FIELD DENSITY SHALL BE DETERMINED IN ACCORDANCE WITH THE UNIFORM BUILDING CODE SEC. 7002, OR EQUIVALENT, AS DETERMINED BY THE CITY ENGINEER. 16. ALL STREET SECTIONS ARE TENTATIVE THE MINIMUM SECTION IS 3" A.C. /4.5" CRUSHED A..B. " ADDITIONAL SOIL TEST SHALL BE REQUIRED AFTER ROUGH GRADING TO DETERMINE EXACT SECTION REQUIREMENTS. CITY ENGINEER TO APPROVE FINAL STREET SECTION. 17. LOCATIONS OF FIELD DENSITY TEST SHALL BE DETERMINED BY THE SOIL ENGINEER OR APPROVED TESTING AGENCY AND SHALL BE SUFFICIENT IN BOTH HORIZONTAL AND I VERTICAL PiACEME14T TO PROVIDE REPRESENTATIVE TESTING OF ALL FILL AND PLACED. TESTING IN AREAS OF A CRITICAL NATURE OF SPECIAL OF ALL FILL PLACED. TESTING IN AREAS OF CRITICAL NATURE OF SPECIAL EMPHASIS SHALL BE IN ADDITION TO THE 1 NORMAL REPRESENTATIVE SAMPLINGS. 18, ALL UNDERGROUND FACILITIES, WITH LATERALS, SHALL BE IN PLACE AND INSPECTED PRIOR. TO PAVING, INCLUDING, BUT NOT LIMITED TO THE FOLLOWING: SEWER, WATER, ELECTRIC, GAS AND DRAINAGE. 19. THE FINAL UTILITY LINE BACKFILL REPORT FROM THE PROJECT SOIL ENGINEER SHALL INCLUDE AN APPROVAL STATEMENT THAT THE BACKFILL IS SUITABLE FOR THE INTENDED USE. 20. THE FINAL COMPACTION REPORT AND APPROVAL FROM THE SOILS ENGINEER SHALL CONTAIN THE TYPE OF FIELD TESTING PERFORMED. EACH TEST SHALL BE IDENTIFIED WITH i THE METHOD OF OBTAINING THE IN -PLACE DENSITY, WHETHER SAND CONE OR DRIVE PING AND SHALL BE SO NOTED FOR EACH TEST. SUFFICIENT MAXIMUM DENSITY DETERMINATION 11 SHALL BE PERFORMED TO VERIFY THE ACCURACY OF THE MAXIMUM DENSITY CURVES USED BY THE FIELD TECHNICIAN. 21. ALL TRAVELED WAYS MUST BE CLEANED DAILY OF ALL DIRT, MUD, AND DEBRIS P DEPOSITED ON THEM AS A RESULT OF THE GRADING OPERATION. CLEANING IS TO BE DONE TO THE SATISFACTION OF THE CITY ENGINEER. W ' 22. BLOCK WALLS ARE NOT PART OF THE GRADING PERMIT. SUBMIT FOR SEPARATE Z BUILDING PERMIT. - Q 23. ALL CONSTRUCTION AREAS SHALL BE PROPERLY POSTED AND LIGHTED IN CONFORMANCE m WITH THE STATE MANUAL OF WARNING SIGNS, LIGHTS AND DEVICES FOR USE IN THE o PERFORMANCE OF WORK UPON HIGHWAYS, IN ORDER TO ELIMINATE ANY HAZARDS. z m 24. THE SOILS ENGINEER AND ENGINEERING GEOLOGIST SHALL EXERCISE SUFFICIENT o o SUPERVISORY CONTROL DURING GRADING TO INSURE COMPLIANCE WITH THE PLANS, ¢ = SPECIFICATIONS, AND CODE WITHIN THEIR PURVIEW. o ` 25. THE C11Y ENGINEER WILL REVIEW FOR APPROVAL THE STREET SECTIONS AFTER o SUBMITTAL OF "R" VALUE TESTS FOR ROADWAY SUBBASE. 26. THE DESIGN CIVIL ENGINEER SHALL EXERCISE SUFFICIENT CONTROL DURING GRADING a AND CONSTRUCTION TO INSURE COMPLIANCE WITH THE PLANS, SPECIFICATIONS, AND CODE WITHIN HIS PURVIEW. 27. THE CONTRACTOR IS RESPONSIBLE TO PREVENT SILT CONTAMINATION OF STORMWATER INFILTRATION FACILITIES DURING CONSTRUCTION OF SUBSEQUENT IMPROVEMENTS BY THE CONTRAC1'OR. IMMEDIATELY PRIOR TO FINAL ACCEPTANCE OF STORM DRAINAGE RETENTION /INFILTRATION FACILITIES, THE CONTRACTOR SHALL CONDUCT, IN THE PRESENCE OF THE CITY INSPECTOR, A PERFORMANCE TEST DESIGNED TO CLEARLY DEMONSTRATE 'THE FUNCTIONAL ADEQUACY OF THE FACILITIES. 28. THE CONTRACTOR SHALL PROVIDE WIND EROSION AND DUST CONTROL MEASURES AS EQUIRED_SY THE EUGITIVE_DUST CONTRO PI AN APPROVED- BEFORE THIS PROJECT a • M z O z A a T! � � a 0 I 4 AB 73 REQUIRES EVERY PERSON PLANNING TO CONDUCT EXCAVATION NOTIFY A REGIONAL NOTIFICATION CENTER AT LEAST TWO PRIOR TO EXCAVATION AND, IF PRACTICAL, THE AREA TO BE EXCAVATED SHALL BE DELINEATED. A VERIFICATION NUMBER WILL BE GIVEN UPON SUCH NOTIFICATION WITHOUT WHICH ANY PERMIT OR DIRECTIVE GIVING PERMISSION TO EXCAVATE SHALL BE INVALID. VERIFICATION NUMBERS EXPIRE IN 14 DAYS. FOR BEST COMMUNICATION, PERSONS PERFORMING EXCAVATION SHOULD MEET THE UTILITY COMPANIES AT THE JOB SITE. FOR MORE INFORMATION YOU CAN CONTRACT THE LOCAL REGIONAL INFORMATION CENTER. UNDERGROUND SERVICE ALERT 3030 SATURN STREET, SUITE 200 BREA, CA 92621 1 -(800) 227 -2600 UNDERGROUND UTILITIES ALL UNDERGROUND UTILITIES OR STRUCTURES REPORTED BY THE OWNER OR OTHERS AND THOSE SHOWN ON THE RECORDS EXAMINED ARE INDICATED WITH THEIR APPROXIMATE LOCATION AND EXTENT. THE OWNER, BY ACCEPTING THESE PLANS OR PROCEEDING WITH IMPROVEMENTS PURSUANT THERETO, AGREES TO ASSUME LIABILITY AND TO HOLD UNDERSIGNED HARMLESS FOR ANY DAMAGES RESULTING FROM EXISTENCE OF UNDERGROUND UTILITIES OR STRUCTURES NOT REPORTED TO THE UNDERSIGNED, NOT INDICATED OR SHOWN ON THE RECORDS EXAMINED. THE CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARY MEASURES TO PROTECT THE UTILITIES OR STRUCTURES SHOWN AND ANY OTHER UTILITIES OR STRUCTURES FOUND AT THE SITE. IT SHALL BE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE OWNERS OF THE UTILITIES OR STRUCTURES CONCERNED BEFORE STARTING WORK. GRADING NOTES 1. IF THE CIVIL ENGINEER OR SOILS ENGINEER ARE CHANGED DURING THE COURSE OF WORK, ALL WORK SHALL BE STOPPED UNTIL A REPLACEMENT HAS AGREED TO ACCEPT THE RESPONSIBILITY FOR CERTIFICATION UPON COMPLETION OF THE WORK. 2. ALL BRUSH, VEGETATION AND OTHER DELETERIOUS MATERIAL, SUCH A RUBBISH SHALL BE COLLECTED, PILED AND REMOVED FROM THE SITE PRIOR TO PLACING FILL, LEAVING THE SITE FREE AND CLEAR FROM OBJECTIONABLE MATERIAL. 3. ANY UNDERGROUND STRUCTURES SUCH AS CESSPOOLS, SEPTIC TANKS, WELLS OR PIPES NOT LOCATED PRIOR TO GRADING ARE TO BE REMOVED OR TREATED IN A MANNER PRESCRIBED BY SOILS ENGINEER, 4. SOIL, ALLUVIUM, OR ROCK MATERIALS DETERMINED BY THE SOILS ENGINEER AS BEING UNSUITABLE FOR PLACEMENT IN COMPACTED FILLS SHALL BE REMOVED FROM THE SITE. THE SURFACE SHALL THEN BE PLOWED OR SCARIFIED TO A MINIMUM DEPTH OF 6 INCHES UNTIL THE SURFACE IS FREE FROM UNEVEN FEATURES THAT WOULD TEND TO PREVENT UNIFORM COMPACTION BY THE EQUIPMENT USED. 5. BUILDING AREAS SHOULD BE OVEREXCAVATED TO DEPTH OF AT LEAST FIVE (5) FEET BELOW THE ' BOTTOM OF THE FOOTINGS. THE EXPOSED SURFACE SHOULD BE SCARIFIED, MOISTURE CONDITIONED AND RECOMPACTED TO AT LEAST NINETY (90) PERCENT OF MAXIMUM DENSITY. THE PREVIOUSLY REMOVED SOILS SHOULD BE REPLACED IN THIN LIFTS AT NEAR OPTIMUM MOISTURE CONTENT AND COMPACTED TO AT LEAST (90) PERCENT OF MAXI DENSITY. OVEREXCAVATION AND COMPACTION SHOULD BE VERIFIED BY TESTING THIS APPLIES TO THE BUILDING AREAS AND AT LEAST FIVE (5) FEET BEYOND FOOTING LIMITS EXCEPT ADJACENT TO THE EXISTING EQUIPMENT BUILDING WHICH WILL BE LIMITED BY THE PRESENCE OF THE SHORING AND UNDERPINNING SYSTEM. 6. MATERIALS FOR COMPACTED FILL SHALL CONSIST OF MATERIALS APPROVED BY THE SOILS ENGINEER. FILL SOILS SHALL BE FREE FROM ORGANIC VEGETATION MATTER AND 01THER UNSUITABLE SUBSTANCES. 7. THE MATERIAL USED IN THE COMPACTING PROCESS SHALL BE EVENLY SPREAD, WATERED, PROCESSED AND COMPACTED IN THE LIFTS NOT TO EXCEED 6 INCHES IN THICKNESS TO OBTAIN A UNIFORMLY DENSE LAYER. 8. WHEN THE MOISTURE CONTENT IS BELOW THAT SPECIFIED BY THE SOILS ENGINEER, WATER SHALL BE ADDED BY THE CONTRACTOR UNTIL THE MOISTURE CONTENT IS NEAR OPTIMUM AS SPECIFIED. 9. WHEN THE MOISTURE CONTENT IS ABOVE THAT SPECIFIED BY THE SOILS ENGINEER THE MATERIAL SHALL BE AERATED BY BLADING, MIXING, OR OTHER METHODS SATISFACTORY TO THE SOILS ENGINEER UNTIL THE MOISTURE CONTENT IS NEAR OPTIMUM AS SPECIFIED. 10. WHERE FILLS ARE MADE ON HILLSIDES OR EXPOSED SLOPE AREAS, GREATER THEN TEN (10) PERCENT, HORIZONTAL BENCHES SHALL BE CUT INTO FIRM UNDISTURBED NATURAL GROUND TO PROVIDE A HORIZONTAL BASE SO THAT EACH LAYER IS PLACED AND COMPACTED ON A HORIZONTAL PLANE. THE INITIAL BENCH AT THE TOE OF THE RILL SHALL BE AT LEAST TEN(10) FEET IN WIDTH ON FIRM, UNDISTURBED NATURAL GROUND AT THE ELEVATION OF THE TOE STAKE PLACED AT THE NATURAL ANGLE OF REPOSE OR DESIGN SLOPE AND WIDTH AND FREQUENCY OF SUCCEEDING BENCHES WIILL VARY WITH THE SOIL CONDITIONS AND THE STEEPNESS OF SLOPE. 111, IF BURIED REMAINS ARE ENCOUNTERED DURING DEVELOPMENT, A QUALIFIED ARCHAEOLOGIST SHALL BE CONTACTED IMMEDIATELY AND APPROPRIATE MITIGATION MEASURES CAN BE TAKEN. 12. EARTH - MOVING AND WORKING OPERATIONS SHALL BE CONTROLLED TO PREVENT WATER FROM RUNNING INTO EXCAVATED AREAS. EXCESS WATER SHALL BE PROMPTLY REMOVED AND THE SITE KEPT DRY. FILL MATERIAL SHALL NOT BE PLACED, SPREAD OR ROLLED DURING UNFAVORABLE WEATHER CONDITIONS. WHEN THE WORK IS INTERRUPTED BY HEAVY RAIN, FILL OPERATIONS SHALL NOT BE RESUMED UNTIL FIELD TESTS BY THE SOILS ENGINEER INDICATE THAT THE MOISTURE CONTENT AND DENSITY OF THE FILL ARE AS PREVIOUSLY SPECIFIED. 13. COMPACTION SHALL BE BY SHEEPSFOOT ROLLERS, VIBRATING SHEEPSFOOT ROLLERS, MULTIPLE -WHEEL PNEUMATIC -TIRED ROLLERS OR OTHER TYPES OR ACCEPTABLE COMPACTING ROLLERS. ROLLERS SHALL BE OF SUCH DESIGN THAT THEY WILL BE ABLE TO COMPACT THE FILL TO THE SPECIFIED DENSITY. ROLLING SHALL BE ACCOMPLISHED WHILE THE FILL MATERIAL IS WITHIN THE SPECIFIED MOISTURE CONTENT RANGE. ROLLING OF EACH LAYER SHALL BE CONTINUOUS OVER ITS ENTIRE AREA AND THE ROLLER SHALL MAKE SUFFICIENT TRIPS TO INSURE THAT THE REQUIRED DENSITY HAS BEEN OBTAINED. 14. FILL AND BACKFILL SHOULD BE COMPACTED TO THE MINIMUM OF NINETY (90) PERCENT OF MAXIMUM DRY DENSITY OBTAINED BY THE ASTM D 1557 TEST METHOD. 15. AUXILIARY STRUCTURES INCLUDING FREESTANDING OR RETAINING WALLS SHOULD HAVE THE EXISTING SOILS 3' BENEATH THE BOTTOM OF THE FOOTING OF THE STRUCTURE COMPACTED TO 90 %. THE GRADING REQUIREMENTS APPLY TO THREE (3) FEET BEYOND THE FACE OF WALLS. 16. FIELD DENSITY TESTS WILL BE PERFORMED BY THE SOIL ENGINEER DURING GRADING OPERATIONS. AT LEAST ONE (1) TEST SHALL BE MARE FOR EACH FIVE HUNDRED (500) CUBIC YARDS OR FRACTION THEREOF PLACED WITH A MINIMUM OF TWO (2) TESTS PER LAYER IN ISOLATED AREAS. WHERE SHEEPSFOOT ROLLERS ARE USED, THE SOIL MAY BE DISTURBED TO A DEPTH OF SEVERAL INCHES. DENSITY TESTS SHALL BE TAKEN IN COMPACTED MATERIAL BELOW THE DISTURBED SURFACE. WHEN THESE TESTS INDICATE THAT THE DENSITY OF ANY LAYER OF FILL, OR PORTION THEREOF IS BELOW THE REQUIRED DENSITY, THIS PARTICULAR LAYER OR PORTION SHALL BE REWORKED UNTIL 17. THE METHODS FOR REMOVAL OF SUBSURFACE IRRIGATION AND UTILITY LINES WILL DEPEND ON THE DEPTH AND LOCATION OF THE LINE. ONE OF THE FOLLOWING METHODS MAY BE USED: 1) REMOVE THE PIPE AND COMPACT THE SOIL IN THE TRENCH ACCORDING TO THE APPLICABLE PORTIONS OF THESE GRADING RECOMMENDATIONS, 2) THE PIPE SHALL BE CRUSHED IN THE TRENCH. THE TRENCH SHALL THEN BE FILLED AND COMPACTED ACCORDING TO THE APPLICABLE PORTIONS OF THESE GRADING SPECIFICATIONS, 3) CAP THE ENDS OF THE LINE WITH CONCRETE TO MITIGATE ENTRANCE OF WATER, THE LENGTH OF THE CAP SHALL NOT BE LESS THAN FIVE (5) FEET. THE CONCRETE MIX SHALL HAVE A MINIMUM SHRINKAGE. 18. ABANDONED WATER WELLS ON THE SITE SHALL BE CAPPED ACCORDING TO THE REQUIREMENTS OF THE APPROPRIATE REGULATORY AGENCY. THE STRENGTH OF THE CAP SHALL BE AT LEASE EQUAL TO THE ADJACENT SOILS. THE FINAL ELEVATION OF THE TOP OF THE WELL CASING MUST BE A MINIMUM OF THIRTY -SIX (36) INCHES BELOW ADJACENT GRADE PRIOR TO GRADING OR FILL OPERATIONS. STRUCTURE FOUNDATIONS SHOULD NOT BE PLACED OVER THE CAPPED WELL PRIVATE ENGINEERING NOTE CONSTRUCTION CONTRACTOR AGREES THAT IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, CONSTRUCTION CONTRACTOR WILL BE REQUIRED -TO ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OR CONSTRUCTION OF THE PROJECT. INCLUDING SAFETY OF ALL PERSONS AND PROPERTY; THAT THIS REQUIREMENT SHALL BE MADE TO APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS, AND CONSTRUCTION CONTRACTOR FURTHER AGREES TO DEFEND, INDEMNIFY AND HOLD DESIGN PROFESSIONAL HARMLESS FROM ANY AND ALL LIA BIL ITY REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING LABILITY ARISING FROM THE SOLE NEGLIGENCE OF DESIGN PROFESSIONAL. SEE SHEET 2 DESIGNED BY: E.L. Tract No. 248901111111111 4 TRACT NO, 24890 -4 14 13 12 11 10 9 8 7 6 5 AVENUE 52 STORM DRAIN INDEX MAP 1"=200' T_ APPROVED BY: CITY OF LA QUINTA Q�oF ESSIO 9 �c, p J. ? Q �Fy 1 CHRIS A. VOGT EXP. DA E: 6/30/01 No. 052496 y m R.C.E. 44250 �* Exp. 12 -31 -02 * PREP NDER THE DIRECTION OF: C1 VIL qTF CAL,E�� REVISIONS APPR. DATE EDWARD J. LEN H EXP. DATE: 12 -31 -02 DRAWN BY: D.L, CHIECKED BY: E.L. R.C.E. 52496 CITY of LA QUINTA Plan Set No, ml M O R S E D 0 K I C H CONSTRUCTION ITEM QUANTITY UNIT REMOVE EXISTING PAVING & CROSS GUTTER rrrtrunuutlnu ttir� >>""Wurrr ttirTritI ..� 55 56 16 47 48 49 50 51 52 53 54 ��5� ♦�� ii /11i1� t �lor � TRACT NO, 24890 -4 14 13 12 11 10 9 8 7 6 5 AVENUE 52 STORM DRAIN INDEX MAP 1"=200' T_ APPROVED BY: CITY OF LA QUINTA Q�oF ESSIO 9 �c, p J. ? Q �Fy 1 CHRIS A. VOGT EXP. DA E: 6/30/01 No. 052496 y m R.C.E. 44250 �* Exp. 12 -31 -02 * PREP NDER THE DIRECTION OF: C1 VIL qTF CAL,E�� REVISIONS APPR. DATE EDWARD J. LEN H EXP. DATE: 12 -31 -02 DRAWN BY: D.L, CHIECKED BY: E.L. R.C.E. 52496 CITY of LA QUINTA Plan Set No, ml M O R S E D 0 K I C H CONSTRUCTION NOTES # CONSTRUCTION ITEM QUANTITY UNIT REMOVE EXISTING PAVING & CROSS GUTTER rrrtrunuutlnu ttir� >>""Wurrr ttirTritI ..� REMOVE EXISTING CURB & GUTTER 432 � fli • � ftil[t If 1 H 1s CONSTRUCT CURB & GUTTER PER R.C.T.D. STD. DWG. 200 (MODIFY FOR 18" FUTTER) 432 ' • � Mir i n 'r �;� • + ��5� ♦�� ii /11i1� t �lor � �11ii1t� r "� � ~+► LF ' INSTALL 6" PVC DRAIN PIPE SDR. 35 117 LF :��r.�- �3��s� � ' �:� off ►1 ! rr r, l fI �, EA 12 -;. -: w:,�..� -::; .-::•; 3�.1...'�.- �.�,.' rGi�I ttt�fi111fut� 13 REPLACE CONCRETE APRON INKIND 1,000 SF 14 REMOVE EXISTING STORM DRAIN PIPE & CB 360 LF rN -- 2 LF 16 INSTALL 6" PVC DRAIN PIPE SDR 35 WITH CONCRETE BACKFILL 39 LF 17 REPAIR WALL FOOTING 1 EA CONSTRUCTION NOTES # CONSTRUCTION ITEM QUANTITY UNIT REMOVE EXISTING PAVING & CROSS GUTTER 8,880 SF 2� REMOVE EXISTING CURB & GUTTER 432 LF O3 CONSTRUCT CURB & GUTTER PER R.C.T.D. STD. DWG. 200 (MODIFY FOR 18" FUTTER) 432 LF C�4 CONSTRUCT CONCRETE GROSS GUTTER PER REVERSIDE CO. STD. 209A MODIFIED PER DETAIL ON SHT. 2 1,760 SF O5 CONSTRUCT 3" AB OVER 4" AB 7,120 LF 10 INSTALL 6" PVC DRAIN PIPE SDR. 35 117 LF 11 INSTALL BROOKS 2424 PRECAST CB 4 EA 12 REMOVE EXISTING CONCRETE APRON 1,000 SF 13 REPLACE CONCRETE APRON INKIND 1,000 SF 14 REMOVE EXISTING STORM DRAIN PIPE & CB 360 LF 15 ABANDON EXISTING DRY WELL PER SOILS ENGINEER 2 LF 16 INSTALL 6" PVC DRAIN PIPE SDR 35 WITH CONCRETE BACKFILL 39 LF 17 REPAIR WALL FOOTING 1 EA PAVING NOTES 1. ALL UNDERGROUND FACILITIES, INCLUDING SERVICE LATERALS, SHALL BE IN PLACE WITH TRENCHES COMPACTED AND TESTED PRIOR TO BASE GRADE INSPECTION AND PAVING. THE CONTRACTOR SHALL. SUBMIT WRITTEN EVIDENCE TO THE CITY ISSUED BY THE RESPECTIVE UTILITY PURVEYOR INDICATING THE SUBSURFACE PORTION OF THEIR UNDERGROUND FACILITIES HAVE BEEN INSTALLED AND ACCEPTED. 2. A SEPARATE PERMIT IS REQUIRED FOR ALL EXCAVATIONS WITHIN EXISTING ROADWAYS AND TRAVELWAYS. LANE CLOSURES AND DETOURS SHALL BE POSTED, DELINEATED LIGHTED IN CONFORMANCE WITH THE CALTRANS' MANUAL OF TRAFFIC CONTROLS FOR CONSTRUCTION AND MAINTENANCE WORK ZONES' AND ANY ADDITIONAL REQUIREMENTS DEEMED NECESSARY BY THE CITY ENGINEER. 3. ASPHALT CONCRETE RV HOO DEG Th TLRA D N TWO (2) OR MORE EXCEPT FOR ACONFOMTO SECTION 203 -6.3.2 OF THE STANDARD SPECIFICATIONS (GREEN BOOK) NOTED AS FOLLOWS: WEARING COURSE UPPER COURSE): C2 -AR -4000 BASE COURSE (LOWER COURSES): B -AR -4000 4. THE WEARING COURSE SHALL BE A 0.1 FEET THICK; THE BASE COURSE(S) SHALL CONTAIN THE ALAN CE OF THE REQUIRED ASPHALT CONCRETE THICKNESS. SEVEN (7 DAYS PRIOR TO COMMENCEMENT OF PAVING OPERATIONS, THE CO RACTOR SHALL SUBMIT FOR CITY APPROVAL A COMPLETE PROPOSED MIX DESIGN IDENTIFYING THE MIX CHARACTERISTICS SUCH AS: AGGREGATE GRADATIONS, VOIDS IN MINERAL AGGREGATE (VMA), AIR VOIDS, AND S -VALUE FOR VARIOUS :OIL CONTENTS FOR EACH MIX. SURFACES AND THE A.C. BASE COURSE, IF TRAFFIC HAS DRIVEN ON IT. THE TACK COAT SHALL BE SLOW SETTING ANIONIC EMULSIFIED ASPHALT TYPE "SS -1H" CONFORMING TO SECTION 203 -3 OF THE STANDARD SPECIFICATIONS. THE LIQUID ASPHALT SHALL BE GRADE 60 -70 AND APPLIED AT THE RATE OF 0.1 GAL /SY. 6. NEW IMPROVEMENTS THAT JOIN EXISTING .IMPROVEMENTS SHALL OR MATCH IN A MANNER SATISFACTORY TO THE CITY ENGINEER. CONSTRUCTION OPERATIONS REQUIRED TO ACHIEVE A SAFE, DURABLE, AESTHETICALLY PLEASING TRANSITION BETWEEN THE NEW AND EXISTING IMPROVEMENTS MAY INCLUDE SAW CUTTING, REMOVAL, REPLACEMENT, CAPPING, AND /OR COLD PLANING, AS NEEDED. 7. ALL MANHOLES AND VALVE BOX FRAMES SHALL BE ADJUSTED TO FINAL GRADES AGTER PAVEMENT INSTALLATION IS COMPLETED, 8. THE CURB SHALL BE ETCHED OR STAMPED SHOWING UTILITY SERVICE LATERAL LOCATIONS AS FOLLOWS: "S" FOR SEWER, "G" FOR GAS, AND "E" FOR ELECTRICAL POWER. 79 -799 Old Avenue La Quinta, CA 92253 Voice: 760 -771 -4013 S C H U L T Z FAX: 760- 771 -4073 P L A N N E R S E N G IN E ER S S U R V E Y O R S SCALE: SEE ABOVE BENCH MARK: BRASS CAP MONUMENT STAMPED "PD- 102 -70" NEAR THE INT. OF WASHINGTON STREET AND AW NUE 50, 315' WEST & 45' NORTH OF INT. BEHIND CURB. DATE: FEB., 2001 6' SOUTH OF POWER POLE JT29860, FLUSH WITH LAWN, IN THE SOUIM9EST 1/4 OF SECTION 31, M. WE. $BUM, FU 31/14 & 39. ELEV. w 43.772 PD- 102 -70 IN THE CITY OF LA QUINTA, STATE OF CALIFORNIA REVISED PINA & CITRUS SHT STORM DRAIN CROSSING TRACT NO. 24890- 4 OF SHTS. A PORTION OF THE NW1 /4 OF SECTION 5 T.6S., R.7E. S.B.B. & M. FOR: RJT HOMES, LI-C W.O. NO: FILE: L \ 35944\ 1MPLANS\ REVSIP 01 03 -02 -01 FIL,t: 1: \35944 \IMPIANS \REVSIP02 03 -02 -01 af d �_ t ( ! �"- r r -__ ` r- +- �- �- 1 �- + , r_ - _1___r___.�._r -�-`- i t - _- i_,__r t . i - -i- �- [ �� # --- {__- -}• - -_ t � i � i T r ! T - -_ I -! -� i -jr-- I r , -T -�t � } t 1 1 1 ! ! _'T t— r i :.�-- �-�_.� � ! - - - �, - - 7 ° {- { f t ! r i t r tr ?� I E i - - _ -._r _..--r- -r•- r � � � � � � i _ _ I r I .. - _T- - -� - i - i i I 1 � j �-.• i �_,._� �......_� [ � "j� T � � _ i O Z � � ir N O � a. � T- 1 , ! - ., ._. -,- � I - _- i -'.._.• ___- � .._.._, t ._..._ -- ! - 1 - - --- `- �- -'-� r _ -_ _._.. - � ..- •- - r - -- F -- - -- -- � -- - -� -•-- - � -� [ � -- .__� i -- -i '--- i ' - � i t - - -- -- ,� '-- - - , 7 t t f .__. - -..._ f � - - - - -r-" r _ _• --•-- .. -},. __._ �_._.. _.- -° - -- -- -- - ---- -- -_ - -s -- I -' - -- r--- --•f -- - -- - '-• -r-- -^ } - '-j - j `_ t �- � - r- -�' - -_ , 1 t i _i I I _ • _ , _ � r ___• —r._ r-- ----� r —� _ -__ -1_ �-` I i j t ......�,,.._,._.1.. _ _ ...r -_ --i___ „�"--_-'-i- -._. - _-t___ _ "'- -1'__� - - {- r °-t' ( ' �� r � [- -' r _. -- � - __-- t-._ -� _•_ ___'_ -___. -. -1' � I- _ ^I^ r pCa O t + i-- �-- t t i { i f I I i r f _ _ � � --- -I - -- � —I _ � _...,t- -_ _._.._.. w..._ ..__- - +•-- -__,_.._-�_-__ • ._ _. -.__ - -- -' _.- -.,.._ - - - _••-- -�•- -� '---- - � -- - -T_ -�_ �� h r r -T r r [' ; T �_ *_ - , L - - -- - , -- --F I - t- 1 I ^I ` �' ' I __ _I _ , T -„'_'- _-T'- ; ___�_.— - �._ -t.._ _�-,r . -.�.__ _T.. t - �- _ �-_- ' - _ - i ' ' s ''' i t ► k' i i - IIt q i k: ?} j i � + ! � _ ! - -t -f ) I t t t ,.,,,,,,�.,_,� _ ._...r- _ ' ' _ ' _ __ -r ' � + t r ..._. -_•- -'- --- _ _— i._.__r_— ,__' .- ..._i. —__.' __- —_ _.. r ._�1. - _._.C__- -�-_.. •r�.- .- ...t.._.. - -. i [ t -� t ! r— r r t - - r- ' I ►� i I I� r , ,—� r I ► T (( pp T s i + I t � r , t � � � T ' I r i t ` i ', t ( t _ , - -- t _T 1 , 1 -- - t t T , i -•_ ^r t�---- rr -. -� -- r i i 1~{ _Z- ___.i.. -_•- t _._.-- T -_._•_ —. - �- _�_ -_--# T I -- i ' + I k - - ---! "- _.. ' _.. i ! ----•� _,_.�.._.._., _-- •�i•• _ :.._r__w.�:,� ' t .__� --... L - : -- - A. - I _.. � ..-- -i -'-- - - --- - - I .�r- � ._. _ _ r I i j 1 i 1 1 j r r I T i ! I t I t - --�•___ t _. _ i I r ( � t j r I 1 1 � � � � i ..._ i _._.. _ __ _ )_ _....- __,. .._._. �._ --- +- - - -' - - -� -- --- - - - -I -_° � i -• -- ' - - ---- � - -�,. -_ �- i -_,,., ,.�i _ _ -_. _ i _ ._. �l_ � _ - �-- ---� -- - - _�• --_- _ -_ { I r �' i � t _ � _._. E ._ -.. i _- � -__� -- , � � 'I'- '--.t---_ - . -----i ___" -. - -- - - -� - -- - - -- - � - ! _ -- I -.E _ -�__ t 1 - �_ � - _:` k ! •- -- -;-- -- 1•- T - - --�- -, -j t - _.. _t ___ - --Z-- -- - - -r • j �y�•— �_ -_�� , . —�- �--� i -�- 7- J t - �..._.__.._ ;• -- ..__� ._� ' _ __�... .., � „ . ; -° M t. -.� ._ ^- r _ i -- --1--- 1--- -- - --!- -- - '- r--- -• ; �-� -- .��-_ _ �_ _ _ _ , 7-7r­7 . _ - _ - +---• ; •-- --- - -- -- -� � i - � : � I k } f... -- t __..- ------ L - - - -- -- - -_ r_.... -I - -= - -- -------- -� - -i -- - - -- -.._- --- � -_s_- - -- - -- -L- - _.!...._}- _ - �.,_. � _..t_.._ _ .. _ _�--•# -� � --, —� I ! i � - i � - ' - -- -- -. _.•. -_- -- � --- --- '---- - ..._{ ._ 1 _ v �1� j�j� i -• r -[ - - � j { K { i i ! _•�._ I ' -I -- -,_ '�_- - ; I— , t � � 1 -• ;- � t t �� —� � 1 i 1► NOTE.s i i i ! + I i 1 DER: Tf�. 490 r , 1 l i I i I I 1 _-_- ,_. i� �- �-- --- -Y - - -= -�-- --�- ••�• - , - --{- -- -- ;- •- -- �- --�- -- - - -- - ;- ,-- - - -�- r �"- _ `� t F ' 1 ? _;,_ -t I`` { t E • ^� -_1 i � C I ,�� j I I I ! � (_ t . L �_ - ._�.. r _ Y -. C l + r t i r + r f _ , i t ' -- - - - t - -- -- -- - - _ I -•. -f - -- - � ._ { ._. T � _ .. - I -' -'- - - - -- - - -_ - --�-._ - �- --- '� -__C_ - ,•-- -- - Y � , - -- � - , - _ , .� _...� -- r - -• �-- -� � - - _- - --t-- -- - -t- -- --- - -+- - -- - - - - - - - —r-- � -- �--- ---!r- - ! {{ ! f t ( i r I [1i i ! ! _ _ r : _ _ 7 _ _J _ _ _ _ r p� {� S-- � - -- � .. ....___.._.___�_.._.._... -, - - -- - -- -. ._ � ._...- - -- --i- -. ca►..__ __. -_. ,� ----{- ._ -!- .--- - -- -r-- __��.� � •--1- � - - - -- - --t- -� . _ _ _ _ ' �.. ! r - I •T f i-GO I T —, �r .t ! r -- ---r -- __. D.---- r- --;- 4 _- I k _ tl/t LlL]ipI i THRf? 1GH: -D I T _ --� �_` -1 --- - i �--- _�.. - - -- - - - -k ,- r �� � , k , � l;E:ilHr_v �R S✓_LL.F _ _ - AI IN E: t wm --� 'T r� , "t- -t t _ ��- - -- . j� � a ` N f -_ � ►, ��- - j... -_.... � -'� t:. � -_ • t � } ( � � _ : r � f i ..,� - - t -- - -. - - 1 ; ,. 1 - ��: T � t - !___•__ --t 1 __- __.. _ _._,_. -- - - ---r -- �•- 3ck _ --- ..i- __ -�--;- ____i -___ _ _ .- -1-- -� - 1' - I ; 1—� E , l _ . _ > _ _ . _ ._ . t , i ! , i ! � ! r i � r � i � i -: � �. 4 + _ - I __°_j_ -, i - - - - = - -• - -�- -- . ..__._ - �fl- .jK1�D'_ �r/a� {} . ---f -• I F i t}- - t' - -r'�' t_ -" `�i_ ,. 'I- r� r -'' - O� �'`.� — f , - t 1 - —��i E 6 -. .. _. -- ___ t T t 7 JrU.i7�P I 1 r i1 .- - - -- - - { - -1 - I - - ` - - -- - - - - } - -Y�— -- - '- r - - - - ' -- -- -- - I _ - --r - --- _ _ _ _ - - - - -- -t -[ -� - - -- - -- - - r- - - - - -- -- - __..__::.__._-. ___'_ --- -- -- • - - --` _.._. -----�--_I_- _.:____- _.- ..,i.. -.. }tj{ -- - -- - 1 -- -- - - - - - -- - - -- --- - -- - - - - S i _ . j i' I-- -_. .__ _"�-• - - -- T T r— F -} � � � � �j � - - -.._. .___.......... , _ ,r.. .._ -'FL .._ .. _..._ ... _. _r_..__ •_ - _. ..._• _._ _'. " -- '- ...�_...__ _' ___. -.._ _. j-- #L r '� } �- 1 � - � t i i , ff t 1 � I i � I � � � ' f _ � _._. �_._ -, � I _ . -[ _ � ___.• ._,.�.___ -- -- - - - -_�-- __ ___ -, _�___ _--._ _ .___�_._.._�- ._._.� -_1•__ '_ ___�__.�_.- -- -- '- --1--- .__ _- --- - -!--'- -� - --_�-__ -- - --+ -_ - -r-- -._ _.. -...- __� _ ._ �._.._.�- ---I. ---.t _ --I-- -• -± t --i- r' + + I i r r i3I E �L0 O,NL . � � UI�AI�t E �LO NLY� ___�� - __- �_- _ --+.•- I - __�- -_ ____� --._ - -- -- -- - -- - -_ ---- -- ___._�.. _ - - , r , _ _ __"i"_ i t Li•• r r ..:q•"'•- ---.� ._ ._ -. _....•.,_t .._.. _ '.—. __ -' .,_.._' _.._- _-.._ __._! .___ -j.__. __. _ ._.,' _... _ _._, __. .,__' -•-- -�- - ._..__ _- _._,. -_. _. _'-_ _'___,.__.__.._...._ .. . .......... __._.r —_ _.._. _Q.. .,- «.. ._._. � -•.' '-r- --- 'T ---- '--w- i-•- r-- � _ f t a : _ .. p4 { _ - .. .. .... .. ...... ... .. �. ... i r . _ .__ .�.. ..... � .. t � � , , t 1 + I 1 � I � � � • r I r � # ii_ __i _ -.�-.' _.__ _-_f___. --_ -- _ r---- F- --T- -- -- - -- T - --Y-- - -�- - _-- _- - -- -1--- -- -- --- ------ _- - -•�-- -. �- __ -_ - -- ___- _..,.:_ --• .-- --- •i'--- r- - --t •- - -- -- -�- , � . _`1 -_ "'T ?' t r T' T- _ -�-' t `_i' , T`-` -( -F [� ; t � _ � � ' _ __ _-L .._....ci. ..- • - - --r - -t- _- �--_�- ,--- rt- •-- ---•_- --�- -- - - -1 } }+- �r t � - � ( �� ^�— � � I i i �* `- � � —y.._ r �_ �_ ._..i �-. _�• � - I i ? i `f- _ � '_ t - _' _ -' _ ! _ — _.�._._ +�'-' _'- �-_' - -- _-'_>•--__ ! r -t- - -=II- it --- -'j-- -T- '- '__�___-' _"' L. ♦ _"_? — T_T - r � � t —r `�- z Q yr D � •cL � W v __.. _- _-__ ... _.__ _ tt .i 1 ! i ! °- x t I ! i f r r i t ! r� t { ; t t j F f T �„ ,�: _ ^_� ; t I ' : { I ���: ! ao a (� . - ! w •- ; - 1 ' r - ► t r i 1 ! ! tra .. # z [ , , t i t. [. r !_ t t 1 ! 1 1 i # f�o t [ r C f LT _ s 1_ , f r ,t,:t "T _. _ _ , 1 _ I _- ----�- i ._....r..._ ._ _! .. _. -�-,_. ___- •I-. -_ ._._..1._ ,.� �-_c� c�•...r._... .....*. -�•- -- t - ��+ -•j `r -}-- '_i_ j"' t S ifi � .3. - t'?J j(�� �� t � i I I � ,� - "- - -'- - -- 'I--•-- � Ci:_. _ -_.,r- pi-s•r •'- ^- �•"'_i___''_` -'_ _. _`_T_ r �" r ~ t T + T j!p � I •` M {t3r �j"' 1 `` t � 7r � .. I �� • i I i i t 7 - s ! ( :.'fit' ... t _ t I t I I t S f i t _ -I _ _ ' _ •-r _ _ ,_ ^I ._ _- _ -_ — _ _- -_T-_- t•._ T i �- -^•-----�'-- i•^ � _- _ _ _ 1 1 -II � a•� 1 -v v-: i 'T• � {{ I V I - I_ -_ w ._ _ t ._.j.,..._..._:__ ---•- ,--- j•_..- _ # r __ �_ _ -•�-�- _ - _�_... -._y._ _!- �' •- O o z �; `•+ __, ...__. _.._ --_ ___ ...__- -_.a- _....._ ___-- ..__---___ ___..,...____ ..ice ....- _- __r'--_� - ' - __""�. _ _". - -i-- -- -r--- i---- '- - ^ -_ __._ �_- ___•_..._. __ _.__r-_._ _— i (�,. (� } Q twT ? I f 1 i t 1 - ` - -- - - -- r _.._- h...- _I_._.1_.._- _._- _.�..__ -.. -_._ _.._ -•� .- �-- ',•-•- --- J.____ _ . ---; - -••- - -- , ___. �-- j - - --T+ _ _._ - -- -- - - -�--- r � 1-" [L E i _ ! __. _ ._ t— -_I _ -__ ! _� _ _f _- is -. .___ .__ -_ _._.._� i _-_ iljt` I f ) � t t _. _ _ —__ _ _. _ _.. - _.._.______ __ ____ i +-- __7 ►_'� � - -I- t � [ _ __ _ - -- .._ _ __ ____ __ _.__ __ _ ___ _ _ _ _ — _ ,.. .•-�- _ - _.T.__ _- - j V o x 7Q i [ jJ tjj' jlj� - { 1 T- I�(�TdLL .�1: �-- 7�•- -� IN At � .o :.: ---- r-- --.� -- _-__ .__ __ -'. � r , I ? r I I I } 1 r I 1 I - - °i -- - ! - r - --- - - _ --. _'-..� I_..- �. '_ . _ ' '_' _ i., _.-- _" --• -.- _J4 -- --- - -,- .— _.y.` -__E•_ - �__.._: _�.____•_,....__ ......-^�^ � } II�TAI,L _ _ . - _ - (-- _ _ j — - - - - - i Rp{I�t PI - ___ 5 - 1?F►IN PE! _ i - - - - -�- - ,I - - - - � �-- r~ v[ r f r 4 �.- - }— � =r-- -• --# r i I t i { I ? ; E 6 ► I f I�_ # ! ! I ? :r.._.._... _.._ ' - - -•• ___.C..._ -._ ._ ...-_- _..— __ ___ _ .__.- .. .__ .- .._ -T -_ -r_ .. .. -_. �.- T_ - -r--- �� .._._ _. _ _ .,__T,,,_— r --.._ � t __..�__ ___• {_._..- T" -'y.- -' �" " r" '-- _}._ -- .'f ' -! -�� a { ! I .. �� - � ..1 __ � {j � -- - j {- ----• - i ---- -- ' - - � -k - --• '- -� -- --- � - -- - I ! , � f T_.'_ _ r � i '_""'� "�' i -F .'__- j r._. -_. k � -�--f -_ ,. 11 l 1 E. i ! i E -- + .E i L t 4 -E-'- ---- .- _ -..j__ __ _._ _..._.,_ _.._._.-- ._..-_` -- .._.._.... --- - ---1 ' -T---- 'i--- --•- -- --- -� - °-- ---- 17- �._ -.t._ -r r__.�_ _. •t E- [-- --1• , 1 � � { f 1 � � � � � � - _ �"""'" � i - -- -- -- --- -- --- -------- - --- --- -- --- --- --- -- --' `--r-- -�._.__ � i _T � _T�. � -` r -.""� ._ { rte__ - t - - � _ - I tL -..�_� T - t---�- -- � -� --- ---+'-._- ._.�- ...,_.--__ _ -.. _- ___�_--- --- -- - --• --- - -{ � i �� � 1 _ � � -.•C•_--'• -r-. •ir'_ _-r -- - _ ..�..._ :_ �`' ^'�'^'• fr_�� _,.:.��-. -_ _ _ _._-_..1.---------------- - - --- -t--•_ __- ._,. _. f� F ,(_%a1- E. r F [ t' - i I 1 { i E � E i k I � { _ � � � � � ` i � t � I � 1 (.: ,! f { -+- = -- -T- # +° r C - L , k I } I I ; ! .... - r 1 r 11' } r- - r - ( Ev JJJ ? [ - { ! j T FT 1 1 j 4 i I _.X_..,._.! � _...._..._.�.�- �... .. __.__- I{ i r I i i I t F ._....a.... -- --•' -- f -�_� ,..1F.�� -._. _....;.-- ._.�._. i _.._. _._.... i , i _...- c.____ ..L_L.�. � • - ----- � �_..._.{,..._..�._. -__ _._._.+ .- ..- .�_..}.....,:�:,.._a_.._._ ..,_..._•_ °- - PLAN t i -SCALE 1" -40' 1 - I if _._- 3' it i CONSTRUCTION ION NO f ��U��� HOME I 10' 1 !I 18' 18' I) 1 10' I PP U,E. 20 SCALE 1')=40I 10 INSTALL 6" PVC DRAIN PIPE SDR 35 11 INSTALL BROOKS 2424 PRECAST CB 43 (1 I 12 REMOVE EXISTING CONCRETE APRON ,: - �- •- �:__ -__ I (! 11 I � -'� 13 REPLACE CONCRETE APRON INKIND ! II I `. j 14 REMOVE EXISTING STORM DRAIN PIPE & CB ABANDON EXISTING DRY WELL PER SOILS ENGINEER If { f' ` !I I u ► t 18 16 INSTALL 6" PVC DRAIN PIPE SDR 35 WITH CONCRETE BACKFILL REPAIR WALL FOOTING Ld q LU Z o z 2: cI I. f F- .A� 1 :J _ r k i' x !I li I - i (; ? `a`s II II I ! LIGHT FILL 0 4' HOME 1 1 ; ;{ �0����� HOUVUE -- 15 €`AYUGHT FIU_ ��G� M U -- - - - -' - + f !1I J A I � ,Y /� \1 rn , t Lin ,p X +__- -fir-_ —�` 's - - ---- -- !� C/ rte' US i .i' I "'• � � � �, �'� E.N9 'T?:E � 14 E LINEA ---�— END � P8 „ :�I N E " Br 12 _ N8U29'57 -_ °. - - - - - - = .s�.�,= - - - - 1 VS47'00 39.00' B 32.58 s DAYUGHT FILL _ - _ BcG. ! PERIM WALL �� . �tI. t AYUGHT FILL -, j' 14 14 u r _ - ._ ----- PRg1E(]CrTHOUGH'WALL � r -_ -�_° �r _,�,�sy ti. •• , , va/ *Ira ___•_- - 8E PIPE - 31'96' _.--_----- -- 89'42'52' W - - - - - -- - - -__ - -�_ BEG PIPE ..-m _ -- , ._ - _ I -- --. CITY of LA QUINTA Plan Set No. P SCALE 40 0 20 40 80 1@ j ( IN FEET ) P I i inch = 4 ft- a "I Z Q a Jy- w v m o - UNDERGROUND UTILITIES ALL UNDERGROUND UTILITIES OR STRUCTURES REPORTED BY THE OWNER OR OTHERS AND THOSE SHOWN ON THE RECORDS EXAMINED ARE INDICATED WITH THEIR APPROXIMATE LOCATION AND EXTENT. THE OWNER, BY ACCEPTING PRIVATE ENGINEERING NOTE CONSTRUCTION CONTRACTOR AGREES THAT IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, CONSTRUCTION CONTRACTOR WILL BE REQUIRED TO ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE �pFESS10 Q �q �w0 p J• !� � Q�� ��� �, APPROVED BY: � - CHRIS A. VOGT CITY OF LA QUINTA to 0 R S E 79 -799 Old Avenue La Quinta, CA 92253 L� /�� /Or � ` i o o K t C r# EXP. DATE: 6/30/01 Voice: 760 -771 -4013 52 IN THE CITY OF LA QUINTA, STATE OF CALIFORNIA REVISED PIMA & CITRUS STORK DRAIN CROSSING SNT. Z THESE PLANS OR PROCEEDING WITH IMPROVEMENTS PURSUANT THERETO, AGREES TO ASSU1rIE LIABILITY AND TO HOLD UNDERSIGNED HARMLESS FOR ANY DAMAGES CONDITIONS DURING THE COURSE OR CONSTRUCTION OF THE PROJECT. INCLUDING SAFETY OF ALL PERSONS AND PROPERTY; THAT THIS REQUIREMENT "' No. 052496 R.C.E. 442'50 S C H U L 7 Z FAX: 76U -771 -4073 T(I'j�iP'+`�' f°'ti, �i t'"��'j,� /� TRACT '6,,d °Gf` 'T c E' 2s; RESULTING FROM EXISTENCE OF UNDERGROUND UTILITIES OR STRUCTURES NOT REPORTED TO THE UNDERSIGNED, NOT INDICATED OR SHOWN ON THE RECORDS SHALL B� MADE TO APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORtvIAL WORKING HOURS, AND CONSTRUCTION CONTRACTOR FURTHER AGREES TO u`�! Exp. 12 -31 -02 �, PREP UNDER THE DIRECTION OF: P LAN N E R S E N G I N E E R S S U R V E Y O R S 1 q��J OF.� _ Q¢ O • EXAMINED_ THE GONfRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARY MEASURES TO PROTECT THE UTILITIES OR STRUCTURES SHOWN AND ANY OTHER DEFEND, INDEMNIFY AND HOLD DESIGN PROFESSIONAL HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE `%qT CIVIL ��� �` F OF CALF ?7 d SCALE: SEE ABOVE BENCH MASK: BRATS CAP MONUMENT STAMPED "PD- 102 -7U' NEAR THE TNT. OF A PORTION OF THE NW1 4 Or SECTION 5 / T.6S., R.7E. S,}3.E3. &. M. _ a UTILITIES OR STRUCTURES FOUND AT THE SITE. IT SHALL BE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE OWNERS OF THE UTILITIES OR STRUCTURES PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF DESIGN PROFESSIONAL. EDWARD J. LE R.C.E. 52496 H EXP. DATE: 12 -31 -02 WASHINGTON STREET AND AVENUE 50. 315' WEST & 45' NORTH OF INf. BEHIND CURB. 6' SOUTH OF POWER POE JT29WO, FLUSH WITH LAWN, IN THE SOUTHWEST 1/4 OF DATE: FEB., 2001 MARK REVISIONS APPR, DATE FOR: RJT HOLES, LLC W NO: I CONCERNED BEFORE STARTING WORK. DESIGNED BY: E.L. DRAWN BY: D.L, CHECKED BY: E.L. SECTION 31, T5S, R7E, SBB&M, FB 31/14 & 39. UY. - 43.772 PD- 102 -70 -0. r!t_t: w- L I % G�QI� N-Gy CITY OF LA QUINTA GENERAL NOTES LOT 3G., TRAGT NO. 248G0 PA VIN G �,ND THE 01TRUS CLUB I�I��,INAG� 11OUSE PL�,N 50th AVENUE AVENIDA ULTIMO a AVENID TUJUNC z 0 O F- CY AVENID NARANJA AVENIDA TAMPICO T w �e THE CITRUS AVENIDA LA POMDA COURSE AVEN I ?A LA T RRES TENT. TRACT A itt7MM A Ati 1CCT6 A NO. 24890 0 rn I w PROJECT LOCATION 1. ALL WORK SHALL BE DONE IN ACCORDANCE -,WITH THE STANDARD PLANS OF THE CITY OF LA QUINTA AND THE STANDARD SPECIFICATIONS FOR . 52nd AVENUE PUBLIC WORKS CONSTRUCTION, LATEST EDITION, AND RIVERSIDE IN T� E COUNTY OF RI V ERSI DE' COUNTY STANDARDS AND SPECIFICATIONS ORDINANCE NO. 461, LATEST EDITION. 2. THE CONTRACTOR SHALL OBTAIN ALL PERMITS AS REQUIRED BY THE VICINITY MAP CITY OF LA Q UINTA OR OTHER GOVERNING AGENCIES. CITY 0 F LA Q NOT TO SCALE 3. THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY. THE CONTRACTOR SHALL DETERMINE THE CITY OF LA QUINTA GENERAL NOTES (CONTINUED) EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK. HE AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL 14. MINIMUM BUILDING PAD DRAINAGE SHALL BE 2 %. DRAINAGE SWALES DAMAGES WHICH MIGHT BE OCCASIONED BY HIS FAILURE TO EXACTLY SHALL BE A MINIMUM OF 0.3' DEEP AND BE CONSTRUCTED A MINIMUM LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. OF 2' FROM THE TOP OF CUT OR FILL SLOPES. MINIMUM SLOPE OF 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL, SWALES SHALL BE 0.50 %. CONSTRUCTION NOTES AND ESTIMATED QUANTITIES REPLACEMENT OR RELOCATION OF ALL REGULATORY, WARNING AND GUIDE SIGNS. 15. ALL FILLS SHALL BE COMPACTED TO A MINIMUM OF NINETY (90) PERCENT OF MAXIMUM DENSITY AS DETERMINED BY UNIFORM. O CONSTRUCT 3" AC OVER 45'`AB I Zo, 3a( SF 5, STREET NAME SIGNS AND TRAFFIC CONTROL SIGNS, TYPE AND BUILDING CODE STANDARD NO. 70 -1 OR EQUIVALENT AS APPROVED BY THE CITY ENGINEER. FIELD DENSITY SHALL BE DETERMINED IN LOCATION SHALL BE APPROVED BY THE CITY ENGINEER. TRAFFIC Q CONSTRUCT 6" CURB AND GUTTER, TYPE= k(o) PaR RIV, CO-'STD. 1010 LF STRIPING, LEGENDS AND PAVEMENT MARKERS, TYPE AND LOCATIONS ACCORDANCE WITH THE UNIFORM BUILDING CODE STANDARD NO. 70 -2, NO. 200. SHALL BE APPROVED BY THE CITY ENGINEER. OR EQUIVALENT, AS DETERMINED BY THE CITY ENGINEER. O CONSTRUCT .u" 'TYPE 0 CUR6; PEA STV, No-204. LF ` 16. ALL STREET SECTIONS ARE TENTATIVE THE MINIMUM SECTION IS 3" PAVING NOTES 6. THE CONTRACTOR SHALL NOT DISTURB EXISTING SURVEY MONUMENTS A.C. /4" A.B. CLASS II, ADDITIONAL SOIL TEST MAY BE REQUIRED O INSTALL 18" RCP) 2000 D. 60.83 LF OR BENCH MARKS NOTED ON THE PLANS, OR FOUND DURING AFTER ROUGH GRADING TO DETERMINE EXACT SECTION REQUIREMENTS. CONSTRUCTION. REMOVAL AND REPLACEMENT SHALL BE DONE BY A CITY ENGINEER TO APPROVE FINAL STREET SECTION. REGISTERED CIVIL ENGINEER WITH AN R.C.E. NUMBER BELOW 33,966 1. ALL UNDERGROUND FACILITIES INCLUDING LATERALS SHALL BE IN U5 INSTALL 18" PVC 117 LF OR A LICENSED LAND SURVEYOR ONLY. 17. LOCATIONS OF FIELD DENSITY TEST SHALL BE DETERMINED BY THE PLACE AND TRENCHES COMPACTED AND TESTED PRIOR TO PAVING. 7. GRADING SHALL BE IN ACCORDANCE WITH THE ENGINEERED GRADING SOIL ENGINEER OR APPROVED TESTING AGENCY AND SHALL BE 2. ALL EXISTING IMPROVEMENTS INCLUDING CURB AND GUTTERS, � pRYWELL { C�>~C�+IL- 614-7 2 dP �'. 1 EAr REQUIREMENTS OF THE UNIFORM BUILDING CODE, LATEST EDITION, SUFFICIENT IN BOTH HORIZONTAL AND VERTICAL PLACEMENT TO SIDEWALKS, ASPHALT CONCRETE OR P.C.C. PAVING, WHICH ARE AND SO I LS REPORT NO. 86 2 -271 PROVIDE REPRESENTATIVE TESTING OF ALL FILL PLACED. TESTING BEING JOINED OR MATCHED IN CONNECTION WITH THIS PROJECT, O W. BO 12UCT' CUR T I.NI. T cA`rCI I A .E> !! I�1V. CO. STp, ` IN AREAS OF A CRITICAL NATURE OF SPECIAL EMPHASIS SHALL BE SHALL BE JOINED OR MATCHED IN A MANNER N0.300•CL 4 ) DATED FED. I98(v, UPVATED Apo. 1994 1 N ADD I T I ON TO THE NORMAL REPRESENTAT I VE SAMPL I NGS . SATISFACTORY TO THE CITY ENGINEER, INCLUDING NECESSARY SAW 8 COWBTRUCTrCo" P&O. PAVE Mr_WT PER 05TAI I -1641- .T 3 6 F5 Ip,.aj0.0 �F ,. q " ALL PREPARED BY 5t -tBNA ENGINEE(cb, INC. 18. AND I�NDPECT�DNPRIOR FACILITIES, TO PAV I PAVING. INCLUDING, SHALL NOT IN PLACE LIMITED REPLACEMENT AND CAPPING. qq HANDICAP 50YMB0 5t.;(I S PIPING RBLUE 5�� LF CUTTING REMOVAL, 3 . A "PRIME ME COAT SHALL BE APPLIED TO THE SURFACE OF THE - '' BR40KS CR.AII`��1 BOX WIT! -1 En 1 F4ICF� YvALLS�. TELEPHONE E�aI9)45 -1588 TO THE FOLLOWING: SEWER, WATER, ELECTRIC, GAS AND DRAINAGE. UNTREATED AGGREGATE BASF', AT THE RATE OF 0.25 GAL. /Y.D. ld Zxy " - UNLESS DELETED BY THE CITY ENGINEER. THE PRIME COAT SHALL 19. THE FINAL UTILITY LINE BACKF I LL REPORT FROM THE PROJECT SOIL BE AN MC -70 , SC -70, MC -250 LIQUID ASPHALT. V- &UTTER FIR DurAIL, SHFUT 5 0,F5. ; X60 SF 8. THE CONTRACTOR SHALL NOTIFY THE CITY PUBLIC WORKS DEPARTMENT ENGINEER SHALL INCLUDE AN APPROVAL STATEMENT THAT THE BACKF I LL IS SUITABLE FOR .THE INTENDED USE. 4. A "TACK COAT" PAINT BINDER) SHALL BE APPLIED BETWEEN IZ RETAINING. WALL �DES1�►N PER SEPHRATE PLAN AND SEPARATE 720 t�F 48 HOURS PRIOR TO ANY GRADING, BRUSHING OR CLEARING AND EACH ( @ PERMIT') PHASE OF CONSTRUCTION AT (619) 777 -7075, AND 48 HOURS PRIOR PAVEMENT LAYERS, CONCRETE SURFACES AND ON EXISTING PAVEMENT _ 20. THE FINAL COMPACTION REPORT AND APPROVAL FROM THE SOILS TO BE RESURFACED AT THE RATE OF 0.10 GAL YD. THE TACK COAT 13 EXGA�IATION 7f1Cn"2 C'>' TO REQUIRING INSPECTIONS. ENGINEER SHALL CONTAIN THE TYPE OF FIELD TESTING PERFORMED. GAL/ YD. BE TYPE SSI ASPHALTIC EMULSION WITH A 60--70 GRADE � 9. DURING ROUGH GRADING OPERATIONS AND PRIOR TO CONSTRUCTION OF EACH TEST SHALL BE IDENTIFIED WITH THE METHOD OF OBTAINING LIQUID ASPHALT. I4 COM F PACTFV ILL _ 2- ?3 C**,( PERMANENT DRAINAGE STRUCTURES, TEMPORARY DRAINAGE CONTROL THE IN -PLACE DENSITY, WHETHER SAND CONE OR DRIVE RING AND . SHALL E PROVIDED TO PREVENT POEMPO WATER AND DAMAGE TO SHALL BE SO NOTED FOR EACH TEST. SUFFICIENT MAXIMUM DENSITY 5. THE VISCOSITY GRADE OF PAVING ASPHALT SHALL BE AR -4000 OR ADJACENT PROPERTY. DETERMINATION SHALL BE PERFORMED TO VERIFY THE ACCURACY OF AR -8000, TO BE DETERMINED BY THE CITY ENGINEER AT THE TIME THE MAXIMUM DENSITY CURVES USED BY THE FIELD TECHNICIAN. OF PAVING. 10. CONSTRUCTION OPERATIONS AND MAINTENANCE OF EQUIPMENT WITHIN 21. ALL TRAVELED WAYS MUST BE CLEANED DAILY OF ALL DIRT, MUD MILE OF HUMAN OCCUPANCY SHALL BE PERFORMED ONLY 6. THE FINAL OR SURFACE LAYER OF ASPHALT CONCRETE SHALL NOT BE ONE HALF MIL DURING THE TIME F HUMAN AS FOLLOWS: AND DEBRIS DEPOSITED ON THEM AS A RESULT OF THE GRADING PLACED UNTIL ALL ON -SITE IMPROVEMENTS HAVE BEEN COMPLETED, OPERATION. CLEANING IS TO BE DONE TO THE SATISFACTION OF INCLUDING ALL EARTHWORK GRADING. THE CITY ENGINEER. OCTOBER 1$T TO APRIL 30TH: MONDAY-FRIDAY 7:00 AM TO 5:30 PM 7. MANHOLES AND VALVE BOX FRAMES SHALL BE ADJUSTED TO FINISHED 22. BLOCK WALLS ARE NOT PART OF THE GRADING PERMIT. SUBMIT FOR GRADES AFTER COMPLETION OF CONSTRUCTION. SATURDAY 8:00 AM TO 5:00 PM SEPARATE BUILDING PERMIT. 8. ANY EXISTING TRAVELWAYS IN WHICH EXCAVATION IS MADE IN MAY 1ST TO SEPTEMBER 30TH: MONDAY- FRIDAY 6:00 AM TO 7:00 PM 23. ALL CONSTRUCTION AREAS SHALL BE PROPERLY POSTED AND LIGHTED CONJUNCTION WITH THIS PROJECT SHALL BE COVERED BY A SOILS ENGINEER IN CONFORMANCE WITH THE STATE MANUAL OF WARNING SIGNS, SEPARATE PERMIT. THIS AREA SHALL BE PROPERLY POSTED AND THE SOILS ENGINEER HAS REVIEWED THE PLANS AND FINDS SATURDAY 8:00 AM TO 5:00 PM LIGHTS AND DEVICES FOR USE IN THE PERFORMANCE OF WORK UPON LIGHTED IN CONFORMANCE WITH THE STATE MANUAL OF WARNING THEM TO BE IN CONFORMANCE WITH' HE REPORT. HIGHWAYS, IN ORDER TO ELIMINATE ANY HAZARDS. SIGNS, LIGHTS, AND DEVICES' FOR USE IN THE PERFORMANCE OF `T1 qtr WORK UPON HIGHWAYS, IN ORDER TO ELIMINATE ANY HAZARDS. .1,,,:.11 ��� WORK SMALL BE PROHIBITED ANY TIME ON SUNDAY OR FEDERAL HOLIDAY. 24. THE SOILS ENGINEER AND ENGINEERING GEOLOGIST SHALL EXERCISE 'S #r3}1' SUFFICIENT SUPERVISORY CONTROL DURING GRADING TO INSURE 9. ALL EXISTING PAVEMENT WITHIN THIS PROJECT SHALL EITHER BE SOILS NGINEER IQ 11. AFTER CLEARING EXISTING GROUND SHALL BE SCARIFIED TO A COMPLIANCE WITH THE PLANS, SPECIFICATIONS, AND CODE WITHIN REMOVED OR STRUCTURALLY TESTED TO VERIFY THE STRUCTURAL DATE YV)l MINIMUM OF 6" ON THE ENTIRE SITE OR AS RECOMMENDED BY SOILS THEIR PURVIEW. CAPABILITIES AND THE RESULTS SHALL BE APPROVED BY THE CITY REPORT. ENGINEER. BUENA ENGINEERS, INC. 25. THE DESIGN CIVIL ENGINEER SHALL EXERCISE SUFFICIENT CONTROL 79 -811B COUNTRY CLUB DRIV 4�r' 12. MAXIMUM CUT AND FILL SLOPES = 2:1. DURING GRADING AND CONSTRUCTION TO INSURE COMPLIANCE WITH B5RMUDA DUNES, CA 92201 , THE PLANS, SPECIFICATIONS, AND CODE WITHIN HIS PURVIEW. 10. THE CURB SHALL BE "ETCHED" SHOWING LATERAL LOCATIONS: "S" (619)345• -1588 13. PADS SHALL BE COMPACTED TO A MINIMUM OF 90% RELATIVE DENSITY FOR SEWER, "G" FOR GAS, AND "E" FOR ELECTRICAL. (619)328 -9131 PER A.S.T.M. SPECIFICATIONS AND ABOVE MENTIONED SOILS 26. THE CITY ENGINEER SHALL RESPOND WITHIN THREE (3)WORKING DAYS REPORT WITH FINAL STREET SECTIONS AFTER SUBMITTAL OF "R" VALUE 11. TRAFFIC STRIPING, LEGENDS AND PAVEMENT MARKERS, TYPE AND TESTS FOR ROADWAY SUBBASE. LOCATIONS SHALL BE APPROVED BY THE CITY ENGINEER. Lek UIf 1A I 12. All underground facilities, including service laterals, shall be in place with trenches P Ian :'t Np. 27. THE CONTRACTOR IS RESPONSIBLE TO PREVENT SILT CONTAMINATION compacted and tested prior to base grade inspection and paving. The. contractor OF STORMWATER INFILTRATION FACILITIES DURING CONSTRUCTION OF shall submit written evidence to the City issued by the respective utility purveror I I SUBSEQUENT IMPROVEMENTS BY THE CONTRACTOR. IMMEDIATELY indicating the subsurface portion of their underground facilities have been installed PRIOR TO FINAL ACCEPTANCE OF STORM DRAINAGE and accepted. RETENTION /INFILTRATION FACILITIES, THE CONTRACTOR SHALL CONDUCT, IN THE PRESENCE OF THE C I TY INSPECTOR, A 13. Asphalt concrete paving, except fQr:overlays, shall be installed in two (2) or more SURVEY PLAT OWNER` PERFORMANCE TEST DESIGNED TO CLEARLY DEMONSTRATE THE courses with mix designs that conform to Section 203 -6.3.2 of the Standard Q�p�SSlpi��� K.S.L. R EGREATION OOR P. FUNCTIONAL ADEQUACY OF THE FACILITIES. Specifications (Green Book). noted as follows: 4�0 ��1G•Y /A l X PLAT OF SURVEY OF LOT 3G + 37 OF TRACT NO. 248gO-°2 RECORDED IN MAP BOOK 227 PAGES 85 THROUGH 90. 5G-140 F.G.A. OULVEVAIZ� 28. THE CONTRACTOR SHALL PROVIDE WIND EROSION AND DUST CONTROL Wearing Course (upper course): C2- AR- 4000 11 IN THE CITY OF LA QUINTA. COUNTY OF RIVERSIDE. MEASURES AS REQUIRED BY THE FUGITIVE DUST CONTROL PLAN Base Course (lower courses): B -AR -4000 Ala. 39037 STATE OF CALIFORNIA. APPROVED FOR THIS PROJECT. LA QUINTA, CA. 9 2 2 5 3 The wearing course shall be- 0.1 feet thick; the base course(s) shall contain the balance of the required asphalt concrete thickness. Seven (7) days prior to IF Q C���0� C G 1 q) 5G4-10B8 commencement of paving operations, the contractor shall submit the proposed mix design for each mix for City approval. FILF WM M 3���rQnaxy. RECOMMENDED FOR SEAL COUNTY SEAL PREPARED BY DATE Z-19- °JS SHEET NO. ENGINEER. BA Sl S OF BEAI�IN G S APPROVAL ITY OF L�A QUINTA �� ` - � THE BA515 OF BEARINGS FOR THIS SURVEY 15 f 3 0 8 7 d -30- 7 THE SOUTHWESTERLY LINE OF LOTS 33 THROUGH LOT 3G. TRACT NO. 248gO R.C.E. N0. EXP.DATE 27 OF TRACT 24880 -1 OF - -. SHTS 1470 S. VALLE Y V ISTA DRIVE DATE AP ED I.E. N45' 01' 40'W CLU H OU S SUITE 290 DATE BY MARK APPR DATE GRADING + PAVING PLAN TILE N0. DIAMOND BAR, CALIFORNIA 91765 CHECKED BY ��/ �S"' SCALE: 1'= 40' BENGf-tMARK ENGINEER REVISIONS COUNTY 4.5 MI..ES WEST or .iAGKSON 5T» HMO. ON HWY 111. 2.75 l�.CS souTrt ON 1NA5F�IGtON 5t. 350' (999) 860-3566 DAVID M. COSPE ENGINEER DATE NoRm or gemE r or AvENm 5z ao' EAST OF CENTEmWE OP WA5MGTON 5T» 6. 5oum FOR WO. DESIGNED BY MMB DRAWN BY MMB CHECKED BY HYP DATE R.C.E. 38022 EXPIRES 03 31 97 DATE 4 -27-94 G POLE A -3t PAGES 752AM a E 02' HIGt M 50UMEA5T QUARTER OF SECTION la. ti 1Q1 e¢, -4' WHIT F,, TYPICAL PARKING ISLAND LL = gf0'00'00' -j R = 2..50' T = 2.50' L = 3,.q3' K.S.L. RECREATION CORP. 5G-140 P.G.A. BOULVEVARD LA QUINTA, CA. 82253 CG19) 5G4-1088 1470 S. VALLEY VISTA DRIVE SUITE 290 DIAMOND BAR, CALIFORNIA 91765 (909) 860 -3566 DRIVING RANGE \\ 51 PRACTICE \ GREEN 1 1 I \ \ DATE1 BY IMARKI ENGINEER DESIGNED BY J.H. REVISIONS DRAWN BY J.H. O RECOMMENDED FOR APPROVAL DATE APPR DATE CHECKED BY OUNTY CHECKED BY H.P. DATE PROP. C U 2?�s - PARKINa MEDIANS PROF A.C. rrr�,�r ••O• A.B. • TYPICAL / ♦ 0 <5 ECT 100 .- 4" !10 / 'J y O. S,9 q \ �o O 1 11 C�� / 0� jg9 � D= 45'22'05" R= 200.00' (� L= 158.3G' \ 1 .�v D= 45'22'05" \ R= 158.1q' I i � \ 0 � ) \ \ \ \ \ ( ) \ § . \ \ ) / } c ( ) » i ( � § c ° m Q / \ } \ \ \ ^ J \ , ( t } \ \ � } | \ .� �\ �w\ i � } \ } \ ' � » \ ) 2 no \ § § \ ( 2 } ) . \ q / \ . \ , > � � \[ | . � ! \ b , m o @ $ 2 \ ( � ; § � \ ) f \ t / . \ \ { / 2,000 1,000 0 6,000 Feet W lip OF City of La Quinta F- Parcel boundaries ---------- City boundary mil �-Jeneral Base Map DRAFT (October 15, ;2004) City Area Exhibit 1 A MOUNTAIN LYLE ST iu 3; .v, Uj W ILI 1%, M M's ����Illl�a W Not Labeled a� . . . . . . . ...... 41111 000 cc .............. Os VLDR CID P LDR L GC MDR NC MHDR Uj W ILI 1%, M 2,000 1,000 0 2,000 4,000 6,000 7E City o a ulnta Street Network Parcel boundaries City boundary I - - - - -- I co 0 O T __z Legend ZONING ����Illl�a W Not Labeled a� . . . . . . . ...... 41111 000 cc .............. Os VLDR CID P LDR L GC MDR NC MHDR TC W oil 111111 111111111 Iff I&V "All ILA 2,000 1,000 0 2,000 4,000 6,000 7E City o a ulnta Street Network Parcel boundaries City boundary I - - - - -- I co 0 O T __z Legend ZONING fm W Not Labeled . . . . . . . ...... 41111 000 cc .............. Os VLDR CID P LDR M/RC GC MDR NC MHDR TC W Notes: Landuse descriptions taken from City of La Quinta General Plan VLDR Residential - Very Low Density LDR Residential - Low Density MDR Residential - Medium Density MHDR Residential - Medium-High Density HDR Residential - High Density MC ? CC Commercial - General CP Commercial - Proposed M/RC Commercial -Mixed Retail NC Commercial - Neighborhood TC Town I Center - Residential and Commercial VC Commercial - Village 0 Open OS Open Space P Parks GC Golf Course I 'Agricultural - Irrigated Farmland W Materbodies; DRAFT (October 15, 2004) f gi,' anduse City Area Exhibit 2 2,000 1,000 0 2,000 4,000 IDA City of La Quinta Legend Parcel boundaries I i City boundary FLOOD ZONE A AO X EMA Flood Zone Map DRAFT (October 15, 2004) (Pre -COMA) City Area Exhibit 3A m to Legend City of La Qul*nta FEMA Flood Zone Map (Pre -COMA) Cove Area DRAFT (October 15, 2004) 400 200 0 400 800 1,200 Feet Exh'Ib'It 3B a x E m 0 c M •, H C7 'a a M-d i 2,000 1,000 0 2,000 4,000 6,000 Feet aver � �u tip' j °i City ofLa Quinta 4 " .,u QParcel boundaries City boundary Drainage Infrastructure Storm Drain Pipes Manholes ® CatchBasins Drainage Map City Area DRAFT (October 15, 2004) xh'ib'lt 4A mmi�� 5Ec ' { A M rr� a _ III 11'RF •k$ +�'�,"biG SY a:. +� r�� llii:.. I �ry ` { A