33588�i
ummim�
o,
IE
�i
HYDROLOGY /HYDRAULICS I��EP U
For Property Located In
A Portion of Section 29, T5S., R7E., SBM
La Quinta, California
CVHC Dune Palms Neighborhood
Parcel 4 of Parcel Map No. 33588
October 12, 2007
Prepared for:
Coachella Valley Housing Coalition
45 -701 Monroe Street, Suite G
Indio, CA 92201
JN: 1786
MSA CONSULTING, INC.
PLarir wo ■ Cwm Bmnammo '. Lanni SvRvnwo
34200 BoB HoPE DRm ■ RANcHo MutaoB ■ CA 92270
1)81 �ONE (760) 320 -98U ■ PAX (760) 323 -7893
gS> F<
C-'b P Y �x
11 6/c,7
:•
•
•
�ARMHNBAA-
AS, ULIC* -S REP014�'
For Property Located In
A Portion of Section 29, TSS., R7E., SBM
La Quinta, California
CVHC Dune Palms Neighborhood
Parcel 4 of Parcel Map No. 33588
October 12, 2007
�QRof ESS/p y�
,�� P. D f �q ,�F
Jam, ^ 1i�- -R
N0. 43880
,(9-30_69
sr ClvIL
Prepared for: qlf OF CAl1F4��\
Coachella Valley Housing Coalition
45 -701 Monroe Street, Suite G
Indio, CA 92201
MSA CONSULTING, INC.
PLnrrMG ■ C M BNGUam mo ■ LAM SURVEMG
34200 BoB Hops DRm ■ RANcxo MmAos ■ CA 92270
TsLmoxs (760) 320 -9811 w FAx (760) 323 -7893
Table of Contents
Introduction...................................................... ..............................1
ExistingConditions ........................................... ..............................1
Flood Control Requirements ............................ ..............................1
Proposed Hydrology and Flood Control Improvements .................1
Run -Off Analysis .............................................. ..............................1
Catch Basin Capacity Calculations .................. ..............................2
Conclusion....................................................... ..............................6
VicinityMap ...................................................... ..............................7
Rational Method Analysis
100 -Year Storm ........................................ ...............................
9
10 -Year Storm ........................................... .............................24
Storm Drain Hydraulics Analysis ..................... .............................40
Storm Drain Hydraulic Requirements ..... ...............................
41
100 -Year Analysis HGL at 48. 0 .............. ...............................
42
100 -Year Analysis HGL at Critical Depth .. .............................75
10- Year Analysis ......................... ...............................
115
FEMAMaps .................... ............................... ............................126
• Hydrologic Soil Group Classification .............. ............................128
HydrologyMap .......................................... ...............................
encl.
Storm Drain Improvement Plans .............. ...............................
encl.
•
• Project Description
The CVHC Dune Palms Neighborhood project is located at the northwest corner of Avenue
48 and Dune Palms Road in the city of La Quinta, California, and consists of approximately
15 acres to be developed as multi - family housing (see Vicinity Map).
Existing Conditions
Flood Rate Map: The project area is covered by FIRM Panel Number 060709 0005 B,
revised August 19, 1991, which shows that the project area lies within Zone X, indicating the
area is outside the 500 -year flood plain (see FEMA Map).
On -Site: The project site is relatively flat except for a hill approximately 20 feet high on the
west side of the site. The overall terrain is gently rolling with numerous highs and lows and
generally slopes toward the south and east. In current conditions, storm runoff would be
generally characterized as sheet flow, ponding in the various low points and overflowing
onto Avenue 48 to the south and Dune Palms Road to the east. The existing soil falls into
two hydrologic soil groups, as defined in the 1978 Riverside County Flood Control & Water
Conservation District (RCFC) Hydrology Manual, referencing Soil Conservation Service
designations. The majority of the site is categorized as Group B, while the area of the hill
and its projected ridgeline to the southeast is designated as Group A (see Hydrology Map).
Off -Site: Sam's Club to the north and the existing single family homes to the west protect
the project site from off -site runoff, except for a portion of Avenue 48 frontage, whose
tributary drainage area extends approximately 334 feet beyond the western boundary of the
project.
• Flood Control Requirements
The drainage of this project site falls under the jurisdiction of the City of La Quinta. The
project design shall provide for the capture of all storm runoff generated on -site and in the
frontages of Avenue 48 and Dune Palms Road in a 100 -year storm. Runoff from a 10 -year
storm shall not overtop curbs and 100 -year runoff shall be confined within the right -of -way
and /or public utility and drainage easements, additionally, the 10 -year flow in the arterial
street can not flood more than one lane. Pursuant to an agreement with the Coachella
Valley Water District (CVWD), storm runoff captured on -site may be conveyed via storm
drain pipe to the La Quinta Evacuation Channel east of the project area.
Proposed Hydrology and Flood Control Improvements
As shown on the Hydrology Map, the proposed design provides for on -site storm runoff to
be conveyed in the streets and captured by catch basins. The captured and collected runoff
will be carried via an underground storm drain line in Dune Palms Road and Avenue 48 to
the La Quinta Evacuation Channel.
Run -Off Analysis
Peak runoff flows for 10 -year and 100 -year one -hour storms were determined using a
Rational Method computer program based on the RCFC Hydrology Manual. The Hydrology
Map shows the peak flow rates at each drainage node as determined by the analysis.
Catch basin sizing was performed using equations taken from the Federal Highway
Administration's Hydraulic Engineering Circular No. 22 (HEC -22) and tabulated street flow
• capacities and depths were calculated from Manning's equation.
• Catch Basin Capacity Calculations
Sump Condition
The following catch basin capacity equation is taken from the Federal Highway
Administration's Hydraulic Engineering Circular No. 22 (HEC -22) and is used for curb -
opening catch basins in sump conditions:
(EQ. 4 -28) Q = C,(L + 1.8W) d1.5
where: Q = maximum storm flow in one inlet (cfs)
L = length of curb opening (ft)
d = depth of flow as measured from normal cross slope (ft)
W = lateral width of depression = 4 ft
CH, = weir coefficient = 2.3
For a 10 -year storm, the maximum allowable flow depth is to top of curb, or 0.50' above
normal flowline. Runoff spread behind curb in a 100 -year storm is constrained to the width
of the sidewalk, or 5 feet, with a cross slope of 2 %, giving a maximum depth of 0.60' above
normal flowline. HEC -22 Equation 4 -28 measures flow depth from an extension of the
normal cross slope, so given a 2% normal cross slope and a 0.16' gutter hike in a standard
2' wide gutter, the normal cross slope extension intersects the curb face at 0.16' - 2(2 %) =
0.12' above normal flowline. The maximum allowable flow depths for use in Equation 4 -28
are then d10= 0.50' - 0.12'= 0.38' and d100= 0.60'- 0.12'= 0.48'.
Catch Basin No. 1 - SUMP
With L = 19': Q1oo -mAx = CW(L + 1.8W) d1oo1.5
• = 2.3[19 + 1.8(4)](0.48)1.5 = 20.0 cfs = Q1oo= 20.0 cfs ✓
Q10 -MAx = CA + 1.8W) d101.5
= 2.3[19 + 1.8(4)](0.38)1.5 = 14.1 cfs > Q10= 11.6 cfs ✓
•
Catch Basin No. 2 - SUMP
With L = 4': Q100-mAx = CW(L + 1.8W) d1oo1.5
= 2.3[4 + 1.8(4)](0.48)1.5 = 8.6 cfs > Q100= 5.1 cfs ✓
Q10-mAx = CW(L + 1.8W) d101.5
= 2.3[4 + 1.8(4)](0.38)1.5 = 6.0 cfs > Q10= 3.0 cfs ✓
Catch Basin No. 3 - SUMP
With L = 4': Q1oo -mAx = C,(L + 1.8W) d1oo1.5
= 2.3[4 + 1.8(4)](0.48)1.5 = 8.6 cfs >. Q1oo= 4.3 cfs ✓
Q10 -MAx = CW(L + 1.8W) d101.5
= 2.3[4 + 1.8(4)](0.38)1.5 = 6.0 cfs > Q10= 2.7 cfs ✓
Catch Basin No. 4 - SUMP
With L = 4': Q100-mAx = C,(L + 1.8W) d1001.5
= 2.3[4 + 1.8(4)](0.48)1.5 = 8.6 cfs > Q1oo= 6.2 cfs ✓
Q10-mAx = CN,(L + 1.8W) d101.5
= 2.3[4 + 1.8(4)](0.38)1.5 = 6.0 cfs > Q10= 3.7 cfs ✓
2
• Catch Basin Nos. 5 - 7
FHWA's Urban Drainage Design Program. HY -22, based on HEC -22 methodology, is used
to size catch basins on grade. Per La Quinta standards, the catch basins have 4" deep local
depressions. Also per La Quinta standards, the maximum spread of runoff (T) in an arterial
street for a 10 -year storm must leave a clear lane of travel. For this project, on 48th Avenue
the allowable spread is 17.7' and on Dune Palms Road the allowable spread is 33.8'
comprised of two travel or turn lanes and one bicycle lane. Peak flows used in the program
were taken from the Rational Method Hydrology Map exhibit, and the following results were
produced:
FHWA Urban Drainage Design Program, HY -22
Drainage of Highway Pavements
Inlets on Grade
Date: 08/10/2007
Project No. :1786
Project Name.: CVHC - Parcel 4 of Parcel Map No. 33588
Computed by : EAK
Inlets on Grade: Curb Opening Inlet
•
Inlet Interception
Inlet Type Curb - Opening
LT Length for 100% Inteception (ft) 7.14
L Curb - Opening Length (ft) 10.00
e Inlet Efficiency 1.000
Qi Intercepted Flow (cfs) 2.100
Qb By -pass Flow (cfs) 0.000
100 -YEAR STORM
Roadway and Discharge Data
CATCH BASIN
No. 5
Composite
S
10 -YEAR STORM
(ft /ft)
0.0058
Sx
Pavement Cross Slope
Roadway and Discharge
Data
Sw
Gutter Cross Slope
Cross Slope
Composite
n
S
Longitudinal Slope (ft /ft)
0.0058
W
Sx
Pavement Cross Slope (ft /ft)
0.0200
a
Sw
Gutter Cross Slope (ft /ft)
0.0630
is
n
W
Manning's Coefficient
Gutter Width (ft)
0.015
2.00
Width of Spread (ft)
a
Gutter Depression (inch)
4.00
Q
Discharge (cfs)
2.100
T
Width of Spread (ft)
9.56
Gutter Flow
Eo
Gutter Flow Ratio
0.561
d
Depth of Flow (ft)
0.28
V
Average Velocity (ft /sec)
2.10
•
Inlet Interception
Inlet Type Curb - Opening
LT Length for 100% Inteception (ft) 7.14
L Curb - Opening Length (ft) 10.00
e Inlet Efficiency 1.000
Qi Intercepted Flow (cfs) 2.100
Qb By -pass Flow (cfs) 0.000
100 -YEAR STORM
Roadway and Discharge Data
3
Cross Slope
Composite
S
Longitudinal Slope
(ft /ft)
0.0058
Sx
Pavement Cross Slope
(ft /ft)
0.0200
Sw
Gutter Cross Slope
(ft /ft)
0.0630
n
Manning's Coefficient
0.015
W
Gutter Width (ft)
2.00
a
Gutter Depression (inch)
4.00
Q
Discharge (cfs)
3.500
T
Width of Spread (ft)
11.87
3
• Gutter Flow
Eo
Gutter Flow Ratio
0.464
d
Depth of Flow (ft)
0.32
V
Average Velocity (ft /sec)
2.34
Inlet Interception
Inlet Type
Curb - Opening
LT
Length for 100% Inteception (ft)
9.73
L
Curb - Opening Length (ft)
10.00
e
Inlet Efficiency
1.000
Qi
Intercepted Flow (cfs)
3.500
Qb
By -pass Flow (cfs)
0.000
Use minimum 10' curb opening.
0.015
0
CATCH BASIN
No. 6
10 -YEAR STORM
Roadway and Discharge Data
Cross Slope
Composite
S
Longitudinal Slope (ft /ft)
0.0096
Sx
Pavement Cross Slope (ft /ft)
0.0200
Sw
Gutter Cross Slope (ft /ft)
0.0630
n
Manning's Coefficient
0.015
W
Gutter Width (ft)
2.00
a
Gutter Depression (inch)
4.00
Q
Discharge (cfs)
5.000
•
T
Width of Spread (ft)
12.39
Gutter Flow
Eo
Gutter Flow Ratio
0.446
d
Depth of Flow (ft)
0.33
V
Average Velocity (ft /sec)
3.08
Inlet Interception
Inlet Type
Curb - Opening
LT
Length for 1008 Inteception (ft)
13.41
L
Curb- Opening Length (ft)
19.00
e
Inlet Efficiency
1.000
Qi
Intercepted Flow (cfs)
5.000
Qb
By -pass Flow (cfs)
0.000
100 -YEAR STORM
Roadway and Discharge Data
Cross Slope
Composite
S
Longitudinal Slope (ft /ft)
0.0096
Sx
Pavement Cross Slope (ft /ft)
0.0200
Sw
Gutter Cross Slope (ft /ft)
0.0630
n
Manning's Coefficient
0.015
W
Gutter Width (ft)
2.00
a
Gutter Depression (inch)
4.00
Q
Discharge (cfs)
8.400
T
Width of Spread (ft)
15.28
Gutter Flow
Eo
Gutter Flow Ratio
0.366
d
Depth of Flow (ft)
0.39
•
V
Average Velocity (ft /sec)
3.47
0
•
0
•
Inlet Interception
Inlet Type Curb - Opening
LT Length for 100% Inteception (ft) 18.37
L Curb - Opening Length (ft) 19.00
e Inlet Efficiency 1.000
Qi Intercepted Flow (cfs) 8.400
Qb By -pass Flow (cfs) 0.000
Use minimum 19' curb opening.
CATCH BASIN No. 7
10 -YEAR STORM
Roadway and Discharge Data
Inlet Type Curb - Opening
LT Length for 100% Inteception (ft) 14.48
L Curb - Opening Length (ft) 20.00
e Inlet Efficiency 1.000
Qi Intercepted Flow (cfs) 4.000
Qb By -pass Flow (cfs) 0.000
Roadway and Discharge Data
Cross Slope
Composite
S
Longitudinal Slope (ft /ft)
0.0114
Sx
Pavement Cross Slope (ft /ft)
0.0087
Sw
Gutter Cross Slope (ft /ft)
0.0630
n
Manning's Coefficient
0.015
W
Gutter Width (ft)
2.00
a
Gutter Depression (inch)
4.00
Q
Discharge (cfs)
4.000
T
Width of Spread (ft)
18.22
Q
Gutter Flow
Eo
Gutter Flow Ratio
0.382
d
Depth of Flow (ft)
0.27
V
Average Velocity (ft /sec)
2.58
Inlet Interception
Inlet Type Curb - Opening
LT Length for 100% Inteception (ft) 14.48
L Curb - Opening Length (ft) 20.00
e Inlet Efficiency 1.000
Qi Intercepted Flow (cfs) 4.000
Qb By -pass Flow (cfs) 0.000
Roadway and Discharge Data
Gutter Flow
Eo Gutter Flow Ratio 0.304
d Depth of Flow (ft) 0.30
V Average Velocity (ft /sec) 2.87
5
Cross Slope
Composite
S
Longitudinal Slope
(ft /ft)
0.0114
Sx
Pavement Cross Slope
(ft /ft)
0.0087
Sw
Gutter Cross Slope
(ft /ft)
0.0630
n
Manning's Coefficient
0.015
W
Gutter Width (ft)
2.00
a
Gutter Depression (inch)
4.00
Q
Discharge (cfs)
6.600
T
Width of Spread (ft)
22.46
Gutter Flow
Eo Gutter Flow Ratio 0.304
d Depth of Flow (ft) 0.30
V Average Velocity (ft /sec) 2.87
5
• Inlet Interception
Inlet Type Curb - Opening
LT Length for 100% Inteception (ft) 20.21
L Curb - Opening Length (ft) 20.00
e Inlet Efficiency 1.000
Qi Intercepted Flow (cfs) 6.598
Qb By -pass Flow (cfs) 0.002
Use minimum 20' curb opening.
Conclusion
The foregoing demonstrates that the proposed design provides for safe and adequate
conveyance of storm runoff to proposed catch basins, and that the catch basins will provide
sufficient capacity to accept the entirety of the runoff for conveyance to the CVWD storm
channel. It is therefore concluded that the proposed development of the City of La Quinta
Affordable Housing project meets the hydrologic requirements set forth by the City of La
Quinta.
•
•
•
0
VICINITY MAP
0 0 0
z
O
Z
D
'v
of
A
�ASHINGTONI
STREET
�Z
ADAMS STREET
(.n
N p
4N.
� =
2
D D
DTI
m m
m
r'77
z z
c c
z
c
m m
m
DUNE
PALMS
JEFFERSON
STREET
r
i
•
RATIONAL METHOD ANALYSIS
100 -YEAR
• Riverside County Rational Hydrology Program
CIVILCADD /CIVILDESIGN Engineering Software,(c) 1989 - 2005 Version 7.1
Rational Hydrology Study Date: 07/11/07 File:1786100.out
------------------------------------------------------------------------
1786 100 year storm event
------------------------------------------------------------------------
* * * * * * * ** Hydrology Study Control Information * * * * * * * * **
English (in -lb) Units used in input data file
------------------------------------------------------------------------
Program License Serial Number 6091
------------------------------------------------------------------------
Rational Method Hydrology Program based on
Riverside County Flood Control & Water Conservation District
1978 hydrology manual
Storm event (year) = 100.00 Antecedent Moisture Condition = 2
Standard intensity- duration curves data (Plate D -9.1)
For the [ Cathedral City ] area used.
10 year storm 10 minute intensity = 2.770(In /Hr)
10 year storm 60 minute intensity = 0.980(In /Hr)
100 year storm 10 minute intensity = 9.520(In /Hr)
100 year storm 60 minute intensity = 1.600(In /Hr)
Storm event year = 100.0
Calculated rainfall intensity data:
1 hour intensity = 1.600(In /Hr)
Slope of intensity duration curve = 0.5800
+++++++++++++++++++++++++++++++++++++++ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + ++
Process from Point /Station 10.000 to Point /Station 11.000
* * ** INITIAL AREA EVALUATION * * **
Initial area flow distance = 671.000(Ft.)
Top (of initial area) elevation = 62.000(Ft.)
Bottom (of initial area) elevation = 59.100(Ft.)
Difference in elevation = 7.900(Ft.)
Slope = 0.01177 s(percent)= 1.18
TC = k(0.370) *[(length ^3) /(elevation change)] ^0.2
Initial area time of concentration = 12.159 min.
Rainfall intensity = 9.039(In /Hr) for a 100.0 year storm
CONDOMINIUM subarea type
Runoff Coefficient = 0.835
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 56.00
Pervious area fraction = 0.350; Impervious fraction = 0.650
Initial subarea runoff = 3.508(CFS)
Total initial stream area = 1.090(Ac.)
Pervious area fraction = 0.350
+++++++++++++++++++++++++++++++++++++++ + + ++ ++ + + + + + + + + ++ + + + + + + + + + + + + + ++
Process from Point /Station 11.000 to Point /Station 12.000
* * ** PIPEFLOW TRAVEL TIME (User specified size) * * **
Upstream point /station elevation = 99.100(Ft.)
Downstream point /station elevation = 96.900(Ft.)
Pipe length = 36.20(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 3.508(CFS)
Given pipe size = 18.00(In.)
Calculated individual pipe flow = 3.508(CFS)
Normal flow depth in pipe = 9.25(In.)
Flow top width inside pipe = 15.29(In.)
Critical Depth = 8.56(In.)
• Pipe flow velocity = 11.01(Ft /s)
Travel time through pipe = 0.05 min.
Time of concentration (TC) = 12.21 min.
10
i+++++++++++++++++++++++++++++++++++++++ + + + + + + + + ++ + + + + + + + + + + + + + + + + + + + ++
Process from Point /Station 11.000 to Point /Station 12.000
* * ** CONFLUENCE OF MAIN STREAMS * * **
The following data inside Main Stream is listed:
In Main Stream number: 1
Stream flow area = 1.040(Ac.)
Runoff from this stream = 3.508(CFS)
Time of concentration = 12.21 min.
Rainfall intensity = 4.029(In /Hr)
Program is now starting with Main Stream No. 2
+++++++++++++++++++++++++++++++++++++++ + + + + + + + + + + + + + + + + + + + + + +++ + + + + + ++
Process from Point /Station 100.000 to Point /Station 101.000
* * ** INITIAL AREA EVALUATION * * **
+++++++++++++++++++++++++++++++++++++++ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + ++
Process from Point /Station 101.000 to Point /Station 12.000
* * ** PIPEFLOW TRAVEL TIME (User specified size) * * **
Upstream point /station elevation = 46.500(Ft.)
Downstream point /station elevation = 46.400(Ft.)
Pipe length = 32.80(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 1.639(CFS)
Given pipe size = 12.00(In.)
Calculated individual pipe flow = 1.639(CFS)
Normal flow depth in pipe = 8.37(In.)
Flow top width inside pipe = 11.03(In.)
Critical Depth = 6.53(In.)
Pipe flow velocity = 2.80(Ft /s)
Travel time through pipe = 0.20 min.
Time of concentration (TC) = 8.83 min.
+++++++++++++++++++++++++++++++++++++++ + + + + + + + + ++ + + + + +++ + + + + + + + + + + ++++
Process from Point /Station 101.000 to Point /Station 12.000
* * ** CONFLUENCE OF MAIN STREAMS * * **
The following data inside Main Stream is listed:
In Main Stream number: 2
Stream flow area = 0.430(Ac.)
Runoff from this stream = 1.639(CFS)
Time of concentration = 8.83 min.
Rainfall intensity = 4.862(In /Hr)
Summary of stream data:
Stream Flow rate TC Rainfall Intensity
• No. (CFS) (min) (In /Hr)
W
Initial area flow distance = 255.000(Ft.)
Top (of initial area) elevation = 64.000(Ft.)
Bottom (of initial area) elevation = 55.200(Ft.)
Difference in elevation = 8.800(Ft.)
Slope = 0.03451 s(percent)= 3.45
TC = k(0.480) *[(length ^3) /(elevation change)] ^0.2
Initial area time of concentration = 8.635 min.
Rainfall intensity = 4.925(In /Hr) for a 100.0 year storm
SINGLE FAMILY (1 Acre Lot)
Runoff Coefficient = 0.774
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 56.00
Pervious area fraction = 0.800; Impervious fraction = 0.200
Initial subarea runoff = 1.639(CFS)
•
Total initial stream area = 0.430(Ac.)
Pervious area fraction = 0.800
+++++++++++++++++++++++++++++++++++++++ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + ++
Process from Point /Station 101.000 to Point /Station 12.000
* * ** PIPEFLOW TRAVEL TIME (User specified size) * * **
Upstream point /station elevation = 46.500(Ft.)
Downstream point /station elevation = 46.400(Ft.)
Pipe length = 32.80(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 1.639(CFS)
Given pipe size = 12.00(In.)
Calculated individual pipe flow = 1.639(CFS)
Normal flow depth in pipe = 8.37(In.)
Flow top width inside pipe = 11.03(In.)
Critical Depth = 6.53(In.)
Pipe flow velocity = 2.80(Ft /s)
Travel time through pipe = 0.20 min.
Time of concentration (TC) = 8.83 min.
+++++++++++++++++++++++++++++++++++++++ + + + + + + + + ++ + + + + +++ + + + + + + + + + + ++++
Process from Point /Station 101.000 to Point /Station 12.000
* * ** CONFLUENCE OF MAIN STREAMS * * **
The following data inside Main Stream is listed:
In Main Stream number: 2
Stream flow area = 0.430(Ac.)
Runoff from this stream = 1.639(CFS)
Time of concentration = 8.83 min.
Rainfall intensity = 4.862(In /Hr)
Summary of stream data:
Stream Flow rate TC Rainfall Intensity
• No. (CFS) (min) (In /Hr)
W
Total of 2 main streams to confluence:
Flow rates before confluence point:
3.508 1.639
Area of streams before confluence:
1.090 0.930
Results of confluence:
Total flow rate = 9.866(CFS)
Time of concentration = 12.209 min.
Effective stream area after confluence = 1.970(Ac.)
+++++++++++++++++++++++++++++++++++++++ + + + + +++ + + + + + + + + + ++ ++ + + + + + + + + + ++
Process from Point /Station 12.000 to Point /Station 21.000
* * ** PIPEFLOW TRAVEL TIME (User specified size) * * **
Upstream point /station elevation = 96.900(Ft.)
Downstream point /station elevation = 99.900(Ft.)
Pipe length = 192.90(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 9.866(CFS)
Given pipe size = 16.00(In.)
Calculated individual pipe flow = 9.866(CFS)
Normal flow depth in pipe = 9.09(In.)
Flow top width inside pipe = 15.85(In.)
Critical Depth = 10.59(In.)
Pipe flow velocity = 5.93(Ft /s)
Travel time through pipe = 0.90 min.
Time of concentration (TC) = 12.61 min.
+++++++++++++++++++++++++++++++++++++++ + + + ++ + + + + + + + + + + + + + + +++ + + + + ++ + ++
Process from Point /Station 12.000 to Point /Station 21.000
* * ** CONFLUENCE OF MAIN STREAMS * * **
The following data inside Main Stream is listed:
In Main Stream number: 1
Stream flow area = 1.970(Ac.)
Runoff from this stream = 9.866(CFS)
Time of concentration = 12.61 min.
Rainfall intensity = 3.959(In /Hr)
Program is now starting with Main Stream No. 2
+++++++++++++++++++++++++++++++++++++++ + + + ++ + + + + ++ + + + + + + + + + + + + + + + + + + ++
Process from Point /Station 20.000 to Point /Station 21.000
* * ** INITIAL AREA EVALUATION * * **
Initial area flow distance = 336.000(Ft.)
Top (of initial area) elevation = 59.500(Ft.)
1
3.508 12.21 9.029
2
1.639 8.83 9:862
Slope = 0.01935 s(percent)= 1.93
Largest stream flow has longer time of concentration
TC = k(0.370) *[(length ^3) /(elevation change)] ^0.2
Qp =
3.508 + sum of
Rainfall intensity = 5.029(In /Hr) for a 100.0 year storm
Qb Ia /Ib
CONDOMINIUM subarea type
1.639 0.829 = 1.358
Qp =
9.866
Total of 2 main streams to confluence:
Flow rates before confluence point:
3.508 1.639
Area of streams before confluence:
1.090 0.930
Results of confluence:
Total flow rate = 9.866(CFS)
Time of concentration = 12.209 min.
Effective stream area after confluence = 1.970(Ac.)
+++++++++++++++++++++++++++++++++++++++ + + + + +++ + + + + + + + + + ++ ++ + + + + + + + + + ++
Process from Point /Station 12.000 to Point /Station 21.000
* * ** PIPEFLOW TRAVEL TIME (User specified size) * * **
Upstream point /station elevation = 96.900(Ft.)
Downstream point /station elevation = 99.900(Ft.)
Pipe length = 192.90(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 9.866(CFS)
Given pipe size = 16.00(In.)
Calculated individual pipe flow = 9.866(CFS)
Normal flow depth in pipe = 9.09(In.)
Flow top width inside pipe = 15.85(In.)
Critical Depth = 10.59(In.)
Pipe flow velocity = 5.93(Ft /s)
Travel time through pipe = 0.90 min.
Time of concentration (TC) = 12.61 min.
+++++++++++++++++++++++++++++++++++++++ + + + ++ + + + + + + + + + + + + + + +++ + + + + ++ + ++
Process from Point /Station 12.000 to Point /Station 21.000
* * ** CONFLUENCE OF MAIN STREAMS * * **
The following data inside Main Stream is listed:
In Main Stream number: 1
Stream flow area = 1.970(Ac.)
Runoff from this stream = 9.866(CFS)
Time of concentration = 12.61 min.
Rainfall intensity = 3.959(In /Hr)
Program is now starting with Main Stream No. 2
+++++++++++++++++++++++++++++++++++++++ + + + ++ + + + + ++ + + + + + + + + + + + + + + + + + + ++
Process from Point /Station 20.000 to Point /Station 21.000
* * ** INITIAL AREA EVALUATION * * **
12
Initial area flow distance = 336.000(Ft.)
Top (of initial area) elevation = 59.500(Ft.)
Bottom (of initial area) elevation = 53.000(Ft.)
Difference in elevation = 6.500(Ft.)
Slope = 0.01935 s(percent)= 1.93
TC = k(0.370) *[(length ^3) /(elevation change)] ^0.2
Initial area time of concentration = 8.395 min.
Rainfall intensity = 5.029(In /Hr) for a 100.0 year storm
CONDOMINIUM subarea type
Runoff Coefficient = 0.896
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 56.00
•
Pervious area fraction = 0.350; Impervious fraction = 0.650
12
1 3.508 12.21 9.029
2 9.30 9.717
Largest stream flow has longer time of concentration
Qp = 3.508 + sum of
Qb Ia /Ib
1.582 0.859 = 1.351
Qp = 9.860
Total of 2 main streams to confluence:
Flow rates before confluence point:
3.508 1.582
Area of streams before confluence:
1.090 0.930
Results of confluence:
Total flow rate = 9.860(CFS)
Time of concentration = 12.209 min.
Effective stream area after confluence = 1.970(Ac.)
+++++++++++++++++++++++++++++++++++++++ + + + + + + + + + + + + + + + + +++ + + + + + + + + + +++
Process from Point /Station 12.000 to Point /Station 21.000
* * ** PIPEFLOW TRAVEL TIME (User specified size) * * **
Upstream point /station elevation = 96.900(Ft.)
Downstream point /station elevation = 99.900(Ft.)
Pipe length = 192.90(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 9.860(CFS)
Given pipe size = 16.00(In.)
Calculated individual pipe flow = 9.860(CFS)
Normal flow depth in pipe = 9.09(In.)
Flow top width inside pipe = 15.85(In.)
Critical Depth = 10.59(In.)
Pipe flow velocity = 5.93(Ft /s)
Travel time through pipe = 0.90 min.
Time of concentration (TC) = 12.61 min.
+++++++++++++++++++++++++++++++++++++++ + + + + ++ + + + + + + ++ ++ + + + + + + + + + + + + + ++
Process from Point /Station 12.000 to Point /Station 21.000
* * ** CONFLUENCE OF MAIN STREAMS * * **
The following data inside Main Stream is listed:
In Main Stream number: 1
Stream flow area = 1.970(Ac.)
Runoff from this stream = 9.860(CFS)
Time of concentration = 12.61 min.
Rainfall intensity = 3.959(In /Hr)
Program is now starting with Main Stream No. 2
+++++++++++++++++++++++++++++++++++++++ + + ++ ++ + + + + + + + + + + + + + + + + + + + + + + + ++
Process from Point /Station 20.000 to Point /Station 21.000
* * ** INITIAL AREA EVALUATION * * **
Initial area flow distance = 336.000(Ft.)
Top (of initial area) elevation = 59.500(Ft.)
Bottom (of initial area) elevation = 53.000(Ft.)
Difference in elevation = 6.500(Ft.)
Slope = 0.01935 s(percent)= 1.93
TC = k(0.370) *[(length ^3) /(elevation change)] ^0.2
Initial area time of concentration = 8.395 min.
Rainfall intensity = 5.029(In /Hr) for a 100.0 year storm
CONDOMINIUM subarea type
Runoff Coefficient = 0.896
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 56.00
Pervious area fraction = 0.350; Impervious fraction = 0.650
• Initial subarea runoff = 6.160(CFS)
Total initial stream area = 1.950(Ac.)
Pervious area fraction = 0.350
13
•
Process from Point /Station 20.000 to Point /Station 21.000
* * ** CONFLUENCE OF MAIN STREAMS * * **
The following data inside Main Stream is listed:
In Main Stream number: 2
Stream flow area = 1.450(Ac.)
Runoff from this stream = 6.160(CFS)
Time of concentration = 8.34 min.
Rainfall intensity = 5.024(In /Hr)
Summary of stream data:
Stream Flow rate TC Rainfall Intensity
No. (CFS) (min) (In /Hr)
1 4.860 12.61 3.954
2 6.160 8.34 5.024
Largest stream flow has longer or shorter time of concentration
Qp = 6.160 + sum of
Qa Tb /Ta
4.860 * 0.662 = 3.216
Qp = 9.376
Total of 2 main streams to confluence:
Flow rates before confluence point:
4.860 6.160
Area of streams before confluence:
1.470 1.450
Results of confluence:
Total flow rate = 9.376(CFS)
Time of concentration = 8.345 min.
Effective stream area after confluence = 2.920(Ac.)
+++++++++++++++++++++++++++++++++++++++ +++ + + ++ ++ + + + ++ + + + + +++ + + + + + ++ + ++
Process from Point /Station 21.000 to Point /Station 31.000
* * ** PIPEFLOW TRAVEL TIME (User specified size) * * **
Upstream point /station elevation = 44.900(Ft.)
Downstream point /station elevation = 42.700(Ft.)
Pipe length = 231.40(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 9.376(CFS)
Given pipe size = 24.00(In.)
Calculated individual pipe flow = 9.376(CFS)
Normal flow depth in pipe = 10.92(In.)
Flow top width inside pipe = 23.90(In.)
Critical Depth = 13.13(In.)
Pipe flow velocity = 6.74(Ft /s)
Travel time through pipe = 0.57 min.
Time of concentration (TC) = 8.92 min.
+++++++++++++++++++++++++++++++++++++++ + + + + + + + + + + + + + + + ++ ++ + + + + + + + + ++ ++
Process from Point /Station 21.000 to Point /Station 31.000
* * ** CONFLUENCE OF MAIN STREAMS * * **
The following data inside Main Stream is listed:
In Main Stream number: 1
Stream flow area = 2.920(Ac.)
Runoff from this stream = 9.376(CFS)
Time of concentration = 8.92 min.
Rainfall intensity = 4.834(In /Hr)
Program is now starting with Main Stream No. 2
14
+++++++++++++++++++++++++++++++++++++++ ++ + + + + +++ + + + + + ++ + + ++ + + + + + + + ++ ++
• Process from Point /Station 30.000 to Point /Station 31.000
* * ** INITIAL AREA EVALUATION * * **
Initial area flow distance = 400.000(Ft.)
Top (of initial area) elevation = 57.500(Ft.)
Bottom (of initial area) elevation = 51.300(Ft.)
Difference in elevation = 6.200(Ft.)
Slope = 0.01550 s(percent)= 1.55
TC = k(0.370), *[(length ^3) /(elevation change)] ^0.2
Initial area time of concentration = 9.353 min.
Rainfall intensity = 4.702(In /Hr) for a 100.0 year storm
CONDOMINIUM subarea type
Runoff Coefficient = 0.838
Decimal fraction soil group A = 0.100
Decimal fraction soil group B = 0.900
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 53.60
Pervious area fraction = 0.350; Impervious fraction = 0.650
Initial subarea runoff = 4.570(CFS)
Total initial stream area = 1.160(Ac.)
Pervious area fraction = 0.350
+++++++++++++++++++++++++++++++++++++++ + + ++++ + + + + + ++ + + + + + + + + + + + + + + + + ++
Process from Point /Station 30.000 to Point /Station 31.000
* * ** CONFLUENCE OF MAIN STREAMS * * **
The following data inside Main Stream is listed:
In Main Stream number: 2
Stream flow area = 1.160(Ac.)
Runoff from this stream = 4.570(CFS)
Time of concentration = 9.35 min.
Rainfall intensity = 4.702(In /Hr)
Summary of stream data:
Stream Flow rate TC Rainfall Intensity
No. (CFS) (min) (In /Hr)
1 9.376 8.92 4.834
2 4.570 9.35 4.702
Largest stream flow has longer or shorter time of concentration
Qp = 9.376 + sum of
Qa Tb /Ta
4.570 * 0.953 = 4.357
Qp = 13.734
Total of 2 main streams to confluence:
Flow rates before confluence point:
9.376 4.570
Area of streams before confluence:
2.920 1.160
Results of confluence:
Total flow rate = 13.734(CFS)
Time of concentration = 8.918 min.
Effective stream area after confluence = 4.080(Ac.)
+++++++++++++++++++++++++++++++++++++++ +++ + + + + + + ++ + + + + + + ++ + + + + + + + + + + ++
Process from Point /Station 31.000 to Point /Station 92.000
* * ** PIPEFLOW TRAVEL TIME (User specified size) * * **
Upstream point /station elevation = 42.700(Ft.)
Downstream point /station elevation = 42.400(Ft.)
Pipe length = 35.00(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 13.734(CFS)
Given pipe size = 24.00(In.)
• Calculated individual pipe flow = 13.734(CFS)
Normal flow depth in pipe = 14.18(In.)
Flow top width inside pipe = 23.60(In.)
15
Critical Depth = 16.01(In.)
Pipe flow velocity = 7.11(Ft /s)
Travel time through pipe = 0.08 min.
Time of concentration (TC) = 9.00 min.
+++++++++++++++++++++++++++++++++++++++ + + + + + + + + + + + + + + + ++ + + + + + + + + + + + + ++
Process from Point /Station 31.000 to Point /Station 92.000
* * ** CONFLUENCE OF MAIN STREAMS * * **
The following data inside Main Stream is listed:
In Main Stream number: 1
Stream flow area = 4.080(Ac.)
Runoff from this stream = 13.734(CFS)
Time of concentration = 9.00 min.
Rainfall intensity = 4.808(In /Hr)
Program is now starting with Main Stream No. 2
+++++++++++++++++++++++++++++++++++++++ + + + + + + +++ + + + + + + + + + + + + + + + + + + + + ++
Process from Point /Station 90.000 to Point /Station 91.000
* * ** INITIAL AREA EVALUATION * * **
Initial area flow distance = 135.000(Ft.)
Top (of initial area) elevation = 55.300(Ft.)
Bottom (of initial area) elevation = 43.900(Ft.)
Difference in elevation = 11.400(Ft.)
Slope = 0.08444 s(percent)= 8.44
TC = k(0.370) *[(length ^3) /(elevation change)] ^0.2
Warning: TC computed to be less than 5 min.; program is assuming the
time of concentration is 5 minutes.
Initial area time of concentration = 5.000 min.
Rainfall intensity = 6.762(In /Hr) for a 100.0 year storm
CONDOMINIUM subarea type
Runoff Coefficient = 0.858
Decimal fraction soil group A = 0.000
• Decimal fraction soil group B = 1.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 56.00
Pervious area fraction = 0.350; Impervious fraction = 0.650
Initial subarea runoff = 1.624(CFS)
Total initial stream area = 0.280(Ac.)
Pervious area fraction = 0.350
+++++++++++++++++++++++++++++++++++++++ + + + + + +++ + + + + + + ++ + + + + + + + + + + + + + ++
Process from Point /Station 91.000 to Point /Station 92.000
* * ** PIPEFLOW TRAVEL TIME (User specified size) * * **
Upstream point /station elevation = 43.900(Ft.)
Downstream point /station elevation = 42.400(Ft.)
Pipe length = 147.00(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 1.624(CFS)
Given pipe size = 12.00(In.)
Calculated individual pipe flow = 1.624(CFS)
Normal flow depth in pipe = 5.65(In.)
Flow top width inside pipe = 11.98(In.)
Critical Depth = 6.50(In.)
Pipe flow velocity = 4.47(Ft /s)
Travel time through pipe = 0.55 min.
Time of concentration (TC) = 5.55 min.
+++++++++++++++++++++++++++++++++++++++ + + + + + + + + + + + + + + + + +++ + + + + ++ ++ ++ ++
Process from Point /Station 91.000 to Point /Station 92.000
* * ** CONFLUENCE OF MAIN STREAMS * * **
The following data inside Main Stream is listed:
In Main Stream number: 2
Stream flow area = 0.280(Ac.)
Runoff from this stream = 1.624(CFS)
Time of concentration = 5.55 min.
Rainfall intensity = 6.365(In /Hr)
16
Summary of stream data:
Stream Flow rate TC Rainfall Intensity
No. (CFS) (min) (In /Hr)
1 13.739 9.00 9.808
2 1.629 5.55 6.365
Largest stream flow has longer time of concentration
Qp = 13.739 + sum of
Qb Ia /Ib
1.629 * 0.755 = 1.227
Qp = 19.961
Total of 2 main streams to confluence:
Flow rates before confluence point:
13.739 1.629
Area of streams before confluence:
9.080 0.280
Results of confluence:
Total flow rate = 19.961(CFS)
Time of concentration = 9.000 min.
Effective stream area after confluence = 9.360(Ac.)
+++++++++++++++++++++++++++++++++++++++ ++ + +++ + + + + + + + + + ++ + + + + + + + + + + ++ ++
Process from Point /Station 92.000 to Point /Station 91.000
* * ** PIPEFLOW TRAVEL TIME (User specified size) * * **
Upstream point /station elevation = 92.900(Ft.)
Downstream point /station elevation = 39.300(Ft.)
Pipe length = 250.00(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 19.961(CFS)
Given pipe size = 29.00(In.)
Calculated individual pipe flow = 19.961(CFS)
Normal flow depth in pipe = 13.31(In.)
Flow top width inside pipe = 23.86(In.)
Critical Depth = 16.73(In.)
Pipe flow velocity = 8.36(Ft /s)
Travel time through pipe = 0.50 min.
Time of concentration (TC) = 9.50 min.
+++++++++++++++++++++++++++++++++++++++ + + + ++ + + + + + +++ + + + + + + + + + + +++ + + + ++
Process from Point /Station 31.000 to Point /Station 91.000
* * ** CONFLUENCE OF MAIN STREAMS * * **
The following data inside Main Stream is listed:
In Main Stream number: 1
Stream flow area = 9.360(Ac.)
Runoff from this stream = 19.961(CFS)
Time of concentration = 9.50 min.
Rainfall intensity = 9.660(In /Hr)
Program is now starting with Main Stream No. 2
+++++++++++++++++++++++++++++++++++++++ + + + + + + + + + + +++ + + + + + + + + + + + + + + + + ++
Process from Point /Station 50.000 to Point /Station 51.000
* * ** INITIAL AREA EVALUATION * * **
Initial area flow distance = 691.000(Ft.)
Top (of initial area) elevation = 61.900(Ft.)
Bottom (of initial area) elevation = 57.900(Ft.)
Difference in elevation = 9.000(Ft.)
Slope = 0.00579 s(percent)= 0.58
TC = k(0.370) *[(length ^3) /(elevation change)] ^0.2
Initial area time of concentration = 19.173 min.
Rainfall intensity = 3.695(In /Hr) for a 100.0 year storm
CONDOMINIUM subarea type
Runoff Coefficient = 0.823
Decimal fraction soil group A = 0.130
Decimal fraction soil group B = 0.870
17
Decimal fraction soil group C = 0.000
is Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 52.88
Pervious area fraction = 0.350; Impervious fraction = 0.650
Initial subarea runoff = 8.031(CFS)
Total initial stream area = 2.640(AC.)
Pervious area fraction = 0.350
•
+++++++++++++++++++++++++++++++++++++++ + + + + + + + + + ++ + + + + + + + + + ++++ + + + + + ++
Process from Point /Station 51.000 to Point /Station 52.000
* * ** STREET FLOW TRAVEL TIME + SUBAREA FLOW ADDITION * * **
Top of street segment elevation = 57.400(Ft.)
End of street segment elevation = 51.900(Ft.)
Length of street segment = 489.000(Ft.)
Height of curb above gutter flowline = 6.0(In.)
Width of half street (curb to crown) = 26.000(Ft.)
Distance from crown to crossfall grade break = 13.000(Ft.)
Slope from gutter to grade break (v /hz) = 0.010
Slope from grade break to crown (v /hz) = 0.010
Street flow is on (1] side(s) of the street
Distance from curb to property line = 10.000(Ft.)
Slope from curb to property line (v /hz) = 0.010
Gutter width = 2.000(Ft.)
Gutter hike from flowline = 1.875(In.)
Manning's N in gutter = 0.0150
Manning's N from gutter to grade break = 0.0150
Manning's N from grade break to crown = 0.0150
Estimated mean flow rate at midpoint of street = 14.091(CFS)
Depth of flow = 0.926(Ft.), Average velocity = 3.278(Ft /s)
Note: depth of flow exceeds top of street crown.
Streetflow hydraulics at midpoint of street travel:
Halfstreet flow width = 26.000(Ft.)
Flow velocity = 3.28(Ft /s)
Travel time = 2.96 min. TC = 16.63 min.
Adding area flow to street
CONDOMINIUM subarea type
Runoff Coefficient = 0.779
Decimal fraction soil group A = 0.720
Decimal fraction soil group B = 0.280
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 38.72
Pervious area fraction = 0.350; Impervious fraction = 0.650
Rainfall intensity = 3.367(In /Hr) for a 100.0 year storm
Subarea runoff = 11.956(CFS) for 4.560(Ac.)
Total runoff = 19.987(CFS) Total area = 7.200(AC.)
Street flow at end of street = 19.987(CFS)
Half street flow at end of street = 19.987(CFS)
Depth of flow = 0.465(Ft.), Average velocity = 3.773(Ft/s)
Note: depth of flow exceeds top of street crown.
Flow width (from curb towards crown)= 26.000(Ft.)
+++++++++++++++++++++++++++++++++++++++ + + + + + + + + + + + + ++ + + + + + + + + + + + + + + + ++
Process from Point /Station 52.000 to Point /Station 61.000
* * ** PIPEFLOW TRAVEL TIME (User specified size) * * **
Upstream point /station elevation = 99.900(Ft.)
Downstream point /station elevation = 93.900(Ft.)
Pipe length = 36.00(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 19.987(CFS)
Given pipe size = 29.00(In.)
Calculated individual pipe flow = 19.987(CFS)
Normal flow depth in pipe = 12.92(In.)
Flow top width inside pipe = 23.99(In.)
Critical Depth = 19.26(In.)
Pipe flow velocity = 12.18(Ft /s)
Travel time through pipe = 0.05 min.
Time of concentration (TC) = 16.68 min.
18
+++++++++++++++++++++++++++++++++++++++ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + ++
Process from Point /Station 52.000 to Point /Station 61.000
* * ** CONFLUENCE OF MINOR STREAMS * * **
Along Main Stream number: 2 in normal stream number 1
Stream flow area = 7.200(Ac.)
Runoff from this stream = 19.987(CFS)
Time of concentration = 16.68 min.
Rainfall intensity = 3.361(In /Hr)
+++++++++++++++++++++++++++++++++++++++ + + + + + +++ + + + + + + + + ++ + + + + + + + + + + + ++
Process from Point /Station 70.000 to Point /Station 60.000
* * ** INITIAL AREA EVALUATION * * **
Initial area flow distance = 103.000(Ft.)
Top (of initial area) elevation = 52.900(Ft.)
Bottom (of initial area) elevation = 96.500(Ft.)
Difference in elevation = 5.900(Ft.)
Slope = 0.05728 s(percent)= 5.73
TC = k(0.370) *[(length ^3) /(elevation change)] ^0.2
Warning: TC computed to be less than 5 min.; program is assuming the
time of concentration is 5 minutes.
Initial area time of concentration = 5.000 min.
Rainfall intensity = 6.762(In /Hr) for a 100.0 year storm
CONDOMINIUM subarea type
Runoff Coefficient = 0.807
Decimal fraction soil group A = 1.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 32.00
Pervious area fraction = 0.350; Impervious fraction = 0.650
Initial subarea runoff = 0.491(CFS)
Total initial stream area = 0.090(Ac.)
Pervious area fraction = 0.350
Process from Point /Station 60.000 to Point /Station 61.000
* * ** PIPEFLOW TRAVEL TIME (User specified size) * * **
Upstream point /station elevation = 99.030(Ft.)
Downstream point /station elevation = 93.900(Ft.)
Pipe length = 128.60(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 0.991(CFS)
Given pipe size = 8.00(In.)
Calculated individual pipe flow = 0.991(CFS)
Normal flow depth in pipe = 9.37(In.)
Flow top width inside pipe = 7.97(In.)
Critical Depth = 3.93(In.)
Pipe flow velocity = 2.51(Ft /s)
Travel time through pipe = 0.85 min.
Time of concentration (TC) = 5.85 min.
+++++++++++++++++++++++++++++++++++++++ + + + + + + + + + + + + + + + + + ++ + + + + + + + + + + ++
Process from Point /Station 60.000 to Point /Station 61.000
* * ** CONFLUENCE OF MINOR STREAMS * * **
Along Main Stream number: 2 in normal stream number 2
Stream flow area = 0.090(Ac.)
Runoff from this stream = 0.991(CFS)
Time of concentration = 5.85 min.
Rainfall intensity = 6.171(In /Hr)
Summary of stream data:
Stream Flow rate TC Rainfall Intensity
No. (CFS) (min) (In /Hr)
• 1 19.987 1.68 3.361
5
2 0.991 5.85 6.171
Largest stream flow has longer time of concentration
19
•
Qp = 19.987 + sum of
Qb Ia /Ib
0.991 * 0.595 = 0.267
Qp = 20.259
Total of 2 streams to confluence:
Flow rates before confluence point:
19.987 0.991
Area of streams before confluence:
7.200 0.090
Results of confluence:
Total flow rate = 20.259(CFS)
Time of concentration = 16.683 min.
Effective stream area after confluence = 7.290(Ac.)
+++++++++++++++++++++++++++++++++++++++ + + + + + + + + + + + + + + + + + + + + + +++ + + + + + ++
Process from Point /Station 61.000 to Point /Station 91.000
* * ** PIPEFLOW TRAVEL TIME (User specified size) * * **
Upstream point /station elevation = 93.900(Ft.)
Downstream point /station elevation = 39.300(Ft.)
Pipe length = 230.00(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 20.259(CFS)
Given pipe size = 30.00(In.)
Calculated individual pipe flow = 20.259(CFS)
Normal flow depth in pipe = 12.63(In.)
Flow top width inside pipe = 29.62(In.)
Critical Depth = 18.35(In.)
Pipe flow velocity = 10.32(Ft /s)
Travel time through pipe = 0.37 min.
Time of concentration (TC) = 17.05 min.
+++++++++++++++++++++++++++++++++++++++ + + + + + ++++ + + + + + ++ + + + + + + + + + + + + + ++
Process from Point /Station 61.000 to Point /Station 91.000
* * ** CONFLUENCE OF MAIN STREAMS * * **
The following data inside Main Stream is listed:
In Main Stream number: 2
Stream flow area = 7.290(Ac.)
Runoff from this stream = 20.259(CFS)
Time of concentration = 17.05 min.
Rainfall intensity = 3.319(In /Hr)
Program is now starting with Main Stream No. 3
+++++++++++++++++++++++++++++++++++++++ + + + + + + +++ + + + + + + + + + + + +++ + + + + + + ++
Process from Point /Station 90.000 to Point /Station 91.000
* * ** INITIAL AREA EVALUATION * * **
Initial area flow distance = 282.000(Ft.)
Top (of initial area) elevation = 53.600(Ft.)
Bottom (of initial area) elevation = 51.900(Ft.)
Difference in elevation = 2.200(Ft.)
Slope = 0.00780 s(percent)= 0.78
TC = k(0.370) *[(length ^3) /(elevation change)] ^0.2
Initial area time of concentration = 9.330 min.
Rainfall intensity = 9.709(In /Hr) for a 100.0 year storm
CONDOMINIUM subarea type
Runoff Coefficient = 0.797
Decimal fraction soil group A = 0.800
Decimal fraction soil group B = 0.200
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 36.80
Pervious area fraction = 0.350; Impervious fraction = 0.650
Initial subarea runoff = 5.066(CFS)
Total initial stream area = 1.350(Ac.)
Pervious area fraction = 0.350
20
+++++++++++++++++++++++++++++++++++++++ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + ++
• Process from Point /Station 90.000 to Point /Station 91.000
* * ** CONFLUENCE OF MAIN STREAMS * * **
The following data inside Main Stream is listed:
In Main Stream number: 3
Stream flow area = 1.350(Ac.)
Runoff from this stream = 5.066(CFS)
Time of concentration = 9.33 min.
Rainfall intensity = 9.709(In /Hr)
Summary of stream data:
Stream Flow rate TC Rainfall Intensity
No. (CFS) (min) (In /Hr)
1
19.961
9.50 9.660
2
20.259
17.05 3.319
3
5.066
9.33 9.709
Largest
stream
flow has longer time of concentration
Qp =
20.259
+ sum of
Qb
Ia /Ib
19.961 *
0.712 = 10.659
Qb
Ia /Ib
5.066 *
0.705 = 3.571
Qp =
39.979
Total of 3 main streams to confluence:
Flow rates before confluence point:
19.961 20.259 5.066
Area of streams before confluence:
9.360 7.290 1.350
Results of confluence:
Total flow rate = 39.979(CFS)
• Time of concentration = 17.055 min. -
Effective stream area after confluence 13.000(Ac.)
0
+++++++++++++++++++++++++++++++++++++++ + + ++ + + + + + + + + + + + + + + + + + + + + + + + + + ++
Process from Point /Station 91.000 to Point /Station 82.000
* * ** PIPEFLOW TRAVEL TIME (User specified size) * * **
Upstream point /station elevation = 39.300(Ft.)
Downstream point /station elevation = 37.000(Ft.)
Pipe length = 203.00(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 39.979(CFS)
Given pipe size = 36.00(In.)
Calculated individual pipe flow = 39.979(CFS)
Normal flow depth in pipe = 17.70(In.)
Flow top width inside pipe = 35.99(In.)
Critical Depth = 22.89(In.)
Pipe flow velocity = 9.97(Ft /s)
Travel time through pipe = 0.39 min.
Time of concentration (TC) = 17.39 min.
+++++++++++++++++++++++++++++++++++++++ +++ + + + ++ + + + + + + + + + + ++ + + + + + + ++ + ++
Process from Point /Station 91.000 to Point /Station 82.000
* * ** CONFLUENCE OF MAIN STREAMS * * **
The following data inside Main Stream is listed:
In Main Stream number: 1
Stream flow area = 13.000(Ac.)
Runoff from this stream = 39.979(CFS)
Time of concentration = 17.39 min.
Rainfall intensity = 3.281(In /Hr)
Program is now starting with Main Stream No. 2
+++++++++++++++++++++++++++++++++++++++ + + + + + + ++ + + + + + + + + + + + + + + + + + ++++ ++
Process from Point /Station 98.000 to Point /Station 99.000
* * ** INITIAL AREA EVALUATION * * **
Initial area flow distance = 902.000(Ft.)
Top (of initial area) elevation = 52.100(Ft.)
Bottom (of initial area) elevation = 46.770(Ft.)
Difference in elevation = 5.330(Ft.)
Slope = 0.00591 s(percent)= 0.59
TC = k(0.300) *[(length ^3) /(elevation change)] ^0.2
Initial area time of concentration = 12.732 min.
Rainfall intensity = 3.932(In /Hr) for a 100.0 year storm
COMMERCIAL subarea type
Runoff Coefficient = 0.873
Decimal fraction soil group A = 0.500
Decimal fraction soil group B = 0.500
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 99.00
Pervious area fraction = 0.100; Impervious fraction = 0.900
Initial subarea runoff = 8.443(CFS)
Total initial stream area = 2.460(Ac.)
Pervious area fraction = 0.100
+++++++++++++++++++++++++++++++++++++++ + + + ++ ++++ + ++ + + + + + + + + + ++ + + ++++ ++
Process from Point /Station 99.000 to Point /Station 82.000
* * ** PIPEFLOW TRAVEL TIME (User specified size) * * **
Upstream point /station elevation = 44.400(Ft.)
Downstream point /station elevation = 36.800(Ft.)
Pipe length = 118.00(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 8.443(CFS)
Given pipe size = 18.00(In.)
Calculated individual pipe flow = 8.443(CFS)
Normal flow depth in pipe = 6.96(In.)
Flow top width inside pipe = 17.53(In.)
Critical Depth = 13.50(In.)
Pipe flow velocity = 13.38(Ft /s)
Travel time through pipe = 0.15 min.
Time of concentration (TC) = 12.88 min.
+++++++++++++++++++++++++++++++++++++++ + + + + + + + + + + + + + + + + +++ + + + + + + + + + + ++
Process from Point /Station 99.000 to Point /Station 82.000
* * ** CONFLUENCE OF MAIN STREAMS * * **
The following data inside Main Stream is listed:
In Main Stream number: 2
Stream flow area = 2.460(Ac.)
Runoff from this stream = 8.443(CFS)
Time of concentration = 12.88 min.
Rainfall intensity = 3.906(In /Hr)
Program is now starting with Main Stream No. 3
+++++++++++++++++++++++++++++++++++++++ + + + + + ++ + + + + + + + + + + + + + + + + +++ + + + ++
Process from Point /Station 80.000 to Point /Station 81.000
* * ** INITIAL AREA EVALUATION * * **
Initial area flow distance = 800.000(Ft.)
Top (of initial area) elevation = 54.800(Ft.)
Bottom (of initial area) elevation = 47.400(Ft.)
Difference in elevation = 7.400(Ft.)
Slope = 0.00925 s(percent)= 0.92
TC = k(0.300) *((length ^3) /(elevation change)] ^0.2
Initial area time of concentration = 11.095 min.
Rainfall intensity = 4.259(In /Hr) for a 100.0 year storm
COMMERCIAL subarea type
Runoff Coefficient = 0.882
Decimal fraction soil group A = 0.040
• Decimal fraction soil group B = 0.960
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
M
RI index for soil(AMC 2) = 55.09
• Pervious area fraction = 0.100; Impervious fraction = 0.900
Initial subarea runoff = 5.294(CFS)
Total initial stream area = 1.910(Ac.)
Pervious area fraction = 0.100
+++++++++++++++++++++++++++++++++++++++ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + ++
Process from Point /Station 81.000 to Point /Station 82.000
* * ** STREET FLOW TRAVEL TIME + SUBAREA FLOW ADDITION * * **
Top of street segment elevation = 97.990(Ft.)
End of street segment elevation = 95.000(Ft.)
Length of street segment = 199.000(Ft.)
Height of curb above gutter flowline = 6.0(In.)
Width of half street (curb to crown) = 96.000(Ft.)
Distance from crown to crossfall grade break = 21.000(Ft.)
Slope from gutter to grade break (v /hz) = 0.020
Slope from grade break to crown (v /hz) = 0.020
Street flow is on [1) side(s) of the street
Distance from curb to property line = 10.000(Ft.)
Slope from curb to property line (v /hz) = 0.020
Gutter width = 2.000(Ft.)
Gutter hike from flowline = 1.875(In.)
Manning's N in gutter = 0.0150
Manning's N from gutter to grade break = 0.0150
Manning's N from grade break to crown = 0.0150
Estimated mean flow rate at midpoint of street = 5.969(CFS)
Depth of flow = 0.389(Ft.), Average velocity = 3.010(Ft /s)
Streetflow hydraulics at midpoint of street travel:
Halfstreet flow width = 13.658(Ft.)
Flow velocity = 3.01(Ft /s)
Travel time = 1.07 min. TC = 12.17 min.
Adding area flow to street
COMMERCIAL subarea type
Runoff Coefficient = 0.863
Decimal fraction soil group A = 1.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 32.00
Pervious area fraction = 0.100; Impervious fraction = 0.900
Rainfall intensity = 9.036(In /Hr) for a 100.0 year storm
Subarea runoff = 1.289(CFS) for 0.370(Ac.)
Total runoff = 6.583(CFS) Total area = 1.780(Ac.)
Street flow at end of street = 6.583(CFS)
Half street flow at end of street = 6.583(CFS)
Depth of flow = 0.900(Ft.), Average velocity = 3.082(Ft /s)
Flow width (from curb towards crown)= 19.212(Ft.)
+++++++++++++++++++++++++++++++++++++++ + + + + ++ + + + + + + + + + + + + + + + + + + + + + + + ++
Process from Point /Station 81.000 to Point /Station 82.000
* * ** CONFLUENCE OF MAIN STREAMS * * **
The following data inside Main Stream is listed:
In Main Stream number: 3
Stream flow area = 1.780(AC.)
Runoff from this stream = 6.583(CFS)
Time of concentration = 12.17 min.
Rainfall intensity = 9.036(In /Hr)
Summary of stream data:
Stream Flow rate TC Rainfall Intensity
No. (CFS) (min) (In /Hr)
1 39.979 17.39 3.281
2 8.993 12.88 3.906
3 6.583 12.17 9.036
Largest stream flow has longer time of concentration
• Qp = 39.979 + sum of
Qb Ia /Ib
8.993 * 0.890 = 7.092
23
•
Qb Ia /Ib
6.583 * 0.813 = 5.351
QP = 96.922
Total of 3 main streams to confluence:
Flow rates before confluence point:
39.979 8.993 6.583
Area of streams before confluence:
13.000 2.960 1.780
Results of confluence:
Total flow rate = 96.922(CFS)
Time of concentration = 17.399 min.
Effective stream area after confluence = 17.290(Ac.)
+++++++++++++++++++++++++++++++++++++++ + + + + + + + + + + + + + + ++ + + + + + + + + + + + + + ++
Process from Point /Station 82.000 to Point /Station 100.000
* * ** PIPEFLOW TRAVEL TIME (User specified size) * * **
Upstream point /station elevation = 36.800(Ft.)
Downstream point /station elevation = 39.900(Ft.)
Pipe length = 583.00(Ft.) Manning's N = 0.013
No. of pipes = 2 Required pipe flow = 96.922(CFS)
Given pipe size = 29.00(In.)
NOTE: Normal flow is pressure flow in user selected pipe size.
The approximate hydraulic grade line above the pipe invert is
9.368(Ft.) at the headworks or inlet of the pipe(s)
Pipe friction loss = 6.268(Ft.)
Minor friction loss = 0.000(Ft.) K- factor = 0.00
Pipe flow velocity = 7.97(Ft /s)
Travel time through pipe = 1.30 min.
Time of concentration (TC) = 18.70 min.
End of computations, total study area = 17.29 (Ac.)
The following figures may
be used for a unit hydrograph study of the same area.
Area averaged pervious area fraction(Ap) = 0.300
Area averaged RI index number = 96.9
24
•
•
RATIONAL METHOD ANALYSIS
10 -YEAR
r &1
Riverside County Rational Hydrology Program
CIVILCADD /CIVILDESIGN Engineering Software,(c) 1989 - 2005 Version 7.1
Rational Hydrology Study Date: 07/11/07 File:178610.out
------------------------------------------------------------------------
1786 10 YEAR STORM EVENT
------------------------------------------------------------------------
* * * * * * * ** Hydrology Study Control Information * * * * * * * * **
English (in -lb) Units used in input data file
------------------------------------------------------------------------
Program License Serial Number 6091
------------------------------------------------------------------------
Rational Method Hydrology Program based on
Riverside County Flood Control & Water Conservation District
1978 hydrology manual
Storm event (year) = 10.00 Antecedent Moisture Condition = 2
Standard intensity- duration curves data (Plate D -9.1)
For the [ Cathedral City ] area used.
10 year storm 10 minute intensity = 2.770(In /Hr)
10 year storm 60 minute intensity = 0.980(In /Hr)
100 year storm 10 minute intensity = 9.520(In /Hr)
100 year storm 60 minute intensity = 1.600(In /Hr)
Storm event year = 10.0
Calculated rainfall intensity data:
1 hour intensity = 0.980(In /Hr)
Slope of intensity duration curve = 0.5800
is......................................................................
Process from Point /Station 10.000 to Point /Station 11.000
* * ** INITIAL AREA EVALUATION * * **
Initial area flow distance = 671.000(Ft.)
Top (of initial area) elevation = 62.000(Ft.)
Bottom (of initial area) elevation = 59.100(Ft.)
Difference in elevation = 7.900(Ft.)
Slope = 0.01177 s(percent)= 1.18
TC = k(0.370) *((length ^3) /(elevation change)] ^0.2
Initial area time of concentration = 12.159 min.
Rainfall intensity = 2.979(In /Hr) for a 10.0 year storm
CONDOMINIUM subarea type
Runoff Coefficient = 0.806
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 56.00
Pervious area fraction = 0.350; Impervious fraction = 0.650
Initial subarea runoff = 2.075(CFS)
Total initial stream area = 1.090(Ac.)
Pervious area fraction = 0.350
+++++++++++++++++++++++++++++++++++++++ ++ + + + + + + + + + + + + ++ + + + + + + + + + + + + + ++
Process from Point /Station 11.000 to Point /Station 12.000
* * ** PIPEFLOW TRAVEL TIME (User specified size) * * **
Upstream point /station elevation = 99.100(Ft.)
Downstream point /station elevation = 46.900(Ft.)
Pipe length = 36.20(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 2.075(CFS)
Given pipe size = 18.00(In.) -
Calculated individual pipe flow 2.075(CFS)
Normal flow depth in pipe = 3.28(In.)
26
Flow top width inside pipe = 13.89(In.)
Critical Depth = 6.51(In.)
Pipe flow velocity = 9.44(Ft /s)
Travel time through pipe = 0.06 min.
Time of concentration (TC) = 12.22 min.
+++++++++++++++++++++++++++++++++++++++ + + + + + + + + + + + + + + + + + + + + + + + + + + + + +++
Process from Point /Station 11.000 to Point /Station 12.000
* * ** CONFLUENCE OF MAIN STREAMS * * **
The following data inside Main Stream is listed:
In Main Stream number: 1
Stream flow area = 1.040(Ac.)
Runoff from this stream = 2.075(CFS)
Time of concentration = 12.22 min.
Rainfall intensity = 2.467(In /Hr)
Program is now starting with Main Stream No. 2
+++++++++++++++++++++++++++++++++++++++ + ++ ++ + + + + + + + + ++ + +++ + + + + + ++++ + ++
Process from Point /Station 100.000 to Point /Station 101.000
* * ** INITIAL AREA EVALUATION * * **
+++++++++++++++++++++++++++++++++++++++ + + + + + + + + + +++ + ++ + + + + + + + + + + + + + + ++
Process from Point /Station 101.000 to Point /Station 12.000
* * ** PIPEFLOW TRAVEL TIME (User specified size) * * **
Upstream point /station elevation = 46.500(Ft.)
Downstream point /station elevation = 46.400(Ft.)
Pipe length = 32.80(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 0.927(CFS)
Given pipe size = 12.00(In.)
Calculated individual pipe flow = 0.927(CFS)
Normal flow depth in pipe = 5.79(In.)
Flow top width inside pipe = 11.99(In.)
Critical Depth = 4.84(In.)
Pipe flow velocity = 2.47(Ft /s)
Travel time through pipe = 0.22 min.
Time of concentration (TC) = 8.86 min.
+++++++++++++++++++++++++++++++++t+++++ + ++ + ++ + + + + + + + + ++ + + + +++ + + + + + + + ++
Process from Point /Station 101.000 to Point /Station 12.000
* * ** CONFLUENCE OF MAIN STREAMS * * **
The following data inside Main Stream is listed:
In Main Stream number: 2
Stream flow area = 0.430(Ac.)
Runoff from this stream = 0.927(CFS)
Time of concentration = 8.86 min.
Rainfall intensity = 2.973(In /Hr)
• Summary of stream data:
27
Initial area flow distance = 255.000(Ft.)
Top (of initial area) elevation = 64.000(Ft.)
Bottom (of initial area) elevation = 55.200(Ft.)
Difference in elevation = 8.800(Ft.)
Slope = 0.03451 s(percent)= 3.45
TC = k(0.480) *[(length ^3) /(elevation change)] ^0.2
Initial area time of concentration = 8.635 min.
Rainfall intensity = 3.017(In /Hr) for a 10.0 year storm
SINGLE FAMILY (1 Acre Lot)
Runoff Coefficient = 0.714
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 56.00
Pervious area fraction = 0.800; Impervious fraction = 0.200
Initial subarea runoff = 0.927(CFS)
Total initial stream area = 0.430(Ac.)
Pervious area fraction = 0.800
+++++++++++++++++++++++++++++++++++++++ + + + + + + + + + +++ + ++ + + + + + + + + + + + + + + ++
Process from Point /Station 101.000 to Point /Station 12.000
* * ** PIPEFLOW TRAVEL TIME (User specified size) * * **
Upstream point /station elevation = 46.500(Ft.)
Downstream point /station elevation = 46.400(Ft.)
Pipe length = 32.80(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 0.927(CFS)
Given pipe size = 12.00(In.)
Calculated individual pipe flow = 0.927(CFS)
Normal flow depth in pipe = 5.79(In.)
Flow top width inside pipe = 11.99(In.)
Critical Depth = 4.84(In.)
Pipe flow velocity = 2.47(Ft /s)
Travel time through pipe = 0.22 min.
Time of concentration (TC) = 8.86 min.
+++++++++++++++++++++++++++++++++t+++++ + ++ + ++ + + + + + + + + ++ + + + +++ + + + + + + + ++
Process from Point /Station 101.000 to Point /Station 12.000
* * ** CONFLUENCE OF MAIN STREAMS * * **
The following data inside Main Stream is listed:
In Main Stream number: 2
Stream flow area = 0.430(Ac.)
Runoff from this stream = 0.927(CFS)
Time of concentration = 8.86 min.
Rainfall intensity = 2.973(In /Hr)
• Summary of stream data:
27
Total of 2 main streams to confluence:
Flow rates before confluence point:
2.075 0.927
Area of streams before confluence:
1.090 0.930
Results of confluence:
Total flow rate = 2.899(CFS)
Time of concentration = 12.218 min.
Effective stream area after confluence = 1.970(Ac.)
+++++++++++++++++++++++++++++++++++++++ + ++ ++ + ++ + + + + + + + + + ++ + + + + + + + + + + ++
Process from Point /Station 12.000 to Point /Station 21.000
* * ** PIPEFLOW TRAVEL TIME (User specified size) * * **
Upstream point /station elevation = 96.900(Ft.)
Downstream point /station elevation = 99.900(Ft.)
Pipe length = 192.90(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 2.899(CFS)
Given pipe size = 16.00(In.)
Calculated individual pipe flow = 2.899(CFS)
001 Normal flow depth in pipe = 6.69(In.)
Flow top width inside pipe = 15.77(In.)
Critical Depth = 7.96(In.)
Pipe flow velocity = 5.18(Ft /s)
Travel time through pipe = 0.96 min.
Time of concentration (TC) = 12.68 min.
+++++++++++++++++++++++++++++++++++++++ + + + + + + + + + +++ + + + + + + + + + + + + + + + + + ++
Process from Point /Station 12.000 to Point /Station 21.000
Stream
Flow rate TC
Rainfall Intensity
No.
(CFS) (min)
(In /Hr)
1
2.075 12.22
2.967
2
0.927 8.86
2.973
Largest
stream flow has longer
time of concentration
Qp =
2.075 + sum of
Initial area flow distance = 336.000(Ft.)
Top (of initial area) elevation = 59.500(Ft.)
Qb Ia /Ib
Bottom (of initial area) elevation = 53.000(Ft.)
Difference in elevation = 6.500(Ft.)
0.927 * 0.830 =
0.769
Qp =
2.899
Initial area time of concentration = 8.395 min.
Total of 2 main streams to confluence:
Flow rates before confluence point:
2.075 0.927
Area of streams before confluence:
1.090 0.930
Results of confluence:
Total flow rate = 2.899(CFS)
Time of concentration = 12.218 min.
Effective stream area after confluence = 1.970(Ac.)
+++++++++++++++++++++++++++++++++++++++ + ++ ++ + ++ + + + + + + + + + ++ + + + + + + + + + + ++
Process from Point /Station 12.000 to Point /Station 21.000
* * ** PIPEFLOW TRAVEL TIME (User specified size) * * **
Upstream point /station elevation = 96.900(Ft.)
Downstream point /station elevation = 99.900(Ft.)
Pipe length = 192.90(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 2.899(CFS)
Given pipe size = 16.00(In.)
Calculated individual pipe flow = 2.899(CFS)
001 Normal flow depth in pipe = 6.69(In.)
Flow top width inside pipe = 15.77(In.)
Critical Depth = 7.96(In.)
Pipe flow velocity = 5.18(Ft /s)
Travel time through pipe = 0.96 min.
Time of concentration (TC) = 12.68 min.
28
+++++++++++++++++++++++++++++++++++++++ + + + + + + + + + +++ + + + + + + + + + + + + + + + + + ++
Process from Point /Station 12.000 to Point /Station 21.000
* * ** CONFLUENCE OF MAIN STREAMS * * **
The following data inside Main Stream is listed:
In Main Stream number: 1
Stream flow area = 1.970(Ac.)
Runoff from this stream = 2.899(CFS)
Time of concentration = 12.68 min.
Rainfall intensity = 2.915(In /Hr)
Program is now starting with Main Stream No. 2
+++++++++++++++++++++++++++++++++++++++ + + + + + + + + + + + + + + + + + + + +++ + + + + + + + ++
Process from Point /Station 20.000 to Point /Station 21.000
* * ** INITIAL AREA EVALUATION * * **
Initial area flow distance = 336.000(Ft.)
Top (of initial area) elevation = 59.500(Ft.)
Bottom (of initial area) elevation = 53.000(Ft.)
Difference in elevation = 6.500(Ft.)
Slope = 0.01935 s(percent)= 1.93
TC = k(0.370) *[(length ^3) /(elevation change)] ^0.2
Initial area time of concentration = 8.395 min.
Rainfall intensity = 3.077(In /Hr) for a 10.0 year storm
CONDOMINIUM subarea type
Runoff Coefficient = 0.820
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C = 0.000
28
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 56.00
Pervious area fraction = 0.350; Impervious fraction = 0.650
Initial subarea runoff = 3.659(CFS)
Total initial stream area = 1.950(Ac.)
Pervious area fraction = 0.350
+++++++++++++++++++++++++++++++++++++++ + + + + + + + + +++ + + + + + + + + + + + + + + + + + + ++
Process from Point /Station 20.000 to Point /Station 21.000
* * ** CONFLUENCE OF MAIN STREAMS * * **
The following data inside Main Stream is listed:
In Main Stream number: 2
Stream flow area = 1.950(Ac.)
Runoff from this stream = 3.659(CFS)
Time of concentration = 8.39 min.
Rainfall intensity = 3.077(In /Hr)
Summary of stream data:
Stream Flow rate TC Rainfall Intensity
No. (CFS) (min) (In /Hr)
1 2.839 12.68 2.915
2 3.659 8.39 3.077
Largest stream flow has longer or shorter time of concentration
Qp = 3.659 + sum of
Qa Tb /Ta
2.839 * 0.658 = 1.869
Qp = 5.527
Total of 2 main streams to confluence:
Flow.rates before confluence point:
2.839 3.659
Area of streams before confluence:
1.970 1.950
Results of confluence:
Total flow rate = 5.527(CFS)
Time of concentration = 8.395 min.
Effective stream area after confluence = 2.920(Ac.)
+++++++++++++++++++++++++++++++++++++++ + + ++ + + + + + + + + + + + + + + +++ + + + + + + + +++
Process from Point /Station 21.000 to Point /Station 31.000
* * ** PIPEFLOW TRAVEL TIME (User specified size) * * **
Upstream point /station elevation = 99.900(Ft.)
Downstream point /station elevation = 92.700(Ft.)
Pipe length = 231.90(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 5.527(CFS)
Given pipe size = 29.00(In.)
Calculated individual pipe flow = 5.527(CFS)
Normal flow depth in pipe = 8.19(In.)
Flow top width inside pipe = 22.76(In.)
Critical Depth = 9.96(In.)
Pipe flow velocity = 5.89(Ft /s)
Travel time through pipe = 0.66 min.
Time of concentration (TC) = 9.01 min.
+++++++++++++++++++++++++++++++++++++++ + + + + + + + + + + + + ++ + + + + +++ + + + + + + + + ++
Process from Point /Station 21.000 to Point /Station 31.000
* * ** CONFLUENCE OF MAIN STREAMS * * **
The following data inside Main Stream is listed:
In Main Stream number: 1
Stream flow area = 2.920(Ac.)
Runoff from this stream = 5.527(CFS)
• Time of concentration = 9.01 min.
Rainfall intensity = 2.999(In /Hr)
Program is now starting with Main Stream No. 2
29
Process from Point /Station 30.000 to Point /Station 31.000
* * ** INITIAL AREA EVALUATION * * **
Initial area flow distance = 900.000(Ft.)
Top (of initial area) elevation = 57.500(Ft.)
Bottom (of initial area) elevation = 51.300(Ft.)
Difference in elevation = 6.200(Ft.)
Slope = 0.01550 s(percent)= 1.55
TC = k(0.370) *[(length ^3) /(elevation change)] ^0.2
Initial area time of concentration = 9.353 min.
Rainfall intensity = 2.880(In /Hr) for a 10.0 year storm
CONDOMINIUM subarea type
Runoff Coefficient = 0.810
Decimal fraction soil group A = 0.100
Decimal fraction soil group B = 0.900
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 53.60
Pervious area fraction = 0.350; Impervious fraction = 0.650
Initial subarea runoff = 2.706(CFS)
Total initial stream area = 1.160(Ac.)
Pervious area fraction = 0.350
+++++++++++++++++++++++++++++++++++++++ + + + +++ + + + + + + + + + ++ + + + + + + + + + + + + ++
Process from Point /Station 30.000 to Point /Station 31.000
* * ** CONFLUENCE OF MAIN STREAMS * * **
The following data inside Main Stream is listed:
In Main Stream number: 2
Stream flow area = 1.160(Ac.)
Runoff from this stream = 2.706(CFS)
Time of concentration = 9.35 min.
Rainfall intensity = 2.880(In /Hr)
Summary of stream data:
Stream Flow rate TC Rainfall Intensity
No. (CFS) (min) (In /Hr)
1 5.527 9.01 2.999
2 2.706 9.35 2.880
Largest stream flow has longer or shorter time of concentration
Qp = 5.527 + sum of
Qa Tb /Ta
2.706 * 0.963 = 2.605
Qp = 8.132
Total of 2 main streams to confluence:
Flow rates before confluence point:
5.527 2.706
Area of streams before confluence:
2.920 1.160
Results of confluence:
Total flow rate = 8.132(CFS)
Time of concentration = 9.005 min.
Effective stream area after confluence = 9.080(Ac.)
+++++++++++++++++++++++++++++++++++++++ + + + + + ++ + + + + + + ++ + + + + + ++ + + + + + + + ++
Process from Point /Station 31.000 to Point /Station 92.000
* * ** PIPEFLOW TRAVEL TIME (User specified size) * * **
Upstream point /station elevation = 92.700(Ft.)
Downstream point /station elevation = 92.900(Ft.)
Pipe length = 35.00(Ft.) Manning's N = 0.013
• No. of pipes = 1 Required pipe flow = 8.132(CFS)
Given pipe size = 29.00(In.)
Calculated individual pipe flow = 8.132(CFS)
30
Normal flow depth in pipe = 10.38(In.)
Flow top width inside pipe = 23.78(In.)
Critical Depth = 12.17(In.)
Pipe flow velocity = 6.25(Ft /s)
Travel time through pipe = 0.09 min.
Time of concentration (TC) = 9.10 min.
+++++++++++++++++++++++++++++++++++++++ + + + + + ++ + + ++ + + + + ++ ++ + + + + + + + + + + ++
Process from Point /Station 31.000 to Point /Station 92.000
* * ** CONFLUENCE OF MAIN STREAMS * * **
The following data inside Main Stream is listed:
In Main Stream number: 1
Stream flow area = 9.080(Ac.)
Runoff from this stream = 8.132(CFS)
Time of concentration = 9.10 min.
Rainfall intensity = 2.927(In /Hr)
Program is now starting with Main Stream No. 2
+++++++++++++++++++++++++++++++++++++++ + + + + + + + + ++ + ++ + + + + + + + + + + + + + + + + ++
Process from Point /Station 90.000 to Point /Station 91.000
* * ** INITIAL AREA EVALUATION * * **
Initial area flow distance = 135.000(Ft.)
Top (of initial area) elevation = 55.300(Ft.)
Bottom (of initial area) elevation = 93.900(Ft.)
Difference in elevation = 11.900(Ft.)
Slope = 0.08999 s(percent)= 8.99
TC = k(0.370) *[(length ^3) /(elevation change)] ^0.2
Warning: TC computed to be less than 5 min.; program is assuming the
time of concentration is 5 minutes.
Initial area time of concentration = 5.000 min.
Rainfall intensity = 9.191(In /Hr) for a 10.0 year storm
CONDOMINIUM subarea type
Runoff Coefficient = 0.836
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 56.00
Pervious area fraction = 0.350; Impervious fraction = 0.650
Initial subarea runoff = 0.970(CFS)
Total initial stream area = 0.280(Ac.)
Pervious area fraction = 0.350
+++++++++++++++++++++++++++++++++++++++ + + + + + + + + + + + + + + + + + + + + + + + + + + + + +++
Process from Point /Station 91.000 to Point /Station 92.000
* * ** PIPEFLOW TRAVEL TIME (User specified size) * * **
Upstream point /station elevation = 93.900(Ft.)
Downstream point /station elevation = 92.900(Ft.)
Pipe length = 197.00(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 0.970(CFS)
Given pipe size = 12.00(In.)
Calculated individual pipe flow = 0.970(CFS)
Normal flow depth in pipe = 9.25(In.)
Flow top width inside pipe = 11.98(In.)
Critical Depth = 9.96(In.)
Pipe flow velocity = 3.89(Ft /s)
Travel time through pipe = 0.63 min.
Time of concentration (TC) = 5.63 min.
+++++++++++++++++++++++++++++++++++++++ + + + + + ++ + + + + + + + + + + + + + + + + + + + + + +++
Process from Point /Station 91.000 to Point /Station 92.000
* * ** CONFLUENCE OF MAIN STREAMS * * **
The following data inside Main Stream is listed:
• In Main Stream number: 2
Stream flow area = 0.280(Ac.)
Runoff from this stream = 0.970(CFS)
M
Time of concentration = 5.63 min.
Rainfall intensity = 3.866(In /Hr)
Summary of stream data:
Stream Flow rate TC Rainfall Intensity
No. (CFS) (min) (In /Hr)
1 8.132 9.10 2.927
2 0.970 5.63 3.866
Largest stream flow has longer time of concentration
Qp = 8.132 + sum of
Qb Ia /Ib
0.970 * 0.757 = 0.739
Qp = 8.866
Total of 2 main streams to confluence:
Flow rates before confluence point:
8.132 0.970
Area of streams before confluence:
9.080 0.280
Results of confluence:
Total flow rate = 8.866(CFS)
Time of concentration = 9.099 min.
Effective stream area after confluence = 9.360(Ac.)
+++++++++++++++++++++++++++++++++++++++ + + + + + ++ + +++ + + + + + + + + + ++ + + + + + + + ++
Process from Point /Station 92.000 to Point /Station 91.000
* * ** PIPEFLOW TRAVEL TIME (User specified size) * * **
Upstream point /station elevation = 92.900(Ft.)
Downstream point /station elevation = 39.300(Ft.)
Pipe length = 250.00(Ft.) Manning's N = 0.013
• No. of pipes = 1 Required pipe flow = 8.866(CFS)
Given pipe size = 29.00(In.)
Calculated individual pipe flow = 8.866(CFS)
Normal flow depth in pipe = 9.83(In.)
Flow top width inside pipe = 23.61(In.)
Critical Depth = 12.75(In.)
Pipe flow velocity = 7.32(Ft /s)
Travel time through pipe = 0.57 min.
Time of concentration (TC) = 9.67 min.
+++++++++++++++++++++++++++++++++++++++ + + + + ++ + + + + ++ + + ++ + + + + + + + + + + +++ ++
Process from Point /Station 31.000 to Point /Station 91.000
* * ** CONFLUENCE OF MAIN STREAMS * * **
The following data inside Main Stream is listed:
In Main Stream number: 1
Stream flow area = 9.360(Ac.)
Runoff from this stream = 8.866(CFS)
Time of concentration = 9.67 min.
Rainfall intensity = 2.825(In /Hr)
Program is now starting with Main Stream No. 2
+++++++++++++++++++++++++++++++++++++++ ++ + ++ + + + + + + + + + ++ + + ++ + + + + + + + ++ ++
Process from Point /Station 50.000 to Point /Station 51.000
* * ** INITIAL AREA EVALUATION * * **
Initial area flow distance = 691.000(Ft.)
Top (of initial area) elevation = 61.900(Ft.)
Bottom (of initial area) elevation = 57.900(Ft.)
Difference in elevation = 9.000(Ft.)
Slope = 0.00579 s(percent)= 0.58
TC = k(0.370) *[(length ^3) /(elevation change)] ^0.2
Initial area time of concentration = 19.173 min.
• Rainfall intensity = 2.263(In /Hr) for a 10.0 year storm
CONDOMINIUM subarea type
Runoff Coefficient = 0.792
32
Decimal fraction soil group A = 0.130
Decimal fraction soil group B = 0.870
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 52.88
Pervious area fraction = 0.350; Impervious fraction = 0.650
Initial subarea runoff = 4.729(CFS)
Total initial stream area = 2.640(Ac.)
Pervious area fraction = 0.350
+++++++++++++++++++++++++++++++++++++++ + + + + + + + + + + + + ++ + + + + + + + + ++ + + + + + ++
Process from Point /Station 51.000 to Point /Station 52.000
* * ** STREET FLOW TRAVEL TIME + SUBAREA FLOW ADDITION * * **
Top of street segment elevation = 57.400(Ft.)
End of street segment elevation = 51.400(Ft.)
Length of street segment = 484.000(Ft.)
Height of curb above gutter flowline = 6.0(In.)
Width of half street (curb to crown) = 26.000(Ft.)
Distance from crown to crossfall grade break = 13.000(Ft.)
Slope from gutter to grade break (v /hz) = 0.010
Slope from grade break to crown (v /hz) = 0.010
Street flow is on (1) side(s) of the street
Distance from curb to property line = 10.000(Ft.)
Slope from curb to property line (v /hz) = 0.010
Gutter width = 2.000(Ft.)
Gutter hike from flowline = 1.875(In.)
Manning's N in gutter = 0.0150
Manning's N from gutter to grade break = 0.0150
Manning's N from grade break to crown = 0.0150
Estimated mean flow rate at midpoint of street = 8.191(CFS)
Depth of flow = 0.375(Ft.), Average velocity = 2.733(Ft/s)
Streetflow hydraulics at midpoint of street travel:
Halfstreet flow width = 23.920(Ft.)
Flow velocity = 2.73(Ft /s)
Travel time = 2.95 min. TC = 17.13 min.
Adding area flow to street
CONDOMINIUM subarea type
Runoff Coefficient = 0.739
Decimal fraction soil group A = 0.720
Decimal fraction soil group B = 0.280
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 38.72
Pervious area fraction = 0.350; Impervious fraction = 0.650
Rainfall intensity = 2.028(In /Hr) for a 10.0 year storm
Subarea runoff = 6.837(CFS) for 4.560(Ac.)
Total runoff = 11.566(CFS) Total area = 7.200(Ac.)
Street flow at end of street = 11.566(CFS)
Half street flow at end of street = 11.566(CFS)
Depth of flow = 0.408(Ft.), Average velocity = 3.034(Ft /s)
Note: depth of flow exceeds top of street crown.
Flow width (from curb towards crown)= 26.000(Ft.)
+++++++++++++++++++++++++++++++++++++++ + + + + + + + + + + + + + + + + + + +++ + + + ++ + + + ++
Process from Point /Station 52.000 to Point /Station 61.000
* * ** PIPEFLOW TRAVEL TIME (User specified size) * * **
Upstream point /station elevation = 44.400(Ft.)
Downstream point /station elevation = 43.400(Ft.)
Pipe length = 36.00(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 11.566(CFS)
Given pipe size = 24.00(In.)
Calculated individual pipe flow = 11.566(CFS)
Normal flow depth in pipe = 9.12(In.)
Flow top width inside pipe = 23.30(In.)
Critical Depth = 14.64(In.)
Pipe flow velocity = 10.56(Ft /s)
Travel time through pipe = 0.06 min.
• Time of concentration (TC) = 17.18 min.
33
+++++++++++++++++++++++++++++++++++++++ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + ++
Process from Point /Station 52.000 to Point /Station 61.000
* * ** CONFLUENCE OF MINOR STREAMS * * **
Along Main Stream number: 2 in normal stream number 1
Stream flow area = 7.200(Ac.)
Runoff from this stream = 11.566(CFS)
Time of concentration = 17.18 min.
Rainfall intensity = 2.024(In /Hr)
+++++++++++++++++++++++++++++++++++++++ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + ++
Process from Point /Station 70.000 to Point /Station 60.000
* * ** INITIAL AREA EVALUATION * * **
Initial area flow distance = 103.000(Ft.)
Top (of initial area) elevation = 52.400(Ft.)
Bottom (of initial area) elevation = 46.500(Ft.)
Difference in elevation = 5.900(Ft.)
Slope = 0.05728 s(percent)= 5.73
TC = k(0.370) *((length ^3) /(elevation change)] ^0.2
Warning: TC computed to be less than 5 min.; program is assuming the
time of concentration is 5 minutes.
Initial area time of concentration = 5.000 min.
Rainfall intensity = 4.141(In /Hr) for a 10.0 year storm
CONDOMINIUM subarea type
Runoff Coefficient = 0.772
Decimal fraction soil group A = 1.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 32.00
Pervious area fraction = 0.350; Impervious fraction = 0.650
Initial subarea runoff = 0.288(CFS)
Total initial stream area = 0.090(Ac.)
Pervious area fraction = 0.350
Process from Point /Station 60.000 to Point /Station 61.000
* * ** PIPEFLOW TRAVEL TIME (User specified size) * * **
Upstream point /station elevation = 44.030(Ft.)
Downstream point /station elevation = 43.400(Ft.)
Pipe length = 128.60(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 0.288(CFS)
Given pipe size = 8.00(In.)
Calculated individual pipe flow = 0.288(CFS)
Normal flow depth in pipe = 3.21(In.)
Flow top width inside pipe = 7.84(In.)
Critical Depth = 2.98(In.)
Pipe flow velocity = 2.19(Ft /s)
Travel time through pipe = 0.98 min.
Time of concentration (TC) = 5.98 min.
++++++++++++++t++++++++++++++++++++++++ + + + + ++ + + + + + + + + + + +++ + + + + + + + + + + ++
Process from Point /Station 60.000 to Point /Station 61.000
* * ** CONFLUENCE OF MINOR STREAMS * * **
Along Main Stream number: 2 in normal stream number 2
Stream flow area = 0.090(Ac.)
Runoff from this stream = 0.288(CFS)
Time of concentration = 5.98 min.
Rainfall intensity = 3.733(In /Hr)
Summary of stream data:
Stream Flow rate TC Rainfall Intensity
No. (CFS) (min) (In /Hr)
• 1 11.566 17.18 2.024
2 0.288 5.98 3.733
Largest stream flow has longer time of concentration
34
Qp = 11.566 + sum of
Qb Ia /Ib
0.288 * 0.592 = 0.156
Qp = 11.722
Total of 2 streams to confluence:
Flow rates before confluence point:
11.566 0.288
Area of streams before confluence:
7.200 0.090
Results of confluence:
Total flow rate = 11.722(CFS)
Time of concentration = 17.182 min.
Effective stream area after confluence = 7.290(Ac.)
+++++++++++++++++++++++++++++++++++++++ + + + + + + + + +++ + + + + + + + + + + + + + + +++ + ++
Process from Point /Station 61.000 to Point /Station 91.000
* * ** PIPEFLOW TRAVEL TIME (User specified size) * * **
Upstream point /station elevation = 93.900(Ft.)
Downstream point /station elevation = 39.300(Ft.)
Pipe length = 230.00(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 11.722(CFS)
Given pipe size = 30.00(In.)
Calculated individual pipe flow = 11.722(CFS)
Normal flow depth in pipe = 9.92(In.)
Flow top width inside pipe = 27.85(In.)
Critical Depth = 13.76(In.)
Pipe flow velocity = 8.88(Ft /s)
Travel time through pipe = 0.93 min.
Time of concentration (TC) = 17.61 min.
+++++++++++++++++++++++++++++++++++++++ + + + + + + + + + + ++ + + + + + + ++ + + + + + + + + + ++
Process from Point /Station 61.000 to Point /Station 91.000
• * * ** CONFLUENCE OF MAIN STREAMS * * **
The following data inside Main Stream is listed:
In Main Stream number: 2
Stream flow area = 7.290(Ac.)
Runoff from this stream = 11.722(CFS)
Time of concentration = 17.61 min.
Rainfall intensity = 1.995(In /Hr)
Program is now starting with Main Stream No. 3
•
+++++++++++++++++++++++++++++++++++++++ + + + + + + + ++ + +++ + + + + + + ++ + + + + + + + + ++
Process from Point /Station 90.000 to Point /Station 91.000
* * ** INITIAL AREA EVALUATION * * **
Initial area flow distance = 282.000(Ft.)
Top (of initial area) elevation = 53.600(Ft.)
Bottom (of initial area) elevation = 51.900(Ft.)
Difference in elevation = 2.200(Ft.)
Slope = 0.00780 s(percent)= 0.78
TC = k(0.370) *[(length ^3) /(elevation change)] ^0.2
Initial area time of concentration = 9.330 min.
Rainfall intensity = 2.889(In /Hr) for a 10.0 year storm
CONDOMINIUM subarea type
Runoff Coefficient = 0.761
Decimal fraction soil group A = 0.800
Decimal fraction soil group B = 0.200
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 36.80
Pervious area fraction = 0.350; Impervious fraction = 0.650
Initial subarea runoff = 2.962(CFS)
Total initial stream area = 1.350(Ac.)
Pervious area fraction = 0.350
35
+++++++++++++++++++++++++++++++++++++++ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + ++
• Process from Point /Station 90.000 to Point /Station 91.000
* * ** CONFLUENCE OF MAIN STREAMS * * **
•
The following data inside Main Stream is listed:
In Main Stream number: 3
Stream flow area = 1.350(Ac.)
Runoff from this stream = 2.962(CFS)
Time of concentration = 9.33 min.
Rainfall intensity = 2.889(In /Hr)
Summary of stream data:
Stream Flow rate TC Rainfall Intensity
No. (CFS) (min) (In /Hr)
1
8.866
9.67
2.825
2
11.722
17.61
1.995
3
2.962
9.33
2.889
Largest
stream
flow has longer
time of concentration
Qp =
11.722
+ sum of
Qb
Ia /Ib
8.866 *
0.706 =
6.261
Qb
Ia /Ib
2.962 *
0.692 =
2.099
Qp =
20.032
Total of 3 main streams to confluence:
Flow rates before confluence point:
8.866 11.722 2.962
Area of streams before confluence:
9.360 7.290 1.350
Results of confluence:
Total flow rate = 20.032(CFS)
Time of concentration = 17.619 min. -
Effective stream area after confluence 13.000(Ac.)
+++++++++++++++++++++++++++++++++++++++ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + ++
Process from Point /Station 91.000 to Point /Station 82.000
* * ** PIPEFLOW TRAVEL TIME (User specified size) * * **
Upstream point /station elevation = 39.300(Ft.)
Downstream point /station elevation = 37.000(Ft.)
Pipe length = 203.00(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 20.032(CFS)
Given pipe size = 36.00(In.)
Calculated individual pipe flow = 20.032(CFS)
Normal flow depth in pipe = 13.08(In.)
Flow top width inside pipe = 39.63(In.)
Critical Depth = 17.29(In.)
Pipe flow velocity = 8.63(Ft /s)
Travel time through pipe = 0.39 min.
Time of concentration (TC) = 18.01 min.
+++++++++++++++++++++++++++++++++++++++ +++ + + + + + ++ + + + + + + + + + + + + + +++ + + + ++
Process from Point /Station 91.000 to Point /Station 82.000
* * ** CONFLUENCE OF MAIN STREAMS * * **
The following data inside Main Stream is listed:
In Main Stream number: 1
Stream flow area = 13.000(Ac.)
Runoff from this stream = 20.032(CFS)
Time of concentration = 18.01 min.
Rainfall intensity = 1.970(In /Hr)
Program is now starting with Main Stream No. 2
36
+++++++++++++++++++++++++++++++++++++++ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + ++
Process from Point /Station 981000 to Point /Station 99.000
* * ** INITIAL AREA EVALUATION * * **
Initial area flow distance = 902.000(Ft.)
Top (of initial area) elevation = 52.100(Ft.)
Bottom (of initial area) elevation = 96.770(Ft.)
Difference in elevation = 5.330(Ft.)
Slope = 0.00591 s(percent)= 0.59
TC = k(0.300) *[(length ^3) /(elevation change)] ^0.2
Initial area time of concentration = 12.732 min.
Rainfall intensity = 2.908(In /Hr) for a 10.0 year storm
COMMERCIAL subarea type
Runoff Coefficient = 0.863
Decimal fraction soil group A = 0.500
Decimal fraction soil group B = 0.500
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 99.00
Pervious area fraction = 0.100; Impervious fraction = 0.900
Initial subarea runoff = 5.112(CFS)
Total initial stream area = 2.960(Ac.)
Pervious area fraction = 0.100
+++++++++++++++++++++++++++++++++++++++ + + + + + + + + + + + + + + + + + + + + + + ++ + + + + + ++
Process from Point /Station 99.000 to Point /Station 82.000
* * ** PIPEFLOW TRAVEL TIME (User specified size) * * **
Upstream point /station elevation = 99.900(Ft.)
Downstream point /station elevation = 36.800(Ft.)
Pipe length = 118.00(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 5.112(CFS)
Given pipe size = 18.00(In.)
Calculated individual pipe flow = 5.112(CFS)
Normal flow depth in pipe = 5.39(In.)
Flow top width inside pipe = 16.95(In.)
Critical Depth = 10.95(In.)
Pipe flow velocity = 11.69(Ft /s)
Travel time through pipe = 0.17 min.
Time of concentration (TC) = 12.90 min.
+++++++++++++++++++++++++++++++++++++++ + + ++ + + + + + + + + + + + + + + + + ++ + + + + + + + ++
Process from Point /Station 99.000 to Point /Station 82.000
* * ** CONFLUENCE OF MAIN STREAMS * * **
The following data inside Main Stream is listed:
In Main Stream number: 2
Stream flow area = 2.960(Ac.)
Runoff from this stream = 5.112(CFS)
Time of concentration = 12.90 min.
Rainfall intensity = 2.390(In /Hr)
Program is now starting with Main Stream No. 3
+++++++++++++++++++++++++++++++++++++++ + + + + + + + + + + + ++ + + + + + + + + + + + + + + + + ++
Process from Point /Station 80.000 to Point /Station 81.000
* * ** INITIAL AREA EVALUATION * * **
Initial area flow distance = 800.000(Ft.)
Top (of initial area) elevation = 59.800(Ft.)
Bottom (of initial area) elevation = 97.900(Ft.)
Difference in elevation = 7.900(Ft.)
Slope = 0.00925 s(percent)= 0.92
TC = k(0.300) *[(length ^3) /(elevation change)] ^0.2
Initial area time of concentration = 11.095 min.
Rainfall intensity = 2.608(In /Hr) for a 10.0 year storm
COMMERCIAL subarea type
Runoff Coefficient = 0.873
Decimal fraction soil group A = 0.090
Decimal fraction soil group B = 0.960
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
• RI index for soil(AMC 2) = 55.09
Pervious area fraction = 0.100; Impervious fraction = 0.900
Initial subarea runoff = 3.213(CFS)
37
Total initial stream area = 1.410(Ac.)
• Pervious area fraction = 0.100
+++++++++++++++++++++++++++++++++++++++ + + + + + + + + + + + + + + + + + + +++ + + + + + + + + ++
Process from Point /Station 81.000 to Point /Station 82.000
* * ** STREET FLOW TRAVEL TIME + SUBAREA FLOW ADDITION * * **
Top of street segment elevation = 47.990(Ft.)
End of street segment elevation = 45.000(Ft.)
Length of street segment = 199.000(Ft.)
Height of curb above gutter flowline = 6.0(In.)
Width of half street (curb to crown) = 46.000(Ft.)
Distance from crown to crossfall grade break = 21.000(Ft.)
Slope from gutter to grade break (v /hz) = 0.020
Slope from grade break to crown (v /hz) = 0.020
Street flow is on (1] side(s) of the street
Distance from curb to property line = 10.000(Ft.)
Slope from curb to property line (v /hz) = 0.020
Gutter width = 2.000(Ft.)
Gutter hike from flowline = 1.875(In.)
Manning's N in gutter = 0.0150
Manning's N from gutter to grade break = 0.0150
Manning's N from grade break to crown = 0.0150
Estimated mean flow rate at midpoint of street = 3.634(CFS)
Depth of flow = 0.339(Ft.), Average velocity = 2.676(Ft/s)
Streetflow hydraulics at midpoint of street travel:
Halfstreet flow width = 11.199(Ft.)
Flow velocity = 2.68(Ft /s)
Travel time = 1.21 min. TC = 12.30 min.
Adding area flow to street
COMMERCIAL subarea type
Runoff Coefficient = 0.852
Decimal fraction soil group A = 1.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 32.00
Pervious area fraction = 0.100; Impervious fraction = 0.900
Rainfall intensity = 2.957(In /Hr) for a 10.0 year storm
Subarea runoff = 0.779(CFS) for 0.370(Ac.)
Total runoff = 3.987(CFS) Total area = 1.780(Ac.)
Street flow at end of street = 3.987(CFS)
Half street flow at end of street = 3.987(CFS)
Depth of flow = 0.398(Ft.), Average velocity = 2.735(Ft/s)
Flow width (from curb towards crown)= 11.583(Ft.)
+++++++++++++++++++++++++++++++++++++++ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + ++
Process from Point /Station 81.000 to Point /Station 82.000
* * ** CONFLUENCE OF MAIN STREAMS * * **
The following data inside Main Stream is listed:
In Main Stream number: 3
Stream flow area = 1.780(Ac.)
Runoff from this stream = 3.987(CFS)
Time of concentration = 12.30 min.
Rainfall intensity = 2.957(In /Hr)
Summary of stream data:
Stream Flow rate TC Rainfall Intensity
No. (CPS) (min) (In /Hr)
1 20.032 18.01 1.970
2 5.112 12.90 2.390
3 3.987 12.30 2.957
Largest stream flow has longer time of concentration
Qp = 20.032 + sum of
Qb Ia /Ib
5.112 * 0.824 = 9.213
Qb Ia /Ib
3.987 * 0.802 = 3.197
• QP = 27.991
Total of 3 main streams to confluence:
38
Flow rates before confluence point:
• 20.032 5.112
Area of streams before confluence:
13.000 2.960 1.780
•
Results of confluence:
Total flow rate = 27.991(CFS)
Time of concentration = 18.006 min.
Effective stream area after confluence = 17.290(Ac.)
+++++++++++++++++++++++++++++++++++++++ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + ++
Process from Point /Station 82.000 to Point /Station 100.000
* * ** PIPEFLOW TRAVEL TIME (User specified size) * * **
Upstream point /station elevation = 36.800(Ft.)
Downstream point /station elevation = 39.900(Ft.)
Pipe length = 583.00(Ft.) Manning's N = 0.013
No. of pipes = 2 Required pipe flow = 27.991(CFS)
Given pipe size = 29.00(In.)
Calculated individual pipe flow = 13.721(CFS)
Normal flow depth in pipe = 29.00(In.)
Flow top width inside pipe = 0.00(In.)
Critical Depth = 15.99(In.)
Pipe flow velocity = 9.11(Ft /s)
Travel time through pipe = 2.36 min.
Time of concentration (TC) = 20.37 min.
End of computations, total study area = 17.29 (AC.)
The following figures may
be used for a unit hydrograph study of the same area.
Area averaged pervious area fraction(Ap) = 0.300
Area averaged RI index number = 96.9
39
•
•
0
STORM DRAIN HYDRAULICS
ANALYSIS
40
•
•
Storm Drain Hydraulic Requirements:
CVWD has allowed this project to drain storm water runoff to the La Quinta Evacuation
Channel. CVWD also requires the project to intercept nuisance flow prior to entering the
channel. Per City Bulletin #06 -16, Item No. 24: "The Evacuation Channel obtains an
HGL -100 with an approximate elevation of 48.0 pursuant to information provided by
CVWD to the City." A HGL of 48.0 represents flooding in Avenue 48 from the
Evacuation Channel west to the intersection of Dune Palms Road. This wide spread
flooding at the intersection of Avenue 48 and Dune Palms Road also represents the
beginning of our Storm Drain Analysis for the 100 -year event (HGL at 48.0). Our
analysis identifies the manhole in Dune Palms Road (at station 16 +28.52) as the outlet
in the 100 -year event (HGL at 48.0). Grates, in lieu of manhole covers, are proposed at
this and the next downstream manhole. We also provide a second 100 -year analysis;
"HGL at Critical Depth ". The intent of this analysis is to identify the HGL of the system
with an outlet at the evacuation channel, and the channel having very little flow. The
beginning HGL is established at critical depth for the proposed pipe.
41
•
0
0
100 -YEAR ANALYSIS
HGL AT 48.0
42
•
•
User Name. mpompa Date: 10 -12 -07
Project: 1786 OFFSITE STORM DRAISCENARIO 1 Time: 11:43:18
Network: 01 START HGL "48.0 RUN Page: 1
Storm Sewers Summary Report
Pipe Name Total Flow Pipe Dim HGL Down HGL Up Invert Down Invert Up Downstream Junct
cfs in ft ft ft ft
Pipe
1
34.50
36.00
48.0000
48.3632
37.2200
38.7200
Outfall
Pipe
1 -A
34.50
36.00
48.3732*
48.4307*
38.7200
38.9000
CONC COLLAR
Pipe
2
34.50
36.00
48.4507*
48.5409*
38.9400
39.1600
MH1 1
Pipe
3
29.40
36.00
48.6409*
48.6717*
39.1600
39.3000
TEE 1
Pipe
4
15.00
24.00
48.8717*
49.8440*
40.3000
42.3400
MH3 2
Pipe
5
15.00
24.00
49.9640*
49.9982*
42.3400
42.4100
BEND 1
Pipe
6
13.80
24.00
50.0882*
50.2251*
42.4100
42.7500
WYE 1
Pipe
7
9.40
24.00
50.2951*
50.3235*
42.7500
42.9000
TEE 2
Pipe
8
9.40
24.00
50.3335*
50.6273*
42.9300
44.4800
MH1 3
Pipe
9
9.40
24.00
50.6773*
50.7474*
44.4800
47.9800
BEND 2
Pipe
10
4.90
18.00
50.8174*
50.8574*
48.4800
48.5700
CB1 4
Pipe
11
4.90
18.00
50.8974*
51.1751*
48.5700
49.2100
BEND 3
Pipe
12
1.60
18.00
51.2051*
51.2089*
49.2100
49.2900
WYE 2
Pipe
13
1.60
18.00
51.2089*
51.2111*
49.2900
49.3400
BEND 4
Pipe
14
20.30
30.00
48.8717*
49.3823*
39.8000
41.9000
MH3 2
Pipe
15
20.00
24.00
49.5823*
49.7300*
42.4000
46.8600
MH3 4
Pipe
16
20.00
24.00
49.9500*
50.5894*
46.8600
46.9500
BEND 5
Pipe
17
1.50
18.00
50.0882*
50.0949*
42.4100
42.7400
WYE 1
Pipe
18
1.50
18.00
50.0949*
50.0994*
42.7400
42.9600
BEND 6
Pipe
19
1.50
18.00
50.0994*
50.1180*
42.9600
43.8800
BEND 7
Pipe
20
3.50
18.00
51.2051*
51.2463*
49.2100
49.3700
WYE 2
Pipe
21
0.50
12.00
49.5823*
49.5853*
43.4000
43.4900
MH3 4
Pipe
22
0.50
12.00
49.5853*
49.5915*
43.4900
43.6500
BEND 8
Pipe
23
0.50
12.00
49.5915*
49.5952*
43.6500
43.7400
BEND 9
Pipe
24
0.50
12.00
49.5952*
49.6002*
43.7400
43.8700
BEND 10
Pipe
25
0.50
12.00
49.6002*
49.6051*
43.8700
43.9900
BEND 11
Pipe
26
0.50
12.00
49.6051*
49.6067*
43.9900
44.0300
BEND 12
Pipe
27
0.50
12.00
49.6067*
49.6074*
44.4800
44.5000
CB2 7
43
User Name: mpompa
Date: 10 -12 -07
Project: 1786 OFFSITE STORM DRAIN
SCENARIO 1 Time: 11:43:24
Network: 01 - START HGL 48.0 RUN
Page: 1
Storm
Sewers Detail Report
PIPE DESCRIPTION: Pipe 1
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 1
Downstream Pipe
= Outfall
Pipe Material
= RCP
Pipe Length
= 135.7352 ft
Plan Length
= 135.7269 ft
Pipe Type
= Circular
Pipe Dimensions
= 36.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 70.09 cfs
Invert Elevation Downstream
= 37.2200 ft
invert Elevation Upstream
= 38.7200 ft
Invert Slope
= 1.118
Invert Slope (Plan Length)
= 1.118
Rim Elevation Downstream
= 45.0400 ft
Rim Elevation Upstream
= 48.7000 ft
Natural Ground Slope
= 2.70%
Crown Elevation Downstream
= 40.2200 ft
Crown Elevation Upstream
= 41.7200 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet input Flow
= 34.50 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 4.56 min
Total Intensity
= 10.44 in /hr
Total Rational Flow
- 0.00 cfs
Total Flow
= 34.50 cfs
Uniform Capacity
= 70.09 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 48.0000 ft
HGL Elevation Upstream
= 48.3632 ft
HGL Slope
= 0.27
EGL Elevation Downstream
= 48.3704 ft
EGL Elevation Upstream
= 48.7336 ft
EGL Slope
= 0.27 %
Critical Depth
= 22.9032 in
Depth Downstream
= 36.0000 in
Depth Upstream
= 36.0000 in
Velocity Downstream
= 4.88 ft /s
Velocity Upstream
= 4.88 ft /s
Uniform Velocity Downstream
= 0.00 ft /s
Uniform Velocity Upstream
= 9.88 ft /s
Area Downstream
= 7.07 ft "2
Area Upstream
= 7.07 ft"2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.010 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= Outfall
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n- value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
•
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
44
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
•
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * g
Grate Efficiency
= * %
Slot Efficiency
= * g
Total Efficiency
= 0.00 g
PIPE DESCRIPTION: Pipe 1 -A
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 1 -A
Downstream Pipe
= Pipe 1
Pipe Material
= HDPE
Pipe Length
= 21.4813 ft
Plan Length
= 23.4805 ft
Pipe Type
= Circular
Pipe Dimensions
= 36.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 61.03 cfs
Invert Elevation Downstream
= 38.7200 ft
Invert Elevation Upstream
= 38.9000 ft
Invert Slope
= 0.84%
Invert Slope (Plan Length)
= 0.77%
Rim Elevation Downstream
= 48.7000 ft
Rim Elevation Upstream
= 52.4000 ft
Natural Ground Slope
= 17.22%
Crown Elevation Downstream
= 41.7200 ft
Crown Elevation Upstream
= 41.9000 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
•
= 0.00 cfs
Inlet Input Flow
= 34.50 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 4.48 min
Total Intensity
= 10.48 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 34.50 cfs
Uniform Capacity
= 61.03 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 48.3732 ft
HGL Elevation Upstream
= 48.4307 ft
HGL Slope
= 0.27 %
EGL Elevation Downstream
= 48.7436 ft
EGL Elevation Upstream
= 48.8011 ft
EGL Slope
= 0.27 %
Critical Depth
= 22.9032 in
Depth Downstream
= 36.0000 in
Depth Upstream
= 36.0000 in
Velocity Downstream
= 4.88 ft /s
Velocity Upstream
= 4.88 ft /s
Uniform Velocity Downstream
= 8.90 ft /s
Uniform Velocity Upstream
= 8.90 ft /s
Area Downstream
= 7.07 ft ^2
Area Upstream
= 7.07 ft^2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.020 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= CONC COLLAR
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
•
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
45
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
•
= 0.00 cfs
Bypassed Flow
- 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00 it
PIPE DESCRIPTION: Pipe 2
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 2
Downstream Pipe
= Pipe 1 -A
Pipe Material
= RCP
Pipe Length
= 33.6839 ft
Plan Length
= 35.6847 ft
Pipe Type
= Circular
Pipe Dimensions
= 36.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 53.88 cfs
Invert Elevation Downstream
= 38.9400 ft
Invert Elevation Upstream
= 39.1600 ft
Invert Slope
= 0.65%
Invert Slope (Plan Length)
= 0.628
Rim Elevation Downstream
= 52.4000 ft
Rim Elevation Upstream
= 51.8900 ft
Natural Ground Slope
= -1.51%
Crown Elevation Downstream
= 41.9400 ft
Crown Elevation Upstream
= 42.1600 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 34.50 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 4.35 min
Total Intensity
= 10.53 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 34.50 cfs
Uniform Capacity
= 53.88 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 48.4507 ft
HGL Elevation Upstream
= 48.5409 ft
HGL Slope
= 0.27 %
EGL Elevation Downstream
= 48.8211 ft
EGL Elevation Upstream
= 48.9112 ft
EGL Slope
= 0.27 %
Critical Depth
= 22.9032 in
Depth Downstream
= 36.0000 in
Depth Upstream
= 36.0000 in
Velocity Downstream
= 4.88 ft /s
Velocity Upstream
= 4.88 ft /s
Uniform Velocity Downstream
= 8.09 ft /s
Uniform Velocity Upstream
= 8.09 ft /s
Area Downstream
= 7.07 ft^2
Area Upstream
= 7.07 ft ^2
(JLC)
=
C
Calculated Junction Loss
•
= 0.100 ft
0.
- -- -INLET INFORMATION--- -
Downstream Inlet
= MH1 1
Inlet Description
= <None>
46
Inlet Type
- Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross - Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 3
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 3
Downstream Pipe
= Pipe 2
Pipe Material
= RCP
Pipe Length
= 15.8606 ft
Plan Length
= 18.9900 ft
Pipe Type
= Circular
Pipe Dimensions
= 36.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
62.64 cfs
Invert Elevation Downstream
= 39.1600 ft
Invert Elevation Upstream
•
= 39.3000 ft
Invert Slope
= 0.88%
Invert Slope (Plan Length)
= 0.74%
Rim Elevation Downstream
= 51.8900 ft
Rim Elevation Upstream
= 51.6850 ft
Natural Ground Slope
= -1.29%
Crown Elevation Downstream
= 42.1600 ft
Crown Elevation Upstream
= 42.3000 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 29.40 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 4.28 min
Total Intensity
= 10.57 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 29.40 cfs
Uniform Capacity
= 62.64 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 48.6409 ft
HGL Elevation Upstream
= 48.6717 ft
HGL Slope
= 0.19 %
EGL Elevation Downstream
= 48.9098 ft
EGL Elevation Upstream
= 48.9406 ft
EGL Slope
= 0.19 %
Critical Depth
= 21.0744 in
Depth Downstream
= 36.0000 in
Depth Upstream
= 36.0000 in
Velocity Downstream
•
= 4.16 ft /s
Velocity Upstream
= 4.16 ft /s
Uniform Velocity Downstream
= 8.72 ft /s
Uniform Velocity Upstream
= 8.72 ft /s
Area Downstream
= 7.07 ft "2
47
Area Upstream
= 7.07 ft "2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.200 ft
- -- -INLET INFORMATION----
Downstream Inlet
= TEE 1
Inlet Description
•
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00 i
PIPE DESCRIPTION: Pipe 4
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 4
Downstream Pipe
= Pipe 3
Pipe Material
= HDPE
Pipe Length
= 221.0512 ft
Plan Length
= 223.3331 ft
Pipe Type
= Circular
Pipe Dimensions
= 24.00 in
Pipe Manning , s --n-,
= 0.013
Pipe Capacity at Invert Slope
= 21.72 cfs
Invert Elevation Downstream
= 40.3000 ft
Invert Elevation Upstream
= 42.3400 ft
Invert Slope
= 0.92%
Invert Slope (Plan Length)
= 0.91%
Rim Elevation Downstream
= 51.6850 ft
Rim Elevation Upstream
= 52.1562 ft
Natural Ground Slope
= 0.21%
Crown Elevation Downstream
= 42.3000 ft
Crown Elevation Upstream
= 44.3400 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 15.00 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 2.91 min
Total Intensity
= 11.25 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 15.00 cfs
Uniform Capacity
= 21.72 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 48.8717 ft
HGL Elevation Upstream
= 49.8440 ft
HGL Slope
•
= 0.44 %
EGL Elevation Downstream
= 49.2261 ft
EGL Elevation Upstream
= 50.1984 ft
EGL Slope
= 0.44 %
Critical Depth
= 16.7544 in
48
Depth Downstream
= 24.0000 in
Depth Upstream
= 24.0000 in
Velocity Downstream
= 4.77 ft /s
Velocity Upstream
= 4.77 ft /s
Uniform Velocity Downstream
= 8.09 ft /s
Uniform Velocity Upstream
= 7.46 ft /s
Area Downstream
•
= 3.14 ft"2
Area Upstream
= 3.14 ft "2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.120 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= MH3 2
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * 9,
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 5
- - -- RAINFALL INFORMATION--- -
Return Period
•
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
- Pipe 5
Downstream Pipe
= Pipe 4
Pipe Material
= HDPE
Pipe Length
= 7.7708 ft
Plan Length
= 7.7705 ft
Pipe Type
= Circular
Pipe Dimensions
= 24.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 21.46 cfs
Invert Elevation Downstream
= 42.3400 ft
Invert Elevation Upstream
= 42.4100 ft
Invert Slope
= 0.908
Invert Slope (Plan Length)
= 0.90%
Rim Elevation Downstream
= 52.1562 ft
Rim Elevation Upstream
= 52.0193 ft
Natural Ground Slope
= -1.763
Crown Elevation Downstream
= 44.3400 ft
Crown Elevation Upstream
= 44.4100 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
- 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 15.00 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 2.88 min
Total Intensity
= 11.27 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 15.00 cfs
Uniform Capacity
•
= 21.46 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
49
HGL Elevation Downstream
= 49.9640 ft
HGL Elevation Upstream
= 49.9982 ft
HGL Slope
= 0.44 %
EGL Elevation Downstream
= 50.3184 ft
EGL Elevation Upstream
= 50.3526 ft
EGL Slope
= 0.44 %
Critical Depth
•
= 16.7544 in
Depth Downstream
= 24.0000 in
Depth Upstream
= 24.0000 in
Velocity Downstream
= 4.77 ft /s
Velocity Upstream
= 4.77 ft /s
Uniform Velocity Downstream
= 7.39 ft /s
Uniform Velocity Upstream
= 7.39 ft /s
Area Downstream
= 3.14 ft'2
Area Upstream
= 3.14 ft "2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.090 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= BEND 1
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
- 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
0.00 ft /s
Curb Efficiency
•
= * 8
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00 8
PIPE DESCRIPTION: Pipe 6
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 6
Downstream Pipe
= Pipe 5
Pipe Material
= HDPE
Pipe Length
= 36.7735 ft
Plan Length
= 36.7720 ft
Pipe Type
= Circular
Pipe Dimensions
= 24.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 21.74 cfs
Invert Elevation Downstream
= 42.4100 ft
Invert Elevation Upstream
= 42.7500 ft
Invert Slope
= 0.92%
Invert Slope (Plan Length)
= 0.92%
Rim Elevation Downstream
= 52.0193 ft
Rim Elevation Upstream
= 51.7900 ft
Natural Ground Slope
= -0.62%
Crown Elevation Downstream
= 44.4100 ft
Crown Elevation Upstream
= 44.7500 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.500
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 13.80 cfs
Inlet Hydrograph Flow
•
= 0.00 cfs
Total Area
= 0.00 ac
weighted Coefficient
= 0.500
Total Time of Concentration
= 2.67 min
Total Intensity
= 11.39 in /hr
50
Total Rational Flow
= 0.00 cfs
Total Flow
= 13.80 cfs
Uniform Capacity
= 21.74 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
•
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 50.0882 ft
HGL Elevation Upstream
= 50.2251 ft
HGL Slope
= 0.37 %
EGL Elevation Downstream
= 50.3881 ft
EGL Elevation Upstream
= 50.5251 ft
EGL Slope
= 0.37 %
Critical Depth
= 16.0560 in
Depth Downstream
= 24.0000 in
Depth Upstream
= 24.0000 in
Velocity Downstream
= 4.39 ft /s
Velocity Upstream
= 4.39 ft /s
Uniform Velocity Downstream
= 7.33 ft /s
Uniform velocity Upstream
= 7.33 ft /s
Area Downstream
= 3.14 ft "2
Area Upstream
= 3.14 ft ^2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.070 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= WYE 1
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * &
Slot Efficiency
= * %
Total Efficiency
= 0.00 8
PIPE DESCRIPTION: Pipe 7
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall Pile
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 7
Downstream Pipe
= Pipe 6
Pipe Material
= HDPE
Pipe Length
= 16.4807 ft
Plan Length
= 18.4800 ft
Pipe Type
= Circular
Pipe Dimensions
= 24.00 in
Pipe Manning's "n"
- 0.013
Pipe Capacity at Invert Slope
= 21.57 cfs
Invert Elevation Downstream
= 42.7500 ft
Invert Elevation Upstream
= 42.9000 ft
Invert Slope
= 0.91%
Invert Slope (Plan Length)
= 0.818
Rim Elevation Downstream
= 51.7900 ft
Rim Elevation Upstream
= 51.9869 ft
Natural Ground Slope
= 1.20t
Crown Elevation Downstream
= 44.7500 ft
Crown Elevation Upstream
= 44.9000 ft
•
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
51
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 9.40 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
•
Total Time of Concentration
= 2.56 min
Total Intensity
= 11.44 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 9.40 cfs
Uniform Capacity
= 21.57 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 50.2951 ft
HGL Elevation Upstream
= 50.3235 ft
HGL Slope
= 0.17 %
EGL Elevation Downstream
= 50.4342 ft
EGL Elevation Upstream
= 50.4627 ft
EGL Slope
= 0.17 $
Critical Depth
= 13.1496 in
Depth Downstream
= 24.0000 in
Depth Upstream
= 24.0000 in
Velocity Downstream
= 2.99 ft /s
Velocity Upstream
= 2.99 £t /s
Uniform velocity Downstream
= 6.63 ft /s
Uniform Velocity Upstream
= 6.63 ft /s
Area Downstream
= 3.14 ft "2
Area Upstream
= 3.14 ft ^2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.010 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= TEE 2
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
•
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * g
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * 8
Grate Efficiency
= * t
Slot Efficiency
= * %
Total Efficiency
= 0.00
PIPE DESCRIPTION: Pipe 8
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 8
Downstream Pipe
= Pipe 7
Pipe Material
= HDPE
Pipe Length
= 170.0522 ft
Plan Length
= 172.5200 ft
Pipe Type
= Circular
Pipe Dimensions
= 24.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 21.59 cfs
Invert Elevation Downstream
= 42.9300 ft
Invert Elevation Upstream
= 44.4800 ft
Invert Slope
= 0.914
•
Invert Slope (Plan Length)
= 0.90%
Rim Elevation Downstream
= 51.9869 ft
Rim Elevation Upstream
= 53.1567 ft
Natural Ground Slope
= 0.69%
Crown Elevation Downstream
= 44.9300 ft
52
Crown Elevation Upstream
= 46.4800 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
•
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 9.40 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 1.60 min
Total Intensity
= 12.01 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 9.40 cfs
Uniform Capacity
= 21.59 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
- 50.3335 ft
HGL Elevation Upstream
= 50.6273 ft
HGL Slope
= 0.17 %
EGL Elevation Downstream
= 50.4727 ft
EGL Elevation Upstream
= 50.7665 ft
EGL Slope
= 0.17 is
Critical Depth
= 13.1496 in
Depth Downstream
= 24.0000 in
Depth Upstream
= 24.0000 in
Velocity Downstream
= 2.99 ft /s
Velocity Upstream
= 2.99 ft /s
Uniform Velocity Downstream
= 6.64 ft /s
Uniform Velocity Upstream
= 6.64 ft /s
Area Downstream
= 3.14 ft"2
Area Upstream
= 3.14 ft "2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.050 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= MH1 3
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
•
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n- value
= 0.000
Pavement Cross- Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
- 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 9
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 9
Downstream Pipe
= Pipe 8
Pipe Material
= HDPE
Pipe Length
= 40.5812 ft
Plan Length
= 41.9300 ft
0 Pipe Type
= Circular
Pipe Dimensions
= 24.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 66.41 cfs
Invert Elevation Downstream
= 44.4800 ft
53
Invert Elevation Upstream
= 47.9800 ft
Invert Slope
= 8.66%
Invert Slope (Plan Length)
= 8.35%
Rim Elevation Downstream
= 53.1567 ft
Rim Elevation Upstream
= 53.4800 ft
Natural Ground Slope
= 0.80%
Crown Elevation Downstream
•
= 46.4800 ft
Crown Elevation Upstream
= 49.9800 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 9.40 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 1.37 min
Total Intensity
= 12.16 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 9.40 cfs
Uniform Capacity
= 66.41 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 50.6773 ft
HGL Elevation Upstream
= 50.7474 ft
HGL Slope
= 0.17 %
EGL Elevation Downstream
= 50.8165 ft
EGL Elevation Upstream
= 50.8866 ft
EGL Slope
= 0.17 %
Critical Depth
= 13.1496 in
Depth Downstream
= 24.0000 in
Depth Upstream
= 24.0000 in
Velocity Downstream
= 2.99 ft /s
Velocity Upstream
= 2.99 ft /s
Uniform Velocity Downstream
= 14.96 ft /s
Uniform Velocity Upstream
= 14.96 ft /s
Area Downstream
= 3.14 ft "2
Area Upstream
= 3.14 ft ^2
Kj (JLC)
•
= NA
Calculated Junction Loss
= 0.070 £t
- -- -INLET INFORMATION--- -
Downstream Inlet
- BEND 2
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
- 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
- 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 10
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
• Rainfall File
= Tutorial
- -PIPE INFORMATION--- -
Current Pipe
= Pipe 10
Downstream Pipe
= Pipe 9
Pipe Material
= HDPE
54
Pipe Length
- 18.3796 ft
Plan Length
= 19.8800 ft
Pipe Type
= Circular
Pipe Dimensions
= 18.00 in
Pipe Manning's 'In"
= 0.013
Pipe Capacity at Invert Slope
= 7.35 cfs
Invert Elevation Downstream
•
= 48.4800 ft
Invert Elevation Upstream
= 48.5700 ft
Invert Slope
= 0.49%
Invert Slope (Plan Length)
= 0.458
Rim Elevation Downstream
= 53.4800 ft
Rim Elevation Upstream
= 53.5163 ft
Natural Ground Slope
= 0.20*
Crown Elevation Downstream
= 49.9800 ft
Crown Elevation Upstream
= 50.0700 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet input Flow
= 4.90 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 1.25 min
Total intensity
= 12.24 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 4.90 cfs
Uniform Capacity
= 7.35 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 50.8174 ft
HGL Elevation Upstream
= 50.8574 ft
HGL Slope
= 0.22 $
EGL Elevation Downstream
= 50.9369 ft
EGL Elevation Upstream
= 50.9769 ft
EGL Slope
= 0.22 %
Critical Depth
= 10.2168 in
Depth Downstream
= 18.0000 in
Depth Upstream
•
= 18.0000 in
velocity Downstream
= 2.77 ft /s
Velocity Upstream
= 2.77 ft /s
Uniform velocity Downstream
= 4.45 ft /s
Uniform Velocity Upstream
= 4.45 ft /s
Area Downstream
= 1.77 ft^2
Area Upstream
= 1.77 ft ^2
Kj (JLC)
= NA
Calculated,Junction Loss
= 0.040 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= CB1 4
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= *
Slot Efficiency
•
= *
Total Efficiency
= 0.00 t
PIPE DESCRIPTION: Pipe 11
- - -- RAINFALL INFORMATION--- -
55
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 11
Downstream Pipe
= Pipe 10
Pipe Material
•
= HDPE
Pipe Length
= 127.5681 ft
Plan Length
= 127.5665 ft
Pipe Type
= Circular
Pipe Dimensions
= 18.00 in
Pipe Manning's ,w
= 0.013
Pipe Capacity at Invert Slope
- 7.44 cfs
Invert Elevation Downstream
= 48.5700 ft
Invert Elevation Upstream
= 49.2100 ft
Invert Slope
= 0.508
Invert Slope (Plan Length)
= 0.508
Rim Elevation Downstream
= 53.5163 ft
Rim Elevation Upstream
= 54.1365 ft
Natural Ground Slope
= 0.498
Crown Elevation Downstream
= 50.0700 ft
Crown Elevation Upstream
= 50.7100 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 4.90 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 0.48 min
Total Intensity
= 12.76 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 4.90 cfs
Uniform Capacity
= 7.44 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION----
HGL Elevation Downstream
= 50.8974 ft
HGL Elevation Upstream
•
= 51.1751 ft
HGL Slope
= 0.22 8
EGL Elevation Downstream
= 51.0169 ft
EGL Elevation Upstream
= 51.2947 ft
EGL Slope
= 0.22 8
Critical Depth
= 10.2168 in
Depth Downstream
= 18.0000 in
Depth Upstream
= 18.0000 in
Velocity Downstream
= 2.77 ft /s
Velocity Upstream
= 2.77 ft /s
Uniform Velocity Downstream
= 4.50 ft /s
Uniform Velocity Upstream
= 4.50 ft /s
Area Downstream
= 1.77 ft "2
Area Upstream
= 1.77 ft ^2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.030 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= BEND 3
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * 8
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Curb Depth at Cu
•
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
56
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * $
Total Efficiency
= 0.00
PIPE DESCRIPTION: Pipe 12
-- RAINFALL INFORMATION--- -
•
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 12
Downstream Pipe
= Pipe 11
Pipe Material
= HDPE
Pipe Length
= 16.2248 ft
Plan Length
= 16.2246 ft
Pipe Type
= Circular
Pipe Dimensions
= 18.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 7.37 cfs
Invert Elevation Downstream
= 49.2100 ft
Invert Elevation Upstream
= 49.2900 ft
Invert Slope
= 0.498
Invert Slope (Plan Length)
= 0.49%
Rim Elevation Downstream
= 54.1365 ft
Rim Elevation Upstream
= 54.3835 ft
Natural Ground Slope
= 1.52%
Crown Elevation Downstream
= 50.7100 ft
Crown Elevation Upstream
= 50.7900 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 1.60 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 0.18 min
Total Intensity
= 12.98 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
•
= 1.60 cfs
Uniform Capacity
= 7.37 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 51.2051 ft
HGL Elevation Upstream
= 51.2089 ft
HGL Slope
= 0.02 %
EGL Elevation Downstream
= 51.2179 ft
EGL Elevation Upstream
= 51.2217 ft
EGL Slope
= 0.02 W
Critical Depth
= 5.7024 in
Depth Downstream
= 18.0000 in
Depth Upstream
= 18.0000 in
Velocity Downstream
= 0.91 ft /s
Velocity Upstream
= 0.91 ft /s
Uniform Velocity Downstream
= 4.12 ft /s
Uniform Velocity Upstream
= 3.33 ft /s
Area Downstream
= 1.77 ft''2
Area Upstream
= 1.77 ft"2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.000 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= WYE 2
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
•
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
57
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
Total Spread
= 0.0000 ft
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * 8
Slot Efficiency
= * 9d
Total Efficiency
= 0.00
PIPE DESCRIPTION: Pipe 13
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 13
Downstream Pipe
= Pipe 12
Pipe Material
= HDPE
Pipe Length
= 9.2501 ft
Plan Length
= 10.0000 ft
Pipe Type
= Circular
Pipe Dimensions
= 18.00 in
Pipe Manning -s 1 -n"
= 0.013
Pipe Capacity at Invert Slope
= 7.72 cfs
Invert Elevation Downstream
= 49.2900 ft
Invert Elevation Upstream
= 49.3400 ft
Invert Slope
= 0.54%
Invert Slope (Plan Length)
= 0.50%
Rim Elevation Downstream
= 54.3835 ft
Rim Elevation Upstream
= 54.1600 ft
Natural Ground Slope
_ -2.42%
Crown Elevation Downstream
= 50.7900 ft
Crown Elevation Upstream
= 50.8400 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
•
Inlet Input Flow
= 1.60 cfs
Inlet Hydrograph Flow
- 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 0.00 min
Total Intensity
= 0.00 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 1.60 cfs
Uniform Capacity
= 7.72 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 51.2089 ft
HGL Elevation Upstream
= 51.2111 ft
HGL Slope
= 0.02 %
EGL Elevation Downstream
= 51.2217 ft
EGL Elevation Upstream
= 51.2238 ft
EGL Slope
= 0.02 %
Critical Depth
= 5.7024 in
Depth Downstream
= 18.0000 in
Depth Upstream
= 18.0000 in
Velocity Downstream
= 0.91 ft /s
Velocity Upstream
= 0.91 ft /s
Uniform Velocity Downstream
= 3.45 ft /s
Uniform Velocity Upstream
= 0.00 ft /s
Area Downstream
= 1.77 ft "2
Area Upstream
= 1.77 ft ^2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.000 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= BEND 4
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
•
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
58
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
• Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00
PIPE DESCRIPTION: Pipe 14
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
-- - -PIPE INFORMATION--- -
Current Pipe
= Pipe 14
Downstream Pipe
= Pipe 3
Pipe Material
= HDPE
Pipe Length
= 208.4060 ft
Plan Length
= 212.8200 ft
Pipe Type
= Circular
Pipe Dimensions
= 30.00 in
Pipe Manning's 'In"
= 0.013
Pipe Capacity at Invert Slope
= 41.16 cfs
Invert Elevation Downstream
= 39.8000 ft
Invert Elevation Upstream
= 41.9000 ft
Invert Slope
= 1.01%
Invert Slope (Plan Length)
= 0.99%
Rim Elevation Downstream
= 51.6850 ft
Rim Elevation Upstream
= 52.0228 ft
Natural Ground Slope
= 0.16%
Crown Elevation Downstream
= 42.3000 ft
• Crown Elevation Upstream
= 44.4000 ft
- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 20.30 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 3.42 min
Total Intensity
= 10.99 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 20.30 cfs
Uniform Capacity
= 41.16 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 48.8717 ft
HGL Elevation Upstream
= 49.3823 ft
HGL Slope
= 0.25 %
EGL Elevation Downstream
= 49.1376 ft
EGL Elevation Upstream
= 49.6482 ft
EGL Slope
= 0.25 %
Critical Depth
= 18.3630 in
Depth Downstream
= 30.0000 in
Depth Upstream
= 30.0000 in
Velocity Downstream
= 4.14 ft /s
Velocity Upstream
= 4.14 ft /s
Uniform Velocity Downstream
= 8.36 ft /s
Uniform Velocity Upstream
= 8.36 ft /s
Area Downstream
= 4.91 ft "2
Area Upstream
= 4.91 ft^2
Kj (JLC)
= NA
• Calculated Junction Loss
= 0.200 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= MH3 2
Inlet Description
= <None>
Inlet Type
= Undefined
59
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
- 0.0000 in
Gutter width
•
= 0.0000 ft
Ponding width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter velocity
= 0.00 ft /s
Curb Efficiency
= * t
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 15
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 15
Downstream Pipe
= Pipe 14
Pipe Material
= HDPE
Pipe Length
= 18.8828 ft
Plan Length
= 20.3600 ft
Pipe Type
= Circular
Pipe Dimensions
= 24.00 in
Pipe Manning's ',n"
= 0.013
Pipe Capacity at Invert Slope
= 109.90 cfs
Invert Elevation Downstream
= 42.4000 ft
Invert Elevation Upstream
= 46.8600 ft
Invert Slope
•
= 24.31%
Invert Slope (Plan Length)
= 21.91%
Rim Elevation Downstream
= 52.0228 ft
Rim Elevation Upstream
= 51.9212 ft
Natural Ground Slope
= -0.54%
Crown Elevation Downstream
= 44.4000 ft
Crown Elevation Upstream
= 48.8600 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 20.00 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 0.05 min
Total Intensity
= 13.08 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 20.00 cfs
Uniform Capacity
= 109.90 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 49.5823 ft
HGL Elevation Upstream
= 49.7300 ft
HGL Slope
= 0.80 %
EGL Elevation Downstream
= 50.2124 ft
EGL Elevation Upstream
= 50.3601 ft
EGL Slope
= 0.80 %
Critical Depth
= 19.2768 in
Depth Downstream
= 24.0000 in
Depth Upstream
= 24.0000 in
Velocity Downstream
= 6.37 ft /s
Velocity Upstream
•
= 6.37 ft /s
Uniform Velocity Downstream
= 26.60 ft /s
Uniform Velocity Upstream
= 26.60 ft /s
Area Downstream
= 3.14 ft ^2
Area Upstream
= 3.14 ft "2
60
Kj (JLC)
= NA
Calculated Junction Loss
= 0.220 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= MH3 4
Inlet Description
= <None>
Inlet Type
•
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 16
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 16
Downstream Pipe
= Pipe 15
Pipe Material
= HDPE
Pipe Length
= 18.1102 ft
Plan Length
•
= 19.6100 ft
Pipe Type
= Circular
Pipe Dimensions
= 24.00 in
Pipe Manning's 'In"
= 0.013
Pipe Capacity at Invert Slope
= 15.94 cfs
Invert Elevation Downstream
= 46.8600 ft
Invert Elevation Upstream
= 46.9500 ft
Invert Slope
= 0.50%
Invert Slope (Plan Length)
= 0.46%
Rim Elevation Downstream
= 51.9212 ft
Rim Elevation Upstream
= 51.9500 ft
Natural Ground Slope
= 0.16%
Crown Elevation Downstream
= 48.8600 ft
Crown Elevation Upstream
= 48.9500 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
- 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 20.00 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 0.00 min
Total Intensity
= 0.00 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 20.00 cfs
Uniform Capacity
= 15.94 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 49.9500 ft
HGL Elevation Upstream
= 50.5894 ft
HGL Slope
= 3.53 %
EGL Elevation Downstream
•
= 50.5801 ft
EGL Elevation Upstream
= 51.2195 ft
EGL Slope i.
= 3.53 %
Critical Depth
= 19.2768 in
Depth Downstream
= 24.0000 in
61
PIPE DESCRIPTION: Pipe 17
- - -- RAINFALL INFORMATION----
• Return Period = 100 Year
Rainfall File = Tutorial
- -- -PIPE INFORMATION--- -
Depth Upstream
= 24.0000 in
= Pipe 17
Velocity Downstream
= 6.37 ft /9
Pipe Material
Velocity Upstream
= 6.37 ft /s
= 33.0960 ft
Uniform Velocity Downstream
= 6.37 ft /s
Pipe Type
Uniform Velocity Upstream
= 0.00 ft /s
= 18.00 in
Area Downstream
= 3.14 ft "2
•
Area Upstream
= 3.14 ft"2
= 42.4100 ft
Kj (JLC)
= NA
Invert Slope
Calculated Junction Loss
- 0.790 ft
= 1.00%
- -- -INLET INFORMATION--- -
= 52.0193 ft
Rim Elevation Upstream
Downstream Inlet
= BEND 5
= -0.21%
Inlet Description
= <None>
Crown Elevation Upstream
Inlet Type
= Undefined
Computation Case
= Sag
Runoff Coefficient
Longitudinal Slope
= 0.00 ft /ft
= 0.00 min
Mannings n -value
= 0.000
Inlet Rational Flow
Pavement Cross -Slope
= 0.00 ft /ft
= 1.50 cfs
Gutter Cross - Slope
= 0.00 ft /ft
Total Area
Gutter Local Depression
= 0.0000 in
= 0.000
Gutter Width
= 0.0000 ft
Total Intensity
Ponding Width
= 0.0000 ft
= 0.00 cfs
Intercept Efficiency
= * %
Uniform Capacity
Flow from Catchment
= 0.00 cfs
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
- - -- HYDRAULIC INFORMATION--- -
Total Flow to Current Inlet
= 0.00 cfs
= 50.0882 ft
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= It %
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 17
- - -- RAINFALL INFORMATION----
• Return Period = 100 Year
Rainfall File = Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 17
Downstream Pipe
= Pipe 5
Pipe Material
= HDPE
Pipe Length
= 33.0960 ft
Plan Length
= 33.0943 ft
Pipe Type
= Circular
Pipe Dimensions
= 18.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 10.48 cfs
Invert Elevation Downstream
= 42.4100 ft
Invert Elevation Upstream
= 42.7400 ft
Invert Slope
= 1.00%
Invert Slope (Plan Length)
= 1.00%
Rim Elevation Downstream
= 52.0193 ft
Rim Elevation Upstream
= 51.9482 ft
Natural Ground Slope
= -0.21%
Crown Elevation Downstream
= 43.9100 ft
Crown Elevation Upstream
= 44.2400 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 1.50 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 2.24 min
Total Intensity
= 11.63 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 1.50 cfs
Uniform Capacity
= 10.48 cfs
Skipped flow
•
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 50.0882 ft
62
63
HGL Elevation Upstream
= 50.0949 ft
HGL Slope
= 0.02 3
EGL Elevation Downstream
= 50.0994 ft
EGL Elevation Upstream
= 50.1061 ft
EGL Slope
= 0.02 %
Critical Depth
= 5.5152 in
•
Depth Downstream
= 18.0000 in
Depth Upstream
= 18.0000 in
Velocity Downstream
= 0.85 ft /s
Velocity Upstream
= 0.85 ft /s
Uniform Velocity Downstream
= 7.55 ft /s
Uniform Velocity Upstream
= 4.21 ft /s
Area Downstream
= 1.77 ft^2
Area Upstream
= 1.77 ft "2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.000 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= WYE 1
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * 3
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
•
Curb Efficiency
Grate Efficiency
= *
- * $
Slot Efficiency
= * 3
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 18
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 18
Downstream Pipe
= Pipe 17
Pipe Material
= HDPE
Pipe Length
= 21.8141 ft
Plan Length
= 21.8130 ft
Pipe Type
= Circular
Pipe Dimensions
= 18.00 in
Pipe Manning,s "n"
= 0.013
Pipe Capacity at Invert Slope
= 10.54 cfs
Invert Elevation Downstream
= 42.7400 ft
Invert Elevation Upstream
= 42.9600 ft
Invert Slope
= 1.016
Invert Slope (Plan Length)
= 1.013
Rim Elevation Downstream
= 51.9482 ft
Rim Elevation Upstream
= 52.4740 ft
Natural Ground Slope
= 2.413
Crown Elevation Downstream
= 44.2400 ft
Crown Elevation Upstream
= 44.4600 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 1.50 cfs
Inlet Hydrograph Flow
= 0.00 cfs
•
Total Area
= 0.00 ac
Weighted Coefficient
- 0.000
Total Time of Concentration
= 1.81 min
Total Intensity
= 11.89 in /hr
Total Rational Flow
= 0.00 cfs
63
Total Flow
= 1.50 cfs
Uniform Capacity
= 10.54 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
•
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 50.0949 ft
HGL Elevation Upstream
= 50.0994 ft
HGL Slope
= 0.02 W
EGL Elevation Downstream
= 50.1061 ft
EGL Elevation Upstream
= 50.1106 ft
EGL Slope
= 0.02
Critical Depth
= 5.5152 in
Depth Downstream
= 18.0000 in
Depth Upstream
= 18.0000 in
Velocity Downstream
= 0.85 ft /s
Velocity Upstream
= 0.85 ft /s
Uniform Velocity Downstream
= 4.23 ft /s
Uniform Velocity Upstream
= 4.23 ft /s
Area Downstream
= 1.77 ft "2
Area Upstream
= 1.77 ft"2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.000 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= BEND 6
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross - Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
•
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * 9,
Total Efficiency
= 0.00 W
PIPE DESCRIPTION: Pipe 19
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 19
Downstream Pipe
= Pipe 18
Pipe Material
= HDPE
Pipe Length
= 91.5206 ft
Plan Length
= 92.0159 ft
Pipe Type
= Circular
Pipe Dimensions
= 18.00 in
Pipe Manning's ^n"
= 0.013
Pipe Capacity at Invert Slope
= 10.53 cfs
Invert Elevation Downstream
= 42.9600 ft
Invert Elevation Upstream
= 43.8800 ft
Invert Slope
= 1.01%
Invert Slope (Plan Length)
=1.00%
Rim Elevation Downstream
= 52.4740 ft
Rim Elevation Upstream
= 54.1365 ft
Natural Ground Slope
= 1.82%
Crown Elevation Downstream
= 44.4600 ft
Crown Elevation Upstream
= 45.3800 ft
- -- -FLAW INFORMATION--- -
•
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
64
Inlet Input Flow
= 1.50 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
•
Total Time of Concentration
Total Intensity
= 0.00 min
= 0.00 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 1.50 cfs
Uniform Capacity
= 10.53 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 50.0994 ft
HGL Elevation Upstream
= 50.1180 ft
HGL Slope
= 0.02 %
EGL Elevation Downstream
= 50.1106 ft
EGL Elevation Upstream
= 50.1292 ft
EGL Slope
= 0.02 %
Critical Depth
= 5.5152 in
Depth Downstream
= 18.0000 in
Depth Upstream
= 18.0000 in
Velocity Downstream
= 0.85 ft /s
Velocity Upstream
= 0.85 ft /s
Uniform Velocity Downstream
= 4.22 ft /s
Uniform velocity Upstream
= 0.00 ft /s
Area Downstream
= 1.77 ft ^2
Area Upstream
= 1.77 ft "2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.000 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= SEND 7
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
0.0000 ft
•
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= *
Slot Efficiency
= *
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 20
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 20
Downstream Pipe
= Pipe 11
Pipe Material
= HDPE
Pipe Length
= 32.6904 ft
Plan Length
= 38.6900 ft
Pipe Type
= Circular
Pipe Dimensions
= 18.00 in
Pipe Manning's ' -n"
= 0.013
Pipe Capacity at Invert Slope
= 7.35 cfs
Invert Elevation Downstream
= 49.2100 ft
Invert Elevation Upstream
= 49.3700 ft
Invert Slope
= 0.49%
Invert Slope (Plan Length)
= 0.41%
•
Rim Elevation Downstream
= 54.1365 ft
Rim Elevation Upstream
= 54.1000 ft
Natural Ground Slope
= -0.11%
Crown Elevation Downstream
= 50.7100 ft
Crown Elevation Upstream
= 50.8700 ft
65
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
•
= 0.00 cfs
Inlet Input Flow
= 3.50 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 0.00 min
Total Intensity
= 0.00 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 3.50 cfs
Uniform Capacity
= 7.35 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 51.2051 ft
HGL Elevation Upstream
= 51.2463 ft
HGL Slope
= 0.13 %
EGL Elevation Downstream
= 51.2661 ft
EGL Elevation Upstream
= 51.3073 ft
EGL Slope
= 0.13 %
Critical Depth
= 8.5662 in
Depth Downstream
= 18.0000 in
Depth Upstream
= 18.0000 in
Velocity Downstream
= 1.98 ft /s
Velocity Upstream
= 1.98 ft /s
Uniform Velocity Downstream
= 4.11 ft /s
Uniform Velocity Upstream
= 0.00 ft/8
Area Downstream
= 1.77 ft "2
Area Upstream
= 1.77 ft"2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.080 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= WYE 2
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
•
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft/5
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00 i
PIPE DESCRIPTION: Pipe 21
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
- Pipe 21
Downstream Pipe
= Pipe 14
Pipe Material
= HDPE
Pipe Length
= 15.1379 ft
Plan Length
= 16.9000 ft
Pipe Type
= Circular
• Pipe Dimensions
= 12.00 in
Pipe Manning's 'In"
= 0.013
Pipe Capacity at Invert Slope
= 2.75 cfs
Invert Elevation Downstream
= 43.4000 ft
Invert Elevation Upstream
= 43.4900 ft
66
Invert Slope
= 0.59%
Invert Slope (Plan Length)
= 0.538 '
Rim Elevation Downstream
= 52.0228 ft
Rim Elevation Upstream
= 52.3395 ft
Natural Ground Slope
= 2.098
Crown Elevation Downstream
= 44.4000 ft
•
Crown Elevation Upstream
= 44.4900 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 0.50 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 2.98 min
Total Intensity
= 11.22 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 0.50 cfs
Uniform Capacity
= 2.75 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 49.5823 ft
HGL Elevation Upstream
= 49.5853 ft
HGL Slope
= 0.02 %
EGL Elevation Downstream
= 49.5886 ft
EGL Elevation Upstream
= 49.5916 ft
EGL Slope
= 0.02 8
Critical Depth
= 3.5184 in
Depth Downstream
= 12.0000 in
Depth Upstream
= 12.0000 in
Velocity Downstream
= 0.64 ft /s
Velocity Upstream
= 0.64 ft /s
Uniform Velocity Downstream
= 6.37 ft /s
Uniform Velocity Upstream
= 2.66 ft /s
Area Downstream
= 0.79 ft "2
Area Upstream
= 0.79 ft'2
(JLC)
=
C
Calculated Junction Loss
0.
= 0.000 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= MH3 4
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * 8
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * 8
Grate Efficiency
= * 8
Slot Efficiency
= * 8
Total Efficiency
= 0.00 8
PIPE DESCRIPTION: Pipe 22
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 22
Downstream Pipe
= Pipe 21
Pipe Material
= HDPE
Pipe Length
= 31.5689 ft
67
Plan Length
= 31.5685 ft
Pipe Type
= Circular
Pipe Dimensions
= 12.00 in
Pipe Manning's ',n-,
= 0.013
Pipe Capacity at Invert Slope
= 2.54 cfs
Invert Elevation Downstream
= 43.4900 ft
Invert Elevation Upstream
= 43.6500 ft
Invert Slope
= 0.518
Invert Slope (Plan Length)
= 0.518
Rim Elevation Downstream
= 52.3395 ft
Rim Elevation Upstream
= 52.3278 ft
Natural Ground Slope
= -0.048
Crown Elevation Downstream
= 44.4900 ft
Crown Elevation Upstream
= 44.6500 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 0.50 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 2.15 min
Total Intensity
= 11.68 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 0.50 cfs
Uniform Capacity
= 2.54 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 49.5853 ft
HGL Elevation Upstream
= 49.5915 ft
HGL Slope
= 0.02 8
EGL Elevation Downstream
= 49.5916 ft
EGL Elevation Upstream
= 49.5978 ft
EGL Slope
= 0.02 8
Critical Depth
= 3.5184 in
Depth Downstream
- 12.0000 in
Depth Upstream
= 12.0000 in
Velocity Downstream
= 0.64 ft /s
Velocity Upstream
= 0.64 ft /s
Uniform Velocity Downstream
= 2.51 ft /s
Uniform Velocity Upstream
= 2.51 ft /s
Area Downstream
= 0.79 ft "2
Area Upstream
= 0.79 ft "2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.000 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= BEND 8
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * 8
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * 8
Grate Efficiency
= * 8
Slot Efficiency
= * 8
Total Efficiency
= 0.00 8
PIPE DESCRIPTION: Pipe 23
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
68
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 23
Downstream Pipe
= Pipe 22
• Pipe Material
= HDPE
Pipe Length
= 18.6440 ft
Plan Length
= 18.6437 ft
Pipe Type
= Circular
Pipe Dimensions
= 12.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 2.47 cfs
Invert Elevation Downstream
= 43.6500 ft
Invert Elevation Upstream
= 43.7400 ft
Invert Slope
= 0.48%
Invert Slope (Plan Length)
= 0.488
Rim Elevation Downstream
= 52.3278 ft
Rim Elevation Upstream
= 50.9200 ft
Natural Ground Slope
= -7.558
Crown Elevation Downstream
= 44.6500 ft
Crown Elevation Upstream
= 44.7400 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 0.50 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 1.66 min
Total Intensity
= 11.98 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 0.50 cfa
Uniform Capacity
= 2.47 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 49.5915 ft
HGL Elevation Upstream
= 49.5952 ft
HGL Slope
•
= 0.02 %
EGL Elevation Downstream
= 49.5978 ft
EGL Elevation Upstream
= 49.6015 ft
EGL Slope
= 0.02 it
Critical Depth
= 3.5184 in
Depth Downstream
= 12.0000 in
Depth Upstream
= 12.0000 in
Velocity Downstream
= 0.64 ft /s
Velocity Upstream
= 0.64 ft /s
Uniform Velocity Downstream
= 2.47 ft /s
Uniform Velocity Upstream
= 2.47 ft /s
Area Downstream
= 0.79 ft "2
Area Upstream
= 0.79 ft "2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.000 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= BEND 9
Inlet Description
= <None>
Inlet Type
- Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross - Slope
= 0.00 ft /ft
Gutter Cross - Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter width
= 0.0000 ft
Ponding width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
•
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
69
Grate Efficiency
= * 6
Slot Efficiency
= * 6
Total Efficiency
= 0.00 6
PIPE DESCRIPTION: Pipe 24
•
-- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 24
Downstream Pipe
= Pipe 23
Pipe Material
= HDPE
Pipe Length
= 25.2574 ft
Plan Length
= 25.2571 ft
Pipe Type
= Circular
Pipe Dimensions
= 12.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 2.55 cfs
Invert Elevation Downstream
= 43.7400 ft
Invert Elevation Upstream
= 43.8700 ft
Invert Slope
= 0.516
Invert Slope (Plan Length)
= 0.516
Rim Elevation Downstream
= 50.9200 ft
Rim Elevation Upstream
= 49.2178 ft
Natural Ground Slope
= -6.746
Crown Elevation Downstream
= 44.7400 ft
Crown Elevation Upstream
= 44.8700 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 0.50 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 1.00 min
Total Intensity
= 12.40 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 0.50 cfs
•
Uniform Capacity
= 2.55 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 49.5952 ft
HGL Elevation Upstream
= 49.6002 ft
HGL Slope
= 0.02 6
EGL Elevation Downstream
= 49.6015 ft
EGL Elevation Upstream
= 49.6065 ft
EGL Slope
= 0.02 6
Critical Depth
= 3.5184 in
Depth Downstream
= 12.0000 in
Depth Upstream
= 12.0000 in
Velocity Downstream
= 0.64 ft /s
Velocity Upstream
= 0.64 ft /s
Uniform velocity Downstream
= 2.53 ft /s
Uniform Velocity Upstream
= 2.53 ft /s
Area Downstream
= 0.79 ft"2
Area Upstream
= 0.79 ft"2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.000 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= BEND 10
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross - Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding width
= 0.0000 ft
Intercept Efficiency
= * 6
Flow from Catchment
= 0.00 cfs
•
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
70
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
•
Total Spread
Gutter Velocity
= 0.0000 ft
= 0.00 ft /s
Curb Efficiency
= *
Grate Efficiency
= *
Slot Efficiency
= *
Total Efficiency
= 0.00
PIPE DESCRIPTION: Pipe 25
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 25
Downstream Pipe
= Pipe 24
Pipe Material
= HDPE
Pipe Length
= 25.2574 ft
Plan Length
= 25.2571 ft
Pipe Type
= Circular
Pipe Dimensions
= 12.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 2.45 cfs
Invert Elevation Downstream
= 43.8700 ft
Invert Elevation Upstream
= 43.9900 ft
Invert Slope
= 0.488
Invert Slope (Plan Length)
= 0.48%
Rim Elevation Downstream
= 49.2178 ft
Rim Elevation Upstream
= 47.5157 ft
Natural Ground Slope
= -6.74%
Crown Elevation Downstream
= 44.8700 ft
Crown Elevation Upstream
= 44.9900 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 0.50 cfs
•
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 0.34 min
Total Intensity
= 12.87 in /hr
Total Rational Flow
= 0.00 cfe
Total Flow
= 0.50 cfs
Uniform Capacity
= 2.45 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 49.6002 ft
HGL Elevation Upstream
= 49.6051 ft
HGL Slope
= 0.02 8
EGL Elevation Downstream
= 49.6065 ft
EGL Elevation Upstream
= 49.6115 ft
EGL Slope
= 0.02 %
Critical Depth
= 3.5184 in
Depth Downstream
= 12.0000 in
Depth Upstream
= 12.0000 in
Velocity Downstream
= 0.64 ft /s
Velocity Upstream
= 0.64 ft /s
Uniform Velocity Downstream
= 2.45 ft /s
Uniform Velocity Upstream
= 2.45 ft /s
Area Downstream
= 0.79 ft "2
Area Upstream
= 0.79 ft "2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.000 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= BEND 11
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
•
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter width
= 0.0000 ft
Ponding Width
= 0.0000 ft
71
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
•
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 26
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 26
Downstream Pipe
= Pipe 25
Pipe Material
= HDPE
Pipe Length
= 7.7501 ft
Plan Length
= 8.5000 ft
Pipe Type
= Circular
Pipe Dimensions
= 12.00 in
Pipe Manning's °n,'
= 0.013
Pipe Capacity at Invert Slope
= 2.56 cfs
Invert Elevation Downstream
= 43.9900 ft
Invert Elevation Upstream
= 44.0300 ft
Invert Slope
= 0.52%
Invert Slope (Plan Length)
= 0.47%
Rim Elevation Downstream
= 47.5157 ft
Rim Elevation Upstream
= 46.8424 ft
Natural Ground Slope
= -8.69%
Crown Elevation Downstream
= 44.9900 ft
Crown Elevation Upstream
= 45.0300 ft
•
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 0.50 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 0.12 min
Total Intensity
= 13.03 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 0.50 cfs
Uniform Capacity
= 2.56 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 49.6051 ft
HGL Elevation Upstream
= 49.6067 ft
HGL Slope
= 0.02 %
EGL Elevation Downstream
= 49.6115 ft
EGL Elevation Upstream
= 49.6130 ft
EGL Slope
= 0.02 %
Critical Depth
= 3.5184 in
Depth Downstream
= 12.0000 in
Depth Upstream
= 12.0000 in
Velocity Downstream
= 0.64 ft /s
Velocity Upstream
= 0.64 ft /s
Uniform Velocity Downstream
= 2.53 ft /s
Uniform Velocity Upstream
= 2.53 ft /s
Area Downstream
= 0.79 ft "2
Area Upstream
= 0.79 ft "2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.000 ft
•
- -- -INLET INFORMATION--- -
Downstream Inlet
= BEND 12
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
72
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
•
Gutter Local Depression
Gutter Width
= 0.0000 in
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * $
Total Efficiency
= 0.00
PIPE DESCRIPTION: Pipe 27
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 27
Downstream Pipe
= Pipe 26
Pipe Material
= HDPE
Pipe Length
= 3.5000 ft
Plan Length
= 4.5000 ft
Pipe Type
= Circular
Pipe Dimensions
= 12.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 2.69 cfs
Invert Elevation Downstream
= 44.4800 ft
Invert Elevation Upstream
= 44.5000 ft
Invert Slope
= 0.57%
•
Invert Slope (Plan Length)
= 0.44%
Rim Elevation Downstream
= 46.8424 ft
Rim Elevation Upstream
= 46.5278 ft
Natural Ground Slope
= -8.99%
Crown Elevation Downstream
= 45.4800 ft
Crown Elevation Upstream
= 45.5000 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
- 0.50 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 0.00 min
Total Intensity
= 0.00 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
- 0.50 cfs
Uniform Capacity
= 2.69 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 49.6067 ft
HGL Elevation Upstream
= 49.6074 ft
HGL Slope
= 0.02 %
EGL Elevation Downstream
= 49.6130 ft
EGL Elevation Upstream
= 49.6137 ft
EGL Slope
= 0.02 %
Critical Depth
= 3.5184 in
Depth Downstream
= 12.0000 in
Depth Upstream
= 12.0000 in
Velocity Downstream
= 0.64 ft /s
Velocity Upstream
= 0.64 ft /s
•
Uniform Velocity Downstream
= 2.62 ft /s
Uniform Velocity Upstream
= 0.00 ft /s
Area Downstream
= 0.79 ft"2
Area Upstream
= 0.79 ft°2
Kj (JLC)
= NA
73
Calculated Junction Loss
= 0.010 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= CB2 7
Inlet Description
= <None>
Inlet Type
•
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00 $
•
74
• 100 -YEAR ANALYSIS
HGL AT CRITICAL DEPTH
•
75
•
76
User.
Name: mpompa
Date: 10 -12 -07
Project: 11786
OFFSITE
STORM DRAIN
Time: 11:38:47
Network:
O1 -
STORM DRAIN"criti'cal r r
Page: 1
Storm Sewers
Summary Report
Pipe
Name
Total
Flow Pipe Dim
HGL Down
HGL
Up
Invert Down
Invert Up
Downstream Junct
cfs
in
ft
ft
ft
ft
Pipe
1
23.50
24.00
35.5813
36.3213
34.2200
34.9600
Outfall
Pipe
1 -A
23.50
24.00
36.6812
39.3070*
34.9600
35.7600
CONC COLLAR 1
Pipe
2
23.50
24.00
39.3570*
42.3216*
35.8100
36.5900
MH1 1
Pipe
3
47.00
36.00
42.3616*
42.4337*
36.6400
36.7800
MH1 2
Pipe
4
41.10
36.00
42.6037*
42.7676*
36.7800
37.1800
WYE 1
Pipe
4 -A
34.50
36.00
43.0276*
43.3983*
37.2200
38.5500
MH2 3
Pipe
5
34.50
36.00
43.3983*
43.4601*
38.5500
38.9000
CONC COLLAR 1
Pipe
6
34.50
36.00
43.6401*
43.7119*
38.9400
39.1600
MH2 4
Pipe
7
29.40
36.00
43.8019*
43.8327*
39.1600
39.3000
WYE 2
Pipe
8
15.00
24.00
44.0327*
45.0050*
40.3000
42.3400
MH3 5
Pipe
9
15.00
24.00
45.1250*
45.1592*
42.3400
42.4100
BEND 1
Pipe
10
13.80
24.00
45.2492*
45.3861*
42.4100
42.7500
WYE 3
Pipe
11
9.40
24.00
45.4561*
45.4845*
42.7500
42.9000
WYE 4
Pipe
12
9.40
24.00
45.4945*
45.7525
42.9300
44.4800
MH1 6
Pipe
13
9.40
24.00
45.8025
49.0758
44.4800
47.9800
BEND 2
Pipe
14
4.90
18.00
49.3314
49.4805
48.4800
48.5700
CB1 4
Pipe
15
4.90
18.00
49.6005
50.0762
48.5700
49.2100
BEND 3
Pipe
16
1.60
18.00
50.0762
50.0736
49.2100
49.2900
WYE 5
Pipe
17
1.60
18.00
50.0836
50.0786
49.2900
49.3400
BEND 4
Pipe
18
8.40
18.00
42.6037*
44.7226
37.6000
43.3600
WYE 1
Pipe
19
6.60
24.00
43.0276*
43.0400*
38.7200
39.5000
MH2 3
Pipe
20
20.30
30.00
44.0327*
44.5433*
39.8000
41.9000
MH3 5
Pipe
21
20.00
24.00
44.7433*
48.4664
42.4000
46.8600
MH3 7
Pipe
22
20.00
24.00
48.6864
49.3976*
46.8600
46.9500
BEND 5
Pipe
23
1.60
12.00
45.2492*
45.3160*
42.4100
42.7400
WYE 3
Pipe
24
1.60
12.00
45.3360*
45.3800*
42.7400
42.9600
BEND 6
Pipe
25
1.60
12.00
45.4000*
45.5848*
42.9600
43.8800
BEND 7
Pipe
26
3.50
18.00
50.0762
50.1662
49.2100
49.3700
WYE 5
Pipe
27
0.50
12.00
44.7433*
44.7463*
43.4000
43.4900
MH3 7
Pipe
28
0.50
12.00
44.7463*
44.7525*
43.4900
43.6500
BEND 8
Pipe
29
0.50
12.00
44.7525*
44.7562*
43.6500
43.7400
BEND 9
Pipe
30
0.50
12.00
44.7562*
44.7597
43.7400
43.8700
BEND 10
Pipe
31
0.50
12.00
44.7597
44.7613
43.8700
43.9900
BEND 11
Pipe
32
0.50
12.00
44.7613
44.7580
43.9900
44.0300
BEND 12
Pipe
33
0.50
12.00
44.7732
44.8053
44.4800
44.5000
CB1 9
•
76
User Name: mpompa
Date: 10 -12 -07
Project: 1786 OFFSITE STORM DRAIN
Time: 11:38:52
Network: 01 - STORM DRAIN critical run
Page: 1
- - - - -- Storm- Sewers
PIPE DESCRIPTION: Pipe 1
Detail Report
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 1
Downstream Pipe
- Outfall
Pipe Material
= RCP
Pipe Length
= 44.5895 ft
Plan Length
= 44.5834 ft
Pipe Type
= Circular
Pipe Dimensions
= 24.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 29.13 cfs
Invert Elevation Downstream
- 34.2200 ft
Invert Elevation Upstream
= 34.9600 ft
Invert Slope
= 1.66%
Invert Slope (Plan Length)
= 1.668
Rim Elevation Downstream
= 34.2200 ft
Rim Elevation Upstream
= 41.2700 ft
Natural Ground Slope
= 15.81$
Crown Elevation Downstream
= 36.2200 ft
Crown Elevation Upstream
= 36.9600 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
- 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 23.50 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 6.09 min
Total Intensity
= 9.79 in /hr
•
Total Rational Flow
= 0.00 cfs
Total Flow
= 23.50 cfs
Uniform Capacity
= 29.13 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 35.5813 ft
HGL Elevation Upstream
= 36.3213 ft
HGL Slope
= 1.66 $
EGL Elevation Downstream
= 37.2368 ft
EGL Elevation Upstream
= 37.9768 ft
EGL Slope
= 1.66 %
Critical Depth
= 20.6544 in
Depth Downstream
= 16.3359 in
Depth Upstream
= 16.3359 in
Velocity Downstream
= 10.32 ft /s
Velocity Upstream
= 10.32 ft /s
Uniform Velocity Downstream
= 0.00 ft /s
Uniform Velocity Upstream
= 10.32 ft /s
Area Downstream
- 2.28 ft ^2
Area Upstream
= 2.28 ft ^2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.360 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= Outfall
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross - Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
•
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
77
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= *
Grate Efficiency
= * $
Slot Efficiency
= *
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 1 -A
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 1 -A
Downstream Pipe
= Pipe 1
Pipe Material
= RCP
Pipe Length
= 236.5086 ft
Plan Length
= 239.2573 ft
Pipe Type
= Circular
Pipe Dimensions
- 24.00 in
Pipe Manning's "n,'
= 0.013
Pipe Capacity at Invert Slope
= 13.15 cfs
Invert Elevation Downstream
= 34.9600 ft
Invert Elevation Upstream
= 35.7600 ft
Invert Slope
= 0.34%
Invert Slope (Plan Length)
= 0.338
Rim Elevation Downstream
= 41.2700 ft
Rim Elevation Upstream
= 40.2500 ft
Natural Ground Slope
= -0.43%
Crown Elevation Downstream
= 36.9600 ft
Crown Elevation Upstream
= 37.7600 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
•
= 0.00 cfs
Inlet Input Flow
= 23.50 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 5.58 min
Total Intensity
= 10.00 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 23.50 cfs
Uniform Capacity
= 13.15 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 36.6812 ft
HGL Elevation Upstream
= 39.3070 ft
HGL Slope
= 1.11 %
EGL Elevation Downstream
= 37.7193 ft
EGL Elevation Upstream
= 40.1770 ft
EGL Slope
= 1.04 %
Critical Depth
= 20.6544 in
Depth Downstream
= 20.6544 in
Depth Upstream
= 24.0000 in
Velocity Downstream
= 8.17 ft /s
Velocity Upstream
= 7.48 ft /s
Uniform Velocity Downstream
= 7.48 ft /s
Uniform Velocity Upstream
= 7.48 ft /s
Area Downstream
= 2.88 ft ^2
Area Upstream
= 3.14 ft^2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.050 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= CONC COLLAR 1
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
•
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
78
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current inlet
= 0.00 cfs
Flow intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 2
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 2
Downstream Pipe
= Pipe 1 -A
Pipe Material
= RCP
Pipe Length
= 274.6055 ft
Plan Length
= 279.8739 ft
Pipe Type
= Circular
Pipe Dimensions
= 24.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 12.05 cfs
Invert Elevation Downstream
= 35.8100 ft
Invert Elevation Upstream
= 36.5900 ft
Invert Slope
= 0.28%
Invert Slope (Plan Length)
= 0.28%
Rim Elevation Downstream
= 40.2500 ft
Rim Elevation Upstream
= 44.6700 ft
Natural Ground Slope
= 1.61%
Crown Elevation Downstream
= 37.8100 ft
Crown Elevation Upstream
= 38.5900 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet input Flow
= 23.50 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 4.96 min
Total Intensity
= 10.26 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 23.50 cfs
Uniform Capacity
= 12.05 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 39.3570 ft
HGL Elevation Upstream
= 42.3216 ft
HGL Slope
= 1.08 %
EGL Elevation Downstream
= 40.2270 ft
EGL Elevation Upstream
= 43.1916 ft
EGL Slope
= 1.08 %
Critical Depth
= 20.6544 in
Depth Downstream
= 24.0000 in
Depth Upstream
= 24.0000 in
Velocity Downstream
= 7.48 ft /s
Velocity Upstream
= 7.48 ft /s
Uniform velocity Downstream
= 7.48 ft /s
Uniform Velocity Upstream
= 7.48 ft /s
Area Downstream
= 3.14 ft'2
Area Upstream
= 3.14 ft "2
(JLC)
= NA
C
Calculated Junction Loss
•
= 0 0.. 040 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= MH1 1
Inlet Description
= <None>
79
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= *
Grate Efficiency
= * g
Slot Efficiency
= *
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 3
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- - PIPE-INFORMATION----
Current Pipe
= Pipe 3
Downstream Pipe
= Pipe 2
Pipe Material
= RCP
Pipe Length
= 14.5124 ft
Plan Length
= 16.5472 ft
Pipe Type
= Circular
Pipe Dimensions
= 36.00 in
Pipe Manning's -,n"
= 0.013
Pipe Capacity at Invert Slope
= 65.48 cfs
Invert Elevation Downstream
= 36.6400 ft
Invert Elevation Upstream
= 36.7800 ft
Invert Slope
= 0.96%
Invert Slope (Plan Length)
= 0.858
Rim Elevation Downstream
= 44.6700 ft
Rim Elevation Upstream
= 44.8580 ft
Natural Ground Slope
= 1.30%
Crown Elevation Downstream
= 39.6400 ft
Crown Elevation Upstream
= 39.7800 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 47.00 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 4.92 min
Total Intensity
= 10.28 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 47.00 cfs
Uniform Capacity
= 65.48 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 42.3616 ft
HGL Elevation Upstream
= 42.4337 ft
HGL Slope
= 0.50 %
EGL Elevation Downstream
= 43.0490 ft
EGL Elevation Upstream
= 43.1211 ft
EGL Slope
= 0.50 %
Critical Depth
= 26.8020 in
Depth Downstream
= 36.0000 in
Depth Upstream
= 36.0000 in
Velocity Downstream
•
= 6.65 ft /s
Velocity Upstream
= 6.65 ft /s
Uniform Velocity Downstream
10.08 ft /s
Uniform Velocity Upstream
= 10.08 ft /s
Area Downstream
= 7.07 ft "2
80
Area Upstream
= 7.07 ft ^2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.170 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= MH1 2
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
- Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * g
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * $
Slot Efficiency
= * g
Total Efficiency
= 0.00
PIPE DESCRIPTION: Pipe 4
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 4
Downstream Pipe
= Pipe 3
Pipe Material
= RCP
Pipe Length
- 43.1477 ft
Plan Length
= 45.1458 ft
Pipe Type
= Circular
Pipe Dimensions
= 36.00 in
Pipe Manning's 'In"
= 0.013
Pipe Capacity at Invert Slope
= 64.19 cfs
Invert Elevation Downstream
= 36.7800 ft
Invert Elevation Upstream
= 37.1800 ft
Invert Slope
= 0.93$
Invert Slope (Plan Length)
= 0.89%
Rim Elevation Downstream
= 44.8580 ft
Rim Elevation Upstream
= 45.4679 ft
Natural Ground Slope
= 1.41k
Crown Elevation Downstream
= 39.7800 ft
Crown Elevation Upstream
= 40.1800 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 41.10 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 4.79 min
Total Intensity
= 10.34 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 41.10 cfs
Uniform Capacity
= 64.19 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 42.6037 ft
HGL Elevation Upstream
= 42.7676 ft
HGL Slope
= 0.38 %
EGL Elevation Downstream
= 43.1293 ft
EGL Elevation Upstream
= 43.2932 ft
EGL Slope
= 0.38 %
Critical Depth
= 25.0596 in
81
Depth Downstream
= 36.0000 in
Depth Upstream
= 36.0000 in
Velocity Downstream
= 5.81 ft /s
Velocity Upstream
= 5.81 ft /s
Uniform Velocity Downstream
= 9.64 ft /s
Uniform Velocity Upstream
= 9.64 ft /s
Area Downstream
= 7.07 ft^2
Area Upstream
= 7.07 ft'2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.260 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= WYE 1
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
- 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 4 -A
- - - - RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 4 -A
Downstream Pipe
= Pipe 4
Pipe Material
= RCP
Pipe Length
= 138.5330 ft
Plan Length
= 140.5600 ft
Pipe Type
= Circular
Pipe Dimensions
= 36.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 65.32 cfs
Invert Elevation Downstream
= 37.2200 ft
Invert Elevation Upstream
= 38.5500 ft
Invert Slope
= 0.96%
Invert Slope (Plan Length)
= 0.95%
Rim Elevation Downstream
= 45.4679 ft
Rim Elevation Upstream
= 48.6300 ft
Natural Ground Slope
= 2.28%
Crown Elevation Downstream
= 40.2200 ft
Crown Elevation Upstream
= 41.5500 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
- 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 34.50 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 4.31 min
Total Intensity
= 10.55 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 34.50 cfs
Uniform Capacity
= 65.32 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
82
HGL Elevation Downstream
= 43.0276 ft
HGL Elevation Upstream
= 43.3983 ft
HGL Slope
= 0.27 %
EGL Elevation Downstream
= 43.3979 ft
EGL Elevation Upstream
= 43.7687 ft
EGL Slope
= 0.27 %
Critical Depth
•
= 22.9032 in
Depth Downstream
= 36.0000 in
Depth Upstream
= 36.0000 in
Velocity Downstream
= 4.88 ft /s
Velocity Upstream
= 4.88 ft /s
Uniform Velocity Downstream
= 9.37 ft /s
Uniform Velocity Upstream
= 9.37 ft /s
Area Downstream
= 7.07 ft ^2
Area Upstream
= 7.07 ft "2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.000 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= MH2 3
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
•
= * %
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
0.00 $
PIPE DESCRIPTION: Pipe 5
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
-- - -PIPE INFORMATION--- -
Current Pipe
= Pipe 5
Downstream Pipe
= Pipe 4 -A
Pipe Material
= RCP
Pipe Length
= 23.1127 ft
Plan Length
= 25.1100 ft
Pipe Type
= Circular
Pipe Dimensions
= 36.00 in
Pipe Manning's "n -'
= 0.013
Pipe Capacity at Invert Slope
= 82.04 cfs
Invert Elevation Downstream
= 38.5500 ft
Invert Elevation Upstream
= 38.9000 ft
Invert Slope
= 1.51%
Invert Slope (Plan Length)
= 1.39%
Rim Elevation Downstream
= 48.6300 ft
Rim Elevation Upstream
= 50.4511 ft
Natural Ground Slope
= 7.88%
Crown Elevation Downstream
= 41.5500 ft
Crown Elevation Upstream
= 41.9000 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
inlet Time
= 0.00 min
Inlet intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 34.50 cfs
Inlet Hydrograph Flow
•
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 4.22 min
Total Intensity
= 10.59 in /hr
83
Total Rational Flow
= 0.00 cfs
Total Flow
= 34.50 cfs
Uniform Capacity
= 82.04 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 43.3983 ft
HGL Elevation Upstream
= 43.4601 ft
HGL Slope
= 0.27 g
EGL Elevation Downstream
= 43.7687 ft
EGL Elevation Upstream
= 43.8305 ft
EGL Slope
= 0.27 %
Critical Depth
= 22.9032 in
Depth Downstream
= 36.0000 in
Depth Upstream
= 36.0000 in
Velocity Downstream
= 4.88 ft /s
Velocity Upstream
= 4.88 ft /s
Uniform Velocity Downstream
= 11.11 ft /s
Uniform Velocity Upstream
= 11.11 ft /s
Area Downstream
= 7.07 ft "2
Area Upstream
= 7.07 ft "2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.180 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= CONC COLLAR 1
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross - Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= O.OD cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
0.00 %
PIPE DESCRIPTION: Pipe 6
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 6
Downstream Pipe
= Pipe 5
Pipe Material
= HDPE
Pipe Length
= 26.8075 ft
Plan Length
= 28.8869 ft
Pipe Type
= Circular
Pipe Dimensions
= 36.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 60.40 cfs
Invert Elevation Downstream
= 38.9400 ft
Invert Elevation Upstream
= 39.1600 ft
Invert Slope
= 0.82%
Invert Slope (Plan Length)
= 0.76%
Rim Elevation Downstream
= 50.4511 ft
Rim Elevation Upstream
= 51.9928 ft
Natural Ground Slope
= 5.758
Crown Elevation Downstream
= 41.9400 ft
Crown Elevation Upstream
= 42.160D ft
•
- - - -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
84
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 34.50 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 4.12 min
Total Intensity
= 10.64 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 34.50 cfs
Uniform Capacity
= 60.40 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 43.6401 ft
HGL Elevation Upstream
= 43.7119 ft
HGL Slope
= 0.27 %
EGL Elevation Downstream
= 44.0105 ft
EGL Elevation Upstream
= 44.0822 ft
EGL Slope
= 0.27 %
Critical Depth
= 22.9032 in
Depth Downstream
= 36.0000 in
Depth Upstream
= 36.0000 in
Velocity Downstream
= 4.88 ft /s
Velocity Upstream
= 4.88 ft /s
Uniform Velocity Downstream
= 8.83 ft /s
Uniform Velocity Upstream
= 8.83 ft /s
Area Downstream
= 7.07 ft^2
Area Upstream
= 7.07 ft ^2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.090 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= MH2 4
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
•
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %,
Slot Efficiency
= * %
Total Efficiency
- 0.00 8
PIPE DESCRIPTION: Pipe 7
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 7
Downstream Pipe
= Pipe 6
Pipe Material
= HDPE
Pipe Length
= 15.8612 ft
Plan Length
= 18.9856 ft
Pipe Type
= Circular
Pipe Dimensions
= 36.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 62.64 cfs
Invert Elevation Downstream
= 39.1600 ft
Invert Elevation Upstream
= 39.3000 ft
Invert Slope
= 0.88%
Invert Slope (Plan Length)
•
= 0.74*
Rim Elevation Downstream
= 51.9928 ft
Rim Elevation Upstream
= 51.6850 ft
Natural Ground Slope
= -1.948
Crown Elevation Downstream
= 42.1600 ft
85
Crown Elevation Upstream
= 42.3000 ft
-- - -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 29.40 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 4.05 min
Total Intensity
= 10.68 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 29.40 cfs
Uniform Capacity
= 62.64 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 43.8019 ft
HGL Elevation Upstream
= 43.8327 ft
HGL Slope
= 0.19 %
EGL Elevation Downstream
= 44.0708 ft
EGL Elevation Upstream
= 44.1017 ft
EGL Slope
= 0.19 %
Critical Depth
= 21.0744 in
Depth Downstream
= 36.0000 in
Depth Upstream
= 36.0000 in
Velocity Downstream
= 4.16 ft /s
Velocity Upstream
= 4.16 ft /s
Uniform Velocity Downstream
= 8.72 ft /s
Uniform Velocity Upstream
= 8.72 ft /s
Area Downstream
= 7.07 ft'2
Area Upstream
= 7.07 ft°2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.200 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= WYE 2
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
•
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross - Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
- 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= *
Grate Efficiency
= * g
Slot Efficiency
= *
Total Efficiency
= 0.00
PIPE DESCRIPTION: Pipe 8
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 8
Downstream Pipe
= Pipe 7
Pipe Material
= HDPE
Pipe Length
= 221.0512 ft
Plan Length
= 223.3331 ft
Pipe Type
•
= Circular
Pipe Dimensions
= 24.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 21.72 cfs
Invert Elevation Downstream
= 40.3000 ft
86
Invert Elevation Upstream
= 42.3400 ft
Invert Slope
= 0.92%
Invert Slope (Plan Length)
= 0.91%
Rim Elevation Downstream
= 51.6850 ft
Rim Elevation Upstream
= 52.1562 ft
Natural Ground Slope
= 0.21%
Crown Elevation Downstream
•
= 42.3000 ft
Crown Elevation Upstream
= 44.3400 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 15.00 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 2.03 min
Total Intensity
= 11.75 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 15.00 cfs
Uniform Capacity
= 21.72 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 44.0327 ft
HGL Elevation Upstream
= 45.0050 ft
HGL Slope
= 0.44 %
EGL Elevation Downstream
= 44.3871 ft
EGL Elevation Upstream
- 45.3594 ft
EGL Slope
= 0.44 %
Critical Depth
= 16.7544 in
Depth Downstream
= 24.0000 in
Depth Upstream
= 24.0000 in
Velocity Downstream
= 4.77 ft /s
Velocity Upstream
= 4.77 ft /s
Uniform Velocity Downstream
= 8.09 ft /s
Uniform Velocity Upstream
= 7.46 ft /s
Area Downstream
= 3.14 ft"2
Area Upstream
= 3.14 ft "2
Kj (JLC)
•
= NA
Calculated Junction Loss
= 0.120 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= MH3 5
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 9
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
• Rainfall File
= Tutorial
- -PIPE INFORMATION--- -
Current Pipe
= Pipe 9
Downstream Pipe
= Pipe 8
Pipe Material
= HDPE
87
Pipe Length
= 7.7708 ft
Plan Length
= 7.7705 ft
Pipe Type
= Circular
Pipe Dimensions
= 24.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 21.46 cfs
Invert Elevation Downstream
= 42.3400 ft
Invert Elevation Upstream
= 42.4100 ft
Invert Slope
= 0.90%
Invert Slope (Plan Length)
= 0.90%
Rim Elevation Downstream
= 52.1562 ft
Rim Elevation Upstream
= 52.0193 ft
Natural Ground Slope
= -1.76%
Crown Elevation Downstream
= 44.3400 ft
Crown Elevation Upstream
= 44.4100 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.500
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 15.00 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.500
Total Time of Concentration
= 2.00 min
Total Intensity
= 11.77 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 15.00 cfs
Uniform Capacity
= 21.46 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 45.1250 ft
HGL Elevation Upstream
= 45.1592 ft
HGL Slope
= 0.44 %
EGL Elevation Downstream
= 45.4794 ft
EGL Elevation Upstream
= 45.5136 ft
EGL Slope
= 0.44 %
Critical Depth
= 16.7544 in
Depth Downstream
= 24.0000 in
Depth Upstream
= 24.0000 in
Velocity Downstream
= 4.77 ft /s
Velocity Upstream
= 4.77 ft /s
Uniform Velocity Downstream
= 7.39 ft /s
Uniform Velocity Upstream
= 7.39 ft /s
Area Downstream
= 3.14 ft "2
Area Upstream
= 3.14 ft'2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.090 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= BEND 1
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * 8
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * §r
Slot Efficiency
•
= * 8
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 10
- - -- RAINFALL INFORMATION--- -
88
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 10
Downstream Pipe
= Pipe 9
Pipe Material
= HDPE
Pipe Length
= 36.7735 ft
Plan Length
= 36.7720 ft
Pipe Type
= Circular
Pipe Dimensions
= 24.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 21.74 cfs
Invert Elevation Downstream
= 42.4100 ft
Invert Elevation Upstream
= 42.7500 ft
Invert Slope
= 0.92W
Invert Slope (Plan Length)
= 0.92%
Rim Elevation Downstream
= 52.0193 ft
Rim Elevation Upstream
= 51.8051 ft
Natural Ground Slope
= -0.588
Crown Elevation Downstream
= 44.4100 ft
Crown Elevation Upstream
= 44.7500 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 13.80 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 1.86 min
Total Intensity
= 11.85 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 13.80 cfs
Uniform Capacity
= 21.74 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 45.2492 ft
HGL Elevation Upstream
= 45.3861 ft
HGL Slope
= 0.37 it
EGL Elevation Downstream
= 45.5492 ft
EGL Elevation Upstream
= 45.6861 ft
EGL Slope
= 0.37 8
Critical Depth
= 16.0560 in
Depth Downstream
= 24.0000 in
Depth Upstream
= 24.0000 in
Velocity Downstream
= 4.39 ft /s
Velocity Upstream
= 4.39 ft /s
Uniform Velocity Downstream
= 7.33 ft /s
Uniform Velocity Upstream
= 7.33 ft /s
Area Downstream
= 3.14 ft "2
Area Upstream
= 3.14 ft"2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.070 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= WYE 3
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross - Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * $
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
- 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
.
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
89
Curb Efficiency
= *
Grate Efficiency
= *
Slot Efficiency
= *
Total Efficiency
= 0.00 8
PIPE DESCRIPTION: Pipe 11
-- RAINFALL INFORMATION--- -
•
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 11
Downstream Pipe
= Pipe 10
Pipe Material
= HDPE
Pipe Length
= 16.4799 ft
Plan Length
= 18.4792 ft
Pipe Type
= Circular
Pipe Dimensions
= 24.00 in
Pipe Manning,s "n"
= 0.013
Pipe Capacity at Invert Slope
= 21.57 cfs
Invert Elevation Downstream
= 42.7500 ft
Invert Elevation Upstream
='42.9000 ft
Invert Slope
= 0.918
Invert Slope (Plan Length)
= 0.818
Rim Elevation Downstream
= 51.8051 ft
Rim Elevation Upstream
= 51.9869 ft
Natural Ground Slope
= 1.108
Crown Elevation Downstream
= 44.7500 ft
Crown Elevation Upstream
= 44.9000 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 9.40 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 1.76 min
Total Intensity
= 11.92 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 9.40 cfs
Uniform Capacity
= 21.57 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 45.4561 ft
HGL Elevation Upstream
= 45.4845 ft
HGL Slope
= 0.17 8
EGL Elevation Downstream
= 45.5953 ft
EGL Elevation Upstream
= 45.6237 ft
EGL Slope
= 0.17 8
Critical Depth
= 13.1496 in
Depth Downstream
= 24.0000 in
Depth Upstream
= 24.0000 in
Velocity Downstream
= 2.99 ft /s
Velocity Upstream
= 2.99 ft /s
Uniform Velocity Downstream
= 6.63 ft /s
Uniform Velocity Upstream
= 6.63 ft /s
Area Downstream
= 3.14 ft ^2
Area Upstream
= 3.14 ft'2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.010 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= WYE 4
Inlet Description
- <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * 8
Flow from Catchment
•
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
90
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
•
= 0.00 ft /s
Curb Efficiency
= * I
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00 &
PIPE DESCRIPTION: Pipe 12
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 12
Downstream Pipe
= Pipe 11
Pipe Material
= HDPE
Pipe Length
= 170.0486 ft
Plan Length
= 172.5164 ft
Pipe Type
= Circular
Pipe Dimensions
= 24.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 21.59 cfs
Invert Elevation Downstream
= 42.9300 ft
Invert Elevation Upstream
= 44.4800 ft
Invert Slope
= 0.91%
Invert Slope (Plan Length)
= 0.908
Rim Elevation Downstream
= 51.9869 ft
Rim Elevation Upstream
= 53.1567 ft
Natural Ground Slope
= 0.69%
Crown Elevation Downstream
= 44.9300 ft
Crown Elevation Upstream
= 46.4800 ft
- -- -FLOW INFORMATION----
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 9.40 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 0.99 min
Total Intensity
= 12.41 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 9.40 cfs
Uniform Capacity
= 21.59 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 45.4945 ft
HGL Elevation Upstream
= 45.7525 ft
HGL Slope
= 0.15 %
EGL Elevation Downstream
= 45.6337 ft
EGL Elevation Upstream
= 46.0613 ft
EGL Slope
= 0.25 $
Critical Depth
= 13.1496 in
Depth Downstream
= 24.0000 in
Depth Upstream
= 15.2695 in
Velocity Downstream
= 2.99 ft /s
Velocity Upstream
= 4.46 ft /s
Uniform velocity Downstream
= 6.64 ft /s
Uniform Velocity Upstream
= 6.64 ft /s
Area Downstream
= 3.14 ft'2
Area Upstream
= 2.11 ft "2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.050 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= MH1 6
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
•
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
91
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * 9,
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00
PIPE DESCRIPTION: Pipe 13
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 13
Downstream Pipe
= Pipe 12
Pipe Material
= HOPE
Pipe Length
= 40.5817 ft
Plan Length
= 41.9305 ft
Pipe Type
= Circular
Pipe Dimensions
= 24.00 in
Pipe Manning's °n"
= 0.013
Pipe Capacity at Invert Slope
= 66.41 cfs
Invert Elevation Downstream
- 44.4800 ft
Invert Elevation Upstream
= 47.9800 ft
Invert Slope
= 8.66%
Invert Slope (Plan Length)
= 8.35%
Rim Elevation Downstream
= 53.1567 ft
Rim Elevation Upstream
= 53.5675 ft
Natural Ground Slope
- 1.01%
Crown Elevation Downstream
= 46.4800 ft
Crown Elevation Upstream
= 49.9800 ft
- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 9.40 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 0.84 min
Total Intensity
= 12.51 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 9.40 cfs
Uniform Capacity
= 66.41 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 45.8025 ft
HGL Elevation Upstream
= 49.0758 ft
HGL Slope
= 8.10 %
EGL Elevation Downstream
= 46.0852 ft
EGL Elevation Upstream
= 49.5182 ft
EGL Slope
= 8.49 %
Critical Depth
= 13.1496 in
Depth Downstream
= 15.8695 in
Depth Upstream
= 13.1496 in
Velocity Downstream
= 4.26 ft /s
Velocity Upstream
= 5.33 ft /s
Uniform Velocity Downstream
= 14.96 ft /s
Uniform Velocity Upstream
= 14.96 ft /s
Area Downstream
= 2.20 ft ^2
Area Upstream
- 1.76 ft"2
Kj (JLC)
= NA
• Calculated Junction Loss
= 0.256 ft
- -INLET INFORMATION--- -
Downstream Inlet
= BEND 2
Inlet Description
= <None>
Inlet Type
= Undefined
92
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
•
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00 &
PIPE DESCRIPTION: Pipe 14
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 14
Downstream Pipe
- Pipe 13
Pipe Material
= HDPE
Pipe Length
= 18.3843 ft
Plan Length
= 19.8847 ft
Pipe Type
= Circular
Pipe Dimensions
= 18.00 in
Pipe Manning,s "n"
= 0.013
Pipe Capacity at Invert Slope
= 7.35 cfs
Invert Elevation Downstream
= 48.4800 ft
Invert Elevation Upstream
= 48.5700 ft
Invert Slope
•
= 0.49%
Invert Slope (Plan Length)
= 0.45%
Rim Elevation Downstream
= 53.5675 ft
Rim Elevation Upstream
= 53.5163 ft
Natural Ground Slope
= -0.28%
Crown Elevation Downstream
= 49.9800 ft
Crown Elevation Upstream
= 50.0700 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 4.90 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 0.77 min
Total Intensity
= 12.56 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 4.90 cfs
Uniform Capacity
= 7.35 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 49.3314 ft
HGL Elevation Upstream
= 49.4805 ft
HGL Slope
= 0.81 %
EGL Elevation Downstream
= 49.6797 ft
EGL Elevation Upstream
= 49.7768 ft
EGL Slope
= 0.53 %
Critical Depth
= 10.2168 in
Depth Downstream
= 10.2168 in
Depth Upstream
= 10.9255 in
Velocity Downstream
= 4.73 ft /s
Velocity Upstream
•
= 4.37 ft /s
Uniform Velocity Downstream
= 4.45 ft /s
Uniform Velocity Upstream
= 4.45 ft /s
Area Downstream
= 1.04 ft "2
Area Upstream
= 1.12 ft "2
93
Kj (JLC)
= NA
Calculated Junction Loss
= 0.120 ft
- -- -INLET INFORMATION----
Downstream Inlet
= CB1 4
IS
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
- 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * &
Total Efficiency
= 0.00 8
PIPE DESCRIPTION: Pipe 15
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 15
Downstream Pipe
= Pipe 14
Pipe Material
= HDPE
Pipe Length
= 127.5681 ft
.
Plan Length
= 127.5665 ft
Pipe Type
= Circular
Pipe Dimensions
= 18.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 7.44 cfs
Invert Elevation Downstream
= 48.5700 ft
Invert Elevation Upstream
= 49.2100 ft
Invert Slope
= 0.50%
Invert Slope (Plan Length)
= 0.50%
Rim Elevation Downstream
= 53.5163 ft
Rim Elevation Upstream
= 54.1365 ft
Natural Ground Slope
= 0.4991
Crown Elevation Downstream
= 50.0700 ft
Crown Elevation Upstream
= 50.7100 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 4.90 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 0.26 min
Total Intensity
= 12.92 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 4.90 cfs
Uniform Capacity
= 7.44 cfs
Skipped flow
= 0.00 cfs
infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 49.6005 ft
HGL Elevation Upstream
= 50.0762 ft
HGL Slope
= 0.37 t
•
EGL Elevation Downstream
= 49.8233 ft
EGL Elevation Upstream
= 50.4102 ft
EGL Slope
= 0.46 $
Critical Depth
= 10.2168 in
Depth Downstream
= 12.3655 in
94
Depth Upstream
= 10.3949 in
Velocity Downstream
= 3.79 ft /s
Velocity Upstream
= 4.63 ft /s
Uniform Velocity Downstream
= 4.50 ft /s
Uniform velocity Upstream
= 4.50 ft /s
Area Downstream
= 1.29 ft ^2
Area Upstream
= 1.06 ft'2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.000 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= BEND 3
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= + %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= • %
Grate Efficiency
= * %
Slot Efficiency
= %
Total Efficiency
= 0.00 8
PIPE DESCRIPTION: Pipe 16
- - -- RAINFALL INFORMATION----
Return Period
= 100 Year
Rainfall File
•
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 16
Downstream Pipe
= Pipe 15
Pipe Material
= HDPE
Pipe Length
= 16.2248 ft
Plan Length
= 16.2246 ft
Pipe Type
= Circular
Pipe Dimensions
= 18.00 in
Pipe Manning's "n"
0.013
Pipe Capacity at Invert Slope
= 7.37 cfs
Invert Elevation Downstream
= 49.2100 ft
Invert Elevation Upstream
= 49.2900 £t
Invert Slope
= 0.49%
Invert Slope (Plan Length)
= 0.49%
Rim Elevation Downstream
54.1365 ft
Rim Elevation Upstream
= 54.3835 ft
Natural Ground Slope
= 1.52%
Crown Elevation Downstream
= 50.7100 ft
Crown Elevation Upstream
= 50.7900 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 1.60 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
- 0.09 min
Total Intensity
= 13.05 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 1.60 cfs
Uniform Capacity
= 7.37 cfs
Skipped flow
•
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 50.0762 ft
95
HGL Elevation Upstream
= 50.0736 ft
HGL Slope
= -0.02 %
EGL Elevation Downstream
= 50.1118 ft
EGL Elevation Upstream
= 50.1193 ft
EGL Slope
= 0.05 %
Critical Depth
= 5.7024 in
Depth Downstream
is
= 10.3949 in
Depth Upstream
= 9.4036 in
Velocity Downstream
= 1.51 ft /s
Velocity Upstream
= 1.71 ft /s
Uniform Velocity Downstream
= 4.12 ft /s
Uniform Velocity Upstream
= 3.33 ft /s
Area Downstream
= 1.06 ft "2
Area Upstream
= 0.93 ft"2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.010 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= WYE 5
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
* 9,
Grate Efficiency
•
- * g
Slot Efficiency
= * %
Total Efficiency
= 0.00
PIPE DESCRIPTION: Pipe 17
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 17
Downstream Pipe
= Pipe 16
Pipe Material
= HDPE
Pipe Length
= 9.2501 ft
Plan Length
= 10.0000 ft
Pipe Type
= Circular
Pipe Dimensions
= 18.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 7.72 cfs
Invert Elevation Downstream
= 49.2900 ft
Invert Elevation Upstream
= 49.3400 ft
Invert Slope
= 0.54%
Invert Slope (Plan Length)
= 0.50%
Rim Elevation Downstream
= 54.3835 ft
Rim Elevation Upstream
= 54.3074 ft
Natural Ground Slope
- -0.82%
Crown Elevation Downstream
= 50.7900 ft
Crown Elevation Upstream
= 50.8400 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 1.60 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
•
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 0.00 min
Total Intensity
= 0.00 in /hr
Total Rational Flow
= 0.00 cfs
96
Total Flow
= 1.60 cfs
Uniform Capacity
= 7.72 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
•
= 50.0836 ft
HGL Elevation Upstream
= 50.0786 ft
HGL Slope
= -0.05 %
EGL Elevation Downstream
= 50.1278 ft
EGL Elevation Upstream
= 50.1317 ft
EGL Slope
- 0.04 %
Critical Depth
= 5.7024 in
Depth Downstream
= 9.5236 in
Depth Upstream
= 8.8638 in
Velocity Downstream
= 1.69 ft /s
Velocity Upstream
= 1.85 ft /s
Uniform Velocity Downstream
= 3.45 ft /s
Uniform Velocity Upstream
= 0.00 ft /s
Area Downstream
= 0.95 ft'2
Area Upstream
= 0.87 ft "2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.000 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= BEND 4
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * }
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
•
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %,
Grate Efficiency
= * 96
Slot Efficiency
= * %
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 18
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 18
Downstream Pipe
= Pipe 3
Pipe Material
= RCP
Pipe Length
= 110.1807 ft
Plan Length
= 119.5300 ft
Pipe Type
= Circular
Pipe Dimensions
= 18.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 24.01 cfs
Invert Elevation Downstream
= 37.6000 ft
Invert Elevation Upstream
= 43.3600 ft
Invert Slope
= 5.23%
Invert Slope (Plan Length)
= 4.82%
Rim Elevation Downstream
= 44.8580 ft
Rim Elevation Upstream
= 48.8527 ft
Natural Ground Slope
= 3.638
Crown Elevation Downstream
= 39.1000 ft
Crown Elevation Upstream
= 44.8600 ft
- -- -FLOW INFORMATION--- -
Catchment Area
•
= 0.00 ac
Runoff Coefficient
= 0.000
inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
97
Inlet Input Flow
= 8.40 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 0.00 min
Total Intensity
= 0.00 in /hr
Total Rational Flow
•
= 0.00 cfs
Total Flow
- 8.40 cfs
Uniform Capacity
= 24.01 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 42.6037 ft
HGL Elevation Upstream
= 44.7226 ft
HGL Slope
= 1.93 1
EGL Elevation Downstream
= 42.9550 ft
EGL Elevation Upstream
= 45.2676 ft
EGL Slope
= 2.10 %
Critical Depth
= 13.4730 in
Depth Downstream
= 18.0000 in
Depth Upstream
= 13.4730 in
Velocity Downstream
= 4.75 ft /s
Velocity Upstream
= 5.92 ft /s
Uniform Velocity Downstream
= 18.31 ft /s
Uniform Velocity Upstream
= 0.00 ft /s
Area Downstream
= 1.77 ft ^2
Area Upstream
= 1.42 ft "2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.440 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= WYE 1
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter width
= 0.0000 ft
Ponding Width
0.0000 ft
Intercept Efficiency
•
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00
PIPE DESCRIPTION: Pipe 19
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 19
Downstream Pipe
= Pipe 4
Pipe Material
= RCP
Pipe Length
= 7.2867 ft
Plan Length
= 10.9500 ft
Pipe Type
= Circular
Pipe Dimensions
= 24.00 in
Pipe Manning's 'In"
= 0.013
Pipe Capacity at invert Slope
= 73.98 cfs
Invert Elevation Downstream
= 38.7200 ft
Invert Elevation Upstream
= 39.5000 ft
Invert Slope
= 10.77%
invert Slope (Plan Length)
= 7.12%
Rim Elevation Downstream
•
= 45.4679 ft
Rim Elevation Upstream
= 45.9625 ft
Natural Ground Slope
= 6.79%
Crown Elevation Downstream
= 40.7200 ft
Crown Elevation Upstream
= 41.5000 ft
98
--- -FLOW INFORMATION--- -
Catchment Area
Runoff Coefficient
Inlet Time
• Inlet Intensity
Inlet Rational Flow
Inlet Input Flow
Inlet Hydrograph Flow
Total Area
Weighted Coefficient
Total Time of Concentration
Total Intensity
Total Rational Flow
Total Flow
Uniform Capacity
Skipped flow
Infiltration
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
HGL Elevation Upstream
HGL Slope
EGL Elevation Downstream
EGL Elevation Upstream
EGL Slope
Critical Depth
Depth Downstream
Depth Upstream
Velocity Downstream
Velocity Upstream
Uniform Velocity Downstream
Uniform Velocity Upstream
Area Downstream
Area Upstream
Kj (JLC)
Calculated Junction Loss
- -- -INLET INFORMATION--- -
Downstream Inlet
Inlet Description
Inlet Type
• Computation Case
Longitudinal Slope
Mannings n -value
Pavement Cross -Slope
Gutter Cross -Slope
Gutter Local Depression
Gutter Width
Ponding Width
Intercept Efficiency
Flow from Catchment
Carryover from previous inlet
Total Flow to Current Inlet
Flow Intercepted by Current Inlet
Bypassed Flow
Pavement Flow
Gutter Flow
Depth at Curb
Depth at Pavement /Gutter Joint
Pavement Spread
Total Spread
Gutter Velocity
Curb Efficiency
Grate Efficiency
Slot Efficiency
Total Efficiency
PIPE DESCRIPTION: Pipe 20
- - -- RAINFALL INFORMATION--- -
Return Period
Rainfall File
- -- -PIPE INFORMATION--- -
Current Pipe
Downstream Pipe
Pipe Material
Pipe Length
Plan Length
• Pipe Type
Pipe Dimensions
Pipe Manning's "n"
Pipe Capacity at Invert Slope
Invert Elevation Downstream
Invert Elevation Upstream
= 0.00 ac
= 0.000
= 0.00 min
= 0.00 in /hr
= 0.00 cfs
= 6.60 cfs
= 0.00 cfs
= 0.00 ac
= 0.000
= 0.00 min
= 0.00 in /hr
= 0.00 cfs
= 6.60 cfs
= 73.98 cfs
= 0.00 cfs
= 0.00 gpd
= 43.0276 ft
= 43.0400 ft
= 0.17 }
= 43.0962 ft
= 43.1086 ft
= 0.17 }
= 10.9272 in
= 24.0000 in
= 24.0000 in
= 2.10 ft /s
= 2.10 ft /s
= 22.54 ft /s
= 0.00 ft /s
= 3.14 ft "2
= 3.14 ft "2
= NA
= 0.090 ft
= MH2 3
_ <None>
= Undefined
= Sag
= 0.00 ft /ft
= 0.000
= 0.00 ft /ft
= 0.00 ft /ft
= 0.0000 in
= 0.0000 ft
= 0.0000 ft
0.00 cfs
0.00 cfs
= 0.00 cfs
0.00 cfs
= 0.00 cfs
0.00 cfs
0.00 cfs
= 0.0000 in
= 0.0000 in
= 0.0000 ft
= 0.0000 ft
= 0.00 ft /s
0.00 }
= 100 Year
= Tutorial
= Pipe 20
= Pipe 7
= HDPE
= 208.4060 ft
= 212.8200 ft
= Circular
= 30.00 in
= 0.013
= 41.16 cfs
= 39.8000 ft
= 41.9000 ft
99
Invert Slope
- 1.01%
Invert Slope (Plan Length)
= 0.99%
Rim Elevation Downstream
= 51.6850 ft
Rim Elevation Upstream
= 52.0228 ft
Natural Ground Slope
= 0.16%
Crown Elevation Downstream
= 42.3000 ft
•
Crown Elevation Upstream
= 44.4000 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 20.30 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 3.19 min
Total Intensity
= 11.11 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 20.30 cfs
Uniform Capacity
= 41.16 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
---- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 44.0327 ft
HGL Elevation Upstream
= 44.5433 ft
HGL Slope
= 0.25 %
EGL Elevation Downstream
= 44.2986 ft
EGL Elevation Upstream
= 44.8092 ft
EGL Slope
= 0.25 %
Critical Depth
= 18.3630 in
Depth Downstream
= 30.0000 in
Depth Upstream
= 30.0000 in
Velocity Downstream
= 4.14 ft /s
Velocity Upstream
= 4.14 ft /s
Uniform Velocity Downstream
= 8.36 ft /s
Uniform Velocity Upstream
= 8.36 ft /s
Area Downstream
= 4.91 ft"2
Area Upstream
= 4.91 ft"2
(JLC)
=
C
Calculated Junction Loss
0.
= 0.200 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= MH3 5
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * 8
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
- 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * $
Slot Efficiency
= * %
Total Efficiency
= 0.00
PIPE DESCRIPTION: Pipe 21
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
•
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 21
Downstream Pipe
= Pipe 20
Pipe Material
= HDPE
Pipe Length
= 18.8828 ft
100
Plan Length
= 20.3600 ft
Pipe Type
= Circular
Pipe Dimensions
= 24.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 109.90 cfs
•
Invert Elevation Downstream
= 42.4000 ft
Invert Elevation Upstream
= 46.8600 ft
Invert Slope
= 24.318
Invert Slope (Plan Length)
= 21.918
Rim Elevation Downstream
= 52.0228 ft
Rim Elevation Upstream
= 51.9212 ft
Natural Ground Slope
= -0.548
Crown Elevation Downstream
= 44.4000 ft
Crown Elevation Upstream
= 48.8600 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 20.00 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 0.07 min
Total Intensity
= 13.07 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 20.00 cfs
Uniform Capacity
= 109.90 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 44.7433 ft
HGL Elevation Upstream
= 48.4664 ft
HGL Slope
= 20.29 8
EGL Elevation Downstream
= 45.3734 ft
EGL Elevation Upstream
= 49.3166 ft
EGL Slope
= 21.49 8
Critical Depth
- 19.2768 in
Depth Downstream
= 24.0000 in
Depth Upstream
= 19.2768 in
Velocity Downstream
= 6.37 ft /s
Velocity Upstream
= 7.40 ft /s
Uniform Velocity Downstream
= 26.60 ft /s
Uniform Velocity Upstream
= 26.60 ft /s
Area Downstream
= 3.14 ft "2
Area Upstream
= 2.70 ft ^2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.220 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= MH3 7
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * 8
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
- * 8
Grate Efficiency
= * 8
Slot Efficiency
= * 8
•
Total Efficiency
= 0.00 8
PIPE DESCRIPTION: Pipe 22
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
101
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 22
Downstream Pipe
= Pipe 21
Pipe Material
= HDPE
Pipe Length
•
= 18.1102 ft
Plan Length
= 27.6100 ft
Pipe Type
= Circular
Pipe Dimensions
= 24.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 15.94 cfs
Invert Elevation Downstream
= 46.8600 ft
Invert Elevation Upstream
= 46.9500 ft
Invert Slope
= 0.50%
invert Slope (Plan Length)
= 0.33%
Rim Elevation Downstream
= 51.9212 ft
Rim Elevation Upstream
= 51.9992 ft
Natural Ground Slope
= 0.43*
Crown Elevation Downstream
= 48.8600 ft
Crown Elevation Upstream
= 48.9500 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 20.00 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 0.00 min
Total Intensity
= 0.00 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 20.00 cfs
Uniform Capacity
= 15.94 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
---- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 48.6864 ft
HGL Elevation Upstream
= 49.3976 ft
HGL Slope
•
= 3.93 %
EGL Elevation Downstream
= 49.3733 ft
EGL Elevation Upstream
= 50.0568 ft
EGL Slope
= 3.77 $
Critical Depth
= 19.2768 in
Depth Downstream
= 21.9168 in
Depth Upstream
= 22.6480 in
Velocity Downstream
= 6.65 ft /s
Velocity Upstream
= 6.51 ft /s
Uniform Velocity Downstream
= 6.37 ft /s
Uniform Velocity Upstream
= 0.00 ft /s
Area Downstream
= 3.01 ft"2
Area Upstream
= 3.07 ft "2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.850 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= BEND 5
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
•
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter velocity
= 0.00 ft /s
Curb Efficiency
= * g
102
Grate Efficiency
= * 8
Slot Efficiency
= * 8
Total Efficiency
= 0.00 $
PIPE DESCRIPTION: Pipe 23
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 23
Downstream Pipe
= Pipe 9
Pipe Material
= HDPE
Pipe Length
= 33.0960 ft
Plan Length
= 33.0943 ft
Pipe Type
= Circular
Pipe Dimensions
= 12.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 3.56 cfs
Invert Elevation Downstream
= 42.4100 ft
Invert Elevation Upstream
= 42.7400 ft
Invert Slope
= 1.008
Invert Slope (Plan Length)
= 1.008
Rim Elevation Downstream
= 52.0193 ft
Rim Elevation Upstream
= 51.9482 ft
Natural Ground Slope
= -0.218
Crown Elevation Downstream
= 43.4100 ft
Crown Elevation Upstream
= 43.7400 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 1.60 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 0.93 min
Total Intensity
= 12.45 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 1.60 cfs
•
Uniform Capacity
= 3.56 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 45.2492 ft
HGL Elevation Upstream
= 45.3160 ft
HGL Slope
= 0.20 8
EGL Elevation Downstream
= 45.3137 ft
EGL Elevation Upstream
= 45.3805 ft
EGL Slope
= 0.20 8
Critical Depth
= 6.4452 in
Depth Downstream
= 12.0000 in
Depth Upstream
= 12.0000 in
Velocity Downstream
= 2.04 ft /s
Velocity Upstream
= 2.04 ft /s
Uniform Velocity Downstream
= 7.55 ft /s
Uniform Velocity Upstream
= 4.41 ft /s
Area Downstream
= 0.79 ft'2
Area Upstream
= 0.79 ft "2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.020 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= WYE 3
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * 8
Flow from Catchment
= 0.00 cfs
•
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
103
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
•
= * 4
Grate Efficiency
= * 4
Slot Efficiency
= * 4
Total Efficiency
= 0.00 4
PIPE DESCRIPTION: Pipe 24
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 24
Downstream Pipe
= Pipe 23
Pipe Material
= HDPE
Pipe Length
= 21.8141 ft
Plan Length
= 21.8130 ft
Pipe Type
= Circular
Pipe Dimensions
= 12.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 3.58 cfs
Invert Elevation Downstream
= 42.7400 ft
Invert Elevation Upstream
= 42.9600 ft
Invert Slope
= 1.014
Invert Slope (Plan Length)
= 1.014
Rim Elevation Downstream
= 51.9482 ft
Rim Elevation Upstream
= 52.4740 ft
Natural Ground Slope
= 2.414
Crown Elevation Downstream
= 43.7400 ft
Crown Elevation Upstream
= 43.9600 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
- 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 1.60 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 0.75 min
Total Intensity
= 12.57 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 1.60 cfs
Uniform Capacity
= 3.58 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 45.3360 ft
HGL Elevation Upstream
= 45.3800 ft
HGL Slope
= 0.20 4
EGL Elevation Downstream
= 45.4005 ft
EGL Elevation Upstream
= 45.4445 ft
EGL Slope
= 0.20 4
Critical Depth
= 6.4452 in
Depth Downstream
= 12.0000 in
Depth Upstream
= 12.0000 in
Velocity Downstream
= 2.04 ft /s
Velocity Upstream
= 2.04 ft /s
Uniform Velocity Downstream
= 4.43 ft /s
Uniform Velocity Upstream
= 4.43 ft /s
Area Downstream
- 0.79 ft "2
Area Upstream
= 0.79 ft ^2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.020 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= BEND 6
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
•
= 0.00 ft /ft
Gutter Cross - Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
104
Intercept Efficiency
= * 8
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
•
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * 8
Grate Efficiency
= * 8
Slot Efficiency
= * 8
Total Efficiency
= 0.00 8
PIPE DESCRIPTION: Pipe 25
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 25
Downstream Pipe
= Pipe 24
Pipe Material
= HDPE
Pipe Length
= 91.5206 ft
Plan Length
= 92.0159 ft
Pipe Type
= Circular
Pipe Dimensions
= 12.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 3.57 cfs
Invert Elevation Downstream
= 42.9600 ft
Invert Elevation Upstream
= 43.8800 ft
Invert Slope
= 1.018
Invert Slope (Plan Length)
= 1.008
Rim Elevation Downstream
= 52.4740 ft
Rim Elevation Upstream
= 54.1365 ft
Natural Ground Slope
= 1.828
Crown Elevation Downstream
= 43.9600 ft
Crown Elevation Upstream
= 44.8800 ft
•
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 1.60 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 0.00 min
Total Intensity
= 0.00 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 1.60 cfs
Uniform Capacity
= 3.57 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 45.4000 ft
HGL Elevation Upstream
= 45.5848 ft
HGL Slope
= 0.20 8
EGL Elevation Downstream
= 45.4645 ft
EGL Elevation Upstream
= 45.6493 ft
EGL Slope
= 0.20 8
Critical Depth
= 6.4452 in
Depth Downstream
= 12.0000 in
Depth Upstream
= 12.0000 in
Velocity Downstream
= 2.04 ft /s
Velocity Upstream
= 2.04 ft /s
Uniform Velocity Downstream
= 4.42 ft /s
Uniform Velocity Upstream
= 0.00 ft /s
Area Downstream
= 0.79 ft"2
Area Upstream
= 0.79 ft ^2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.000 ft
•
- - - -INLET INFORMATION--- -
Downstream Inlet
= BEND 7
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
105
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross - Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
.
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 26
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 26
Downstream Pipe
= Pipe 15
Pipe Material
= HDPE
Pipe Length
= 32.6904 ft
Plan Length
= 38.6900 ft
Pipe Type
= Circular
Pipe Dimensions
= 18.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 7.35 cfs
Invert Elevation Downstream
= 49.2100 ft
Invert Elevation Upstream
= 49.3700 ft
Invert Slope
= 0.49%
Invert Slope (Plan Length)
= 0.41%
Rim Elevation Downstream
= 54.1365 ft
Rim Elevation Upstream
= 54.5576 ft
Natural Ground Slope
= 1.29%
Crown Elevation Downstream
= 50.7100 ft
Crown Elevation Upstream
= 50.8700 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 3.50 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 0.00 min
Total Intensity
= 0.00 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 3.50 cfs
Uniform Capacity
= 7.35 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 50.0762 ft
HGL Elevation Upstream
= 50.1662 ft
HGL Slope
= 0.28 %
EGL Elevation Downstream
= 50.2466 ft
EGL Elevation Upstream
= 50.4153 ft
EGL Slope
= 0.52 %
Critical Depth
= 8.5662 in
Depth Downstream
= 10.3949 in
Depth Upstream
= 8.9260 in
Velocity Downstream
= 3.31 ft /s
Velocity Upstream
= 4.00 ft /s
•
Uniform Velocity Downstream
= 4.11 ft /s
Uniform Velocity Upstream
= 0.00 ft /s
Area Downstream
= 1.06 ft"2
Area Upstream
= 0.87 ft^2
Kj (JLC)
- NA
106
Calculated Junction Loss
= 0.210 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= WYE 5
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
•
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 27
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 27
Downstream Pipe
= Pipe 20
Pipe Material
= HDPE
Pipe Length
= 15.1379 ft
Plan Length
= 16.9000 ft
Pipe Type
.
= Circular
Pipe Dimensions
= 12.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 2.75 cfs
Invert Elevation Downstream
= 43.4000 ft
Invert Elevation Upstream
= 43.4900 ft
Invert Slope
= 0.59%
Invert Slope (Plan Length)
= 0.53%
Rim Elevation Downstream
= 52.0228 ft
Rim Elevation Upstream
= 52.3395 ft
Natural Ground Slope
= 2.09%
Crown Elevation Downstream
- 44.4000 ft
Crown Elevation Upstream
= 44.4900 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 0.50 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 2.75 min
Total Intensity
= 11.34 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 0.50 cfs
Uniform Capacity
= 2.75 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 44.7433 ft
HGL Elevation Upstream
= 44.7463 ft
HGL Slope
= 0.02 %
EGL Elevation Downstream
= 44.7496 ft
EGL Elevation Upstream
•
= 44.7526 ft
EGL Slope
= 0.02 %
Critical Depth
= 3.5184 in
Depth Downstream
= 12.0000 in
Depth Upstream
= 12.0000 in
107
Velocity Downstream
= 0.64 ft /s
Velocity Upstream
= 0.64 ft /s
Uniform Velocity Downstream
= 6.37 ft /s
Uniform Velocity Upstream
= 2.66 ft /s
Area Downstream
= 0.79 ft"2
Area Upstream
= 0.79 ft"2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.000 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= MH3 7
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= It g
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00
PIPE DESCRIPTION: Pipe 28
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
• Rainfall File
= Tutorial
- -PIPE INFORMATION--- -
Current Pipe
= Pipe 28
Downstream Pipe
= Pipe 27
Pipe Material
= HDPE
Pipe Length
= 31.5689 ft
Plan Length
= 31.5685 ft
Pipe Type
= Circular
Pipe Dimensions
= 12.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 2.54 cfs
Invert Elevation Downstream
= 43.4900 ft
Invert Elevation Upstream
= 43.6500 ft
Invert Slope
= 0.518
Invert Slope (Plan Length)
= 0.518
Rim Elevation Downstream
= 52.3395 ft
Rim Elevation Upstream
= 52.3278 ft
Natural Ground Slope
= -0.04W
Crown Elevation Downstream
= 44.4900 ft
Crown Elevation Upstream
= 44.6500 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 0.50 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 1.92 min
Total Intensity
= 11.82 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 0.50 cfs
Uniform Capacity
= 2.54 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 44.7463 ft
HGL Elevation Upstream
= 44.7525 ft
108
HGL Slope
= 0.02 %
EGL Elevation Downstream
= 44.7526 ft
EGL Elevation Upstream
= 44.7588 ft
EGL Slope
= 0.02 $
Critical Depth
= 3.5184 in
• Depth Downstream
= 12,0000 in
Depth Upstream
= 12.0000 in
Velocity Downstream
= 0.64 ft /s
Velocity Upstream
= 0.64 ft /s.
Uniform Velocity Downstream
= 2.51 ft /s
Uniform Velocity Upstream
= 2.51 ft /s
Area Downstream
= 0.79 ft'2
Area Upstream
= 0.79 ft "2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.000 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= BEND 8
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= *
Grate Efficiency
= * $
Slot Efficiency
•
= * $
Total Efficiency
= 0.00 $
PIPE DESCRIPTION: Pipe 29
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 29
Downstream Pipe
- Pipe 28
Pipe Material
= HDPE
Pipe Length
= 18.6440 ft
Plan Length
= 18.6437 ft
Pipe Type
= Circular
Pipe Dimensions
= 12.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 2.47 cfs
Invert Elevation Downstream
= 43.6500 ft
Invert Elevation Upstream
= 43.7400 ft
Invert Slope
= 0.48%
Invert Slope (Plan Length)
= 0.48%
Rim Elevation Downstream
= 52.3278 ft
Rim Elevation Upstream
= 50.9200 ft
Natural Ground Slope
= -7.55%
Crown Elevation Downstream
= 44.6500 ft
Crown Elevation Upstream
= 44.7400 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet input Flow
= 0.50 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
•
= 0.000
Total Time of Concentration
= 1.43 min
Total Intensity
= 12.12 in /hr
Total Rational Flow
- 0.00 cfs
Total Flow
= 0.50 cfs
109
Uniform Capacity
= 2.47 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION----
• HGL Elevation Downstream
= 44.7525 ft
HGL Elevation Upstream
= 44.7562 ft
HGL Slope
= 0.02 %
EGL Elevation Downstream
= 44.7588 ft
EGL Elevation Upstream
= 44.7625 ft
EGL Slope
= 0.02 %
Critical Depth
= 3.5184 in
Depth Downstream
= 12.0000 in
Depth Upstream
= 12.0000 in
Velocity Downstream
= 0.64 ft /s
Velocity Upstream
= 0.64 ft /s
Uniform Velocity Downstream
= 2.47 ft /s
Uniform Velocity Upstream
= 2.47 ft /s
Area Downstream
= 0.79 ft"2
Area Upstream
= 0.79 ft ^2
Kj (JLC)
= NA
Calculated Junction Lass
= 0.000 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= BEND 9
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
- 0.0000 ft
Intercept Efficiency
= . %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
•
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= . 96
Grate Efficiency
= • $
Slot Efficiency
= x %
Total Efficiency
= 0.00
PIPE DESCRIPTION: Pipe 30
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 30
Downstream Pipe
= Pipe 29
Pipe Material
= HDPE
Pipe Length
= 25.2574 ft
Plan Length
= 25.2571 ft
Pipe Type
= Circular
Pipe Dimensions
= 12.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 2.55 cfs
Invert Elevation Downstream
= 43.7400 ft
Invert Elevation Upstream
= 43.8700 ft
Invert Slope
= 0.51%
Invert Slope (Plan Length)
= 0.51%
Rim Elevation Downstream
= 50.9200 ft
Rim Elevation Upstream
= 49.2178 ft
Natural Ground Slope
= -6.74%
Crown Elevation Downstream
= 44.7400 ft
Crown Elevation Upstream
= 44.8700 ft
- -- -FLOW INFORMATION----
Catchment Area
= 0.00 ac
Runoff Coefficient
•
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
- 0.50 cfs
110
111
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 0.79 min
•
Total Intensity
Total Rational Flow
= 12.55 in /hr
= 0.00 cfs
Total Flow
= 0.50 cfs
Uniform Capacity
- 2.55 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 44.7562 ft
HGL Elevation Upstream
= 44.7597 ft
HGL Slope
= 0.01 %
EGL Elevation Downstream
= 44.7625 ft
EGL Elevation Upstream
= 44.7668 ft
EGL Slope
= 0.02
Critical Depth
= 3.5184 in
Depth Downstream
= 12.0000 in
Depth Upstream
= 10.6760 in
Velocity Downstream
= 0.64 ft /s
velocity Upstream
= 0.68 ft /s
Uniform velocity Downstream
= 2.53 ft /s
Uniform Velocity Upstream
= 2.53 ft /s
Area Downstream
= 0.79 ft^2
Area Upstream
= 0.74 ft"2
Kj (JLC)
= NA
Calculated Junction Loss
- 0.000 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= BEND 10
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
•
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * *
Grate Efficiency
= * *
Slot Efficiency
= *
Total Efficiency
= 0.00 $
PIPE DESCRIPTION: Pipe 31
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 31
Downstream Pipe
= Pipe 30
Pipe Material
= HDPE
Pipe Length
= 25.2574 ft
Plan Length
= 25.2571 ft
Pipe Type
= Circular
Pipe Dimensions
= 12.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 2.45 cfs
Invert Elevation Downstream
= 43.8700 ft
Invert Elevation Upstream
= 43.9900 ft
Invert Slope
= 0.488
Invert Slope (Plan Length)
= 0.48*
Rim Elevation Downstream
= 49.2178 ft
•
Rim Elevation Upstream
= 47.5157 ft
Natural Ground Slope
= -6,74*
Crown Elevation Downstream
= 44.8700 ft
Crown Elevation Upstream
= 44.9900 ft
111
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
•
= 0.50 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 0.21 min
Total Intensity
= 12.96 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 0.50 cfs
Uniform Capacity
= 2.45 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 44.7597 ft
HGL Elevation Upstream
= 44.7613 ft
HGL Slope
= 0.01 %
EGL Elevation Downstream
= 44.7668 ft
EGL Elevation Upstream
= 44.7705 ft
EGL Slope
= 0.01 %
Critical Depth
= 3.5184 in
Depth Downstream
= 10.6760 in
Depth Upstream
= 9.2559 in
Velocity Downstream
= 0.68 ft /s
Velocity Upstream
= 0.77 ft /s
Uniform Velocity Downstream
= 2.45 ft /s
Uniform Velocity Upstream
= 2.45 ft /s
Area Downstream
= 0.74 ft^2
Area Upstream
= 0.65 ft"2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.000 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= BEND 11
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
•
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00
PIPE DESCRIPTION: Pipe 32
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 32
Downstream Pipe
= Pipe 31
Pipe Material
= HDPE
Pipe Length
= 7.7501 ft
Plan Length
= 8.5000 ft
Pipe Type
= Circular
Pipe Dimensions
= 12.00 in
Pipe Manning's "n"
•
= 0.013
Pipe Capacity at Invert Slope
= 2.56 cfs
Invert Elevation Downstream
= 43.9900 ft
Invert Elevation Upstream
= 44.0300 ft
Invert Slope
= 0.52%
112
Invert Slope (Plan Length)
= 0.47%
Rim Elevation Downstream
= 47.5157 ft
Rim Elevation Upstream
= 46.8424 ft
Natural Ground Slope
= -8.69%
Crown Elevation Downstream
= 44.9900 ft
• Crown Elevation Upstream
= 45.0300 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 0.50 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 0.03 min
Total Intensity
= 13.10 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 0.50 cfs
Uniform Capacity
= 2.56 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 44.7613 ft
HGL Elevation Upstream
= 44.7580 ft
HGL Slope
= -0.04 $
EGL Elevation Downstream
= 44.7705 ft
EGL Elevation Upstream
= 44.7684 ft
EGL Slope
= -0.03 W
Critical Depth
= 3.5184 in
Depth Downstream
= 9.2559 in
Depth Upstream
= 8.7365 in
Velocity Downstream
= 0.77 ft /s
Velocity Upstream
= 0.82 ft /s
Uniform Velocity Downstream
= 2.53 ft /s
Uniform Velocity Upstream
= 2.53 ft /s
Area Downstream
= 0.65 ft "2
Area Upstream
= 0.61 ft^2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.015 ft
• - -INLET INFORMATION--- -
Downstream Inlet
= BEND 12
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * $
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfe
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * g
Grate Efficiency
= * g
Slot Efficiency
= * g
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 33
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
•
= Pipe 33
Downstream Pipe
= Pipe 32
Pipe Material
= HDPE
Pipe Length
= 3.7500 ft
Plan Length
= 4.7500 ft
113
114
Pipe Type
= Circular
Pipe Dimensions
= 12.00 in
Pipe Manning's "n°
= 0.013
Pipe Capacity at Invert Slope
= 2.60 cfs
Invert Elevation Downstream
= 44.4800 ft
Invert Elevation Upstream
= 44.5000 ft
•
Invert Slope
= 0.533
Invert Slope (Plan Length)
= 0.423
Rim Elevation Downstream
= 46.8424 ft
Rim Elevation Upstream
= 46.5278 ft
Natural Ground Slope
= -8.393
Crown Elevation Downstream
= 45.4800 ft
Crown Elevation Upstream
= 45.5000 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 0.50 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 0.00 min
Total Intensity
= 0.00 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 0.50 cfs
Uniform Capacity
= 2.60 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 44.7732 ft
HGL Elevation Upstream
= 44.8053 ft
HGL Slope
= 0.85 3
EGL Elevation Downstream
= 44.8787 ft
EGL Elevation Upstream
= 44.9021 ft
EGL Slope
= 0.62 3
Critical Depth
= 3.5184 in
Depth Downstream
= 3.5184 in
Depth Upstream
= 3.6281 in
Velocity Downstream
= 2.60 ft /s
•
Velocity Upstream
= 2.50 ft /s
Uniform Velocity Downstream
= 2.56 ft /s
Uniform Velocity Upstream
= 0.00 ft /s
Area Downstream
= 0.19 ft"2
Area Upstream
= 0.20 ft "2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.030 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= CB1 9
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * 3
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * 3
Grate Efficiency
= * 3
Slot Efficiency
= * 3
•
Total Efficiency
= 0.00 3
114
•
0
10 -YEAR STORM DRAIN
ANALYSIS
115
116
User
Name: mpompa
Date: 10 -12 -07
Project: 1786
STORM DRAIN
10 YR CALC_S
Time: 11:52:34
Network: 01 -
1786 STORM DRAIN 10 YR?
Page: 1
Storm Sewers
Summary Report
Pipe
Name
Total Plow
Pipe Dim
HGL Down
HGL Up
Invert Down
Invert Up
Downstream Junct:
cfs
in
ft
ft
ft
ft
Pipe
1
13.70
24.00
35.1847
35.9247
34.2200
34.9600
Outfall
Pipe
2
13.70
24.00
36.2930
37.6599
34.9600
35.7600
CONC COLLAR 1
Pipe
3
13.70
24.00
37.7099
38.6613*
35.8100
36.5900
MH1 1
Pipe
4
27.40
36.00
38.7013
38.5909
36.6400
36.7800
MH1 2
Pipe
5
24.00
36.00
38.7609
38.7592
36.7800
37.1800
WYE 1
Pipe
6
20.00
36.00
39.0192
39.9855
37.2200
38.5500
MH2 3
Pipe
7
5.00
18.00
38.7609
44.3760
37.6000
43.3600
WYE 1
Pipe
8
4.00
24.00
39.0358
40.0368
38.7200
39.5000
MH2 3
116
User Name: mpompa
Date: 10 -12 -07
Project: 1786 STORM DRAIN 10 YR CALCS
Time: 11:52:36
Network: 01 -
Page: 1
- -Storm Sewers
PIPE DESCRIPTION: Pipe 1
Detail Report
- - -- RAINFALL INFORMATION--- -
Return Period
= 10 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 1
Downstream Pipe
= Outfall
Pipe Material
= RCP
Pipe Length
= 44.5895 ft
Plan Length
= 44.5834 ft
Pipe Type
= Circular
Pipe Dimensions
= 24.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 29.13 cfs
Invert Elevation Downstream
= 34.2200 ft
Invert Elevation Upstream
= 34.9600 ft
Invert Slope
= 1.66%
Invert Slope (Plan Length)
= 1.66%
Rim Elevation Downstream
= 34.2200 ft
Rim Elevation Upstream
= 41.2700 ft
Natural Ground Slope
= 15.81*
Crown Elevation Downstream
= 36.2200 ft
Crown Elevation Upstream
= 36.9600 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 13.70 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 2.44 min
Total Intensity
= 8.30 in /hr
•
Total Rational Flow
= 0.00 cfs
Total Flow
= 13.70 cfs
Uniform Capacity
= 29.13 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 35.1847 ft
HGL Elevation Upstream
= 35.9247 ft
HGL Slope
= 1.66 %
EGL Elevation Downstream
= 36.4812 ft
EGL Elevation Upstream
= 37.2212 ft
EGL Slope
= 1.66 W
Critical Depth
= 15.9960 in
Depth Downstream
= 11.5767 in
Depth Upstream
= 11.5767 in
Velocity Downstream
= 9.13 ft /s
Velocity Upstream
= 9.13 ft /s
Uniform Velocity Downstream
= 0.00 ft /s
Uniform Velocity Upstream
= 9.13 ft /s
Area Downstream
= 1.50 ft "2
Area Upstream
= 1.50 ft ^2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.368 ft
- -- -INLET INFORMATION----
Downstream Inlet
= Outfall
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross - Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
•
Intercept Efficiency
= * !k
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
117
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
•
Depth at Pavement /Gutter Joint
Pavement Spread
= 0.0000 in
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 2
- - -- RAINFALL INFORMATION--- -
Return Period
= 10 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 2
Downstream Pipe
= Pipe 1
Pipe Material
= RCP
Pipe Length
= 236.5086 ft
Plan Length
= 239.2573 ft
Pipe Type
= Circular
Pipe Dimensions
= 24.00 in
Pipe Manning's -'n°
= 0.013
Pipe Capacity at Invert Slope
= 13.15 cfs
Invert Elevation Downstream
= 34.9600 ft
Invert Elevation Upstream
= 35.7600 ft
Invert Slope
= 0.34%
Invert Slope (Plan Length)
= 0.33%
Rim Elevation Downstream
= 41.2700 ft
Rim Elevation Upstream
= 40.2500 ft
Natural Ground Slope
= -0.43%
Crown Elevation Downstream
= 36.9600 ft
Crown Elevation Upstream
= 37.7600 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
•
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 13.70 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 1.69 min
Total Intensity
= 8.67 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 13.70 cfs
Uniform Capacity
= 13.15 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 36.2930 ft
HGL Elevation Upstream
= 37.6599 ft
HGL Slope
= 0.58 %
EGL Elevation Downstream
= 36.8828 ft
EGL Elevation Upstream
= 37.9669 ft
EGL Slope
= 0.46 %
Critical Depth
= 15.9960 in
Depth Downstream
= 15.9960 in
Depth Upstream
= 22.7985 in
Velocity Downstream
= 6.16 ft /s
Velocity Upstream
= 4.44 ft /s
Uniform Velocity Downstream
= 4.36 ft /s
Uniform Velocity Upstream
= 4.36 ft /s
Area Downstream
= 2.22 ft "2
Area Upstream
= 3.08 ft "2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.050 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= CONC COLLAR 1
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
•
Longitudinal Slope
= 0.00 ft /ft
Mannings n- value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
118
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * $
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
Total Flow to Current Inlet
= 0.00 cfs
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * $
Grate Efficiency
= *
Slot Efficiency
= *
Total Efficiency
= 0.00
PIPE DESCRIPTION: Pipe 3
- - -- RAINFALL INFORMATION--- -
Return Period
= 10 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 3
Downstream Pipe
= Pipe 2
Pipe Material
= RCP
Pipe Length
= 274.6055 ft
Plan Length
= 279.8739 ft
Pipe Type
= Circular
Pipe Dimensions
= 24.00 in
Pipe Manning's °n,'
= 0.013
Pipe Capacity at Invert Slope
= 12.05 cfs
Invert Elevation Downstream
= 35.8100 ft
Invert Elevation Upstream
= 36.5900 ft
Invert Slope
= 0.28%
Invert Slope (Plan Length)
= 0.28%
Rim Elevation Downstream
= 40.2500 ft
Rim Elevation Upstream
= 44.6700 ft
Natural Ground Slope
= 1.61%
Crown Elevation Downstream
= 37.8100 ft
•
Crown Elevation Upstream
= 38.5900 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
- 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 13.70 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 0.63 min
Total Intensity
= 9.24 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 13.70 cfs
Uniform Capacity
= 12.05 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 37.7099 ft
HGL Elevation Upstream
= 38.6613 ft
HGL Slope
= 0.35 %
EGL Elevation Downstream
= 38.0169 ft
EGL Elevation Upstream
= 38.9570 ft
EGL Slope
= 0.34 %
Critical Depth
- 15.9960 in
Depth Downstream
= 22.7985 in
Depth Upstream
= 24.0000 in
Velocity Downstream
= 4.44 ft /s
Velocity Upstream
= 4.36 ft /s
Uniform Velocity Downstream
= 4.36 ft /s
Uniform Velocity Upstream
= 4.36 ft /s
Area Downstream
= 3.08 ft "2
Area Upstream
= 3.14 ft"2
(JLC)
=
•
Calculated Junction Loss
C
0.
= 0.040 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= MH1 1
Inlet Description
= <None>
119
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
•
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 4
- - -- RAINFALL INFORMATION--- -
Return Period
= 10 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 4
Downstream Pipe
= Pipe 3
Pipe Material
= RCP
Pipe Length
= 14.5124 ft
Plan Length
= 16.5472 ft
Pipe Type
= Circular
Pipe Dimensions
= 36.00 in
Pipe Manning -s °n -I
= 0.013
Pipe Capacity at Invert Slope
= 65.48 cfs
Invert Elevation Downstream
= 36.6400 ft
Invert Elevation Upstream
•
= 36.7800 ft
Invert Slope
= 0.96%
Invert Slope (Plan Length)
= 0.85%
Rim Elevation Downstream
= 44.6700 ft
Rim Elevation Upstream
= 44.8580 ft
Natural Ground Slope
= 1.30%
Crown Elevation Downstream
= 39.6400 ft
Crown Elevation Upstream
= 39.7800 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 27.40 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 0.58 min
Total Intensity
= 9.27 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 27.40 cfs
Uniform Capacity
= 65.48 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 38.7013 ft
HGL Elevation Upstream
= 38.5909 ft
HGL Slope
= -0.76 %
EGL Elevation Downstream
= 39.1366 ft
EGL Elevation Upstream
= 39.1776 ft
EGL Slope
= 0.28 %
Critical Depth
= 20.3112 in
Depth Downstream
= 24.7358 in
Depth Upstream
= 21.7304 in
Velocity Downstream
•
= 5.29 ft /s
Velocity Upstream
= 6.14 ft /s
Uniform Velocity Downstream
= 8.85 ft /s
Uniform Velocity Upstream
= 8.85 ft /s
Area Downstream
= 5.18 ft^2
120
Area Upstream
= 4.46 ft ^2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.170 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= MH1 2
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * 9,
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * 9,
Grate Efficiency
= * %
Slot Efficiency
= * 96
Total Efficiency
= 0.00 W
PIPE DESCRIPTION: Pipe 5
- - -- RAINFALL INFORMATION--- -
Return Period
= 10 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 5
Downstream Pipe
= Pipe 4
Pipe Material
= RCP
•
Pipe Length
= 43.1477 ft
Plan Length
= 45.1458 ft
Pipe Type
= Circular
Pipe Dimensions
= 36.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 64.19 cfs
Invert Elevation Downstream
= 36.7800 ft
Invert Elevation Upstream
= 37.1800 ft
Invert Slope
= 0.93%
Invert Slope (Plan Length)
= 0.89%
Rim Elevation Downstream
= 44.8580 ft
Rim Elevation Upstream
= 45.4679 ft
Natural Ground Slope
= 1.41%
Crown Elevation Downstream
= 39.7800 ft
Crown Elevation Upstream
= 40.1800 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 24.00 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 0.45 min
Total Intensity
= 9.35 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 24.00 cfs
Uniform Capacity
= 64.19 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 38.7609 ft
HGL Elevation Upstream
= 38.7592 ft
•
HGL Slope
= -0.00 %
EGL Elevation Downstream
= 39.1261 ft
EGL Elevation Upstream
= 39.3887 ft
EGL Slope
= 0.61 $
Critical Depth
= 18.9504 in
121
Depth Downstream
= 23.7704 in
Depth Upstream
= 18.9504 in
Velocity Downstream
= 4.85 ft /s
Velocity Upstream
= 6.36 ft /s
Uniform Velocity Downstream
= 8.43 ft /s
Uniform Velocity Upstream
= 8.43 ft /s
Area Downstream
= 4.95 ft ^2
Area Upstream
= 3.77 ft "2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.260 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= WYE 1
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n- value
= 0.000
Pavement Crass -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= *
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 6
- - -- RAINFALL INFORMATION--- -
Return Period
= 10 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 6
Downstream Pipe
= Pipe 5
Pipe Material
= RCP
Pipe Length
= 138.5330 ft
Plan Length
= 140.5600 ft
Pipe Type
= Circular
Pipe Dimensions
= 36.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 65.32 cfs
Invert Elevation Downstream
- 37.2200 ft
Invert Elevation Upstream
= 38.5500 ft
Invert Slope
= 0.96%
Invert Slope (Plan Length)
= 0.95%
Rim Elevation Downstream
= 45.4679 ft
Rim Elevation Upstream
= 48.6300 ft
Natural Ground Slope
= 2.28%
Crown Elevation Downstream
= 40.2200 ft
Crown Elevation Upstream
= 41.5500 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
- 0.00 cfs
Inlet Input Flow
= 20.00 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 0.00 min
Total Intensity
= 0.00 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 20.00 cfs
Uniform Capacity
•
= 65.32 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
122
HGL Elevation Downstream
= 39.0192 ft
HGL Elevation Upstream
= 39.9855 ft
HGL Slope
= 0.70 %
EGL Elevation Downstream
= 39.3367 ft
EGL Elevation Upstream
= 40.5427 ft
EGL Slope
= 0.87 it
Critical Depth
= 17.2260 in
Depth Downstream
= 21.5904 in
Depth Upstream
= 17.2260 in
Velocity Downstream
= 4.52 ft /s
Velocity Upstream
= 5.99 ft /s
Uniform Velocity Downstream
= 8.13 ft /s
Uniform Velocity Upstream
- 0.00 ft /s
Area Downstream
= 4.43 ft"2
Area Upstream
= 3.34 ft ^2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.000 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= MH2 3
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * t
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
- 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
•
= *
Grate Efficiency
= * g
Slot Efficiency
= *
Total Efficiency
= 0.00
PIPE DESCRIPTION: Pipe 7
- - -- RAINFALL INFORMATION--- -
Return Period
= 10 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 7
Downstream Pipe
= Pipe 4
Pipe Material
= RCP
Pipe Length
= 110.1807 ft
Plan Length
= 119.5300 ft
Pipe Type
= Circular
Pipe Dimensions
= 18.00 in
Pipe Manning,s "n"
= 0.013
Pipe Capacity at Invert Slope
= 24.01 cfe
Invert Elevation Downstream
= 37.6000 ft
Invert Elevation Upstream
= 43.3600 ft
Invert Slope
= 5.23%
Invert Slope (Plan Length)
= 4.82%
Rim Elevation Downstream
= 44.8580 ft
Rim Elevation Upstream
= 48.8527 ft
Natural Ground Slope
- 3.63%
Crown Elevation Downstream
= 39.1000 ft
Crown Elevation Upstream
= 44.8600 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 5.00 cfs
Inlet Hydrograph Flow
•
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000 .
Total Time of Concentration
= 0.00 min
Total Intensity
= 0.00 in /hr
123
Total Rational Flow
= 0.00 cfs
Total Flow
= 5.00 cfs
Uniform Capacity
= 24.01 cfs
Skipped flow
= 0.00 cfs
•
Infiltration
-- HYDRAULIC INFORMATION--- -
= 0.00 gpd
HGL Elevation Downstream
= 38.7609 ft
HGL Elevation Upstream
= 44.3760 ft
HGL Slope
= 5.10 %
EGL Elevation Downstream
= 38.9414 ft
EGL Elevation Upstream
= 44.7294 ft
EGL Slope
= 5.26 %
Critical Depth
= 10.3266 in
Depth Downstream
= 13.9304 in
Depth Upstream
= 10.3266 in
Velocity Downstream
= 3.41 ft /s
Velocity Upstream
= 4.77 ft /s
Uniform velocity Downstream
= 15.73 ft /s
Uniform Velocity Upstream
= 0.00 ft /s
Area Downstream
= 1.47 ft"2
Area Upstream
= 1.05 ft"2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.440 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= WYE 1
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
•
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 8
- - -- RAINFALL INFORMATION--- -
Return Period
= 10 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 8
Downstream Pipe
= Pipe 5
Pipe Material
= RCP
Pipe Length
= 7.2867 ft
Plan Length
= 10.9500 ft
Pipe Type
= Circular
Pipe Dimensions
= 24.00 in
Pipe Manning's 'In"
= 0.013
Pipe Capacity at Invert Slope
= 73.98 cfs
Invert Elevation Downstream
= 38.7200 ft
Invert Elevation Upstream
= 39.5000 ft
Invert Slope
= 10.77%
Invert Slope (Plan Length)
= 7.12%
Rim Elevation Downstream
= 45.4679 ft
Rim Elevation Upstream
= 45.9625 ft
Natural Ground Slope
= 6.79
Crown Elevation Downstream
= 40.7200 ft
Crown Elevation Upstream
= 41.5000 ft
•
= 0.00 ac
= 0.000
= 0.00 min
= 0.00 in /hr
124
= 39.0358 ft
= 40.0368 ft
= 13.82 %
= 41.4919 ft
= 42.4930 ft
= 13.82 %
= 8.4192 in
= 3.7891 in
= 3.7891 in
= 12.57 ft /s
= 12.57 ft /s
= 19.24 ft /s
= 0.00 ft /s
= 0.32 ft"2
= 0.32 ft"2
= NA
= 0.090 ft
= MH2 3
= <None>
= 0.00 ft /ft
= 0.000
= 0.00 ft /ft
0.00 ft /ft
= 0.0000 in
• = 0.0000 ft
= 0.0000 ft
0.00 cfs
0.00 cfs
0.00 cfs
= 0.00 cfs
= 0.00 cfs
0.00 cfs
0.00 cfs
0.0000 in
0.0000 in
0.0000 ft
= 0.0000 ft
= 0.00 ft /s
* $
Slot Efficiency = * $
Total Efficiency = 0.00 %
C
125
= 0.00 cfs
= 4.00 cfs
= 0.00 cfs
= 0.00 ac
= 0.000
= 0.00 min
= 0.00 in /hr
= 0.00 cfs
= 4.00 cfs
= 73.98 cfs
= 0.00 cfs
= 0.00 gpd
= 39.0358 ft
= 40.0368 ft
= 13.82 %
= 41.4919 ft
= 42.4930 ft
= 13.82 %
= 8.4192 in
= 3.7891 in
= 3.7891 in
= 12.57 ft /s
= 12.57 ft /s
= 19.24 ft /s
= 0.00 ft /s
= 0.32 ft"2
= 0.32 ft"2
= NA
= 0.090 ft
= MH2 3
= <None>
= 0.00 ft /ft
= 0.000
= 0.00 ft /ft
0.00 ft /ft
= 0.0000 in
• = 0.0000 ft
= 0.0000 ft
0.00 cfs
0.00 cfs
0.00 cfs
= 0.00 cfs
= 0.00 cfs
0.00 cfs
0.00 cfs
0.0000 in
0.0000 in
0.0000 ft
= 0.0000 ft
= 0.00 ft /s
* $
Slot Efficiency = * $
Total Efficiency = 0.00 %
C
125
.7
•
FEMA MAP
HKI
H
ZONE X
La Quinta Evacuation
APPROXIMATE SCALE IN FEET
1000
2CLr�'kiTt1Y.� "` .F -` :•� . >�., �}�... �� vY.'` 0 1000
tT
NATIONAL FLOOD INSURANCE PROGRAM
FIN
FLOOD INSURANCE RATE MAP
CITY OF
LA QUINTA,
CALIFORNIA
RIVERSIDE COUNTY
PANEL50F10
'!:.' �;;, :•!• (SEE MAP INDEX FOR PANELS NOT PRINTED)
;t .. ..
PANEL LOCATION
-.COMMUNITY-PANEL NUMBER
060109 0005 B
�I
MAP REVISED:
AUGUST 19, 1991
Federal Emergency Management Agency
This is an ot(Icial copy of a portion of the above referenced flood map. It
was extracted using F-MIT 0r 1_lne. This map does not reflect changes
or amendments which may have been made subsequent to the date on the
title block. For the latest product information about National Flood Insurance
Program flood maps check the FEMA Flood Map Store at www.msc.feme.gov
•
• HYDROLOGIC
SOIL GROUP MAP
C
128
kl: I.
42'30"
• RIVERSIDE COUNTY, CALIFORNIA 77
TABLE 12. —Soil and water features
[Absence of an entry indicates the feature is not a concern. See text for descriptions of symbols and such terms as "rare,"
"brief," and "Perched." The symbol < means less than; > means greater than].
•
•
Soil name and
map symbol
Hydro-
logic
group
Flooding
High water table
Bedr6ck
Frequency
Duration
Months
Depth
Kind
Months
Depth
Hardness
Ft
B&AIand:
BA.
Borrow pits:
BP.
Bull Trail:
BtE-----------------
B
None - - - - -•
--------------
------------
>6.0
--------------
------------
>60
..........
C18%
A
None
-----------------
- - - - --
--------------
------------
>6.0
--------------
------------
>60
- --- - - - ---
Cajon Variant:
cbD-----------------
A
None - - -- --
--------------
------------
>6.0
--------------
------------
>60
----------
Carrizo:
CCC-----------------
A
Rare- - - - - --
--------------
------------
>6.0
--------------
------------
>eo
Carsitas:
CdC, Cd E, C hC, C k B.
A
None - - - - --
--------------
------------
>6.0
--------------
------------
>60
CI`B ------------------
A
None - - - - --
-------- - - - ---
------ -- - - --
2.0-4.0
Apparent-----
Jan- Dec- - --
>60
----------
----------
Carsitas Variant:
C m 8, C m E -----------
C
None - - - - --
--------------
------------
>6.0
--------------
------------
6-20
Rippable.
Chuckawalla:
Co B, Co D, CnC, CnE.
B
None - - - - --
--------------
------------
>6.0
--------------
------------
>60
----------
CAPNe"WQA:
tjEA
(D
None ------
None
--------------
------------
>6.0
--------------
- ----- ----- -
>60
- - --------
-----------------
------
--------------
------------
3.0 -5.0
Apparent -----
Jan - Dec - - --
>60
----------
Fluvaquents:
Fa-- ------- ---- -- ----
D.
Frequent__-
Very long___ --
Apr- Sep -- --
0.5-2.0
Apparent-_---
Jan-Dec -- --
>60
----------
Fluvents:
Fe-- ---- -- ----- -- - - --
A/D
Occasional__
Very brief- ---
Jan-Dec__
>6.0
--------------
------------
>60
---- -- - - --
Oilman:
GaB I GbA,GbB,GeA.
B
Rare-- - - - --
--------------
------------
>0.0
--------------------------
>60
----------
GcAl GdA, GfA ------
B
None______
--------------
------------
3.0-5.0
Apparent__ -__
Apr-Oct____
>60
----------
I
aravPel pits and dumps:
G .
Imperial:
'
IeA------------------
D
None ---- --
--------------
------------
>6.0
--------------
------------
>60
----------
IfA ------------------
D
None - - - - --
--------------
------------
1.0-3.0
Apparent - - - --
Jan - Dec - - --
>60
----------
Imcl:
Imperial part- - - - - --
GX-ed land
D
None-- - - --
--------------
------------
>6.0
--------------
------------
>60
----------
part.
Imperial:
roc 1:
Imperial part -------
Guiedland
D
None- -- - --
--------------
-------------
1. 5-5. 0
Apparent -----
Jan- Dec___.
>60
- -
- - --- --
-
part.
Indio:
IP, Is----- ----- -- -- --
B
None --- ---
---------------------------
>6.0
--------------
------------
>60
----------
Ir, It---------- - - -- --
B.
None- -- - --
--------------
------------
3.0-5.0
Apparent-----
Jan- Dec -- --
>60
----------
Uthic Torn' .,
psamments
L R J .
Lithic
Torripsamments paA."
D
None - - ----
--------------
------------
>6.0
--------------
------------ -
1-10
Hard.
Rock outcrop part.
130
•
C,
•
78 SOIL SURVEY
TABLE 12. Soil and water features— Continued
Soil name and
map symbol
Hydro-
logic
group
Flooding
High water table
Bedrock
Frequency
Duration
Months
Depth
Kind
Months
Depth
Hardness
Ft
In
Myoma �Ma6
MaD ---------
None -- - - --
-------- - - - - --
------ - - - - --
>6.0
-----------
----- - - - - --
>60
McB - - -- - ---
-
None - - - - --
- ------ - - - - - --
------ -- - - --
1.5 -5.0
Apparent -- -__
Jan - Dec - - --
>60
---- - - - - --
_
Niland:
NaB------- ---- --- - --
NbB-----------------
C
C
None ------
None
------- - - - - --
--- --- - - - - --
>6.0
-- -- -- -- - - - - --
Apparent
-- ---- - - - ---
>60
----------
- - - - --
--- ----- - - - ---
------ - - - - --
1.5 -5.0
- - - --
Jan - Dec - - --
>60
---- - --- --
Omstott:
OmD- ------- -- - - -- --
C
None- - - - --
-- ------ - - - - --
------ - -- - --
>6.0
- -- ---- - - --- --
- ----- -- - - --
4-20
Rippable.
Or':
Omstott part- - -- --.
Ruck outcrop part.
C
None -- - - --
------- - -- ----
- ----- -- - - --
>6.0
------- - - - - ---
------ - - - - --
4-20
Rippable.
Riverwash:
RA.
Ruck outcrop:
RO.
RTi:
Rock outcrop part.
Lithic
Torripsamments part.
D
None - -----
-- --- --- -- - ---
---------------
---- -- - -- - --
1 -10
Hard.
Rubble land:
RU.
Salton:
Sa, Sb- -------- - - - - --
D
None- -- - --
--- -- --- ---- --
--- -- -- - - ---
2.0 -5.0
Apparent - -- --
Jan- Dec - - --
>60
--
Soboba:
SoD, SpE------ - - - - --
A
None - - - - --
--- ----- - - - - --
- ----- - - - - --
>6.0
-------- - -- - --
---- -- - - - - --
>60
---- --- - --
Torriorthents:
TO 1:
Torriorthents part.
Ruck outcrop part.
Tuj ri
TrC, Ts B--
p , - -- --
A
None - - - - --
-- -- ---- - - - - --
-- -- -- --- - --
>6.0
- ------ - - - - ---
------ - -- - --
>60
- --- - -- ---
'This mapping unit is made up of two or more dominant kinds of soil. See mapping unit description for the composition and
behavior of the whole mapping unit.
parent; and the months of the year that the water
table commonly is high. Only saturated zones above a
depth of 5 or 6 feet are indicated.
Information about the seasonal high water table
helps in assessing the need for specially designed
foundations, the need for specific kinds of drainage
systems, and the need for footing drains to insure dry
basements. Such information is also needed to decide
whether or not construction of basements is feasible
and to determine how septic tank absorption fields and
other underground installations will function. Also, a
seasonal high water table affects ease of excavation.
Depth to bedrock is shown for all soils that are
underlain by bedrock at a depth of 5 to 6 feet or less.
For many soils, the limited depth to bedrock is a part
of the definition of the soil series. The depths shown
are based on measurements made in many soil borings
131
and on other observations during the mapping of the
soils. The kind of bedrock and its hardness as related
to ease of excavation is also shown. Rippable bedrock
can be excavated with a single -tooth ripping attach-
ment on a 200 - horsepower tractor, but hard bedrock
generally requires blasting.
Formation, Morphology, and
Classification of the Soils
This section contains descriptions of the major fac-
tors of soil formation as they occur in the Coachella
Valley Area, a summary of significant morphological
characteristics of the soils of the Area, ail 'explanation
of the current system of classifying soils `'by categories
broader than the series, and a table showing the clas-
Riverside i ounty_ [,a 1
A
lift
• � i '1 ',4 Pq 1 // � AxI � '7s/� �r
f
l� {}
�1 .?" - �s¢sri: / .�;.. � nI e _ ,�r f r/ L f �•F� -li .,t��' ��.� .�� rk? i � ,( ',<
:..-. - .,cam i�iJi �' -•fP% Y, 1 j..�v ;..l f.. �pi�. � "'r ''�'.,�:::�.Qj-... '� -
���� l � � � f � �_y_- ff' � Yys ,,j r � - t {f� ,ny �••�.� � ' .
! ;=k"a�i -F'� '�F Lo. � .`Y'P•r P :t(j3'+�'� s�'f r. l' y�! i7 ;�:. " 'F y, ..t_
f lam
I ��j�f� �'�' -�s': »:ka. .:�.�>�k�.. �1%•�`�'t��?i�i{��;:z* .,;elf
nr jl•Fd! 'r-- '":`ti:;..` - GOV,
gg
•"_"-`-- �- ...^�."�'r > :: x� is .;, .} . h <. "= .c'1 :.:- .-�:ri?R. ! -" ;�'F
j
!1' -d`t r r� •:+`�3. �"�' -t"i'i ice- fz^'n s'�
r _ �x >',a7>.,
t �j,'- tkd c9' lb r v" •w" �r`` y`,� "y, '�',n..fi,:
Ai
��.s+sg.L`�'4 "M a.
��v✓"" "•4 =''� a- •- �y��`• �a��.+a..f'"� ""..,r•::t:?a z,D3- 4 ,e.�d•:,?:
.�{
k�.G— s ?FS F 3 :K fish �k y
4` t -ibp z
v
,
r�
U
• HYDROLOGY MAP
n
U
133
KM
�
•
LEGEND
............
DEVELOPED AREA
ORI"
Swt -40'
-- - - - - - - - - - - - - - -
- - - - - - - - - - - -
L-671
-T - : 11.1 ) :
AA04
ffl�l
IJY
4P L
'M
_.-�►
�
�-���
m;�
�
� --fig
_
..��
IN
ffl�l
IJY
4P L
. STORM DRAIN
IMPROVEMENT PLANS
0
135
P.O. Box 1504
LA QUINTA, CALIFORNIA 92247 -1504
78 -495 CALLE TAMPICO
LA QUINTA, CALIFORNIA 92253
April 21, 2009
Mr. Steve Robbins
Coachella Valley Water District
P.O. Box 1058
85 -955 Avenue 52
Coachella; CA 92236
RE: Wolf Waters Affordable Housing Project
Dear Mr. Robbins:
(760) 777 -7000
FAX (76.0) 777 -7101
Wolf Waters is a housing project to be developed by La Quinta Housing Associates, L.P.
(the "Partnership "), to be located at the northwest corner of Dune Palms and Avenue 48
in the City of La Quinta. The Coachella Valley Housing Coalition ( "CVHC ") ' is the
general partner of the Partnership.
The City of La Quinta has reviewed the improvement plans, specifically the proposed
storm drain outlets into the Whitewater River Watershed, and is hereby certifying that the
proposed storm drain system meets the requirements of the National Pollutant Discharge
Elimination System permit and Waste Discharge Requirements for the discharge of storm
water in the Whitewater River Watershed, also known as the MS4 Permit. This
certification applies to the requirements included in the Drainage Area Management Plan,
Storm Water Management Plan, Storm Water Pollution Prevention Plan and Water
Quality Management Plan described in the MS4 Permit.
The City of La Quinta acknowledges that 100 year storm conditions create a ponding
condition slightly west and north of the Dune Palms /Avenue 48 intersection and would
inundate Storm Drain Manholes No. 1, 2 & 3. This inundation and potential overflow of
the storm drain manholes during the 100 year storm condition is acceptable to the City of
La Quinta.
I hope this meets with your approval. Please let me know if you need additional
'information, or if you have any questions on this project.
Sincerely,
dimothy o s n, PE
Public Works erector /City Engineer
cc: Doug Evans, Brian Peulicke (CVHC), Les Johnson,(Ed=Wimmer
Vl:LANNING B CIVIL ENGINEERING ■ L,AND'SURVEYING
etter of Transmittal
Date: April 2, 2009 Via: Hand Deliver ;
Job #: 1786
To: Paul D Goble Senior Engineer
CITY OF LA QUINTA Public Works/ Development Service
78-495 Calle Tampico
La Quinta, CA 92253
From: Cherie Murphy
Re: Final Phase Offsite Storm Drain Plans 2nd Submittal
Project: CVHC — Wolf Waters
CC: Brian Peulicke
❑ Urgent Z For Review ❑ Please Comment ® As Requested ❑ Other
QTY.
ITEM ' E s„ :
1 set
Final Phas i sif6 Storhj train Improvement Plans (prints)
RECEIVED
1 set
Fina iW0c§ iR Improvement Plans 1 plan check comments
R 0 2 2009
1 ea.
BMP and Calculations
Se
0 Comments: Paul,
Attached please find a bond copy of the "Final Phase - Offsite Storm Drain Plans ". We are providing a bond set to
get your approval prior to submitting mylars to CVWD for signatures. Per your direction, CVWD shall sign the
mylars prior to City signatures. As requested, we have included the response to comments, BMP Letter, BMP
Calculations and the original plan check set. Please notify us at your earliest convenience if our re- submittal
meets your approval and we will begin the CVWD approval process. Below in italics are responses to plan check
comments.
34200 BOB HOPE DRIVE 0 RANCHO MIRAGE 0 CALIFORNIA 0 92270
760 - 320 -9811 0 760- 323 -7893 FAX 0 www.MSACoNSULTINGINC.COM
ices
All Sheets: Please identify the potential location of a 5th drywell for an additional injection location or for a future
replacement site. We have added geometry and a note on the cover sheet specifying future location of
drywell as needed.
2. Sheet 1: Please clarify the proposed 3.7 acres of reduced tributary area from onsite infiltration basins on the
index map. Please provide final WQMP and related synthetic unit hydrology calculations. Please formalize the
partial document sent to Public Works by email on 3/11/2009. Please highlight and identify all drywell and storm
drain locations on the index map. We have identified all BMP self contained areas, all storm drain lines and
drywell locations on the index map.
3. Sheets 1, 2 & 4: Please provide CVWD signature blocks or equal showing CVWD approval. We have added
the CVWD signature block to all pertinent sheets.
4. Sheet 2: Please correct HDPE storm pipe callout and indicate use of RCP as redlined. We have revised the
callout
5. Sheet 3: Please clarify use of 3 interceptors and 4 drywells. Modify construction notes as required. We have
split up note 8 into two specific. notes for the drywells and interceptors.
6. Sheet 3: Please relocate sidewalk to avoid placement of drywells within. the sidewalk surface. Callout bolted
covers, concrete collars at drywell access as required. We have moved all drywells and interceptors out of the
sidewalk to avoid installing concrete collars. The bolted covers are specified in the Maxwell plus detail on
sheet 4.
7. Sheet 3: Please call out inlet vault floor elevations to clarify construction detail and absence of sumps as
applicable. We have indicated on plan vault floor elevation.
Please call if you have any questions.
34200 BOB HOPE DRIVE ■ RANCHO MIRAGE ■ CALIFORNIA ■ 92270
760 - 320 -9811 ■ 760 - 323 -7893 FAX ■ www.MSACONSULTINGINC.COM
T-VY 4 4a"
P.O. Box 1504
LA QUINTA, CALIFORNIA 92247 -1504
78 -495 CALLE TAMPICO
LA QUINTA, CALIFORNIA 92253
TRANSMITTAL MEMO
TO: Engineer of Record
PUBLIC WORKS DEPARTMENT
(760) 777 -7075
FAX (760) 777 -7155
SUBJECT: PCN 09037 COACHELLA VALLEY HOUSING COALITION (CVHC)
PM 33588 OFF -SITE STORM DRAIN - FINAL
DATE: March 27, 2009
INSTRUCTIONS TO APPLICANT:
1) Please provide a written response to each comment on the following pages or in
green line on the redlined plans.
2) Please revise originals and reprint Plans and/or. Calculations as necessary for
corrections.
3) Please return all red - marked Plans, Back -Up Documents, Specifications,
Calculations or Reports with the resubmittal.
4) Please assure that each sheet of the resubmitted Plans and the title, cover or
signature sheet of the Documents, Specifications, Calculations or Reports
include the preparer's name and telephone number and are wet - signed and
stamped by the licensed preparer as prescribed by California Business and
Professions Code Section 5536 (Architects) and Section 6735 (Civil Engineers).
Resubmittals will not be accepted with signatures missing.
5) Please return this list, your written responses, and all documents listed above with
your resubmittal.
REQUESTED PUBLIC WORKS CORRECTIONS (1St Round Check):
All Sheets: Please identify the potential location of a 5th drywell for an additional
injection location or for a future replacement site.
2. Sheet 1: Please clarify the proposed 3.7 acres of reduced tributary area from
onsite infiltration basins on the Index Map. Please provide final ,WQMP and related
synthetic unit hydrology calculations. Please formalize the partial document sent
to Public Works by email on 3/11/2009. Please highlight and identify all drywell
and storm drain locations on the Index Map.
3. Sheets 1, 2 & 4: Please provide CVWD signature blocks or equal showing CVWD
approval.
4. Sheet. 2: Please correct HDPE storm pipe callout and indicate use of RCP as
redlined.
5. Sheet 3: Please clarify use of 3 interceptors and 4 drywells. Modify construction
notes as required.
6. Sheet 3: Please relocate sidewalk to avoid placement of drywells within the
sidewalk surface. Callout bolted covers, concrete collars at drywell access as
required.
7. Sheet 3: Please call out inlet vault floor elevations to clarify construction detail and
absence of sumps, as applicable.
Please fully correct and submit signed mylars with CVWD approvals.
Sincerely,
imothy R. on s on, P.E.
Public Works Di ector/ City Engineer
Q
Paul Goble
From
Sent:
To:
Cc:
De LaTorre, Julian [JDeLaTo
Wednesday, March 11, 2009
Tim Jonasson
Ed Wimmer; Paul Gobl
Subject: FW: 1786 CVHC Dune
Attachments: 1786 Shortcut Method/
Tim and Staff,
Page 1 of 2
Rgmsaconsultinginc.com]
09 PM
rian Peulicke; Witherspoon, Michelle; Mike Troth
ms - Revised BMP System - first 3/8 inch of 100 year storm
Syn Hydro.pdf; 1786 BMP Exh 3- 8th.pdf
Thank you for the opportunity to pr pose a revised approach to the BMP system for Wolfe Waters (CVHC Dune
Palms). Our goal is to provide the alculations to support a BMP system that complies with the requirements of
MS4 and the City. In addition, our goal is to design a cost effective and practical system.
The new and improved approac thel Infiltrate the runoff fr m the first 3/8 inch of rainfall in -year storm
Here is the technical backup t support the new approach. L
1. The 100 -year, 24-houollorm was chosen because this storm represents te wojCse case scenario the
four 100 -year storms hr 3 -hr, 6 -hr,& 24 -hr). The 24 -hour storm produces and effective rain o 2.61
inches per acre of run see Shortcut Method Synthetic Unit Hydrograph attached).
2. As shown on the Synthetic Hydrogra a first 3/8 inch of rainfall, which represents 9 percent of the
storm, falls in the first 9 intervals_ . hours of the storm. The Synthetic Hydrograph is based on 1.0 acre
of tributary area. W t$.— , 5.0 L.1>
3. Also, as shown in the ninth interval, the FLOW is 0.0825 cubic feet per second (cfs) per acre.
4. The project consists of 3.4 acres of offsite area and 13.6 acres onsite. Of the 13.6 onsite acres, 3.7 acres
are tributary to the small retention basins throughout the site; therefore reducing the onsite acres to 9.9
acres.
5. Using the maximum FLOW rate and the off and onsite area, we can determine the BMP facility for offsite
flow will have to handle 0.28 cfs (3.4 x .0825) and the onsite facility will have to handle 0.82 cfs (9.9
x .0825).
6. Maxwell Plus Drywells are designed to infiltrate 0.25 cfs. If that rate is acceptable, we propose one (1)
drywell for the offsite runoff and three (3) drywells for the onsite runoff.
7. We propose to install the four drywells in the parkway along Dune Palms Road (see sketch attached).
We also request a variance for the drywell separation to 70 -feet. Torrent Resources (company that installs
Maxwell drywells) states minimum separation for cities in Arizona and Nevada is 50 -feet, and doesn't
anticipate any issues with drywells in this area at 70 -feet. In addition, all onsite underground and most of
the above ground infrastructure is in place; the excavation required and drilling operation is a huge
challenge.
I realize these calculations, like many calculations, can be scrutinized and questioned; however we need to keep
in mind that we are trying to design a system that meets the Maximum Extent Practicable (MEP) standard, and
this is our nrnnnsal fnr a nracticabte solution.
Julian A
Principal
3/12/2009
y_
♦ �''1l/Ktr^i..�:,'i'M.. rf,:�.*y• ,,,./.iL.4y�.:,n �..., � ,.r
t
d4 .i
`r 7.'i1Q 4wJWw;wJ '
I ?
a
I'�-•'
_�
Sy�wf.�i "'1f' - w �'.'.'�M'Yi �uA1 ifYM
i�
2
i
0
I
11 I
is I
! 1
a 1
a
1 � I
I I I
I I
I I
I I
I
1
I
I
I I
1 I
I I
11
I
►1
I 1
I I
I I I
i I
i I
I
1;
I'
I
I
I
r
� 1 I
I
'} 7A 11JOAd,
1 I I
I I I1
I I i
I I
0
lll;
itll;
Illi
•
Itl�
111 {�
111
tl�l
;111
Illr.
� M
4zt�t�l
Illli)
t!hI
�- 111p
1
Ilily
li4
gt !,+tl
MI
� tllt
IN
Z
WH
Cm
ZI
QX
MW
�C }
G �
0(o
QJ
�LL
Z
WU
Z
U
9
- - -- •Ash_--- •--- �- --�� -� -• -- -- ;
! I I
8f 31 -IN3Ad I I I I
I
ir{ ._- ____---- F_�_
i
I
I
2A
I I n
M AX` `l vo
�.
Vs\
Z5'
31 S
30
377
3S
yy �
yJ
500
5
566
q,04�.
0
5
1
6 o 17s3
11
FiR5i Ye 0.F TAE too YMR, $-log 'I
R C F C& W C D
GNDU3OdOC'l
mmdlm
"SHORTCUT METHOD"
SYNTHETIC UNIT HYDROGRAPH METHOD
Unit Hydrograph and Effective Rain
Calculation Form
Project
1786 CVHC Dune Palms
Sheet
1
By JAD Date
Chocked Data
[11 CONCENTRATION POINT -
[3] DRAINAGE AREA -ACRES 1.0D
[5] UNIT TIME - MINUTES VO,
[7] UNIT TIME - PERCENT OF LAG 1100'15FM) -
191 STORM FREQUENCY & DURATION 100 -YR, 244IR
[11] VARIABLE LOSS RATE (AVG)- INCHESIHOUR -
1`131 CONSTANT LOSS RATE- INCHESMOUR 0.14
[2] AREA DESIGNATION -
[4] ULTIMATE DISCHARGE -CFS- HRSIIN (645•[3]) -
[8] LAG TIME - MINUTES -
[E] S -CURVE -
[10] TOTAL ADJUSTED STORM RAIN4NCHES 4.25
[121 MINIMUM LOSS RATE (FOR VAR. LOSS)4N/HR -
[M LOW LOSS RATE- PERCENT 26
UNIT HYDROGRAPH
EFFECTIVE RAIN
FLOOD
HYDROGRAPH
1151
UNIT
TIME
PERIOD
M
[16]
TIME
PERCENT
OF LAG
Vrll5]
[171
CUMULATIVE
AVERAGE
PERCENT OF
ULTIMATE
DISCHARGE
(S- GRAPH)
1161
DISTRIB
GRAPH
PERCENT
[17]m- [17]m4
[17]
UNIT.
HYDROGRAPH
CFS -HRSIlN
r4rr16I
100.000
[20]
PATTERN
PERCENT
(PL E-5.9)
[211
STORM
RAIN
INIHR
60 tf 0IT201
[22)
LOSS
RATE
IN/HR
1231
EFFECTIVE
RAIN
INMR
[21]-[221
[24]
FLOW
CFS
100[51
MAX
LOW
1
0.5
0.043
0.140
0.011
0.031
0.0317
2
0.7
0.060
0.140
0.015
0.044
0.0444
3
0.6
0.051
0.140
0.013
0.038
0.0381
4
0.7
0.060
0.140
0.015
0.044
0.0444
5
0.8
0.068
0.140
0.018
0.050
0.0507
6
1.0
0.085
0.140
0.022
0.063
0.0634
7
1.0
0.085
0.140
0.022
0.083
0.0634
8
1.1
0.094
0.140
0.024
0.069
0.069.8
199r*,
1.3
0.111
0.140
0.029
0.082
Il0.08251
0.14
0.033
.094
0. 1
11
1.3
0.111.
0.140
0.029
0.082
0.0825
12
1.6
0.136
0.140
0.035
0.101
0.1015
13
1.8
0.153
0.140
0.040
0.013
0.0131
14
2.0
0.170
0.140
0.044
0.030
0.0302
15
2.1
0.179
0.140
0.046
0.039
0.0388
16
2.5
0.213
1 0.140
0.055
0.073
0.0731
17
3.0
0.255
0.140
0.066
1 0.115
0.1160
18
3.3
0.281
0.140
0.073
0.141
0.1417
19
3.9
0.332
0.140
0.086
0.192
0.1931
20
4.3
0.366
0.140
0.095
0.226
0.2274
21
3.0
0.255
0.140
0.066
0.115
0.1160
22
4.0
0.340
0.140
0.088
0.200
0.2017
23
3.8
0.323
0.140
0.084
0.183
0.1845
24
3.5
0.298
0.140
0.077
0.158
0.1588
25
5.1
0.434
0.140
0.113
0.294
0.2959
26
5.7
0.485
0.140
0.126
0.345
0.3474
27
6.8
0.578
0.140
0.150
0.438
0.4416
28
4.6
0.391
0.140
0.102
0.251
0.2531
29
5.3
0.451
0.140
0.117
0.311
0.3131
30
5.1
0.434
0 140
0.113
0.294
0.2959
31
4.7
0.400
0.140
0.104
0.260
0.2617
32
3.8
1 0.323
0.140
0.084
0.183
0.1845
33
0.8
0.068
0.140
0.018
0.050
0.0507
34
0.6
0.051
0.140
0.013
1 0.038
0.0381
35
1.0
0.085
0.140
0.022
1 0.063
0.0634
36
0.9
0.077
0.140
0.020
0.057
0.0571
37
0.8
0.068
0.140
0.018
0.050
0.0507
38
0.5
0.043
0.140
0.011
0.031
0.0317
39
0.7
0.060
0.140
0.015
0.044
0.0444
40
0.5
0.043
'0.140
0.011
0.031
0.0317
41
0.6
0.051
0.140
0.013
0.038
0.0381
42
0.5
0.043
0.140
0.011
0.031
0.0317
43
0.5
0.043
1 0.140
0.011
0.031
0.0317
44
0.5
0.043
0.140
0.011
0.031
0.0317
45
0.5
0.043
0.140
0.011
0.031
0.0317
46
0.4
0.034
0.140
0.009
0.025
0.0254
47
0.4
0.034
0.140
0.009
0.025
0.0254
48
0.4
0.034
0.140
0.009
0.025
0.0254
TOTALS
100.0
5.220
5.2639
EFFECTIVE RAIN = 2.610 INCHES .
TOTAL RUNOFF VOLUME = 0.22 AC-FT
CUM.
volume volume
(aaft) (ao ft)
0.0013 0.0013
0.0018 0.0031
0.0016 0.0047
0.0018 0.0066
0.0021 0.0086
0.0026 0.0113
0.0026 0.0139
0.0029 0.0168
0.0034 0.0202
0.0039 0.0241
0.0034 0.0275
0.0042 0.0317
0.0005 0.0323
0.0012 0.0335
0.0016 0.0351
0.0030 0.0381
0.0048 0.0429
0.0059 0.0488
0.0080 0.0568
0.0094 0.0661
0.0048 0.0709
0.0083 0.0793
0.0076 0.0869
0.0068 0.0935
0.0122 0.1057
0.0144 0.1200
0.0182 0.1383
0.0105 0.1488
0.0129 0.1617
0.0122 0.1739
0.0108 0.1847
0.0076 0.1924
0.0021 0.1945
0.0016 0.1960
0.0026 0.1986
0.0024 0.2010
0.0021 0.2031
0.0013 0.2044
0.0018 0.2062
0.0013 0.2076
0.0016 0.2091
0.0013 0.2104
0.0013 0.2118
0.0013 0.2131
0.0013 0.2144
0.0010 0.2154
0.0010 0.2165
0.0010 0.2175
RCFC Syn Unt Shortcut Method Ver4.XLS
Riverside County Hydrology Manual
Calculation of
SYNTHETIC UNIT HYDROGRAPH METHOD
Lag hr =
#DIV /0!
SHORTCUT METHOD Less than 100 -200 acres & Lag Time
< 7 -8 min)
Data Input (boxed is calced)
Concentration Point
0
Soil Group Sheet 11/ pp 78
C
Area Designation
0
Precipitation Rate PI E5.1 -5.6
2.1
Area (acres)
1.0
0.0 sqmi
Area Precip Corr E5.8 %
100.00
L (miles)
0
Total Adjusted Storm =.
2.10
Lca (miles)
0
jRunoff
Index PI E -6.1)
56
Elev @ Headwater
0
AMC Condition I, II, or III Sheet E -8
2
Elev @ Concentration Point
0
Infiltr Rate for Pery Areas PI E -6.2 Fp
0.51
H =
0
Devel Area Cover PI 6.3)
90%
S ft/mile =
#DIV /0! 1
17728
Const Loss Rate, F 3 -6 hr storm
0.10
n (Ave Mann, Plate E.3)
0.0015
Fm, Min Low Loss 50 -75% of F
0.05
Lag (min)
#DIV 101
j
Low Loss
Rate Percent 3 & 6hr :
0.90 .
Storm Frequency (10, 25, 100)
100
Results
La Quinta Zone (1 to 6)
4
7210
Cubic Ft
Duration 1, 3, 6, 24
1 hr
0.17
Acre - Ft
j
Unit Time
Pattern
Storm
Loss Rates
Effective
Flood
Period
Percent {
Rain
Max
Used Rate'
I Rain
Hydrograph
Volume
Sum Vol
Basin Infil
(min)
( %) j
(in /hr)
in /hr) j
(cfs)
f (cult)
cult
(cuft)
3.a 20.93 0. 0 (1. (0 (018 (0.835 �b'1 251
y1�0. 4t8 11,;211 (D q* Mx(0 0,.g4 33'4 584
11116 115A (0 "j(0 (010 9.19 11.'408 356 -1941
24, 49 123 (0-00 (018 '9.438 '341 1282
25 1
6.6
1.66
0.10
0.10
1.57
1.566
470
1752
30
1 7.3
1.84
0.10
0.10
1.74 j
1.742
523
2274
35
j 8.4
2.12 j
0.10 1
0.10
2.02
2.020
606
2880
40
9.0
2.27
0.10
0.10
2.17
2.171
651
3532
45
12.3
3.10
0.10
0.10
3.00
3.002
901
4432
50
j 17.6
4.44
0.1.0
0.10
4.34
j 4.338
1301
5734
55
j 16.1
4.06
0.10
0.10
3.96
3.960
1188
6922
60
{ 4.2
j 1.06
0.10
1 0.10
0.96 j
0.961
288 {
7210
0
j 0.0
j 0.00
j 0.17 j
0.00
0.00-17-
0.000
0
7210
0
j 0.0
1 0.00
1 0.17
1 0.00
0.00
j
0.000
0
7210
0
j 0.0
0.00
0.17
0.00
0.00
{ 0.000
0
1 7210
0
0.0
0.00
0.17
0.00
0.00
0.000
0
7210
0
0.0
0.00
{ 0,17
0.00
0.00
{ 0.000
0
7210
0
j 0.0
0.00
0.17
"0.00
0.00
{ 0.000.
0
7210
j
0
{ 0.0
0.00
j 0.17
0.00
0.00
0.000
{ 0
7210
0 j
0.0
{ 0.00
0.17
0.00
0.00 1
J 0.000
0 j
7210
0
0.0
0.00
0.17
0.00
0.00
{ 0.0
0
7210
0
j 0.0
j 0.00
0.17
{ 0.00
0.00
j 0.0
0 1
7210
0
0.0
0.00
0.17 j
0.00
0.00
0.0
0
{ 7210
0
{ 0.0
0.00
0.17
0.00
0.00
j
0.0
0
7210
0
0.0
0.00
0.17
0.00
j 0.00
j
0.0
0
7210
0
0.0
0.00
{ 0.17
0.00.
0.00
0.0
1 0
7210
0
1 0.0
0.00
j 0.17
0.00
0.00
j
0.0
0
7210
0
j 0.0
j 0.00
0.17
0.00
0.00
0.0
0
7210
0
0.0
0.00
0.17
0.00
0.00
0.0
0
7210
0
0.0
0.00
0.17
0.00
0.00
j
0.0
0
7210
0
0.0
j 0.00
0.17
j 0.00
0.00
0.0
0
j 7210
0
0.0
0.00
0.17
0.00
0.00
0.0
0
7210
0
{ 0.0
0.00
0.17
j 0.00
0.00
0.0
0
7210
0
j 0.0
0.00
0.17
0.00
0.00
0.0
0
7210
0
1 0.0
0.00
0.17
0.00
0.00
1
1-0.0
0
7210
0
0.0
0.00
1 0.17
0.00
0.00
j
1 0.0
0
7210
0
) 0.0
j 0.00
1 0.17
1 0.00
{ 0.00
j
0.0
1 0
7210
Page 1
RCFC Syn Unt Shortcut Method Ver4.XLS
Riverside County Hydrology Manual
j
{Calculation of
SYNTHETIC UNIT HYDROGRAPH METHOD
{
Lag (hr)
' #DIV /0!
SHORTCUT METHOD Less than 100 -200 acres & La Time
< 7 -8 min )
Data Input (boxed is calced) {
Concentration Point
0
Soil Group Sheet 11/ pp 78
C
Area Designation
0
Precipitation Rate PI E5.1 -5.6)
2.7
Area (acres)
{
1.0
0.0 sqmi
Area Precip Corr E5.8 %
100.00
L (miles)
0
Total Adjusted Storm =
2.70
Lca (miles)
0
Runoff Index PI E -6.1
56
Elev @ Headwater
0
{AMC
Condition I, II, or III (Sheet E -8 ))
2
Elev @ Concentration Point,
0
Infiltr Rate for Pery Areas PI E -6.2) Fp
0.51
H =
0
{
Devel Area Cover PI 6.3 1
90%
S ft/mile)
#DIV /0!
17728
Const Loss Rate, F 3 -6 hr storm
0.10
n (Ave Mann, Plate E.3)
0.0015
Fm, Min Low Loss 50-75% of F1
705
Lag (min)
#DIV 101
i
{
Low Loss
Rate Percent 3 & 6hr : 1
0.90
Storm Frequency 10, 25, 100)
100
Results
La Quinta Zone (1 to 6)
4
8641
Cubic Ft
Duration 1, 3, 6, 24
3 hr
0.20
Acre: Ft
UnitTimej
Pattern { Storm
Loss Rates
Effective
Flood
Period
Percent { Rain
Max
Used Rate
I Rain
Hydrograph
Volume I
Sum Vol I
Basin Infil
(min)
j (% ) (in /hr)
in /hr
cfs
cult)
cult)
cult
{
6 013 (0'74�z 0 0 9775 0:32 60 :324 (9 197
(1(0 1'.13 (W42 (0A0 (0.:0(0 (0i32 Q.32'4 (97 11,94
0(5 41 (0:3:6 (0.9(0 x(0.00 (0'26 00.25.9 In 272
120 0 15 0249 MAP (0000 C59 p0.389 biili07 .389
26 1,IP5 049 (GA0 (0,0(0 X0:39 10;389 007 1505
330 1,1,18 (0,58 (O q 0 (000 Q,49 *486 4 4 (6551
35 015 (649 (0_C0 (0.1(0 10'39 (01389 00x7 788
!40 018 (0158 MAP 0.00 (049 �0�`88 046 91
00K98 WOO 01 0 049 00.x:86 04tY6 1059
�50�,l8
j 0.49
0.10
0.10
{ 0.39
0.389
117
1176
1.6
0.52
0.10
0.10
0.42
0.421
126
1302
60
1.8
{ " 0.58
1 0.10
0.10
0.49
0.486
146
j 1448
65
2.2
0.71
1 0.10
0.10
0.62.
0.616
185
1633
70
2.2
{ 0.71
1 0.10
0.10
0.62
0.616 1
185
1818
75
2.2
j 0.71
0.10 {
0.10
0.62
0.616 1
185
2002 "
80
2.0
{ 0.65
0.10
0.10
0.55
j
0.551 j
165
2167
85
2.6
0.84
0.10
0.10
0.75
0.745
224
2391
90
2.7
0.87
0.10
0.10
0.78
0.778 {
. 233 {
2624
95
2.4
0.78
0.10
0.10
0.68
0.6-8-0--j-
680
204
2828
100
2.7
{ 0.87
j 0.10
0.10
j 0.78 j
0.778
233
3062
105
1 3.3
1.07
0.10
0.10
0.97
1.0
292
3353
110
3.1
j 1.00
0.10
0.10
0.91
0.9
272
3625
115
1 2.9
0.94
0.10
0.10
0.84
0.8 {
253
3878
120
3.0
0.97' (
0.10
0.10
0.87
0.9 {
262
4141
125
3.1
1.00
0.10
0:10
0.91
{
0.9
272
4413
130
4.2
{ 1.36
0.10
0.10
1.26
1.3
379
4792
135
5.0
{ 1.62
0.10
0.10
1.52
j
1.5
457
5249 '
140
3.5
1.13
0.10
0.10
1.04
1.0
311
5560
145
6.8
j 2.20
0.10
0.10
1 2.11
{ 2.1
632
6191 1
150
7.3
2.37
0.10
0.10
2.27
{ 2.3
680
6872
155
8.2
{ 2.66
0.10
0.10
2.56
2.6
768
7640
160
5.9
1.91
0.10
0.10
j 1.81
1.8
544
8184
165
2.0
0.65
0.10
0.10
0.55
#-0.6
1 165
8349
170"
1.8
0.58
0.10
j 0.10
0.49
0.5
146
8495
175
1.8
{ 0.58
0.10
0.10
0.49
{
1 0.5
146
8641
180
0.6
j 0.19
0.10
0.10
0.10
0.1
0
j 8641
0
0.0
0.00
( 0.10
1 0.00
1 0.00
0.0
0
8641.
Page 1
RCFC Syn Unt Shortcut Method Ver4.XLS
Riverside County Hydrology Manual
Calculation of
SYNTHETIC UNIT HYDROGRAPH METHOD
tLag (hr)
#DIV /0!
SHORTCUT METHOD Less than 100 -200 acres & Lag Time
< 7 -8 min)
Data Input (boxed is calced)
Concentration Point
0
Soil Group Sheet 11/ p 78
C
Area Designation
0
Precipitation Rate PI E5.1 -5.6
3.2
Area acres
1.0
0.0 sgmi ;
Area Precip Corr E5.8 %)
100.00
L (miles)
0
Total Adjusted Storm =
3.20
Lca (miles)
0
jRunoff
Index PI E -6.1
56
Elev @ Headwater
0
]AMC
Condition I, ll, or III Sheet E -8
2
Elev @ Concentration Point
0
Infltr Rate for Pery Areas PI E -6.2 F p
0.51
H =
0
Devel Area Cover PI 6.3 1
90%
S fUmile =
#DIV /0! 1
17728 1
Const Loss Rate, F 3 -6 hr storm)
0.10
n (Ave Mann, Plate E.3)
0.0015
j
Fm, Min Low Loss 50 -75% of F
0.05
Lag (min) 1
#DIV /O!
Low Loss Rate Percent 3 & 6hr :
0.90
Storm Frequency 10, 25, 100)
100
Results
La Quinta Zone (1 to 6)
4
9427
Cubic Ft
Duration 1, 3, 6, 24
. 6hr
0.22
Acre - Ft
i
I
Unit Time 1
Pattern
Storm
Loss Rates
1 Effective
Flood
Period j
Percent
Rain
Max
Used Rate
Rain
Hydro graph
Volume
Sum Vol
Basin Infil
min
%)
(in /hr )
(in /hr )
(cfs)
(cult )
(cult
cult
1
5QCO' 4..1 (0.21 0.0,0 0:x(0 0.,fl 0.114 (68 0(68
0 'dq'2 40.23 000 (0.00 (0_.V3 Q.133 Zo 148
20 9,3 Q.15 MAO (040 (0A.5 (0.1'52 t91 240
40 04 +(017 (0 0(00 (010 (0:47 0.172 X3 .343
16'@ tl 44 0.21/ (0 i!(0 W. *0 kk.0'.7 ,0. 1'72 403 3 #446
00_ dl 1 (0-29 (0,1190 to'.AA (0,0'q 0.1191 -144 1560
g7w 416 (0.34 (000 (01 00 0 00.210 4,26 +686
[80 tl (6 0_."84 (0_�1t0 (040 0.21 '0.2110 `1126 (812
00: 916 (03d 0; 0 0. (0 0:21 0.21� -0 �1, 26 '938
100 1
7T_6
1 0.31
0.10
1 0.10
0.21
0.210
126
1064
1.6
0.31
0.10
j 0.10
0.21
1
1 0.210
1 126
1190
120
j 1.7
0.33
0.10
1 0.10
1 0.23
1 0.229
1 138
1328
130
j 1.7
0.33
j 0.10
1 0.10
0.23
0.229
1 138
1465
1.8
0.35
0.10
0.10
0.25
0.248
149
1614
1
r14
1.8
0.35
0.10
0.10
0.25
0.248
i 149
1763
1.8
0.35
0.10
0.10
0.25
1 0.248
149
1912
j 2.0
0.38
0.10
0.10
i 0.29
1 0.287
172
2084
180
2.0
0.38
0:10
0.10 _
0.29 1
1 0.287
172
2256
190 j
2.1
0.40
0.10
0.10
0.31
0.306
184
2440
200
1 2.2
j 0.42
1 0.10
0.10
0.33
0.325
195
2635
210
1 2.5
0.48
0.10
j 0.10
0.38
1
1 0.4
1 230
1 2865
220
2.8
0.54
1 0.10
1 0.10
0.44
1
0.4
264 -
3129
230
3.0
0.58
1 0.10
0.10
0.48
1
1 0.5
287
3416
1
240
3.2
0.61
0.10
1 0.10
0.52
0.5
310
3726
250
3.5
0.67
0.10
0.10
0.57
0.6
345
4071
260
3.9
0.75
0.10
0.10
0.65
0.7
391
4462
270
4.2
0.81
0.10
0.10
0.71
0.7
426
4888
280
4.5
0.86
0.10
0.10
1 0.77
0.8
460
5348
290
1 4.8
0.92
0.10
0.10
0.82
i
0.8
495
5843
300
5.1
0.98
0.10
0.10
0.88
0.9
529
6372
310
6.7
1.29
0.10
0.10
1 1.19
1.2
714
7085
320
8.1
1.56
0.10
0.10
1.46
1.5
875
7960
330
10.3
1.98
0.10
0.10
1.88
1.9
1128
9088
340
2.8
0.54
0.10
0.10
0.44
0.4
264
9352
350
1.1
1 0.21
0.10
0.10
j 0.11
0.1
68
9421
360
0.5
0.10
0.10
0.09
0.01
0.0
6
9427
0
0.0
1 0.00
0.10
0.00
0.00
0.0
0
9427
Page 1
E
RCFC Syn Unt Shortcut Method Ver4.XLS
Riverside County Hydrology Manual
Calculation of
SYNTHETIC UNIT HYDROGRAPH METHOD
ILag
(hr) _
I #DIV /0!
SHORTCUT METHOD Less than 100 -200 acres A Ti
La
me < 7 -8 min )
Data Input (boxed is calced)
Concentration Point
0
Soil Group Sheet 11/ pp 78
C
Area Designation
0
Precipitation Rate PI E5.1 -5.6
4.3
Area acres
1.0
0.0 sqmi
Area Precip Corr E5.8 %
100.00
L (miles)
0
Total Adjusted Storm =
4.25
Lca (miles)
0
IRunoff
Index (PI E -6.1 )
56
Elev @ Headwater
0
JAMC
Condition I, II, or III Sheet E -8
2
Elev @ Concentration Point
0
Infiltr Rate for Pery Areas PI E -6.2) Fp .
0.51
H =
=
Devel Area Cover PI 6.3) 1
90%
S fUmile) =,
#DIV /01 1
17728
1
Const Loss Rate, F 3 -6 hr storm
0.10
n (Ave Mann, Plate E.3)
0.0015
Fm, Min Low Loss 50 -75% of F
0.05
Lag (min) I I
#DIVI01
Low Loss
Rate Percent 3 & 6hr :
1 0.50
Storm Frequency (10, 25, 100)
100
Results
La Quinta Zone (1 to 6)
4
9801
Cubic Ft
Duration 1, 3, 6, 24 {
24 hr
0.23
Acre - Ft
Unit Time
Pattern I Storm J
Loss Rates
j
Effective
I
Flood
Period
Percent Rain
Max
Used Rate
Rain
Hydrograph
Volume
Sum Vol
Basin Infil
min
( %) in /hr)
in /hr)
cfs
(cult)
cult)
cult
h,15 COW +(0[03 0:17 0_02 (002 0!700, 915 `1.5
!a0 (073 0105 (0.,47 (0103 (0103 (0!026 x23 38
45 0�13 (0.105 0:17 (0103 (0703 (01026 23 461
f90 (QA 007 (0.1(6 (Gfm 40103 (01034 :31 ,92
X5 (0.13 4005 (0.146 (0103 (0103 (01028 23 11115
4910 WA (0(05 (0.146 (0(03 40103 (0, 026 23 1138
1140.5 (0x3 (0,03 (0.91(6 (0 103 (0 x03 Q 6 .23 461
%Z;0 (014 (0(07 (0:1(0 0193 4023 (0.1034 31 (1491
tiVM 004 (007 (0:91(6 (0 23 0103 (0.1034 31 222
00 (00 (0107 Q.95 (0193 1003 Q (A34 31 252
*05 (00 (0.109 (0.45 00104 (0104 (010.",4:3 38 291
11180 W5 (0109 (0.0 0fiO4 40104 (01043 38 329
Y1% (46 (0109 +(0:9115 10104 0104 (01043 38 367
Zn(0 ots. (0!09 401'5 (0.104 (03014 (0!043 38 405
X25 (Q5 (0:109 40:1((1 (0104 40104 01043 38 44"4
"240 (016 (0AO 40_14 (0105 (0105 4010;5111 446 490
2?5:5 (0;(6 (0.11(0 40:14 (01(05 (0.105 40805'1 46 S3 "6
"fto (0''¢7 00.12 O.V4 010:6 0 6 40.000 54 1589
,295 (017 QO.,`l2 40:.14 (0.10:6 0106 40,/060 °54 4643
"300 Q@E(8 0. 14 (0!.113 (0.; 3 (0.100 10001, 0 4644
315
0.6
1 0.10
0.13
0.05
1 0.05
0.1
46
689
33
0.7
0.12
0.13
0.06
0.06
0.1
54
743
345
0.8
1 0.14
0.13
0.13
0.01
0.0
6
749
360
0.8
0.14
0.13
0.13
0.01
0.0
7
756
375
0.9
0.15
0.13
0.13
0.03
0.0
24
780
390
0.9
0.15
0.12
0.12
0.03
0.0
26
805
405
1.0
0.17
0.12
0.12
0.05
0.0
42
848
420
1.0
0.17
0.12
j 0.12
0.05
0.0
44
891
435
1.0
0.17
0.12
0.12
0.05
0.1
45
937
450
1.1
0.19
0.12
0.12
0.07
0.1
62'
999
465
1.2
0.20
0.12
0.12
0.09
0.1
79
1078
480
1.3
0.22
0.11
0.11
0.11
0.1
96
1173
495
1.5
0.26
0.11
0.11
0.14
0.1
128
1301
510
1.5
0.26
0.11
0.11
0.14
0.1
129
1430
525
1.6
0.27
0.11
0.11
0.16
0.2
146
1576
540
1.7
0.29
0.11
0.11
0.18
0.2
162
1 1738
555
1.9
0.32
0.11
0.11
j 0.22
j
0.2
194
1 1933
Page 1
' CBHC 1 h WQMP.XLS ' 00 0��
Riverside County Hydrology Manual
{Calculation
of
SYNTHETIC UNIT HYDROGRAPH METHOD
Lag hr =
#DIV /0!
SHORTCUT METHOD Less than 100 -200 acres & La Time
< 7 -8 min)
{
Data Input boxed is calced)
Concentration Point
0
1
Soil Group Sheet 11/ pp 78
C
Area Designation
0
Precipitation Rate PI E5.1 -5.6
2.1
Area acres
1.0
0.0 sqmi
Area Precip Corr E5.8 %
100.00
L (miles) 1
0
Total Adjusted Storm =
2.10
Lca miles
0
-A
1
Runoff Index (PI E -6.1 ) 1
56
Elev @ Headwater
0
(AMC
Condition I, ll, or III Sheet E -8
2
Elev @ Concentration Point
0
Infiltr Rate for Pery Areas PI E -6.2) Fp
0.51
H=1
0 1
Devel Area Cover PI 6.3 (
80%
S (ft/mile)--,'
#DIV /0!
17728
Const Loss Rate, F 3 -6 hr storm)
0.14
n (Ave Mann, Plate E.3)
0.0015
Fm, Min Low Loss 50-75% of F1
0.07
Lag (min) 'I I
#DIV /01
Low Loss
Rate Percent 3 & 6hr :
1 0.90
Storm Frequency (10, 25, 100 )
100
Results
La Quinta Zone (1 to 6)
4
(
7044
Cubic Ft
Duration 1, 3, 6, 24
1 hr {
0.16
Acre - Ft
1
1
Unit Time
Patt ern
Storm
Loss Rates
Effective
Flood
Period
Percent .
Rain
Max
Used Rate
Rain
Hydrograph
Volume
Sum Vol
Basin Infil
(min)
( %)
in /hr
(in /hr )
(cfs)
(cult)
cult
cult
5 3.7 0.93 0.14 0.14 0.79 0.789 237 237
10 4.8 1.21 0.14 0.14 107 1.066 320 557
15 5.1 1.29 0.14 0.14 1.14 1.142 343 899
20 4.9 1.23 0.14 0.14 1.09 1.092 327 1227
25
6.6
1.66
0.14
1 0.14
1.52
1.520
456
1683
30
{ 7.3
1.84
0.14
0.14
1.70
1.696
509
2192
35
8.4
2.12
0.14
0.14
1.97
1.974
592
2784
40
9.0
2.27
1 0.14
0.14
{ 2.12
2.125
637
3421
45
12.3
3.10
0.14
0.14
2.96
j
1 2.956
887
4308.
50 •
17.6
{ 4.44
1 0.14
1 0.14
4.29
1 4.292
1288
5596
55
16.1
{ 4.06
1 0.14
1 0.14
3.91
{ 3.914
1174
6770
60
4.2
1.06
j 0.14
1 0.14
1 0.92
1
1 0.915
275
7044
0
1 0.0
0.00
0.25
0.00
1 0.00
0.000
0
7044
0
0.0
0.00
0.25
0.00
1 0.00
{
0.000
0
7044
0
0.0
0.00
0.25
0.00
0.00 1
0.000
0
7044
0
0.0
1 0.00
0.25
0.00
0.00
1 0.000
0
7044
0
{ 0.0
1 0.00
0.25
0.00
0.00
0.000
0
7044
0
0.0
0.00
j 0.25
0.00
0.00
1
0.000
0
7044
0
0.0
0.00
0.25
0.00
0.00
j 0.000
0
7044
0
0.0
j 0.00
j 0.25
1 0.00
j 0.00
1
1 0.000
1 0
7044
1
0
0.0
0.00
j 0.25
0.00
1 0.00
1 0.0
1 0
7044
0
0.0
0.00
0.25
0.00
1 0.00
0.0
1 0
7044
0
0.0
0 .00
0.25
0.00
0.00
0.0
0
7044
0
0.0
1 0.00
0.25
0.00
0.00
0.0
0
7044
0
0.0
1 0.00
0.25
0.00
1 0.00
(
{ 0.0
0
7044
0
j 0.0
0.00
0.25
0.00
0.00
F 0.0
0
7044
0
0.0
0.00
0.25
0.00
0.00
0.0
0
7044
0
1 0.0
0.00
0.25
0.00
0.00
{ 0.0
0
7044
0
0.0
0.00
0.25
0.00
0.00
0.0
0
7044
0
0.0
0.00
0.25
0.00
0.00
0.0
0
7044
0
0.0
1 0.00
0.25
0.00
0.00
1
0.0
0
7044
0
0.0
0.00
0.25
0.00
0.00
1
0.0
0
7044
0
0.0
0.00
0.25
0.00
1 0.00
0.0
1 0
7044
0
0.0
0.00
0.25
0.00
j 0.00
0.0
0
7044
0
0.0
0.00
0.25
0.00
0.00
1 0.0
0
7044
0
0.0
0.00
0.25
0.00
0.00
0.0
0
{ 7044
0
0.0
0.00
1 0.25
0.00
0.00
0.0,
0
7044
Page 1
CBHC 1 hr WQMP.XLS
Riverside County Hydrology Manual
Calculation of
SYNTHETIC UNIT HYDROGRAPH METHOD
I
11-ag (hr)
#DIV /0! .
SHORTCUT METHOD Less than 100 -200 acreLLLaq Time < 7 -8 min)
Data Input (boxed is calced) I
Concentration Point
0
Soil Group Sheet 11/ pp 78)
C
Area Designation
0
Precipitation Rate PI E5.1 -5.6
2.7
Area (acres)
1.0
0.0 sqmi
Area Precip Corr E5.8 %
100.00
L (miles)
0
1 Total Adjusted Storm =
2.70
Lca (miles)
0
Runoff Index PI E -6.1
56
Elev @ Headwater
0
AMC Condition 1, 11, or III Sheet E -8)
2
Elev @ Concentration Point j
0
llnfiltr
Rate for Pery Areas PI E -6.2 Fp
0.51
H=1
0 1
Devel Area Cover PI 6.3 1
80%
S ft/mile);
#DIV /0! 1
17728
Const Loss Rate, F 3 -6 hr storm)l
0.14
n (Ave Mann, Plate E.3)
0.0015
Fm, Min Low Loss 50 -75% of F1
0.07
Lag (min)
#DIV 101
Low Loss
Rate Percent 3 & 6hr :
0.90
Storm Frequency 10, 25, 100)
100
Results
La Quinta Zone (1 to 6)
4
8157
Cubic Ft
Duration 1, 3, 6, 24
3 hr
0.19
Acre - Ft
Unit Time
Pattern
Storm
Loss Rates
Effective
Flood
Period
Percent
Rain
Max
Used Rate
Rain
Hydrograph
Volume
Sum Vol
Basin Infil
min
( %)
in /hr
(in /hr )
(cfs
cult
cult
cult
5 173 0.42 0.14 0.14 0.28 0.278 83 83
10 1.3 0.42 0.14 0.14 0.28 0.278 83 167
15 1.1 0.36 0.14 0.14 0.21 0.213 64 231
20 1.5 0.49 0.14 0.14 0.34 0.343 103 334
25 1.5 0.49 0.14 0.14 0.34 0.343 103 436
30 1.8 0.58 0.14 0.14 0.44 0.440 132 568
35 1.5 0.49 0.14 0.14 0.34 0.343 103 671
40 1.8 0.58 0.14 0.14 0.44 0.440 132 803
45 1.8 0.58 0.14 0.14 0.44 0.440 132 935
50
1.5
0.49
0.14
0.14
0.34
0.343
103
1038
55
1.6
0.52
0.14
j 0.14
j 0.38
0.375
113
1150
60
1.8
0.58
0.14
0.14
0.44
0.440
132
1282
65
( 2.2
0.71
{ 0.14
0.14
0.57
0.570
171
1453
70
1 2.2
0.71
0.14
0.14
0.57
(
0.570
171
1624
f
75
2.2
0.71
0.14
0.14
0.57
0.570
171
1795
,
80
2.0
0.65
0.14
0.14
0.50
0.505
151
1946
j
85
2.6
0.84
0.14
0.14
0.70
0.699
210
2156
90
2.7
0.87
0.14
0.14
0.73
0.732
219
2376
95
2.4
0.78
0.14
0.14
0.63 )
0.634
190
2566
100
j 2.7
j 0.87
0.14
0.14
0.73 j
1
0.732
219
2785
105
j 3.3
1.07
0.14
0.14
0.93
0.9
278
3063
77fT0-
3.1
1.00
0.14
0.14
0.86
0.9
258
3322
115
1 2.9
0.94
0.14
0.14
0.80
(
0.8
239
3560
120
3.0
0.97
0.14
0.14
0.83
0.8
249
3809
125
3.1
1.00
0.14
0.14
0.86
0.9
258
4067
130
4.2
1.36
0.14
j 0.14
1.22
1.2
365
4433
135
5.0
1.62
0.14
0.14
1.48
1.5
443
4876
140
3.5
1.13
( 0.14
0.14
0.99
{
1.0
297
5173
145
( 6.8
2.20
j 0.14
0.14
2.06
2.1
618
5791
150
7.3
2.37
0.14
0.14
2.22 j
2.2
667
6457
155
8.2
2.66
0.14
0.14
2.51
2.5
754
7212
160
5.9
1.91
0.14
0.14
1.77
j
1.8
531
7742
165
2.0
0.65
0.14
0.14
0.50
0.5
151
7893
170
1.8
0.58
0.14
0.14
1 0.44
0.4
132
8025
175
1.8
0.58
0.14
1 0.14
0.44
0.4
132
8157
180
0.6
0.19
0.14
1 0.14
0.05
0.1
0
8157
0
( 0.0
0.00
I 0.14
1 0.00
0.00
I
0.0
1 0
8157
Page 1
CBHC 1 h WQMP.XLS
Riverside County Hydrology Manual
Calculation of
SYNTHETIC UNIT HYDROGRAPH METHOD
Lag hr =
j #DIV /0!
SHORTCUT METHOD Less than 100 -200 acres & Lag Time < 7 -8 min)
Data Input (boxed is calced) J
Concentration Point
0
Soil Group Sheet 11/ pp 78 J
C
Area Designation
0
IPrecipitation
Rate PI E5.1 -5.6
3.2
Area (acres) J
1.0
0.0 sgmi
Area Precip Corr E5.8 %
100.00
L (miles) 1
0
1
1 Total Adjusted Storm =
1 3.20
Lca (miles)
0
jRunoff
Index (PI E -6.1 ) 1
56
Elev @ Headwater
0
;
AMC Condition I, II, or III (Sheet E -8 ))
2
Elev @ Concentration Point
0
Infiltr Rate for Pery Areas (PI E -6.2 ) Fp
1 0.51
H =
0
{
De Area Cover PI 6.3) 1
1 80 %
S ft/mile)=
#DIV /0!
17728
Const Loss Rate, F (3 -6 hr storm))
0.14
n (Ave Mann, Plate E.3)
0.0015 {
Fm, Min Low Loss 50 -75% of F
1 0.07
Lag (min)
#DIV/01
Low Loss
Rate Percent 3 & 6hr :
1 0.90
Storm Frequency (10, 25, 100)
100
Results
La Quinta Zone (1 to 6)
4
8460
Cubic Ft
Duration 1, 3, 6, 24
6 hr
{
0.19
Acre - Ft
�
1
�
Unit Time
Pattern
Storm J
Loss Rates
Effective
Flood
Period
Percent
Rain
Max
Used Rate
J Rain
Hydrograph {
Volume
Sum Vol
Basin Infil
(min)
%
(in /hr) {
in /hr)
(cfs )
(cult)
cult
(cult
10 1.1 0.21 0.14 0.14 0.07 0.068 41 41
20 1.2 0.23 0.14 0.14 0.09 0.087 52 93
30 1.3 0.25 0.14 0.14 0.11 0.106 64 157
40 1.4 0.27 0.14 0.14 0.13 0.126 75 232
50 1.4 0.27 0.14 0.14 0.13 0.126 75 307
60 1.5 0.29 0.14 0.14 0.14 0.145 87 394
70 1.6 0.31 0.14 0.14 0.16 0.164 98 493
80 1:6 0.31 0.14 0.14 0.16 0.164 98 591
90 1.6 0.31 0.14 0.14 0.16 0.164 98 689
100
1.6
0.31
0.14
0.14
1 0.16
0.164
98
788
110
J 1.6
0.31
0.14 1
0.14
0.16
0.164
98
886
120
1.7
{ 0.33
0.14 {
0.14
0.18 {
{
0.183
J 110
996
130
I 1.7
0.33
0.14
0.14
0.18 J
J 0.183
1 110
1106
1
140
{ 1.8
0.35 J
0.14 J
0.14
0.20 J
j
0.202
121
1227
150
{ 1.8
0.35 j
0.14
0.14
{ 0.20
{
0.202
J 121
1349
160
1.8
0.35
{ 0.14
0.14
{ 0.20
0.202
{ 121
1470
170
J 2.0
I 0.38
0.14 j
0.14
0.24
{ 0.241
1 144
1615
180
2.0
0.38 J
0.14 1
0.14
1 0.24
1-0,241
1 144
1759
190
2.1
1 0.40 J
0.14
0.14
{ 0.26
0.260
156
1915
J
200
2.2
J 0.42
{ 0.14
0.14
0.28 {
0.279
167
2082
210
{ 2.5
{ 0.48
0.14 J
0.14.
0.34 {
0.3
202
2284
220
J 2.8
0.54
J 0.14
0.14
0.39 {
0.4
237
2521
230
J 3.0
0.58
0.14 (
0.14
J 0.43
0.4
260
2781
240
{ 3.2
0.61
1 0.14 J
0.14
1 0.47
0.5
283
3063
250
1 3.5
0.67
0.14
0.14
0.53 {
0.5
317
3381
260
3.9
0.75
0.14
0.14
0.61
0.6
{ 363
3744
270
j 4.2
0.81 {
0.14
0.14
0.66
0.7
398
4142
280
4.5
0.86
0.14
0.14
0.72
J 0.7
432
4574
290
4.8
0.92
0.14
j 0.14
0.78
0.8
467
5041
300
5.1
0.98
0.14
0.14
0.84
0.8
502
5543
310
( 6.7
1.29
0.14
0.14
1.14
1.1
686
6229
320
d 8.1
{ 1.56
{ 0.14
0.14-T
1.41
J
j 1.4
847
7076
330
10.3
1.98
0.14
{ 0.14
{ 1.83
{
1.8
1101
8176
340
{ 2.8
0.54
{ 0.14
{ 0.14
0.39
0.4
237
8413
350
1.1
0.21
0.14
0.14
0.07
0.1
41
8454
360
0.5
0.10
0.14
0.09
0.01
0.0
6
8460
0
0.0
0.00
0.14
0.00
0.00
0.0
0
8460
Page 1
z3
CVHC 1 hr WQMP.XLS
Riverside County Hydrology Manual
Calculation of
SYNTHETIC UNIT HYDROGRAPH METHOD I
Lag hr =
#DIV /0!
SHORTCUT METHOD Less than 100 -200 acres & Lag Time < 7 -8 min) .
Data Input (boxed is calced)
I
Concentration Point
0
iSoil
Group Sheet 11/ pp 78
C
Area Designation
jPrecipitation
Rate PI E5.1 -5.6
4.3
Area (acres)
1.0
0.0 sgmi
jArea
Precip Corr E5.8 %
100.00
L (miles) 1
0
1 Total Adjusted Storm =
4.25
Lca miles
0
!
I
Runoff Index (PI E -6.1 ) 1
56
Elev @ Headwater
0
AMC Condition (I, II, or III Sheet E -8
2 -
Elev @ Concentration Point 1
0
linfiltr
Rate for Pery Areas PI E -6.2 Fp
0.51
H =1
0-1
Devel Area Cover PI 6.3) 1
80%
S (ft/mile)--"
#DIV /0! 1
17728
Const Loss Rate, F 3 -6 hr storm
0.14
n (Ave Mann, Plate E.3)
0.0015
Fm, Min Low Loss 50 -75% of F
0.07
Lag (min) I I
#DIV 101
Low Loss
Rate Percent 3 & 6hr :
0.50
Storm Frequency 10, 25, 100)
100
:,
Results .
La Quinta Zone (1 to 6)
4
8949
Cubic Ft
Duration 1, 3, 6, 24
24 hr
0.21
Acre - Ft
J J
Unit Time
Patt ern Storm
Loss Rates
Effective
Flood
Period
Percent Rain
Max
Used Rate J
Rain
Hydrograph
Volume
Sum Vol
Basin Infil
(min)
% in /hr
J
in /hr)
cfs
(tuft)
cult
cult
15 0.2 0.03 0.25 0.02 0.02 0.017 15 1.5
30 0.3 0.05 0.25 0.03 0.03 0.026 23 38
45 0.3 0.05 0.25 0.03 0.03 0.026 23 61
60 0.4 .0.07 0.24 0.03 0.03 0.034 31 92
75 0.3 0.05 0.24 0.03 0.03 0.026 23 115
90 0.3 0.05 0.24 0.03 0.03 0.026 23 138
105 0.3 0.05 0.23 0.03 0.03 0.026 23 161
120 0.4 0.07 0.14 0.03 0.03 0.034 31 191
135 0.4 0.07 0.23 0.03 0.03 0.034 31 222
150 0.4 0.07 0.23 0.03 0.03 0.034 31 252
165 0.5 0.09- 0.22 0.04 0.04 0.043 38 291
180 0.5 0.09 0.22 0.04 0.04 0.043 38 329
195 0.5 0.09 0.22 0.04 0.04 0.043 38 367
210 0.5 0.09 0.21 0.04 0.04 0.043 38 405
225 0.5 0.09 0.21 0.04 0.04 0.043 38 444
240 0.6 0.10 0.21 0.05 0.05 0.051 46 490
255 0.6 0.10 0.21 0.05 0.05 0.051 46 536
270 0.7 0.12 0.20 0.06 0:06 0.060 54 589
285 0.7 0.12 0.20 0.06 0.06 0.060 54 643
300
0.8
0.14
0.20
0.07
0.07
0.068
61
704
315
0.6
0.10
0.20
0.05
0.05
0.1
46
750
J
330
0.7
0.12
0.19
0.06
0.06
0.1
54
803
345
0.8
0.14
0.19
0.07
OA7
0.1
61 7
864
360
0.8
0.14
J 0.19
0.07
0.07
0.1
61
926
375
0.9
0.15
0.19
0.08
0.08
0.1
69
995
390
0.9
0.15
0.18
1 0.08
0.08
0.1
J 69
1063
405
1.0
J 0.17
0.18
0.09
j 0.09
0.1
77
1140
420
1.0
j 0.17
0.18
0.09
0.09
0.1
77
1216
435
1.0
0.17
0.18
0.09
j 0.09
J 0.1
77
1293
450
1.1
0.19
0.17
0.17
0.01
0.0
12
1305
465
1.2
J 0.20
0.17
0.17
0.03
0.0
29
1334
480
1.3
0.22
0.17
0.17
0.05
0.1
47
1381
495
1.5
J 0.26
0.17
0.17
0.09
j
J 0.1
79
1460
510
1.5
0.26
0.16
0.16
it 0.09
0.1
81
1541
525
1.6
0.27
0.16
0.16
1 0.11
0.1
99
1640
540
1.7
0.29
0.16
0.16
0.13
0.1
116
1756
555
1.9
J 0.32
0.16
1 0.16
1 0.17
0.2
1 149
1905
Page 1
L
Page 1 of 1
Paul Goble
From: Paul Goble
Sent: Wednesday, April 22, 2009 3:33 PM
To: 'Tesfaye Demissie'
Cc: 'De LaTorre, Julian'
Subject: RE: 1786 CVHC Dune Palms - Revised MS4 Letter by CVWD - Offsite Storm Drain Plans
(Final)
Attachments: Wolf Waters Housing CVWD Certification by CLQ.pdf
Gentlemen,
As discussed with Julian earlier this week, please find a PDF of the subject letter requested by CVWD and signed
by Tim Jonasson. Hard copy of this letter has been sent to Steve Robbins at CVWD via USPS. The attached
PDF is being sent to expedite storm drain plan signature by CVWD.
Please call if we may be of any further assistance.
Paul Goble, PE TE
Public Works Senior Engineer
City of La Quinta
(760) 777 -7087
pgoble @la - quinta.org
From: De LaTorre, Julian [ mailto:]DeLaTorre @msaconsultinginc.com]
Sent: Thursday, April 16, 2009 2:04 PM
To: Tim Jonasson
Cc: Ed Wimmer; Paul Goble; Smith, Sky; San Agustin, Jaime; Witherspoon, Michelle; Baiza, Joe; Murphy, Cherie;
Brian Peulicke
Subject: 1786 CVHC Dune Palms - Revised MS4 Letter by CVWD - Offsite Storm Drain Plans (Final)
Tim,
CVWD is ready to sign the Final Offsite Storm Drain Plans however they are requesting a revised MS4 BMP letter
by the City (current letter attached). As explained in earlier emails (copy attached) CVWD is requesting language
be added that acknowledges flooding may occur over Manholes 1, 2 and 3 due to the elevation of Avenue 48 with
respect to water surface elevation of the channel. Please let us know if we can be of any assistance.
Julian A. De La Torre
Principal Engineer
SA CONS �,TtNG, IN .
�D, PL +DWI NC ■ MrWI NGWEIKI iG ■ LAND SMrEYINC
342001306 HOPE DRIVE
RANCHO MIRAGE, CA 92270
760.320.9811 ■ FAX 760.32178,93
wow MSACaNSULT,NCJnrc.com
V i�JrAh drill ln,966V JMem
kasecohSidNriho this oft-4
4/22/2009
rage I.otI
Paul Goble
From: De LaTorre, Julian [ JDeLaTorre @msaconsultinginc.com]
Sent: Thursday, April 16, 2009 2:04 PM
To: Tim Jonasson
Cc: Ed Wimmer; Paul Goble; Smith, Sky; San Agustin, Jaime; Witherspoon, Michelle;.Baiza,*Joe;
Murphy, Cherie; Brian Peulicke
Subject: 1786 CVHC Dune Palms - Revised MS4 Letter by CVWD - Offsite Storm. Drain Plans (Final)
Attachments: Fwd: 1786 Example Letter; FW: 1786 CVHC Offsite sTorm Drain Plan REview; City MS4 BMP
letter to CVWD 08- 15- 08.pdf
Tim,
CVWD is ready to sign the'Final Offsite Storm Drain Plans however they are requesting a revised MS4 BMP letter
by the City (current letter attached). As explained in earlier emails (copy attached) CVWD is requesting language
be added that acknowledges flooding may occur over Manholes 1, 2 and 3 due to the elevation of Avenue 48 with
respect to water surface elevation of the channel. Please let us know if we can be of any assistance.
Julian A. De La Torre
Principal Engineer
MSS CO SULTING, Ylw1 .
PLANNING ■ CIVIL ENGINEERING ■ LAND SURVEYING
34200 BOB HOPE DRIVE
RANCHO MIRAGE, CA 92270
760.320.9811 ■ FAX 760.323.7893
www MSAGots.uLnmG,Itc.com
��.1dIC!'
P ow CoAtIK1Et!' the csrtlatL
4/21/2009
r, w: i i 6o u v tiu utrsite s t orm uratn Plan XP_vtew Page 1 of 2
Paul Goble
From: De LaTorre, Julian [ JDeLaTorre @msaconsultinginc.com]
Sent: Mongay, November 26, 2007 10:33 AM
To: Ed Wimmer
Cc: Paul Goble; Tyme Flatt; Brian Peulicke; Maryann Ybarra; Murphy, Cherie; Baiza, Joe; Witherspoon,
Michelle
Subject: FW: 1786 CVHC Offsite sTorm Drain Plan REview
Re: Dune Palms Neighborhood - Parcel 4 of Parcel Map 33588
Offsite Storm Drain Plans
Ed,
The City and CVWD have requested mylars for the Offsite Storm Drain Plans. We have revised the plan (minor City
comments) and submitted mylars to CVWD for approval. Once approved, the mylars will be delivered to the City for
approval.
As stated in Tyme Flatt's email below, CVWD requires a letter from the City stating the project is in compliance with
Supplement A and Best Management Practices (BMPs). Please also note CVWD is requesting a statement (in the letter)
acknowledging that overflow may occur from Manholes 1, 2 and 3 due to their relationship with the La Quinta Evacuation
Channel water surface during storm conditions. As discussed in previous City meetings, the water surface elevation in the
100 -year storm would create ponding slightly west and north of the Dune Palm Road/Avenue 48 intersection. I realize this
letter is tied to the "Indemnification" agreement/clausebetween the City and CVHC; can you estimate when the letter can be
prepared and sent to CVWD?
Please let us know if we can be of any assistance.
Julian A. De La Torre
Senior Project Manager
MSA Consulting, Inc.
- - - -- Original Message---- -
From: Tyme Flatt [mailto:tflatt@cvwd.org]
Sent: Thursday, November 15, 2007 4:01 PM
To: Murphy, Cherie; De La Torre, Julian
Cc: Chris Morley; Georgia Celehar; Kelly Rehn; Tesfaye Demissie
Subject: Re: 1786 CVHC Offsite sTorm Drain Plan REview
Hello guys
We reviewed the revised plans for the Dune Palms Neighborhood and everything looks acceptable. Please submit mylars for
signature and then we can begin the encroachment permit process. After you received the approved mylars, please contact
our right of way department (Kelly Rehn or Chris Morley).
Please reniemlier'that we will need a.lefter from the Gity�abouescliarge f
requirements as' well.as. a statement from the City that backwater effects' and F
(fiom:the Lart;Quinta'Evac) is acceptable..r
Thank you for your help and please let me know if you need anything further.
Please note change of e-mail address to tflatt@cvwd.org
Sincerely,
4/21/2009
at
r w: i i ad u v n kinsite s i orm Lrain rian tctview
Tyme Flatt
Assistant Stormwatei Engineer `
Coachella Valley Water District
(760) 398 -2651 x2229
tflatt@cvwd.oig
>>> "Murphy, Cherie" <CMurphy @msaconsultingina.com> 11/12/2007 9:28 AM >>>
Good Morning Tyme -
We received the plan check comments from the City of La Quinta on the
above mentioned plans. They have requested mylar. Have you had a chance
to review the plans? If you have no further comments we can run the
mylar. This is for tract 33588.
Thanks for. your help.
Cherie Murphy
Assistant Project Manager
< hqp : / /www.msaconsultinginc.com/>
4/21/2009
Ya�GLUlL
DXt11111J1C LCIICi�
Paul Goble
From: Tyme Flatt [tflatt @cvwd.org]
Sent: Thursday, November 01, 2007 10:17 AM
To: Brian Ching
Subject: Example Letter
Attachments: City Letter on complying for Outlets.PDF
Brian
rage l of i
Attached please find an example letter from the City of Indio stating that the outlet discharge will meet the NPDES
requirements.
Please let me know if you have any additional questions. Thank you for your help with this matter.
Pleasepote change of e-mail address to tflatt@cvwd.org
Sincerely,
Tyme Flatt
Assistant Stormwater Engineer
Coachella Valley Water District
760)398 -2651 x2229
tflatt@cvwd.org
4/21/2009
I i vv i,ouca
Paul Goble
From:
Tyme Flatt [tflatt @cvwd.org]
Sent:
Monday, December 03, 2007 9:19 AM
To:
Ed Wimmer .
Cc:
De LaTorre, Julian
Subject:
Fwd: 1786 Example Letter
Attachments: Example Letter
Ed
Attached please find the example letter that I had previously sent to
Brian. We would also need the information about the manholes backing up
being acceptable to the City in this letter.
Below is also the new wording that we are putting in our encroachment
permits as well as on the mylars prior to approval of any outlets.
13. PRIOR TO APPROVAL OF A PERMANENT ENCROACHMENT PERMIT FOR OUTLETS
DISCHARGING INTO CVWD FACILITIES, THE PERMITTEE SHALL PROVIDE A LETTER
FROM THE LAND USE AUTHORITY FOR THE PROJECT CERTIFYING THAT THE PROJECT
HAS BEEN REVIEWED AND DETERMINED TO MEET THE REQUIREMENTS OF THE
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM PERMIT AND WASTE -
DISCHARGE REQUIREMENTS FOR THE DISCHARGE OF STORMWATER IN THE WHITEWATER
RIVER WATERSHED, WHICH IS KNOWN AS THE MS4 PERMIT. THIS CERTIFICATION
APPLIES TO REQUIREMENTS INCLUDED IN THE DRAINAGE AREA MANAGEMENT PLAN,
STORM WATER MANAGEMENT PLAN, STORM WATER POLLUTION PREVENTION PLAN AND
WATER QUALITY MANAGEMENT PLAN DESCRIBED IN THE MS4 PERMIT AND APPLICABLE
TO THE PROJECT AT THE TIME OF THE APPLICATION.
CVWD REQUIRES THE PERMITTEE TO IMPLEMENT CONTROL MEASURES TO THE
MAXIMUM EXTENT PRACTICABLE TO PREVENT THE DISCHARGE OF NON- STORMWATER
GENERATED RUNOFF INTO THE
CHANNEL. THE PERMITTEE SHALL REPAIR AND MAINTAIN THE OUTLET STRUCTURE
AND THE CHANNEL TO MITIGATE ANY CONDITION OF NUISANCE AND /OR DAMAGE TO
THE OUTLET STRUCTURE AND THE CHANNEL CAUSED BY THE PERMITTE'S
DISCHARGE OF NON - STORMWATER AS DETERMINED BY CVWD. THIS MAINTENANCE AND
REPAIR SHALL INCLUDE, BUT NOT BE LIMITED TO OUTLET CONCRETE REPAIRS,
CHANNEL BOTTOM SCOUR REPAIR, SLOPE PROTECTION REPAIR, VEGETATION
CLEARING, PONDEDMHSANCE WATER REMOVAL, ETC. FAILURE TO COMPLY WITH
THESE CONDITIONS OF APPROVAL MAY RESULT IN CVWD REVOKING THE PERMANENT
ENCROACHMENT PERMIT ASSOCIATED WITH THE OUTLET AND REMOVAL OR SEALING OF
THE OUTLET.
If you have any additional questions please let me know. Thank you.
W
4/21/2009
rage i or L
rage /_ of z
Please note change of e-mail address to tflatt@cvwd.org
Sincerely,
Tyme Flatt
Assistant Stormwater Engineer
Coachella Valley Water District
(760) M- 2651 x2229,
tflatt@cvwd.org
4/21/2009
4
CITY OF INDIO
100 CHIC CENTER MALL • INDIO, CA 9220:1
760:391 4000 • FAX 760:391.4008 WWlA1.INDIq;ORG
Mr. Steve Robbins September 20, 2007
Coachella Valley Water District .
P.O. Box 1058
85 -955 Avenue 5.2
Coachella, :CA 92236 .
RE: Whtewater River Watershed NPD:ES. Stormwater Discharge Certification
Miles Avenue Bridge and Street Improvement Project, City of Indio and Riverside County
Dear Mr. Robbins:
The City of Indio has reviewed the:lVltles Avenue:Bridge and Street Improvement plans, specifically
the proposed storm drain outlets into the Whitewater River Watershed and is hereby certifying.that
the proposed storm drain system meets the requirements of the National Pollutant Discharge
Elimination System permit and Waste Discharge Requirements for the discharge of stormwater in
the Whitewater River Watershed, .also know as the MS4 Permit. This certification -applies to the
requirements included in the Drainage:Area Management Plan, Storm Water Management Plan,
Storm Water Pollution Prevention Plan and .Water Quality Management Plan described in the MS4
Permit.
We, City of Indio and Riverside County, hope this meets with your approval and we look forward
toward the timely start of construction on this important bridge crossing of the Whtewater River.
Let me know if you will need additional information or it you have any questions on this project.
Sincerely,
Tom Rafferty,
Principal Civil Engineer, City of.Indio
cc: Grant Eklund, PE, City Engineer
ATTACHMENT TO 050721 -1 -015
%J I-
I -
I =
I -
I I_
I -
I -
I 1=of
o j
i!
0
l --
�,
DEVELOPED AREA
63
------- - - - - -� - - -�\I 62.0
FS 10
�
61.4 5
- I FS
= I ® L -671
II = ® ® A -1.04
= I ® ® ® THIS AREA `
I I I ( = I DRAINS TO
NODE 6
S II I
,I
i AREA
t ® DRAIN
I I I
I I 0000
0
L -691
A -2.64
I I
ti,%
O R'C
40' 80'
SCALE .1 " =40'
64
1
120'
L -255
A -0.43
49.4 INV
55.2 FL
2)Q1oo =1.6
Q10 =0.9
CB #5
53.6 FL
9.4 INV
Q1 o =3.5
Qi o =2.1
�A
LEGEND
DRAINAGE DIRECTION
TRIBUTARY DRAINAGE AREA BOUNDARY
TRIBUTARY DRAINAGE SUB -AREA BOUNDARY
■■■ ■■ HYDROLOGIC SOIL GROUP BOUNDARY
P1 PIPE No. 10 PER STORM DRAIN ANALYSIS
(HGL AT 48.0)
(P1) PIPE No. 10 PER STORM DRAIN ANALYSIS
(HGL AT CRITICAL DEPTH)
-
Il
53.8 I 0
FL
4
f
c
I
I
I
I
�l
l
i
0
° 18" S.D. `® a
146 `LF ®
Q10 =4.9
CL
59.5
FS 20
op 1 L�80011 1 1 _
II
{ 1.41, 0 I _
I
I ° L -336 i
I I A -1.45 �' �'o I f =
_ CB #4 I
® ; 53.0 FL Of
48.4 INV `
I 21,.Q1oo =6.2
I 1 i
I FL ' -
,I I 000.a i I I -
{
I
L -135 51. FL ® 24" D. I i
- 31 42.7- IN ® 231 LF
A-0.28 Q1oo 4 6
jQ10 =2.7 Qloo 9 4 1 I
L N Q10= .5 !
AREA (INLET FLO ® 0 i
� I
DRAINS ® a I
. I •Y ;
P7 CID I s
=1 �, I -
7 - P11)
I
F
91 43.9
' Q1oo =1 6 a
Q10 =1 + I
.0
a
i I P19 P25 A I 1
51 57.4 FL 12" S.D. j
j Q10 =4 -3 0 -o
i
-
/ -
i - -
_ � 92 42.4 I N � Q
" i
24 S.D. .D
®® 57.5 ° Q 35 L I =
FS 30- (P9) Q1oo 13.81 I _
II -
i Q10 1 I -
� i I
0000000
i - 250 LF T
--I- I Q1oo =15.0` j
T
-1
01m =0 AREA
DRAIN
°0°� L -484
;° A -4.56
I
TRENCH. RAIN
i ®® 46.5 FL
44.0 INV ao I
Q10 I
_ =2 '
N N A 47.4 11
Q_ d ® ®® ' "���i i� i i��� ■��� Q10o= .3, 1
I Q10 =3 2' 1
FS 70 i
(P29� 3
i- 1 103 P23 2 3 F 71
Q1 0 =20.3
/ 28
Q10=1 1.
/ , I 8" S.D.
246" L S.D. P 2,1 4N .9 1
®® C
51.1 FL
-- - - - - --
_ - - - -_ ® 47.0 INV 52
® Q1oo =20 0
y ID Q10 =1 6
i
i
,/w -------------
52.1 98
o 233' WEST --
:/W R/W
`-" R/W R/W
A -2.46
- rr f• q
P14 (P20)
e
-
AVENUE 48
R/W
51:4 FL
41 39.0 INV
Zy-Q1oo=5.1
Q10 =3.0
(INS F
46:8 FL
43.4 1 W
Q1 o =5.0
60
? 0 A
" � I
6 .D.
66 :LF
loo 34.5
10= 0.0
i
f
L0
a
L -194
A -0.37
1
C
44.
FL
j
37.
INVII
82
Qloor
61
Qlo=t
o
I 1
11
I I
r ; 4-
_
2 4" .D. o
- - - - -- - - -- Q1 0 =47.0 ❑
Si'- -- 11 - o o -Q1 t=2q-.4 - - - _ - - - - --
OW CONTINUES
o THE LA QUINTA
EVACIUAMW_CFIANNE -
R/W R/W R/W I - - - -- - --
MSA CONSULTING, INC. CITY OF LA QUINTA
MAiNmRo, SmrrH & Assocum, INC. CVHC DUNE PALMS NEIGHBORHOOD
PLANNING . cam- ENGINEERING . LAND SURVEYING Parcel 4 of PM 33588
34200 BOB HOPE DRm ■ RANCHO MIliAGE • CA 92270 PROPOSED HYDROLOGY MAP
T mEPHoNE (760) 320 -9811 ■ FAx (760) 323 -7893
11r
CONTRACTOR TO ' REMOVE • p/+p
�/ �/!� Q /��,iyy�� ppA� p HOPE iii. 3�w RGP STQRA4 ;:.
EXISTING r r c- STUB.. P�+•R�/O�pP�� �7���pp��fl1��J�.{. 1A AN pp /�r}y /�
.VOR1[i.:Mrvq�� . M,► AN PER .CI 1 Of
OUT AND ;RECQRE TO FIT'
Un=1 '' Q'U'INTA PLAN SET
. HO EI J. .f..TO {�iW,•IO EVACUATION, C.•I'W'{i!�F.l -. k
r �
0
.. ::� . , O '; EXISTING
t
{:
h
MANHOLE TA
Ao -
BOTTOM IONG. STEM.
wi
INY
DRAIN PER CITY `f ` �? i 1. r ; s DOWEL q
t A QUINTA !?tAN SEf ` t
i < f 1
,..r�,a
... �+ FIRE HYDRANT /N PREPARED FORo wk
_.
OR/1K F�(ISTtNG..IRRtG11ilON NLWALAf�{1
�. GRADE ,.
<.Nott'[t1EAS1' ....W CATE .VALVE � .. _. 42: .. - .. , • � : � _
...- .- .� WATER �CaACH�L�a..A 1/,ALLEY HUU��t�G �C�A1.�T .Ca.. -- . .. -... _
T
Esf
=HZ. HQRIZQN.AL.
SEWER. l�RTERK. ISIS:11t �1At#i .
EASr . !cw wur I . C�
_.:.. 4a 741 tNta�lRQ,E STRUT` � T� . � ,Fw Aft A3M: RELIEF. YALVE:'
AIR.. V14GUilM L1►T• :LATERAL _ AL4. WORK:: SEM1l1,. DONE. N. A+CCAROANCE ;.WLTH. LATEST. Efa1TK?N. _ ...TkIE. ST ,. ., _ 0 - PL4NS E..CITY..-
- .. uET>;+GroR CH�ac � INQ #Cl �A �22Q1:
F. U O.F., LA QU . A..ANI?'.LATEST: EDIrIO V .O!`. THE .STIWDARD SPECIfiGATIONS PURL '''WORKS POW_I UCTIQM;
MEAL FF.Ei �o !� . INT ... , : _ .. FQR. ,. .......... .:. ... _:.
P OUT _
CLEAN
QF MAI+ HO E :: N Y .
BC CURVE M}f .R S . THE RESPONSIBILITY .oF THE tlEYELQP OW .QR CONTRACTQR, T APPI CItY` OF •
T kw . _e _ERf ER TO .
�� >��/p tT. fit)! .3�7 �► „ � wt�+±.11►:
T. TO ROPOS1rQ MAN H
1, : T..iF,tKlN1"Rl�IOiOR!I..
' :. CURB �.� .�. � SCALE . � . 1iQ4.E h . �Wo
a. �. sra .LA ,QUINTA. PUBIJC..WORKS DfPAITf#AEl+IL::FQR . THE - NECESSARY`.PERI�Il1"S ANQ,TQ:;BE• R�tBLE:,FOR : • at$�+kti#1�11f''
k ON?rR�Ira: ...
R T C
I -4 R /L. PROPERTY E.MIE �,r,. 11A : SATISFACTORY COMPLIANCE FOR ALL._CU ENV{RQNMENT.:.:RE. TINS. DURING:THE >,LIFE.!!F: '
PROPQ D .IR+ATEit SERVK W(TN. 9ACKfLOW Deem
Y PCG POINT CQMPOWltI CUB€. .
O
8V ALVE .. _ 1
't'�RFL
s. N FQR: THLS. PRO; AgQITbQt�IAI.. STIJQiF,..l►MD OR: PERbItFS A:A►`C RSQt1iRED:.
.VK
csrRUrl�...nA+rtivrcus .
:RE.t�1JCl;R. VE.IAdiD B<�tiW -�AFF p� ,,..,4..�
P� PIIIII.0 !�^ INllfril' i111L 1'N1Q1/R' w ... � . �T'r- ... ... T^S ! .. 1"T'7 t 1_11 c r � ..,. ,. ..� .�...... .... �.... .........�..........,... ...........+......... .......... .... �....�,.....,..�...�.. .... ....._...�...+................. - --- ---__—_ ..... ..a ne,elt..mmweaent _
., - _ r .• r .. ..- .. .l.. a �..: ! ,,. -:., _ ,;n.
q!�3TALL HW*E .. t f. H_ WA N..OR !NA : AJVF
!*, .... :
.. o 4 _ . YS 1 QER TO ELIM
_ ._T - IE ANY FiAEARDS.
r ,
:
' N LAS . : »`: .
_ RA •...._ ....,
r _ . .: TIMAk[tAlr
ti ... 3.
CONSTRUCTION PROJ R 1 _ ;
■■ �w 1 'i `
PROJECTS B MORE. 1 ACRE AIN A NA ' PO LITANY ;
�. 1�. /,rte►_ I. �� � 1'� ... u�u. � � �usr �eT T►Qw4L u, +�CI�+
- X71
f=
ml
WATER DISCLAW
R NQ
ftUN` ,OF ..hN SC'I�PIMIG, of PERS{STS. CAN ; i't3TEMTtALtY RESULT :,IN. py►MAGE' TU QR FNWRE..OF QRtt.WEL L.$j REfENTIQN. Q�oo� $ 4` ds f%
BASS HAR[?S{;APE'aRt :PA1tEMENT.: TF . MIGN :SHOWN .HEREIM.:IS '.INTENDED 'TO C�MPf.Y ..WITH ;ACENCY.,REQUIREMENTS. 'INDUSTRY STANDARQS
SHEET 'INDEX
EiABED UR�I IFaRMI►iKl�1 :AYAIL,, 8Al E: :Tt? THF. DESIGN; ; • I4SS1,Iirtt . RErain I L :_hWNTfMArIGE SON .. �?.HG T
AN 3 LQG�L:.CONOIriONS: THE 'PART:'
OF .THE P'RQ4Tt'
QWI, R.. clR, :.ASSOC{ATKH"1; IT 41S RECOMMENOEQ' WI : T1iE AE�FER. IN PORATE ANTQ: FUTURl±:`�CdcR'S �NFQRGEABI�. 0' 10Q' 2p(3: .300' . 401'
Ft�0*�01&; AGAINST 0! R.- IIMATERING. W FUTVK: RESIDENTS.
T A T l, > ITION9 rE ss�
»�
Q. .
RAGTOR AGREg$ -'.TO= ME'SOLE ,AN COMPLETE- ,.RESPO SIBlONY FOR THE: 4W SITE• CQNDrriON: :SCALE i,
ASSU
;.THE PERSONS t..
.8'tea
DURING :THE C9URSE 4F .CQNSTRt1CTIQN. OF. THIS:,PRWECT..{NCLUQING SAFEtY :OF N.L. .. _
THIS PLAN.. HAS., BEEN .REYIEWED,.BY:EARTH`''S,YSTEMS SOUTFIitVEST
IREMENT APPUES :C ONTN�lUOUSLY AND !S NOT,.UMITED TO NORMAL: WORKING HOURS. _ ,•�`° f �, - _.. �•. . �� o
.PROP.
THIS REQU ....:
DEFEND'' O"MNIFY' 'AND:.HQW' :TM OWNER: AND.• THE' MSA CONSULTING MIT :Y• :WITH . T R C4 NDATIQ
- `THE >CONTRACTOR- -AkS�# AtREES..TQ _ . . -. .,.E, � APPEARS..TO..BE..{N CiENERAI, GONFQR Hi; E -
F ,-
QI+At, TOLLED r�
�� ALERT .. �rl/� _ uwDUY ccc -CDn►� ♦�/V �Vn' X11. ! IAQII IT/ ..0011 -:AO �I fC�`_C11:' 1►I t'Y1AIAlC�4TIAAI WIRI TLIR RF'Qf:11R1i�A![`.�. i �...... ...�....,..�...'..�..... _...: ..:.�..: .....,... v..... ru .+ -.0 .. i�rR, w�rw� e� �' :wn ��s.lr2s J. 0A .tip .. :SJ 'f�AZAA(#
7
i
.
�'
4
: ,
—
'
.. — — :�— — �.,-- • =�.:- =- :.rte... — —
{
j
I
v 1
...
f
46.. f►C
l
:
j�£
111 i `
.. r
is
.14
{
i
r.•.
i
`Y
� tr i Ni
f j
ask
r
i - ^- , - --
r IN I'll WIN 1111
.,
I Poll ill pi
ti
N
X1;
�S
.i
Jf f
April 2, 2009
Tim Jonasson, Director of Public Works
CITY OF LA QUINTA
78 -495 Calle Tampico
La Quinta CA 92247 -1504
Subject: Wolff Waters Place M54 Compliance _:PM 33S% _r-JAYZc._L �.
Dear Tim:
MSA Consulting, Inc., and Coachella Valley Housing Coalition (CVHC) would like to
submit this letter to you to address the National Pollutant Discharge Elimination
(NPDES) Whitewater River Region Storm Water Management Program. The purpose of
this letter is to describe compliance with the Municipal Separate Storm Sewer System
(MS4) required by the Coachella Valley Water District (CVWD) in relation to the project
located at the northwest corner of Dune Palms and Avenue 48 (Wolff Waters Place).
We are providing a description of the Pollutants of Concern for the area. Project Specific
Best Management Practices (BMPs) are included in this letter that will reduce the
Pollutants of concern to the Maximum Extent Possible (MEP).
The project is implementing measures as delineated and defined in Supplement A to the
Riverside County Drainage Area Management Plans (April 1996). Supplement A is
attached to this letter for your reference. According to Supplement A, The BMPs
proposed herein will meet the permit requirements while not imposing undue burden
on those that are to implement the actions called for.
We feel that implementation of the non - structural measures throughout the life of the
project and inclusion of structural measures within the project design and construction
will serve to mitigate, to the most feasible degree and to the MEP, post construction
contaminant impacts (including pollutants of concern) to the Whitewater Drainage Area
Management Plan.
34200 BOB HOPE DRIvE ■ RANCHO MIRAGE ■ CALIFORNIA ■ 92270
760 - 320 -9811 ■ 760 - 323 -7893 FAX B www.MSACONSULTINGINC.COM
Mr. Tim Jonnason
Page 2 of 6
April 2. 2009
The standard measures indicated by Supplement A are listed below. The project's
detailed implementation of the primary BMPs are described, subsequently.
Supplement A Non - structural BMPs ( *Measures to be provided by owner through
Management Entity, Lease Agreements and Maintenance Contracts):
N1. Education for Tenants and Occupants
N2. Activity Restrictions
N3. Common Area Landscape Management
N4. Common Area Catch Basin Inspection
N5. Common Area Litter Control
N6. Street Sweeping Private Streets and Parking Lots
N8. Spill Contingency Plan (for Maintenance Vehicles/ Equipment)
N13. Employee Training/ Education Program
N14. BMP Maintenance
Supplement A Structural BMPs ( *Measures to- be provided by owner through project
design and construction):
S1. Control of Impervious Runoff (includes vegetated swales and retention basins)
S2. Common Area Efficient Irrigation
S3. Common Area Runoff- minimizing Landscape Design
S6. Trash Container (dumpster) Areas
S8. Outdoor Storage (oils, fuels, solvents, landscape chemicals)
S12. Catch Basin Stenciling ( "No Dumping - Only Rain in the Drain")
Supplement A Special Structural BMP:
SP1. Water Quality Inlets
Please note that we have incorporated nearly all Structural and Non - Structural
Measures described as appropriate for residential developments within Supplement A.
We have also included some additional measures that are indicated for more intense
usages.
Pollutants of Concern:
According to NPDES NO. CAS617002, the Clean Water Act Section 303(d) list has
identified portions of the Coachella Valley Stormwater Channel (CVSC) that are not
meeting Water Quality Standards (WQS) for pathogens (fecal coliform) and
toxaphene. The CVSC is the constructed downstream extension of the Whitewater
River Channel starting near Indio.
34200 BOB HOPE DRIvE ■ RANCHO MIRAGE ■ CALIFORNIA ■ 92270
760 - 320 -9811 ■ 760 - 323 -7893 FAX ■ www.MSACONSULTINGINC.COM
Mr. Tim Jonnason
Page 3 of 6
April 2. 2009
The portion of the drainage system that is located in the City of La Quinta is the
Whitewater River. The Whitewater River is not designated impaired. However,
because the CVSC is impaired (from Dillon Road to the Salton Sea), all projects that
drain into the system are required to mitigate bacteria to a medium or high
effectiveness (presuming the development type is identified as a potential source of
bacteria).
Currently a Basin Plan Amendment for a "wet weather exemption' for the
Whitewater River is being drafted. When the exemption is in place,. that
requirement to consider medium or high effectiveness BMPs will be removed.
Jason Uhley of the Riverside County Flood Control and Water Conservation District
(RCFCWCD) instructed the team to emphasize BMPs related to Pathogens, as these
are the project's primary pollutants of concern:
• Pathogens (bacteria, protozoa, viruses): The project will mitigate this concern by
prohibiting pets. John Carmona of the Regional Water Quality Control Board
indicated that pet waste is a major contributor of pathogen contamination. The
absence of pet waste will mitigate pathogens to the MEP.
(As mentioned previously, the CVSC is also identified as impaired by toxaphene
from agricultural activities. Toxaphene was banned from all uses in the US in
1990. It will not be an issue with this project and is discussed further below).
• Per our Discussion with Brian Peulicke (CVHC Land' Development and
Construction Manager) Property leases will not allow any pets. This action will
result in the absence of waste which will mitigate this primary pollutant of
concern to the Maximum Extent Practicable. This BMP is referred to as "Source
Control" and is one of the most effective Management Practices, according to the
RCFCWCD.
• Additionally, as described below, a series of infiltration measures will be
utilized throughout the project and especially in -line with the storm drain line
that discharges directly into the La Quinta Evacuation Channel.
Our "secondary" pollutants of concern consist of the remaining list of pollutants
commonly found in Urban Runoff:
• Sediment: In addition to general grounds- keeping requirements of the
maintenance staff of the multifamily residential facility the project will mitigate
this pollutant by capturing remaining sediment in the primary settling chamber
of the Maxwell Plus Drywell (discussed below). It will then be removed in
compliance with a required maintenance schedule (N14 BMP Maintenance).
34200 BOB HOPE DRIVE ■ RANCHO MIRAGE ■ CALIFORNIA ■ 92270
760 - 320 -9811 ■ 760 -323 -7893 FAX ■ www.MSACONSULTINGINC.COM
Mr. Tim Jonnason
Page 4 of 6
April 2, 2009
(The following BMPs mentioned previously will. also mitigate this type of
pollutant: N3 Common Area Landscape Management, N5 common area litter
control, N6 Street Sweeping of private streets and parking lots, S3 Common
areas runoff - minimizing landscape design).
• Trash: In addition to general grounds- keeping requirements of the maintenance
staff of the multifamily facility (and the following BMPs mentioned previously:
N3 Common area landscape management, N5 common area litter control, N6
Street sweeping of private streets and parking lots) the project will mitigate this
pollutant by capturing all sediment in the primary settling chamber of the
Maxwell Plus Drywell. It will then be removed in compliance with a required
maintenance schedule (N14 BMP Maintenance).
• Fertilizers (nutrients, compound of nitrogen and phosphorus) Drip irrigation
and several small retention basins, will minimize nuisance water that may carry
fertilizer from landscaped areas (S2 common area efficient irrigation, S3 common
area runoff - minimizing landscape design).
• Pesticides (DDT, Chlordane, Diazinon, chlorpyrifos): 'DDT, Chlordane,
Diazinon and Toxaphene (discussed above) are prohibited by law in the US for
residential uses. Chlorpyrifos are expected to be banned in 2008. These chemicals
will not be utilized by the project. Additionally, as mentioned above drip
irrigation and several small retention basins, will minimize nuisance water that
may carry pesticides from landscaped areas (S2 common area efficient irrigation,
S3 common area runoff - minimizing landscape design).
• Heavy metals (cadmium, chromium, copper, lead, zinc): The project will
mitigate these pollutants, by capturing heavy metals, along with sediments, in
the primary settling chamber of the Maxwell Plus Drywell. They will then be
removed in compliance with a required maintenance schedule
• Petroleum products (oil, grease, petroleum hydrocarbons, polycyclic aromatic
hydrocarbons): The project will mitigate this pollutant by capturing petroleum
products in the hydrophobic petrochemical sponges contained in the main
Chamber of the Maxwell Plus Drywell. It will then be removed in compliance
with a required maintenance schedule
*Per a discussion with Brian Peulicke, Maintenance contract will include language
that defines all maintenance schedules and prohibits the use of fertilizers described
above. This action will result in the management of the "Secondary" Pollutants of
Concern and will mitigate to the Maximum Extent Practicable.
34200 BOB HOPE DRIvE ■ RANCHO MIRAGE ■ CALIFORNIA ■ 92270
760 - 320 -9811 ■ 760 - 323 -7893 FAX ■ www.MSACONSULTINGINC.COM
Mr. Tim Jonnason
Page 5 of 6
April 2, 2009
Additional Infiltration BMP's
Infiltration is the BMP of choice by the Riverside County Flood Control and Water
Conservation District, due to its proven efficiency in removing pollutants from
Storinwater. Therefore, this project also includes the provisions to infiltrate the runoff
from the first 3/8 inch of rainfall in the 100 -year storm.
The project design includes four proposed Maxwell Plus Drywells. The identification of
an appropriate location of one "future" Drywell has also been provided as a
contingency plan should any regulatory changes to design parameters occur.
The BMP facility for offsite flow will handle 0.28 cfs and the onsite facility will handle
0.82 cfs. Maxwell Plus Drywells are designed to infiltrate 0.25 cfs. One (1) drywell will
sufficiently treat the offsite runoff and three (3) drywells will be constructed to handle
the onsite runoff.
Four drywells will be installed in the parkway along Dune Palms Road. We also
request a variance for the drywell separation to 70 -feet. Torrent Resources (company
that installs Maxwell drywells) states minimum separation for. cities in Arizona and
Nevada is 50 -feet, and doesn't anticipate any issues with drywells in this area at 70 -feet
The Maxwell Plus Drywell includes a primary settling chamber (mentioned previously)
and a secondary chamber. The drywell pipe extends directly from the secondary
chamber. Both chambers contain a hydrophobic petrochemical sponge that removes
further pollutants prior to flows entering into the drywell structure.
The Maxwell Plus effectively infiltrates nuisance and first flush flows, therefore
pollutants of concern that are not captured in upstream BMPs, such as the settling
chamber or the hydrophobic petrochemical sponges, are naturally filtered out by native
soils and not released into the MS4 system. The depth to groundwater is well over 100
feet at the project location and the Maxwell Drywell is designed to penetrate to
approximately 50 feet.
The floating blankets (hydrophobic petrochemical sponges) contained within the
secondary chambers will absorb up to 128 ounces of hydrocarbons per blanket before
saturation. Each Maxwell Plus drywell contains two floating blankets; therefore each
can remove up to 256 ounces of petroleum -based organic compounds before
maintenance is necessary. This results in a total removal of 1024 ounces of petroleum -
based organic compounds.
34200 BOB HOPE DRIVE ■ RANCHO MIRAGE ■ CALIFORNIA ■ 92270
760 - 320 -9811 ■ 760 - 323 -7893 FAX ■ www.MSACONSULTINGINC.COM
Mr. Tim Jonnason
Page 6 of 6
April 2. 2009
Maintenance of Drywells
Coachella Valley Housing Coalition will coordinate with Torrent Resources regarding
any product specific maintenance requirements.
In addition the following provisions are included in the Offsite Storm Drain
Improvement Plan to supplement the product specific maintenance.
1. Establish periodic inspection program. Include, as a minimum, quarterly
removal of the covers and inspection for silt of sediment in drywell
sedimentation chambers.
2. Inspect catch basins and dry wells after any storm event of significance for
sediment buildup.
3. Monitor nuisance water runoff periodically; excess landscape irrigation
which results in street runoff can tax the drywell over time. Make certain
that retention basin is not watered excessively for extended periods.
4. Either manually or using vacuum truck service, clean out the drywell
chambers of all sediment on an as- needed basis.
5. Do not allow the sediment to build to the level of the overflow pipe in any
event. Once sediment enters the drywell below the sedimentation
chamber, the well can become contaminated and the voids may clog.
6. Provide a written log of the inspections and clean out frequencies, so that
the drywells can be monitored in the future with the proper frequency.
7. It is the responsibility. of the Coachella Valley Housing Coalition to
maintain drywells and further NPDES treatment facilities.
Please contact me if you should have any questions.
Very truly yours,
ti
Michelle Witherspoon
Director of Environmental Services
MDW %nv
c: Patti Reyes
c: Ed Wimmer
34200 BOB HOPE DRIvE ■ RANCHO MIRAGE ■ CALIFORNIA ■ 92270
760- 320 -9811 ■ 760 - 323 -7893 FAX ■ www.MS,ACONSULTINGINC.COM
BMP for Wolff Waters Apartments
Infiltrate runoff from the first 3/8 inch of rainfall in the 100 -year storm
Our goal is.to provide the calculations to support a BMP system that complies with the
requirements of MS4 and the City. In addition, our goal is to design a cost effective and
practical system.
Here is the technical backup to support the new approach.
1. The 100 -year, 24 -hour storm was chosen because this storm represents the worse
case scenario (largest runoff volume) of the four 100 -year storms (1 -hr, 3 -hr, 6 -hr & 24-
hr). The 24 -hour storm produces and effective rain of 2.61 inches per acre of runoff (see
Shortcut Method Synthetic Unit Hydrograph and Synthetic Unit Hydrograph Factors
attached).
2. As shown on the Synthetic Hydrograph, the first 3/8 inch of rainfall, which represents 9
percent of the storm, falls in the first 9 intervals (4.5 hours) of the storm. The Synthetic
Hydrograph is based on 1.0 acre of tributary area.
3. Also, as shown in the ninth interval, the FLOW is 0.0825 cubic feet per second (cfs)
per acre.
4. The project consists of 3.4 acres of offsite area and 13.6 acres onsite. Of the 13.6
onsite acres, 3.3 acres are tributary to the small retention basins throughout the site;
therefore reducing the onsite acres to 10.3 acres (see BMP Self Contained Area Map).
5. Using the maximum FLOW rate and the off and onsite area, we can determine the BMP
facility for offsite flow will have to handle 0.28 cfs (3.4 x.0825) and the onsite facility will
have to handle 0.85 cfs (10.3 x..0825).
6. Maxwell Plus Drywells are designed to infiltrate 0.25 cfs. If that rate is acceptable, we
propose one (1) drywell for the offsite runoff and three (3) drywells for the onsite runoff.
7. We propose to install the four drywells in the parkway along Dune Palms Road (see
sketch attached). We also request a variance for the drywell separation to 60 -feet.
Torrent Resources (the company that installs Maxwell Drywells) states minimum
separation for cities in Arizona and Nevada is 50 -feet, and doesn't anticipate any issues
with drywells in this area. In the event another drywell becomes necessary, one can be
located 60 -feet north of the most northerly drywell (see BMP Self- Contained Area Map)
This is our proposal for a practicable solution.
N0. 43880
07
i J'l CIVIC-
OF CA10F��
34200 BOB HOPE DRIVE ■ RANCHO MIRAGE ■ CALIFORNIA ■ 92270
760 - 320 -9811 ■ 760 - 323 -7893 FAX ■ www.MSACONSULTINGINC.COM
Synthetic Unit Hydrograph Factors
The Synthetic Unit Hydrograph, Shortcut Method, as prescribed in the 1978 Riverside County
Flood Control & Water Conservation District Hydrology Manual, was used to determine the runoff
volumes created from the proposed improvements in a 100 -year, 24 -hour storms. The data used
in the Synthetic Unit Hydrograph calculations are as follows:
Soil Group:
Runoff Index (RI) Number:
Infiltration Rate (FP):
Impervious Area (A;):
Constant Loss Rate (F):
Low Loss Rate:
Storm Frequency:
Total Adjusted Storm:
B, AMC -II (site has combination of A and B soils,
soil type B used for calculations)
56.(Urban cover — Residential)
0.51 in /hr
80% (Apartment)
0.51[1 - 0.9(80 %)] = 0.14 in /hr (Apartment)
0.9 — (0.8 X 80 %) = 26% (Apartment)
100 -Year
24 -Hour: 4.25 inches
The low loss rates obtained are per the approved RCFC & WCD Hydrology Manual computer
program:
(Developed condition) Low Loss Rate 0.90- (0.8 x % impervious)
34200 BOB HOPE DRIVE ■ RANCHO MIRAGE ■ CALIFORNIA ■ 92270
760 - 320 -9811 ■ 760 - 323 -7893 FAX ■ www.MSACONSULTINGINC.COM
R C F C& W C D
Nw5R @1LO6V
1l°lU��i�1d
"SHORTCUT METHOD"
SYNTHETIC UNIT HYDROGRAPH METHOD
Unit Hydrograph and Effective Rain
Calculation Form
Project
1786 CVHC Dune Palms
sheet
By JAD Date
Checked- Date
[1) CONCENTRATION POINT -
(31 DRAINAGE AREA -ACRES 1.00
[5] UNIT TIME- MINUTES 30h
[7] UNIT TIME - PERCENT OF LAG (100•[511[6]) `-
19] STORM FREQUENCY & DURATION 100 -YR, 24-HR
[11) VARIABLE LOSS RATE (AVG)- INCHES /HOUR -
[131 CONSTANT LOSS RATE- INCHES /HOUR 0.14
[2] AREA DESIGNATION -
[41 ULTIMATE DISCHARGE - CFS - HRS /IN (645•[3]) -
[6) LAG TIME - MINUTES -
[8] S -CURVE -
1101 TOTAL ADJUSTED STORM RAIN- INCHES 4.25
[12] MINIMUM LOSS RATE (FOR VAR. LOSS) -INIHR -
041 LOW LOSS RATE- PERCENT 26
UNIT HYDROGRAPH
EFFECTIVE RAIN
FLOOD
HYDROGRAPH
1151
UNIT
TIME
PERIOD
m
[161
TIME
PERCENT
OF LAG
[71•[151
1171
CUMULATIVE
AVERAGE
PERCENT OF
ULTIMATE
DISCHARGE
(S- GRAPH)
[16]
DISTRIB
GRAPH
PERCENT
[17]m- [17]m -1
1171
UNIT.
HYDROGRAPH
CFS - HRS /IN
[41.1181
100.000
[201
PATTERN
PERCENT
(PL E -5.9)
[211
STORM
RAIN
IN /HR
601f 0Ir201
100[5)
[221
LOSS
RATE
IN /HR
[23]
EFFECTIVE'
RAIN
IN /HR
[211 -[221
[241
FLOW
CFS
MAX
LOW
1
0.5
0.043
0.140
0.011
0.031
0.0317
2
0.7
0.060
0.140
0.015
0.044
0.0444
3
0.6
0.051
0.140
0.013
0.038
0.0381
4
0.7
0.060
0.140
0.015
0.044
0.0444
5
0.8
0.068
0.140
0.018
0.050
0.0507
6
1.0
0.085
0.140
0.022
0.063
0.0634
7
1.0
0.085
0.140
0.022
0.063
0.0634
8
1.1
0.094
0.140
1 0.024
1 0.069
0.0698 '
x.$
1.3
0.111
0.140
0.029
0.082
0 6.0825:'
128
0.140
0.033
0.094
0.09 =1
11
1.3
0.111
0.140
0.029
0.082
0.0825
12
1.6
0.136
0.140
0.035
0.101
0.1015
13
1.8
0.153
0.140
0.040
0.013
0.0131
14
2.0
0.170
0.140
0.044
0.030
0.0302
15
2.1
0.179
0.140
0.046
0.039
0.0388
16
2'.5
0.213
0.140
1 0.055
0.073
0.0731
17
3.0
0.255
0.140
0.066
0.115
0.1160
18
3.3
0.281
0.140
0.073
0.141
0.1417
19
3.9
0:332
0:140
0.086'
0.192
0.1931
20
4.3
0.366
0.140
0.095
0.226
0.2274
21
3.0
0.255
0.140
0.066
0.115
0.1160
22
4.0
0.340
0.140
0.088
0.200
0.2017
23
3.8
0.323
0.140
0.084
0.183
0.1845
24
3.5
0.298
1 0.140
0.077
1 0.158
0.1588
25
5.1
0.434
0.140
0.113
0.294
0.2959
26
5.7
0.485
0.140
0.126
0.345
0.3474
27
6.8
0.578
0.140
0.150
0.438
0.4416
28
4.6
0.391
0.140
0.102
0.251
0.2531
29
5.3
0.451
0.140
' 0.117
0.311
0.3131
30
5.1
0.434
0.140
0.113
0.294
0.2959
31
4.7
0.400
0.140
0.104
0.260
0.2617
32
3.8
0.323
0.140
0.084
0.183
0.1845
33
0.8
0.068
0.140
0.018
0.050
0.0507
34
0.6
0.051
''0.140
0.013
0.038
0.0381
35
1.0
0.085'
0.140
0.022
0.063 `
0.0634
36
0:9'
0.077
'0.140.
0.020
0.057
0.0571
37
0.8
0.068
0.140
0.018
0.050
0.0507
38
0.5
0.043
0.140
0.011
0.031
0.0317
39
0.7
0.060
0.140'
0.015
0.044
0.0444
40 '
0.5
0.043
'0.140
0.011
0.031
0.0317
41
0.6
0.051
0.140
0:013
•0.038
0.0381
42
0.5
0.043
'0: 140
0.011
0.031
0.0317
43.
0.5
0.043
0.140
0.011
0.031
0.0317'
44
0.5
0.043 '
0.140
0.011
0.031.
0.0317
45
0.5
0.043
0.140
0.011
0.031
0.0317
46 '
0.4
0.034
0.140
0.009
0.025
0.0254
47
0.4
0.034
0.140
0.009
0.025
0.0254
48
0.4
0.034
0:140
0.009 '
0.025
0.0254
TOTALS 1
100.0
5.220
5.2839
EFFECTIVE. RAIN = . 2.610 INCHES
TOTAL RUNOFF VOLUME 0.22 AC -FT
cum.
volume • volume
(ac-ft) (ac-ft)
0.0013 0.0013
0.0018 0.0031
0.0016 0.0047
0.0018 0.0086
0.0021 0.0086
0.0026 0.0113
0.0026 0.0139
0.0029 0.0168
0.0034 0.0202
0.0039 0.024
0.0034 0:0275
0.0042 0.0317
0.0005 0.0323
0.0012 0.0335
0.0016 0.0351
0.0030 0.0381
0.0048 0.0429
6.0059 0.0488
0.0080 0.0568
0.0094 0.0661
0.0048 0.0709
0.0083 0.0793
0.0076 0.0869
0.0066 0.0935
0.0122 0.1057
0.0144 0.1200
0.0182 0.1383
0.0105 0.1488
0.01.29 0.1617
0.0/22 0.1739
0.0106 0.1847
0.0076 0.1924
0.0021 0.1945
0.0016 0.1960
0.0026 0.1986'
0.0024 0.2010
0.0021 0.2031
0.0013 0.2044
0.0018 0.2062
0.0013 0.2076
0.0016 0.2091
0.0013 0.2104
0.0013 0.2118
0.0013 0.2131
0.0013 0.2144
0.0010 0.2154
0.0010 0.2165
0.0010 0.2175