Loading...
33960 (3)IF-1111111111111F 22 IE Go Project Site: COSTCO PLAZA La Quinta, CA Prepared for: COSTCO WHOLESALE COMPANY 999 Lake Drive Issaquah, WA 98027 Project Manager: Bob Strong, P.E. Date Prepared: May 2095 JN: 156.93.07 AIL? VMENT ,)!:?AANEN L LID Mml '4�: Prepared by: ENGINEERING 16795 Von Karman Avenue, Suite 100 Irvine, CA 92606 (949) 474-1960 www.fuscoe.com r� Hydrology /Hydraulic Report April 2005 TABLE OF CONTENTS 1.0 PROJECT DESCRIPTION ............................ ..............................1 1.1 Existing Conditions ........................................ ............................... 1 1.2 Proposed Development ................................... ............................... 1 2.0 BASIS FOR DESIGN ................................... ..............................2 3.0 PROPOSED STORM DRAIN FACILITATES . ..............................3 4.0 RESULTS AND CONCLUSIONS .................. ............................... 3 5.0 APPENDICES ............................................... ..............................4 Appendix 1 - Site Hydrology .................................... ............................... 4 Appendix 2 - Site Hydrology Map (pocket) ..... 4 Prepared by: 1 Fuscoe Engineering, Inc. 16795 Von Karman Avenue, Suite 100 Irvine, California 92606 (949) 474 -1960 (949) 474- 5315.(fax) 156.9301 Costco La Quinta • • • Hydrology /Hydraulic Report April 2005 156.9301 Costco Plaza City of La Quinta Project Number: 156.93.01 Supervising Engineer: Bob Strong RCE No. 28300 Date Prepared: April 2005 Costco La Qu i nta Hydrology /Hydraulic Report April 2005 • 1.0 PROJECT DESCRIPTION 1.1 Existing Conditions The project site is approximately 27 acres located near the southwest corner of Jefferson Street and Highway 111. The site is presently undeveloped and is bounded on the east by an undeveloped parcel in the City of Indio, -on the west by an undeveloped parcel, on the north by Highway 111 and on the south by La Quinta Evacuation Channel. The site drains in a southerly direction to the channel where the flow enters the channel from the top and continues northerly in the channel to White Water River approximately 2500' to the north. 1.2 Proposed Development The 27 acre site is proposed to include a Costco, other retail buildings and associated parking facilities. 156.9301 1 Costco La Quinta Hydrology /Hydraulic Report April 2005 • • • 12.0 BASIS FOR DESIGN The basis for design of the storm drain system includes analyzing the natural condition and proposed development using the 100 year design storm per the County of Riverside Hydrology Manual. The site storm drain system will be designed to convey the 100 year storm with the building finished floors elevated above the 100 year flood elevation. Per discussions with Coachella Valley Water District, owners of La Quinta Evacuation Channel, detention of flow will not be required on site. The site storm drain system will outlet directly to the channel. 156.9301 2 Costco La Quinta Hydrology /Hydraulic Report April 2005 • 13.0 PROPOSED STORM DRAIN FACILITATES The site storm drain system will be designed to intercept flow from the parking areas and building and convey the flow to the existing La Quinta Evacuation Channel. Storm water will be filtered using a CDS unit, or similar structure, prior to release into the existing channel. .0 RESULTS AND CONCLUSIONS The building will be protected from 100 year flows. All site flows will discharge directly to the La Quinta Evacuation Channel using a conventional system of pipe and inlets. 156.9301 3 Costco La Quinta Hydrology /Hydraulic Report April 2005 • 15.0 APPENDICES Appendix 1 - Site Hydrology Appendix 2 - Site Hydrology Map (pocket) 401 156.9301 4 Costco La Quinta COMPONENT AREA NUMBER ACREAGE Q1 CO FLOW (CFS)- 100 YEAR FREQUENCY CFS CUBIC FOOT PER SECOND --"a- FLOW DIRECTION HYDROLOGY NODE HWY Ill SHEET. I OF '"ff AUG 12 2005 Eyl � ^� S� �`��. 1 • r•_ �' 't V . F �� �- ��. ,..�.��r� --' � �setc"'�,ztt�`�'l"',�5 -, ,= e,4yS"'. � �a _<+.�42 .k-,.; . r S HWY 111 ■ Al JA 12 1