Loading...
TUP 2018-0005 Torre Nissan Temporary Parking (UPDATED 07.03.2018)June 26, 2018 Updated: July 3, 2018 Mr. Craig Boyajian 79125 Highway 111 La Quinta, CA 92253 SUBJECT: TEMPORARY USE PERMIT 2018-0005 – TORRE NISSAN TEMPORARY PARKING Dear Mr. Boyajian: The Design and Development Department hereby approves your application request to operate a temporary parking lot for Torre Nissan vehicles at the southwest corner of Auto Center Drive and Auto Center Way in the City of La Quinta. This decision may be appealed or called up to the Planning Commission within 15 calendar days of the issuance of this letter (July 11, 2018). The temporary parking lot shall be installed in conformance with the application and attached exhibits and subject to the following conditions: 1.The temporary parking lot (lot) can remain operational for a twenty seven month period, from the date of this approval letter (September 26, 2020), which includes the estimated three (3) month time period to establish the use. Use of the subject parcel for purposes of temporary parking shall cease upon expiration of Temporary Use Permit 2018-0005, unless a new Temporary Use Permit has been approved. 2.Access to lot shall only occur during regular business hours for Torre Nissan. If additional car dealership(s) are proposing to use the site, applicant shall notify Planning Division staff and obtain Director approval. This may require, at a minimum: a revised site plan, operational information, and conditions of approval. 3.The entire lot shall be compacted with gravel or AB fill prior to any car being parked. 4.No temporary signs are permitted unless separately approved by this Department. 78-495 Calle Tampico La Quinta, CA 92253 760.777.7000 5. Prior to use of the lot, applicant shall apply for and construct driveway approach through the Public Works department. Driveway approach shall be located at access point identified on attached site plan. If applicant proposes to change location of driveway approach, a revised site plan shall be submitted and approved by the Planning department. For more information on applying for driveway approach, contact Amy Yu at (760) 777-7047 or ayu@la-quinta.org 6. Applicant shall comply with the requirements for Fugitive Dust Control per Chapter 6.16.040 of the La Quinta Municipal Code. 7. Surrounding streets and project site shall be kept clean. The streets shall be cleaned at the end of each working day and more frequently, if required. The applicant shall take measures to prevent rock, vegetation, or dirt materials from the lot from entering into surrounding streets or from becoming unruly on project site. 8. Should additional work, materials, or modifications of the work be required in order to meet City standards, safety requirements, signage requirements, or to fit actual field conditions, the work shall be performed by the Permittee as directed by and to the satisfaction of the City Engineer at no cost to the city of La Quinta. 9. Surrounding roadways and intersections shall remain readily accessible for passage of emergency response vehicles and private vehicles. There shall be no queuing of vehicles along all surrounding roads for the purposes of entering the lot. Roadways to activities in and around the lot shall be maintained accessible to emergency vehicles at all times. 10. Per the attached site plan, a protective barrier constructed of bollards and rope shall be established around the perimeter of the lot. The barrier shall meet the following conditions of approval: a. The bollards shall be cylindrical, constructed of stone or concrete and painted white. Bollards located adjacent to driveway locations shall include a reflective hazard striping. b. Bollards shall extend above the surface no less than 3’ in height. c. Materials chosen for barrier and rope shall be matching in style and color, with the exception of bollard(s) located within or immediately adjacent to permitted driveways. d. Bollards shall be spaced up to 10 feet apart from each other. Bollards or rope shall not encroach into public right of way. e. Driveways may either utilize a removable bollard or may be secured with a locked rope. Ropes installed across driveways 78-495 Calle Tampico La Quinta, CA 92253 760.777.7000 shall utilize an appropriate reflective hazard tag painted orange, yellow, or white in color. f. No bollard or rope shall extend beyond the property line or into sight visibility triangles. g. In the event that an adjoining property utilizes a permanent wall, fence, or other such restrictive feature along an adjacent property line, protective barrier may be excluded from such portions of a vacant lot. The southern property line of the project site currently has a fence and no barrier is required along this property line. In the event that the southern property line fence was to be removed, the applicant shall be required to install protective barrier along this southern property line. h. Property owner(s) are responsible for the maintenance and appearance of the protective barriers and bollards. 11. The use of the lot is subject to spot inspections by the Police Department and/or City Staff to ensure compliance with the conditions of this letter. 12. Any damage to public hardscape caused by this event shall be repaired as directed by the City Engineer. This includes but is not limited to sidewalks, curb and gutter, landscaping, and pavement especially within the surrounding public streets. 13. The City of La Quinta reserves the right to revoke, suspend, or void this permit at any time. 14. The permittee shall indemnify, hold harmless and assume the defense of the City from all damages, delay costs, costs or expenses in law or equity that may arise out of work under this permit. 15. The City may elect to add conditions to this application request to mitigate any problems that may arise and are not addressed herein. Should you have questions regarding the content of this letter, please contact the undersigned at 760-777-7069 or via e-mail at cflores@laquintaca.gov. Sincerely, Carlos Flores Associate Planner